Thermal management system and method

By designing a thermal management system, using controllers and heat exchange medium recovery devices, the problems of energy waste and resource waste in traditional thermal management technology are solved, and efficient thermal management and energy utilization are achieved.

CN119459413APending Publication Date: 2025-02-18GUANGZHOU ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411608329.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-12
Publication Date
2025-02-18

AI Technical Summary

Technical Problem

Traditional thermal management technology relies on a large amount of energy input, increases energy consumption, noise pollution, resource waste, and lacks a mechanism for recycling and reuse of heat exchange media.

Method used

A thermal management system is designed, including a controller, a thermal management device and a heat exchange medium recovery device. By monitoring the ambient temperature and the thermal management device, the use and supplement of the heat exchange medium are regulated, and the recycling and reuse of the heat exchange medium is realized.

Benefits of technology

Reduces energy waste, reduces noise and space occupation, improves energy utilization efficiency, and extends the service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119459413A_ABST
    Figure CN119459413A_ABST
Patent Text Reader

Abstract

The invention provides a thermal management system and method, and relates to the technical field of thermal management. The heat management system comprises a controller, a heat management device and a heat exchange medium recovery device. The heat exchange medium recovery device is configured to recover a heat exchange medium; the recovered heat exchange medium is used for carrying out heat exchange treatment on the heat load equipment; the heat management device comprises a heat load device and a heat exchange device. The heat exchange equipment is configured to perform heat exchange treatment on heat generated by the heat load equipment by using a heat exchange medium; the controller is configured to monitor the ambient temperature and the thermal management device, obtain thermal monitoring data, and regulate the heat exchange medium based on the thermal monitoring data. Wherein the heat exchange medium is generated based on the use of the first service device; the heat is generated based on the use of the second service device. According to the heat management system provided by the invention, the heat exchange medium is recycled, so that the energy waste is reduced, and the energy utilization efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of thermal management technology, and in particular to a thermal management system and method. Background Art

[0002] With the rapid development of industrialization and informatization, energy demand continues to grow, and energy efficiency and environmental impact have become important indicators for measuring technological progress. In this context, the development and application of thermal management technology, as one of the key technologies to improve energy efficiency and reduce environmental impact, is particularly important. Thermal management technology is widely used in electronic equipment, industrial production, transportation and other fields. Its core goal is to control and adjust the temperature of equipment or systems through effective heat exchange methods to ensure its stable operation and extend its service life.

[0003] Traditional thermal management technologies often rely on large amounts of energy input, such as electrically driven fans, which not only increases overall energy consumption but also runs counter to the goal of energy conservation and emission reduction. Especially in urban environments, traditional heat dissipation devices such as fans can generate noise pollution while occupying valuable space resources. At the same time, traditional thermal management systems do not fully utilize recycled heat exchange media, resulting in a waste of resources. In addition, the system may lack an effective storage and replenishment mechanism, and cannot dynamically adjust the amount of heat exchange media according to actual needs. Summary of the invention

[0004] In view of this, the purpose of the embodiments of the present application is to provide a thermal management system to improve the recovery and reuse of heat exchange media existing in the prior art, so as to reduce energy waste, improve energy utilization efficiency, and reduce noise and space occupancy problems.

[0005] The thermal management system comprises: a controller, a thermal management device and a heat exchange medium recovery device; the heat exchange medium recovery device is configured to recover the heat exchange medium; the recovered heat exchange medium is used to perform heat exchange processing on the heat load device; wherein the heat exchange medium is generated based on the use of a first service device; the thermal management device comprises: a heat load device and a heat exchange device; the heat exchange device is configured to perform heat exchange processing on the heat generated by the heat load device using the heat exchange medium; wherein the heat is generated based on the use of a second service device; the controller is configured to monitor the ambient temperature and the thermal management device, obtain thermal monitoring data, and regulate the heat exchange medium based on the thermal detection data; wherein the heat exchange medium comprises: one or more of a first heat exchange medium, a second heat exchange medium and a third heat exchange medium.

[0006] In the above implementation process, the heat exchange medium recovery device generates heat exchange medium based on the use of the first service device; the thermal management device includes a heat load device and a heat exchange device, the heat load device generates heat based on the use of the second service device, and the heat exchange device uses the heat exchange medium to perform heat exchange processing on the heat load device. The controller monitors the ambient temperature and the thermal management device, obtains thermal monitoring data, and regulates the heat exchange medium based on the obtained thermal detection data. The heat exchange recovery device can recover the heat exchange medium, and the heat exchange medium recovered by the heat load device is used by the heat exchange device to perform heat exchange processing on the heat load device, and the heat generated by the heat load device is transferred to the heat exchange medium, so that the heat load device can dissipate heat in time, reducing the damage caused by overheating of the heat load device. In traditional thermal management solutions, fans are a common source of noise, and reducing the use of fans can reduce noise; in this application, the reliance on fans to dissipate heat is reduced, so that noise is reduced.

[0007] Optionally, the heat exchange device includes: a supplementing unit; the supplementing unit is used to supplement the heat exchange medium; the supplementing unit includes a valve; the valve is configured to adjust the corresponding opening based on the regulation of the controller.

