Sampler for geological survey
By designing a sampler for geological surveying that includes sampling outer cylinder, excavation inner cylinder, adjustment of excavation claws and sampling pallets, the weight and texture of samples at different depths are solved, and the sample diameter and shape are flexible to adjust, which is convenient for sampling and detection.
Patent Information
- Application Number
- CN202510097469.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-22
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2045-01-22
AI Technical Summary
During geological exploration, the quality of geological samples at different depths is different, the samples are too heavy and difficult to take out, and it is difficult to ensure the integrity of the samples when sampling geological samples with soft texture, which affects detection.
A sampler for geological surveying is designed, including a sampling mechanism and a control mechanism. The sampling mechanism consists of a sampling outer cylinder, an excavation inner cylinder, a hollow excavation claw, an adjustment excavation claw and a sampling pallet. By adjusting the excavation claw and a sampling pallet, the diameter and shape of the sample can be adjusted according to the needs, which is convenient for sampling and detection.
The sample diameter is adjusted according to the needs to prevent the sample from being too heavy and difficult to take out; through multiple fixed-point sampling, samples of the required height are obtained; soft samples are effectively collected and supported for easy subsequent inspection.
Smart Images

Figure CN119534019A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of geological survey, and in particular to a sampler for geological survey. Background Art
[0002] Geological exploration is the exploration and detection of geological structures or mineral resource distribution on the surface or underground by different means.
[0003] During geological exploration, it is necessary to sample geological structures at different depths according to different needs and actual conditions. However, due to the different quality of geological samples at different depths, if the size of the cut samples is not adjusted, the weight of the samples will make them difficult to remove. At the same time, it is difficult to ensure the integrity of the samples when sampling and collecting softer geological samples, making detection more difficult.
[0004] Based on this, the present invention provides a sampler for geological survey. Summary of the invention
[0005] In view of the above technical problems, the present invention provides a sampler for geological survey, including a sampling mechanism, a control mechanism is longitudinally slidably installed on the top of the sampling mechanism, the sampling mechanism includes a sampling outer cylinder, an excavation inner cylinder is longitudinally rotatably installed on the bottom of the sampling outer cylinder, a plurality of hollow excavation claws are fixedly installed on the bottom of the excavation inner cylinder, an adjustable excavation claw is transversely slidably installed in the hollow excavation claw, the adjustable excavation claw slides in the radial direction of the excavation inner cylinder, a plurality of sliding excavation teeth are longitudinally slidably installed in the adjusting excavation claw, a compression spring is fixedly installed between the top of the sliding excavation tooth and the adjusting excavation claw, a supporting material baffle plate is fixedly installed on the top of the adjusting excavation claw, and an adjustable telescopic rod is fixedly installed between the outer wall of the supporting material baffle plate and the inner wall of the excavation inner cylinder.
[0006] Furthermore, the control mechanism includes a supporting slide, which is longitudinally slidably installed inside the sampling outer cylinder, a sampling pipe is fixedly installed on the top of the excavation inner cylinder, a plurality of clamping claw slide grooves are provided on the sampling pipe, a plurality of sampling support plates are laterally rotatably installed on the inner wall of the sampling pipe, a discharging inner cylinder is fixedly installed inside the supporting slide, the bottom of the discharging inner cylinder is an inner and outer sleeve, the inner sleeve of the discharging inner cylinder is slidably matched with the outer wall of the sampling pipe, a plurality of clamping triangular sliders are laterally slidably installed in the sleeve inside the discharging inner cylinder, and a compression spring is fixedly installed between the clamping triangular slider and the discharging inner cylinder.
[0007] Furthermore, a reset push rod is fixedly installed in the hollow excavating claw, a reset slider is fixedly installed on the top of the sliding excavating tooth, a pressure block is provided at the front end of the reset slider, and a pressure groove is provided at the rear end of the reset slider. The pressure blocks and pressure grooves between multiple reset sliders contact and cooperate with each other, and a slide groove is provided in the reset push rod. The width of the slide groove in the reset push rod is the same as that of the reset slider.
