Transportation and installation integrated trolley for lining steel pipe of water delivery tunnel and construction method of transportation and installation integrated trolley
By designing an integrated trolley for transport and installation of steel pipes in the water transmission tunnel, the rectangular frame structure, moving mechanism, fine-tuning mechanism and testing mechanism are used to solve the problems of unstable steel pipe docking and low calibration efficiency in the prior art. , achieving a more stable and efficient steel pipe installation process.
Patent Information
- Application Number
- CN202411734549.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2025-02-21
- Estimated Expiration
- 2044-11-29
AI Technical Summary
When existing trolleys transport and install steel pipes in tunnels, they are prone to unstable connection of steel pipes due to inertial impact, and the calibration process is inefficient and difficult to operate.
A integrated trolley with a water transmission tunnel lined steel pipe transportation and installation is designed, using a rectangular frame structure chassis, moving mechanism, fine-tuning mechanism and detection mechanism to reduce the impact force during steel pipe docking through the fine-tuning mechanism, and assist in calibration through the detection mechanism. , improve the accuracy of alignment.
It effectively reduces the impact force during steel pipe docking, improves the stability and efficiency of installation, simplifies the calibration process, and reduces the difficulty of operation.
Smart Images

Figure CN119491955A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of engineering transport trolleys, and in particular relates to an integrated trolley for transporting and installing lining steel pipes in a water conveyance tunnel and a construction method thereof. Background Art
[0002] In order to minimize the impact of route construction on the ground, improve the utilization rate of ground and underground land resources, and avoid the impact of tunnels on ground houses, roads, underground subway tunnels, circuit communications and other municipal tunnels as much as possible, water resource allocation projects often design routes deep underground.
[0003] Hydraulic tunnels carry important functions such as water diversion, water delivery, and drainage. During construction, tunnel steel pipes are usually transported into the tunnel by a trolley. After contacting the previous section of steel pipes, the position of the steel pipes is changed by lateral movement and height raising and lowering to align with the previous section of steel pipes, and then the steel pipes are welded and subsequently processed.
[0004] At present, the existing trolleys have the following deficiencies when transporting and installing steel pipes in tunnels: 1. When the trolley transports the steel pipe and approaches the previous section of steel pipe in the tunnel, the port of the steel pipe on the trolley will gradually approach the port of the previous section of steel pipe and eventually collide with it. Due to the large deadweight between the trolley and the steel pipe, when the steel pipe on the trolley collides with the previous section of steel pipe, there is a large impact force due to inertia, which may have an adverse effect on the original installed steel pipe, and ultimately reduce the overall installation quality of the steel pipe in the tunnel. 2. When the steel pipe on the trolley collides with the previous section of steel pipe for alignment, it is usually manually measured by tools and visually assisted observation to determine whether it is aligned. Due to the narrow space and harsh environment in the tunnel, the method of measuring with tools is not only inefficient, but also relatively more difficult to operate. Summary of the invention
[0005] In view of the above problems, an integrated trolley for transporting and installing steel pipes for lining a water supply tunnel and a construction method thereof are provided in an embodiment of the present application, which can greatly reduce the impact force of two steel pipes when they are butted together, making the butt installation more stable. At the same time, it can assist in the calibration of the steel pipes after they are butt-jointed, thereby reducing the difficulty of operation during calibration.
[0006] In order to achieve the above-mentioned purpose, the embodiment of the present application provides the following technical solutions: The present invention provides an integrated trolley for transporting and installing steel pipes lined in a water conveyance tunnel, comprising a chassis with a rectangular frame structure, a moving mechanism is commonly arranged between the front and rear ends of the chassis, a first fine-tuning mechanism is arranged on the chassis, a plurality of guide wheels in contact with the ground are arranged on the first fine-tuning mechanism, two slide rails symmetrically arranged on the first fine-tuning mechanism, a second fine-tuning mechanism is commonly arranged on the two slide rails, a plurality of balls are movably arranged between the second fine-tuning mechanism and the chassis, a limit frame for supporting and limiting the steel pipe is arranged on the second fine-tuning mechanism, and a detection mechanism for measuring the alignment of the steel pipe installation is arranged on the chassis. The detection mechanism comprises a first sliding component arranged on the chassis, a first telescopic component is connected to the sliding component, a transverse plate is arranged on the telescopic component, a positioning component for determining the center of the steel pipe is arranged on the transverse plate, a second sliding component is also arranged at the rear end of the transverse plate, a first motor is arranged on the second sliding component, a second telescopic component is fixedly connected to the output shaft of the first motor, and a pressure detector is arranged on the second telescopic component. The second telescopic assembly includes a first connecting plate fixedly connected to the output shaft of the first motor, a second connecting plate movably inserted into the end of the first connecting plate away from the first motor, the first connecting plate and the second connecting plate are locked by bolts, a movable groove is formed at the end of the second connecting plate away from the first connecting plate, a first spring is fixedly arranged in the movable groove, and an end of the first spring close to the movable groove port is fixedly connected to the pressure detector.
[0007] According to a favorable embodiment, the first sliding component is fixedly arranged on two first guide rods that are symmetrical between the front and rear inner walls of the chassis, and a tooth plate is slidably connected between the two first guide rods. The rear end of the tooth plate is movably plugged into the rear inner wall of the chassis, and the front end of the tooth plate movably penetrates the front end side wall of the chassis, and the front end upper part of the tooth plate is fixedly connected to the first telescopic component, and a second motor is fixedly arranged on the front end side wall of the chassis, and the output shaft of the second motor is fixedly connected to a first gear meshing with the tooth plate.
