Steel structure building shell capable of erecting scaffold and scaffold erecting method thereof

By using a two-stage fixing method in steel structure buildings, the eagle frame is fixed on the transverse aluminum extrusion, which solves the problem of embedded steel bars hindering the assembly of curtain walls, and realizes the assembly of curtain walls on the eagle frames, reducing construction costs and improving the environmental protection and life of the building.

CN119531483APending Publication Date: 2025-02-28楊豐溢
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311103806.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-08-30
Publication Date
2025-02-28

AI Technical Summary

Technical Problem

In steel structure buildings, when embedded steel bars are used to fix eagle frames, it will hinder the assembly of curtain walls, resulting in high-cost high-altitude hanging operations for assembly of curtain walls.

Method used

By setting up transverse aluminum extrusion between the floors of steel structure buildings and using a two-stage fixing method, the eagle frame is fixed to the transverse aluminum extrusion. The first stage of fixing is used to wrap embedded steel bars, and the second stage of fixing is used to replace embedded steel bars with wall connecting rods to ensure that the curtain wall can be assembled on the eagle frame.

Benefits of technology

This method enables the curtain wall to be assembled on the eagle frame without the need for high-altitude hanging operations, which reduces the construction cost of steel structure buildings, is conducive to the promotion of steel structure buildings, improves the building life and meets environmental protection needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119531483A_ABST
    Figure CN119531483A_ABST
Patent Text Reader

Abstract

The invention relates to a steel structure building shell capable of erecting a scaffold and a scaffold erecting method of the steel structure building shell. The steel structure building shell comprises a steel structure building main body, a building floor and a building outer wall. The steel structure building body comprises an H-shaped steel beam, and the DECK steel bearing floor slab is assembled on the H-shaped steel beam. The building floor slabs comprise RC floor slabs laid on the DECK steel bearing floor slabs, the DECK steel bearing floor slabs and the RC floor slabs serve as the building floor slabs, steel bar structures and embedded steel bars are laid in the RC floor slabs, and the embedded steel bars stretch out of the RC floor slabs and are connected to the scaffold in a winding mode to serve as first-stage fixing of the scaffold. The building outer wall comprises embedded parts used for locking and fixing the wall connecting rods, the embedded parts are embedded into the RC floor slab at intervals, transverse aluminum extrusion parts are arranged on the outer side of the RC floor slab, one ends of the wall connecting rods penetrate through the transverse aluminum extrusion parts to be locked and fixed to the embedded parts, and the scaffold is locked and fixed to the other ends of the wall connecting rods. And then the embedded steel bars are removed from the scaffold to serve as second-stage fixing of the scaffold.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a steel structure building shell capable of erecting a scaffold and a scaffold erection method thereof, and more particularly to an invention in which a transverse aluminum extrusion is arranged between floors of the steel structure building shell, and the scaffold is fixed to the transverse aluminum extrusion by a two-stage fixing method, so that the outer wall can be assembled on the scaffold without adopting a high-altitude hanging operation. Background Art

[0002] Early residential buildings in Taiwan were mainly brick buildings. After reinforced concrete technology was introduced to Taiwan and the cost was reduced, residential buildings were changed to be mainly reinforced concrete. Later, with the economic development and high population density in Taiwan, the demand for super high-rise buildings with steel structures increased due to high land costs. Not only in commercial buildings, but also in residential buildings, there are more and more super high-rise buildings with steel structures. Among them, according to statistics, residential buildings in Taiwan account for more than 90% and are the bulk of the construction industry.

[0003] In general, Taiwan's buildings include three structural systems: RC structure (reinforced concrete), SS structure (steel frame structure) and SRC structure (steel frame reinforced concrete). Compared with traditional RC structure (reinforced concrete), SS structure (steel frame structure) or SRC structure (steel frame reinforced concrete) has the environmental characteristics of long life and recyclable materials, but the construction cost of SS structure (steel frame structure) or SRC structure (steel frame reinforced concrete) is high, so residential buildings are still mainly RC structure (reinforced concrete).

