Water traffic safety risk grading management and control system and method
By providing a water traffic safety risk classification control system, the problems of unscientific risk level determination and irregular data management in the existing technology are solved, dynamic updates and visual display of risk information are realized, and regulatory capabilities and judgment work are improved. objectivity.
Patent Information
- Application Number
- CN202411515795.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-29
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2044-10-29
AI Technical Summary
The existing technology lacks unified methods and rules for determining risk level of water traffic safety, resulting in low scientificity and accuracy of risk level determination results, and lacks unified risk data management specifications and intelligent risk determination and management software, which affects decision-making. The person makes scientific and reasonable decisions.
Provide a water traffic safety risk classification control system, including data collection and processing module, risk determination module and risk classification control module, supports dynamic update and visual display of risk information, provides relatively objective and accurate risk level determination rules, and supports risk information classification control and coordinated.
It has achieved dynamic updates and visual display of water traffic safety risks, improved the objectivity of risk level determination work, reduced the injustice caused by subjective evaluation, enhanced the water traffic safety supervision capabilities, and facilitated the reasonable layout of regulatory resources.
Smart Images

Figure CN119514855A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water traffic safety supervision, and in particular to a water traffic safety risk classification management and control system and method. Background Art
[0002] Water traffic safety risk refers to the combination of the possibility and consequences of water traffic accidents that occur during the navigation, mooring and operation of ships or facilities. It is a subjective evaluation of the possibility of water traffic accidents and the severity of their consequences. The water traffic safety risk level is divided into four levels from high to low, according to the possibility and severity of accidents that may occur, namely major risk, greater risk, general risk and lesser risk.
[0003] In recent years, the transportation industry has continuously strengthened the prevention and resolution of production safety risks and the investigation and management of hidden dangers, and has achieved phased results. However, accidents (incidents) in the field of water transportation still occur from time to time, exposing that the production safety risks of transportation have not been effectively controlled. At the national level, the current management of water transportation safety risks still has the following drawbacks:
[0004] (1) There is a lack of unified risk level determination methods and rules, and the scientificity and accuracy of risk level determination results are not high. Different managers or institutions make risk level determinations based on their own understanding and experience, resulting in the same risk source being determined as different risk levels under different circumstances. It is difficult to make horizontal and vertical comparisons and evaluations of risk level determination results in different regions and at different times, and it is impossible to form an effective risk management mechanism. The inconsistency of risk level determination results may make it difficult for decision makers to make scientific and reasonable decisions, which in turn affects the overall effect of water transportation safety management.
[0005] (2) There is a lack of unified risk data management standards, no unified visualization, intelligent risk assessment and management software, and a low level of informatization and intelligence. The risk assessment process relies on manual experience and judgment, and it is difficult to ensure accuracy and consistency; the existing software lacks visualization functions, making it difficult to present risk data intuitively, which is not conducive to decision makers making quick decisions. They are not aware of the current security situation and are unable to recognize the existing risks; the allocation of risk supervision resources has no objective basis, which has become a bottleneck for the transformation of the water transportation safety governance model to pre-emptive prevention. Summary of the invention
[0006] In response to the above problems, an object of the present invention is to provide a water traffic safety risk classification and control system, which supports dynamic updating and visual display of risk information, provides relatively objective and accurate risk level determination rules, supports risk information classification and control, and supports the coordinated linkage of risk information among different users.
[0007] The second object of the present invention is to provide a method for hierarchical management and control of water traffic safety risks.
[0008] The first technical solution adopted by the present invention is: a water traffic safety risk classification management and control system, including a data collection and processing module, a risk determination module and a risk classification management and control module;
[0009] The data collection and processing module is used to collect risk data and pre-process the risk data;
[0010] The risk determination module is used to determine whether the pre-processed risk data meets specific conditions. If so, the risk situation is matched directly based on the pre-processed risk data to obtain a risk level determination result; if not, the pre-processed risk data is subjected to risk identification to obtain potential risk events and risk factors, and the potential risk events are subjected to risk assessment to obtain the risk level of the potential risk events, and the risk control measures level of the potential risk events is determined based on the risk type, risk level and risk factors of the potential risk events to obtain a risk level determination result; the risk level determination result includes the risk level and the risk control measures level;
[0011] The risk assessment of the potential risk event includes: obtaining a static risk value and a dynamic risk value based on the risk factors and risk severity values of the potential risk event, and determining the risk level of the potential risk event based on the static risk value and the dynamic risk value; wherein the dynamic risk value is obtained by adopting a fuzzy comprehensive evaluation method and determining the risk level in accordance with a preset principle; and the static risk value is calculated by the following formula:
[0012] R=L×S
[0013] In the formula, R is the static risk value; L is the risk probability value; S is the risk severity value;
[0014]
[0015] In the formula, L is the risk probability value; m is the number of first-level indicators; n is F x1 The corresponding number of second-level indicators; Q x1 , F x1 Respectively represent the weight and score of the xth indicator in the first layer; F y1 , F y2 , …, F yn Respectively represent the scores of the 1st to nth indicators in the second layer;
[0016] The risk classification control module is used to build a risk classification control measures library, and automatically match control measures in the risk classification control measures library based on the risk level determination results to obtain risk control measures; and is also used to provide the upload and download functions of the risk level determination results and risk control measures to achieve collaborative linkage of information between different users.