[0008] According to a preferred embodiment, the first telescopic assembly includes a first column fixedly arranged at the upper front end portion of the tooth plate, the upper part of the first column is provided with a sliding groove, the first screw is rotatably arranged in the sliding groove, a third motor is fixedly arranged at the lower front end portion of the tooth plate, the output shaft of the third motor is fixedly connected to the lower end of the first screw, the first screw is threadedly connected to the second column, the lower end of the second column is slidably arranged in the sliding groove, a cylindrical third column is fixedly arranged at the lower front end portion of the cross plate, the lower end of the third column is movably plugged into the upper end of the second column, ear plates are fixedly arranged on the left and right outer walls of the second column, and second guide rods are movably plugged into the two ear plates, the second guide rod is fixedly connected to the third column, and a second spring is sleeved on the surface of the second guide rod, the upper end of the second spring is fixedly connected to the second guide rod, and the lower end of the second spring is fixedly connected to the corresponding upper end of the ear plate.
[0009] According to a favorable embodiment, the positioning assembly includes a disc fixedly arranged on a transverse plate, four second screws distributed in a cross shape are rotatably arranged on the surface of the disc, and top support blocks are threadedly connected to the four second screws, and the top support blocks are slidably connected to the disc, a through hole is opened at the center of the disc, and the ends of the four second screws close to each other extend to the through hole, a second gear is fixedly arranged at one end of the second screw located in the through hole, and a third gear meshing with the four first gears is rotatably arranged in the through hole, a fourth motor is fixedly arranged on the transverse plate, and the output shaft of the fourth motor is fixedly connected to the third gear.
[0010] According to a favorable embodiment, a sliding hole is provided at the rear end of the transverse plate, and the second sliding assembly includes a third screw rod rotatably arranged in the sliding hole, and a third connecting plate slidably arranged in the sliding hole is threadedly connected to the third screw rod, and the rear end of the third connecting plate movably passes through the rear end of the transverse plate and is fixedly connected to the first motor, and a seventh motor is fixedly arranged on the transverse plate, and the output shaft of the seventh motor is fixedly connected to the third screw rod.
[0011] According to a favorable embodiment, the moving mechanism includes two mounting seats fixedly arranged on the front end side wall of the chassis and symmetrically arranged on the left and right sides, a driving wheel with a brake plate is rotatably arranged on the mounting seat, and a reduction motor is arranged on the front end side wall of the mounting seat, the output shaft of the reduction motor is connected to the corresponding driving wheel through a first sprocket group, and two driven wheels are symmetrically arranged on the rear end of the chassis.
[0012] According to a favorable embodiment, two first adjustment holes that are symmetrical front and back are opened on the upper left and right sides of the chassis, and the first fine-tuning mechanism includes two fourth screws, and the fourth screws are rotatably arranged between the two first fine-tuning holes corresponding to the front and rear, and the front and rear ends of the fourth screws are threaded with first slides, and the first slides are slidably arranged in the first adjustment holes, and the corresponding left and right first slides are fixedly connected to the corresponding slide rails, and the guide wheel is fixedly arranged at the lower part of the first slide, and the rear ends of the two fourth screws are commonly connected through the second sprocket group for transmission, and one end of any fourth screw is fixedly connected to the output shaft of the fifth motor, and the fifth motor is fixedly arranged on the rear side wall of the chassis.
[0013] According to a favorable embodiment, second adjustment holes are provided at both left and right ends of the upper part of the slide rail, the second fine-tuning mechanism includes two fifth screws, the fifth screws are rotatably arranged between the two left and right second adjustment holes, the left and right ends of the fifth screws are threadedly connected with second slide seats, the second slide seats are slidably arranged in the corresponding second adjustment holes, the ball bearings are movably arranged at the lower part of the second slide seat, and the ball bearings are rollingly arranged on the upper surface of the chassis, the limit frame is fixedly arranged on the upper part of the four second slide seats, the left ends of the two fifth screws are commonly connected through the third sprocket group for transmission, one end of any one of the fifth screws is fixedly connected to the output shaft of the sixth motor, and the sixth motor is fixedly arranged on the right side wall of the corresponding slide rail.
[0014] According to a favorable embodiment, the limit frame includes a support base of a rectangular structure, and two hydraulic jacks symmetrically arranged front and back are fixedly provided on the left and right side walls of the support base. The four hydraulic jacks are respectively fixedly provided on the upper part of the corresponding second slide seat, and the telescopic end of the hydraulic jack is fixedly provided with a diagonal support plate that is movably abutted against the steel pipe.
[0015] A method for constructing a water conveyance tunnel lining steel pipe, which is completed in cooperation with the above-mentioned integrated trolley for transporting and installing the water conveyance tunnel lining steel pipe, comprises the following steps:
[0016] S1. Parameter adjustment: adjusting the height of the horizontal plate through the first telescopic assembly, and adjusting the relative length of the first connecting plate and the second connecting plate according to the length of the steel pipe.
[0017] S2, steel pipe placement, the steel pipe is placed on the limit frame through the first sliding assembly and the external lifting equipment, and the height of the rear section of the steel pipe is adjusted to be the same as the height of the front section of the steel pipe in the tunnel through four hydraulic jacks.
[0018] S3. Perform pressure testing on the steel pipe to be installed, and use a pressure detector to detect the pressure value of the inner wall of the steel pipe to be installed on the pressure detector.
[0019] S4, preliminary docking, the whole is moved along the tunnel by the moving mechanism until there is a certain distance between the steel pipe to be installed and the previous section of steel pipe and then stops.