[0008] Furthermore, a support baffle is fixedly installed in the sampling outer tube, a positioning support rod is fixedly installed in the sampling outer tube, a transmission gear ring is fixedly installed on the top of the excavation inner tube, the inner ring of the transmission gear ring is provided with gear patterns, an excavation transmission rod is longitudinally rotatably installed in the positioning support rod, a gear is fixedly installed at the bottom of the excavation transmission rod, and the gear at the bottom of the excavation transmission rod is meshed with the gear pattern of the inner ring of the transmission gear ring.
[0009] Furthermore, a bulk material transmission trough is provided on the outer wall of the excavation inner cylinder, and a plurality of bulk material collecting plates are fixedly installed on the bottom of the excavation inner cylinder. The number of the bulk material collecting plates is the same as the bulk material transmission troughs, and the bulk material collecting plates are fixedly installed between the bottoms of the two bulk material transmission troughs.
[0010] Furthermore, the outer sleeve of the inner discharging cylinder is slidably matched with the supporting baffle, and a bulk material transmission channel is provided between the outer wall of the outer sleeve of the inner discharging cylinder and the inner wall of the supporting slide cylinder, and the bulk material transmission channel is connected to the bulk material transmission groove.
[0011] Furthermore, the control mechanism includes a discharge cover plate, which is fixedly installed on the top of the supporting slide, a supporting handle is fixedly installed on the top of the discharge cover plate, a bulk material discharge port is fixedly installed on the top of the discharge cover plate, the bulk material discharge port is connected to the bulk material transmission channel, a first drive motor and a second drive motor are fixedly installed in the discharge cover plate, a hollow transmission rod is fixedly installed on the output shaft of the first drive motor, the hollow transmission rod is slidably matched with the excavation transmission rod, and an adjusting screw is fixedly installed on the output shaft of the second drive motor, and the adjusting screw is matched with the positioning support rod screw.
[0012] Furthermore, a counterweight block is fixedly installed on the top of the inner wall of the sampling support plate, and a positioning support block is fixedly installed on the bottom of the inner wall of the sampling support plate.
[0013] Furthermore, a plurality of arc-shaped material-blocking plates are fixedly mounted on the inner wall of the excavation inner tube, and the arc-shaped material-blocking plates are in contact with and cooperate with the supporting material-blocking plates.
[0014] Compared with the prior art, the present invention has the following advantages: (1) the present invention can adjust the diameter of the sample to be cut according to the demand, so as to prevent the sample from being too heavy to be taken out from the borehole; (2) the present invention can perform multiple fixed-point sampling of geological samples by adjusting the digging claws, so as to facilitate the cutting of samples of the required height; (3) the present invention can collect relatively soft geological samples through the sampling support plate, and maintain the shape of the sample, so as to facilitate subsequent detection and observation. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the bottom structure of the present invention.
[0016] Figure 2 It is a schematic diagram of the front structure of the present invention.
[0017] Figure 3It is a schematic diagram of the overall structure of the present invention.
[0018] Figure 4 It is a half-section structural schematic diagram of the control structure of the present invention.
[0019] Figure 5 It is a schematic diagram of the overall half-section structure of the present invention.
[0020] Figure 6 This is a schematic diagram of the half-section structure of the excavation inner tube of the present invention.
[0021] Figure 7 It is a schematic diagram of the half-section structure of the discharge inner cylinder of the present invention.
[0022] Figure 8 It is a schematic diagram of the excavating grab assembly structure of the present invention.
[0023] Figure 9 This is a schematic diagram of the structure of the sampling support plate parts of the present invention.
[0024] Figure 10 This is a schematic diagram of the top structure of the sampling outer cylinder of the present invention.