[0017] Preferably, the data acquisition and processing module includes a data acquisition unit, a data processing unit and a data storage unit;
[0018] The data collection unit is used to collect risk data;
[0019] The data processing unit is used to pre-process the risk data, and the pre-processing includes accuracy, repeatability, completeness and timeliness processing;
[0020] The data storage unit is used to construct a water traffic safety risk database, and store the pre-processed risk data in the water traffic safety risk database according to different data types.
[0021] Preferably, the risk data includes basic risk information, risk control measures information, risk emergency response information and the scope of risk impact.
[0022] Preferably, the risk identification includes: dividing the pre-processed risk data into corresponding risk identification units, using a flowchart method in each risk identification unit to investigate and analyze each stage and each link of the ship's entry and exit process one by one, and discovering and determining potential risk events according to risk identification parameters; and finding risk factors based on risk factor indicators and weights, thereby obtaining potential risk events and risk factors.
[0023] Preferably, the risk determination module includes a risk identification parameter configuration unit, a risk factor index and weight configuration unit, a risk severity matching unit and a risk level determination calculation unit;
[0024] The risk identification parameter configuration unit is used to configure risk identification parameters based on the preprocessed risk data, and identify potential risk events based on the risk identification parameters;
[0025] The risk factor index and weight configuration unit is used to configure the risk factor index and weight for the potential risk event, and obtain the risk factor of the potential risk event based on the risk factor index and weight;
[0026] The risk severity matching unit is used to match the severity level of the potential risk event according to the severity of the historical event to obtain the risk severity value of the potential risk event;
[0027] The risk level determination calculation unit is used to obtain static risk and dynamic risk values based on the risk factors and risk severity values of the potential risk event, and determine the risk level of the potential risk event based on the size of the risk value.
[0028] Preferably, the risk identification parameters include: one or more of: ship type, ship activity waters, ship activity / operation type, functional waters where risk events occur, risk event type, basic information of risk events, risk occurrence possibility level and value.
[0029] Preferably, the risk factor indicators and weights include: one or more of human factors, ship factors, material factors, environmental factors and management factors.
[0030] Preferably, the risk classification control module includes a risk measure management unit, a risk measure query unit, a risk measure dynamic matching unit and a risk measure information synchronization unit;
[0031] The risk measures management unit is used to build a risk classification control measures library;
[0032] The risk measure query unit is used to query and obtain detailed information of risk control measures;
[0033] The risk measure dynamic matching unit is used to automatically match the control measures in the risk classification control measures library based on the risk level determination result to obtain the risk control measures;
[0034] The risk measure information synchronization unit is used to transmit the risk level determination result and risk control measures to different institutional users to achieve coordinated linkage of information between different institutional users.
[0035] Preferably, it also includes a risk information display module and a statistical analysis module;
[0036] The risk information display module is used to display risk event location information, risk level, risk event list, risk control measures, regulatory resources and historical risk information;
[0037] The statistical analysis module is used to perform risk characteristic analysis and trend change analysis, and present them in a graphical form.
[0038] The second technical solution adopted by the present invention is: a method for hierarchical management and control of water traffic safety risks, comprising the following steps:
[0039] S100: Collect risk data and pre-process the risk data;
[0040] S200: Determine whether the pre-processed risk data meets specific conditions. If so, directly match the risk situation to obtain a risk level determination result; if not, perform risk identification on the pre-processed risk data to obtain potential risk events and risk factors, perform risk assessment on the potential risk events to obtain the risk level of the potential risk events, and determine the risk control measures level of the potential risk events based on the risk type, risk level and risk factors of the potential risk events to obtain a risk level determination result; the risk level determination result includes the risk level and the risk control measures level; wherein, the risk assessment of the potential risk events includes: obtaining a static risk value and a dynamic risk value based on the risk factors and risk severity values of the potential risk events, and determining the risk level of the potential risk events based on the size of the static risk value and the dynamic risk value; wherein, the dynamic risk value is obtained by adopting a fuzzy comprehensive evaluation method and determining the risk level in accordance with a preset principle; the static risk value is calculated by the following formula:
[0041] R=L×S
[0042] In the formula, R is the static risk value; L is the risk probability value; S is the risk severity value;
[0043]
[0044] In the formula, L is the risk probability value; m is the number of first-level indicators; n is F x1 The corresponding number of second-level indicators; Q x1 , F x1 Respectively represent the weight and score of the xth indicator in the first layer; F y1 , F y2 , …, F yn Respectively represent the scores of the 1st to nth indicators in the second layer;
[0045] S300: construct a risk classification control measures library, automatically match control measures in the risk classification control measures library based on the risk level determination result to obtain risk control measures; and upload and distribute the risk level determination result and risk control measures to different institutional users.
[0046] Beneficial effects of the above technical solution:
[0047] (1) The water traffic safety risk classification management system provided by the present invention realizes the dynamic update and visual display of water traffic safety risks, realizes the hierarchical management and coordinated linkage of risk information, and improves the water traffic safety supervision capability.
[0048] (2) The present invention proposes a risk level determination method and rules, which improves the objectivity of risk level determination and reduces the unfairness caused by subjective evaluation.