[0020] S5. Depth alignment: the two steel pipes can be further aligned through the cooperation of the first fine-adjustment mechanism and the second fine-adjustment mechanism.
[0021] S6, calibration, the pressure detector originally in the steel pipe to be installed is sent into the previous section of the steel pipe through the second sliding assembly, and the pressure detector is used to perform pressure testing on the previous section of the steel pipe. The staff compares the data detected by the pressure detector with the pressure value detected in step S3 to determine whether the two steel pipes are aligned and make corresponding adjustments.
[0022] S7. The trolley is withdrawn, the aligned steel pipes are welded, and then reinforced with steel bars. After that, the hydraulic jack is retracted and the entire pipe is moved out of the tunnel.
[0023] Compared with the prior art, the integrated trolley for transporting and installing steel pipes lined in a water conveyance tunnel and the construction method thereof provided in the embodiment of the present invention have the following beneficial effects:
[0024] 1. In the present invention, when moving over a long distance, the driving wheel on the moving mechanism is used for movement. At the same time, after the two steel pipes are close to each other, the fourth screw on the first fine-tuning mechanism cooperates with the first slide seat to drive the steel pipe to be installed to further move and dock. The use of this steel pipe docking and resistance method can greatly reduce the impact force of the two steel pipes when docking, and the docking installation is more stable.
[0025] 2. In the present invention, the detection mechanism is capable of performing pressure detection on the inner walls of the two steel pipes respectively. The pressure detector is fixed at the axial position of the rear section of the pipeline through the positioning assembly, and the pressure detector is inserted into the interior of the front section of the pipeline and made to perform circular motion along the inner wall for pressure detection. The alignment of the steel pipes can be quickly determined based on the pressure detection data, and the staff can be assisted in calibration. At the same time, the difficulty of calibration after the pipelines are aligned in narrow tunnels is reduced.
[0026] 3. In the present invention, the positioning assembly in the detection mechanism can adapt to different pipe diameters. At the same time, the positioning assembly and the cross plate can also be adjusted in height through the first telescopic assembly, so that the entire detection mechanism can adapt to the auxiliary calibration work of various types of steel pipes during installation, and has better applicability. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is an overall three-dimensional first-view structural diagram of the present invention.
[0028] Figure 2 It is an overall three-dimensional second viewing angle structural diagram of the present invention.
[0029] Figure 3 for Figure 2 A magnified structural diagram of part A.
[0030] Figure 4 It is a bottom-up stereoscopic structural diagram of the present invention.
[0031] Figure 5 It is the overall plan structure diagram of the present invention.
[0032] Figure 6 It is an overall plan cross-sectional view of the present invention.
[0033] Figure 7 for Figure 6 Enlarged structural diagram of part B.
[0034] Figure 8 for Figure 6 Enlarged structural diagram of part C in the middle.
[0035] Reference numerals in the figure: 1, chassis; 2, moving mechanism; 201, mounting seat; 202, driving wheel; 203, reduction motor; 204, driven wheel; 3, first fine-tuning mechanism; 301, fourth screw rod; 302, first slide seat; 4, guide wheel; 5, slide rail; 6, second fine-tuning mechanism; 601, fifth screw rod; 602, second slide seat; 7, ball bearing; 8, limit frame; 801, support base; 802, hydraulic jack; 803, diagonal support plate; 9, detection mechanism; 901, first sliding assembly; 9011, first guide rod; 9012, tooth plate; 9013, first gear; 902, first telescopic assembly; 90 21. The first column; 9022. The first screw rod; 9023. The second column; 9024. The third column; 9025. The second guide rod; 9026. The second spring; 903. The horizontal plate; 904. The positioning assembly; 9041. The disc; 9042. The top support block; 9043. The second gear; 9044. The third gear; 9045. The second screw rod; 905. The second sliding assembly; 9051. The third screw rod; 9052. The third connecting plate; 906. The first motor; 907. The second telescopic assembly; 9071. The first connecting plate; 9072. The second connecting plate; 9073. The first spring; 908. The pressure detector. DETAILED DESCRIPTION
[0036] The following is combined with Figure 1-8 The present application is further described in detail.
[0037] Please refer to Figure 1 , Figure 2 , Figure 4 , Figure 5 and Figure 6A transport and installation integrated trolley for lining steel pipes in water conveyance tunnels, comprising a chassis 1 with a rectangular frame structure, a moving mechanism 2 is commonly arranged between the front and rear ends of the chassis 1, a first fine-tuning mechanism 3 is arranged on the chassis 1, a plurality of guide wheels 4 in contact with the ground are arranged on the first fine-tuning mechanism 3, two left-right symmetrical slide rails 5 are arranged on the first fine-tuning mechanism 3, a second fine-tuning mechanism 6 is commonly arranged on the two slide rails 5, a plurality of balls 7 are movably arranged between the second fine-tuning mechanism 6 and the chassis 1, a limiting frame 8 for supporting and limiting the steel pipe is arranged on the second fine-tuning mechanism 6, and the limiting frame 8 comprises a supporting base 801 with a rectangular structure, two front-to-back symmetrical hydraulic jacks 802 are fixedly arranged on the left and right side walls of the supporting base 801, four hydraulic jacks 802 are all arranged on the second fine-tuning mechanism 6, and a diagonal brace plate 803 movably abutting against the steel pipe is fixedly arranged at the telescopic end of the hydraulic jack 802. A detection mechanism 9 for measuring the alignment of the steel pipe installation is arranged on the chassis 1. The steel pipe is hoisted onto the limit frame 8 by external lifting equipment, and then the steel pipe is lifted to a certain height which is the same as the height of the steel pipe in the tunnel by four hydraulic jacks 802, and then the detection mechanism 9 is inserted into the pipeline, and then the steel pipe is driven into the tunnel by the moving mechanism 2. When the steel pipe on the limit frame 8 is close to the port of the previous steel pipe for a certain distance, it stops, and then the first fine-tuning mechanism 3 is used to control the steel pipe port on the limit frame 8 to slowly approach the port of the previous steel pipe, so that the two steel pipe ports can slowly and tightly fit, and with the cooperation of the second fine-tuning mechanism 6, the two steel pipes are aligned and detected by the detection mechanism 9.
