Design method and simulation structure of double-water-taking-pump rear pre-sedimentation tank

By adopting gate components, settlement components and sand removal components in the pre-sealing tank, the problems of too fast water inlet speed, low settlement efficiency and difficulty in dredging in the traditional pre-sealing tank design are solved, and more efficient water treatment is achieved and maintenance.

CN119425177AActive Publication Date: 2025-02-14CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +2
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411456249.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2025-02-14
Estimated Expiration
2044-10-18

AI Technical Summary

Technical Problem

The traditional pre-sealing tank design has a single water inlet method that causes the water inlet speed to be too fast and the water flow dynamics are unstable, which affects the sedimentation effect; it depends on the natural sedimentation process to be low, especially when large-flow water treatment; after long-term operation, a large amount of sedimentation accumulates at the bottom of the pond. The traditional silt method is time-consuming and labor-intensive and may damage the structure of the pool.

Method used

The design of a pre-sealing tank after the double water intake pump is adopted, and the water inlet is diverted and partitioned through the gate assembly, the sedimentation component is used to accelerate the sedimentation, and the sand removal component is used to automatically silt.

Benefits of technology

It effectively solves the problems of too fast water inlet speed and low settlement efficiency in traditional designs, ensures the continuity and stability of water treatment, improves the sedimentation efficiency and dredging efficiency, and reduces maintenance costs and risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119425177A_ABST
    Figure CN119425177A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of water treatment engineering, in particular to a double-water-taking-pump post-pre-sedimentation tank design method and a simulation structure. The double-water-taking-pump post-pre-sedimentation tank design method comprises a sedimentation tank body, two pre-sedimentation tanks are arranged on the upper surface of the sedimentation tank body, a partition wall is arranged between the two pre-sedimentation tanks, and the outer surface of the sedimentation tank body is sleeved with a guide pipe; two water taking valve chambers are formed in the upper surface of the sedimentation tank main body, a gate assembly is arranged on the upper surface of the partition wall, one side needing to be maintained or cleaned can be isolated through the gate assembly by closing a gate body between the pre-sedimentation tanks, and meanwhile, the other side continues to operate normally; the water supply continuity and the system stability are ensured, sediment particles are accelerated to settle towards the bottom of the pond through the settling assembly under the action of centrifugal force and gravity, the settling path is shortened, the settling time is shortened, the sediment particles enter the sediment collecting mechanism through the sediment removing assembly to be collected in a centralized mode, regular cleaning is facilitated, and it is ensured that the sediment particles are rapidly discharged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of water treatment engineering, and in particular to a design method and simulation structure of a pre-sedimentation tank after a double water intake pump. Background Art

[0002] With the acceleration of industrialization and urbanization, the effective use and treatment of water resources have become particularly important. In the process of water resource treatment, the pre-sedimentation tank is a vital component. Its main function is to remove suspended solids and other particulate matter in the water, thereby reducing the pressure of the subsequent treatment stage. The design and operation of the pre-sedimentation tank directly affects the efficiency and treatment quality of the entire water treatment system.

[0003] The existing technology still has the following problems:

[0004] 1. Traditional pre-sedimentation tank designs usually use a single water inlet, that is, all water flows into the sedimentation tank through a common water inlet. This design is simple, but it often cannot effectively cope with large flow rates or large fluctuations in water quality. Under high flow conditions, a single water inlet may cause the water inlet speed to be too fast, the water flow is dynamically unstable, and the sedimentation effect is affected. In addition, when the input water quality deteriorates or contains higher concentrations of suspended solids, it is difficult for a single system to adjust quickly to maintain treatment efficiency.

[0005] 2. Traditional pre-sedimentation tanks rely on the natural sedimentation process to remove suspended solids from the water. This process is usually inefficient, especially when treating large flows of water. The speed of natural sedimentation is affected by many factors, including water temperature, particle size, and particle density, which slows down the sedimentation process, prolonging the entire water treatment cycle and limiting treatment capacity.

[0006] 3. During the long-term operation of the pre-sedimentation tank, a large amount of sediment will accumulate at the bottom of the tank. Traditional dredging methods usually rely on manual or mechanical excavation, which is not only time-consuming and labor-intensive, but also often leads to interruptions in the water intake process. In addition, frequent mechanical intervention may cause damage to the tank structure, increasing maintenance costs and risks. Summary of the invention

[0007] In order to overcome the problem that traditional pre-sedimentation tanks are usually designed with a single water inlet method, that is, all water flows into the sedimentation tank through a common water inlet. Traditional pre-sedimentation tanks rely on the natural sedimentation process to remove suspended matter in the water. This process is usually inefficient, and a large amount of sediment will accumulate at the bottom of the pre-sedimentation tank during long-term operation. Traditional dredging methods usually rely on manual or mechanical excavation, which is not only time-consuming and labor-intensive, but also often leads to interruptions in the water intake process. The purpose of the present invention is to provide a design method and simulation structure of a pre-sedimentation tank after a double water intake pump to solve the above-mentioned shortcomings.

