Flexible assembly production line and production method

By designing flexible assembly production lines and using flow tooling to flow products between units, the existing production lines cannot meet the assembly requirements of small size, high precision and high performance products, and achieve efficient and accurate assembly and inspection.

CN119550008APending Publication Date: 2025-03-04GOERTEK INC
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411545021.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2025-03-04

AI Technical Summary

Technical Problem

The existing product assembly production lines cannot meet the assembly needs of small size, high precision and high performance products.

Method used

A flexible assembly production line is designed, including support seats, flow tooling, loading unit, assembly unit, dispensing unit, preliminary inspection unit, cutting unit and testing unit. The products are flowed between the units through flow tooling to achieve high-precision assembly and preliminary inspection.

Benefits of technology

High-precision assembly of small-sized products is achieved, and assembly efficiency and product qualification rate are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119550008A_ABST
    Figure CN119550008A_ABST
Patent Text Reader

Abstract

The invention provides a flexible assembly production line and a production method. The flexible assembly production line comprises a stock bin used for containing a to-be-machined product, a feeding module, a laser etching module, a first recognition camera and a discharging module. Wherein the feeding module is used for carrying out secondary positioning on a to-be-machined product in a stock bin and then feeding the to-be-machined product to a circulation tool at an initial feeding position, and the to-be-machined product is circulated to the laser etching module through the circulation tool; the first identification camera is arranged at the laser etching module and is used for shooting laser etching position information of the to-be-processed product, so that the laser etching module carries out laser etching operation on the to-be-processed product according to the laser etching position information; the transferring tool is used for transferring the product subjected to laser etching to the discharging module, and the product subjected to laser etching is conveyed back to the initial feeding position through the discharging module to be discharged. The laser etching size precision can be improved, the number of modules is reduced, and the laser etching cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of product assembly, and more specifically, to a flexible assembly production line and a production method. Background Art

[0002] In the field of production and processing of electronic equipment, products need to achieve certain properties such as waterproofness and airtightness, and the assembly accuracy requirements for the joints between the shell and different components are getting higher and higher; at the same time, with the continuous improvement of the functions of electronic equipment, the structure of the corresponding equipment is becoming more and more complex, which requires the dimensional accuracy of the product assembly production line to be improved accordingly. However, the existing product assembly production lines can no longer meet the requirements of today's products for small size, high precision and high performance. Summary of the invention

[0003] In view of the above problems, an object of the present invention is to provide a flexible assembly production line and a production method to solve the problem that existing product assembly production lines cannot meet the high-precision assembly requirements of small-sized products.

[0004] The flexible assembly production line provided by the present invention comprises a support seat, a circulation tooling arranged on the support seat, and a loading unit, an assembly unit, a dispensing unit, a preliminary inspection unit, a unloading unit and a detection unit; wherein the loading unit is used to transfer the first structural part to be assembled from the material tray to the circulation tooling, and the first structural part is transferred to the assembly unit through the circulation tooling; the assembly unit is used to assemble the first structural part with the external accessories and the second structural part to form an assembly part, and the assembly part is transferred to the dispensing unit through the circulation tooling; the dispensing unit is used to perform dispensing treatment on the assembly part to form a product, and the product is transferred to the preliminary inspection unit through the circulation tooling; the preliminary inspection unit is used to perform a preliminary inspection on the product, and after the inspection is qualified, it is transferred to the unloading unit through the circulation tooling; the unloading unit is used to unload the product that has passed the preliminary inspection; the detection unit is used to perform a preset performance test on the product after unloading.

[0005] In addition, an optional technical solution is that it also includes a jig assembly unit arranged before the dispensing unit, and a curing unit and a jig reflow unit arranged after the dispensing unit; wherein, the process of the assembly being transferred to the dispensing unit through the circulation tooling includes: assembling the circulation tooling where the assembly is located with an external dispensing jig through the jig assembly unit; performing dispensing treatment on the assembly through the cooperation of the dispensing jig and the dispensing unit; performing standing, curing and cooling treatment on the dispensing product after the dispensing treatment through the curing unit to form the product; separating the dispensing jig from the circulation tooling through the jig reflow unit, and the separated dispensing jig is reflowed to the jig assembly unit.