[0049] (3) The present invention can display water traffic safety risk information based on "one picture", so that regulatory agencies can intuitively understand and grasp the overall risk picture of their jurisdiction, making it easier for them to rationally allocate regulatory resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Figure 1 A schematic diagram of the structure of a water traffic safety risk classification management and control system provided by an embodiment of the present invention;
[0051] Figure 2 A schematic flow chart of a risk level determination method provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0052] The following detailed description of the embodiments of the present invention is further described in detail in conjunction with the accompanying drawings and examples. The detailed description of the following embodiments and the accompanying drawings are used to exemplarily illustrate the principles of the present invention, but cannot be used to limit the scope of the present invention, that is, the present invention is not limited to the preferred embodiments described, and the scope of the present invention is defined by the claims.
[0053] In the description of the present invention, it should be noted that, unless otherwise specified, “plurality” means two or more than two; the terms “first”, “second”, etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance; for ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0054] Embodiment 1
[0055] like Figure 1 As shown, an embodiment of the present invention provides a water traffic safety risk classification management and control system, including a data acquisition and processing module, a risk determination module, a risk classification management and control module, a risk information display module and a statistical analysis module;
[0056] The data collection and processing module is used to collect risk data, pre-process the risk data, and store the pre-processed risk data;
[0057] The risk determination module is used to determine whether the pre-processed risk data meets specific conditions. If so, the risk situation is directly matched to obtain a risk level determination result; if not, the risk level of the pre-processed risk data is determined according to the risk level determination method to obtain a risk level determination result;
[0058] The risk classification control module is used to build a risk classification control measures library, automatically match control measures in the risk classification control measures library based on the risk level determination result to obtain risk control measures; and transmit the risk level determination result and risk control measures to different institutional users;
[0059] The risk information display module is used to display risk event location information, risk level, risk event list, risk control measures, regulatory resources and historical risk information;
[0060] The statistical analysis module is used to perform risk characteristic analysis and trend change analysis, and present them in a graphical form.
[0061] (1) Data acquisition and processing module;
[0062] The data acquisition and processing module includes a data acquisition unit, a data processing unit and a data storage unit; wherein the data acquisition unit is used to collect risk data; the data processing unit is used to pre-process the collected risk data, and the pre-processing includes but is not limited to accuracy, repeatability, completeness, and timeliness processing; the data storage unit is used to construct a water traffic safety risk database, and store the pre-processed risk data in the water traffic safety risk database according to different data types.
[0063] 1) Data acquisition unit;
[0064] The data collection unit provides a risk data collection interface, and collects passive risk data by setting risk data entry restrictions; risk data includes basic risk information, risk control measures information, risk emergency disposal information and the scope of risk impact; based on the collected risk data, points or areas are drawn on the map to describe the coordinate position of the current risk; among which, the basic risk information includes one or more of the risk name, risk type, risk status, detailed address, risk situation, and risk supervision department; the risk control measures information includes one or more of the measure name, implementing agency name, and implementing agency content; the risk emergency disposal information includes one or more of emergency measures and emergency material lists.
[0065] The data collection unit also provides a data import function, which can centrally collect risk data for batches of data that meet the input specifications by setting data import templates.
[0066] Furthermore, in one embodiment, the data collection unit also provides a data export function, through which the user selects a list of data to be exported, and then all risk data can be exported with one click.
[0067] 2) Data processing unit;
[0068] The data processing unit is used to process the collected risk data for accuracy, repeatability, completeness and timeliness;
[0069] The accuracy processing of risk data includes: defining data rules (data rules include, for example, the accuracy of name, risk type, risk status, risk situation, and address description, and the absence of garbled and abnormal information), determining the accuracy of risk data through data rules, and providing error prompts for inaccurate risk data during the entry process; and storing accurate risk data.
[0070] The duplication processing of risk data includes: judging whether the risk name, risk category, risk status, and risk supervision department are the same. If they are the same, the historical data will be eliminated based on the entry time.
[0071] The integrity processing of risk data includes: data integrity constraints are implemented by defining mandatory items and required items. Incomplete data will be prompted with errors during the entry process.
[0072] Timely processing of risk data includes: screening the data table through the latest record update time log, and if no new records are generated within the specified time, the system will issue an online reminder.
[0073] 3) Data storage unit;
[0074] The data storage unit constructs a water traffic safety risk database, which includes a risk basic information data table, a risk control measures information data table, a risk emergency response information data table, a risk level determination information data table, etc., and stores the pre-processed risk data in corresponding data tables according to different data types.
[0075] (2) Risk determination module;
[0076] The risk determination module is used to perform risk level determination on the pre-processed risk data and obtain a risk level determination result; including: determining whether the pre-processed risk data meets specific conditions; if so, directly matching the risk situation in a preset specific condition risk level table based on the pre-processed risk data to obtain a risk level determination result; if not, performing risk level determination on the pre-processed risk data according to a risk level determination method to obtain a risk level determination result; wherein, the specific conditions include severe weather conditions (such as a tropical cyclone (wind force 10 or above) passing through, visibility 500 meters or less) or an accident hazard range; the specific condition risk level table includes specific conditions and the risk level corresponding to each specific condition, the level of risk control measures, etc.; the risk level determination result includes but is not limited to the risk level and the level of risk control measures.