[0038] See also Figure 1 The moving mechanism 2 includes two mounting seats 201 fixedly arranged on the front side wall of the chassis 1 and symmetrically arranged on the left and right sides. A driving wheel 202 with a brake plate is rotatably arranged on the mounting seat 201, and a reduction motor 203 is arranged on the front side wall of the mounting seat 201. The output shaft of the reduction motor 203 is connected to the corresponding driving wheel 202 through a first sprocket group. Two driven wheels 204 are symmetrically arranged on the rear end of the chassis 1. The reduction motor 203 cooperates with the first sprocket group to drive the driving wheel 202 to rotate, and the two driven wheels 204 at the rear end of the chassis 1 follow and move, driving the entire trolley to move.
[0039] See also Figure 2 , Figure 3 and Figure 4Two first adjustment holes that are symmetrical front and back are opened on the upper left and right sides of the chassis 1. The first fine-tuning mechanism 3 includes two fourth screws 301. The fourth screw 301 is rotatably set between the two first fine-tuning holes corresponding to the front and rear. The front and rear ends of the fourth screw 301 are threaded with first slides 302. The first slide 302 is slidably set in the first adjustment hole. The corresponding left and right first slides 302 are fixedly connected to the corresponding slide rails 5. The guide wheel 4 is fixedly set at the lower part of the first slide 302. The rear ends of the two fourth screws 301 are jointly connected through the second sprocket set. One end of any one of the fourth screws 301 is fixedly connected to the output shaft of the fifth motor. The fifth motor is fixedly set on the rear side wall of the chassis 1. The fifth motor cooperates with the second sprocket group to enable the two fourth screw rods 301 to rotate synchronously, so that the four first slides 302 can move synchronously to drive the slide rail 5 to move. The guide wheel 4 arranged under the first slide 302 can contact the ground to support the first slide 302, avoiding the problem of excessive pressure on the fourth screw rod 301 caused by the first slide 302 being suspended in the air, thereby allowing the slide rail 5 to move back and forth along the length direction of the chassis 1.
[0040] See also Figure 2 and Figure 6 , second adjustment holes are provided at both left and right ends of the upper part of the slide rail 5, the second fine-tuning mechanism 6 includes two fifth screw rods 601, the fifth screw rod 601 is rotatably arranged between the two left and right second adjustment holes, the left and right ends of the fifth screw rod 601 are threadedly connected with the second slide seat 602, the second slide seat 602 is slidably arranged in the corresponding second adjustment hole, the ball 7 is movably arranged at the lower part of the second slide seat 602, and the ball 7 is rollingly arranged on the upper surface of the chassis 1, the limit frame 8 is fixedly arranged on the upper part of the four second slide seats 602, the left ends of the two fifth screw rods 601 are connected together by the third sprocket group, one end of any one of the fifth screw rods 601 is fixedly connected with the output shaft of the sixth motor, and the sixth motor is fixedly arranged on the right side wall of the corresponding slide rail 5. The second slide 602 is connected to the chassis 1 by the sixth motor and the third sprocket group to synchronously drive the two fifth screw rods 601 to rotate, so that the four second slides 602 can drive the limit frame 8 to move back and forth along the width direction of the chassis 1, and the ball 7 arranged under the second slide 602 rolls and abuts against the upper part of the chassis 1 to support the second slide 602, thereby avoiding the problem of excessive pressure on the fifth screw rod 601 caused by the second slide 602 being suspended in the air.
[0041] In order to reduce the impact force when the two steel pipes collide, the steel pipe is driven by the moving mechanism 2 on the chassis 1 to move toward the previous section of the steel pipe, and slows down and stops in advance when the two steel pipe ports are about to contact. At this time, there is a certain distance between the two steel pipe ports, and then the first fine-tuning mechanism 3 drives the limit frame 8 to drive the steel pipe to continue to move toward the previous section of the steel pipe, so that the steel pipe of the limit frame 8 finally collides with the previous section of the steel pipe smoothly, effectively reducing the inertial impact. At the same time, the four hydraulic jacks 802 on the limit frame 8 can work at the same time to lift the steel pipe to the same height as the previous section of the steel pipe, and then the second fine-tuning mechanism 6 can drive the steel pipe on the limit frame 8 to translate left and right, further assisting the alignment of the two steel pipes.
