Novel modularized rapid first-aid repair pier

By dividing the railway piers emergency repair device into multiple small-unit components and adopting modular connection methods, the problems of complex structure and slow assembly speed in the existing technology are solved, and fast and simple installation and assembly are achieved, and emergency repair speed is improved. and efficiency.

CN119507349APending Publication Date: 2025-02-25SHANDONG CHINA RAILWAY BRIDGE ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510017827.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-06
Publication Date
2025-02-25

AI Technical Summary

Technical Problem

The existing railway piers repair equipment has a solid structure, but the poles are large in size and complex in structure, and the speed of out-of-warehouse assembly is slow, which makes it difficult to quickly open damaged railway bridges.

Method used

The emergency repair pier is divided into top beam assembly, pad beam assembly, support assembly and multiple basic unit components. It is first assembled and then connected, and is installed and fixed from small to large, simplifying the installation method and structure.

Benefits of technology

It realizes fast and simple installation and assembly, improves emergency repair speed and efficiency, and solves the problems of complex structure and slow assembly speed in the existing technology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119507349A_ABST
    Figure CN119507349A_ABST
Patent Text Reader

Abstract

The invention discloses a novel modularized rapid first-aid repair pier, and relates to the technical field of bridge pier first-aid repair devices. The device comprises a top beam assembly, a bearing beam assembly and a foundation unit assembly. Supporting assemblies are arranged at the bottoms of the bearing beam assemblies. The basic unit assembly comprises a plurality of stand columns arranged in parallel. A connecting piece is arranged between every two adjacent stand columns. The connecting piece comprises transverse plates which are symmetrically arranged between the two adjacent stand columns up and down; connecting plates are arranged at two ends of the transverse plate; the two connecting plates are fixed to the two adjacent stand columns respectively. A plurality of inclined plates are arranged between every two adjacent stand columns. The whole first-aid repair pier is divided into the top beam assembly, the bearing beam assembly, the supporting assembly and the multiple basic unit assemblies, a main body of the first-aid repair pier is composed of the multiple small-size basic unit assemblies, the assemblies of all the small units are assembled firstly, then all the small units are connected to be delivered out of a warehouse and assembled, and the small units are installed and fixed from small to large; the installation mode is simple, the structure is simple, and installation is easy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge pier emergency repair devices, and in particular relates to a novel modular rapid emergency repair pier. Background Art

[0002] As of November 2023, the national railway operating mileage will reach 155,500 kilometers. The total length of high-speed railway bridges currently completed and under construction accounts for more than 50% of the lines. The proportion of bridges on lines such as the Beijing-Tianjin Intercity Railway and the Beijing-Shanghai High-Speed ​​Railway is as high as more than 80%. Bridges have become the main body of high-speed railway projects. According to statistics from relevant departments of the China Railway Corporation, railway bridges are increasingly suffering from sudden disasters of varying degrees, especially railway bridges overpassing highways. Because the clearance under the bridge is mostly less than 5m, and large highway trucks are driven by economic interests, overweight and over-high loading are common, resulting in frequent collisions of overpassing railway bridges.

[0003] After a railway bridge is hit by a highway truck, the beam and pier are most likely to be damaged. When the damage is not serious, the solution of first opening and then repairing is usually adopted to minimize the loss and impact, that is, first set up temporary piers under the beam to share the force of the damaged pier or reduce the span of the beam to increase the bearing capacity of the damaged beam, so that the damaged bridge has the ability to pass at a limited speed. After the bridge is fully repaired, the damaged beam or pier will be replaced and repaired. Temporary piers are a very important emergency repair structure for railway bridges. Their warehouse transportation and on-site assembly efficiency directly affect the timeliness of the damaged railway bridge to resume traffic. However, the existing railway pier repair equipment generally has the disadvantages of strong structure but large rod volume, complex structure, slow warehouse assembly speed, etc., which is not conducive to the rapid opening of damaged railway bridges.