[0077] The risk determination module includes a risk identification parameter configuration unit, a risk causative factor index and weight configuration unit, a risk severity matching unit and a risk level determination calculation unit; the risk identification parameter configuration unit is used to configure risk identification parameters based on preprocessed risk data, and identify potential risk events based on the risk identification parameters; the risk causative factor index and weight configuration unit is used to configure risk causative factor indexes and weights for the potential risk events, and obtain the causative factors of the potential risk events based on the risk causative factor indexes and weights; the risk severity matching unit is used to match the severity level of the potential risk events according to the severity of historical events, and obtain the risk severity value of the potential risk events; the risk level determination calculation unit is used to obtain static risk and dynamic risk values based on the causative factors and risk severity values of the potential risk events, and determine the risk level of the potential risk event based on the size of the risk value to achieve risk level determination.
[0078] 1) Risk identification parameter configuration unit;
[0079] The risk identification parameter configuration unit is used to provide a risk identification parameter configuration interface, configure the parameters in the risk identification process based on the pre-processed risk data, and obtain risk identification parameters; identify potential risk events based on the risk identification parameters; the risk identification parameters include one or more of ship type, ship activity waters, ship activity / operation type, functional waters where risk events occur, risk event type, basic information of risk events, risk occurrence possibility level and numerical value.
[0080] Among them, the ship activity waters are divided based on functional waters, including: navigable waters, mainly waterways and other ship navigation waters; facility waters, mainly waters with obstructions such as water and underwater construction areas, bridge waters, pipeline waters, etc., which are very likely to cause accidents; berthing waters, mainly docks, anchorages and other waters where ships are moored. The ship types are mainly aimed at the regional ship operation status, including high-speed passenger ships, ordinary passenger ships, dangerous goods ships, container ships, ordinary cargo ships and other ship types. The ship activity / operation type refers to the activities or operations of ships entering and leaving the port in the region, which are divided into: ship navigation, ship berthing (including ship berthing, mooring, shifting, etc.), ship construction operations, ship loading and unloading operations (including ship loading or unloading operations, tank cleaning or tank washing operations, oil supply and receiving operations, crude oil tank washing operations, pollutant receiving operations) and other situations.
[0081] Potential risk events are identified based on risk identification parameters. The potential risk events are mainly divided into: collision and capsizing risks; reef and grounding risks; contact risks; wave damage risks; fire and explosion risks; wind disasters or typhoon prevention risks; self-sinking and sinking risks; leakage and pollution risks; and other risks according to the relevant regulations of the water traffic accident statistics method.
[0082] 2) Risk factor indicators and weight allocation units;
[0083] The risk-causing factor indicator and weight configuration unit is used to provide a risk-causing factor indicator and weight configuration interface to configure the risk-causing factor indicators and weights of potential risk events, and obtain the risk factors of potential risk events based on the risk-causing factor indicators and weights; configuring the risk-causing factor indicators and weights includes: for risk events, selecting risk-causing factor indicators from aspects such as human factors, ship factors, material factors, environmental factors and management factors, and configuring indicator weights for the risk-causing factor indicators.
[0084] Among them, human factors mainly analyze the competence, safety awareness, safety and emergency skills, safety behavior or status of employees, including: crew members have not obtained a certificate of competence, crew members do not comply with navigation rules or safety operating procedures, crew members do not comply with cargo loading and unloading operation specifications, crew members are insufficient and other risk factors. Ship factors mainly analyze the conditions of the ship's mechanical equipment, hull structure and strength, maneuverability, cargo loading and lashing. Material factors mainly analyze factors related to the cargo carried by ships, such as the hazard of cargo, cargo volume, cargo transportation methods and other risk factors of cargo. Environmental factors mainly analyze the conditions of the ship's movement, including the natural environment, navigation environment, navigation order and working environment. Management factors mainly analyze management factors such as competent authorities, ship owners, operators or managers, port enterprises, construction units, etc.
[0085] Based on the risk factor indicators and weights, the risk factors that lead to potential risk events are found, and the possible consequences and adverse effects caused by the risk factors leading to the risk events are analyzed to obtain risk identification results.
[0086] 3) Risk severity matching unit;
[0087] The risk severity matching unit is used to automatically match the severity level of a potential risk event according to the severity of historical events, and assign a risk severity value to the event; and the system provides a manual verification and modification function. When the risk severity value differs from the user's perception, the user can modify the risk severity value and fill in the basis for the modification.
[0088] 4) Risk level determination calculation unit;
[0089] The risk level determination calculation unit is used to obtain static risk and dynamic risk values based on the risk factors and risk severity values of potential risk events, and determine the risk level based on the size of the risk value to achieve risk level determination, obtain the risk level determination result, and store the risk level determination result in the data storage unit.
[0090] like Figure 2 As shown, the risk determination module determines the risk level of the pre-processed risk data according to the risk level determination method, including risk identification of the pre-processed risk data to obtain potential risk events and risk factors; risk assessment of the potential risk events to obtain the risk level of the potential risk events; based on the risk type, risk level and risk factors of the potential risks, the level of risk control measures is determined, thereby realizing risk hierarchical control;
[0091] ① Risk identification includes: the risk identification parameter configuration unit divides the pre-processed risk data into corresponding risk identification units (the risk identification unit corresponds to the spatial position, and the main purpose of the risk identification unit division is to refine the location of the risk event for the convenience of standardized management), and in each risk identification unit, the flowchart method is used to investigate and analyze each stage and each link of the ship's entry and exit process one by one, and discover and determine potential risk events according to the risk identification parameters; and the risk factor index and weight configuration unit comprehensively considers the risk factor index and weight to find out the risk factors that cause the risk event, analyzes the possible consequences and adverse effects after the risk factor causes the risk event, so as to obtain the risk identification results, and the risk identification results include potential risk events and risk factors of potential risk events.
