Sintering engineering instrument high-stage design system and control method
By designing a high-stage design system for sintering engineering instruments, and using databases and algorithms to realize high-stage automatic design of instruments, the problems of low design efficiency and high error rate in the existing technology are solved, the design efficiency and accuracy are improved, and design errors are reduced rate and labor intensity.
Patent Information
- Application Number
- CN202411579830.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-07
- Publication Date
- 2025-02-14
AI Technical Summary
In the prior art, sintering engineering instruments have low design efficiency and high error rate at high stages, and lack of automated design software and standardized design processes, resulting in low standardization, low design productivity and high design error rate.
A high-stage design system for sintering engineering instruments was designed, including the basic database of sintering instrument budget, sintering instrument price database and system configuration interface. Through the combination of expert experience and relevant standards and sintering processes, data is automatically queried and analyzed, and the algorithm is automatically generated. The instrument high-stage equipment table and budget estimates realize fully automated design.
It realizes automatic design of the instrument at a high stage, improves design efficiency and accuracy, reduces design error rate and labor intensity, and improves design productivity and standardization.
Smart Images

Figure CN119442378A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of sintering engineering instruments, and in particular relates to a high-stage design system and a control method for sintering engineering instruments. Background Art
[0002] In traditional engineering design, the high stage of sintering engineering automation instrumentation requires the preparation of budget tables through EXCEL, which is inefficient, has a high error rate, a large workload, and there is no specially customized efficient design software.
[0003] In the prior art, no automatic design software has been developed to automatically complete the technology and algorithms of automated design using computer programs, thereby greatly improving design efficiency, reducing error rates, and achieving drawing standardization.
[0004] In the existing technology, there is no combination of expert experience with relevant standards and sintering processes to achieve automatic design of high-level instruments with minimal system input to the greatest extent possible, nor is there a method or system designed to standardize the design process, improve design productivity, and reduce the design error rate.
[0005] Defects and shortcomings of existing technology (manual labor):
[0006] (1) Low efficiency.
[0007] (2) High error rate.
[0008] (3) Low degree of standardization.
[0009] (4) Heavy workload. Summary of the invention
[0010] In order to solve the above-mentioned problems, the present invention proposes: a high-stage design system for sintering engineering instruments, including a sintering instrument budget basic database, a sintering instrument price database, and a system configuration interface three modules and a main control center. The sintering instrument budget basic database, the sintering instrument price database, and the system configuration interface three modules are connected to the main control center. The engineering personnel set and input the sintering instrument high-stage design options through the system configuration interface. The system automatically queries and matches the sintering instrument budget basic database and the sintering instrument price database based on the input content by analyzing the expert experience and relevant standards and the pelletizing process, and automatically generates the sintering instrument high-stage equipment table and budget through the algorithm to complete the fully automated high-stage design.
[0011] Furthermore, the basic database of sintering instrument budget is designed and constructed, and the workshops involved include: raw material yard, fuel crushing, batching room, primary mixing room, secondary mixing room, sintering room, flue gas circulation, ring cooler, main electrostatic precipitator and main exhaust fan, finished product system, dust removal system, water pump station, energy metering, and air compressor station;
[0012] According to expert experience, relevant standards, and sintering process, the information of various instruments in the above workshops is constructed, including "name", "unit", "quantity", "unit price", "total price", and "installation fee", forming Table 1, where:
[0013] 1) All kinds of instruments and equipment are listed in full according to engineering experience;
[0014] 2) Instrument quantity: pre-set as a constant value based on engineering experience and stored in the database. When the engineer makes a specific input in the "system configuration interface", the input value is taken;
[0015] 3) Equipment unit price: call the "sintering instrument price database" to read the unit prices of different grades of equipment;
[0016] 4) Total equipment price: Total equipment price = quantity x unit price;
[0017] 5) Installation fee: Set the coefficient based on the "System Configuration Interface" and take the equipment installation fee.
[0018] Furthermore, a sintering instrument price database is designed and constructed, involving all types of sintering engineering instruments, forming Table 2. The instrument prices are divided into grades and estimated. The number of grades is greater than or equal to 3, and a database is established for easy reference.