[0004] To this end, we provide a new type of modular rapid repair pier to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide a novel modular rapid repair pier. The repair pier is divided into a top beam assembly, a cushion beam assembly, a support assembly and a plurality of basic unit assemblies. The main body of the repair pier is composed of a plurality of small-volume basic unit assemblies. The pier is assembled and shipped out of the warehouse in a manner of first assembling the components of each small unit and then connecting the small units. The pier is installed and fixed from small to large. The installation method is simple, the structure is simple, and the pier is easy to install. The existing railway pier repair equipment generally has the disadvantages of a strong structure but a large rod volume, a complex structure, and a slow assembly speed, which is not conducive to the rapid repair of damaged railway bridges.

[0006] To solve the above technical problems, the present invention is implemented through the following technical solutions: The present invention is a new modular rapid repair pier, comprising a top beam assembly and a cushion beam assembly which are arranged in parallel up and down; a number of basic unit assemblies are evenly arranged between the top beam assembly and the cushion beam assembly; two adjacent basic unit assemblies are aligned and fitted with each other; a support assembly is arranged at the bottom of the cushion beam assembly; the basic unit assembly comprises a number of parallel columns; a connecting member is arranged between two adjacent columns; the connecting member comprises a horizontal plate which is symmetrically arranged between two adjacent columns up and down; connecting plates are arranged at both ends of the horizontal plate; the two connecting plates are respectively fixed on two adjacent columns; a number of inclined plates are arranged between two adjacent columns; and the two ends of the inclined plate are arranged on connecting plates on different horizontal plates.

[0007] The present invention is further configured such that the basic unit assembly includes two specifications, upper and lower; the basic size of the basic unit assembly located at the lower side is 2m×1.5m×1.5m; the basic size of the basic unit assembly located at the upper side is 1.5m×1.5m×1.5m.

[0008] The present invention is further configured such that the connecting piece on the basic unit assembly located at the bottom is provided with two groups of inclined plates; the two inclined plates are cross-arranged; the connecting piece on the basic unit assembly located at the top is provided with a group of inclined plates; one end of the connecting plate is welded and fixed to the column, and the other end thereof is welded and fixed to the horizontal plate and the inclined plate.

[0009] The present invention is further configured such that the top beam assembly and the cushion beam assembly include a plurality of first cushion plates and second cushion plates arranged in parallel; the first cushion plates and the second cushion plates are arranged vertically and horizontally; the first cushion plates and the second cushion plates are fixedly connected by M22 high-strength bolts; the first cushion plates that fit together and the second cushion plates that fit together are both fixedly connected by M22 high-strength bolts.

[0010] The present invention is further configured such that the column is fixedly connected to the first pad by an M48 fastening bolt; the two horizontally attached columns are fixedly connected by an M22 high-strength bolt; and the two vertically attached columns are fixedly connected by an M48 fastening bolt.

[0011] The present invention is further configured such that the materials of the column, the first pad and the second pad are all Q345 steel; the column adopts a 160×160mm square tube with a thickness of 10mm; and the inclined plate adopts a 75×75mm equilateral angle steel with a thickness of 5mm.

[0012] The present invention is further configured such that the connecting plate is made of 130×260mm steel plate with a thickness of 10mm; the second pad is made of 300×150mm cold-bent channel steel; and the first pad is made of 284×142mm steel plate with a thickness of 10mm.

[0013] The present invention is further configured such that the support assembly includes a plurality of jacks fixed on the bottom surfaces of the two outermost first pads near their two ends; the jacks are fixed to the bottom surfaces of the first pads by M22 high-strength bolts; and a plurality of load-bearing wheels are provided on the bottom surfaces of the two outermost second pads.

[0014] The present invention has the following beneficial effects: 1. The present invention divides the entire emergency repair pier into a top beam assembly, a cushion beam assembly, a support assembly and a plurality of basic unit assemblies. The main body of the emergency repair pier is composed of a plurality of small-volume basic unit assemblies. The pier is assembled and shipped out of the warehouse in a manner of first assembling the components of each small unit and then connecting each small unit. The pier is installed and fixed from small to large, and the installation method is simple, the structure is simple, and the pier is easy to install.

[0015] 2. In the present invention, the second pads that fit together, the first pads that fit together, the adjacent first pads and second pads, and the columns that fit together are all fixedly connected with M22 high-strength bolts. At the same time, the connecting parts are assembled by welding, and the two columns are connected by welding, which improves safety.

