Load transfer control method and system of communication power supply system, equipment and medium
By monitoring energy consumption of key equipment in the communication power supply system and calculating curve deviation, the precise matching of load transfer equipment and load transfer equipment is achieved, solving the problem of unbalanced energy consumption changes during load transfer in the prior art, ensuring efficient operation and stability of the system.
Patent Information
- Application Number
- CN202411713254.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-27
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2044-11-27
AI Technical Summary
The prior art cannot accurately match the load transfer equipment and the load transfer equipment during the load transfer process, resulting in unbalanced energy consumption changes and system instability, which affects the operating efficiency and stability of the communication power supply system.
By monitoring the energy consumption of key equipment in the communication power supply system, the energy consumption change curve of the load transfer equipment and the load transfer equipment during the load transfer process is obtained, the degree of deviation between the curves is calculated, the equipment matching is judged, and the best matching equipment is selected from the remaining key equipment when the matching is not matched as a new load transfer equipment.
It realizes accurate matching between the load transfer equipment and the load transfer equipment, ensures the smooth progress of the load transfer process, avoids the problems of system instability and efficiency reduction, and enables the communication power supply system to maintain efficient operation, reduces the equipment failure rate, and extends the service life of the equipment.
Smart Images

Figure CN119561031A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of communication power supply systems, and in particular, to a load transfer control method and system of a communication power supply system, an electronic device, and a computer-readable storage medium. Background Art
[0002] The communication power system plays a vital role in modern communication networks, ensuring the stable operation and continuous power supply of communication equipment. In the operation of the communication power system, load transfer is a common and necessary operation, which is used to transfer the power load from one key device to another during equipment maintenance, fault isolation or load balancing. The core of the load transfer process is to ensure the smooth and stable change of energy consumption to maintain the continuity and reliability of the communication power system. Generally, the energy consumption of the load-out device shows a gradual downward trend, while the energy consumption of the load-in device shows a gradual upward trend.
[0003] However, the existing technology has significant deficiencies in the load transfer process, which is mainly manifested in the inability to accurately match the load transfer-out device with the appropriate load transfer-in device. When the power of the load transfer-in device is insufficient to bear the load of the transfer-out device, it will lead to an imbalance in energy consumption changes, which is manifested as the energy consumption increase rate of the load transfer-in device is slower than the energy consumption decrease rate of the load transfer-out device. This mismatch may cause system instability, resulting in an unsmooth load transfer process and affecting the overall operating efficiency and stability of the communication power supply system. In addition, during the load transfer process, the existing technology usually relies on static parameters for matching, lacks dynamic analysis of real-time energy consumption data, and cannot adjust the load distribution in time, further exacerbating the instability of the system. Summary of the invention
[0004] The present invention provides a load transfer control method and system for a communication power supply system, an electronic device, and a computer-readable storage medium, which can achieve accurate matching between a load transfer-out device and a load transfer-in device during the load transfer process, ensure smooth load transfer, avoid system instability or efficiency reduction due to incompatibility, enable the communication power supply system to maintain efficient operation, reduce equipment failure rate, and extend equipment service life.
[0005] According to one aspect of the present invention, a load transfer control method for a communication power supply system is provided, comprising the following contents:
[0006] Monitor the energy consumption of all key equipment in the communication power supply system and analyze whether there is a load transfer process. If a load transfer process is confirmed, determine the load transfer-out equipment and load transfer-in equipment;
[0007] Obtain the energy consumption change curves of the load transfer-out device and the load transfer-in device during the load transfer process, determine the degree of deviation between the two curves, and judge whether the load transfer-in device and the load transfer-out device match based on the degree of deviation;
[0008] If it is determined that the load transfer-in device and the load transfer-out device do not match, the device information of the load transfer-in device is obtained, and the best matching key device is selected from the remaining key devices based on the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, and it is used as the new load transfer-in device.
