Material management system

Through the modularly designed material management system, combined with budget prediction, execution monitoring and dynamic adjustment functions, the limitations of material management in construction projects are solved, and the synchronization optimization of budget and actual construction is achieved, which improves the accuracy and efficiency of material management.

CN119515261AInactive Publication Date: 2025-02-25HAIKUI NETWORK TECHNOLOGY (HAINAN) CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411683230.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-22
Publication Date
2025-02-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing material management system has budget dependence experience in construction projects, lacks scientific prediction and dynamic adjustment capabilities, the procurement plan is out of touch with the construction progress, the supplier management is imperfect, price fluctuations have a great impact on cost control, the level of informatization of inventory management is insufficient, the real-time and accuracy are low, resulting in inventory backlog or shortage, and the supplier management lacks a systematic evaluation and cooperation mechanism, which cannot ensure efficient coordination of the supply chain.

Method used

Provide a material management system that covers project management, budget management, procurement management, inventory management and intelligent collaboration modules through modular design to form closed-loop management. The system includes budget prediction, budget execution monitoring and dynamic budget adjustment functions. It uses historical project data to build a project volume prediction model, obtain the actual project volume and expenses in real time, and dynamically adjust the budget to ensure that the budget and actual construction are optimized simultaneously.

Benefits of technology

It effectively solves the limitations in traditional material management, realizes the synchronous optimization of budget and actual construction, improves the accuracy, dynamic response and coordination of material management in construction projects, improves the efficiency and benefits of material management, and reduces costs and risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119515261A_ABST
    Figure CN119515261A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of material management, and particularly discloses a material management system which is used for solving the problems that an existing material management system has limitations, including budget depends on experience, and scientific prediction and dynamic adjustment capabilities are lacked. First basic information and project member information of a project are managed through a project management module, and first budget information of the project is managed based on a budget management module; the first budget information comprises project budget, actual cost, budget project amount and supply unit price; a purchase management module is used for managing material application and purchase application of a project, a stock management module is used for managing material entry, ex-warehouse orders, warehousing orders and allocation orders, and a dynamic budget adjustment unit is used for dynamically adjusting project budget according to actual project amount and supply unit price. The limitation in traditional material management can be effectively solved, synchronous optimization of budget and actual construction is realized, and the material management efficiency and benefit of the construction project are comprehensively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of material management, and more specifically, to a material management system. Background Art

[0002] In the construction of modern construction projects, material management, as an important part of construction management, is directly related to project quality, construction progress and cost control. However, construction projects usually face the characteristics of large material demand, multiple types and complex supply chain. Traditional material management methods are difficult to adapt to the current needs of refined and intelligent construction management. With the development of cloud computing, Internet of Things, big data and artificial intelligence technologies, the construction industry has begun to explore intelligent and digital material management models. By introducing real-time data collection, dynamic analysis and intelligent decision-making tools, the accuracy and coordination of material management can be significantly improved. For example, inventory dynamic monitoring based on the Internet of Things, procurement demand forecasting based on big data and cloud-based collaborative supplier management system all provide effective technical support for solving existing deficiencies; however, the existing material management system still has the following limitations: budgets rely on experience and lack scientific prediction and dynamic adjustment capabilities; procurement plans are out of touch with construction progress, supplier management is imperfect, and price fluctuations have a greater impact on cost control; inventory management informationization is insufficient, real-time and accuracy are low, and it is easy to cause inventory backlogs or shortages; and supplier management lacks a systematic evaluation and cooperation mechanism, and cannot guarantee efficient coordination of the supply chain, which directly affects the overall benefits of the project. In order to solve the above problems, a technical solution is now provided. Summary of the invention

[0003] In order to overcome the above-mentioned defects of the prior art, the present invention provides a material management system to solve the limitations of the existing material management system, that is, the budget relies on experience and lacks scientific prediction and dynamic adjustment capabilities, and to improve the accuracy, dynamic response capabilities and coordination of material management. Through modular design, it covers project management, budget management, procurement management, inventory management, and dynamic budget adjustment functions to form a closed-loop management to solve the problems raised in the above-mentioned background technology.