[0004] In RC (reinforced concrete) buildings, scaffolding is set up so that construction workers can complete the building structure on high floors. The scaffolding is set up by pre-embedded steel bars (such as three-point bamboo steel bars) on the RC beams of the building structure. The distance between adjacent pre-embedded steel bars is about 160 cm to 180 cm (adjusted according to the scaffolding erection diagram), and the pre-embedded steel bars are wrapped around the scaffolding to fix the scaffolding on the outside of the building structure. When the scaffolding is set up with pre-embedded steel bars, position errors are allowed and do not affect subsequent construction, so the scaffolding can be set up quickly.

[0005] In steel structure buildings such as SS structure (steel frame structure) or SRC structure (steel frame reinforced concrete), curtain walls are mostly used for the exterior walls. Curtain walls have the advantages of light weight, modular units, and fast construction and assembly. The assembly method is to hang the curtain wall outside the building floor through combined components.

[0006] However, the embedded steel bars used to fix the scaffolding in the building structure will hinder the assembly of the curtain wall, so the curtain wall cannot be assembled by setting up the scaffolding. At present, the curtain wall is assembled by high-altitude hanging operations, but the high-altitude hanging operations require high operating costs such as hanging tools and professionals, which further increases the cost of steel structure buildings and is not conducive to the promotion of steel structure buildings. Summary of the invention

[0007] In order to reduce the construction cost of steel structure residential buildings, the inventor has proposed Taiwan Patent Application No. 111147640 "Structure of Steel Structure Building Shell". In order to further facilitate the erection of scaffolding in steel structure buildings, and to assemble exterior walls (such as curtain walls) on the scaffolding, the purpose of the present invention is to provide a steel structure building shell that can be scaffolded and a scaffolding erection method.

[0008] The present invention provides a steel structure building shell capable of erecting a scaffold, which is used for two-stage fixed scaffolding, and comprises:

[0009] The main body of the steel structure building comprises an H steel beam and a DECK steel floor slab, wherein the DECK steel floor slab is assembled on the H steel beam.

[0010] The building floor comprises a RC floor slab laid on the DECK steel-supported floor slab, and the DECK steel-supported floor slab and the RC floor slab serve as the building floor slab, a steel bar structure and embedded steel bars are laid in the RC floor slab, and the embedded steel bars extend out of the RC floor slab and are connected around the scaffolding to serve as the first stage of fixing of the scaffolding.

[0011] The building exterior wall includes: embedding parts for locking wall connecting rods into the RC floor slabs at intervals. A transverse aluminum extrusion is arranged on the outside of the RC floor slab. One end of the wall connecting rod passes through the transverse aluminum extrusion and is locked on the embedding part, and the other end of the wall connecting rod is locked on the scaffolding, and then the embedded steel bars are removed from the scaffolding to serve as the second stage of fixing of the scaffolding. The exterior wall panels are installed between the building floor slabs from the outside, and the adjacent exterior wall panels are separated by the transverse aluminum extrusion.

[0012] When the exterior wall of the building is completed, the wall connecting rods are dismantled one by one to remove the scaffolding.

[0013] The present invention also provides a method for erecting a scaffold for a steel structure building, comprising the following steps:

[0014] Constructing the main body of the steel structure building: erecting the H steel beams and the DECK steel floor slabs of the main body of the steel structure building, and assembling the DECK steel floor slabs on the H steel beams.

[0015] Construction of building floor: The RC floor is laid on the DECK steel-supported floor, and the DECK steel-supported floor and the RC floor serve as the building floor. The RC floor is laid with a steel bar structure and embedded steel bars. The embedded steel bars extend out of the RC floor and are connected around the scaffolding to serve as the first stage of fixing the scaffolding.

[0016] Construction of building exterior walls: embedding parts for locking wall connecting rods into the RC floor slabs at intervals, and arranging transverse aluminum extrusions on the outer side of the RC floor slabs, and then passing one end of the wall connecting rod through the transverse aluminum extrusions and locking it on the embedding parts, and locking the other end of the wall connecting rod to the scaffolding, and then removing the embedded steel bars from the scaffolding as the second stage of fixing the scaffolding; installing the exterior wall panels between the building floor slabs from the outside, and separating the adjacent exterior wall panels by the transverse aluminum extrusions.