[0042] See also Figure 1 , Figure 2 , Figure 4 and Figure 8 The detection mechanism 9 includes a first sliding component 901 arranged on the chassis 1, the sliding component is connected to a first telescopic component 902, the telescopic component is provided with a horizontal plate 903, the horizontal plate 903 is provided with a positioning component 904 for determining the center of the steel pipe, and a second sliding component 905 is also provided at the rear end of the horizontal plate 903, the second sliding component 905 is provided with a first motor 906, the output shaft of the first motor 906 is fixedly connected to a second telescopic component 907, and the second telescopic component 907 is provided with a pressure detector 908. The second telescopic component 907 includes a first connecting plate 9071 fixedly connected to the output shaft of the first motor 906, and the second connecting plate 9072 is movably connected to the end of the first connecting plate 9071 away from the first motor 906, and the surface of the second connecting plate 9072 is provided with a plurality of limiting holes distributed along the length direction of the second connecting plate 9072, and the first connecting plate 9071 is threaded with locking bolts movably connected to the limiting holes, so that the relative lengths of the two can be adjusted as needed, and the second connecting plate 9072 is provided with a movable groove at one end away from the first connecting plate 9071, and a first spring 9073 is fixedly arranged in the movable groove, and the end of the first spring 9073 close to the movable groove port is fixedly connected to the pressure detector 908.
[0043] In order to reduce the difficulty of calibrating the two steel pipes, the first sliding component 901 drives the cross plate 903 to move relative to the chassis 1, and the pressure detector 908 lying across the chassis 1 is removed, so that the steel pipe can be smoothly placed on the limit frame 8 through the external lifting equipment. At the same time, the steel pipe is lifted to the same level as the steel pipe in the tunnel through the hydraulic jack 802. After the steel pipe is placed, the first sliding component 901 drives the pressure detector 908 to reset, so that the pressure detector 908 is inserted into the interior of the steel pipe, and then the positioning component 901 is 04 works, the positioning component 904 can be fixed on the inner wall of the steel pipe and force the cross plate 903 to be at the same height level as the axis of the steel pipe. At this time, the pressure detector 908 is movably abutted against the inner wall of the steel pipe, and the pressure when the inner wall of the steel pipe and the pressure detector 908 are abutted is measured. The pressure detector 908 is driven to rotate by the first motor 906 to detect whether the pressure deviation of the pressure detector 908 is large after one rotation, and reversely judge whether the center line of the cross plate 903 is at the same position as the axis of the steel pipe. When the steel pipe on the limit frame 8 is aligned with the previous section of steel pipe and it is necessary to detect the alignment of the two steel pipes, the second sliding component 905 extends to drive the pressure detector 908 to move from the latter section of the steel pipe to the inner wall of the former section of the steel pipe. Since the position of the cross plate 903 relative to the latter steel pipe has not changed, when the first motor 906 drives the second telescopic component 907 to rotate, the pressure detector 908 moves in a circular motion along the inner wall of the former section of the steel pipe. The pressure of the inner wall of the steel pipe acting on the pressure detector 908 is measured by the pressure detector 908 (the influence of the gravity of the pressure detector 908 itself is negligible). If the two steel pipes are not aligned, it means that the centers of the two steel pipes are not on the same axis. At this time, there will be a large deviation between the data detected by the pressure detector 908 in a certain area of the former section of the steel pipe and the data measured in the steel pipe on the limit frame 8. The staff can judge whether the two steel pipes are aligned based on the detection data and make corresponding adjustments to the steel pipe on the limit frame 8. If the two steel pipes are aligned and the centers of the two steel pipes are on the same axis, and the pressure data measured by the pressure detector 908 after one rotation in the previous section of the steel pipe is basically the same as the pressure data measured in the limit frame 8, it means that the two steel pipes are aligned. The second sliding component 905 can be used to drive the pressure detector 908 to adjust its position in the previous section of the steel pipe for repeated measurements to finally determine whether the two steel pipes are aligned. After confirming the alignment, subsequent processing can be carried out.
[0044] See also Figure 1 , Figure 4 and Figure 6The first sliding assembly 901 is fixedly arranged between the front and rear inner walls of the chassis 1 and the two first guide rods 9011 are symmetrical to each other. A tooth plate 9012 is slidably connected between the two first guide rods 9011. The rear end of the tooth plate 9012 is movably plugged with the rear inner wall of the chassis 1. The front end of the tooth plate 9012 movably penetrates the front side wall of the chassis 1, and the front upper part of the tooth plate 9012 is fixedly connected with the first telescopic assembly 902. The front side wall of the chassis 1 is fixedly arranged with a second motor, and the output shaft of the second motor is fixedly connected with a first gear 9013 meshing with the tooth plate 9012. The second motor drives the first gear 9013 to rotate so that the tooth plate 9012 can slide along the length direction of the chassis 1, and the pressure detector 908 above the chassis 1 is controlled to slide along the length direction of the chassis 1.
[0045] See also Figure 1 and Figure 6 The first telescopic assembly 902 includes a first column 9021 fixedly arranged at the upper front end of the tooth plate 9012, a slide groove is provided at the upper part of the first column 9021, and a first screw rod 9022 is rotatably arranged in the slide groove, a third motor is fixedly arranged at the lower front end of the tooth plate 9012, and the output shaft of the third motor is fixedly connected to the lower end of the first screw rod 9022, a second column 9023 is threadedly connected to the first screw rod 9022, and the lower end of the second column 9023 is slidably arranged in the slide groove, and a cylindrical third motor is fixedly arranged at the lower front end of the cross plate 903. The lower end of the third column 9024 is movably connected with the upper end of the second column 9023, and the left and right outer walls of the second column 9023 are fixedly provided with ear plates, and the two ear plates are movably connected with the second guide rod 9025, and the second guide rod 9025 is fixedly connected with the third column 9024, and the surface of the second guide rod 9025 is sleeved with a second spring 9026, and the upper end of the second spring 9026 is fixedly connected with the second guide rod 9025, and the lower end of the second spring 9026 is fixedly connected with the corresponding upper end of the ear plate. The third motor drives the first screw rod 9022 to rotate, which makes the second column 9023 slide up and down to adjust the height of the horizontal plate 903.
