Building slag collecting method in exterior facade updating process
By using electric hoists and slag delivery hoppers and other devices during the facade renewal process, the slag collection and transportation problems are solved, safe and efficient slag construction transportation is achieved, and the walls and operating personnel are protected.
Patent Information
- Application Number
- CN202411676771.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-02-14
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The prior art is difficult to collect and transport the slag generated safely and efficiently during the facade renewal process, affecting operational efficiency and safety.
The slag collection device including electric hoist, slag construction feeding hopper, construction hanging basket and slag collection bag is adopted. Through the traction of the electric hoist and the design of the hoist, the safe and efficient collection and transportation of slag construction is achieved.
It realizes safe and efficient transportation of slag, avoids damage to the wall structure, and provides protection for operators, making the device easy to install and disassemble and run conveniently.
Smart Images

Figure CN119434600A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of vertical transportation of construction waste, and in particular relates to a method for collecting construction waste during a facade renewal process. Background Art
[0002] The facade demolition operation is the most important step in the early stage of the facade renovation project. It is not only related to the overall quality of the facade renovation, but also affects the surrounding environment of the building and normal social life if the construction waste generated during the demolition process is not collected and transported in time.
[0003] The construction slag generated by the demolition of the facade is often piled on the construction platform and transported to the ground from the construction platform. This method affects the work efficiency and is not safe. The string-type transport device used in the new technology is not only inconvenient to install and fix for the renovation of the facade of high-rise buildings, but also causes safety problems due to the large drop.
[0004] Therefore, a safe and efficient construction waste collection method is needed to solve the problem of construction waste transportation generated during the facade demolition process. Summary of the invention
[0005] The purpose of this application is to overcome the problems of the prior art and disclose a method for collecting construction waste in the process of facade renewal. The method of this application solves the problem of collecting and transporting construction waste in the process of building facade renewal through a construction waste collection device. The device is easy to manufacture and install, does not affect the normal operation of facade demolition, and is safe, efficient, green and environmentally friendly.
[0006] The purpose of this application is achieved through the following technical solutions:
[0007] A method for collecting construction slag in a facade renewal process, the method for collecting construction slag is implemented based on a construction slag collection device, the construction slag collection device comprises: an electric hoist, a construction slag feeding hopper, a construction hanging basket and a construction slag collection bag;
[0008] The electric hoist is fixedly arranged on the outer wall of the building, and the construction slag collection bag is hung and fixed by a hook of the electric hoist;
[0009] The slag feeding hopper is arranged between the construction hanging basket and the building outer wall, and is fixedly connected to the construction hanging basket via the feeding hopper frame;
[0010] The top of the slag feeding hopper is also provided with a plurality of baffle plates close to the building outer wall;
[0011] The construction slag collection bag is arranged at the bottom side of the construction slag feeding hopper and is used for collecting construction slag;
[0012] The construction slag collection method comprises: when performing the facade demolition operation, the construction slag generated by the demolition enters the construction slag feeding hopper along the material blocking plate, and the construction slag then slides along the inner wall of the feeding hopper to the lower opening and enters the construction slag collection bag;
[0013] When the slag collection bag collects a predetermined amount of slag, the electric hoist is started to move the wire rope traction hook toward the ground, and finally the slag collection bag is transported to the ground, and then the slag in the slag collection bag is emptied;
[0014] Then use the electric hoist to pull the hook upwards, and put the slag collection bag into the lower mouth of the slag feeding hopper to start the next round of collection work.
[0015] According to a preferred embodiment, the baffle plate is hingedly connected to the slag feeding hopper, and when the material receiving operation is carried out, the baffle plate is unfolded and placed against the outer wall of the building.
[0016] According to a preferred embodiment, a baffle plate gasket is further provided at the edge where the baffle plate abuts against the building exterior wall, and the baffle plate gasket is made of flexible material.
[0017] According to a preferred embodiment, a rubber expansion belt is provided between each baffle plate on the slag feeding hopper to complete the connection between the baffle plates.
[0018] According to a preferred embodiment, a pull rope hole is provided on a material baffle plate in the slag feeding hopper for passing the pull rope of the electric hoist.
[0019] According to a preferred embodiment, the feeding hopper frame comprises: an upper horizontal frame, an inclined support, and a lower horizontal frame.
[0020] The upper transverse frame and the lower transverse frame are rectangular frame structures, and the cross-sectional area of the upper transverse frame is larger than the cross-sectional area of the lower transverse frame;
[0021] Each vertex of the upper horizontal frame and the lower horizontal frame is connected to each other through an oblique support;
[0022] The upper and lower transverse frames are fixedly connected to the construction hanging basket on both sides through rectangular tubes.