[0004] To achieve the above object, the present invention provides the following technical solutions:

[0005] A material management system includes a project management module, a budget management module, a procurement management module, an inventory management module and an intelligent collaboration module; the budget management module is used to manage the first budget information of the project; the first budget information includes the project name, project budget, actual cost, budgeted engineering quantity and supply unit price; the intelligent collaboration module includes a budget prediction unit, a budget execution monitoring unit and a dynamic budget adjustment unit; the budget prediction unit is used to obtain the project budget, actual cost, budgeted engineering quantity and supply unit price in the first budget information; wherein the budgeted engineering quantity is calculated by constructing an engineering quantity prediction model based on the actual consumption of historical projects and the predicted consumption of historical projects, and the formula of the engineering quantity prediction model is:

[0006]

[0007] Where: Q U is the estimated engineering quantity, Q L is the actual consumption of historical projects, Q LU Forecast consumption for historical projects;

[0008] The project budget is obtained by calculating the budgeted engineering quantity and supply unit price:

[0009]

[0010] Where: B U is the project budget, n is the number of project materials, Q Ui is the estimated engineering quantity of the i-th type of materials, U i is the supply unit price of the i-th category of materials, Q Li is the actual consumption of the historical items of the i-th category of materials, Q LUi Forecast consumption for historical items of class i materials.

[0011] As a further solution of the present invention, the intelligent budget execution monitoring unit is used to obtain the actual engineering quantity and actual cost in real time, and build a budget deviation calculation model based on the actual engineering quantity, budgeted engineering quantity, actual cost and project budget to calculate the budget deviation rate. The formula of the budget deviation calculation model is:

[0012]

[0013] Where: θ Ut is the budget deviation rate at time t, Q t is the actual engineering quantity at time t, Q Ut is the budgeted engineering quantity at time t, B t is the actual cost at time t, B Ut is the project budget at time t;

[0014] The dynamic budget adjustment unit is used to dynamically adjust the project budget according to the actual project quantity and supply unit price:

[0015] B Ut ′=B Ut +θ Ut ;

[0016] Where: B Ut ′ is the dynamically adjusted project budget, B Ut is the project budget at time t, θ Ut is the budget deviation rate at time t.

[0017] As a further scheme of the present invention, the project management module is used to manage the first basic information of the project and the project member information; the first basic information includes the project name, project location, construction area, start date, planned completion date, and total project cost; project member information management includes adding project members and modifying project member permissions; the operating steps for adding project members are: project management - project list - click on a project to edit - enter the project homepage - project members - add new members - select users; the operating steps for modifying project member permissions are: project management - project list - click on a project to edit - enter the project homepage - project members - edit members - role assignment; the options for role assignment include ordinary employees, material users, procurement auditors, material managers, warehouse managers, general managers, purchasers, and project managers;.

[0018] As a further solution of the present invention, the budget management module is used to manage the first budget information of the project; managing the first budget information of the project includes exporting the budget, adding budget subcategories, and deleting the budget; the operating steps for exporting the budget are: budget management - budget list - click to export the budget; the operating steps for adding a budget subcategory are: budget management - budget list - select a budget - add a subcategory; the operating steps for deleting the budget are: budget management - budget list - select a budget - operation - delete.

[0019] As a further solution of the present invention, the procurement management module is used to manage the material application and procurement application of the project; the material application of the project is managed, including adding a new material application, reviewing the material application, and viewing the material application process; the procurement application of the project is managed, including confirming / initiating a purchase order, reviewing the purchase application, and viewing the procurement application process; the operation steps of adding a new material application are: procurement management - material application list - material application - adding a new material - selecting a material - filling in the material quantity; the operation steps of reviewing the material application are: procurement management - material application list - selecting a material application form to be reviewed - clicking on details - selecting agree / reject - filling in approval opinions; the operation steps of viewing the material application process are: procurement management - material application list - selecting a material application form - clicking on the process - viewing the process;

[0020] The steps to confirm / initiate a purchase order are: Purchase Management - Purchase List - Select a purchase to be confirmed - Click Details - Initiate a purchase application - Edit application material information; the steps to review a purchase application are: Purchase Management - Purchase List - Select a purchase to be reviewed - Click Details - Select Agree / Reject - Fill in approval comments; the steps to view the purchase application process are: Purchase Management - Purchase List - Select a purchase application - Click Process - View Process.

