Surveying device for earlier stage of three-dimensional geological modeling

By using electric telescopic rods and support rod systems in the geological survey device, the hole digging angle of the auger drill rod is adjusted, and the drilling deviation caused by uneven terrain is solved, and the survey efficiency and accuracy are improved.

CN119466574APending Publication Date: 2025-02-18ZHENGZHOU GEOLOGY ENG INVESTIGATION INST MINISTRY OF CHEM IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411715312.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-27
Publication Date
2025-02-18

AI Technical Summary

Technical Problem

In geological survey, uneven terrain causes deviations in the angle of the auger's hole digging, affecting the survey efficiency and measurement accuracy.

Method used

A survey device for the early stage of three-dimensional geological modeling is designed, using electric telescopic rods and support rod systems, and the support rod length is adjusted through a level to ensure that the auger rod remains vertical when drilling.

Benefits of technology

It effectively reduces the deviation of the auger drill rod during drilling, and improves survey efficiency and measurement accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119466574A_ABST
    Figure CN119466574A_ABST
Patent Text Reader

Abstract

The invention relates to a three-dimensional geological modeling earlier-stage surveying device which comprises a base frame, a lifting mechanism and a drilling mechanism, the lifting mechanism and the drilling mechanism are installed on the base frame, the lifting mechanism comprises an electric telescopic rod, a base and guide wheel sets, and the two ends of the base are slidably connected with the base frame through the guide wheel sets; the two ends of the electric telescopic rod are connected with the top of the base frame and the base correspondingly, the drilling mechanism comprises a spiral drilling rod and supporting rods, the supporting rods are arranged on the two sides of the spiral drilling rod, and the spiral drilling rod is installed below the base; according to the device, the lengths of the supporting rods on the two sides of the spiral drill rod can be adjusted according to the actual terrain, the spiral drill rod is kept in a vertical state during drilling, the deviation probability is reduced, and the exploration efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geological modeling, in particular to a survey device for the early stage of three-dimensional geological modeling. Background Art

[0002] Geological survey is a geological investigation and research work carried out to identify the geological factors that affect engineering buildings. The geological factors that need to be surveyed include geological structure, landform, hydrogeological conditions, and the physical and mechanical properties of soil and rock. Soil sampling is required in geological survey. Sampling is mainly for soil identification and indoor testing to provide samples; three-dimensional geological modeling is to integrate geological, well logging, geophysical data and various interpretation results or conceptual models to generate a three-dimensional quantitative stochastic model.

[0003] When in use, the device is first pushed to the place to be inspected to dig a hole. After the hole is excavated, this process often causes deviations in the digging angle of the spiral drill material due to uneven terrain, resulting in inaccurate measurement results and affecting the survey efficiency. Therefore, how to overcome the above-mentioned technical problems and defects has become a key issue that needs to be solved. Summary of the invention

[0004] The purpose of the present invention is to overcome the defects described in the background technology, thereby realizing a survey device for the early stage of three-dimensional geological modeling, which can adjust the length of the support rods on both sides of the spiral drill rod according to the actual terrain, so that the spiral drill rod can remain vertical when drilling, reduce the probability of deviation, and improve the survey efficiency.

[0005] To achieve the above-mentioned purpose of the invention, the technical solution of the present invention is: a survey device for the early stage of three-dimensional geological modeling, including a base frame and a lifting mechanism and a drilling mechanism installed on the base frame, the lifting mechanism includes an electric telescopic rod, a base and a guide wheel group, the two ends of the base are slidably connected to the base frame through the guide wheel group, the two ends of the electric telescopic rod are respectively connected to the top of the base frame and the base, the drilling mechanism includes a spiral drill rod and a support rod, the support rod is arranged on both sides of the spiral drill rod, and the spiral drill rod is installed below the base.

[0006] Furthermore, the base frame is a door-type frame, the lower end of the base frame is equipped with walking wheels, the upper end of the base frame is provided with handrails, and a level is placed on the base frame.

[0007] Furthermore, a through slot is provided on the side plate of the base frame, and parallel slide rails are provided on both sides of the through slot, and the guide wheel group is in contact with the slide rails.

[0008] Furthermore, the auger rod is installed below the base through a motor, and fixing frames are provided on both sides of the motor.

[0009] Furthermore, a plug is provided at the lower end of the support rod, and the upper part of the support rod is fixedly connected to the sliding rod by bolts.

[0010] Furthermore, the middle portion of the slide rod is slidably connected to the base and the slide groove, and a connecting rod is provided between the two oppositely arranged slide rods.

[0011] Beneficial effects of the survey device for the early stage of three-dimensional geological modeling of the present invention: The survey device for the early stage of three-dimensional geological modeling of the present invention uses an electric telescopic rod to control the relative height of the auger rod and the roller, and can switch the mobile state and the working state at any time, which is very convenient. The support rods on both sides of the auger rod are used to adjust the length of the support rods in conjunction with a level to adjust the digging angle of the auger rod, thereby ensuring the accuracy of the digging angle of the auger rod and ensuring the accuracy and efficiency of the measurement. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the structure of the survey device for the early stage of three-dimensional geological modeling of the present invention; In the figure: 1-base, 2-slide rail, 3-base, 4-connecting shaft, 5-guide wheel group, 6-electric telescopic rod, 7-slide rod, 8-connecting rod, 9-slide groove, 10-plug, 11-fixed frame, 12-motor, 13-auger rod, 14-support rod, 15-handrail, 16-travel wheel. DETAILED DESCRIPTION

[0013] The following is a more detailed description of the preliminary survey device for three-dimensional geological modeling of the present invention in conjunction with the accompanying drawings and through specific implementation methods.