[0046] See also Figure 1 , Figure 6 and Figure 7The positioning assembly 904 includes a disk 9041 fixedly set on the horizontal plate 903, and four second screws 9045 distributed in a cross shape are rotatably set on the surface of the disk 9041. The four second screws 9045 are all threadedly connected with a top support block 9042, and the top support block 9042 is slidably connected to the disk 9041. A through hole is opened at the center of the disk 9041, and the ends of the four second screws 9045 close to each other extend to the through hole. A second gear 9043 is fixedly set on one end of the second screw 9045 located in the through hole, and a third gear 9044 meshing with the four first gears 9013 is rotatably set in the through hole. A fourth motor is fixedly set on the horizontal plate 903, and the output shaft of the fourth motor is fixedly connected to the third gear 9044. The third gear 9044 is driven to rotate by the fourth motor, so that the four second gears 9043 rotate synchronously to drive their respective second screws 9045 to rotate. The rotation of the second screws 9045 can drive the support blocks 9042 to move radially along the disk 9041 until the four support blocks 9042 abut against the inner wall of the steel pipe at the same time.
[0047] In order to adapt to the calibration and detection of different steel pipes, the first telescopic component 902 can quickly adjust the horizontal plate 903 to a height roughly the same as the center of the steel pipe. At the same time, when the four top support blocks 9042 on the positioning component 904 are movably abutted against the inner wall of the steel pipe, the horizontal plate 903 is fixedly connected to the disc 9041, and the disc 9041 will drive the horizontal plate 903 to move and finally be fixed at the center of the steel pipe. The front end of the horizontal plate 903 is movably plugged with the second column 9023 through the third column 9024, so that the horizontal plate 903 can move a short distance with the disc 9041. Ensure that the output shaft of the first motor 906 at the rear end of the horizontal plate 903 and the steel pipe are at the same center, which is convenient for the subsequent comparison of the two steel pipes after pressure detection.
[0048] See also Figure 1 and Figure 6 The rear end of the horizontal plate 903 is provided with a sliding hole, and the second sliding assembly 905 includes a third screw 9051 rotatably arranged in the sliding hole, and the third screw 9051 is threadedly connected with a third connecting plate 9052 slidably arranged in the sliding hole, and the rear end of the third connecting plate 9052 movably penetrates the rear end of the horizontal plate 903 and is fixedly connected to the first motor 906, and the horizontal plate 903 is fixedly provided with a seventh motor, and the output shaft of the seventh motor is fixedly connected to the third screw 9051. The third screw 9051 is driven to rotate by the seventh motor so that the third connecting plate 9052 can slide along the length direction of the horizontal plate 903, thereby pushing the pressure detector 908 originally in the steel pipe to be installed into the previous section of the installed steel pipe for corresponding pressure detection.
[0049] In addition, the present invention also provides a water conveyance tunnel lining steel pipe construction method, which is used in conjunction with the above-mentioned water conveyance tunnel lining steel pipe transportation and installation integrated trolley, comprising the following steps:
[0050] S1. Parameter adjustment. The height of the horizontal plate 903 is adjusted through the first telescopic component 902 to ensure that the height of the horizontal plate 903 is basically the same as the height of the axis of the steel pipe after the steel pipe is placed on the limit frame 8. At the same time, by adjusting the relative lengths of the first connecting plate 9071 and the second connecting plate 9072, the pressure detector 908 can abut against the inner wall of the steel pipe when entering the steel pipe.
[0051] S2. Placement of the steel pipe. The horizontal plate 903 and the pressure detector 908 originally lying across the limit frame 8 are removed from above the limit frame 8 by the first sliding assembly 901. The steel pipe to be installed is transported outside the water tunnel by the lifting equipment and placed on the limit frame 8. The height of the rear section of the steel pipe is adjusted to be flush with the height of the front section of the steel pipe by the hydraulic jack 802. Then the first sliding assembly 901 is reset. At the same time, the staff assists and inserts the horizontal plate 903 and the pressure detector 908 into the steel pipe.
[0052] S3. Perform pressure testing on the steel pipe to be installed. The positioning assembly 904 is actuated so that the center of the disc 9041 is fixed co-center with the steel pipe. At this time, the pressure value of the inner wall of the steel pipe on the pressure detector 908 is detected by the pressure detector 908.
[0053] S4, preliminary docking, using the moving mechanism 2 to move the entire structure along the tunnel close to the previous section of steel pipe that has been installed and fixed in the tunnel, and brake and stop in advance when it is about to contact the previous section of steel pipe, so that there is a certain distance between the end of the previous section of steel pipe and the steel pipe to be installed.
[0054] S5, depth alignment, the first fine-tuning mechanism 3 drives the steel pipe to be installed to move toward the end of the previous steel pipe again, and finally makes the two stably collide, and then the second fine-tuning mechanism 6 can drive the steel pipe to be installed to move left and right to further adjust so that the steel pipe to be installed can finally be aligned with the previous steel pipe.
[0055] S6, calibration, the pressure detector 908 originally in the steel pipe to be installed is sent into the previous section of the steel pipe through the second sliding component 905, and then the second telescopic component 907 is driven by the first motor 906 to rotate and drive the pressure detector 908 to rotate in the previous end of the steel pipe. The staff compares the data detected by the pressure detector 908 with the pressure value detected in step S3 to determine whether the two steel pipes are aligned. If the deviation exceeds the threshold, it means that they are not fully aligned and need to be adjusted accordingly. If the deviation is within the threshold, it means that they are fully aligned.