[0025] Figure numerals: 1-control mechanism; 2-sampling mechanism; 101-discharging cover plate; 102-support slide; 103-discharging inner cylinder; 104-first drive motor; 105-second drive motor; 106-adjusting screw rod; 107-hollow transmission rod; 108-clamping triangular slider; 109-bulk material discharge port; 110-bulk material transmission channel; 201-sampling outer cylinder; 202-digging inner cylinder; 203-sampling pipeline; 204-sampling support plate ; 205-excavation transmission rod; 206-transmission gear ring; 207-hollow excavation claw; 208-adjustable excavation claw; 209-sliding excavation tooth; 210-adjustable telescopic rod; 211-arc-shaped material baffle plate; 212-support material baffle plate; 213-bulk material collecting plate; 214-reset push rod; 215-counterweight block; 216-bulk material transmission trough; 217-support baffle plate; 218-positioning support rod; 219-reset slider; 220-positioning support block. DETAILED DESCRIPTION
[0026] The technical solution provided by the present invention is further described below in conjunction with the accompanying drawings and according to specific implementation methods.
[0027] like Figures 1 to 10As shown, a sampler for geological survey comprises a sampling mechanism 2, a control mechanism 1 is longitudinally slidably installed on the top of the sampling mechanism 2, the sampling mechanism 2 comprises a sampling outer cylinder 201, an excavation inner cylinder 202 is longitudinally rotatably installed on the bottom of the sampling outer cylinder 201, a plurality of hollow excavation claws 207 are fixedly installed on the bottom of the excavation inner cylinder 202, the plurality of hollow excavation claws 207 form an annular drilling head, a feeding port is arranged at the center of the annular drilling head for intercepting geological samples, an adjustable excavation claw 208 is transversely slidably installed in the hollow excavation claw 207, the adjustable excavation claw 208 slides along the radial direction of the excavation inner cylinder 202, and is used to adjust the diameter of the intercepted sample, so as to adjust the drilling area according to the difficulty of ground drilling and improve the drilling efficiency. Efficiency, a plurality of sliding digging teeth 209 are longitudinally installed in the adjusting digging claw 208, a compression spring is fixedly installed between the top of the sliding digging tooth 209 and the adjusting digging claw 208, a supporting baffle plate 212 is fixedly installed on the top of the adjusting digging claw 208, the supporting baffle plate 212 is used to clamp the intercepted samples for subsequent removal, an adjusting telescopic rod 210 is fixedly installed between the outer wall of the supporting baffle plate 212 and the inner wall of the digging inner tube 202, a plurality of arc-shaped baffle plates 211 are fixedly installed on the inner wall of the digging inner tube 202, the arc-shaped baffle plates 211 are in contact with the supporting baffle plates 212 to form an intercepting pipeline for transmitting softer geological samples to prevent the samples from dispersing in the equipment and affecting the operation of the equipment.
[0028] like Figures 1 to 10 As shown, a reset push rod 214 is fixedly installed in the hollow excavating claw 207, and a reset slider 219 is fixedly installed on the top of the sliding excavating tooth 209. A pressure block is provided at the front end of the reset slider 219, and a pressure groove is provided at the rear end of the reset slider 219. The pressure blocks and pressure grooves between multiple reset sliders 219 are in contact and cooperation with each other. A sliding groove is provided in the reset push rod 214, and the width of the sliding groove in the reset push rod 214 is the same as that of the reset slider 219. The bottom of the reset push rod 214 is in contact and cooperation with the top of the reset slider 219, which is used to adjust the extension and retraction of the sliding excavating tooth 209 at the bottom of the adjusting excavating claw 208, so as to prevent the sliding excavating tooth 209 from hindering the sliding of the adjusting excavating claw 208 in the hollow excavating claw 207.