[0023] According to a preferred embodiment, a limit plate is further installed between two adjacent inclined supports of the feeding hopper frame, and the limit plate is located on the side of the feeding hopper frame away from the construction hanging basket to limit the lifting position of the hook.
[0024] According to a preferred embodiment, the electric hoist is fixed to the outer wall of the building via expansion bolts;
[0025] The expansion bolt comprises: a screw rod, a push nut, a sleeve, a lower wedge block and an upper wedge block;
[0026] A push nut is provided in the middle of the screw rod, the sleeve is sleeved on the screw rod, and the sleeve is fixedly connected to the push nut;
[0027] The lower wedge block is arranged on the other side of the sleeve and is in contact with the top of the sleeve. A groove is arranged on the lower wedge block, and the screw is arranged in the groove body of the lower wedge block.
[0028] The outer side of the sleeve is also sleeved with a spring, and the two ends of the spring are respectively connected to the lower wedge block and the push nut;
[0029] An upper wedge block is arranged on the other side of the lower wedge block, the wedge-shaped inclined surfaces of the upper wedge block and the lower wedge block are matched, and the upper wedge block is fixedly connected to the screw rod.
[0030] According to a preferred embodiment, when the expansion bolt is fixed, the upper wedge block and the lower wedge block are located in the hole of the wall, and the push nut is configured to be screwed in the direction of the upper wedge block;
[0031] When the expansion bolt is removed, the push nut is configured to be screwed in a direction away from the upper wedge block.
[0032] According to a preferred embodiment, a locking nut is further provided in the middle of the screw rod, and when the expansion bolt is fixed, the locking nut contacts and connects with the push nut; and a corrugated convex ridge structure is provided on the outside of the lower wedge block and the upper wedge block.
[0033] The aforementioned main scheme of the present application and its further options can be freely combined to form multiple schemes, all of which are schemes that can be adopted and claimed for protection in the present application. After understanding the scheme of the present application, those skilled in the art can understand that there are multiple combinations based on the prior art and common knowledge, all of which are technical schemes to be protected by the present application, and they are not exhaustively listed here.
[0034] Beneficial effects of this application:
[0035] The method of the application integrates the collection and transportation of construction slag through the corresponding device, and can safely and efficiently realize the transportation operation of construction slag; the device does not cause damage to the wall structure layer when in use, and can provide certain protection for the operators. The device is easy to install and disassemble, and easy to operate. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a structural schematic diagram of the construction slag collection device in this application;
[0037] Figure 2 It is a schematic diagram of the construction slag transportation process in this application;
[0038] Figure 3 It is a schematic diagram of the feeding hopper frame structure in this application;
[0039] Figure 4 It is a schematic diagram of the connection relationship between the feeding hopper frame and the construction hanging basket in this application;
[0040] Figure 5 It is a schematic diagram of the slag feeding hopper structure in this application;
[0041] Figure 6 It is a schematic diagram of the structure of the expansion bolt in this application;
[0042] Among them, 1-expansion bolt, 2-electric hoist, 3-material baffle, 4-slag feeding hopper, 5-feeding hopper frame, 501-upper horizontal frame, 502-inclined support, 503-lower horizontal frame, 6-building exterior wall, 7-hook, 8-construction hanging basket, 9-slag collecting bag, 10-limiting plate, 12-rubber expansion belt, 13-pull rope hole. DETAILED DESCRIPTION
[0043] The following describes the embodiments of the present application through specific examples, and those skilled in the art can easily understand other advantages and effects of the present application from the contents disclosed in this specification. The present application can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present application. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.
[0044] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0045] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the application is usually placed when in use. They are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0046] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0047] In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0048] In addition, the present application would like to point out that, in the present application, unless the specific structure, connection relationship, positional relationship, power source relationship, etc. are specifically written out, the structure, connection relationship, positional relationship, power source relationship, etc. involved in the present application are all known by those skilled in the art on the basis of the prior art without creative work.
[0049] Embodiment 1:
[0050] refer to Figure 1 As shown, the figure shows a method for collecting construction waste in the process of facade renewal. The method of this application is implemented based on a construction waste collection device.
[0051] The construction slag collecting device mainly comprises an expansion bolt 1, an electric hoist 2, a material blocking plate 3, a construction slag feeding hopper 4, a feeding hopper frame 5, a hook 7 and a construction slag collecting bag 9.