[0021] The inventory management module is used to manage material entry, outbound orders, inbound orders and transfer orders; the steps for material entry are: inventory management - material entry - select a receipt to be signed - click details - select receipt confirmation - fill in the receipt material information; the steps for returning the signed materials are: inventory management - material entry - select a receipt to be signed - click details - select return - fill in comments; the steps for signing for materials are: inventory management - material entry - select a material entry - click process - view process;

[0022] The operation steps of the outbound order are: Inventory Management - Outbound Order - Add Outbound - Fill in the Outbound Order - Add Outbound Materials; the review steps of the outbound order are: Inventory Management - Outbound Order - Select the outbound order to be reviewed - Click Details - Select Agree / Reject - Fill in the review opinion; the steps for viewing the outbound process are: Inventory Management - Outbound Order - Select an outbound order - Click Process - View Process;

[0023] The operation steps of incoming orders are: Inventory Management - Incoming Orders - Select a certain purchase incoming order - Click Details - Edit incoming materials; the operation steps of adding incoming orders are: Inventory Management - Incoming Orders - Add incoming orders - Edit incoming orders - Add incoming materials - Select incoming materials - Edit incoming material information; the operation steps of viewing incoming materials are: Inventory Management - Incoming Orders - Select a certain incoming order - Click Process - View Process;

[0024] The operation steps of transfer order are: Inventory Management - Transfer Order - Add Transfer - Edit Transfer Information - Add Transfer Materials; the review steps of transfer order are: Inventory Management - Transfer Order - Select a transfer order to be reviewed - Click Details - Confirm Transfer - Edit Transfer Materials; the confirmation steps of transfer outbound are: Inventory Management - Transfer Order - Select a transfer order to be confirmed for outbound delivery - Click Details - Confirm outbound delivery; the confirmation steps of transfer inbound are: Inventory Management - Transfer Order - Select a transfer order to be confirmed for inbound delivery - Click Details - Confirm inbound delivery; the confirmation steps of transfer outbound are: Inventory Management - Transfer Order - Select a transfer order to be verified - Click Details - Verify Pass / Fail - Review Opinion; the viewing process of transfer order is: Inventory Management - Transfer Order - Select a transfer order - Click Process - View Process.

[0025] The technical effects and advantages of a material management system of the present invention are as follows: the present invention manages the first basic information of the project and the project member information through the project management module, and manages the first budget information of the project based on the budget management module; the first budget information includes the project budget, actual expenditure, budgeted engineering quantity and supply unit price; utilizes the procurement management module to manage the material application and procurement application of the project, manages the material entry, outbound orders, inbound orders and transfer orders according to the inventory management module, and dynamically adjusts the engineering budget according to the actual engineering quantity and supply unit price through the dynamic budget adjustment unit, which can effectively solve the limitations in traditional material management, realize the synchronous optimization of budget and actual construction, and comprehensively improve the material management efficiency and benefits of construction projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 A structural schematic diagram of a material management system provided by the present invention;

[0027] Figure 2 The operating interface for adding project members provided by the present invention;

[0028] Figure 3 The operating interface for modifying project member permissions provided by the present invention;

[0029] Figure 4 The present invention provides an operation interface for exporting a budget. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the present invention to clearly and completely describe the technical solution in the present invention. Obviously, the described technical solution is only a part of the present invention, not all of it. Based on the technical solution in the present invention, all other technical solutions obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0031] Figure 1 This is a schematic diagram of the structure of a material management system provided by the present invention. Figure 1 As shown, a material management system includes a project management module, a budget management module, a procurement management module, an inventory management module, and an intelligent collaboration module.