[0008] The present application provides a double water-intake pump rear pre-sedimentation tank simulation structure, including a sedimentation tank body, a pre-sedimentation tank is provided on the upper surface of the sedimentation tank body, a water pump and a drain pipe are arranged in the inner cavity of the pre-sedimentation tank, there are two pre-sedimentation tanks, a partition wall is arranged between the pre-sedimentation tanks, a conduit is sleeved on the outer surface of the sedimentation tank body, a water-intake valve chamber is provided on the upper surface of the sedimentation tank body, there are two water-intake valve chambers, a gate assembly is arranged on the upper surface of the partition wall, a sedimentation assembly is arranged on the inner wall of the pre-sedimentation tank, and there is only one sedimentation assembly, a sand removal assembly is arranged at the bottom end of the pre-sedimentation tank, and the gate assembly includes a support frame, the support frame It is fixedly connected to the upper surface of the partition wall, a winch is provided at the top of the support frame, a correction mechanism is provided on the bottom wall of the top of the support frame, a traction rope is wound around the outer surface of the winch, the traction rope passes through the support frame and the correction mechanism, and the traction rope is located in the middle part of the support frame, the bottom end of the traction rope is fixedly connected to the adjustment mechanism, both ends of the adjustment mechanism are provided with lifting ropes, the bottom end of the lifting rope is sleeved with lifting ears, and a gate body is fixedly installed on the lower surface of the lifting ear, there are two lifting ears, the gate body and the partition wall are slidably connected, a connecting groove is opened at the bottom end of the partition wall, and the gate body covers the connecting groove when the gate body and the bottom end of the partition wall are flush.

[0009] Furthermore, the correction mechanism includes a fixed ring, which is fixedly connected to the bottom wall of the top end of the support frame, the inner cavity of the fixed ring is slidably connected to the first sliding rod, one end of the first sliding rod is fixedly connected to the first correction ring, the outer surface of the first sliding rod is sleeved with a first spring, the first spring is located between the fixed ring and the first correction ring, the inner cavity of the first correction ring is slidably connected to the second sliding ring, one end of the second sliding ring is fixedly installed with the second correction ring, the outer surface of the second sliding ring is sleeved with a second spring, the second spring is located between the first correction ring and the second correction ring, and the traction rope passes through the second correction ring.

[0010] Furthermore, the adjustment mechanism includes an adjustment frame, the inner cavity of the adjustment frame is rotatably connected to a first threaded rod, both ends of the first threaded rod are sleeved with sliders, the slider and the first threaded rod are connected by threads, and the threads at both ends of the first threaded rod are in opposite directions, the traction rope is fixedly connected to the middle part of the adjustment frame, the slider is fixedly connected to the lifting rope, and the end of the lifting rope away from the slider is fixedly sleeved with the lifting ear.

[0011] Furthermore, the sedimentation assembly includes a sedimentation cylinder, the inner cavity of the sedimentation cylinder is rotatably connected to a spiral blade, a first motor is arranged on the upper surface of the sedimentation cylinder, the output end of the first motor is sleeved with the spiral blade, there is a gap between the bottom end of the sedimentation cylinder and the bottom of the pre-sedimentation tank, and the sedimentation cylinder is connected to the water intake valve chamber.

[0012] Furthermore, the sand removal component includes a second threaded rod, which is rotatably connected to the inner wall of the sedimentation tank body, and the outer surface of the second threaded rod is connected to a push plate by a thread, and the push plate is slidably connected to the inner wall of the pre-sedimentation tank. A second motor is provided on the outer surface of the sedimentation tank body, and the output end of the second motor is socketed with the second threaded rod. A sand collecting mechanism is socketed in the inner cavity of the sedimentation tank body, and the upper surface of the sand collecting mechanism is flush with the bottom of the pre-sedimentation tank, and there are two sand collecting mechanisms on each pre-sedimentation tank, and the bottom end of the push plate is in close contact with the bottom of the pre-sedimentation tank.

