Tower training device structure
By designing the structure of the tower training device, including support components, rotary components and lifting components, simulating the high foot condition of the tower, the problem of the tower basic acceptance work in the existing technology is difficult to meet the rapid training and skill inheritance of newcomers, and the convenience of Training and skills inheritance.
Patent Information
- Application Number
- CN202411844148.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-15
- Publication Date
- 2025-02-18
AI Technical Summary
The lack of effective auxiliary tools and training facilities in the existing technology has made it difficult for the tower basic acceptance work to meet the needs of rapid training and skills inheritance of newcomers, and is highly dependent on experienced technicians for operation.
A tower training device structure was designed, including support components, rotary components and lifting components. By simulating the high foot condition of the tower, the tower to be accepted in the project is assisted in training and teaching. The structure is reasonable, which is convenient for transportation and quick construction.
The simulation of the tower's high foot condition is achieved, and a convenient training platform is provided to help newcomers quickly master skills and reduce their dependence on experienced technicians.
Smart Images

Figure CN119479447A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of transformer substation auxiliary tools, in particular to a pole tower training device structure. Background Art
[0002] As the key supporting structure of the transmission line, the quality of the foundation of the tower is directly related to the stability and service life of the tower, which is crucial to the operation of the entire power grid system.
[0003] At present, the acceptance work of tower foundations fails to meet the needs of rapid training of new personnel and skill inheritance due to the lack of effective auxiliary tools and training facilities, and is highly dependent on on-site operations by experienced technicians. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a tower training device structure, which can simulate the high footing condition of the iron tower and provide auxiliary training and teaching for the iron tower to be accepted in the construction project; the structure is reasonable, and it is easy to transport and quickly build.
[0005] In order to solve the above technical problems, the present invention provides a tower training device structure for simulating the iron tower to be accepted in the project for auxiliary training and teaching, including: a support component, the support component includes: a base, the bottom of the base is equipped with fixed legs; a rotating component installed on the base, the rotating component includes: a rotating base plate rotatably installed inside the base; a lifting component installed on the rotating base plate, the lifting component includes: an outer sleeve installed on the rotating base plate, a first motor installed at the bottom of the outer sleeve and a lifting column slidably connected to the outer sleeve, the output end of the first motor is driven by a screw rod, and the lifting column is tightened An inherent threaded sleeve, a screw rod and the threaded sleeve are adaptively connected, a pressure rod is provided at the bottom of the lifting column; a sliding sleeve is installed on the rotating base plate, a pressure sliding rod is installed in the sliding sleeve, the bottom of the pressure sliding rod is connected to a support member, and a movable support leg is provided at the bottom of the support member; and an assembly support installed on the lifting component, wherein: the lifting column is extended and retracted relative to the outer sleeve through the linkage of the screw rod and the threaded sleeve to adjust the height of the assembly support and simulate the high base condition of the iron tower; the position of the pressure rod and the pressure sliding rod are adaptively matched, and the lifting column links the pressure rod, the sliding rod and the support member to prop up the movable support leg to replace the fixed support leg for support.
[0006] A pressure spring is installed between the pressure rod and the pressure slide rod, wherein: the pressure rod is away from the pressure slide rod, the pressure spring drives the pressure slide rod to slide along the sliding sleeve to reset, and the fixed leg replaces the movable leg for support.
[0007] The rotating assembly further comprises: a guide slide groove installed at the bottom of the rotating base plate, an annular slide rail is arranged inside the base, the guide slide groove is adapted to be clamped in the annular slide rail, and the rotating base plate can rotate relative to the base.
[0008] The rotating assembly further comprises a driving unit, which comprises a second motor and a gear. The second motor and the gear are drivingly connected, and the gear is connected to the rotating base plate.
[0009] The edge of the rotating base plate is provided with a tooth groove, and the gear is meshed with the tooth groove, wherein: the second motor drives the gear to rotate, and the guide slide groove of the rotating base plate rotates under the guidance of the annular slide rail, so that the linkage lifting assembly rotates synchronously.
[0010] Wherein, an assembly cavity is provided in the base, and the annular slide rail and the rotating base plate are accommodated in the assembly cavity.
[0011] The first motor and the second motor are electrically connected to an external controller.
[0012] The utility model also includes: an assembly support connected to the lifting column, and the assembly support is provided with a plurality of anchor bolts for connecting with the iron tower.
[0013] Among them, the anchor bolts are T-type anchor bolts, J-type anchor bolts, ratchet-type anchor bolts or stud-type anchor bolts.
[0014] A steel frame is provided inside the assembly support, and sand, gravel or plastic particles are filled in the steel frame.