[0006] In addition, an optional technical solution is that the preliminary inspection unit is used to inspect the preset position holes, glue overflow and the front and back of the sound holes of the product.

[0007] In addition, an optional technical solution is that the detection unit includes a detection loading unit, a detection unloading unit, a PIN height detection unit, an airtight detection unit, an electrical connection detection unit and a front and back detection unit which are arranged in sequence; wherein the product flows through the detection assembly line tooling in sequence on the detection loading unit, the front and back detection unit, the electrical connection detection unit, the airtight detection unit, the PIN height detection unit and the detection unloading unit.

[0008] In addition, an optional technical solution is that the PIN height detection unit is used to detect the height and size of the spring piece of the product; the airtightness detection unit is used to detect the airtightness of the product; the electrical connection detection unit is used to detect the conductive performance of the spring piece of the product; and the front and back detection unit is used to detect the front and back of the first structural member and the second structural member.

[0009] In addition, an optional technical solution is that the pipeline of the detection unit is distributed in a U shape.

[0010] In addition, an optional technical solution is that the first structural member includes a socket or an electrical connection seat of the wireless headset; the second structural member includes a shell of the wireless headset; and the external accessories include a mesh cloth and a dust-proof film.

[0011] In addition, an optional technical solution is to further include an identification camera arranged at the assembly unit; wherein the identification camera is used to capture and determine position information of the first structural member and the second structural member, and assemble the first structural member and the second structural member according to the position information.

[0012] In addition, an optional technical solution is that the unloading unit includes unloading of qualified products and unqualified products.

[0013] On the other hand, the present invention further provides a flexible assembly production method, which utilizes the above-mentioned flexible assembly production line to assemble the first structural member and the second structural member.

[0014] By utilizing the above-mentioned flexible assembly production line and production method, the first structural component and the second structural component can be circulated between the loading unit, the assembly unit, the dispensing unit, the preliminary inspection unit and the unloading unit under the action of the circulation tooling, and the assembly and preliminary inspection are completed. Then, the performance of the assembled product is tested by the detection unit, thereby achieving high-precision assembly of small-size products and improving assembly efficiency and product qualification rate.

[0015] In order to achieve the above and related purposes, one or more aspects of the present invention include the features that will be described in detail later. The following description and the accompanying drawings describe some exemplary aspects of the present invention in detail. However, these aspects indicate only some of the various ways in which the principles of the present invention can be used. In addition, the present invention is intended to include all these aspects and their equivalents. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] By referring to the following description in conjunction with the accompanying drawings, and with a more comprehensive understanding of the present invention, other objects and results of the present invention will become more apparent and easy to understand. In the accompanying drawings:

[0017] Figure 1 is a schematic structural diagram of a flexible assembly production line according to an embodiment of the present invention;

[0018] Figure 2 Schematic diagram of the structure of a detection unit according to an embodiment of the present invention.

[0019] The same reference numerals throughout the drawings indicate similar or corresponding features or functions. DETAILED DESCRIPTION

[0020] In the following description, for the purpose of illustration, in order to provide a comprehensive understanding of one or more embodiments, many specific details are set forth. However, it is apparent that these embodiments may also be implemented without these specific details. In other examples, for ease of describing one or more embodiments, known structures and devices are shown in the form of block diagrams.

[0021] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0022] In order to describe the flexible assembly production line and production method of the present invention in detail, specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

[0023] Figure 1 The schematic structure of a flexible assembly production line according to an embodiment of the present invention is shown.