[0032] The project management module is used to manage the first basic information of the project and the project member information; the first basic information includes the project name, project location, construction area, start date, planned completion date, and total project cost; project member information management includes adding project members and modifying project member permissions; Figure 2 The operation interface for adding project members is shown in the figure. The operation steps for adding project members are: Project Management - Project List - Click on a project to edit - Enter the project homepage - Project Members - Add new members - Select users; Figure 3The operation interface for modifying project member permissions is shown. The operation steps for modifying project member permissions are: Project Management - Project List - Click a project to edit - Enter the project homepage - Project Members - Edit Members - Role Assignment; the options for role assignment include ordinary employee, material user, purchasing auditor, material clerk, warehouse manager, general manager, purchaser and project manager;

[0033] The budget management module is used to manage the first budget information of the project; the first budget information includes the project name, project budget, actual cost, budgeted engineering quantity and supply unit price; managing the first budget information of the project includes exporting the budget, adding budget subcategories, and deleting the budget; Figure 4 The operation interface for exporting a budget is shown. The steps for exporting a budget are: Budget management - Budget list - Click to export a budget; the steps for adding a budget subcategory are: Budget management - Budget list - Select a budget - Add subcategory; the steps for deleting a budget are: Budget management - Budget list - Select a budget - Operation - Delete.

[0034] Through modular design, the whole process management of project management, budget management, procurement management, inventory management and intelligent collaboration is realized. Each module has a clear division of labor and is responsible for different management links, such as project information management, budget preparation, procurement process and inventory monitoring, which effectively reduces confusion and repeated operations in the management process. Clear operation steps (such as adding project members, exporting budgets, and reviewing material applications) enable users to get started quickly and reduce time waste caused by complex processes. The first basic information of the project management module (project name, location, and building area) and the first budget information of the budget management module (budgeted project volume, actual expenditure) are shared in real time to provide reliable data support for the procurement and inventory modules. The permissions of project members can be dynamically adjusted according to role allocation, supporting efficient collaboration between different positions (such as ordinary employees, procurement auditors, warehouse managers, etc.) while ensuring data security. The budget management module supports export, subcategory addition and dynamic adjustment functions, and can quickly update the budget according to actual needs and changes to avoid the problem of over- or under-budgeting, and realize the comparison between budget and actual expenditure. Analysis, timely adjustment when deviations are found, and waste of project funds is reduced; the material application process of the procurement management module is clear (adding new materials, reviewing materials, and checking processes), and the entire process from demand to approval is traceable online, reducing communication costs. By reviewing the purchase order and the procurement application process, it is ensured that the procurement plan meets the project needs and budget, and duplicate or missed procurement is avoided; the inventory management module combines material entry, outbound orders, inbound orders, and transfer orders to fully control the status of material circulation, reduce waste or loss caused by poor management, set inventory safety lines, and provide real-time warnings for low or high inventory, optimize material procurement and storage strategies, add or adjust project members according to project needs, dynamically configure resources, and improve management flexibility. Material transfer is achieved through inventory management and intelligent collaboration modules, reducing idle resources and improving overall material utilization efficiency; procurement management and budget are linked in the system, and procurement plans are scientifically formulated based on budget and inventory conditions to reduce the impact of excessive procurement and price fluctuations, and clear operation steps and authority management are used to reduce data confusion and process interruptions caused by manual operation errors.