[0019] Further, in the overall configuration interface, using a drop-down menu or fill-in-the-blank method, the engineer configures the following parameters to form Table 3:
[0020] The investment / equipment level option is used to search the price quantity library and allocate prices according to the selected level in the later stage;
[0021] The installation fee ratio option is used to make an estimate of the installation construction fee based on the filled ratio in the later stage. Installation fee = equipment price * ratio;
[0022] The Isolation Distributor Location option is used to select whether to include signal isolation equipment;
[0023] The trade measurement option is used to select whether to select a trade measurement scale in the raw material input workshop;
[0024] The temperature transmitter option is used to select whether to use a temperature transmitter;
[0025] The Isolation Distribution Backup Ratio option is used to configure the backup ratio.
[0026] Furthermore, the configuration interface of each sintering workshop is constructed to form Table 4. The workshops involved include: raw material yard, fuel crushing, batching room, primary mixing chamber, secondary mixing chamber, combustion chamber, flue gas circulation, ring cooler, main electrostatic precipitator and main exhaust fan, finished product system, dust removal system, water pump station, energy metering, and air compressor station; according to the expert engineering design experience, specifications, and process content, the instrument detection distribution of each workshop of the sintering plant is configured in the interface to meet the specific design needs of different projects.
[0027] A control method according to the above-mentioned sintering engineering instrumentation high-stage design system comprises the following steps:
[0028] S1. Read the input content of the engineering staff;
[0029] S2. According to the number of "workshops" entered in Table 4, find out which workshops the sintering plant includes:
[0030] 0 means there is no workshop with this name
[0031] 1~n: Enter an integer to indicate how many workshops of the same name there are in the project.
[0032] S3. Retrieve "Table 1" "Basic Database of Estimated Cost of Sintering Instruments" and preliminarily configure the contents and quantity of instruments in each workshop;
[0033] S4. According to the workshop instrument information entered in "Table 4", modify the content and quantity of instruments in each workshop:
[0034] Correct the number of instruments in the workshop
[0035] Calculate the number of "isolators", "distributors" and "temperature transmitters"
[0036] Calculate the number of "instrument panel box" and "DC power supply"
[0037] S5. According to the instrument grade and special options entered in "Table 3", solve the price of each instrument:
[0038] Price according to grade
[0039] The installation fee is allocated according to the installation fee ratio
[0040] Correction of settlement instruments such as belt scales in batching and raw material workshops according to trade measurement
[0041] S6. Generate a final high-stage instrument equipment table;
[0042] S7. Generate the final high-stage instrument budget table.
[0043] Furthermore, the step S4 includes the following steps:
[0044] S41. Correct the number of instruments in the workshop
[0045] According to the situation of instruments in a workshop input in "Table 4", correct the number of instruments;
[0046] S42. Calculate the number of "isolators", "distributors" and "temperature transmitters"
[0047] For instruments that input and output 4-20mA DC signals:
[0048] Isolator quantity algorithm:
[0049] N1 = (number of four-wire instruments + number of actuators * 2) * (1 + standby ratio)
[0050] Distributor quantity algorithm:
[0051] N2 = number of two-wire instruments * (1 + standby ratio)
[0052] Temperature transmitter quantity calculation method:
[0053] N3 = (number of thermocouples + number of thermal resistors) * (1 + spare ratio)
[0054] S43. Calculate the number of "instrument panel box" and "DC power supply"
[0055] Number of “instrument panel boxes”: The number of instrument panel boxes is configured according to the number of instruments in the workshop, usually 1, and the sintering room and batching room are set to 2-3;
[0056] Number of “DC power supplies”: Number of DC power supplies = number of panels (with isolated distributors).
[0057] The beneficial effects of the present invention are as follows: the present invention combines expert experience with relevant standards and sintering processes to achieve automatic design of high-level instruments with minimal system input to the greatest extent, standardize design processes, improve design productivity, and reduce design error rates.
[0058] (1) Efficient.
[0059] (2) High accuracy.
[0060] (3) Drawing standardization.
[0061] (4) Reduce labor intensity.
[0062] (5) Designs are made based on expert experience to improve design quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] Figure 1 This is a flow chart of the high-stage design system of the sintering engineering instrumentation of the present invention. DETAILED DESCRIPTION
[0064] In order to make the technical means and objectives of the present invention easy to understand, the present invention is further described below in combination with specific implementation methods. A high-stage design system for sintering engineering instruments includes three modules: a basic database for sintering instrument budget estimates, a sintering instrument price database, and a system configuration interface, as well as a main control center. The three modules are connected to the main control center. The engineers set and input the high-stage design options of sintering instruments through the system configuration interface. The system automatically queries and matches the basic database for sintering instrument budget estimates and the sintering instrument price database based on the input content, by analyzing expert experience and relevant standards and pelletizing processes. The high-stage equipment table and budget estimates of sintering instruments are automatically generated through algorithms to complete the fully automated high-stage design. The purpose of this patent is to realize the automatic design of the high-stage of sintering plant instruments.