[0017] When the exterior wall of the building is completed, the wall connecting rods are dismantled one by one to remove the scaffolding.

[0018] Furthermore, the embedded steel bars are made of three-part bamboo-joint steel bars, and the three-part bamboo-joint steel bars are used to wrap the scaffolding at least three and a half turns to meet the fixing strength specified by regulations.

[0019] Furthermore, after the embedded steel bars are removed from the scaffolding, the portion of the embedded steel bars exposed from the RC floor slab is cut off.

[0020] Furthermore, the embedded part is an expansion nut, and one end of the wall connecting rod is screwed to the expansion nut.

[0021] Furthermore, after the wall connecting rod is disassembled, the embedded part is locked with a nut, or filled with silicone and then sealed with paint.

[0022] The following effects can be achieved according to the above technical features:

[0023] 1. The scaffolding is fixed to the horizontal aluminum extrusion in a two-stage fixing method, so that the curtain wall can be assembled on the scaffolding without the need for high-altitude hanging operations, which can reduce the cost of steel structure buildings, is conducive to the promotion of steel structure buildings, and prolongs the life of buildings and meets environmental protection requirements.

[0024] 2. The first stage of fixing of the scaffold of the present invention uses embedded steel bars to wrap and fix, which can quickly complete the erection of the scaffold; the second stage of fixing the scaffold uses wall connecting rods to replace the embedded steel bars one by one. In addition to enabling the curtain wall to be assembled on the scaffold, the wall connecting rods are accurately positioned, making the scaffold more firmly erected and improving safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1This is a three-dimensional appearance diagram of the first stage of fixing the steel structure building shell with three-part bamboo-section steel bars as scaffolding.

[0026] Figure 2 This is a plan view of the first stage of fixing the steel structure building shell with three-part bamboo-section steel bars as scaffolding.

[0027] Figure 3 This is a three-dimensional appearance diagram of the second stage of fixing the scaffolding on the outer shell of a steel structure building using wall connecting rods in an embodiment of the present invention.

[0028] Figure 4 This is a plan view of the second stage of fixing the scaffolding on the outer shell of a steel structure building using wall connecting rods in an embodiment of the present invention.

[0029] Figure 5 This is a three-dimensional appearance diagram of an embodiment of the present invention, in which after the outer wall panels of the steel structure building shell are assembled, the wall connecting rods are removed and the embedded parts are sealed with nuts.

[0030] Figure 6 This is a plan view of an embodiment of the present invention, in which after the outer wall panels of the steel structure building shell are assembled, the wall connecting rods are removed and the embedded parts are sealed with nuts.

[0031] Explanation of the reference numerals: A-steel structure building body; B-building floor; C-building exterior wall; 1-H steel beam; 2-DECK steel floor; 3-RC floor; 31-reinforcement structure; 32-three-section bamboo steel bar; 4-scaffolding; 5-RC water stop pier; 6-wall connecting rod; 7-embedded parts; 8-transverse aluminum extrusion; 9-C-shaped steel; 101-exterior wall panel; 102-interior wall panel; 20-sound insulation material; 30-silicon; 40-nut; S-hollow space. DETAILED DESCRIPTION

[0032] The following embodiments are only for the purpose of explaining the steel structure building shell and the scaffolding erection method of the present invention, and are not intended to limit the present invention. Due to the large size of the steel structure building shell, the drawings are partial schematic diagrams to clearly show the features of the present invention.

[0033] The steel structure building shell of the embodiment of the present invention includes a steel structure building body, a building floor and a building exterior wall.

[0034] See also Figure 1 and Figure 2 As shown, firstly, a steel structure building body A is constructed. The steel structure building body A mainly includes an H steel beam 1 and a DECK steel floor slab 2. The DECK steel floor slab 2 is assembled on the H steel beam 1.