[0008] In the above implementation process, there is a supplementary unit in the heat exchange equipment, which is used to supplement the heat exchange medium. During the heat exchange process, the amount of heat exchange medium may be reduced due to the transfer of heat and the flow of the medium. The valve contained in the supplementary unit is a key component for regulating the flow of the heat exchange medium. The opening of the valve can be adjusted according to the instructions of the controller to supplement these heat exchange media. When the heat load equipment generates more heat, the valve can be opened wider to increase the flow of the heat exchange medium and improve the heat exchange efficiency; conversely, when the heat is less, the valve can be closed to reduce the flow of the medium and save resources. While meeting the thermal management needs under different conditions, based on the opening of the valve, calling the medium to where it is needed can also reduce energy waste.

[0009] Optionally, the heat exchange device also includes: a first fluid storage unit; the first fluid storage unit is used to store the heat exchange medium; the first fluid storage unit is used to store the heat exchange medium; the first fluid storage unit includes: a first inlet and a second inlet; the first inlet is connected to the heat exchange medium recovery device, for receiving the recovered first heat exchange medium; the second inlet is connected to the replenishment unit.

[0010] In the above implementation process, the heat exchange device also has a first fluid storage unit for storing heat exchange medium. The first fluid storage unit has two inlets. The first inlet is directly connected to the heat exchange medium recovery device. Its main function is to receive the recovered and processed heat exchange medium. The recovered medium is transported to the first fluid storage unit and prepared for the subsequent heat exchange process, so that the heat exchange medium is recycled and the resource utilization efficiency is improved; the second inlet is connected to the supplementary unit for receiving supplementary heat exchange medium. When the amount of heat exchange medium in the system decreases or needs to be updated, the supplementary unit adds new medium to the storage unit through the second inlet to maintain the heat exchange efficiency of the system. Under different environmental conditions and heat load requirements, the first fluid storage unit can adjust the storage and supply of heat exchange medium to adapt to changes.

[0011] Optionally, the first fluid storage unit further includes: a first sensor and a second sensor;

[0012] The first sensor is configured to monitor the total amount of the heat exchange medium stored in the first fluid storage unit.

[0013] The second sensor is configured to monitor an overall temperature of the heat exchange medium stored inside the first fluid storage unit.

[0014] In the above implementation process, the first sensor is specially designed to monitor the liquid level of the heat exchange medium inside the first fluid storage unit and provide real-time storage information of the heat exchange medium; by monitoring the liquid level, the controller can determine whether the medium in the storage unit is at an appropriate level, and adjust the valve opening of the replenishment unit accordingly to replenish or reduce the heat exchange medium and maintain the operating state of the heat exchange system. The second sensor is responsible for monitoring the overall temperature of the heat exchange medium inside the first fluid storage unit and providing real-time data on the medium temperature to optimize the heat exchange efficiency. In addition, temperature monitoring can also help prevent overheating and protect the heat exchange system from damage.

[0015] Optionally, a heat dissipation unit is provided inside the first fluid storage unit; the heat dissipation unit is connected to the heat load device via a flow channel; wherein the flow channel is used for the circulation of the heat exchange medium; the heat exchange medium performs heat exchange processing with the heat load device; the heat dissipation unit is configured to perform heat exchange processing between the heat generated by the heat load device and the heat exchange medium in the first fluid storage unit.

[0016] In the above implementation process, the heat dissipation unit is the core component of heat transfer between the heat exchange medium and the heat load device. The heat dissipation unit is connected to the heat load device through the flow channel, so that the heat exchange medium can absorb the heat generated by the device during the flow process. Through the heat dissipation unit, the heat in the heat load device is effectively transferred to the heat exchange medium, thereby reducing the temperature of the device, preventing overheating, protecting the normal operation of the device and extending its service life.

[0017] Optionally, the heat exchange device further comprises: a second fluid storage unit;

[0018] The second fluid storage unit is used to store heat exchange medium; the second fluid storage unit is connected to the heat dissipation unit through a flow channel; the second fluid storage unit, the heat dissipation unit and the heat load device form a loop.

[0019] In the above implementation process, the second fluid storage unit, the heat dissipation unit and the heat load device together form a closed loop, and the heat exchange medium circulates in this loop to achieve continuous transfer and exchange of heat. The main function of the second fluid storage unit is to store the heat exchange medium and provide a heat exchange medium reserve for the heat exchange system to cope with different heat load requirements and operating conditions.

[0020] The embodiment of the present application also provides a thermal management method, which is applied to a thermal management system including a controller, a thermal management device and a heat exchange medium recovery device; the thermal management device includes a supplementary unit, and the supplementary unit is configured with a valve; the method includes: monitoring the ambient temperature, determining the temperature level according to the temperature range based on the ambient temperature, and obtaining the adjustment coefficient K according to the temperature level; calculating the total heat exchange medium demand Q1 required by the heat load device based on the usage requirements of the second service device; calculating the total heat exchange medium generation Q2 generated by the heat exchange medium recovery device based on the usage of the first service device; calculating the total heat exchange medium supply Q3 of the supplementary unit based on the liquid level of the total heat exchange medium in the first fluid storage unit and the overall temperature of the heat exchange medium; the valve of the supplementary unit adjusts the valve opening P based on the total heat exchange medium demand Q1, the total heat exchange medium generation Q2 and the total heat exchange medium supply Q3.