[0065] Architecture design:
[0066] Combining expert experience with relevant standards and sintering processes, we can achieve automatic design of the power supply system with minimal system input to the greatest extent possible, standardize the design process, improve design productivity, and reduce the design error rate.
[0067] The patented system structure is designed as follows:
[0068] Construct three modules: "Basic database for sintering instrument budget", "Sintering instrument price database" and "System configuration interface". The administrator has the authority to modify the database parameters.
[0069] Through the "system configuration interface", engineers can input high-stage design options for sintering instruments. Based on the input content, the system analyzes expert experience, relevant standards, and sintering processes, and automatically queries and matches the "sintering instrument budget basic database" and "sintering instrument price database". The system automatically generates a high-stage equipment table and budget for sintering instruments through algorithms to complete fully automated high-stage design.
[0070] Software environment:
[0071] In order to meet the needs of office and design to the greatest extent, this patent uses the VBA language environment of the conventional software EXCEL for degree development, without the need to install additional plug-ins, so as to adapt to user habits, and is compatible with WPS. The system input end is designed in the EXCEL table, which is very convenient for users to use.
[0072] The program is written in VBA language, involving VBA language such as cell judgment, writing, deleting, row and column operations, and table generation.
[0073] Hardware composition:
[0074] In order to best meet office and design needs, the hardware is adapted to conventional computer systems.
[0075] 1. Design of “Basic Database for Estimated Cost of Sintering Instruments”:
[0076] Design of "Basic Database for Sintering Instrument Budget Estimate" involves workshops including: raw material yard, fuel crushing, batching room, primary mixing room, secondary mixing room, sintering room, flue gas circulation, ring cooler, main electrostatic precipitator and main exhaust fan, finished product system, dust removal system, water pump station, energy metering, compressor station and other workshops.
[0077] According to expert experience, relevant standards, and sintering process, the information of various instruments in the above workshops is constructed, including "name", "unit", "quantity", "unit price", "total price", and "installation fee", among which:
[0078] 1) All kinds of instruments and equipment are listed in full according to engineering experience;
[0079] 2) Instrument quantity: pre-set as a constant value based on engineering experience and stored in the database. When the engineer makes a specific input in the "system configuration interface", the input value is taken;
[0080] 3) Equipment unit price: call the "sintering instrument price database" to read the unit prices of different grades of equipment;
[0081] 4) Total equipment price: Total equipment price = quantity x unit price;
[0082] 5) Installation fee: The equipment installation fee is calculated based on the coefficient set in the "System Configuration Interface";
[0083] Taking the "Sintering Room" of the main plant of the sintering project as an example, the "Sintering Instrument Budget Basic Database" information of the sintering room related instruments is listed below. The data of more than ten other workshops are similar in form but different in content (the content is compiled by engineers based on design experience), so they are not listed here.
[0084] Table 1
[0085]
[0086]
[0087] 2. Design of “Sintering Instrument Price Database”:
[0088] The design of "sintering instrument price database" involves all types of sintering engineering instruments, including: temperature, pressure, flow, level, various analysis systems, valves, signal equipment, etc. The database structure is constructed as follows:
[0089] Table 2
[0090]
[0091]
[0092] In the above table, the instrument prices are divided into grades (multiple grades, more than 3 grades) and the database is established for reference. Due to the wide variety of sintering engineering instruments, only some instruments are listed in the table, and the price structure of other instruments is the same.
[0093] 3. “System Configuration Interface” Design:
[0094] 1) Overall configuration interface:
[0095] In the overall configuration interface, engineers configure the following parameters using the drop-down menu or fill-in-the-blank method:
[0096] Table 3
[0097]
[0098]
[0099] In Table 3 above:
[0100] 1. The investment / equipment level option is used to find the price quantity library according to the selected level in the later stage, and the price is used
[0101] 2. The installation fee ratio option is used to make an estimate of the installation construction cost based on the filled ratio in the later stage. Installation fee = equipment price * ratio
[0102] 3. The isolation distributor location option is used to select whether to include signal isolation equipment
[0103] 4. The trade measurement option is used to select whether to select a trade measurement scale in the raw material input workshop
[0104] 5. The temperature transmitter option is used to select whether to use a temperature transmitter.