[0014] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0015] See also Figure 1 , a survey device for the early stage of three-dimensional geological modeling in this embodiment can adjust the length of the supporting rods on both sides of the spiral drill rod according to the actual terrain, so that the spiral drill rod can remain in a vertical state when drilling, reduce the probability of deviation, and improve the survey efficiency. It mainly includes a base frame 1 and a lifting mechanism and a drilling mechanism installed on the base frame 1. The base frame 1 is a door-type frame. A walking wheel 16 is installed at the lower end of the base frame 1 to facilitate the transfer of the survey device. A handrail 15 is arranged at the upper end of the base frame 1. A level is placed on the base frame 1 to facilitate the adjustment of the drilling angle of the spiral drill rod.

[0016] The lifting mechanism includes an electric telescopic rod 6, a base 3 and a guide wheel group 5. The two ends of the base 3 are slidably connected to the base frame 1 through the guide wheel group 5. Through grooves are provided on the two side panels of the base frame 1, and parallel slide rails 2 are provided on both sides of the through grooves. The two groups of guide wheels on the guide wheel group 5 are respectively in contact with the slide rails 2 on both sides of the through grooves to guide the base 3 to move up and down along the side panels of the base frame 1. The two ends of the electric telescopic rod 6 are respectively connected to the top plate of the base frame 1 and the base 3 to control the relative movement between the base frame 1 and the base 3, and then control the relative height of the walking wheel and the spiral drill rod.

[0017] The drilling mechanism includes an auger rod 13 and a support rod 14, the support rod 14 is arranged on both sides of the auger rod 13, a plug 10 is arranged at the lower end of the support rod 14, the plug 10 is in contact with the ground, the upper part of the support rod 14 is fixedly connected to the slide rod 7 by bolts, the middle part of the slide rod 7 is slidably connected to the base 3 and the slide groove 9, a connecting rod 8 is arranged between the upper ends of the two oppositely arranged slide rods 7, so that the two support rods 14 keep moving synchronously, the auger rod 13 is installed below the base 3 through a motor 12, and fixed frames 11 are arranged on both sides of the motor 12 for supporting the motor and the auger rod.

[0018] When in use, after arriving at the survey site, use the walking wheels to move the survey device to the designated position, and stand up the survey device. According to the flatness of the ground and the drilling angle, adjust the distance between the two plugs and the ground so that when the two plugs are in contact with the ground, the angle of the auger rod remains the same as the drilling angle. The electric telescopic rod is extended to control the support rod and the auger rod to descend until the walking wheels leave the ground. The motor drives the auger rod to start drilling. During the drilling process, keep the two plugs in contact with the ground at the same time to ensure the accuracy of the drilling angle and avoid deviations that affect subsequent surveys.

[0019] Unless otherwise defined, the technical or scientific terms used herein shall have the common meanings understood by persons with ordinary skills in the field to which the present invention belongs. "Include" or "comprising" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, whether direct or indirect.

[0020] The exemplary implementation modes of the present invention are described in detail above with reference to the preferred embodiments. However, it can be understood by those skilled in the art that, without departing from the concept of the present invention, various modifications and variations can be made to the above-mentioned specific embodiments, and various combinations of the technical features and structures proposed in the present invention can be made without exceeding the protection scope of the present invention.

Claims

1. A survey device for the early stage of three-dimensional geological modeling, comprising a base frame and a lifting mechanism and a drilling mechanism installed on the base frame, characterized in that: The lifting mechanism includes an electric telescopic rod, a base and a guide wheel group. The two ends of the base are slidably connected to the base frame through the guide wheel group. The two ends of the electric telescopic rod are respectively connected to the top of the base frame and the base. The drilling mechanism includes an auger rod and a support rod. The support rod is arranged on both sides of the auger rod, and the auger rod is installed below the base.

2. The survey device for the early stage of three-dimensional geological modeling according to claim 1, characterized in that: The base frame is a door-type frame, the lower end of the base frame is equipped with walking wheels, the upper end of the base frame is provided with handrails, and a level is placed on the base frame.

3. The survey device for the early stage of three-dimensional geological modeling according to claim 1, characterized in that: A through slot is provided on the side plate of the base frame, and parallel slide rails are provided on both sides of the through slot, and the guide wheel group is in contact with the slide rails.

4. The survey device for the early stage of three-dimensional geological modeling according to claim 1, characterized in that: The auger rod is installed below the base through a motor, and fixing frames are arranged on both sides of the motor.

5. The survey device for the early stage of three-dimensional geological modeling according to claim 1, characterized in that: A plug is arranged at the lower end of the support rod, and the upper part of the support rod is fixedly connected with the sliding rod through bolts.

6. The survey device for the early stage of three-dimensional geological modeling according to claim 5, characterized in that: The middle part of the slide rod is slidably connected with the base and the slide groove, and a connecting rod is arranged between the two slide rods arranged opposite to each other.