[0009] Furthermore, the process of obtaining the energy consumption change curves of the load-transferring device and the load-transferring device during the load transfer process and determining the degree of deviation between the two curves includes the following:
[0010] Obtaining energy consumption change data of the load transfer-out device and the load transfer-in device within a preset time period during the load transfer process, and generating energy consumption change curves of the load transfer-out device and the load transfer-in device within the preset time period;
[0011] The absolute value of the average slope of the two energy consumption change curves is calculated;
[0012] The absolute value of the average slope corresponding to the load transfer-in device is divided by the absolute value of the average slope corresponding to the load transfer-out device to obtain the average slope ratio, and the average slope ratio is defined as the degree of deviation between the energy consumption change curves of the load transfer-out device and the load transfer-in device.
[0013] Further, if the average slope ratio is greater than a preset threshold, it is determined that the load transfer-in device and the load transfer-out device match; if the average slope ratio is not greater than the preset threshold, it is determined that the load transfer-in device and the load transfer-out device do not match.
[0014] Furthermore, the process of selecting the best matching key device from the remaining key devices according to the device information of the load transfer device and the degree of deviation of the energy consumption change curve includes the following contents:
[0015] Determine the working power and purpose of electricity use based on the equipment information transferred into the load device;
[0016] Select multiple target key devices with the same power usage as the load transfer device from other key devices;
[0017] Divide the working power transferred by the load into the device by the average slope ratio to obtain the adapted power;
[0018] The key device closest to the adapted power is selected from multiple target key devices and is used as the best matching key device.
[0019] Furthermore, the following contents are also included:
[0020] If the best matching key device cannot be screened out from the remaining key devices, an abnormal reminder message is generated.
[0021] Furthermore, the energy consumption of all key devices in the communication power supply system is monitored, and whether a load transfer process occurs is analyzed. If a load transfer process is determined to occur, the process of determining the load transfer-out device and the load transfer-in device includes the following:
[0022] Energy consumption of all key equipment in the communication power supply system is monitored. When the energy consumption of a certain key equipment decreases and the energy consumption of another key equipment increases, and the energy consumption changes of the two are the same, it is determined that a load transfer process has occurred. The key equipment with reduced energy consumption is defined as a load transfer-out device, and the key equipment with increased energy consumption is positioned as a load transfer-in device.
[0023] In addition, the present invention also provides a load transfer control system for a communication power supply system, comprising:
[0024] The energy consumption monitoring module is used to monitor the energy consumption of all key devices in the communication power supply system and analyze whether there is a load transfer process. If it is determined that a load transfer process occurs, the load transfer-out device and the load transfer-in device are determined;
[0025] The matching evaluation module is used to obtain the energy consumption change curves of the load transfer-out device and the load transfer-in device during the load transfer process, determine the degree of deviation between the two curves, and judge whether the load transfer-in device and the load transfer-out device match according to the degree of deviation;
[0026] The matching screening module is used to obtain the device information of the load transfer-in device when it is determined that the load transfer-in device and the load transfer-out device do not match, and screen out the best matching key device from the remaining key devices according to the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, and use it as the new load transfer-in device.
[0027] Furthermore, it also includes:
[0028] The abnormality reminder module is used to generate abnormality reminder information when the best matching key device cannot be screened out from the remaining key devices.
[0029] In addition, the present invention also provides an electronic device, including a processor and a memory, wherein the memory stores a computer program, and the processor executes the steps of the above method by calling the computer program stored in the memory.
[0030] In addition, the present invention also provides a computer-readable storage medium for storing a computer program for load transfer control of a communication power supply system, wherein the computer program executes the steps of the method described above when running on a computer.
[0031] The present invention has the following beneficial effects:
[0032] The load transfer control method of the communication power supply system of the present invention can accurately evaluate the symmetry of the two curves based on the degree of deviation between the energy consumption change curves of the load transfer-out device and the load transfer-in device. The lower the degree of deviation, the better the symmetry of the two curves, which means that the adaptability of the load transfer-out device and the load transfer-in device is higher; and, when the load transfer-in device and the load transfer-out device do not match, the best matching key device can be quickly re-screened from the remaining key devices as a new load transfer-in device based on the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, thereby realizing automated precise matching, and accurately matching the load transfer-out device with the best load transfer-in device; thereby ensuring the smooth progress of the load transfer, avoiding system instability or efficiency reduction problems caused by incompatibility, enabling the communication power supply system to maintain efficient operation, reduce equipment failure rate, and extend equipment service life.