[0029] like Figures 1 to 10As shown, a support baffle 217 is fixedly installed in the sampling outer cylinder 201, a positioning support rod 218 is fixedly installed in the sampling outer cylinder 201, a transmission gear ring 206 is fixedly installed on the top of the excavation inner cylinder 202, and the inner ring of the transmission gear ring 206 is provided with a gear pattern, an excavation transmission rod 205 is longitudinally rotatably installed in the positioning support rod 218, a gear is fixedly installed at the bottom of the excavation transmission rod 205, and the gear at the bottom of the excavation transmission rod 205 is meshed with the gear pattern of the inner ring of the transmission gear ring 206, the control mechanism 1 includes a support slide 102, the support slide 102 is longitudinally slidably installed inside the sampling outer cylinder 201, a discharge cover plate 101 is fixedly installed on the top of the support slide 102, a first drive motor 104 and a second drive motor 105 are fixedly installed in the discharge cover plate 101, and a first drive motor 104 and a second drive motor 105 are fixedly installed in the discharge cover plate 101. A hollow transmission rod 107 is fixedly installed on the output shaft of the driving motor 104, and the hollow transmission rod 107 is slidably matched with the excavation transmission rod 205, and is used to drive the hollow transmission rod 107 to rotate through the first driving motor 104. The rotation of the hollow transmission rod 107 drives the excavation transmission rod 205 to rotate, and the rotation of the excavation transmission rod 205 drives the excavation inner cylinder 202 to rotate in the sampling outer cylinder 201 for drilling. An adjusting screw 106 is fixedly installed on the output shaft of the second driving motor 105, and the adjusting screw 106 is matched with the positioning support rod 218 screw rod, and is used to drive the adjusting screw 106 to rotate through the second driving motor 105. The height of the equipment is adjusted by adjusting the screw 106 and the screw rod of the positioning support rod 218, so as to facilitate the sampling of geological samples at different depths.
[0030] like Figures 1 to 10 As shown, a sampling pipe 203 is fixedly installed on the top of the excavation inner cylinder 202, and a plurality of clamping claw slide grooves are arranged on the sampling pipe 203. A plurality of sampling support plates 204 are installed on the inner wall of the sampling pipe 203 to support the bottom of the intercepted geological samples, so as to facilitate the extraction of the samples to the surface. A counterweight block 215 is fixedly installed on the top of the inner wall of the sampling support plate 204, and a positioning support block 220 is fixedly installed on the bottom of the inner wall of the sampling support plate 204, which is used to control the sampling support plate 204 to rotate to a horizontal angle in the sampling pipe 203, so as to facilitate the extraction of the samples to the surface. The geological samples are cut off and supported, and a discharge inner cylinder 103 is fixedly installed in the supporting slide cylinder 102. The bottom of the discharge inner cylinder 103 is an inner and outer sleeve. The inner sleeve of the discharge inner cylinder 103 slides with the outer wall of the sampling pipe 203. A plurality of clamping triangular sliders 108 are installed in the sleeve inside the discharge inner cylinder 103 for horizontal sliding. A compression spring is fixedly installed between the clamping triangular slider 108 and the discharge inner cylinder 103. The clamping triangular slider 108 is used to clamp the intercepted samples to prevent the geological samples from slipping in the equipment.
[0031] like Figures 1 to 10As shown, a bulk material transmission groove 216 is provided on the outer wall of the excavation inner tube 202 for transmitting the loose samples drilled out from the borehole to the outside, and a plurality of bulk material collecting plates 213 are fixedly installed at the bottom of the excavation inner tube 202. The number of the bulk material collecting plates 213 is the same as the bulk material transmission groove 216. The bulk material collecting plates 213 are fixedly installed between the bottoms of two bulk material transmission grooves 216 for collecting the loose samples drilled out into the bulk material transmission groove 216.
[0032] like Figures 1 to 10 As shown, the outer sleeve of the discharge inner cylinder 103 is slidably matched with the support baffle 217, and a bulk material transmission channel 110 is provided between the outer wall of the outer sleeve of the discharge inner cylinder 103 and the inner wall of the support slide cylinder 102, and the bulk material transmission channel 110 is connected with the bulk material transmission trough 216, and a bulk material discharge port 109 is fixedly installed on the top of the discharge cover plate 101, and the bulk material discharge port 109 is connected with the bulk material transmission channel 110, which is used to discharge loose geological samples outside the exploration cave for easy collection.
[0033] like Figures 1 to 10 As shown, a support handle is fixedly installed on the top of the discharge cover plate 101, and a control switch is fixedly installed on the support handle. The support handle is connected to the first drive motor 104, the second drive motor 105 and the adjustment telescopic rod 210 through wires to control the start-up and height adjustment of the equipment.