[0035] The procurement management module is used to manage the material application and purchase application of the project; managing the material application of the project includes adding new material application, reviewing material application, and viewing the material application process; managing the purchase application of the project includes confirming / initiating purchase orders, reviewing purchase applications, and viewing the purchase application process;

[0036] The steps for adding a material requisition are: Purchase Management - Material Requisition List - Material Requisition - Add Material - Select Material - Fill in Material Quantity; the steps for reviewing a material requisition are: Purchase Management - Material Requisition List - Select a material requisition to be reviewed - Click Details - Select Agree / Reject - Fill in Approval Comments; the steps for viewing the material requisition process are: Purchase Management - Material Requisition List - Select a material requisition - Click Process - View Process;

[0037] The steps to confirm / initiate a purchase order are: Purchase Management - Purchase List - Select a purchase to be confirmed - Click Details - Initiate a purchase application - Edit application material information; the steps to review a purchase application are: Purchase Management - Purchase List - Select a purchase to be reviewed - Click Details - Select Agree / Reject - Fill in approval comments; the steps to view the purchase application process are: Purchase Management - Purchase List - Select a purchase application - Click Process - View Process.

[0038] The operating steps of adding new material applications, reviewing material applications, and checking material processes are refined to make the process standardized and easy to operate, avoiding delays caused by improper operations. After the material application is completed, a purchase application can be directly initiated without repeatedly entering material information, reducing manual entry errors and time waste. From material demand to purchase execution, each link is clearly visible, and application, approval, and execution are completed in one go; each material application and purchase application supports viewing process records, including application initiation, approval, status update, etc., which facilitates problem tracing and clear responsibility, and the status of the application form (pending review, reviewed, purchased) The material application specifies the types and quantities of materials to avoid redundant purchases and waste of materials. The material information and quantity are edited in the purchase application to ensure that the purchase meets the actual needs and budget and avoid the risk of over-purchase or out-of-stock. The approval opinions are recorded for each approval to help optimize the material application and procurement process and improve the efficiency of material management. Both the material application and the procurement application must go through the review process to ensure the rationality and compliance of the application and reduce unnecessary material consumption or purchases. The reviewer can choose to agree or reject and Filling in the approval opinions helps to refine the process and improve the quality of material management. Each material application or purchase order needs to be reviewed, which eliminates the waste of resources caused by unnecessary applications or excessive purchases. All material applications and purchase applications are completed in the same system. Project members can check the progress of the application at any time to reduce the cost of cross-departmental communication. After the material application is completed, the procurement module receives information immediately to ensure the rapid connection between procurement and material demand and improve supply efficiency. The operation steps of each link are clear. Each participant (such as material personnel, purchasers, and auditors) completes their duties in the system, effectively reducing cross-role coordination problems. Through the visual viewing of the material and procurement process, the management can clearly understand the entire process of application and execution, provide a basis for optimizing the process, record all material application and procurement application data, and provide reference for the budget preparation and material management strategy of subsequent projects. The strict application and approval process reduces the risks of over-budget procurement and unreasonable material use, and provides a guarantee for the overall resource control of the project. By covering the entire process of material application and procurement application, closed-loop management from demand to execution is realized, solving the problems of opaque process, low efficiency, and resource waste in traditional procurement management. It has significant advantages in improving efficiency, reducing costs, optimizing processes and supporting decision-making, providing strong support for material management of construction projects.

[0039] The inventory management module is used to manage material entry, outbound orders, inbound orders and transfer orders; the steps for material entry are: inventory management - material entry - select a receipt to be signed - click details - select receipt confirmation - fill in the receipt material information; the steps for returning the signed materials are: inventory management - material entry - select a receipt to be signed - click details - select return - fill in comments; the steps for signing for materials are: inventory management - material entry - select a material entry - click process - view process;

[0040] The operation steps of the outbound order are: Inventory Management - Outbound Order - Add Outbound - Fill in the Outbound Order - Add Outbound Materials; the review steps of the outbound order are: Inventory Management - Outbound Order - Select the outbound order to be reviewed - Click Details - Select Agree / Reject - Fill in the review opinion; the steps for viewing the outbound process are: Inventory Management - Outbound Order - Select an outbound order - Click Process - View Process;

[0041] The operation steps of incoming orders are: Inventory Management - Incoming Orders - Select a certain purchase incoming order - Click Details - Edit incoming materials; the operation steps of adding incoming orders are: Inventory Management - Incoming Orders - Add incoming orders - Edit incoming orders - Add incoming materials - Select incoming materials - Edit incoming material information; the operation steps of viewing incoming materials are: Inventory Management - Incoming Orders - Select a certain incoming order - Click Process - View Process;