[0013] Furthermore, the sand collecting mechanism includes a dust box, the inner cavity of the dust box is fixedly equipped with a guide plate, the guide plates are symmetrically distributed about the middle part of the dust box, and the guide plates are inclined downward along the middle part of the dust box, the inner cavity of the dust box is slidably connected with a collecting block, the middle part of the collecting block is provided with a sand collecting trough, one end of the collecting block is fixedly equipped with a handle, the collecting block and the sedimentation tank body are slidably connected, and the sand collecting trough is located between the two guide plates when the handle and the dust box are in affixed.

[0014] A design method for a pre-sedimentation tank after a double water intake pump is implemented by the above simulation structure, comprising the following steps:

[0015] S1. Two pre-sedimentation tanks and two water intake valve chambers are set on the main body of the sedimentation tank. Water is taken in by a conduit, and the conduit is connected through a diverter. A diverter can be set on a single water intake pipeline to distribute the water flow equally or in a predetermined proportion to two independent water inlet pipelines. Each pipeline is connected to an independent pre-sedimentation tank of the pre-sedimentation tank. Each pre-sedimentation tank is equipped with independent inlet and outlet control valves, which can be opened or closed as needed;

[0016] S2. Use gate components to connect and isolate the two pre-sedimentation tanks. When performing maintenance, the valve of the pipeline entering the pre-sedimentation tank under maintenance can be closed, while the other tank body continues its normal treatment activities. This not only ensures the uninterrupted water treatment activities, but also reduces the impact of maintenance on the operation of the entire system;

[0017] S3. Use sedimentation components to settle surface water. The surface water intake has a high sediment content. Accelerating sediment settling is a key step to improve sedimentation efficiency. A spiral device is installed above the surface water pre-sedimentation tank. The spiral blades are arranged in the vertical direction to cover the appropriate area of ​​the pre-sedimentation tank.

[0018] S4. Use sand removal components for automatic silt removal, collect the silt at the bottom of the pre-sedimentation tank, and clean it regularly.

[0019] The technical solution provided by this application has at least the following technical effects or advantages:

[0020] 1. The use of gate components effectively solves the problem that the traditional pre-sedimentation tank design usually adopts a single water inlet method, that is, all water flows into the sedimentation tank through a common water inlet. This design is simple, but it often cannot effectively deal with large flow or large fluctuations in water quality. The present invention can isolate the side that needs maintenance or cleaning by closing the gate body between the pre-sedimentation tanks through the gate component, while the other side continues to operate normally, ensuring the continuity of water supply and the stability of the system. When the surface water intake system needs to be overhauled, the groundwater intake system can still continue to supply water; and when one side of the pre-sedimentation tank needs to be cleaned or maintained, the other side can operate independently, avoiding the risk of the entire system shutting down due to a single equipment failure.

[0021] 2. The use of sedimentation components effectively solves the problem that traditional pre-sedimentation tanks rely on natural sedimentation processes to remove suspended matter in water. This process is usually inefficient, especially when treating large flows of water. The speed of natural sedimentation is affected by many factors, including water temperature, particle size, and particle density, which slows down the sedimentation process, thereby extending the entire water treatment cycle and limiting the treatment capacity. The present invention uses sedimentation components to accelerate the sedimentation of silt particles to the bottom of the pool under the action of centrifugal force and gravity, shortening the sedimentation path and time.

[0022] 3. The use of sand removal components effectively solves the problem of a large amount of sediment accumulating at the bottom of the pre-sedimentation tank during long-term operation. Traditional dredging methods usually rely on manual or mechanical excavation, which is not only time-consuming and labor-intensive, but also often leads to interruptions in the water intake process. In addition, frequent mechanical intervention may damage the tank structure, increase maintenance costs and risks. The present invention uses sand removal components to allow silt particles to enter the sand collection mechanism for centralized collection, which is convenient for regular cleaning, ensuring that silt particles are quickly discharged and avoiding re-suspension, effectively improving silt removal efficiency and reducing manual maintenance requirements, while maintaining water quality and reducing maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 This is a schematic diagram of the overall structure of Example 1 of the present application;

[0024] Figure 2 This is a schematic diagram of the structure of the pre-sedimentation tank 2 in Example 1 of the present application;

[0025] Figure 3 This is a schematic cross-sectional view of the partition wall structure in Example 1 of the present application;

[0026] Figure 4 This is a schematic diagram of the gate assembly structure in Example 1 of the present application;

[0027] Figure 5 This is a schematic diagram of the correction mechanism structure in Example 1 of the present application;

[0028] Figure 6 This is a schematic diagram of the structure of the adjustment mechanism in Example 1 of the present application;

[0029] Figure 7 This is a schematic cross-sectional view of the settling tube structure in Example 1 of the present application;

[0030] Figure 8 This is a schematic diagram of the structure of the sand removal component in the second embodiment of the present application;

[0031] Fig. 9 This is a schematic cross-sectional view of the dust box structure in the second embodiment of the present application.