[0024] like Figure 1As shown, the flexible assembly production line of an embodiment of the present invention includes a support base of the entire production line, a flow fixture arranged on the support base, and a loading unit, an assembly unit, a dispensing unit, a preliminary inspection unit, a unloading unit and a detection unit; wherein the loading unit is used to transfer the first structural part to be assembled from the material tray to the flow fixture, and then transfer the first structural part to the assembly unit through the flow fixture; the assembly unit is used to assemble the first structural part with the external accessories and the second structural part to form an assembly part, and then transfer the assembly part to the dispensing unit through the flow fixture; the dispensing unit is used to perform dispensing treatment on the assembly part to form a product, and then transfer the product to the preliminary inspection unit through the flow fixture; the preliminary inspection unit is used to perform preliminary inspection on the product, and after the inspection is qualified, it is transferred to the unloading unit through the flow fixture; the unloading unit is used to unload the products that pass the preliminary inspection and the unqualified products respectively; finally, the detection unit performs a preset performance test on the products that pass the preliminary inspection after unloading.

[0025] Among them, in order to ensure the dispensing accuracy of the first structural part and the second structural part, the flexible assembly production line may also include a jig assembly unit arranged before the dispensing unit, and a curing unit and a jig reflow unit arranged after the dispensing unit; wherein, in the process of the assembly part being transferred to the dispensing unit through the flow tooling, first, the flow tooling where the assembly part is located is assembled with the external dispensing jig through the jig assembly unit; the assembly part is subjected to dispensing treatment by the cooperation of the dispensing jig and the dispensing unit; the dispensing product after the dispensing treatment is subjected to standing, curing and cooling treatment by the curing unit to form a product; the dispensing jig is separated from the flow tooling by the jig reflow unit, and the separated dispensing jig is returned to the jig assembly unit.

[0026] It can be seen that the flexible assembly production line of the embodiment of the present invention includes a loading unit, an assembly unit, a jig assembly unit, a dispensing unit, a curing unit, a jig reflow unit, a preliminary inspection unit and a unloading unit which are arranged in sequence, and qualified products and unqualified products are unloaded and processed separately by the unloading unit; wherein, in order to avoid the entire production line being too long, the detection unit can be separated to form a flexible detection line, that is, the detection unit in the embodiment of the present invention can be used as an independent production line, and can also be connected with the above-mentioned units to form a production line.

[0027] Among them, the preliminary inspection unit is used to inspect the preset position holes, overflow glue and the front and back of the sound holes of the product, which belongs to the preliminary inspection of the appearance, and the inspection unit includes an inspection loading unit, an inspection unloading unit, a PIN height inspection unit, an airtight inspection unit, an electrical connection inspection unit and a front and back inspection unit which are arranged in sequence; among them, the product flows through the inspection loading unit, the front and back inspection unit, the electrical connection inspection unit, the airtight inspection unit, the PIN height inspection unit and the inspection unloading unit in sequence through the inspection assembly line tooling.

[0028] Specifically, the PIN height detection unit is used to detect whether the height and size of the product's spring clip meet the requirements, the airtight detection unit is used to detect whether the product's airtightness meets the requirements, and the electrical connection detection unit is used to detect the conductivity between the product's spring clip and other structural parts; the front and back detection unit is used to detect the front and back of the first structural part and the second structural part. If all the above tests are qualified, the product inspection can be guaranteed to be qualified. Otherwise, if any abnormality occurs in any test, the material can be unloaded through the corresponding assembly line so that the inspectors can further confirm and analyze its defects.