[0042] The operation steps of transfer order are: Inventory Management - Transfer Order - Add Transfer - Edit Transfer Information - Add Transfer Materials; the review steps of transfer order are: Inventory Management - Transfer Order - Select a transfer order to be reviewed - Click Details - Confirm Transfer - Edit Transfer Materials; the confirmation steps of transfer outbound are: Inventory Management - Transfer Order - Select a transfer order to be confirmed for outbound delivery - Click Details - Confirm outbound delivery; the confirmation steps of transfer inbound are: Inventory Management - Transfer Order - Select a transfer order to be confirmed for inbound delivery - Click Details - Confirm inbound delivery; the confirmation steps of transfer outbound are: Inventory Management - Transfer Order - Select a transfer order to be verified - Click Details - Verify Pass / Fail - Review Opinion; the viewing process of transfer order is: Inventory Management - Transfer Order - Select a transfer order - Click Process - View Process.

[0043] The inventory management module covers the management of material entry, outbound orders, inbound orders and transfer orders through detailed and standardized operation procedures, providing full-process management capabilities and data transparency, significantly improving inventory management efficiency and reducing management risks; each type of order (entry, inbound, outbound, transfer) has clear operation steps, standardized management reduces operational errors and improves work efficiency; from material entry to transfer verification, all processes are automatically transferred in the system without the need for additional communication and coordination, reducing human intervention, supporting the instant addition of outbound, inbound and transfer orders, and being able to quickly respond to changes in material demand on the construction site; each The process of each order (entry, outbound, inbound, transfer) can be viewed, covering operation records, audit records, material information, etc. All operations can be traced, and the order status (such as waiting for receipt, waiting for review, completed, etc.) is updated in real time. Relevant personnel can view the progress of the order at any time to avoid information delays or omissions. Each operation step records the operator and time to ensure clear responsibilities and effectively avoid disputes. Through the real-time update of outbound, inbound, and transfer orders, managers can accurately grasp the inventory quantity, status, and distribution to avoid excessive or insufficient inventory. The signature return function supports the return of materials that do not meet the requirements to ensure The quality of incoming materials is qualified, waste is reduced, and the verification process of allocated materials is supported to avoid loss or damage in the circulation of materials. The inventory safety line can be configured to trigger an early warning when the inventory is lower than or exceeds the set threshold, thereby optimizing procurement and allocation decisions; the inventory management module is seamlessly connected with the procurement management module, and the incoming orders come directly from the purchase orders, without the need for repeated entry, which improves the coordination efficiency and combines with the allocation management to realize the cross-project and cross-warehouse allocation of materials, optimize resource allocation, and support the addition, review, confirmation of outbound and inbound of transfer orders, ensuring that the allocation of materials between different projects or warehouses is fast and efficient; for outbound orders, The transfer order has multiple levels of review links (such as approval / rejection, filling in approval opinions) to ensure that each order is strictly approved to prevent misoperation or illegal operation. The on-site receipt of materials supports the return of unqualified materials to avoid the storage of materials that do not meet quality requirements to ensure the quality of the project. The transfer order outbound and inbound must be confirmed and verified to avoid deviations in the circulation of materials. By covering the entire life cycle of material entry, outbound, inbound and transfer, combined with standardized processes, real-time status updates, comprehensive process records and multi-level review mechanisms, it provides construction projects with efficient, transparent and intelligent inventory management solutions. It not only improves inventory control capabilities, but also significantly reduces the overall operating costs of the project by optimizing material circulation, reducing waste and providing decision support, ensuring the stability of project progress and quality.

