Bracket positioning platform for rectangular pier column and positioning method
By designing a beef leg positioning platform for rectangular pier columns, using a bubble meter to adjust the level of the positioning platform, and fixing the crawling cone through positioning ribs, the problems of crawling cone deviation and deformation in traditional beef leg installation methods are solved, and the precise installation of the beef leg and the high reliability and safety of the support are achieved.
Patent Information
- Application Number
- CN202411839352.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-13
- Publication Date
- 2025-02-25
AI Technical Summary
In bridge construction, traditional beef leg installation methods can easily lead to deviation or deformation of the crawler cone, affecting the installation quality of the beef leg and the reliability and safety of the overall bracket.
A charlatan positioning platform for rectangular piers is designed, including a positioning platform, a charlatan and a crawling cone. The positioning platform adjusts its level through an azimuth bubble meter and a horizontal bubble meter to ensure the accurate installation position of the cow legs. The crawling cone is fixedly installed on the main rib of the pier column by positioning ribs to avoid deformation and displacement.
The precise installation of the cow legs is achieved, the reliability and safety of the bracket is improved, the problems of crawling cone deviation and deformation are avoided, and the normal installation of the cover beam support frame is ensured.
Smart Images

Figure CN119507339A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridge construction, relates to bridge piers, and in particular to a bracket positioning platform and a positioning method for rectangular piers. Background Art
[0002] In bridge construction, the cap beam support meets the construction load of the cap beam by means of climbing cones and corbels attached to the piers. In this support system, the height of the corbel determines the height of the cap beam formwork support, and the installation accuracy of the climbing cone affects the installation quality of the corbel. Therefore, the installation and positioning accuracy of the corbel is particularly important, which will affect the reliability and safety of the overall support.
[0003] The traditional installation method is to fix multiple corbels on the pier, and each corbel is provided with multiple climbing cone points. If a single climbing cone is pre-buried separately, the climbing cone may be misaligned or deformed during the pouring of pier concrete, which directly affects the installation quality and stress of the corbel. In severe cases, the corbel cannot be installed, thereby reducing the overall reliability and safety of the bracket, and even causing the bracket to collapse.
[0004] Therefore, we propose a corbel positioning platform and positioning method for rectangular pier columns to solve the above problems. Summary of the invention
[0005] The purpose of the present invention is to overcome the deficiencies of the prior art and to provide a corbel positioning platform and a positioning method for a rectangular pier column which are accurate in positioning and easy to install.
[0006] To solve the above problems, the technical solution of the present invention is:
[0007] A bracket positioning platform for a rectangular pier column, comprising:
[0008] The positioning platform is fixedly installed on the template of the pier column to form a closed loop structure around the pier column;
[0009] The corbel is arranged on the positioning platform and is fixed on the pier column through a climbing cone;
[0010] The positioning platform comprises a plurality of platform bodies and a leveling unit. The leveling units are fixedly installed on the plurality of platform bodies and are suitable for adjusting the installation level of the platform bodies.
[0011] In a further embodiment, the leveling unit includes a plurality of azimuth bubble gauges and a plurality of horizontal bubble gauges, the azimuth bubble gauges are commonly installed at the ends of adjacent platform bodies, and the horizontal bubble gauges are fixedly installed in the middle of the platform body.
[0012] In a further embodiment, a plurality of platform bodies form a rectangular structure around the pier, and a plurality of azimuth bubble meters are respectively located at the four corners of the rectangular structure.
[0013] In a further embodiment, bolt holes are formed on the platform body to facilitate installation on the template of the pier.
[0014] In a further embodiment, the climbing cone is fixedly mounted on the main reinforcement of the pier column through a plurality of positioning reinforcements.
[0015] In a further embodiment, the main reinforcement is arranged vertically and the positioning reinforcement is arranged horizontally.
[0016] In a further embodiment, an anchor plate is sandwiched between the corbel and the outer surface of the pier.
[0017] A method for positioning a bracket for a rectangular pier column, wherein a positioning platform is fixedly installed on the pier column, and comprises the following steps:
[0018] Step S101: Assembling the positioning platform
[0019] Connecting a plurality of platform bodies, a plurality of azimuth bubble meters and a plurality of level bubble meters to form a positioning platform;
[0020] Adjust the levelness of the positioning platform through the azimuth bubble meter and the level bubble meter;
[0021] The positioning platform is fixedly installed on the formwork of the pier column;
[0022] Step S103: Install the corbel
[0023] Fix the anchor plate and climbing cone on the side of the corbel in sequence; place the corbel on the positioning platform;
[0024] Step S105: Install climbing cone
[0025] The climbing cone is fixed on the main reinforcement of the pier column through positioning reinforcement.
[0026] In a further embodiment, after the climbing cone and the corbel are connected in step S103, the horizontality of the positioning platform is adjusted again by using the azimuth bubble meter and the level bubble meter.