[0029] In order to facilitate the inspection of products and enable them to have sufficient space for caching and loading in the inspection unit, thereby improving the inspection efficiency of products, the assembly line of the inspection unit in the present invention can be set to a U-shaped distribution, that is, the inspection loading unit, the inspection unloading unit, the PIN height inspection unit, the airtight inspection unit, the electrical connection inspection unit and the front and back inspection unit are arranged in sequence from left to right. However, during the product inspection process, the assembled product is first loaded by the inspection loading unit, and then transferred to the front and back inspection unit located at the last station through the corresponding flow tooling. After the front and back inspections are passed, it moves forward to the electrical connection inspection unit until it reaches the position of the inspection unloading unit, wherein the inspection unloading unit and the inspection loading unit are arranged adjacent to each other, which can provide sufficient assembly lines for the circulation of products and achieve the effect of improving the product inspection efficiency.

[0030] It should be noted that the first structural component of the embodiment of the present invention may include a socket or electrical connection socket of the wireless headset; the second structural component may include a shell of the wireless headset, and the external accessories may include structural components such as a mesh cloth and a dust-proof film. The preset performance involved in the above-mentioned detection unit includes the front and back of the product, electrical connection performance, airtight performance, height size, etc. Different functional detection items can be flexibly set according to different products or detection requirements.

[0031] In a specific embodiment of the present invention, the flexible assembly production line further includes an identification camera disposed at the assembly unit; wherein the identification camera can be used to capture and determine position information of the first structural member and the second structural member in real time, and then control corresponding manipulators and other components to perform high-precision assembly of the first structural member and the second structural member according to the position information.

[0032] Corresponding to the above-mentioned flexible assembly production line, the present invention further provides a flexible assembly production method, which utilizes the above-mentioned flexible assembly production line to process the first structural member and the second structural member.

[0033] Specifically, the process of assembling the first structural member and the second structural member using the above-mentioned flexible assembly production line includes:

[0034] 1. In the loading unit, the first structural component is transferred from the turnover tray to the circulation tooling, and the first structural component is transferred to the assembly unit through the circulation tooling;

[0035] 2. Assembling the first structural member and external accessories such as mesh in the assembly unit to form an assembly;

[0036] 3. Assemble the flow fixture where the assembly parts are located with the dispensing fixture in the fixture assembly unit, and then transfer them to the dispensing unit;

[0037] 4. With the assistance of the dispensing fixture, the assembly parts are glued by the dispensing machine and other equipment at the dispensing unit;

[0038] 5. In the curing unit, the product after dispensing is placed online, baked and cured, and cooled to form a product;

[0039] 6. In the reflux unit, the dispensing jig is separated from the flow tooling, and the separated dispensing jig is returned to the jig assembly unit. The dispensing product passes through the preliminary inspection unit of the next stage to detect the holes at each position, the overflow glue and the sound hole;

[0040] 7. After the preliminary inspection, the products are separated into preliminary qualified products and preliminary unqualified products through the unloading unit.

[0041] 8. Load the preliminarily qualified products in the inspection and loading unit and assemble them into the flow tooling on the assembly line. Then, the products are directly transferred to the front and back inspection unit at the last station through the assembly line, and the front and back inspection unit inspects the products in both directions.

[0042] 9. Products that have passed the positive and negative direction inspections move forward and are inspected by the electrical connection inspection unit, the air tightness inspection unit, and the PIN height inspection unit in turn. After all the inspections are passed, they reach the unloading unit for unloading of qualified and unqualified products into the silo.

[0043] It should be noted that the embodiments of the above-mentioned flexible assembly production method can refer to the description in the flexible assembly production line embodiment, which will not be described in detail here.

[0044] According to the flexible assembly production line and production method of the present invention, different structural parts can be assembled with high precision, and preliminary inspection and performance testing of the products can be completed. It can be applicable to small structural parts such as wireless headphones, and improve the efficiency and pass rate of product assembly.

[0045] The flexible assembly line and production method according to the present invention are described as an example with reference to the accompanying drawings. However, those skilled in the art should understand that various improvements can be made to the flexible assembly line and production method proposed by the present invention without departing from the content of the present invention. Therefore, the protection scope of the present invention should be determined by the content of the attached claims.