[0092] Among them, the risk identification unit division can divide the pre-processed risk data into appropriate risk identification units according to regional supervision characteristics, ship operating environment, ship speed under different environments, conditions required for rescue operations in the event of an accident, and possible environmental pollution; risk identification units are divided into management grids, responsibility grids, and unit grids from large to small. The management grid is based on the basic framework of water traffic safety supervision, with grassroots management agencies as the basic management entity units, and its management scope is a management grid; the responsibility grid is the corresponding responsibility area delineated by each grassroots management agency according to the characteristics of regional waters, supervision characteristics and ship traffic characteristics. For the responsibility grid, specific supervision resources and supervision responsibilities need to be clarified, and a management grid can be divided into multiple responsibility grids; the unit grid corresponds to the smallest risk identification unit, and functional waters are used as unit grids. Multiple unit grids with similar functions constitute a responsibility grid.
[0093] Identifying potential risk events refers to determining possible risk events based on risk identification parameters (such as different ship activity waters, based on ship types, ship operations / activity types), combined with the actual situation of daily production safety management, and comprehensive consideration of historical risk events within the jurisdiction; analyzing risk factors refers to comprehensively analyzing the impact of risk factor indicators and weights (such as human factors, ship factors, material factors, environmental factors, and management factors) on risk events.
[0094] ② Risk assessment includes: the risk level determination calculation unit conducts assessment from two dimensions, static risk and dynamic risk, for potential risk events after risk identification, based on the static risk assessment timing (static risk assessment timing refers to regular assessment, with an annual, quarterly, monthly or periodic cycle) and the dynamic risk assessment timing (dynamic risk assessment timing is a quasi-real-time assessment, generally in hours), to obtain the risk level of the potential risk event; and determines the change in risk level based on the risk assessment results; that is, the risk assessment includes static risk assessment and dynamic risk assessment;
[0095] Among them, static risk assessment is also called regular risk assessment. According to the characteristics of regional supervision and changes in water transportation, risk assessment is conducted regularly on an annual, quarterly, monthly or periodic basis to adjust the overall risk level of the risk identification unit in a timely manner.
[0096] The static risk assessment selects different risk factor indicators, and the risk severity matching unit analyzes the possibility of occurrence of different risk factors and the severity of the risk events that may be caused to obtain the risk severity value; the risk level determination calculation unit uses the risk assessment matrix method based on the risk severity value to obtain the static risk value of the region. The static risk value is expressed by the following formula:
[0097] R=L×S
[0098] In the formula, R is the static risk value; L is the risk probability value; S is the risk severity value.
[0099]
[0100] In the formula, L is the risk probability value; m is the number of first-level indicators; n is F x1 The corresponding number of second-level indicators; Q x1 , F x1 Respectively represent the weight and score of the xth indicator in the first layer; F y1 , F y2 , …, F yn They respectively represent the scores of the 1st to nth indicators in the second layer.
[0101] The risk probability value is determined by the possibility of the risk factor. According to the actual situation of the risk factors in the region, different functional areas adopt different risk probability assessment indicators in accordance with the principles of representativeness, independence, relativity, quantification and data collection. The risk probability assessment indicators, indicator weights and scores can be adjusted and supplemented according to the actual situation of the region.
[0102] The risk severity is divided into four levels: not serious, relatively serious, serious, and extremely serious, with values ranging from 1 to 10. Based on the situation of key regional regulated ships, the maximum casualties, economic losses, environmental pollution, and social impact that may be caused after the risk event occurs are analyzed, and the consequences and losses of similar events in history are comprehensively referenced for decision making.
[0103] Dynamic risk assessment means that when changes are detected in the risk factors that affect water transportation safety, it is necessary to conduct dynamic risk assessment and adjust the dynamic risk level of the risk identification unit in real time.
[0104] The dynamic risk assessment is based on the characteristics of regional safety supervision and risk impact, adopts a fuzzy comprehensive evaluation method, and follows the following principles to determine the risk level and obtain a dynamic risk value; including: 1) One-vote veto principle: When certain indicators reach or exceed the critical value of ship navigation and operation safety, such as when the wind force reaches level 10 or above, the regional risk is directly adjusted to a major risk; 2) Indicator promotion principle: Among all the evaluated indicators, if there are many indicators close to the critical value of navigation and operation safety, under the joint effect of multiple indicators, the risk situation is relatively dangerous at this time, and the risk situation is directly adjusted to a major risk; 3) Special classification principle: For major water activities and sudden water traffic incidents, special risk classification principles can be formulated according to management needs.
[0105] The fuzzy comprehensive evaluation method uses weighted evaluation, in which the weight coefficient is represented by a fuzzy weight vector, and the score of the factor is represented by an evaluation matrix; combined with the regional characteristics of the jurisdiction and the quantifiability and accessibility of the indicators, the regional dynamic risk assessment indicator system is determined from several dimensions such as personnel skills and comprehensive quality, ship entry and exit status, ship traffic flow, visibility, wind, and shipping company management level.
[0106] ③Risk control includes: determining the level of risk control measures based on the risk type, risk level and risk factors of potential risk events (the level of risk control measures is equivalent to a catalog or category of control measures, which can clearly define the dimensions from which risk control measures are determined, so that the risk measure dynamic matching unit can match the corresponding measures later), scientifically formulating targeted control measures, clarifying the risk responsible parties and regulatory bodies, and limiting risks within preventable and controllable ranges, thereby achieving risk hierarchical control.