[0027] In a further embodiment, after the climbing cone is installed in step S105 and the concrete pouring of the pier is completed, the positioning platform is disassembled and is suitable for recycling.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] 1. The platform body of this positioning platform forms a closed structure around the pier column. Several azimuth bubble gauges are fixedly installed at the four corners of the platform body, and a horizontal bubble gauge is fixedly installed in the middle of the platform body. The azimuth bubble gauge and the horizontal bubble gauge cooperate with each other to ensure the installation level of the positioning platform, and then locate the installation position of the corbel to ensure that the corbel is installed firmly and accurately. After the construction is completed, the positioning platform can be disassembled and assembled again when used next time. It is convenient and quick, can be reused, and reduces construction costs.
[0030] 2. Several positioning bars are fixedly installed at intervals on the main bars of the pier column of this positioning platform, the climbing cone is fixedly installed on several positioning bars, and the corbel is fixedly installed on the climbing cone through the corbel connecting bolts, so as to ensure that during the installation of the pier column formwork and the pouring of the pier column concrete, the climbing cone and the corbel can remain stable to avoid deformation and displacement problems, ensure that the subsequent cap beam support frame can be installed normally, and improve the safety and reliability of the overall structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 is a cross-sectional view of a corbel positioning platform for a rectangular pier;
[0032] Figure 2 A top view of a corbel positioning platform for a rectangular pier;
[0033] Figure 3 The present invention is a flow chart of a method for positioning a corbel for a rectangular pier.
[0034] In the figure: 1. Positioning platform; 11. Azimuth bubble meter; 12. Platform body; 121. Horizontal bubble meter; 122. Platform connecting bolts; 123. Bolt holes; 2. Corbel; 21. Corbel connecting bolts; 22. Anchor plate; 3. Climbing cone; 31. Positioning reinforcement; 4. Pier column; 41. Main reinforcement. DETAILED DESCRIPTION
[0035] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0036] Embodiment 1:
[0037] A bracket positioning platform for rectangular piers, such as Figure 1 , Figure 2 As shown, it includes a horizontally arranged positioning platform 1, which is fixedly installed on the template of the pier column 4. A plurality of corbels 2 are installed on the positioning platform 1, which is suitable for positioning the plurality of corbels 2 to ensure that the installation position of the corbels 2 is accurate; the plurality of corbels 2 are fixedly installed on the pier column 4 through climbing cones 3, which are firm and stable, avoiding the displacement of the corbels 2 during the pouring of concrete of the pier column 4, thereby ensuring the installation quality of the corbels 2.
[0038] The positioning platform 1 is a closed annular structure, and the specific structural shape can be changed according to the shape of the pier 4; the positioning platform 1 includes a plurality of platform bodies 12 and a plurality of azimuth bubble meters 11, the plurality of platform bodies 12 are all horizontally arranged, and the plurality of platform bodies 12 are respectively located on the side end surfaces of the pier 4, and the ends of two adjacent platform bodies 12 are jointly fixedly installed with the azimuth bubble meters 11 through platform connecting bolts 122, and the plurality of azimuth bubble meters 11 are respectively located at the four corners of the pier 4, which can ensure that the orientation of the positioning platform 1 is consistent with the orientation of the pier 4, so that the force on the corbel 2 is uniform; the middle parts of the plurality of platform bodies 12 are fixedly installed with horizontal bubble meters 121, which can cooperate with the azimuth bubble meters 11 to adjust the installation level of the platform bodies 12 and improve the installation accuracy of the corbel 2; a plurality of bolt holes 123 are evenly arranged on the plurality of platform bodies 12, and bolts are installed at the bolt holes 123, which are suitable for fixing the platform bodies 12 on the template of the pier 4.
[0039] Several climbing cones 3 are fixedly installed at intervals in the pier column 4, and several positioning ribs 31 are fixedly installed between several main ribs 41 of the pier column 4. The positioning ribs 31 are arranged horizontally, and the climbing cone 3 is fixedly installed on the several positioning ribs 31 to ensure that the climbing cone 3 is firmly and stably installed; the side end surface of the corbel 2 is fixedly installed with an anchor plate 22, and the side end surface of the corbel 2 and the anchor plate 22 are both provided with several round holes at intervals, and the corbel connecting bolts 21 are installed at the round holes, and the corbel 2 and the climbing cone 3 are fixedly installed together through the corbel connecting bolts 21, and the corbel 2 is placed on the platform body 12, and can also be fixedly installed on the platform body 12 by bolts or the like. Preferably, several ribs are also provided at intervals on the corbel 2, which are suitable for improving the structural strength of the corbel 2; the climbing cone 3 is an integral climbing cone; and the corbel connecting bolts 21 use high-strength hexagonal bolts.