[0052] The device is attached to the building outer wall 6 and the construction hanging basket 8, wherein the expansion bolt 1 is fixed in the structural layer of the building outer wall 6, the expansion bolt 1 is hung with an electric hoist 2, a hook 7 is pulled by a wire rope under the electric hoist 2, and a slag collection bag 9 is hung on the hook 7. The slag feeding hopper 4 is close to the wall, a baffle plate 3 is installed on the top, the feeding hopper is placed in the feeding hopper frame 5, and the feeding hopper frame 5 is connected to the construction hanging basket 8.
[0053] refer to Figure 2 As shown, when the facade demolition operation is being carried out, the construction slag generated by the demolition flows along the baffle plate 3 into the construction slag feeding hopper 4, and then the construction slag slides along the inner wall of the feeding hopper to the lower opening and enters the construction slag collecting bag 9. When the construction slag collecting bag collects a certain amount of construction slag, the electric hoist 2 is started to make the wire rope traction hook 7 move toward the ground, and finally the construction slag collecting bag 9 is transported to the ground, and then the construction slag in the construction slag collecting bag is emptied. Then the hook 7 is pulled upward by the electric hoist, and when the hook 7 rises to the limit plate 10, it stops rising. At this time, the construction slag collecting bag 9 is inserted into the lower opening of the construction slag feeding hopper 4, and the next round of collection work can be started.
[0054] Figure 3As shown, the hopper frame 5 includes an upper transverse frame 501, an oblique support 502, a limit plate 10 and a lower transverse frame 503. The upper transverse frame 501 and the lower transverse frame 503 are both rectangular frames spliced by rectangular tubes, and the cross-sectional area of the upper transverse frame is larger than the cross-sectional area of the lower transverse frame. The four corners of the upper transverse frame are respectively connected to the four corresponding corners of the lower transverse frame through oblique supports 502, and the four oblique supports are of equal length, so that the connecting line of the geometric center lines of the upper and lower transverse frames is located on the same plumb line. A limit plate 10 is also installed between two adjacent oblique supports on the front of the hopper frame to keep a preset distance between the hopper frame 5 and the building exterior wall 6. The limit plate 10 is placed horizontally, and the limit plate 10 is provided with a flexible cushion layer on the edge facing the building exterior wall 6 to avoid damaging the building exterior wall.
[0055] The horizontal position relationship between the feeding hopper frame 5 and the construction hanging basket 8 is as follows: Figure 4 As shown, both sides of the upper horizontal frame 501 and the lower horizontal frame 503 are fixed on the construction hanging basket through rectangular tubes, and the limiting plate 10 is located on the side of the feeding hopper frame away from the construction hanging basket.
[0056] The structure of the slag feeding hopper 4 is as follows: Figure 5 As shown, the slag hopper is a prism-shaped structure as a whole, with openings on the upper and lower sides, the upper opening being larger and the lower opening being smaller. A plurality of baffle plates 3 are also installed on a long side of the top of the device, and the baffle plates 3 are connected to the hopper through a loose-leaf structure, so that the baffle plates 3 can rotate with the long side of the hopper as the axis. Baffle plate gaskets 11 are also installed on the side of the baffle plate 3, and the baffle plate gaskets 11 are in flexible contact with the facade when the device is working normally. Rubber expansion belts 12 are also connected between adjacent baffle plates. When adjacent baffle plates are not located on the same plane, the rubber expansion belts can be stretched so that there is no gap between the two baffle plates. A long strip rope hole 13 is opened at the center of the baffle plate located in the middle, and the wire rope pulled down by the electric hoist 2 passes through the hole.
[0057] refer to Figure 6 As shown, the expansion bolt includes: a screw rod 102 , a push nut 104 , a sleeve 106 , a lower wedge block 107 and an upper wedge block 108 .
[0058] A push nut 104 is provided in the middle of the screw rod 102, and the sleeve 106 is sleeved on the screw rod 102, and the sleeve 106 is fixedly connected to the push nut 104; the lower wedge block 107 is provided on the other side of the sleeve 106, and is in contact with the sleeve 106, and the lower wedge block 107 is provided with a groove, and the screw rod 102 is arranged in the groove body of the lower wedge block 107; a spring 105 is also sleeved on the outer side of the sleeve 106, and the two ends of the spring 105 are respectively connected to the lower wedge block 107 and the push nut 104; an upper wedge block 108 is provided on the other side of the lower wedge block 107, and the wedge-shaped inclined surfaces of the upper wedge block 108 and the lower wedge block 107 are matched, and the upper wedge block 108 is fixedly connected to the screw rod 102.