[0056] S7. The trolley is withdrawn, the aligned steel pipes are welded, and then the steel pipes are reinforced with steel bars. After that, the hydraulic jack 802 is retracted and the entire pipe is moved out of the tunnel.
[0057] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A water tunnel lining steel pipe transport and installation integrated trolley, comprising a chassis (1) in a rectangular frame structure, characterized in that: A moving mechanism (2) is commonly provided between the front and rear ends of the chassis (1); a first fine-adjustment mechanism (3) is provided on the chassis (1); a plurality of guide wheels (4) in contact with the ground are provided on the first fine-adjustment mechanism (3); two left-right symmetrical slide rails (5) are provided on the first fine-adjustment mechanism (3); a second fine-adjustment mechanism (6) is commonly provided on the two slide rails (5); a plurality of balls (7) are movably provided between the second fine-adjustment mechanism (6) and the chassis (1); a limit frame (8) for supporting and limiting the steel pipe is provided on the second fine-adjustment mechanism (6); and a detection mechanism (9) for measuring the installation alignment of the steel pipe is provided on the chassis (1); The detection mechanism (9) comprises a first sliding component (901) arranged on the chassis (1), the sliding component is connected to a first telescopic component (902), the telescopic component is provided with a transverse plate (903), the transverse plate (903) is provided with a positioning component (904) for determining the center of a steel pipe, a second sliding component (905) is further provided at the rear end of the transverse plate (903), the second sliding component (905) is provided with a first motor (906), the output shaft of the first motor (906) is fixedly connected to a second telescopic component (907), and the second telescopic component (907) is provided with a pressure detector (908); The second telescopic component (907) includes a first connecting plate (9071) fixedly connected to the output shaft of the first motor (906); the end of the first connecting plate (9071) away from the first motor (906) is movably connected to the second connecting plate (9072); the first connecting plate (9071) and the second connecting plate (9072) are locked by bolts; the end of the second connecting plate (9072) away from the first connecting plate (9071) is provided with a movable groove, and a first spring (9073) is fixedly arranged in the movable groove; the end of the first spring (9073) close to the movable groove port is fixedly connected to the pressure detector (908).
2. The integrated trolley for transporting and installing steel pipes lined in water conveyance tunnels according to claim 1 is characterized in that: The first sliding assembly (901) is fixedly arranged between the front and rear inner walls of the chassis (1) and has two first guide rods (9011) that are symmetrical on the left and right. A toothed plate (9012) is slidably connected between the two first guide rods (9011). The rear end of the toothed plate (9012) is movably plugged into the rear inner wall of the chassis (1). The front end of the toothed plate (9012) movably penetrates the front end side wall of the chassis (1). The front end upper part of the toothed plate (9012) is fixedly connected to the first telescopic assembly (902). A second motor is fixedly arranged on the front end side wall of the chassis (1). The output shaft of the second motor is fixedly connected to a first gear (9013) that meshes with the toothed plate (9012).
3. The integrated trolley for transporting and installing steel pipes lined in water conveyance tunnels according to claim 2 is characterized in that: The first telescopic assembly (902) includes a first column (9021) fixedly arranged at the upper front end of the tooth plate (9012), a slide groove is provided at the upper part of the first column (9021), a first screw rod (9022) is rotatably arranged in the slide groove, a third motor is fixedly arranged at the lower front end of the tooth plate (9012), the output shaft of the third motor is fixedly connected to the lower end of the first screw rod (9022), a second column (9023) is threadedly connected to the first screw rod (9022), the lower end of the second column (9023) is slidably arranged in the slide groove, and a cylindrical cylindrical screw rod is fixedly arranged at the lower front end of the cross plate (903). A third column (9024), the lower end of the third column (9024) is movably connected to the upper end of the second column (9023), ear plates are fixedly arranged on the left and right outer walls of the second column (9023), and the second guide rods (9025) are movably connected to the two ear plates, the second guide rod (9025) is fixedly connected to the third column (9024), and the surface of the second guide rod (9025) is sleeved with a second spring (9026), the upper end of the second spring (9026) is fixedly connected to the second guide rod (9025), and the lower end of the second spring (9026) is fixedly connected to the upper part of the corresponding ear plate.
4. The integrated trolley for transporting and installing steel pipes lined in water conveyance tunnels according to claim 1, characterized in that: The positioning assembly (904) comprises a disk (9041) fixedly arranged on the transverse plate (903), four second screw rods distributed in a cross shape are rotatably arranged on the surface of the disk (9041), and top support blocks (9042) are threadedly connected to the four second screw rods, and the top support blocks (9042) are slidably connected to the disk (9041), a through hole is opened at the center of the disk (9041), and the ends of the four second screw rods close to each other extend to the through hole, and a second gear (9043) is fixedly arranged at one end of the second screw rod located in the through hole, and a third gear (9044) meshing with the four first gears (9013) is rotatably arranged in the through hole, and a fourth motor is fixedly arranged on the transverse plate (903), and the output shaft of the fourth motor is fixedly connected to the third gear (9044).
5. The integrated trolley for transporting and installing steel pipes for lining a water delivery tunnel according to claim 4, characterized in that: A sliding hole is provided at the rear end of the transverse plate (903); the second sliding assembly (905) comprises a third screw rod (9051) rotatably arranged in the sliding hole; a third connecting plate (9052) slidably arranged in the sliding hole is threadedly connected to the third screw rod (9051); a rear end of the third connecting plate (9052) movably passes through the rear end of the transverse plate (903) and is fixedly connected to the first motor (906); a seventh motor is fixedly arranged on the transverse plate (903); and an output shaft of the seventh motor is fixedly connected to the third screw rod (9051).