[0015] The pole tower training device structure of the present invention has the following beneficial effects: the pole tower training device structure comprises: a supporting assembly, the supporting assembly comprises: a base, the bottom of the base is equipped with a fixed support leg; a rotating assembly mounted on the base, the rotating assembly comprises: a rotating base plate rotatably mounted inside the base; a lifting assembly mounted on the rotating base plate, the lifting assembly comprises: an outer sleeve mounted on the rotating base plate, a first motor mounted at the bottom of the outer sleeve and a lifting column slidably connected to the outer sleeve, a screw rod is provided at the output end of the first motor, a threaded sleeve is fastened on the lifting column, the screw rod is adaptively connected to the threaded sleeve, and a pressure rod is provided at the bottom of the lifting column; a first motor is mounted on the rotating base plate, and a first motor is mounted on the bottom of the outer sleeve, and a first motor is mounted on the rotating base plate ... A sliding sleeve on the base plate is equipped with a pressure sliding rod, the bottom of the pressure sliding rod is connected to a support member, and the bottom of the support member is provided with a movable support leg; and an assembly support installed on the lifting component, wherein: the lifting column is linked by a screw rod and a threaded sleeve to be extended and retracted relative to the outer sleeve to adjust the height of the assembly support and simulate the high base condition of the iron tower; the position of the pressure rod and the pressure sliding rod are adapted to correspond, the lifting column links the pressure rod, the sliding rod and the support member to prop up the movable support leg to replace the fixed support leg for support, which can simulate the high base condition of the iron tower and provide auxiliary training and teaching for the iron tower to be accepted in the construction project; the structure is reasonable, and it is easy to transport and quickly build. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 The figure is a schematic diagram of the overall structure of a plurality of pole tower training devices assembled in accordance with an embodiment of the present invention.
[0018] Figure 2 It is a three-dimensional structural schematic diagram of the tower training device structure according to an embodiment of the present invention.
[0019] Figure 3 It is a schematic diagram of the internal structure of the assembly support of the tower training device structure according to an embodiment of the present invention.
[0020] Figure 4 The figure is a schematic diagram of the internal structure of the tower training device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] like Figure 1-Figure 4 FIG. 1 is a first embodiment of the structure of the tower training device of the present invention.
[0023] The tower training device structure in this embodiment is used to simulate the tower to be accepted in the project for auxiliary training and teaching, including: a support assembly 6, the support assembly 6 includes: a base 17, the bottom of the base 17 is equipped with a fixed support leg 19; a rotating assembly 5 installed on the base 17, the rotating assembly 5 includes: a rotating base plate 24 rotatably installed inside the base 17;
[0024] The lifting assembly 3 is mounted on the rotating base plate 24, and the lifting assembly 3 includes: an outer sleeve 10 mounted on the rotating base plate 24, a first motor 12 mounted at the bottom of the outer sleeve 10, and a lifting column 8 slidably connected to the outer sleeve 10, a screw rod 9 is provided at the output end of the first motor 12, a threaded sleeve 11 is fastened to the lifting column 8, the screw rod 9 is adapted to be connected to the threaded sleeve 11, and a pressure rod 13 is provided at the bottom of the lifting column 8;
[0025] A sliding sleeve 25 mounted on a rotating base plate 24, a pressing slide bar 14 is mounted in the sliding sleeve 25, a support member 18 is connected to the bottom of the pressing slide bar 14, and a movable support leg 20 is provided at the bottom of the support member 18; and an assembly support 1 mounted on a lifting assembly 3, wherein:
[0026] The lifting column 8 is linked with the screw rod 9 and the threaded sleeve 11 to be extended and retracted relative to the outer sleeve 10 to adjust the height of the assembly support 1 and simulate the high base condition of the iron tower; the pressure rod 13 and the pressing slide rod 14 are adapted to correspond to each other in position, and the lifting column 8 is linked with the pressure rod 13, the slide rod 14 and the support member 18 to support the movable leg 20 to replace the fixed leg 19 for support.
[0027] In specific implementation, one end of the rotating assembly 5 is installed inside the supporting assembly 6, the upper end of the rotating assembly 5 is provided with a lifting assembly 3, and the upper end of the lifting assembly 3 is fixed with an assembly support 1. The base 17 of the supporting assembly 6 is provided with an assembly cavity 21.
[0028] Furthermore, the rotating assembly 5 includes: a rotating base plate 24 rotatably mounted inside the base 17. The rotating assembly 5 also includes: a guide slide groove 23 mounted at the bottom of the rotating base plate 24, an annular slide rail 22 is provided inside the base 17, the guide slide groove 23 is adapted to be clamped in the annular slide rail 22, and the rotating base plate 24 can rotate relative to the base 17. The annular slide rail 22 and the rotating base plate 24 are accommodated in the assembly cavity 21.