[0021] In the above implementation process, first, the system monitors the current ambient temperature and determines the corresponding temperature level according to the preset temperature range. The temperature level affects the determination of the adjustment coefficient K, which in turn affects the adjustment of the heat exchange medium. Then, based on the use demand of the second service device, the total amount of heat exchange medium demand Q1 required by the heat load device is calculated; based on the use of the first service device, the total amount of heat exchange medium generated Q2 generated by the heat exchange medium recovery device is calculated; based on the liquid level of the total amount of heat exchange medium in the first fluid storage unit and the overall temperature of the heat exchange medium, the total amount of heat exchange medium provided Q3 of the supplementary unit is calculated; so that the supply of heat exchange medium matches the heat demand of the heat load device to achieve effective heat exchange and equipment cooling. The valve of the supplementary unit adjusts the valve opening P according to the total amount of heat exchange medium demand Q1, the total amount of generation Q2 and the total amount of supply Q3, so that the flow of the heat exchange medium is balanced with the heat demand and supply of the heat exchange system, and the thermal management efficiency is optimized.

[0022] Optionally, the calculating the total demand Q1 of the heat exchange medium required by the heat load device based on the usage demand of the second service device includes: based on monitoring the temperature of the heat load device, counting the usage power of the heat load device, the number of times the heat load device is used, and the time the heat load device is still required to be used, to calculate the total demand Q1 of the heat exchange medium required by the heat load device.

[0023] In the above implementation process, the controller monitors the temperature of the heat load equipment, counts the power used by the heat load equipment, the number of heat load equipment used, and the time that the heat load equipment needs to be used, and calculates the total amount of heat exchange medium required by the heat load equipment Q1. Temperature data is the basis for calculating the demand for heat exchange medium, reflecting the current thermal state and cooling requirements of the equipment; power used is a key factor affecting the heat generated by the heat load equipment, and power statistics help predict the heat output and cooling requirements of the heat load equipment; the number of heat load equipment directly affects the total heat load, and counting the number of uses helps calculate the total amount of heat exchange medium required; the estimated use time helps predict the heat load of the equipment during the remaining use period, thereby determining the demand for heat exchange medium.

[0024] Optionally, the total amount of heat exchange medium generated by the heat exchange medium recovery device Q2 is calculated based on the usage of the first service equipment, including: counting the average usage time of each of the heat exchange medium recovery devices, the amount of heat exchange medium generated by each of the heat exchange medium recovery devices, the usage time of the heat exchange medium recovery devices, and the number of uses of the heat exchange medium recovery devices, and calculating the total amount of heat exchange medium generated by the heat exchange medium recovery devices Q2.

[0025] In the above implementation process, the controller counts the average usage time of each heat exchange medium recovery device, the amount of heat exchange medium generated by each heat exchange medium recovery device, the usage time of the heat exchange medium recovery device, and the number of heat exchange medium recovery devices used, and calculates the total amount of heat exchange medium generated by the heat exchange medium recovery device Q2. The average usage time provides a typical cycle of operation of each heat exchange medium recovery device, which helps to predict the operation mode of the heat exchange medium recovery device and the frequency of heat exchange medium generation; the usage time helps to determine the current state and remaining operation time of the heat exchange medium recovery device, thereby predicting the amount of heat exchange medium generated; the number of heat exchange medium recovery devices directly affects the amount of heat exchange medium generated, and counting the usage number helps to calculate the heat exchange demand, so that the recovery and reuse of the heat exchange medium matches the thermal demand of the system, optimizing the utilization efficiency of resources.

[0026] Optionally, the valve of the supplementary unit adjusts the valve opening based on the total amount of heat exchange medium demand Q1, the total amount of heat exchange medium generated Q2, and the total amount of heat exchange medium provided Q3, including:

[0027] When the sum of the total amount of heat exchange medium generated Q2 and the total amount of heat exchange medium provided Q3 is greater than the total amount of heat exchange medium required Q1, the valve opening is 0;

[0028] When the sum of the total amount of heat exchange medium generated Q2 and the total amount of heat exchange medium provided Q3 is less than or equal to the total amount of heat exchange medium required Q1, the valve opening is calculated according to the following rule:

[0029]

[0030] In the above implementation process, the heat exchange system first compares the total amount of heat exchange medium generated Q2 with the total amount of heat exchange medium provided Q3 and the total amount of heat exchange medium demand Q1. When Q2+Q3>Q1, the valve opening is 0; in this case, the system already has enough heat exchange medium to meet the demand, so no additional replenishment is required, and the valve remains closed to avoid oversupply. When Q2+Q3≤Q1, the valve opening is calculated according to the formula P=K×(Q1-Q2-Q3). In this case, the heat exchange system needs additional heat exchange medium to meet the demand, and the valve opening is adjusted according to the difference between demand and supply, so that enough medium is replenished into the heat exchange system. This method improves the efficiency and response speed of heat exchange medium management, reduces energy waste, and improves the stability and reliability of the system.