[0107] The risk control measures include three levels: key technologies and engineering measures, personnel quality and system management measures, and individual protection and emergency management measures. Among them, the key technologies and engineering measures mainly refer to the basic technical requirements and control measures for making ships seaworthy, crew members competent, and cargo suitable. Ships, crew members on board, cargo loading, water facilities, shipping containers, important marine equipment, components and materials comply with the requirements of the International Maritime Organization and domestic laws, regulations, administrative regulations, and mandatory standards and technical specifications. The personnel quality in the personnel quality and system management measures mainly includes personnel quality skills, operating procedures, management systems, etc. System management measures include establishing an organizational system, clarifying the responsibility system, establishing a system system, regularly conducting safety risk assessment, and conducting risk monitoring and early warning. Individual protection in the individual protection and emergency management measures includes the provision of protective equipment as required, such as lifeboats, lifebuoys, safety helmets, safety belts, protective clothing, etc.; the emergency management measures include the formulation of emergency plans and on-site disposal plans, the provision of emergency equipment, emergency duty, emergency evacuation, emergency drills, etc.
[0108] Risk classification and control follows the principle of "classified control, comprehensive internal and external management" and adopts corresponding levels of risk control measures for different risk types according to risk levels and risk-causing factors.
[0109] (3) Risk classification and control module;
[0110] The risk classification and control module includes a risk measure management unit, a risk measure query unit, a risk measure dynamic matching unit and a risk measure information synchronization unit; wherein, the risk measure management unit is used to form a risk classification and control measure library to realize dynamic updating and management of risk measures; the risk measure query unit is used to query and obtain detailed information on risk control measures; the risk measure dynamic matching unit is used to automatically obtain risk control measures corresponding to risk events; the risk measure information synchronization unit is used to realize the coordinated linkage between risk measures and related information among users of different institutions.
[0111] 1) Risk measures management unit;
[0112] The risk measures management unit is used to provide risk measures adding, editing and canceling functions for risks of different types and levels, forming a risk classification management measures library; the newly added risk measures include one or more of risk type, risk level, measure name, measure content, implementing agency type, implementing agency name, and effective date.
[0113] The system provides a risk control measures import function, and users can import risk control measures in batches according to the import template requirements; it also provides a risk measures export function, and users can export the required risk control measures documents as needed.
[0114] 2) Risk measures query unit;
[0115] The risk measure query unit provides keyword query, risk type query, and risk level query functions. The system presents the query results in a list format. Click the list to view detailed information on the measures.
[0116] Risk type query and risk level query provide a tree-like query method, which displays all risk prevention and control measures for the jurisdiction waters by default. After clicking a risk type, all corresponding risk control measures for that risk type are presented. After clicking the risk level of a risk type, the risk control measures corresponding to the risk level of that risk type are presented.
[0117] 3) Risk measures dynamic matching unit;
[0118] The risk measure dynamic matching unit is mainly used to automatically obtain risk control measures corresponding to risk events; in the risk assessment process, risk control measures are automatically matched and pushed according to risk name, risk level, implementing agency and other contents; in the control measure display process, this function displays the matched measure information, and can also recommend the main measures taken by other agencies to carry out the same risk prevention and control.
[0119] 4) Risk measures information synchronization unit;
[0120] The risk measure information synchronization unit refers to the risk measure upload and distribution function provided by the system. Users can report the risks and risk control measures information in their jurisdiction to the superior agency, and can also distribute the information to users of their subordinate agencies, thereby realizing the coordinated linkage of risks and risk control measures information among different users.
[0121] Superior users can view the risks and risk control measures information reported by users of all branches in the jurisdiction in the risk information display module, and users at the same level can view the risks and risk control measures information within the jurisdiction of that level and the information issued by superior users.
[0122] (4) Risk information display module;
[0123] The risk information display module includes a risk map display unit, a risk list display unit, a control measures display unit, a supervision resource display unit and a risk information playback unit; wherein the risk map display unit provides a four-color map of "red, orange, yellow and blue" to display the location information and risk level of risk events; the risk list display unit displays a list of all risk events in the area in a tabular form; the control measures display unit provides a display of control measures corresponding to different risk events; the supervision resource display unit is used to display supervision resources in the area; and the risk information playback unit is used to display historical risk information.
[0124] 1) Risk map display unit;
[0125] The risk map display unit is based on an electronic map and uses four colors, red, orange, yellow, and blue, to display risk information. By default, the location information of water transportation safety risk events is displayed as dot symbols on the electronic map. Different risk levels are displayed in different colors in GIS. Among them: red indicates major risk, orange indicates greater risk, yellow indicates general risk, and blue indicates lesser risk.
[0126] As the map is zoomed in to a certain scale, the regional information (i.e. location information) of the risk event is displayed in a surface graphic; click on the point graphic or the regional graphic, and a dialog box will pop up to display the basic risk information and risk control measures information.
[0127] 2) Risk list display unit;
[0128] The risk list display unit displays a list of all risk events in the region in the form of a table, which supports page turning, query, sorting and other functions; the system supports merging between table records, and risk events with the same region, type and risk level can have their information merged, and a manual verification function is provided.
[0129] Double-click a record in the list and the system will open the risk basic information page. Users with different permissions can view or edit the risk basic information.