[0029] In this embodiment, the rotating assembly 5 further includes a driving unit 4 , which includes a second motor 15 and a gear 16 . The second motor 15 and the gear 16 are in transmission connection, and the gear 16 is connected to the rotating base plate 24 .
[0030] In this embodiment, a tooth groove is provided on the edge of the rotating base plate 24, and the gear 16 is meshed with the tooth groove, wherein: the second motor 15 drives the gear 16 to rotate, and the guide groove 23 of the rotating base plate 2 rotates under the guidance of the annular slide rail 22, so that the linkage lifting assembly 3 rotates synchronously.
[0031] Furthermore, the outer sleeve 10 is fixedly arranged on the upper end of the rotating base plate 24, the lifting column 8 is installed in the outer sleeve 10, and the lower end of the lifting column 8 is fixedly provided with a pressure rod 13 corresponding to the upper and lower pressing slide rod 14; the first motor 12 is fixedly arranged at the bottom of the outer sleeve 10, and the output end transmission of the first motor 12 is provided with a screw rod 9, and the surface of the screw rod 9 is threadedly connected with a threaded sleeve 11, and the threaded sleeve 11 is fixedly connected to the lifting column 8.
[0032] During implementation, multiple pole tower training device structures are moved to the installation position. During this process, the mobile legs 20 are in a state of being pressed and stretched out, and the distance that the mobile legs 20 are pressed and stretched out is greater than that of the fixed legs 19. Therefore, the mobile legs 20 can be used for movement, and the mobile legs 20 can be set as universal wheels during specific implementation.
[0033] The second motor 15 drives the gear 16 to rotate, thereby driving the rotating base plate 24 to rotate on the surface of the annular slide rail 22 through the guide slide groove 23 to adjust the installation angle, and the top tower model is installed through the anchor bolts 2. The first motor 12 is controlled by an external controller. The first motor 12 drives the screw rod 9 to rotate, driving the threaded sleeve 11 to rise, thereby driving the lifting column 8 to slide upward inside the outer sleeve 10 to reach the preset height of the model, and then the assembly support 1 can be driven to adjust the height to simulate the high base of the iron tower.
[0034] During the operation of the lifting assembly 3, the pressure rod 13 no longer presses the pressure slide bar 14. Since a pressure spring 26 is installed between the pressure rod 13 and the pressure slide bar 14, under the action of gravity and the pressure spring 26, the pressure slide bar 14 is driven to slide upward inside the sliding sleeve 25, thereby lifting the movable leg 20 and the fixed leg 19 is supported on the ground to remain stable.
[0035] Furthermore, the lifting assembly 3 is connected to an assembly support 1, and the assembly support 1 is provided with a plurality of anchor bolts 2 for connecting with the iron tower.
[0036] Preferably, the anchor bolt 2 is a T-shaped anchor bolt, a J-shaped anchor bolt, a ratchet-shaped anchor bolt or a stud-shaped anchor bolt.
[0037] Preferably, a steel frame 7 is provided inside the assembly support 1, and the steel frame 7 is filled with sand, gravel or plastic particles.
[0038] It is understandable that the first motor 12 and the second motor 15 are electrically connected to an external controller, and the first motor 12 and the second motor 15 can be controlled by the external controller.
[0039] In other embodiments, batteries connected to the first motor 12, the second motor 15 and the controller are respectively provided in the base 17 to power the above-mentioned components; the assembly support 1 can also be made of transparent material, so that the structural changes inside the tower training device structure can be further observed.
[0040] During the specific implementation of the pole tower training device structure in this embodiment, multiple pole tower training device structures are moved to the installation position, and the second motor 15 drives the gear 16 to rotate, thereby driving the rotating base plate 24 to rotate on the surface of the annular slide rail 22 through the guide slide groove 23 to adjust the installation angle, and the top pole tower model is installed through the anchor bolts 2, and the first motor 12 is controlled by an external controller. The first motor 12 drives the screw rod 9 to rotate, drives the threaded sleeve 11 to rise, thereby driving the lifting column 8 to slide upward inside the outer sleeve 10 to reach the preset height of the model, and then drives the assembly support 1 to adjust the height to simulate the high base of the iron tower.
[0041] During the lifting operation of the lifting assembly 3, the pressure rod 13 no longer presses the pressing slide bar 14, because a pressing spring 26 is installed between the pressure rod 13 and the pressing slide bar 14. Under the action of gravity and the pressing spring 26, the pressing slide bar 14 is driven to slide upward inside the sliding sleeve 25, so that the movable leg 20 is lifted, and the fixed leg 19 is supported on the ground to maintain the stability of the tower training device.