[0032] In the figure: 1, sedimentation tank body; 2, pre-sedimentation tank; 3, partition wall; 4, conduit; 5, water intake valve chamber; 6, gate assembly; 61, support frame; 62, winch; 63, correction mechanism; 631, fixing ring; 632, first slide bar; 633, first correction ring; 634, first spring; 635, second slide ring; 636, second correction ring; 637, second spring; 64, traction rope; 65, adjustment mechanism; 651 , adjusting frame; 652, first threaded rod; 653, slider; 66, lifting rope; 67, lifting ear; 68, gate body; 7, sedimentation assembly; 71, sedimentation cylinder; 72, spiral blade; 73, first motor; 8, sand removal assembly; 81, second threaded rod; 82, push plate; 83, second motor; 84, sand collecting mechanism; 841, dust collecting box; 842, guide plate; 843, collecting block; 844, sand collecting trough; 845, handle. DETAILED DESCRIPTION

[0033] Traditional pre-sedimentation tanks are usually designed with a single water inlet method. The present invention can isolate the side that needs maintenance or cleaning by closing the gate body between the pre-sedimentation tanks through the gate assembly, while the other side continues to operate normally, ensuring the continuity of water supply and the stability of the system; traditional pre-sedimentation tanks rely on the natural sedimentation process to remove suspended matter in the water. The present invention accelerates the sedimentation of silt particles to the bottom of the tank under the action of centrifugal force and gravity through the sedimentation assembly, shortening the sedimentation path and time; during the long-term operation of the pre-sedimentation tank, a large amount of sediment will accumulate at the bottom of the tank. The present invention uses the sand removal assembly to allow the silt particles to enter the sand collecting mechanism for centralized collection, which is convenient for regular cleaning and ensures that the silt particles are quickly discharged.

[0034] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0035] Embodiment 1:

[0036] See also Figure 1 and Figure 2As shown, a simulation structure of a pre-sedimentation tank after a double water intake pump comprises a sedimentation tank body 1, a pre-sedimentation tank 2 is provided on the upper surface of the sedimentation tank body 1, a water pump and a drain pipe are provided in the inner cavity of the pre-sedimentation tank 2, wherein the water pipe is submerged in water and has a certain gap from the bottom, so as to discharge the precipitated water for the next process, there are two pre-sedimentation tanks 2, a partition wall 3 is provided between the pre-sedimentation tanks 2, a conduit 4 is sleeved on the outer surface of the sedimentation tank body 1, a water intake valve chamber 5 is provided on the upper surface of the sedimentation tank body 1, there are two water intake valve chambers 5, one of which is used to take surface water and the other is used to take groundwater, a gate assembly 6 is provided on the upper surface of the partition wall 3, a sedimentation assembly 7 is provided on the inner wall of the pre-sedimentation tank 2, and there is only one sedimentation assembly 7, and it is located In the pre-sedimentation tank 2 connected to the surface water intake valve chamber 5, a sand removal component 8 is arranged at the bottom of the pre-sedimentation tank 2, two pre-sedimentation tanks 2 and two intake valve chambers 5 are opened on the sedimentation tank body 1, a conduit 4 is used to take water, and the conduit 4 is connected through a diverter, a diverter can be set on a single water intake pipe to distribute the water flow equally or according to a predetermined proportion to two independent water inlet pipes, each pipe is connected to an independent pre-sedimentation tank 2 of the pre-sedimentation tank 2, each pre-sedimentation tank 2 is equipped with independent inlet and outlet control valves, which can be opened or closed as needed, a gate component 6 is used to connect and isolate the two pre-sedimentation tanks 2, a sedimentation component 7 is used to settle the surface water, and a sand removal component 8 is used for automatic dredging.