[0035] After the main body A of the steel structure building is assembled, the building floor B is constructed, and the RC floor 3 is laid on the DECK steel floor 2, and the DECK steel floor 2 and the RC floor 3 serve as the building floor B. A steel bar structure 31 and embedded steel bars are laid in the RC floor 3. The embedded steel bars in this embodiment use three-part bamboo-joint steel bars 32, which extend out of the RC floor 3 and are wrapped around the scaffolding 4 as the first stage of fixing the scaffolding 4. To ensure that the scaffolding 4 is stable and meets the fixing strength specified by laws and regulations, the three-part bamboo-joint steel bars 32 are wrapped around the scaffolding 4 for at least three and a half turns. When the embedded steel bars use other steel bars such as four-part bamboo-joint steel bars, the scaffolding 4 is wrapped according to relevant specifications.

[0036] See also Figure 3 and Figure 4 As shown, after the construction of the building floor B is completed and the scaffolding 4 is set up for the first stage of fixing, the construction of the building exterior wall C can be carried out. The building exterior wall C of this embodiment is a double-layer structure. First, the RC water stop pier 5 is cast on the RC floor 3, and then the embedded parts 7 for locking the wall connecting rod 6 are embedded in the RC floor 3 at intervals, and a transverse aluminum extrusion 8 is set on the outside of the RC floor 3, and then one end of the wall connecting rod 6 passes through the transverse aluminum extrusion 8 and is locked in the embedded part 7. The embedded part 7 of this embodiment uses an expansion nut, and the wall connecting rod 6 is screwed on the embedded part 7. It has been tested that it can bear a load of 2 tons. Then the other end of the wall connecting rod 6 is locked to the scaffolding 4, and then the three-part bamboo-jointed steel bar 32 is removed from the scaffolding 4 as the second stage of fixing the scaffolding 4. After the three-part bamboo-jointed steel bar 32 is removed from the scaffolding 4, the part of the three-part bamboo-jointed steel bar 32 exposed in the RC floor 3 can be cut off.

[0037] Then, one of the two C-shaped steels 9 is arranged on the RC water stop pier 5 with the opening facing upward, and the other is arranged on the DECK steel bearing floor slab 2 with the opening facing downward. Further, the outer wall panel 101 and the inner wall panel 102 are attached to the opposite sides of the RC water stop pier 5 and the two C-shaped steels 9, and a hollow space S is formed between the outer wall panel 101 and the inner wall panel 102, thereby making the building outer wall C a double-layer structure, and making the building outer wall C directly arranged on the building floor slab B, so that the building floor slab B can completely separate the upper / lower floor space, and become a good water-proof / soundproof / heat-insulating layer between the upper / lower floors, wherein the outer wall panel 101 is installed between the building floor slabs B from the outside, and the adjacent outer wall panels 101 are separated by the transverse aluminum extrusion 8, and the assembly gap of the outer wall panel 101 can be further filled with elastic cement to improve the waterproof effect between the indoor and outdoor sides. In this embodiment, the sound insulation material 20 is respectively arranged on the two C-shaped steels 9 and filled in the hollow space S. The sound insulation material 20 extends along the height direction of the building outer wall C. For example, the hollow space S is filled with rock wool. The sound insulation material 20 further fills the hollow space S in the double-layer structure of the building outer wall C, so that the sound insulation / heat insulation effect between the indoor and outdoor sides is better. Then, silicone 30 is filled between the transverse aluminum extrusion 8 and the above-mentioned two outer wall panels 101. Compared with the traditional one-piece curtain wall that is easily damaged due to resonance when subjected to force and vibration, the present invention can divide the outer wall panel 101 through the transverse aluminum extrusion 8, which can reduce the risk of force damage to the outer wall panel 101. In addition, the building outer wall C uses the transverse aluminum extrusion 8 to rationally fill the seams at the floor joints. The number of silicone 30 is small, so maintenance is better and cost is less.