[0016] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0018] Figure 1 This is a structural diagram of a new type of modular rapid repair pier.

[0019] Figure 2 For the present invention Figure 1 A magnified image of area A.

[0020] Figure 3 It is a front view of the basic unit component assembly of the present invention.

[0021] Figure 4 It is a schematic structural diagram of the top beam assembly of the present invention.

[0022] Figure 5 It is a structural schematic diagram of the cushion beam assembly of the present invention.

[0023] Figure 6 It is a schematic structural diagram of the basic unit assembly of the present invention.

[0024] In the accompanying drawings, the components represented by the reference numerals are listed as follows: 1. Top beam assembly; 2. Pad beam assembly; 3. Basic unit assembly; 4. Support assembly; 5. Column; 6. Connector; 7. Cross plate; 8. Connecting plate; 9. Inclined plate; 10. First pad; 11. Second pad; 12. Jack; 13. Load-bearing wheel. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] For specific embodiment 1, please refer to Figure 1-6 The present invention is a novel modular rapid repair pier, comprising a top beam assembly 1 and a cushion beam assembly 2 which are arranged in parallel up and down; a plurality of basic unit assemblies 3 are evenly arranged between the top beam assembly 1 and the cushion beam assembly 2; two adjacent basic unit assemblies 3 are aligned and fitted with each other; a support assembly 4 is arranged at the bottom of the cushion beam assembly 2; the basic unit assembly 3 comprises a plurality of parallel columns 5; a connecting member 6 is arranged between two adjacent columns 5; the connecting member 6 comprises a horizontal plate 7 which is symmetrically arranged between two adjacent columns 5 up and down; connecting plates 8 are arranged at both ends of the horizontal plate 7; the two connecting plates 8 are respectively fixed on two adjacent columns 5; a plurality of inclined plates 9 are arranged between two adjacent columns 5; and the two ends of the inclined plate 9 are arranged on connecting plates 8 on different horizontal plates 7.

[0027] The operation process of this embodiment is: when the bridge pier needs to be repaired, the device is loaded into a truck in a scattered form and transported to the repair site. First, the cushion beam assembly 2 is assembled, and then the support assembly 4 is installed at the bottom of the cushion beam assembly 2, the installation of the base is preliminarily completed, and then multiple basic unit assemblies 3 are installed.

[0028] When installing the basic unit assembly 3, first connect and fix the column 5 and the cushion beam assembly 2, then fix the connecting plate 8 on the connecting piece 6 to the corresponding position of the corresponding column 5 in turn, and then install the cross plate 7 on the connecting plate 8 between two adjacent columns 5 to improve the fixing strength between the columns 5 on the same basic unit assembly 3, and finally install the inclined plate 9 on the connecting plate 8 on different cross plates 7 to strengthen the fixing strength of the connecting piece 6. The columns 5 between adjacent basic unit assemblies 3 are also connected and fixed to improve the fixing strength between the basic unit assemblies 3. Finally, the top beam assembly 1 is installed on the top of each basic unit assembly 3 to perform the total connection and fixation at the top.

[0029] In this embodiment, the entire emergency repair pier is divided into a top beam assembly 1, a cushion beam assembly 2, a support assembly 4 and a plurality of basic unit assemblies 3. The main body of the emergency repair pier is composed of a plurality of small-volume basic unit assemblies 3. The pier is assembled and shipped out of the warehouse in a manner of first assembling the components of each small unit and then connecting each small unit. The pier is installed and fixed from small to large, and the installation method is simple, the structure is simple, and the pier is easy to install.

[0030] For specific embodiment 2, please refer to Figure 1-6 On the basis of the first specific embodiment, the basic unit assembly 3 includes two specifications, upper and lower; the basic size of the basic unit assembly 3 located at the bottom is 2m×1.5m×1.5m; the basic size of the basic unit assembly 3 located at the top is 1.5m×1.5m×1.5m.

[0031] Specifically, the connecting member 6 on the basic unit assembly 3 located at the bottom is provided with two groups of inclined plates 9; the two inclined plates 9 are cross-arranged; the connecting member 6 on the basic unit assembly 3 located at the top is provided with a group of inclined plates 9; one end of the connecting plate 8 is welded and fixed to the column 5, and the other end thereof is welded and fixed to the cross plate 7 and the inclined plate 9.