[0037] See also Figure 3 and Figure 4As shown, the gate assembly 6 includes a support frame 61, which is fixedly connected to the upper surface of the partition wall 3. A winch 62 is provided at the top of the support frame 61, and a correction mechanism 63 is provided at the bottom wall of the top of the support frame 61. The correction mechanism 63 is used to prevent the traction rope 64 from shaking when the traction rope 64 is raised or lowered. The outer surface of the winch 62 is wrapped with a traction rope 64, which passes through the support frame 61 and the correction mechanism 63, and the traction rope 64 is located in the middle part of the support frame 61. The bottom end of the traction rope 64 is fixedly connected to the adjustment mechanism 65, and the two ends of the adjustment mechanism 65 are provided with a hanging rope 66. The bottom end of the hanging rope 66 is sleeved with a lifting ear 67, and a gate body 68 is fixedly installed on the lower surface of the lifting ear 67. There are two lifting ears 67. The gate body 68 is slidably connected to the partition wall 3, and the bottom end of the partition wall 3 is provided with a connecting rod. When the gate body 68 and the bottom end of the partition wall 3 are flush, the gate body 68 covers the connecting groove. When the two pre-sedimentation tanks 2 need to be connected, the gate body 68 needs to be lifted in the inner cavity of the partition wall 3. At this time, the winch 62 drives the traction rope 64 to be rolled up, and the rolling of the traction rope 64 drives the adjustment mechanism 65 to be lifted, and the adjustment mechanism 65 drives the suspension rope 66 to move upward, and the suspension rope 66 drives the lifting lug 67 to move upward, so that the lifting lug 67 drives the gate body 68 to move in the inner cavity of the partition wall 3, so that the two pre-sedimentation tanks 2 are connected, so that when one of the pre-sedimentation tanks 2 needs to be repaired or maintained, the gate body 68 between the pre-sedimentation tanks 2 can be closed to isolate the side that needs to be repaired or cleaned, while the other side continues to operate normally, ensuring the continuity of water supply and the stability of the system. For example, when the surface water intake system needs to be overhauled, the groundwater intake system can still continue to supply water; and when one side of the pre-sedimentation tank 2 needs to be cleaned or maintained, the other side can operate independently. This design ensures that the system can maintain stable water treatment capabilities under different working conditions, avoiding the risk of the entire system shutting down due to a single device failure.

[0038] See also Figure 4 and Figure 5As shown, the correction mechanism 63 includes a fixed ring 631, the fixed ring 631 is fixedly connected to the top and bottom walls of the support frame 61, the inner cavity of the fixed ring 631 is slidably connected to the first sliding rod 632, one end of the first sliding rod 632 is fixedly connected to the first correction ring 633, the outer surface of the first sliding rod 632 is sleeved with a first spring 634, the first spring 634 is located between the fixed ring 631 and the first correction ring 633, the inner cavity of the first correction ring 633 is slidably connected to the second sliding ring 635, one end of the second sliding ring 635 is fixedly installed with a second correction ring 636, the outer surface of the second sliding ring 635 is sleeved with a second spring 637, the second spring 637 is located between the first correction ring 633 and the second correction ring 636. 6, the traction rope 64 passes through the second correction ring 636, and when the traction rope 64 shakes during lifting and lowering, the second correction ring 636 moves, and the second correction ring 636 moves to compress the second spring 637 or the first spring 634. Since the fixing ring 631 is fixed, the first correction ring 633 and the second correction ring 636 are restored to their original positions under the elastic force of the first spring 634 and the second spring 637, so that the second correction ring 636 always remains in the original position. Therefore, when the traction rope 64 shakes, the second correction ring 636 has the effect of correcting the traction rope 64, which is convenient for maintaining stability when the gate body 68 goes up and down, preventing the gate body 68 from colliding with the partition wall 3, and improving the service life of the equipment.

[0039] See also Figure 4 and Figure 6 As shown, the adjustment mechanism 65 includes an adjustment frame 651, the inner cavity of the adjustment frame 651 is rotatably connected with a first threaded rod 652, and sliders 653 are sleeved at both ends of the first threaded rod 652. The slider 653 and the first threaded rod 652 are threadedly connected, and the threads at both ends of the first threaded rod 652 are in opposite directions. The traction rope 64 is fixedly connected to the middle part of the adjustment frame 651, the slider 653 is fixedly connected to the suspension rope 66, and one end of the suspension rope 66 away from the slider 653 is fixedly sleeved with the lifting ear 67. The slider 653 is driven to move on the adjustment frame 651 by rotating the first threaded rod 652 to change the spacing of the sliders 653, so that the spacing of the suspension ropes 66 and the spacing of the lifting ears 67 remain equal, so that the gate body 68 is evenly stressed during lifting and lowering, thereby increasing the stability of the gate body 68.