[0031] An embodiment of the present application also provides an electronic device, which includes a memory and a processor, wherein the memory stores program instructions, and when the processor reads and runs the program instructions, it executes the steps of any one of the thermal management methods provided in this embodiment. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0033] Figure 1 A schematic diagram of a heat exchange system provided in an embodiment of the present application;

[0034] Figure 2 A simple schematic diagram of the connection relationship of the heat exchange system provided in the embodiment of the present application;

[0035] Figure 3 A schematic diagram of a heat exchange system provided in an embodiment of the present application;

[0036] Figure 4 Flow chart of the heat exchange method provided in the embodiment of the present application;

[0037] Figure 5 A schematic diagram of valve adjustment of a heat exchange method provided in an embodiment of the present application;

[0038] Figure 6 A schematic diagram of an electronic device provided in an embodiment of the present application.

[0039] Icons: 010-first service device; 020-second service device; 100-controller; 200-thermal management device; 210-heat load device; 220-heat exchange device; 221-first fluid storage unit; 222-second fluid storage unit; 223-heat dissipation unit; 224-supplement unit; 225-valve; 300-heat exchange medium recovery device; 400-electronic device; 410-memory; 420-storage controller; 430-processor; 440-peripheral interface; 450-input and output unit; 460-display unit. DETAILED DESCRIPTION

[0040] The technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments of the embodiments of the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the embodiments of the present application.

[0041] The present application embodiment provides a thermal management system. Figure 1 , Figure 1 A schematic diagram of a heat exchange system provided in an embodiment of the present application.

[0042] The thermal management system includes: a controller 100, a thermal management device 200 and a heat exchange medium recovery device 300; the heat exchange medium recovery device 300 is configured to recover the heat exchange medium; the recovered heat exchange medium is used to perform heat exchange processing on the heat load device 210; wherein the heat exchange medium is generated based on the use of the first service device 010; the thermal management device 200 includes: the heat load device 210 and the heat exchange device 220; the heat exchange device 220 is configured to use the heat exchange medium to perform heat exchange processing on the heat generated by the heat load device 210; wherein the heat is generated based on the use of the second service device 020; the controller 100 is configured to monitor the ambient temperature and the thermal management device 200, obtain thermal monitoring data, and regulate the heat exchange medium based on the thermal detection data; wherein the heat exchange medium includes: one or more of the first heat exchange medium, the second heat exchange medium and the third heat exchange medium.

[0043] In the above implementation process, the heat exchange medium recovery device 300 generates heat exchange medium based on the use of the first service device 010; the thermal management device 200 includes a heat load device 210 and a heat exchange device 220, the heat load device 210 generates heat based on the use of the second service device 020, and the heat exchange device 220 uses the heat exchange medium to perform heat exchange processing on the heat load device 210. The controller 100 monitors the ambient temperature and the thermal management device 200, obtains thermal monitoring data, and regulates the heat exchange medium based on the obtained thermal detection data. The heat exchange recovery device can recover the heat exchange medium, and the heat exchange medium recovered by the heat load device 210 is used by the heat exchange device 220 to perform heat exchange processing on the heat load device 210, and the heat generated by the heat load device 210 is transferred to the heat exchange medium, so that the heat load device 210 can dissipate heat in time, reducing the damage caused by overheating of the heat load device 210.

[0044] In one embodiment of the present application, the thermal management system is applied to an electric vehicle charging station with a car wash space, the heat exchange medium recovery device 300 is a car wash device, the heat load device 210 is a charging module in a charging pile, and the heat exchange device 220 is a collection of multiple units for performing heat exchange treatment on the heat load device 210. The first heat exchange medium is car wash waste water, the second heat exchange medium is tap water, and the third heat exchange medium is the refrigerant inside the charging pile. After washing the vehicle, the car wash device (i.e., the heat exchange medium recovery device 300) recycles the car wash waste water as a source of one of the heat exchange media of the heat exchange device 220. The thermal management system reduces the demand for fresh water resources by recycling and reusing car wash waste water, while reducing the energy consumption and environmental impact of the charging station, and has energy-saving and environmental protection benefits.

[0045] Optionally, the second heat exchange medium can be replaced with: deionized water, distilled water, ethylene glycol aqueous solution, propylene glycol aqueous solution, environmentally friendly refrigerant and other media that are compatible with the first heat exchange medium (car wash wastewater).

[0046] See also Figure 2 , Figure 2 A simple schematic diagram of the connection relationship of the heat exchange system provided in the embodiment of the present application. The heat management device 200 is divided into a heat load device 210 and a heat exchange device 220, which are connected to the heat exchange medium recovery device 300 to form a loop. The heat exchange medium circulates in the loop to achieve heat transfer. For more details, please refer to Figure 3 , Figure 3 A schematic diagram of a heat exchange system provided in an embodiment of the present application.