[0038] See also Figure 5 and Figure 6 As shown, when the building exterior wall C is completed, the wall connecting rods 6 are dismantled one by one and the scaffolding 4 is removed (the wall connecting rods 6 and the scaffolding 4 are shown in FIG. Figure 3 , Figure 4 ), after the wall connecting rod 6 is removed, the nut 40 is locked on the embedded part 7, or the silicone is filled and then sealed with paint. In this way, the exterior wall panel 101 of the present invention is flat and does not need to be attached with tiles. Therefore, after the exterior wall panel 101 is sprayed with a waterproof layer throughout the building, a natural paint can be further applied to complete the construction of the building exterior wall C.

[0039] The specific construction steps of this embodiment are as follows, wherein the same or similar methods as those in the conventional steel structure construction are well known to those skilled in the art. To avoid the drawing being too small, the construction details are not shown in the drawing and will not be repeated. (1) Assemble the BOX steel columns and H steel beams 1 of each floor; (2) Lay the DECK steel slabs 2 and DECK fenders of each floor; (3) Lay out the pipes; (4) Lay the steel structure 31 (or spot welded steel mesh) of each floor and pre-embed the three-part bamboo steel bar 32; (5) Pour concrete on each floor to form the RC floor slab 3; (6) Build the construction scaffolding 4, and wrap the three-part bamboo steel bar 32 around the scaffolding 4 for at least three and a half turns to fix the scaffolding 4 in the first stage; (7) Construct the RC water stop pier 4 (embed the steel bar and grout); (8) Z (9) Spray fireproof coating on BOX steel columns and H steel beams 1 on each floor; (10) Layout the embedded parts 7 of wall tie rods 6 in fixed positions; (11) Install the embedded parts 7 of wall tie rods 6 on RC floor slabs 3; (12) Install the horizontal aluminum extrusion 8; (13) Install the wall tie rods 6 to lock the scaffolding 4 and remove the three-section bamboo steel bars 32 one by one to perform the second stage of fixing the scaffolding 4; (14) Layout, spacing and vertical correction of 125 C-shaped steel (including C-shaped steel 5 in the building exterior wall C) and fix it ; (15) Lay out 125 C-shaped steel (with cross-pieces and fixing iron parts) on the opening, door or window facade; (16) Fix the exterior wall panel 101; (17) Fill the assembly gap of the exterior wall panel 101 with elastic cement (fill the assembly gap of the exterior wall panel 101 with beneficial glue); (18) Anti-crack net / close the gap between the external panels; (19) Fill the long rock wool 30 in the building exterior wall C; (20) Fix the interior wall panel 102; (21) Fix the aluminum window installation components; (22) Install the aluminum window frame and door frame; (23) Fill (24) Install drip lines for doors and windows; (25) All assembly gaps between the steel structure building body A, the building floor slab B and the building exterior wall C are filled with fireproof caulking; (26) The waterproof layer of the exterior wall panel 101 is sprayed on the entire building; (27) Silicone is filled on the aluminum window frames and door frames of each part; (28) Natural paint is applied on the surface of the exterior wall panel 61; (29) The scaffolding 4 is removed layer by layer and the wall connecting rods 6 are removed one by one, and at the same time, the nuts 50 are locked or the paint is sealed after filling with silicone; (30) The exterior wall construction of the current floor is completed.

[0040] The present invention fixes the scaffolding on the horizontal aluminum extrusion through a two-stage fixing method, so that the curtain wall can be assembled on the scaffolding without high-altitude hanging operations, which can reduce the cost of steel structure buildings, is conducive to the promotion of steel structure buildings, and prolongs the life of buildings and meets environmental protection requirements.

[0041] The above description is only illustrative rather than restrictive of the present invention. Those skilled in the art will understand that many modifications, changes or equivalents may be made without departing from the spirit and scope defined by the claims, but all will fall within the scope of protection of the present invention.