[0034] Working principle: When conducting geological sampling, the staff holds the support handle on the top of the discharge cover plate 101 to place the excavation inner cylinder 202 at the drilling position, and then starts the first drive motor 104 to drive the excavation inner cylinder 202 to rotate in the sampling outer cylinder 201 to drill the geology. During this period, the adjustment telescopic rod 210 is started as needed to control the sliding position of the excavation claw 208 in the hollow excavation claw 207, and the excavation claw 208 is controlled to slide toward the outer circle of the excavation inner cylinder 202 in the hollow excavation claw 207. The feed port at the bottom of the excavation inner cylinder 202 is opened to intercept the drilled geological samples, and the excess loose samples are transmitted to the bulk material transmission channel 110 through the bulk material transmission slot 216, and are exported to the surface through the bulk material discharge port 109.
[0035] If it is necessary to perform fixed-point intermittent sampling of samples at different depths, the adjusting telescopic rod 210 is started during the drilling process to drive the adjusting excavation claw 208 to slide toward the axis in the hollow excavation claw 207, closing the feed port at the bottom of the excavation inner cylinder 202, and at the same time, the sliding excavation tooth 209 is pushed out to the outside of the adjusting excavation claw 208 by the reset push rod 214 to drill the borehole, and then the second drive motor 105 is started to drive the adjusting screw 106 to rotate, adjust the distance between the excavation inner cylinder 202 and the discharge cover plate 101, and increase the drilling depth of the excavation inner cylinder 202. When the excavation inner cylinder 202 is drilled to the required depth, the adjusting telescopic rod 210 is started to open the feed port at the bottom of the excavation inner cylinder 202, and geological samples in the area can be sampled.
[0036] When drilling and sampling relatively soft strata, the excavation inner cylinder 202 is drilled to a position deeper than the sampling depth, so that the sample at the required depth is higher than the sampling support plate 204 at the bottom of the inner wall of the sampling pipe 203. The equipment is then lifted out of the borehole. During this period, excess samples in the excavation inner cylinder 202 are detached from the excavation inner cylinder 202. At the same time, the sampling support plate 204 is driven by the counterweight block 215 to rotate to a horizontal angle in the sampling pipe 203, thereby lifting the sample inside the sampling pipe 203 to avoid the loss of the required soft sample.
Claims
1. A sampler for geological survey, comprising a sampling mechanism (2), a control mechanism (1) being longitudinally slidably mounted on the top of the sampling mechanism (2), characterized in that: The sampling mechanism (2) comprises a sampling outer cylinder (201), an excavation inner cylinder (202) is longitudinally rotatably mounted on the bottom of the sampling outer cylinder (201), a plurality of hollow excavation claws (207) are fixedly mounted on the bottom of the excavation inner cylinder (202), an adjustable excavation claw (208) is transversely slidably mounted inside the hollow excavation claw (207), the adjustable excavation claw (208) slides along the radial direction of the excavation inner cylinder (202), a plurality of sliding excavation teeth (209) are longitudinally slidably mounted inside the adjustable excavation claw (208), a compression spring is fixedly mounted between the top of the sliding excavation teeth (209) and the adjustable excavation claw (208), a supporting material blocking plate (212) is fixedly mounted on the top of the adjustable excavation claw (208), and an adjustable telescopic rod (210) is fixedly mounted between the outer wall of the supporting material blocking plate (212) and the inner wall of the excavation inner cylinder (202); The control mechanism (1) comprises a supporting slide (102), the supporting slide (102) being longitudinally slidably mounted inside a sampling outer cylinder (201), a sampling pipe (203) being fixedly mounted on the top of an excavation inner cylinder (202), a plurality of clamping claw slide grooves being provided on the sampling pipe (203), a plurality of sampling support plates (204) being laterally rotatably mounted on the inner wall of the sampling pipe (203), a discharging inner cylinder (103) being fixedly mounted inside the supporting slide (102), the bottom of the discharging inner cylinder (103) being an inner and outer sleeve, the inner sleeve of the discharging inner cylinder (103) being slidably matched with the outer wall of the sampling pipe (203), a plurality of clamping triangular sliders (108) being laterally slidably mounted inside the sleeve inside the discharging inner cylinder (103), and a compression spring being fixedly mounted between the clamping triangular sliders (108) and the discharging inner cylinder (103).