[0033] In addition, the load transfer control system of the communication power supply system of the present invention also has the above advantages.
[0034] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0036] Figure 1 It is a flow chart of a load transfer control method of a communication power supply system according to a preferred embodiment of the present application.
[0037] Figure 2 yes Figure 1 Schematic diagram of the sub-process of step S2 in FIG.
[0038] Figure 3 yes Figure 1 Schematic diagram of the sub-process of step S3 in FIG.
[0039] Figure 4 It is another flow chart of the load transfer control method of the communication power supply system of the preferred embodiment of the present application.
[0040] Figure 5 It is a schematic diagram of the module structure of a load transfer control system of a communication power supply system according to another embodiment of the present application. DETAILED DESCRIPTION
[0041] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0042] Reference Figure 1 , a preferred embodiment of the present application provides a load transfer control method for a communication power supply system, comprising the following contents:
[0043] Step S1: monitor the energy consumption of all key devices in the communication power supply system, and analyze whether there is a load transfer process. If it is determined that a load transfer process occurs, determine the load transfer-out device and the load transfer-in device;
[0044] Step S2: Obtain energy consumption change curves of the load transfer-out device and the load transfer-in device during the load transfer process, determine the degree of deviation between the two curves, and determine whether the load transfer-in device and the load transfer-out device match according to the degree of deviation;
[0045] Step S3: If it is determined that the load transfer-in device and the load transfer-out device do not match, the device information of the load transfer-in device is obtained, and the best matching key device is selected from the remaining key devices according to the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, and it is used as the new load transfer-in device.
[0046] It can be understood that the load transfer control method of the communication power supply system of this embodiment monitors the energy consumption of all key devices in the target communication power supply, and analyzes whether a load transfer process occurs. If it is determined that a load transfer process occurs, the load transfer-out device and the load transfer-in device are determined. Then, the energy consumption change curves of the load transfer-out device and the load transfer-in device during the load transfer process are obtained, and the degree of deviation between the two curves is determined, and whether the load transfer-in device and the load transfer-out device match are judged based on the degree of deviation. If it is determined that the load transfer-in device and the load transfer-out device do not match, the best matching key device is re-screened from the remaining key devices based on the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, and it is used as the new load transfer-in device. The load transfer control method of the present invention can accurately evaluate the symmetry of the two curves based on the degree of deviation between the energy consumption change curves of the load transfer-out device and the load transfer-in device. The lower the degree of deviation, the better the symmetry of the two curves, which means that the compatibility of the load transfer-out device and the load transfer-in device is higher; and, when the load transfer-in device and the load transfer-out device do not match, the best matching key device can be quickly re-screened from the remaining key devices as a new load transfer-in device based on the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, thereby realizing automated precise matching, and accurately matching the load transfer-out device with the best load transfer-in device; thereby ensuring the smooth progress of the load transfer, avoiding system instability or efficiency reduction problems caused by incompatibility, enabling the communication power supply system to maintain efficient operation, reduce equipment failure rate, and extend equipment service life.
[0047] It can be understood that in step S1, the energy consumption of all key devices in the communication power supply system is monitored, and whether a load transfer process occurs is analyzed. If a load transfer process is determined to occur, the process of determining the load transfer-out device and the load transfer-in device includes the following:
[0048] Energy consumption of all key equipment in the communication power supply system is monitored. When the energy consumption of a certain key equipment decreases and the energy consumption of another key equipment increases, and the energy consumption changes of the two are the same, it is determined that a load transfer process has occurred. The key equipment with reduced energy consumption is defined as a load transfer-out device, and the key equipment with increased energy consumption is positioned as a load transfer-in device.