[0042] A pole tower training device structure implementing the present invention has the following beneficial effects: the pole tower training device structure comprises: a supporting assembly, the supporting assembly comprises: a base, the bottom of the base is equipped with a fixed support leg; a rotating assembly mounted on the base, the rotating assembly comprises: a rotating base plate rotatably mounted inside the base; a lifting assembly mounted on the rotating base plate, the lifting assembly comprises: an outer sleeve mounted on the rotating base plate, a first motor mounted at the bottom of the outer sleeve and a lifting column slidably connected to the outer sleeve, a screw rod is provided at the output end of the first motor, a threaded sleeve is fastened on the lifting column, the screw rod is adaptively connected to the threaded sleeve, and the bottom of the lifting column is provided with a There is a pressure rod; a sliding sleeve installed on the rotating base plate, a pressure sliding rod is installed in the sliding sleeve, the bottom of the pressure sliding rod is connected to a support member, and a movable support leg is provided at the bottom of the support member, wherein: the lifting column is linked by a screw rod and a threaded sleeve to be extended and retracted relative to the outer sleeve to adjust the height of the assembly support and simulate the high base condition of the iron tower; the position of the pressure rod and the pressure sliding rod are adapted to correspond, the lifting column links the pressure rod, the sliding rod and the support member to prop up the movable support leg to replace the fixed support leg for support, which can simulate the high base condition of the iron tower and provide auxiliary training and teaching for the iron tower to be accepted in the construction project; the structure is reasonable, and it is easy to transport and quickly build.
Claims
1. A tower training device structure, used to simulate the tower to be accepted in the project to assist in training and teaching, characterized in that: include: A support assembly, the support assembly comprising: a base, a bottom of the base being provided with fixed legs; A rotating assembly mounted on the base, the rotating assembly comprising: a rotating base plate rotatably mounted inside the base; A lifting assembly mounted on the rotating base plate, the lifting assembly comprising: an outer sleeve mounted on the rotating base plate, a first motor mounted at the bottom of the outer sleeve, and a lifting column slidably connected to the outer sleeve, a screw rod is provided at the output end of the first motor, a threaded sleeve is fastened on the lifting column, the screw rod is adapted to be connected with the threaded sleeve, and a pressure rod is provided at the bottom of the lifting column; A sliding sleeve mounted on the rotating base plate, wherein a pressing sliding rod is mounted in the sliding sleeve, a supporting member is connected to the bottom of the pressing sliding rod, and a movable supporting leg is provided at the bottom of the supporting member; and An assembly support mounted on the lifting assembly, wherein: The lifting column is extended and retracted relative to the outer sleeve by the linkage of the screw rod and the threaded sleeve to adjust the height of the assembly support and simulate the high footing condition of the iron tower; The positions of the pressure rod and the pressing slide rod are adapted to correspond to each other, and the lifting column links the pressure rod, the slide rod and the supporting member to prop up the movable leg to replace the fixed leg for support.
2. The tower training device structure according to claim 1, characterized in that: A pressure spring is installed between the pressure rod and the pressure slide rod, wherein: The pressure rod is away from the pressing sliding rod, the pressing spring drives the pressing sliding rod to return and slide along the sliding sleeve, and the fixed leg replaces the movable leg for support.
3. The tower training device structure according to claim 1, characterized in that: The rotating assembly further comprises: a guide slide groove installed at the bottom of the rotating base plate, an annular slide rail is arranged inside the base, the guide slide groove is adapted to be clamped in the annular slide rail, and the rotating base plate can rotate relative to the base.
4. The tower training device structure according to claim 3, characterized in that: The rotating assembly further includes a driving unit, which includes a second motor and a gear. The second motor and the gear are in driving connection, and the gear is connected to the rotating base plate.
5. The tower training device structure according to claim 4, characterized in that: The edge of the rotating base plate is provided with a tooth groove, and the gear is meshed with the tooth groove, wherein: the second motor drives the gear to rotate, and the guide slide groove of the rotating base plate rotates under the guidance of the annular slide rail, so that the linkage lifting assembly rotates synchronously.
6. The tower training device structure according to claim 4, characterized in that: An assembly cavity is provided in the base, and the annular slide rail and the rotating base plate are accommodated in the assembly cavity.
7. The tower training device structure according to claim 4, characterized in that: The first motor and the second motor are electrically connected to an external controller.
8. The tower training device structure according to claim 1, characterized in that: Also includes: An assembly support connected to the lifting column is provided with a plurality of anchor bolts for connecting with the iron tower.
9. The tower training device structure according to claim 8, characterized in that: The anchor bolt is a T-shaped anchor bolt, a J-shaped anchor bolt, a ratchet-shaped anchor bolt or a stud-shaped anchor bolt.
10. The tower training device structure according to claim 8, characterized in that: A steel bar frame is arranged inside the assembly support, and sand, gravel or plastic particles are filled in the steel bar frame.