[0047] The first fluid storage unit 221 is used to store heat exchange medium; the first fluid storage unit 221 is used to store heat exchange medium; the first fluid storage unit 221 includes: a first inlet and a second inlet; the first inlet is connected to the heat exchange medium recovery device 300, for receiving the recovered first heat exchange medium; the second inlet is connected to the supplementary unit 224. The supplementary unit 224 is used to supplement the heat exchange medium; the supplementary unit 224 includes a valve 225; the valve 225 is configured to adjust the corresponding opening based on the control of the controller 100. The first fluid storage unit 221 also includes: a first sensor and a second sensor; the first sensor is configured to monitor the total liquid level of the heat exchange medium stored in the first fluid storage unit 221; the second sensor is configured to monitor the overall temperature of the heat exchange medium stored in the first fluid storage unit 221.

[0048] In the above implementation process, the first fluid storage unit 221 has two inlets. The first inlet is directly connected to the heat exchange medium recovery device 300. Its main function is to receive the first heat exchange medium (such as car wash wastewater) that has been recovered and processed. The recovered medium is transported to the first fluid storage unit 221 and is prepared for the subsequent heat exchange process, so that the heat exchange medium is recycled and the resource utilization efficiency is improved; the second inlet is connected to the supplementary unit 224, which is used to receive the supplementary second heat exchange medium (such as tap water or other alternative medium). When the amount of heat exchange medium in the system is reduced or needs to be updated, the supplementary unit 224 adds new medium to the storage unit through the second inlet to maintain the heat exchange efficiency of the system. Under different environmental conditions and heat load requirements, the first fluid storage unit 221 can adjust the storage and supply of the heat exchange medium to adapt to the changes. The supplementary unit 224 includes a valve 225, and the opening of the valve 225 is controlled by the controller 100 to adjust the flow of the heat exchange medium. The controller 100 intelligently adjusts the opening of the valve 225 based on real-time monitoring data: the first sensor is specially designed to monitor the liquid level of the heat exchange medium inside the first fluid storage unit 221, and provide real-time storage capacity information of the heat exchange medium; the second sensor is responsible for monitoring the overall temperature of the heat exchange medium inside the first fluid storage unit 221, and providing real-time data on the medium temperature.

[0049] The first fluid storage unit 221 is provided with a heat dissipation unit 223 inside; the heat dissipation unit 223 is connected to the heat load device 210 through a flow channel; wherein the flow channel is used for the circulation of a heat exchange medium; the heat exchange medium performs heat exchange processing with the heat load device 210; the heat dissipation unit 223 is configured to perform heat exchange processing between the heat generated by the heat load device 210 and the heat exchange medium in the first fluid storage unit 221. The second fluid storage unit 222 is connected to the heat dissipation unit 223 through a flow channel; the second fluid storage unit 222, the heat dissipation unit 223 and the heat load device 210 form a loop.

[0050] In the above implementation process, the heat dissipation unit 223 is a key component for heat exchange between the heat exchange medium and the heat load device 210. It receives heat from the heat load device 210 and transfers it to the heat exchange medium. The first fluid storage unit 221 not only stores the heat exchange medium, but also receives the heat transferred by the heat dissipation unit 223, and transfers and disperses the heat through the heat exchange medium inside the storage unit. The second fluid storage unit 222, the heat dissipation unit 223 and the heat load device 210 are interconnected through the flow channel to form a closed loop. In this loop, the third heat exchange medium in the second fluid storage unit 222 can take away the heat generated by the heat load device 210 in the loop. After absorbing the heat of the heat load device 210, the heat exchange medium flows to the heat dissipation unit 223 to release the heat, and then returns to the second fluid storage unit 222, and is pumped to the heat load device 210, forming a continuous cycle process.

[0051] The present application also provides a thermal management method. Figure 4 , Figure 4 The heat exchange method flow chart provided in the embodiment of the present application. The method is applied to a heat management system including a controller 100, a heat management device 200 and a heat exchange medium recovery device 300; the heat management device 200 includes a supplementary unit 224, and the supplementary unit 224 is configured with a valve 225; the method includes: monitoring the ambient temperature, determining the temperature level according to the temperature range based on the ambient temperature, and obtaining the adjustment coefficient K according to the temperature level; calculating the total amount of heat exchange medium required by the heat load device 210 Q1 based on the use demand of the second service device 020; calculating the total amount of heat exchange medium generated Q2 generated by the heat exchange medium recovery device 300 based on the use of the first service device 010; calculating the total amount of heat exchange medium provided Q3 of the supplementary unit 224 based on the liquid level of the total amount of heat exchange medium in the first fluid storage unit 221 and the overall temperature of the heat exchange medium; the valve 225 of the supplementary unit 224 adjusts the opening P of the valve 225 based on the total amount of heat exchange medium required Q1, the total amount of heat exchange medium generated Q2 and the total amount of heat exchange medium provided Q3.

[0052] In the above implementation process, first, the system monitors the current ambient temperature and determines the corresponding temperature level according to the preset temperature range. The temperature level affects the determination of the adjustment coefficient K, which in turn affects the adjustment of the heat exchange medium. Then, based on the use demand of the second service device 020, the total amount of heat exchange medium demand Q1 required by the heat load device 210 is calculated; based on the use of the first service device 010, the total amount of heat exchange medium generated Q2 generated by the heat exchange medium recovery device 300 is calculated; based on the liquid level of the total amount of heat exchange medium in the first fluid storage unit 221 and the overall temperature of the heat exchange medium, the total amount of heat exchange medium provided Q3 of the supplementary unit 224 is calculated; so that the supply of heat exchange medium matches the heat demand of the heat load device 210 to achieve effective heat exchange and equipment cooling. The valve 225 of the supplementary unit 224 adjusts the valve 225 opening P according to the total amount of heat exchange medium demand Q1, the total amount of generation Q2 and the total amount of supply Q3, so that the flow of the heat exchange medium is balanced with the heat demand and supply of the heat exchange system, and the thermal management efficiency is optimized.