[0044] The intelligent collaboration module includes a budget prediction unit, a budget execution monitoring unit and a dynamic budget adjustment unit; the budget prediction unit is connected to the budget execution monitoring unit, and the budget execution monitoring unit is connected to the dynamic budget adjustment unit;

[0045] The budget prediction unit is used to obtain the project budget, actual cost, budgeted engineering quantity and supply unit price in the first budget information; wherein the budgeted engineering quantity is calculated by building an engineering quantity prediction model based on the actual consumption of historical projects and the predicted consumption of historical projects. The formula of the engineering quantity prediction model is:

[0046]

[0047] Where: Q U is the estimated engineering quantity, Q L is the actual consumption of historical projects, Q LU Forecast consumption for historical projects;

[0048] The project budget is obtained by calculating the budgeted engineering quantity and supply unit price:

[0049]

[0050] Where: B U is the project budget, n is the number of project materials, Q Ui is the estimated engineering quantity of the i-th type of materials, U i is the supply unit price of the i-th category of materials, Q Li is the actual consumption of the historical items of the i-th category of materials, Q LUi Forecast consumption for historical items of class i materials.

[0051] The budget execution monitoring unit is used to obtain the actual engineering quantity and actual expenditure in real time, build a budget deviation calculation model based on the actual engineering quantity, budgeted engineering quantity, actual expenditure and project budget, and calculate the budget deviation rate. The formula of the budget deviation calculation model is:

[0052]

[0053] Where: θ Ut is the budget deviation rate at time t, Q t is the actual engineering quantity at time t, Q Ut is the budgeted engineering quantity at time t, B t is the actual cost at time t, B Ut is the project budget at time t;

[0054] The dynamic budget adjustment unit is used to dynamically adjust the project budget according to the actual project quantity and supply unit price:

[0055] B Ut ′=B Ut +θ Ut ;

[0056] Where: B Ut′ is the dynamically adjusted project budget, B Ut is the project budget at time t, θ Ut is the budget deviation rate at time t.

[0057] The intelligent collaborative module realizes the scientific, dynamic and real-time nature of budget management through the collaborative work of the budget forecasting unit, the budget execution monitoring unit and the dynamic budget adjustment unit. It builds an accurate engineering quantity forecasting model by using the actual consumption and predicted consumption of historical projects, eliminating the budget deviation caused by lack of experience. The engineering quantity forecasting model formula takes into account the difference between actual consumption and predicted consumption, and dynamically corrects the budget engineering quantity to ensure the accuracy of budget data. The budget execution monitoring unit obtains the actual engineering quantity, actual expenditure and other data in real time to ensure that the budget execution status is synchronized with the construction progress. Through the budget deviation calculation model, the budget deviation is quantified into a specific deviation rate to help managers quickly understand the difference between the budget and actual execution. The deviation calculation model monitors the deviation of engineering quantity and expenditure at the same time, providing managers with a more comprehensive budget execution situation. The dynamic budget adjustment unit automatically adjusts the project budget according to the deviation rate and generates a dynamically adjusted budget to ensure that the budget can respond to changes in actual conditions in real time. The dynamic adjustment function can quickly correct deviations to avoid waste of resources caused by excessive budget or insufficient budget affecting the construction progress. The adjusted budget is directly based on the actual supply unit price and engineering quantity to ensure that the budget always fits the market dynamics and actual construction needs. After dynamic adjustment, resource allocation can be optimized according to real-time engineering quantity and material consumption, reducing idle or insufficient resources. The module is suitable for budget monitoring and adjustment of multiple projects, which is convenient for cross-project resource allocation and budget optimization. From budget forecasting to dynamic adjustment, the whole process is automatically calculated and adjusted by the system, reducing errors and management costs caused by manual intervention. Through budget deviation monitoring and dynamic adjustment functions, budget deviations can be discovered and corrected in time to avoid cost overruns or construction delays caused by budget out of control. The budget can be adjusted in real time according to changes in supply unit prices to effectively respond to risks brought by market fluctuations. The module records data such as budget, actual engineering quantity, actual expenditure and adjusted budget, which is convenient for reference for budget preparation and optimization of subsequent projects. Through deviation rate analysis, it provides managers with visual deviation data to help efficient decision-making. The combination of historical project data and real-time adjustment results is conducive to the optimization of future budget models and improves the long-term benefits of budget management. The intelligent collaboration module realizes the scientific nature of budget preparation, the real-time nature of budget execution and the dynamic nature of budget adjustment through the collaborative work of three units: budget forecasting, execution monitoring and dynamic adjustment. It can significantly improve the accuracy and flexibility of budget management, reduce costs and risks, and provide strong support for the optimal allocation of project resources.