[0105] 6. The isolation distribution backup ratio option is used to configure the backup ratio
[0106] 2) Configuration interface of each sintering workshop:
[0107] Construct the "sintering workshop configuration interface", involving workshops including: raw material yard, fuel crushing, batching room, primary mixing chamber, secondary mixing chamber, burning chamber, flue gas circulation, ring cooler, main electrostatic precipitator and main exhaust fan, finished product system, dust removal system, water pump station, energy metering, compressor station and other workshops.
[0108] According to the expert engineering design experience, specifications and process content, the instrument detection distribution of each workshop in the sintering plant is configured in the interface to meet the specific design requirements of different projects.
[0109] Table 4
[0110]
[0111]
[0112] 4. Procedure steps: Figure 1 As shown;
[0113] 1) Read the input from the engineer
[0114] 2) According to the number of "workshops" entered in Table 4, find out which workshops the sintering plant includes:
[0115] 0 means there is no workshop with this name
[0116] 1~n: Enter an integer to indicate how many workshops of the same name there are in the project.
[0117] 3) Retrieve "Table 1" "Basic Database of Sintering Instrument Estimation" and preliminarily configure the content and quantity of instruments in each workshop
[0118] 4) According to the workshop instrument information entered in "Table 4", modify the content and quantity of instruments in each workshop
[0119] Correct the number of instruments in the workshop
[0120] Calculate the number of "isolators", "distributors" and "temperature transmitters"
[0121] Calculate the number of "instrument panel box" and "DC power supply"
[0122] 5) According to the instrument grade and special options entered in "Table 3", solve the price of each instrument according to the grade and price
[0123] The installation fee is allocated according to the installation fee ratio
[0124] Correction of settlement instruments such as belt scales in batching and raw material workshops according to trade measurement
[0125] 6) Generate the final high-level instrument equipment table
[0126] 7) Generate the final high-level instrument budget table
[0127] 5 Algorithm Design
[0128] In the above procedure step 4), the algorithms involved are:
[0129] 1) Correct the number of instruments in the workshop
[0130] According to the situation of the instruments in a workshop entered in "Table 4", the number of instruments is corrected. For example, if the instrument engineer enters 18 in the "Number of Ore Slots" of the "Batching Room", the number of radar level meters in the instrument equipment table is forced to be set to 8.
[0131] 2) Calculate the number of "isolators", "distributors" and "temperature transmitters"
[0132] For instruments that input and output 4-20mA DC signals:
[0133] Isolator quantity algorithm:
[0134] N1 = (number of four-wire instruments + number of actuators * 2) * (1 + standby ratio)
[0135] Distributor quantity algorithm:
[0136] N2 = number of two-wire instruments * (1 + standby ratio)
[0137] Temperature transmitter quantity calculation method:
[0138] N3 = (number of thermocouples + number of thermal resistors) * (1 + spare ratio)
[0139] 3) Calculate the number of "instrument panel box" and "DC power supply"
[0140] Number of “instrument panel boxes”: The number of instrument panel boxes is configured according to the number of instruments in the workshop, usually 1, and the sintering room and batching room are usually set to 2~3.
[0141] Number of “DC power supplies”: Number of DC power supplies = number of panels (with isolated distributors).
[0142] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A high-level design system for sintering engineering instruments, characterized in that: It includes three modules, namely, basic database for budget estimate of sintering instrument, price database for sintering instrument, and system configuration interface, as well as a main control center. These three modules are connected to the main control center. Engineers set and input high-stage design options for sintering instrument through the system configuration interface. The system automatically queries and matches basic database for budget estimate of sintering instrument and price database for sintering instrument according to the input content by analyzing expert experience, relevant standards and pelletizing process. It automatically generates high-stage equipment table and budget estimate of sintering instrument through algorithm to complete fully automated high-stage design.