[0053] Optionally, based on the usage demand of the second service device 020, the total amount of heat exchange medium demand Q1 required by the heat load device 210 is calculated, including: based on monitoring the temperature of the heat load device 210, counting the usage power of the heat load device 210, the number of heat load devices 210 in use, and the time that the heat load device 210 still needs to be used, and calculating the total amount of heat exchange medium demand Q1 required by the heat load device 210. Based on the usage of the first service device 010, the total amount of heat exchange medium generated by the heat exchange medium recovery device 300 is calculated, including: counting the average usage time of each heat exchange medium recovery device 300, the heat exchange medium generation of each heat exchange medium recovery device 300, the usage time of the heat exchange medium recovery device 300, and the number of heat exchange medium recovery devices 300 in use, and calculating the total amount of heat exchange medium generated by the heat exchange medium recovery device 300.

[0054] In the above implementation process, the controller 100 monitors the temperature of the heat load device 210, counts the power used by the heat load device 210, the number of heat load devices 210 used, and the time that the heat load device 210 needs to be used, and calculates the total amount of heat exchange medium required by the heat load device 210 Q1. Temperature data is the basis for calculating the demand for heat exchange medium, reflecting the current thermal state and cooling demand of the device; power used is a key factor affecting the heat generated by the heat load device 210, and power statistics help predict the heat output and cooling demand of the heat load device 210; the number of heat load devices 210 directly affects the total heat load, and counting the number of uses helps calculate the total amount of heat exchange medium required; the estimated use time helps predict the heat load of the device during the remaining use period, thereby determining the demand for heat exchange medium.

[0055] The controller 100 counts the average usage time of each heat exchange medium recovery device 300, the heat exchange medium generation amount of each heat exchange medium recovery device 300, the usage time of the heat exchange medium recovery device 300, and the number of heat exchange medium recovery devices 300 used, and calculates the total amount of heat exchange medium generation Q2 generated by the heat exchange medium recovery device 300. The average usage time provides a typical cycle of operation of each heat exchange medium recovery device 300, which helps to predict the operation mode of the heat exchange medium recovery device 300 and the frequency of heat exchange medium generation; the usage time helps to determine the current state and remaining operation time of the heat exchange medium recovery device 300, thereby predicting the generation amount of heat exchange medium; the number of heat exchange medium recovery devices 300 directly affects the generation amount of heat exchange medium, and counting the usage number helps to calculate the heat exchange demand, so that the recovery and reuse of the heat exchange medium matches the thermal demand of the system, and optimizes the utilization efficiency of resources.

[0056] After calculating Q1, Q2, and Q3, the heat exchange system first compares the total amount of heat exchange medium generated Q2 with the total amount of heat exchange medium provided Q3 and the total amount of heat exchange medium demanded Q1. When Q2+Q3>Q1, the opening of valve 225 is 0; in this case, the system already has enough heat exchange medium to meet the demand, so no additional replenishment is required, and valve 225 remains closed to avoid oversupply. When Q2+Q3≤Q1, the opening of valve 225 is calculated according to the formula P=K×(Q1-Q2-Q3). In this case, the heat exchange system requires additional heat exchange medium to meet the demand, and the opening of valve 225 is adjusted according to the difference between demand and supply, so that sufficient medium is replenished into the heat exchange system. This method improves the efficiency and response speed of heat exchange medium management, reduces energy waste, and improves the stability and reliability of the system.

[0057] It is worth noting that the order of the steps can be exchanged in some cases, for example, ① monitoring the ambient temperature, determining the temperature level according to the temperature range based on the ambient temperature, and obtaining the adjustment coefficient K according to the temperature level; ③ calculating the total amount of heat exchange medium generated Q2 generated by the heat exchange medium recovery device 300 based on the usage of the first service device 010; ② calculating the total amount of heat exchange medium required Q1 required by the heat load device 210 based on the usage demand of the second service device 020; ④ calculating the total amount of heat exchange medium provided Q3 of the supplementary unit 224 based on the liquid level of the total amount of heat exchange medium in the first fluid storage unit 221 and the overall temperature of the heat exchange medium; ⑤ adjusting the opening P of the valve 225 of the supplementary unit 224 based on the total amount of heat exchange medium required Q1, the total amount of heat exchange medium generated Q2 and the total amount of heat exchange medium provided Q3. The above steps ①, ②, ③ and ④ can all be similarly exchanged.