[0040] See also Figure 2 and Figure 7As shown, the sedimentation assembly 7 includes a sedimentation cylinder 71, the inner cavity of the sedimentation cylinder 71 is rotatably connected to a spiral blade 72, the upper surface of the sedimentation cylinder 71 is provided with a first motor 73, the output end of the first motor 73 is sleeved with the spiral blade 72, there is a gap between the bottom end of the sedimentation cylinder 71 and the bottom of the pre-sedimentation tank 2, the middle part of the sedimentation cylinder 71 is connected to the water intake valve chamber 5, and the silt particles are directly at the lowest end. When water enters the sedimentation cylinder 71, the operation of the first motor 73 drives the spiral blade 72 to rotate so that the silt particles attached to the water quickly settle to the bottom of the pre-sedimentation tank 2, that is, the water flow entering the pre-sedimentation tank 2 forms a vortex, and the silt particles are accelerated to settle to the bottom of the tank under the action of centrifugal force, thereby shortening the sedimentation path and time.

[0041] Embodiment 2:

[0042] See also Figure 1 and Figure 8 As shown, the sand removal assembly 8 includes a second threaded rod 81, which is rotatably connected to the inner wall of the sedimentation tank body 1, and the outer surface of the second threaded rod 81 is connected to a push plate 82 by a thread, and the push plate 82 is slidably connected to the inner wall of the pre-sedimentation tank 2. The outer surface of the sedimentation tank body 1 is provided with a second motor 83, and the output end of the second motor 83 is sleeved with the second threaded rod 81. The inner cavity of the sedimentation tank body 1 is sleeved with a sand collecting mechanism 84, and the upper surface of the sand collecting mechanism 84 is flush with the bottom of the pre-sedimentation tank 2, and each pre-sedimentation tank 2 There are two sand collecting mechanisms 84 on the top, the bottom end of the push plate 82 is in close contact with the bottom of the pre-sedimentation tank 2, and the push plate 82 is driven to move back and forth on the second threaded rod 81 under the operation of the second motor 83. The movement of the push plate 82 drives the push plate 82 to push the silt particles at the bottom of the pre-sedimentation tank 2, so that the silt particles enter the sand collecting mechanism 84 for centralized collection, which is convenient for regular cleaning. After the silt particles are scraped to the sand collecting mechanism 84 at the edge of the pool, they naturally flow to the middle of the sand collecting mechanism 84 by gravity, ensuring rapid discharge and avoiding re-suspension. This application effectively improves the efficiency of silt removal, reduces the need for manual maintenance, maintains water quality, and reduces maintenance costs.

[0043] See also Figure 8 and Fig. 9As shown, the sand collecting mechanism 84 includes a dust collecting box 841, the inner cavity of the dust collecting box 841 is fixedly installed with a guide plate 842, the guide plates 842 are symmetrically distributed about the middle part of the dust collecting box 841, and the guide plates 842 are inclined downward along the middle part of the dust collecting box 841, the inner cavity of the dust collecting box 841 is slidably connected with a collecting block 843, the middle part of the collecting block 843 is provided with a sand collecting groove 844, one end of the collecting block 843 is fixedly installed with a handle 845, the collecting block 843 is slidably connected to the sedimentation tank body 1, and the handle 845 and the dust collecting block are slidably connected. When the box 841 is fitted, the sand collecting trough 844 is located between the two guide plates 842. When the mud and sand particles are pushed to the dust collecting box 841, the guide plates 842 are used to guide the mud and sand particles to enter the inner cavity of the sand collecting trough 844. By regularly pulling the handle 845, the collecting block 843 is driven to slide in the inner cavity of the dust collecting box 841 to expose the sand collecting trough 844. At this time, the mud and sand particles can be discharged. At the same time, the collecting block 843 body has a shielding effect between the guide plates 842 to prevent excess mud and sand particles at the bottom of the pre-sedimentation tank 2 from leaking between the guide plates 842.