2. A geological survey sampler according to claim 1, characterized in that: A reset push rod (214) is fixedly installed in the hollow excavating claw (207), a reset slider (219) is fixedly installed on the top of the sliding excavating tooth (209), a pressure block is provided at the front end of the reset slider (219), a pressure groove is provided at the rear end of the reset slider (219), the pressure blocks and the pressure grooves between the multiple reset sliders (219) are in contact and fit with each other, a slide groove is provided in the reset push rod (214), and the width of the slide groove in the reset push rod (214) is the same as that of the reset slider (219).
3. A geological survey sampler according to claim 1, characterized in that: A support baffle (217) is fixedly installed in the sampling outer cylinder (201), a positioning support rod (218) is fixedly installed in the sampling outer cylinder (201), a transmission gear ring (206) is fixedly installed on the top of the excavation inner cylinder (202), the inner ring of the transmission gear ring (206) is provided with a gear pattern, an excavation transmission rod (205) is longitudinally rotatably installed in the positioning support rod (218), a gear is fixedly installed at the bottom of the excavation transmission rod (205), and the gear at the bottom of the excavation transmission rod (205) meshes with the gear pattern of the inner ring of the transmission gear ring (206).
4. A geological survey sampler according to claim 1, characterized in that: The outer wall of the excavation inner cylinder (202) is provided with a bulk material transmission trough (216), and a plurality of bulk material collecting plates (213) are fixedly installed at the bottom of the excavation inner cylinder (202). The number of the bulk material collecting plates (213) is the same as the bulk material transmission trough (216), and the bulk material collecting plates (213) are fixedly installed between the bottoms of two bulk material transmission troughs (216).
5. A geological survey sampler according to claim 1, characterized in that: The outer sleeve of the discharge inner cylinder (103) is slidably matched with the support baffle (217), and a bulk material transmission channel (110) is provided between the outer wall of the outer sleeve of the discharge inner cylinder (103) and the inner wall of the support slide cylinder (102), and the bulk material transmission channel (110) is connected to the bulk material transmission trough (216).
6. A geological survey sampler according to claim 1, characterized in that: The control mechanism (1) comprises a discharge cover plate (101), the discharge cover plate (101) being fixedly mounted on the top of a support slide cylinder (102), a support handle being fixedly mounted on the top of the discharge cover plate (101), a bulk material discharge port (109) being fixedly mounted on the top of the discharge cover plate (101), the bulk material discharge port (109) being connected to a bulk material transmission channel (110), a first drive motor (104) and a second drive motor (105) being fixedly mounted inside the discharge cover plate (101), a hollow transmission rod (107) being fixedly mounted on the output shaft of the first drive motor (104), the hollow transmission rod (107) being slidably matched with the excavation transmission rod (205), an adjustment screw rod (106) being fixedly mounted on the output shaft of the second drive motor (105), the adjustment screw rod (106) being matched with the screw rod of a positioning support rod (218).
7. A geological survey sampler according to claim 1, characterized in that: A counterweight block (215) is fixedly mounted on the top of the inner wall of the sampling support plate (204), and a positioning support block (220) is fixedly mounted on the bottom of the inner wall of the sampling support plate (204).
8. A geological survey sampler according to claim 1, characterized in that: A plurality of arc-shaped material blocking plates (211) are fixedly mounted on the inner wall of the excavation inner cylinder (202), and the arc-shaped material blocking plates (211) are in contact with and cooperate with the supporting material blocking plates (212).
Citation Information
Patent Citations
Bionic petaling sampler
CN102169060A
Plant root soil sampling device
CN116642729A
Geological drilling core sampling device
CN117365348A
Sampling device for forestry ecological protection
CN117664642A
Sampling device for geological exploration of deep mine
CN117825095A