[0032] Furthermore, the top beam assembly 1 and the cushion beam assembly 2 include a plurality of first pads 10 and second pads 11 arranged in parallel; the first pads 10 and the second pads 11 are arranged vertically and horizontally; the first pads 10 and the second pads 11 are fixedly connected by M22 high-strength bolts; the first pads 10 and the second pads 11 that fit together are fixedly connected by M22 high-strength bolts.

[0033] Furthermore, the column 5 is fixedly connected to the first pad 10 by means of M48 fastening bolts; the two horizontally attached columns 5 are fixedly connected by means of M22 high-strength bolts; and the two vertically attached columns 5 are fixedly connected by means of M48 fastening bolts.

[0034] Furthermore, the materials of the column 5, the first pad 10 and the second pad 11 are all Q345 steel; the column 5 adopts a 160×160 mm square tube with a thickness of 10 mm; the inclined plate 9 adopts a 75×75 mm equilateral angle steel with a thickness of 5 mm.

[0035] Furthermore, the connecting plate 8 is made of a 130×260 mm steel plate with a thickness of 10 mm; the second pad 11 is made of a 300×150 mm cold-bent channel steel; and the first pad 10 is made of a 284×142 mm steel plate with a thickness of 10 mm.

[0036] The operation process of this embodiment is as follows: when it is necessary to repair the bridge pier, the device is loaded into a truck in a scattered form and transported to the repair site. First, the second pad 11 on the cushion beam assembly 2 is laid flat on the ground and adjusted in position. The second pad 11 that fits in is fixed and connected with M22 high-strength bolts. Then, the first pad 10 is laid flat on the surface of the second pad 11 and adjusted in position. The first pad 10 that fits in is fixed and connected with M22 high-strength bolts. The adjacent first pads 10 and second pads 11 are fixed and connected with M22 high-strength bolts. Finally, the support assembly 4 is installed on the cushion beam assembly 2 to complete the installation of the base. The installation strength of the cushion beam assembly 2 is improved by M22 high-strength bolts, thereby improving safety.

[0037] Then, install the basic unit assembly 3 located below, fix the column 5 on the surface of the first pad 10 by M48 fastening bolts, and then weld the connecting plates 8 on the connecting parts 6 to the corresponding positions of the corresponding columns 5 in sequence, and then weld the cross plate 7 to the connecting plate 8 between the two adjacent columns 5 to improve the fixing strength between the columns 5 on the same basic unit assembly 3, and finally install the inclined plate 9 on the connecting plates 8 on different cross plates 7, and finally fix the mutually fitting columns 5 on the two adjacent basic unit assemblies 3 by M22 high-strength bolts to improve the fixing strength between the basic unit assemblies 3, and then perform the same operation to complete the installation of the basic unit assembly 3 located above.

[0038] Then install the top beam assembly 1, lay the first pad 10 flat on the basic unit assembly 3 and adjust the position, fix the fitted first pad 10 with M22 high-strength bolts, then lay the second pad 11 flat on the surface of the first pad 10 and adjust the position, fix the fitted second pad 11 with M22 high-strength bolts, and fix the adjacent first pads 10 and second pads 11 with M22 high-strength bolts. The installation strength of the top beam assembly 1 is improved by M22 high-strength bolts, thereby improving safety.

[0039] For specific embodiment 3, please refer to Figure 1-6 On the basis of the first and second specific embodiments, the support assembly 4 includes a plurality of jacks 12 fixed to the bottom surfaces of the two outermost first pads 10 in the cushion beam assembly 2 near both ends thereof; the jacks 12 are fixed to the bottom surfaces of the first pads 10 by M22 high-strength bolts; and a plurality of load-bearing wheels 13 are provided on the bottom surfaces of the two outermost second pads 11.