[0049] Specifically, in the communication power supply system, key equipment includes uninterruptible power supply (UPS), rectifier, inverter, battery pack, power distribution equipment, monitoring and control equipment, power management system, voltage stabilizer, transfer switch and cooling system, etc. These equipment are crucial to the stability and operation efficiency of the system. The present invention can collect the energy consumption information of each key equipment in real time by setting an independent energy consumption detector in each key equipment. Among them, the load transfer process refers to the transfer of power load from one key equipment (such as UPS, rectifier or battery pack) to another key equipment in the communication power supply system in order to ensure the stability, reliability and efficiency of the system, in order to cope with equipment failure, maintenance requirements or load balancing, so as to maintain the continuous operation of the communication equipment and the stability of power supply. Since the energy consumption changes of the transfer-in end and the transfer-out end are usually the same or very close during the load transfer process, therefore, when it is found that the energy consumption of a certain key equipment is reduced, while the energy consumption of another key equipment is increased, and the energy consumption changes of the two are the same or very close, it can be confirmed that the load transfer process occurs. At this time, the key equipment with reduced energy consumption is defined as the load transfer-out equipment, and the key equipment with increased energy consumption is positioned as the load transfer-in equipment.
[0050] It can be understood that in the above step S1, the load transfer process has been identified and the load transfer-out device and the load transfer-in device have been determined. In step S2, it is necessary to evaluate and judge the matching between the load transfer-out device and the load transfer-in device to ensure the smooth progress of the load transfer process.
[0051] Among them, Figure 2 As shown, in the step S2, the process of obtaining the energy consumption change curves of the load-transferring device and the load-transferring device during the load transfer process and determining the degree of deviation between the two curves includes the following:
[0052] Step S21: acquiring energy consumption change data of the load transfer-out device and the load transfer-in device within a preset time period during the load transfer process, and generating energy consumption change curves of the load transfer-out device and the load transfer-in device within the preset time period;
[0053] Step S22: Calculate the absolute value of the average slope of the two energy consumption change curves;
[0054] Step S23: Divide the absolute value of the average slope corresponding to the load transfer-in device by the absolute value of the average slope corresponding to the load transfer-out device to obtain the average slope ratio, and define the average slope ratio as the degree of deviation between the energy consumption change curves of the load transfer-out device and the load transfer-in device.
[0055] It can be understood that under normal circumstances, when the load transfer device transfers the electric load to the load transfer device, the entire transfer process should be in a gentle and stable state and last for a certain period of time. Therefore, after identifying the load transfer process, the load transfer device and the load transfer device are continuously monitored for energy consumption, and the energy consumption change data of the load transfer device and the load transfer device within a preset time period are collected, thereby generating an energy consumption change curve of the load transfer device and the load transfer device within a preset time period. Among them, the length of the preset time period can be set manually, preferably set to 5 to 10 seconds, because the load transfer process usually completes the preliminary power load transfer operation within this time range.
[0056] During the load transfer process, the energy consumption of the load-in device will continue to increase, while the energy consumption of the load-out device will continue to decrease. Therefore, the energy consumption change curves of the load-out device and the load-in device in the preset time period will show a trend of gradually decreasing and gradually increasing, respectively. In addition, when the load-in device can adapt well to the load-out device (that is, the power of the load-in device is close to or greater than the power of the load-out device), the energy consumption change curves of the two should have good symmetry. If the adaptability is poor, the symmetry of the two energy consumption change curves is also poor. Therefore, the present invention can accurately reflect the changing law of the two energy consumption change curves by calculating the absolute value of the average slope of the two energy consumption change curves, and then divide the absolute value of the average slope of the energy consumption change curve of the load transfer-in device by the absolute value of the average slope of the energy consumption change curve of the load transfer-out device to obtain the average slope ratio, and define the average slope ratio as the degree of deviation between the energy consumption change curves of the load transfer-out device and the load transfer-in device. The closer the average slope ratio is to 1, the smaller the degree of deviation, the better the symmetry, and the higher the adaptability. On the contrary, the farther the average slope ratio is from 1, the greater the degree of deviation, the worse the symmetry, and the lower the adaptability. The average slope ratio in the ideal case is 1, indicating that the energy consumption increase trend of the load transfer-in device is completely symmetrical with the energy consumption decrease trend of the load transfer-out device, which means that the power load is all smoothly and smoothly transferred from the load transfer-out device to the load transfer-in device, and the stability of the communication power supply system during the load transfer process is the best. Among them, the process of calculating the average slope of the energy consumption change curve belongs to the prior art and will not be repeated here.