[0044] In summary, two pre-sedimentation tanks 2 and two water intake valve chambers 5 are provided on the sedimentation tank body 1, and water is taken in by a conduit 4, which is connected by a diverter. A diverter can be set on a single water intake pipeline to distribute the water flow equally or in a predetermined proportion to two independent water inlet pipes, each of which is connected to an independent pre-sedimentation tank 2 of the pre-sedimentation tank 2. Each pre-sedimentation tank 2 is equipped with independent inlet and outlet control valves, which can be opened or closed as needed; a gate assembly 6 is used to connect and isolate the two pre-sedimentation tanks 2. When maintenance is carried out, the pipeline valve entering the pre-sedimentation tank 2 under maintenance can be closed, while the other tank body continues its normal processing. Activities, which not only ensure the uninterrupted water treatment activities, but also reduce the impact of maintenance on the operation of the entire system; the sedimentation component 7 is used to settle the surface water. The surface water intake has a high sediment content. Accelerating sedimentation is a key step to improve sedimentation efficiency. A spiral device is installed above the surface water pre-sedimentation tank 2. The spiral blades 72 are arranged in the vertical direction to cover the appropriate area of ​​the pre-sedimentation tank 2; the sand removal component 8 is used for automatic dredging, and the silt is collected and cleaned at the bottom of the pre-sedimentation tank 2 regularly. By improving the water inlet method, strengthening the sedimentation process and optimizing the dredging mechanism, the shortcomings of traditional pre-sedimentation tanks in large flow treatment, water quality fluctuations and dredging maintenance are solved.

[0045] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

[0046] What has been described above are only preferred specific implementation methods of the embodiments of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes based on the technical solution and concept of the present application within the technical scope disclosed in the present application, which should be covered by the protection scope of the present application.

Claims

1. A simulated structure of a pre-sedimentation tank after a double water intake pump, comprising a sedimentation tank body (1), characterized in that: A pre-sedimentation tank (2) is provided on the upper surface of the sedimentation tank body (1), a water pump and a drainage pipe are provided in the inner cavity of the pre-sedimentation tank (2), there are two pre-sedimentation tanks (2), a partition wall (3) is provided between the pre-sedimentation tanks (2), a conduit (4) is sleeved on the outer surface of the sedimentation tank body (1), a water intake valve chamber (5) is provided on the upper surface of the sedimentation tank body (1), there are two water intake valve chambers (5), a gate assembly (6) is provided on the upper surface of the partition wall (3), a sedimentation assembly (7) is provided on the inner wall of the pre-sedimentation tank (2), and there is only one sedimentation assembly (7), and a sand removal assembly (8) is provided at the bottom end of the pre-sedimentation tank (2); The gate assembly (6) comprises a support frame (61), the support frame (61) is fixedly connected to the upper surface of the partition wall (3), a winch (62) is arranged at the top of the support frame (61), a correction mechanism (63) is arranged at the bottom wall of the top of the support frame (61), a traction rope (64) is wound around the outer surface of the winch (62), the traction rope (64) passes through the support frame (61) and the correction mechanism (63), and the traction rope (64) is located in the middle part of the support frame (61), and the traction rope The bottom end of (64) is fixedly connected to an adjusting mechanism (65), and both ends of the adjusting mechanism (65) are provided with hanging ropes (66), and the bottom end of the hanging rope (66) is sleeved with a hanging ear (67), and a gate body (68) is fixedly installed on the lower surface of the hanging ear (67). There are two hanging ears (67), and the gate body (68) and the partition wall (3) are slidably connected. A connecting groove is opened at the bottom end of the partition wall (3), and when the gate body (68) and the bottom end of the partition wall (3) are flush, the gate body (68) covers the connecting groove.

2. A simulation structure of a pre-sedimentation tank after a double water intake pump as claimed in claim 1, characterized in that: The correction mechanism (63) comprises a fixing ring (631), wherein the fixing ring (631) is fixedly connected to the top and bottom walls of the support frame (61); the inner cavity of the fixing ring (631) is slidably connected to a first sliding rod (632); one end of the first sliding rod (632) is fixedly connected to a first correction ring (633); the outer surface of the first sliding rod (632) is sleeved with a first spring (634); the first spring (634) is located between the fixing ring (631) and the first correction ring (633); the inner cavity of the first correction ring (633) is slidably connected to a second sliding ring (635); one end of the second sliding ring (635) is fixedly installed with a second correction ring (636); the outer surface of the second sliding ring (635) is sleeved with a second spring (637); the second spring (637) is located between the first correction ring (633) and the second correction ring (636); the traction rope (64) passes through the second correction ring (636).

3. A simulation structure of a pre-sedimentation tank after a double water intake pump as claimed in claim 1, characterized in that: The adjustment mechanism (65) comprises an adjustment frame (651), the inner cavity of the adjustment frame (651) is rotatably connected to a first threaded rod (652), both ends of the first threaded rod (652) are sleeved with sliders (653), the slider (653) and the first threaded rod (652) are connected by threads, and the threads at both ends of the first threaded rod (652) are in opposite directions, the traction rope (64) and the middle part of the adjustment frame (651) are fixedly connected, the slider (653) and the suspension rope (66) are fixedly connected, and one end of the suspension rope (66) away from the slider (653) is fixedly sleeved with the lifting ear (67).