[0058] In one embodiment of the present application, the method is applied to a charging station with a car wash. The specific calculation method of Q1 is as follows: ① Count the charging power P(t) and ΔSOC of each device to be charged in the first t time period. When the vehicle is fully charged, the battery power is P(t)×t / ΔSOC, the remaining amount to be charged is P(t)×t / ΔSOC(1-SOC), and the remaining time to be charged is t / ΔSOC(1-SOC)② Count the number of charging vehicles n1, and sum the remaining charging power, power, and time of each vehicle in ① to obtain the total remaining charging power and charging time of the charging pile③ Combined with the charging module temperature T1, estimate the cooling demand Q1(t,T1) of the charging pile in the future time period.

[0059] In one embodiment of the present application, Q2 is calculated as follows: ① Calculate the average car wash time of each car in the previous t time period t avg ② Count the time t1 that each car wash has washed, and get the remaining time t for each car wash avg -t1③Count the number of vehicles in the car wash n2 and estimate the cooling capacity of the car wash Q2(t) in the future time period.

[0060] In one embodiment of the present application, the ambient temperature is monitored, and the temperature level is determined according to the temperature range based on the ambient temperature, and the adjustment coefficient K is obtained according to the temperature level, wherein the high temperature is 1.2, the normal temperature is 1.1, and the low temperature is 1; when the temperature of the heat load device 210 is T1≤45°C, Q1(t, T1) is 4%-6% of the total charging power, otherwise Q1(t, T1) is (4%-6%)×1.1 of the total charging power; Q2(t)=q×cwater×|(T2+T) / 2-25|, wherein cwater is the specific heat capacity of water; Q3(t)=P×Q 补水 , P ranges from 0 to 1, Q 补水 is the maximum cooling power of the water replenishment device; Q4(t)=Q2(t)+Q3(t); when the liquid level height H is less than 0.9, water replenishment is forced.

[0061] See also Figure 5 , Figure 5 Schematic diagram of the adjustment of valve 225 of the heat exchange method provided in the embodiment of the present application. The valve 225 of the replenishment unit 224 adjusts the opening of the valve 225 based on the total amount of heat exchange medium demand Q1, the total amount of heat exchange medium generated Q2, and the total amount of heat exchange medium provided Q3, including: when the sum of the total amount of heat exchange medium generated Q2 and the total amount of heat exchange medium provided Q3 is greater than the total amount of heat exchange medium demand Q1, the valve opening is 0; when the sum of the total amount of heat exchange medium generated Q2 and the total amount of heat exchange medium provided Q3 is less than or equal to the total amount of heat exchange medium demand Q1, the valve opening is calculated according to the following rule:

[0062]

[0063] See also Figure 6 , Figure 6 A schematic diagram of an electronic device provided in an embodiment of the present application.

[0064] The electronic device 400 may include a memory 410, a storage controller 420, a processor 430, a peripheral interface 440, an input and output unit 450, and a display unit 460. A person skilled in the art may understand that Figure 6 The structure shown is for illustration only and does not limit the structure of the electronic device 400. For example, the electronic device 400 may further include Figure 6 More or fewer components as shown, or with Figure 6 Different configurations are shown.

[0065] The memory 410, storage controller 420, processor 430, peripheral interface 440, input / output unit 450 and display unit 460 are electrically connected to each other directly or indirectly to achieve data transmission or interaction. For example, these components can be electrically connected to each other via one or more communication buses or signal lines. The processor 430 is used to execute the executable module stored in the memory.

[0066] The memory 410 may be, but is not limited to, a random access memory (RAM), a read only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable read-only memory (EEPROM), etc. The memory 410 is used to store programs, and the processor 430 executes the program after receiving the execution instruction. The method executed by the electronic device 400 defined by the process disclosed in any embodiment of the present application can be applied to the processor 430, or implemented by the processor 430.

[0067] The processor 430 may be an integrated circuit chip with signal processing capabilities. The processor 430 may be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it may also be a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present application may be implemented or executed. The general-purpose processor may be a microprocessor or any conventional processor.

[0068] The above-mentioned peripheral interface 440 couples various input / output devices to the processor 430 and the memory 410. In some embodiments, the peripheral interface 440, the processor 430 and the memory controller 420 can be implemented in a single chip. In some other examples, they can be implemented by separate chips.

[0069] The input / output unit 450 is used to provide input data to the user, and can be, but not limited to, a mouse and a keyboard.

[0070] The display unit 460 provides an interactive interface (e.g., a user operation interface) between the electronic device 400 and the user or is used to display image data for the user's reference. In this embodiment, the display unit 460 may be a liquid crystal display or a touch display. If it is a touch display, it may be a capacitive touch screen or a resistive touch screen that supports single-point and multi-point touch operations. Supporting single-point and multi-point touch operations means that the touch display can sense touch operations generated simultaneously from one or more positions on the touch display, and the sensed touch operations are handed over to the processor 430 for calculation and processing.

[0071] In summary, in several embodiments provided in the present application, it should be understood that the disclosed device can also be implemented in other ways. The device embodiments described above are merely schematic, for example, the block diagrams in the accompanying drawings show the possible architecture, functions and operations of the devices according to the multiple embodiments of the present application. In this regard, each box in the block diagram can represent a module, a program segment or a part of a code, and the module, a program segment or a part of a code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram, and the combination of the block diagrams, can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.

[0072] In addition, the functional modules in the various embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.

[0073] The above description is only an embodiment of the present application and is not intended to limit the scope of protection of the present application. For those skilled in the art, the present application may have various changes and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the scope of protection of the present application. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.