[0059] Preferably, when the expansion bolt is fixed, the upper wedge block 108 and the lower wedge block 107 are located in the wall hole 109, and the push nut 104 is configured to be screwed in the direction of the upper wedge block 108. When the expansion bolt is removed, the push nut 104 is configured to be screwed away from the upper wedge block 108.
[0060] Preferably, a locking nut 103 is further provided in the middle of the screw rod 102 , and when the expansion bolt is fixed, the locking nut 103 and the push nut 104 are in contact with each other.
[0061] Preferably, the screw rod 102 is further provided with a nut 101 , which is located on a side of the locking nut 103 away from the push nut 104 .
[0062] Preferably, the outer surfaces of the lower wedge block 107 and the upper wedge block 108 are provided with corrugated ridge structures, and the connection tightness between the expansion bolt and the wall is improved by providing the ridge structures.
[0063] Preferably, the upper wedge block 108 is connected to the screw rod 102 by integral molding or welding. Preferably, two ends of the spring 105 are respectively connected to the lower wedge block 107 and the push nut 104 by welding.
[0064] The working principle of this detachable expansion bolt:
[0065] (1) When the expansion bolt is in the initial state, the lower wedge block 107 and the upper wedge block 108 are in a separated state, and the spring 105 is in a natural state.
[0066] (2) After the bolt penetrates into the hole in the wall, the push nut 104 is rotated inward, and the push nut 104 pushes the sleeve 106 so that it has a tendency to move deeper into the hole. After the push nut 104 contacts the wall, the screw rod 102 moves outward, so that the lower wedge block 107 and the upper wedge block 108 at the end of the screw rod move toward each other. After the lower wedge block 107 and the upper wedge block 108 begin to contact, the lower wedge block 107 begins to move outward along the radial direction of the screw rod 102 due to the action of the wedge surface. After the lower wedge block 107 contacts the hole wall, the push nut 104 is screwed in 3-5 mm. At this time, the lower wedge block 107 and the upper wedge block 108 have a tightening effect on the hole wall, and then the locking nut 103 is screwed to a position close to the push nut 104, completing the fixing of the bolt to the wall.
[0067] (3) When the exterior work is completed and the bolts need to be removed, the locking nut 103 is first screwed outward for a distance, and then the push nut 104 is screwed outward. At this time, the sleeve 106 moves outward of the hole under the drive of the push nut 104 and separates from the lower wedge block 107. The spring 105 is in a stretched state and starts to pull the lower wedge block 107 outward of the hole. The push nut 104 is screwed outward continuously to separate the lower wedge block from the hole wall, and then the bolt is removed from the hole in the wall as a whole, completing the removal of the bolt.
[0068] When installing the construction slag collection device of the present application, first drill a hole on the outer wall, fix the expansion bolt 1 in the hole of the outer wall, and hang the electric hoist 2 on the screw 102 on the expansion bolt 1. At the same time, first install the baffle plate 3 on the top of the construction slag hopper 4 on the ground, and install the limit plate 10 on the hopper frame 5, and then install the hopper frame 5 on the front of the construction hanging basket 8, and then lift the construction hanging basket 8 and the hopper frame 5 as a whole to the height of the outer wall working surface. Then hang the construction slag hopper 4 into the hopper frame 5, and then pass the pull rope under the electric hoist 2 through the pull rope hole 13 and the limit plate 10 on the baffle plate 3, and install the hook 7 at the bottom of the pull rope, and then hang the construction slag collection bag 9 on the hook 7.
[0069] When disassembling the device, first remove the slag collection bag 9 and the hook 7 in sequence, pull out the pull rope from the limit plate 10 and the pull rope hole 13, and then remove the electric hoist 2. Then pull out the slag feeding hopper 4 from the feeding hopper frame 5 and hang it on the ground, and then lower the construction hanging basket 8 and the feeding hopper frame 5 as a whole to the ground. Finally, take out the expansion bolt 1 from the hole in the outer wall to complete the disassembly of the device.