[0130] 3) Control measures display unit;
[0131] The control measures display unit provides a list of risk control measures that should be taken by different management agencies for specific water traffic safety risk events, and also provides a list of other typical measures.
[0132] 4) Supervision resource display unit;
[0133] The regulatory resource display unit is based on an electronic map and displays regulatory resource information within the jurisdiction, including VTS system resources, CCTV video resources, VHF communication resources, patrol law enforcement resources, emergency rescue facilities and equipment, etc. The system displays the spatial location of regulatory resources with dot icons. Click the corresponding icon to obtain detailed information on the resource.
[0134] 5) Risk information playback unit;
[0135] The risk information playback unit is based on days and provides a time progress tool to display historical risk information; drag the time scale to a certain year, month and day, and the map will display the valid risk information up to that day.
[0136] The system provides a comparison page where you can view a comparison chart of the risk information at that point in time and the risk information at the current time, as well as a risk comparison list; the system also provides a comparison chart of risk events and a risk list at any two selected time points.
[0137] (5) Statistical analysis module;
[0138] The statistical analysis module includes a risk feature analysis unit and a risk rule analysis unit; wherein the risk feature analysis unit is used for graphically presenting the risk feature analysis results; and the risk rule analysis unit is used for graphically presenting the risk trend change results.
[0139] 1) Risk characteristic analysis unit;
[0140] The risk characteristic analysis unit includes statistical analysis of risk quantities in different jurisdictions, statistical analysis of risk quantities at different levels, statistical analysis of risk quantities of different types, and statistical analysis of risk measures of different types, and displays the statistical analysis results in the form of graphs and tables.
[0141] 2) Risk pattern analysis unit;
[0142] The risk pattern analysis unit includes risk quantity trend change analysis in different jurisdictions, risk quantity trend change analysis at different levels, and risk quantity trend change analysis of different types, and displays the trend change results in the form of a line graph.
[0143] The present invention proposes a method for determining the risk level of water traffic safety, clarifies the working norms for determining the risk level of water traffic safety, improves the objectivity of the risk level determination work, and reduces the unfairness caused by subjective evaluation; the water traffic safety risk grading management and control system for regional safety supervision of the present invention realizes the dynamic update and visual display of water traffic safety risks, realizes the hierarchical management and coordinated linkage of risk information, and improves the water traffic safety supervision capability; and the present invention displays the water traffic safety risk information based on "one picture", so that the regulatory agency can intuitively understand and grasp the overall risk picture of the jurisdiction, which is convenient for them to rationally allocate regulatory resources.
[0144] Embodiment 2
[0145] An embodiment of the present invention provides a method for hierarchical management and control of water traffic safety risks, comprising the following steps:
[0146] S100: Collect risk data and pre-process the risk data;
[0147] S200: Determine whether the pre-processed risk data meets a specific condition. If so, directly match the risk situation to obtain a risk level determination result. If not, perform risk level determination on the pre-processed risk data according to a risk level determination method to obtain a risk level determination result.
[0148] S300: construct a risk classification control measures library, automatically match control measures in the risk classification control measures library based on the risk level determination result to obtain risk control measures; and transmit the risk level determination result and risk control measures to different institutional users.
[0149] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed in the embodiments of the present invention can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0150] In the embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0151] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0152] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0153] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as USB flash drives, mobile hard disks, ROM, RAM, magnetic disks, or optical disks.
[0154] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A water traffic safety risk classification management and control system, characterized in that: It includes data collection and processing module, risk determination module and risk classification and control module; The data collection and processing module is used to collect risk data and pre-process the risk data; The risk determination module is used to determine whether the pre-processed risk data meets specific conditions. If so, the risk situation is matched directly based on the pre-processed risk data to obtain a risk level determination result; If not, the pre-processed risk data is subjected to risk identification to obtain potential risk events and risk factors, the potential risk events are subjected to risk assessment to obtain the risk level of the potential risk events, and the risk control measures level of the potential risk events is determined based on the risk type, risk level and risk factors of the potential risk events to obtain the risk level determination result; The risk level determination result includes the risk level and the level of risk control measures; The risk assessment of the potential risk event includes: obtaining a static risk value and a dynamic risk value based on the risk factors and risk severity values of the potential risk event, and determining the risk level of the potential risk event based on the static risk value and the dynamic risk value; wherein the dynamic risk value is obtained by adopting a fuzzy comprehensive evaluation method and determining the risk level in accordance with a preset principle; and the static risk value is calculated by the following formula: R=L×S In the formula, R is the static risk value; L is the risk probability value; S is the risk severity value; In the formula, L is the risk probability value; m is the number of first-level indicators; n is F x1 The corresponding number of second-level indicators; Q x1 , F x1 Respectively represent the weight and score of the xth indicator in the first layer; F y1 , F y2 , …, F yn Respectively represent the scores of the 1st to nth indicators in the second layer; The risk classification control module is used to build a risk classification control measures library, and automatically match control measures in the risk classification control measures library based on the risk level determination results to obtain risk control measures; and is also used to provide the upload and download functions of the risk level determination results and risk control measures to achieve collaborative linkage of information between different users.