Claims

1. A steel structure building shell capable of erecting a scaffold, used for two-stage fixed scaffolding, characterized in that: Included are: The main body of the steel structure building includes an H steel beam and a DECK steel floor slab, wherein the DECK steel floor slab is assembled on the H steel beam; The building floor comprises a RC floor, the RC floor is laid on the DECK steel-supported floor, and the DECK steel-supported floor and the RC floor serve as the building floor, the RC floor is laid with a steel bar structure and embedded steel bars, the embedded steel bars extend out of the RC floor and are connected around the scaffolding to serve as the first stage of fixing of the scaffolding; Building exterior walls include: embedding embedded parts for locking wall connecting rods into the RC floor slab at intervals; Arranging a transverse aluminum extrusion on the outer side of the RC floor; One end of the wall connecting rod is passed through the transverse aluminum extrusion and locked on the embedded part, and the other end of the wall connecting rod is locked on the scaffolding, and then the embedded steel bars are removed from the scaffolding to serve as the second stage of fixing the scaffolding; External wall panels are installed between the building floors from the outside, and adjacent external wall panels are separated by the transverse aluminum extrusion; When the exterior wall of the building is completed, the wall connecting rods are dismantled one by one to remove the scaffolding.

2. The steel structure building shell capable of erecting a scaffold as claimed in claim 1, characterized in that: The embedded steel bars are made of three-part bamboo-joint steel bars, and the three-part bamboo-joint steel bars are used to wrap the scaffolding at least three and a half turns.

3. The steel structure building shell capable of erecting a scaffold as claimed in claim 1, characterized in that: After the embedded steel bars are removed from the scaffolding, the portion of the embedded steel bars exposed from the RC floor slab is cut off.

4. The steel structure building shell capable of erecting a scaffold as claimed in claim 1, characterized in that: The embedded part is an expansion nut, and one end of the wall connecting rod is screwed to the expansion nut.

5. The steel structure building shell capable of erecting a scaffold as claimed in claim 1, characterized in that: After the wall connecting rod is disassembled, the embedded part is locked with a nut, or silicone is filled and then sealed with paint.

6. A method for erecting a scaffold for a steel structure building, characterized in that: The following steps are involved: Constructing the main body of the steel structure building: erecting the H steel beams and the DECK steel floor slabs of the main body of the steel structure building, and assembling the DECK steel floor slabs on the H steel beams; Constructing the building floor: laying the RC floor on the DECK steel-supported floor, and the DECK steel-supported floor and the RC floor serve as the building floor. The RC floor is provided with a steel bar structure and embedded steel bars. The embedded steel bars extend out of the RC floor and are connected around the scaffolding to serve as the first stage of fixing the scaffolding. Construction of building exterior walls: embedding embedded parts for locking wall connecting rods into the RC floor slabs at intervals, and arranging transverse aluminum extrusions on the outer side of the RC floor slabs, and then passing one end of the wall connecting rod through the transverse aluminum extrusions and locking it on the embedded parts, and locking the other end of the wall connecting rod to the scaffolding, and then removing the embedded steel bars from the scaffolding as the second stage of fixing the scaffolding; installing the exterior wall panels between the building floor slabs from the outside, and separating the adjacent exterior wall panels by the transverse aluminum extrusions; When the exterior wall of the building is completed, the wall connecting rods are dismantled one by one to remove the scaffolding.

7. The method for erecting a scaffold for a steel structure building according to claim 6, characterized in that: The embedded steel bars are made of three-part bamboo-joint steel bars, and the three-part bamboo-joint steel bars are used to wrap the scaffolding at least three and a half turns.

8. The method for erecting a scaffold for a steel structure building according to claim 6, characterized in that: After the embedded steel bars are removed from the scaffolding, the portion of the embedded steel bars exposed from the RC floor slab is cut off.

9. The method for erecting a scaffold for a steel structure building according to claim 6, characterized in that: The embedded part is an expansion nut, and one end of the wall connecting rod is screwed to the expansion nut.

10. The method for erecting a scaffold for a steel structure building according to claim 6, characterized in that: After the wall connecting rod is disassembled, the embedded part is locked with a nut, or silicone is filled and then sealed with paint.