[0070] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A method for collecting construction waste in the process of facade renewal, characterized in that: The construction slag collection method is implemented based on a construction slag collection device. The construction slag collection device comprises: an electric hoist (2), a construction slag feeding hopper (4), a construction hanging basket (8) and a construction slag collection bag (9); The electric hoist (2) is fixedly mounted on the building outer wall (6), and the construction slag collection bag (9) is hung and fixed via a hook (7) of the electric hoist (2); The slag feeding hopper (4) is arranged between the construction hanging basket (8) and the building outer wall (6), and is fixedly connected to the construction hanging basket (8) via the feeding hopper frame (5); A plurality of material blocking plates (3) are also provided on the top of the slag feeding hopper (4) close to the building outer wall (6); The construction slag collection bag (9) is arranged at the bottom side of the construction slag feeding hopper (4) and is used for collecting construction slag; The construction slag collection method comprises: when performing exterior facade demolition operations, the construction slag generated by the demolition flows along a baffle plate (3) into a construction slag feeding hopper (4), and the construction slag then slides along the inner wall of the feeding hopper to the lower opening and enters a construction slag collection bag (9); When the slag collecting bag (9) collects a predetermined amount of slag, the electric hoist (2) is started to move the wire rope traction hook (7) toward the ground, and finally the slag collecting bag (9) is transported to the ground, and then the slag in the slag collecting bag (9) is emptied; Then, the hook (7) is pulled upward by the electric hoist (2), and the slag collecting bag (9) is inserted into the lower opening of the slag feeding hopper (4), and the next round of collection work can be started.
2. The method for collecting construction slag according to claim 1, characterized in that: The material baffle plate (3) is hingedly connected to the slag feeding hopper (4); when receiving materials, the material baffle plate (3) is unfolded and placed against the building outer wall (6).
3. The construction slag collection method according to claim 2, characterized in that: A material baffle plate gasket (11) is also provided at the edge where the baffle plate (3) abuts against the building exterior wall (6); the material baffle plate gasket (11) is made of a flexible material.
4. The method for collecting construction slag according to claim 2, characterized in that: A rubber expansion belt (12) is provided between the material baffle plates (3) on the slag feeding hopper (4) to complete the connection between the material baffle plates (3).
5. The method for collecting construction slag according to claim 2, characterized in that: A pull rope hole (13) is provided on a material blocking plate (3) in the slag feeding hopper (4) for passing a pull rope of an electric hoist (2).
6. The construction slag collection method according to claim 2, characterized in that: The feeding hopper frame (5) comprises: an upper horizontal frame (501), an inclined support (502), and a lower horizontal frame (503). The upper transverse frame (501) and the lower transverse frame (503) are rectangular frame structures, and the cross-sectional area of the upper transverse frame (501) is greater than the cross-sectional area of the lower transverse frame (503); Each vertex of the upper horizontal frame (501) and the lower horizontal frame (503) is connected to each other via an inclined support (502); The two side edges of the upper transverse frame (501) and the lower transverse frame (503) are fixedly connected to the construction hanging basket (8) through rectangular tubes.
7. The construction slag collection method according to claim 6, characterized in that: A limit plate (10) is also installed between two adjacent inclined supports (502) of the feeding hopper frame (5). The limit plate (10) is located on the side of the feeding hopper frame (5) away from the construction hanging basket (8) to limit the lifting position of the hook (7).
8. The construction slag collection method according to claim 1, characterized in that: The electric hoist (2) is fixed to the building outer wall (6) via expansion bolts (1); The expansion bolt comprises: a screw rod (102), a push nut (104), a sleeve (106), a lower wedge block (107) and an upper wedge block (108); A push nut (104) is provided in the middle of the screw rod (102), the sleeve (106) is sleeved on the screw rod (102), and the sleeve (106) is fixedly connected to the push nut (104); The lower wedge block (107) is arranged on the other side of the sleeve (106) and is in contact with the sleeve (106). The lower wedge block (107) is provided with a groove, and the screw rod (102) is arranged in the groove body of the lower wedge block (107); A spring (105) is sleeved on the outer side of the sleeve (106), and two ends of the spring (105) are respectively connected to the lower wedge block (107) and the push nut (104); An upper wedge block (108) is disposed on the other side of the lower wedge block (107), the wedge-shaped inclined surfaces of the upper wedge block (108) and the lower wedge block (107) are matched, and the upper wedge block (108) is fixedly connected to the screw rod (102).
9. The method for collecting construction slag according to claim 8, characterized in that: When the expansion bolts are fixed, the upper wedge block (108) and the lower wedge block (107) are located in the wall hole (109), and the push nut (104) is configured to be screwed in the direction of the upper wedge block (108); When the expansion bolt is removed, the push nut (104) is configured to be screwed in a direction away from the upper wedge block (108).
10. The construction slag collection method according to claim 8, characterized in that: A locking nut (103) is also provided in the middle of the screw rod (102). When the expansion bolt is fixed, the locking nut (103) contacts and connects with the push nut (104). The outer surfaces of the lower wedge block (107) and the upper wedge block (108) are provided with corrugated ridge structures.