[0058] The embodiment of the present invention manages the first basic information of the project and the project member information through the project management module, and manages the first budget information of the project based on the budget management module; the first budget information includes the project budget, actual expenditure, budgeted engineering quantity and supply unit price; uses the procurement management module to manage the material application and procurement application of the project, and manages the material entry, outbound orders, inbound orders and transfer orders according to the inventory management module. The project budget is dynamically adjusted according to the actual engineering quantity and supply unit price through the dynamic budget adjustment unit, which can effectively solve the limitations of traditional material management, realize the synchronous optimization of budget and actual construction, and comprehensively improve the material management efficiency and benefits of construction projects.

[0059] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0060] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A material management system, comprising a project management module, a budget management module, a procurement management module, an inventory management module and an intelligent collaboration module; characterized in that: The budget management module is used to manage the first budget information of the project; the first budget information includes the project name, project budget, actual cost, budgeted engineering quantity and supply unit price; the intelligent collaboration module includes a budget prediction unit, a budget execution monitoring unit and a dynamic budget adjustment unit; the budget prediction unit is used to obtain the project budget, actual cost, budgeted engineering quantity and supply unit price in the first budget information; the budgeted engineering quantity is calculated by building an engineering quantity prediction model based on the actual consumption of historical projects and the predicted consumption of historical projects. The formula of the engineering quantity prediction model is: Where: Q U is the estimated engineering quantity, Q L is the actual consumption of historical projects, Q LU Forecast consumption for historical projects; The project budget is obtained by calculating the budgeted engineering quantity and supply unit price: Where: B U is the project budget, n is the number of project materials, Q Ui is the estimated engineering quantity of the i-th type of materials, U i is the supply unit price of the i-th category of materials, Q Li is the actual consumption of the historical items of the i-th category of materials, Q LUi Forecast consumption for historical items of class i materials.

2. The material management system according to claim 1, characterized in that: The budget execution monitoring unit is used to obtain the actual engineering quantity and actual expenditure in real time, build a budget deviation calculation model based on the actual engineering quantity, budgeted engineering quantity, actual expenditure and project budget, and calculate the budget deviation rate. The formula of the budget deviation calculation model is: Where: θ Ut is the budget deviation rate at time t, Q t is the actual engineering quantity at time t, Q Ut is the budgeted engineering quantity at time t, B t is the actual cost at time t, B Ut is the project budget at time t; The dynamic budget adjustment unit is used to dynamically adjust the project budget according to the actual project quantity and supply unit price: B Ut ′=B Ut +θ Ut ; Where: B Ut ′ is the dynamically adjusted project budget, B Ut is the project budget at time t, θ Ut is the budget deviation rate at time t.

3. The material management system according to claim 1, characterized in that: The project management module is used to manage the first basic information of the project and the project member information; the first basic information includes the project name, project location, construction area, start date, planned completion date, and total project cost; project member information management includes adding project members and modifying project member permissions.

4. The material management system according to claim 1, characterized in that: The budget management module is used to manage the first budget information of the project; managing the first budget information of the project includes exporting the budget, adding a budget subcategory, and deleting the budget.

5. The material management system according to claim 1, characterized in that: The procurement management module is used to manage the material application and purchase application of the project; managing the material application of the project includes adding new material application, reviewing material application, and viewing the material application process; managing the purchase application of the project includes confirming / initiating purchase orders, reviewing purchase applications, and viewing the purchase application process; the inventory management module is used to manage material incoming, outbound orders, inbound orders, and transfer orders.