[0040] Example 2
[0041] A method for positioning the brackets of rectangular piers, such as Figure 3 As shown, the following steps are also included:
[0042] Step S101: Assembling positioning platform 1
[0043] A horizontal bubble meter 121 is fixedly installed on the platform body 12, and then a plurality of platform bodies 12 and a plurality of azimuth bubble meters 11 are fixedly installed together using platform connecting bolts 122 to form a positioning platform 1; the positioning platform 1 is leveled by the horizontal bubble meter 121 and the azimuth bubble meter 11, and the positioning platform 1 is adjusted to be horizontal and vertical.
[0044] The adjusted positioning platform 1 is installed on the pier column 4 , and is fixed on the template of the pier column 4 through the bolt holes 123 of the platform body 12 and the platform connecting bolts 122 .
[0045] Step S103: Install the corbel 2
[0046] The anchor plate 22 and the climbing cone 3 are installed in sequence on the side end surface of the corbel 2, and the corbel 2, the anchor plate 22 and the climbing cone 3 are fixed together by the corbel connecting bolts 21, and then the corbel 2 is placed on the positioning platform 1; the climbing cone 3 can also be fixedly installed on the pier 4 first, and then the corbel 2 is fixedly installed on the climbing cone 3.
[0047] After the corbel 2 is placed, the horizontal bubble meter 121 and the azimuth bubble meter 11 are used again to adjust the horizontality of the positioning platform 1.
[0048] Step S105: Install climbing cone 3
[0049] Several positioning bars 31 are fixedly installed on the main bars 41 of the pier column 4 at intervals, and the climbing cone 3 is fixedly installed on the several positioning bars 31 to complete the fixation of the corbel 2, and the installation is accurate and firm; the concrete of the pier column 4 is poured, and after the concrete reaches a predetermined strength, the positioning platform 1 is disassembled and retained for next use.
[0050] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A bracket positioning platform for rectangular piers, characterized in that: include: A positioning platform (1) is fixedly mounted on a template of a pier column (4) to form a closed loop structure around the pier column (4); A bracket (2) is arranged on the positioning platform (1), and the bracket (2) is fixedly mounted on the pier (4) via a climbing cone (3); The positioning platform (1) comprises a plurality of platform bodies (12) and a leveling unit. The leveling unit is fixedly mounted on the plurality of platform bodies (12) and is suitable for adjusting the installation level of the platform bodies (12).
2. The bracket positioning platform for rectangular piers according to claim 1, characterized in that: The leveling unit comprises a plurality of azimuth bubble gauges (11) and a plurality of level bubble gauges (121); the azimuth bubble gauges (11) are installed together at the ends of the adjacent platform bodies (12); and the level bubble gauges (121) are fixedly installed at the middle of the platform body (12).
3. The bracket positioning platform for rectangular piers according to claim 2, characterized in that: A plurality of platform bodies (12) surround the pier (4) to form a rectangular structure, and a plurality of azimuth bubble meters (11) are respectively located at the four corners of the rectangular structure.
4. The bracket positioning platform for rectangular piers according to claim 3, characterized in that: The platform body (12) is provided with bolt holes (123) for easy installation on the template of the pier column (4).
5. The bracket positioning platform for rectangular piers according to claim 4, characterized in that: The climbing cone (3) is fixedly mounted on the main reinforcement (41) of the pier column (4) via a plurality of positioning reinforcements (31).
6. The bracket positioning platform for rectangular piers according to claim 5, characterized in that: The main ribs (41) are arranged vertically, and the positioning ribs (31) are arranged horizontally.
7. The bracket positioning platform for rectangular piers according to claim 6, characterized in that: An anchor plate (22) is sandwiched between the corbel (2) and the outer surface of the pier column (4).
8. A method for positioning a corbel for a rectangular pier, characterized in that: Fixedly installing a positioning platform (1) according to any one of claims 1 to 7 on a pier (4) comprises the following steps: Step S101: Assembling the positioning platform (1) Connecting a plurality of the platform bodies (12), a plurality of the azimuth bubble meters (11) and a plurality of the level bubble meters (121) to form the positioning platform (1); Adjusting the horizontality of the positioning platform (1) by means of the azimuth bubble meter (11) and the level bubble meter (121); The positioning platform (1) is fixedly mounted on the template of the pier column (4); Step S103: Installing the corbel (2) The anchor plate (22) and the climbing cone (3) are sequentially fixedly installed on the side of the corbel (2); the corbel (2) is placed on the positioning platform (1); Step S105: Install climbing cone (3) The climbing cone (3) is fixedly mounted on the main reinforcement (41) of the pier column (4) via the positioning reinforcement (31).
9. The method for positioning a corbel for a rectangular pier according to claim 8, characterized in that: After the climbing cone (3) and the bracket (2) are connected in step S103, the horizontality of the positioning platform (1) is adjusted again by the azimuth bubble meter (11) and the level bubble meter (121).
10. The method for positioning a corbel for a rectangular pier according to claim 9, characterized in that: After the climbing cone (3) is installed in step S105 and the concrete pouring of the pier (4) is completed, the positioning platform (1) is disassembled and is suitable for recycling.