[0040] The operation process of this embodiment is as follows: after the first pad 10 and the second pad 11 of the cushion beam assembly 2 are installed and fixed, the jack 12 is fixed to the bottom surface of the first pad 10 by M22 high-strength bolts, and then a servo motor is installed on the side of the second pad 11, and the output end of the servo motor is coaxially connected to a load-bearing wheel 13, and then the servo motor is started to drive the corresponding load-bearing wheel 13 to rotate, thereby driving the cushion beam assembly 2 to move, and then driving the basic unit assembly 3 and the top beam assembly 1 to move, and the device is moved to the emergency repair pier in place, and the jack 12 is used to push it to support the bridge pier.

[0041] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0042] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A novel modular rapid repair pier, comprising a top beam assembly (1) and a cushion beam assembly (2) arranged in parallel up and down; the characteristics are: A plurality of basic unit assemblies (3) are evenly arranged between the top beam assembly (1) and the cushion beam assembly (2); two adjacent basic unit assemblies (3) are aligned and fitted with each other; a support assembly (4) is arranged at the bottom of the cushion beam assembly (2); The basic unit assembly (3) comprises a plurality of columns (5) arranged in parallel; a connecting piece (6) is arranged between two adjacent columns (5); The connecting member (6) comprises a horizontal plate (7) symmetrically arranged between two adjacent columns (5); connecting plates (8) are arranged at both ends of the horizontal plate (7); and the two connecting plates (8) are respectively fixed on the two adjacent columns (5); A plurality of inclined plates (9) are arranged between two adjacent upright columns (5); both ends of the inclined plates (9) are arranged on connecting plates (8) on different transverse plates (7).

2. A new modular rapid repair pier according to claim 1, characterized in that: The basic unit assembly (3) comprises two specifications, upper and lower; the basic unit assembly (3) located at the lower side has a basic size of 2m×1.5m×1.5m; the basic unit assembly (3) located at the upper side has a basic size of 1.5m×1.5m×1.5m.

3. A new modular rapid repair pier according to claim 2, characterized in that: The connecting piece (6) on the base unit assembly (3) located at the bottom is provided with two groups of inclined plates (9); the two inclined plates (9) are arranged crosswise; the connecting piece (6) on the base unit assembly (3) located at the top is provided with a group of inclined plates (9); one end of the connecting plate (8) is welded and fixed to the column (5), and the other end thereof is welded and fixed to the horizontal plate (7) and the inclined plate (9).

4. The novel modular rapid repair pier according to claim 3 is characterized in that: The top beam assembly (1) and the cushion beam assembly (2) comprise a plurality of first cushion plates (10) and second cushion plates (11) arranged in parallel; the first cushion plates (10) and the second cushion plates (11) are arranged vertically and horizontally; the first cushion plates (10) and the second cushion plates (11) are fixedly connected by M22 high-strength bolts; the first cushion plates (10) and the second cushion plates (11) that fit together are both fixedly connected by M22 high-strength bolts.

5. The novel modular rapid repair pier according to claim 4 is characterized in that: The columns (5) are fixedly connected to the first pad (10) by means of M48 fastening bolts; the two columns (5) that are horizontally attached are fixedly connected by means of M22 high-strength fastening bolts; and the two columns (5) that are vertically attached are fixedly connected by means of M48 fastening bolts.

6. The novel modular rapid repair pier according to claim 5 is characterized in that: The materials of the column (5), the first pad (10) and the second pad (11) are all Q345 steel; the column (5) is a 160×160 mm square tube with a thickness of 10 mm; and the inclined plate (9) is an equilateral angle steel with a thickness of 75×75 mm and a thickness of 5 mm.

7. The novel modular rapid repair pier according to claim 6 is characterized in that: The connecting plate (8) is made of a 130×260 mm steel plate with a thickness of 10 mm; the second pad (11) is made of a 300×150 mm cold-bent channel steel; and the first pad (10) is made of a 284×142 mm steel plate with a thickness of 10 mm.

8. The novel modular rapid repair pier according to claim 7 is characterized in that: The support assembly (4) comprises a plurality of jacks (12) fixed to the bottom surfaces of the two outermost first pads (10) in the pad beam assembly (2) near the two ends thereof; the jacks (12) are fixed to the bottom surfaces of the first pads (10) by means of M22 high-strength bolts; and a plurality of load-bearing wheels (13) are provided on the bottom surfaces of the two outermost second pads (11).