6. The integrated trolley for transporting and installing steel pipes lined in water conveyance tunnels according to claim 1, characterized in that: The moving mechanism (2) comprises two mounting seats (201) fixedly arranged on the front end side wall of the chassis (1) and symmetrical to the left and right, a driving wheel (202) with a brake plate is rotatably arranged on the mounting seat (201), and a reduction motor (203) is arranged on the front end side wall of the mounting seat (201), the output shaft of the reduction motor (203) and the corresponding driving wheel (202) are transmission-connected via a first sprocket set, and two driven wheels (204) are rotatably arranged at the rear end of the chassis (1).
7. The integrated trolley for transporting and installing steel pipes for lining water tunnels according to claim 1 is characterized in that: Two first adjustment holes symmetrically arranged in front and back are provided on the upper parts of the left and right sides of the chassis (1); the first fine-tuning mechanism (3) comprises two fourth screw rods (301); the fourth screw rods (301) are rotatably arranged between the two first fine-tuning holes corresponding to the front and back; the first slide seats (302) are threadedly arranged at the front and back ends of the fourth screw rods (301); the first slide seats (302) are slidably arranged in the first adjustment holes; the corresponding left and right first slide seats (302) are fixedly connected to the corresponding slide rails (5); the guide wheel (4) is fixedly arranged at the bottom of the first slide seat (302); the rear ends of the two fourth screw rods (301) are jointly connected in transmission through the second sprocket group; one end of any one of the fourth screw rods (301) is fixedly connected to the output shaft of the fifth motor; the fifth motor is fixedly arranged on the rear side wall of the chassis (1).
8. The integrated trolley for transporting and installing steel pipes lined in water conveyance tunnels according to claim 7, characterized in that: The left and right ends of the upper part of the slide rail (5) are both provided with second adjustment holes. The second fine-tuning mechanism (6) includes two fifth screw rods (601). The fifth screw rods (601) are rotatably arranged between the two second adjustment holes on the left and right. The left and right ends of the fifth screw rod (601) are both threadedly connected with second slide seats (602). The second slide seats (602) are slidably arranged in the corresponding second adjustment holes. The ball (7) is movably arranged at the lower part of the second slide seat (602), and the ball (7) is rollingly arranged on the upper surface of the chassis (1). The limit frame (8) is fixedly arranged on the upper part of the four second slide seats (602). The left ends of the two fifth screw rods (601) are connected together by a third sprocket group. One end of any fifth screw rod (601) is fixedly connected with the output shaft of the sixth motor. The sixth motor is fixedly arranged on the right side wall of the corresponding slide rail (5).
9. The integrated trolley for transporting and installing steel pipes lined in water conveyance tunnels according to claim 8, characterized in that: The limit frame (8) includes a support base (801) of a rectangular structure, and two hydraulic jacks (802) are fixedly arranged on the left and right side walls of the support base (801) in a front-to-back symmetrical manner. The four hydraulic jacks (802) are respectively fixedly arranged on the upper part of the corresponding second slide seat (602), and the telescopic end of the hydraulic jack (802) is fixedly arranged with a diagonal support plate (803) that is movably abutted against the steel pipe.
10. A method for constructing a steel pipe lining a water delivery tunnel, characterized in that: The process is completed by using an integrated trolley for transporting and installing the inner lining steel pipe of a water conveyance tunnel as claimed in claim 9, including the following steps: S1, parameter adjustment, adjusting the height of the horizontal plate (903) through the first telescopic component (902), and adjusting the relative lengths of the first connecting plate (9071) and the second connecting plate (9072) according to the length of the steel pipe; S2, placing the steel pipe, placing the steel pipe on the limit frame (8) by using the first sliding assembly (901) in cooperation with the external lifting equipment, and adjusting the height of the rear section of the steel pipe to be the same as the height of the front section of the steel pipe in the tunnel by using four hydraulic jacks (802); S3, performing pressure testing on the steel pipe to be installed, and using a pressure detector (908) to detect the pressure value of the inner wall of the steel pipe to be installed on the pressure detector (908); S4, preliminary docking, moving the whole along the tunnel through the moving mechanism (2) until there is a certain distance between the steel pipe to be installed and the previous steel pipe and then stopping; S5, depth alignment, through the cooperation of the first fine-adjustment mechanism (3) and the second fine-adjustment mechanism (6), the two steel pipes can be further aligned; S6, calibration, the pressure detector (908) originally in the steel pipe to be installed is sent into the previous section of the steel pipe through the second sliding assembly (905), and the pressure detector (908) is used to detect the pressure of the previous section of the steel pipe. The staff compares the data detected by the pressure detector (908) with the pressure value detected in step S3 to determine whether the two steel pipes are aligned and make corresponding adjustments; S7. The trolley is withdrawn, the aligned steel pipes are welded, and then the steel pipes are reinforced by a steel bar frame. After that, the hydraulic jack (802) is retracted and the whole is moved out of the tunnel.
Citation Information
Patent Citations
Motor iron core inner diameter concentricity detection device and detection method thereof
CN113203386A
Auxiliary mounting device for large-diameter pipeline
CN114260871A
Device and method for measuring centrality deviation of butt-joint pipelines with different pipe diameters
CN114383542A
Pressure-bearing testing device for PE (Poly Ethylene) water supply pipeline
CN118937098A
Aligning method for metallic pipe
JP2001009590A