[0074] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "include..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

Claims

1. A thermal management system, characterized in that: The thermal management system comprises: a controller, a thermal management device and a heat exchange medium recovery device; The heat management device comprises: a heat load device and a heat exchange device; the heat exchange device is configured to perform heat exchange processing on the heat generated by the heat load device using the heat exchange medium; The heat exchange medium recovery device is configured to recover the heat exchange medium; the recovered heat exchange medium is used to perform heat exchange processing on the heat load equipment; wherein the heat exchange medium is generated based on the use of the first service device; and the heat is generated based on the use of the second service device; The controller is configured to monitor the ambient temperature and the thermal management device, and obtain thermal monitoring data, and regulate the heat exchange medium based on the thermal detection data; The heat exchange medium includes: one or more of a first heat exchange medium, a second heat exchange medium and a third heat exchange medium.

2. The system according to claim 1, characterized in that The heat exchange device comprises: a supplementary unit; The supplementary unit is used to supplement the heat exchange medium; the supplementary unit includes a valve; the valve is configured to adjust the corresponding opening based on the regulation of the controller.

3. The system according to claim 2, characterized in that The heat exchange device further comprises: a first fluid storage unit; the first fluid storage unit is used to store the heat exchange medium; The first fluid storage unit comprises: a first inlet and a second inlet; The first inlet is connected to the heat exchange medium recovery device for receiving the recovered first heat exchange medium; the second inlet is connected to the supplementary unit.

4. The system according to claim 3, characterized in that The first fluid storage unit further includes: a first sensor and a second sensor; The first sensor is configured to monitor the total amount of the heat exchange medium stored in the first fluid storage unit. The second sensor is configured to monitor an overall temperature of the heat exchange medium stored inside the first fluid storage unit.

5. The system according to claim 3, characterized in that A heat dissipation unit is disposed inside the first fluid storage unit; The heat dissipation unit is connected to the heat load device through a flow channel; Wherein, the flow channel is used for the circulation of the heat exchange medium; the heat exchange medium performs heat exchange processing with the heat load device; The heat dissipation unit is configured to perform heat exchange processing between the heat generated by the heat load device and the heat exchange medium in the first fluid storage unit.

6. The system according to claim 5, characterized in that The heat exchange device further includes: a second fluid storage unit; The second fluid storage unit is used to store heat exchange medium; the second fluid storage unit is connected to the heat dissipation unit through a flow channel; the second fluid storage unit, the heat dissipation unit and the heat load device form a loop.

7. A thermal management method, characterized in that: Applicable to a thermal management system including a controller, a thermal management device and a heat exchange medium recovery device; the thermal management device includes a heat load device, a first fluid storage unit and a supplementary unit, and the supplementary unit is equipped with a valve; The method comprises: Monitoring the ambient temperature, determining a temperature level according to a temperature range based on the ambient temperature, and obtaining an adjustment coefficient K according to the temperature level; Based on the usage demand of the second service device, calculate the total demand Q1 of the heat exchange medium required by the heat load device; Calculating a total amount Q2 of heat exchange medium generated by the heat exchange medium recovery device based on the usage of the first service device; Calculating a total amount Q3 of heat exchange medium provided by the supplementary unit based on the liquid level of the total amount of the heat exchange medium in the first fluid storage unit and the overall temperature of the heat exchange medium; The valve of the replenishing unit adjusts the valve opening P based on the total heat exchange medium demand Q1, the total heat exchange medium generation Q2, and the total heat exchange medium supply Q3.

8. The method according to claim 7, characterized in that The calculating the total amount Q1 of heat exchange medium required by the heat load device based on the usage demand of the second service device includes: Based on monitoring the temperature of the heat load device, counting the power used by the heat load device, the number of times the heat load device is used, and the time the heat load device is still needed to be used, the total amount of heat exchange medium required by the heat load device Q1 is calculated.

9. The method according to claim 7, characterized in that: The calculating, based on the usage of the first service device, the total amount Q2 of heat exchange medium generated by the heat exchange medium recovery device comprises: The average usage time of each heat exchange medium recovery device, the heat exchange medium generation amount of each heat exchange medium recovery device, the usage time of the heat exchange medium recovery device, and the number of heat exchange medium recovery devices in use are counted to calculate the total amount of heat exchange medium generated Q2 by the heat exchange medium recovery device.

10. The method according to claim 7, characterized in that The valve of the supplementary unit adjusts the valve opening based on the total amount of heat exchange medium demand Q1, the total amount of heat exchange medium generated Q2, and the total amount of heat exchange medium provided Q3, including: When the sum of the total amount of heat exchange medium generated Q2 and the total amount of heat exchange medium provided Q3 is greater than the total amount of heat exchange medium required Q1, the valve opening is 0; When the sum of the total amount of heat exchange medium generated Q2 and the total amount of heat exchange medium provided Q3 is less than or equal to the total amount of heat exchange medium required Q1, the valve opening is calculated according to the following rule: Valve opening P = Adjustment coefficient K×(total heat exchange medium demand Q1-total heat exchange medium generation Q2-total heat exchange medium supply Q3).