Claims

1. A flexible assembly production line, characterized in that: include: A support seat, a flow tooling arranged on the support seat, a loading unit, an assembly unit, a dispensing unit, a preliminary inspection unit, a unloading unit and a detection unit; wherein, The loading unit is used to transfer the first structural component to be assembled from the material tray to the transfer tooling, and the first structural component is transferred to the assembly unit through the transfer tooling; The assembly unit is used to assemble the first structural member with the external accessories and the second structural member to form an assembly, and the assembly is transferred to the dispensing unit through the transfer tooling; The dispensing unit is used to perform dispensing processing on the assembly to form a product, and the product is transferred to the preliminary inspection unit through the transfer tooling; The preliminary inspection unit is used to perform preliminary inspection on the product, and after the product passes the inspection, it is transferred to the unloading unit through the transfer tooling; The unloading unit is used to unload the products that have passed the preliminary inspection; The detection unit is used to detect the preset performance of the product after unloading.

2. The flexible assembly line according to claim 1, characterized in that: It also includes a jig assembly unit arranged before the dispensing unit, and a curing unit and a jig reflow unit arranged after the dispensing unit; wherein the process of transferring the assembly to the dispensing unit through the transfer tooling includes: Assembling the flow fixture where the assembly part is located with the external dispensing fixture through the fixture assembly unit; Perform glue dispensing on the assembly by cooperating the glue dispensing jig with the glue dispensing unit; The curing unit performs a standing, curing and cooling process on the glue-dispensing product after the glue-dispensing process to form the product; The glue dispensing jig is separated from the transfer tooling by the jig reflow unit, and the separated glue dispensing jig is reflowed to the jig assembly unit.

3. The flexible assembly line according to claim 1, characterized in that: The preliminary inspection unit is used to inspect the preset position holes, glue overflow and the front and back of the sound holes of the product.

4. The flexible assembly line according to claim 1, characterized in that: The detection unit includes a loading detection unit, a unloading detection unit, a PIN height detection unit, an airtight detection unit, an electrical connection detection unit and a front and back detection unit which are arranged in sequence; wherein, The product passes through the inspection assembly line and circulates in sequence on the inspection loading unit, the front and back inspection unit, the electrical connection inspection unit, the airtight inspection unit, the PIN height inspection unit and the inspection unloading unit.

5. The flexible assembly line according to claim 4, characterized in that: The PIN height detection unit is used to detect the height and size of the spring piece of the product; The airtightness detection unit is used to detect the airtightness of the product; The electrical connection detection unit is used to detect the electrical conductivity of the spring of the product; The front and back detection unit is used to detect the front and back of the first structural member and the second structural member.

6. The flexible assembly line according to claim 4, characterized in that: The pipeline of the detection unit is distributed in a U shape.

7. The flexible assembly line according to claim 1, characterized in that: The first structural member includes a socket or an electrical connection seat of a wireless headset; The second structural member includes a housing of the wireless headset; The external accessories include mesh and dust-proof film.

8. The flexible assembly line according to claim 1, characterized in that: It also includes a recognition camera arranged at the assembly unit; wherein, The recognition camera is used to photograph and determine position information of the first structural member and the second structural member, and assemble the first structural member and the second structural member according to the position information.

9. The flexible assembly line according to claim 1, characterized in that: The unloading unit includes unloading of qualified products and unloading of unqualified products.

10. A flexible assembly production method, characterized in that: The first structural member and the second structural member are assembled using the flexible assembly production line as described in any one of claims 1 to 9.

Citation Information

Patent Citations

  • Mechanical arm sorting device for air tightness detecting device

    CN108910523A

  • Full-automatic lithium-ion battery production line and production process thereof

    CN110085918A

  • Jig transfer device and method for automatic assembling of earphone coil bodies

    CN111496490A

  • Automatic production assembly line for Bluetooth earphones

    CN113423053A

  • Earphone assembling equipment

    CN113635053A