2. A water traffic safety risk classification management and control system according to claim 1, characterized in that: The data acquisition and processing module includes a data acquisition unit, a data processing unit and a data storage unit; The data collection unit is used to collect risk data; The data processing unit is used to pre-process the risk data, and the pre-processing includes accuracy, repeatability, completeness and timeliness processing; The data storage unit is used to construct a water traffic safety risk database, and store the pre-processed risk data in the water traffic safety risk database according to different data types.
3. A water traffic safety risk classification management and control system according to claim 1, characterized in that: The risk data includes basic risk information, risk control measures information, risk emergency response information and the scope of risk impact.
4. A water traffic safety risk classification management and control system according to claim 1, characterized in that: The risk identification includes: dividing the pre-processed risk data into corresponding risk identification units, using the flowchart method in each risk identification unit to investigate and analyze each stage and each link of the ship's entry and exit process one by one, and discovering and determining potential risk events according to risk identification parameters; and finding risk factors based on risk factor indicators and weights, thereby obtaining potential risk events and risk factors.
5. A water traffic safety risk classification management and control system according to claim 1, characterized in that: The risk determination module includes a risk identification parameter configuration unit, a risk factor index and weight configuration unit, a risk severity matching unit and a risk level determination calculation unit; The risk identification parameter configuration unit is used to configure risk identification parameters based on the preprocessed risk data, and identify potential risk events based on the risk identification parameters; The risk factor index and weight configuration unit is used to configure the risk factor index and weight for the potential risk event, and obtain the risk factor of the potential risk event based on the risk factor index and weight; The risk severity matching unit is used to match the severity level of the potential risk event according to the severity of the historical event to obtain the risk severity value of the potential risk event; The risk level determination calculation unit is used to obtain static risk and dynamic risk values based on the risk factors and risk severity values of the potential risk event, and determine the risk level of the potential risk event based on the size of the risk value.
6. A water traffic safety risk classification management and control system according to claim 5, characterized in that: The risk identification parameters include: one or more of: ship type, ship activity waters, ship activity / operation type, functional waters where risk events occur, risk event type, basic information of risk events, risk occurrence possibility level and value.
7. A water traffic safety risk classification management and control system according to claim 1, characterized in that: The risk factor indicators and weights include: one or more of human factors, ship factors, material factors, environmental factors and management factors.
8. A water traffic safety risk classification management and control system according to claim 1, characterized in that: The risk classification control module includes a risk measure management unit, a risk measure query unit, a risk measure dynamic matching unit and a risk measure information synchronization unit; The risk measures management unit is used to build a risk classification control measures library; The risk measure query unit is used to query and obtain detailed information of risk control measures; The risk measure dynamic matching unit is used to automatically match the control measures in the risk classification control measures library based on the risk level determination result to obtain the risk control measures; The risk measure information synchronization unit is used to transmit the risk level determination result and risk control measures to different institutional users to achieve coordinated linkage of information between different institutional users.
9. A water traffic safety risk classification management and control system according to claim 1, characterized in that: It also includes risk information display module and statistical analysis module; The risk information display module is used to display risk event location information, risk level, risk event list, risk control measures, regulatory resources and historical risk information; The statistical analysis module is used to perform risk characteristic analysis and trend change analysis, and present them in a graphical form.
10. A method for hierarchical management and control of water traffic safety risks, characterized in that: The following steps are involved: S100: Collect risk data and pre-process the risk data; S200: Determine whether the pre-processed risk data meets specific conditions. If so, directly match the risk situation to obtain a risk level determination result; If not, the pre-processed risk data is subjected to risk identification to obtain potential risk events and risk factors, the potential risk events are subjected to risk assessment to obtain the risk level of the potential risk events, and the risk control measures level of the potential risk events is determined based on the risk type, risk level and risk factors of the potential risk events to obtain the risk level determination result; The risk level determination result includes the risk level and the level of risk control measures; wherein, the risk assessment of the potential risk event includes: obtaining a static risk value and a dynamic risk value based on the risk factors and risk severity values of the potential risk event, and determining the risk level of the potential risk event based on the static risk value and the dynamic risk value; wherein, the dynamic risk value is obtained by adopting a fuzzy comprehensive evaluation method and determining the risk level in accordance with a preset principle; the static risk value is calculated by the following formula: R=L×S In the formula, R is the static risk value; L is the risk probability value; S is the risk severity value; In the formula, L is the risk probability value; m is the number of first-level indicators; n is F x1 The corresponding number of second-level indicators; Q x1 , F x1 Respectively represent the weight and score of the xth indicator in the first layer; F y1 , F y2 , …, F yn Respectively represent the scores of the 1st to nth indicators in the second layer; S300: construct a risk classification control measures library, automatically match control measures in the risk classification control measures library based on the risk level determination result to obtain risk control measures; and upload and distribute the risk level determination result and risk control measures to different institutional users.
Citation Information
Patent Citations
Coastal-water-traffic safety risk monitoring and early-warning system and method
CN109243205A
Modularized risk prediction method and device for power distribution terminal and storable medium
CN109492913A
Method of evaluating risk grade of new project crossing existing road facility
CN110033178A
Water traffic risk dynamic test method, medium and system
CN113469504A
Urban rail transit risk assessment method and system based on fault tree analysis
CN114565210A
Cited By
Inland ship grading deploy and control system and method
CN120634820A
Port water area ship navigation risk distribution calculation and visualization method and device based on AIS and GIS data fusion
CN121390870A
Method and apparatus for calculating and visualizing the distribution of vessel navigation risks in port waters based on AIS and GIS data fusion
CN121390870B