2. The sintering engineering instrumentation high-level design system according to claim 1, characterized in that: Design and build the basic database of sintering instrument budget, involving workshops including: raw material yard, fuel crushing, batching room, primary mixing room, secondary mixing room, sintering room, flue gas circulation, ring cooler, main electrostatic precipitator and main exhaust fan, finished product system, dust removal system, water pump station, energy metering, and air compressor station; According to expert experience, relevant standards, and sintering process, the information of various instruments in the above workshops is constructed, including "name", "unit", "quantity", "unit price", "total price", and "installation fee", forming Table 1, where: 1) All kinds of instruments and equipment are listed in full based on engineering experience; 2) Instrument quantity: pre-set as a constant value based on engineering experience and stored in the database. When the engineer makes a specific input in the "system configuration interface", the input value is taken; 3) Equipment unit price: call the "sintering instrument price database" to read the unit prices of different grades of equipment; 4) Total equipment price: Total equipment price = quantity x unit price; 5) Installation fee: Set the coefficient based on the "System Configuration Interface" and take the equipment installation fee.
3. The sintering engineering instrumentation high-level design system according to claim 2, characterized in that: Design and construct a sintering instrument price database, involving all types of sintering engineering instruments, forming Table 2, and divide the instrument prices into grades for rough estimation. The number of grades is greater than or equal to 3, and a database is established for easy reference.
4. The sintering engineering instrumentation high-level design system according to claim 3, characterized in that: On the overall configuration interface, using the drop-down menu or fill-in-the-blank method, the engineer configures the following parameters to form Table 3: The investment / equipment level option is used to search the price quantity library and allocate prices according to the selected level in the later stage; The installation fee ratio option is used to make an estimate of the installation construction fee based on the filled ratio in the later stage. Installation fee = equipment price * ratio; The Isolation Distributor Location option is used to select whether to include signal isolation equipment; The trade measurement option is used to select whether to select a trade measurement scale in the raw material input workshop; The temperature transmitter option is used to select whether to use a temperature transmitter; The Isolation Distribution Backup Ratio option is used to configure the backup ratio.
5. The high-level design system for sintering engineering instruments as claimed in claim 4, characterized in that: Construct the configuration interface of each sintering workshop to form Table 4. The workshops involved include: raw material yard, fuel crushing, batching room, primary mixing chamber, secondary mixing chamber, combustion chamber, flue gas circulation, ring cooler, main electrostatic precipitator and main exhaust fan, finished product system, dust removal system, water pump station, energy metering, and air compressor station; according to the expert engineering design experience, specifications, and process content, the instrument detection distribution of each workshop of the sintering plant is configured in the interface to meet the specific design requirements of different projects.
6. A control method for a sintering engineering instrumentation high-stage design system according to claim 1, characterized in that: The steps include: S1. Read the input content of the engineering staff; S2. According to the number of "workshops" input in Table 4, find out which workshops the sintering plant includes: 0 means there is no workshop with this name 1~n: Enter an integer to indicate how many workshops of the same name there are in the project. S3. Retrieve "Table 1" "Basic Database of Estimated Cost of Sintering Instruments" and preliminarily configure the contents and quantity of instruments in each workshop; S4. According to the workshop instrument information entered in "Table 4", modify the content and quantity of instruments in each workshop: Correct the number of instruments in the workshop Calculate the number of "isolators", "distributors", and "temperature transmitters" Calculate the number of "instrument panel box" and "DC power supply" S5. According to the instrument grade and special options entered in "Table 3", solve the price of each instrument: Price according to grade The installation fee is allocated according to the installation fee ratio Correction of settlement instruments such as belt scales in batching and raw material workshops according to trade measurement S6. Generate a final high-stage instrument equipment table; S7. Generate the final high-stage instrument budget table.
7. The control method of the sintering engineering instrumentation high-stage design system according to claim 6, characterized in that: The step S4 includes the following steps: S41. Correct the number of instruments in the workshop According to the situation of instruments in a workshop input in "Table 4", correct the number of instruments; S42. Calculate the number of "isolators", "distributors", and "temperature transmitters" For instruments that input and output 4-20mA DC signals: Isolator quantity algorithm: N1 = (number of four-wire instruments + number of actuators * 2) * (1 + standby ratio) Distributor quantity algorithm: N2 = number of two-wire instruments * (1 + standby ratio) Temperature transmitter quantity calculation method: N3 = (number of thermocouples + number of thermal resistors) * (1 + spare ratio) S43. Calculate the number of "instrument panel box" and "DC power supply" Number of "instrument panel boxes": The number of instrument panel boxes is configured according to the number of instruments in the workshop, usually 1, and the sintering room and batching room are set to 2-3; Quantity of "DC power supplies": Quantity of DC power supplies = number of panels (with isolated distributors).