4. A simulation structure of a pre-sedimentation tank after a double water intake pump as claimed in claim 1, characterized in that: The sedimentation assembly (7) comprises a sedimentation cylinder (71), the inner cavity of the sedimentation cylinder (71) is rotatably connected to a spiral blade (72), a first motor (73) is arranged on the upper surface of the sedimentation cylinder (71), an output end of the first motor (73) is sleeved with the spiral blade (72), a gap is formed between the bottom end of the sedimentation cylinder (71) and the bottom of the pre-sedimentation tank (2), and the sedimentation cylinder (71) is connected to the water intake valve chamber (5).

5. The simulation structure of the pre-sedimentation tank after the double water intake pump according to claim 1 is characterized in that: The sand removal component (8) comprises a second threaded rod (81), the second threaded rod (81) is rotatably connected to the inner wall of the sedimentation tank body (1), the outer surface of the second threaded rod (81) is threadedly connected to a push plate (82), the push plate (82) is slidably connected to the inner wall of the pre-sedimentation tank (2), the outer surface of the sedimentation tank body (1) is provided with a second motor (83), the output end of the second motor (83) is sleeved with the second threaded rod (81), the inner cavity of the sedimentation tank body (1) is sleeved with a sand collecting mechanism (84), the upper surface of the sand collecting mechanism (84) is flush with the bottom of the pre-sedimentation tank (2), and each pre-sedimentation tank (2) is provided with two sand collecting mechanisms (84), and the bottom end of the push plate (82) is in close contact with the bottom of the pre-sedimentation tank (2).

6. A simulation structure of a pre-sedimentation tank after a double water intake pump as claimed in claim 5, characterized in that: The sand collecting mechanism (84) comprises a dust collecting box (841), the inner cavity of the dust collecting box (841) is fixedly provided with a guide plate (842), the guide plates (842) are symmetrically distributed about the middle part of the dust collecting box (841), and the guide plates (842) are inclined downward along the middle part of the dust collecting box (841), the inner cavity of the dust collecting box (841) is slidably connected with a collecting block (843), the middle part of the collecting block (843) is provided with a sand collecting groove (844), one end of the collecting block (843) is fixedly provided with a handle (845), the collecting block (843) is slidably connected with the sedimentation tank body (1), and when the handle (845) and the dust collecting box (841) are in contact, the sand collecting groove (844) is located between the two guide plates (842).

7. A design method for a pre-sedimentation tank after a double water intake pump, which is implemented by a simulation structure of a pre-sedimentation tank after a double water intake pump according to any one of claims 1 to 6, characterized in that: The following steps are involved: S1. Two pre-sedimentation tanks (2) and two water intake valve chambers (5) are provided on the sedimentation tank body (1). Water is taken in through a conduit (4), and the conduit (4) is connected through a diverter. A diverter can be set on a single water intake pipeline to distribute the water flow equally or in a predetermined proportion to two independent water inlet pipelines. Each pipeline is connected to an independent pre-sedimentation tank (2) of the pre-sedimentation tank 2. Each pre-sedimentation tank (2) is equipped with independent inlet and outlet control valves, which can be opened or closed as needed. S2. A gate assembly (6) is used to connect and isolate the two pre-sedimentation tanks (2). When maintenance is performed, the valve of the pipeline entering the pre-sedimentation tank (2) under maintenance can be closed, while the other tank body continues its normal treatment activities. This not only ensures that the water treatment activities are not interrupted, but also reduces the impact of maintenance on the operation of the entire system; S3, using a sedimentation assembly (7) to sediment the surface water. The surface water intake has a high sediment content. Accelerating sediment sedimentation is a key step to improve sedimentation efficiency. A spiral device is installed above the surface water pre-sedimentation tank 2. The spiral blades are arranged in the vertical direction to cover an appropriate area of ​​the pre-sedimentation tank 2. S4. Automatically remove silt using a sand removal assembly (8), collect the silt at the bottom of the pre-sedimentation tank 2, and clean it regularly.

Citation Information

Patent Citations

  • Dedusting desulfuration circular circulation sedimentation basin

    CN102847348A

  • Composite regulation and storage pre-sedimentation tank

    CN203790633U

  • Water and soil conservation desilting basin

    CN214680220U

  • Improved secondary sedimentation basins of biological sewage and waste water treatment plant.

    KR1020080105445A

  • Sedimentation tank capable of automatically adjusting liquid level and flow

    US20180290079A1