[0057] It can be understood that if the average slope ratio is greater than the preset threshold, it is determined that the load transfer-in device and the load transfer-out device match, and if the average slope ratio is not greater than the preset threshold, it is determined that the load transfer-in device and the load transfer-out device do not match. Among them, the preset threshold can be set according to the actual accuracy requirements, specifically manually set according to the historical energy consumption data analysis, equipment performance parameters and system operation requirements, for example, it can be set to 0.9, 0.95, etc.
[0058] It can be understood that if the average slope ratio of the two energy consumption change curves calculated in step S2 is not greater than the preset threshold, it means that the load transfer-in device and the load transfer-out device at this time do not match, and it is necessary to find a new load transfer-in device that matches the load transfer-out device from the remaining key devices to ensure that the load transfer process proceeds smoothly. At this time, in step S3, the device information of the load transfer-in device is first obtained, and then the best matching key device is selected from the remaining key devices according to the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, and it is used as the new load transfer-in device.
[0059] Among them, Figure 3 As shown, the process of selecting the best matching key device from other key devices according to the device information of the load transfer device and the degree of deviation of the energy consumption change curve includes the following contents:
[0060] Step S31: determining the working power and power usage of the load according to the device information of the load-transferred device;
[0061] Step S32: Filter out a plurality of target key devices having the same power usage as the load transfer device from the remaining key devices;
[0062] Step S33: Divide the working power transferred by the load into the device by the average slope ratio to obtain the adapted power;
[0063] Step S34: Filter out the key device closest to the adapted power from the multiple target key devices and use it as the best matching key device.
[0064] It can be understood that when the power of the load-in device is not enough to bear the power load of the load-out device, the energy consumption change of the two (i.e., the energy consumption change curve) will show poor symmetry, so the average slope absolute value of the energy consumption change curve of the load-in device will be less than the average slope absolute value of the energy consumption change curve of the load-out device. In addition, in order to ensure that the new load-in device can well carry the power load of the load-out device, it is necessary to ensure that the new load-in device matches the power use of the current load-in device. Therefore, the present invention first obtains the device information of the current load-in device, and the rated working power and power use of the current load-in device can be determined according to the device information. First, according to the power use, multiple key devices with the same power use as the current load-in device are selected from the remaining key devices in the communication power supply system, and they are used as the target key devices to be selected; then, the rated working power of the load-in device is divided by the average slope ratio to obtain the adaptation power, and then the key device closest to the adaptation power is selected from multiple target key devices, and it is used as the best matching key device, that is, the new load-in device. Among them, since the average slope absolute value of the energy consumption change curve of the load transfer-in device will be smaller than the average slope absolute value of the energy consumption change curve of the load transfer-out device, the average slope ratio will usually be less than 1, and the calculated adaptation power will be greater than the rated working power of the current load transfer-in device, and the rated working power of the new load transfer-in device must be greater than the adaptation power and closest, or the deviation value between the adaptation power is within the preset range to ensure that the new load transfer-in device can meet the load transfer requirements.
[0065] Alternatively, if Figure 4 As shown, the load transfer control method of the communication power supply system also includes the following contents:
[0066] If the best matching key device cannot be screened out from the remaining key devices, an abnormal reminder message is generated.
[0067] It can be understood that if no key equipment with the same power usage as the current load transfer equipment is found among the other key equipment in the communication power system, or if no key equipment that does not meet the adaptive power matching conditions is screened out, an abnormal load transfer process reminder message will be generated and sent to the staff's smart terminal to remind the staff to intervene manually in time.
[0068] It can be understood that the load transfer control method of the present invention can timely detect abnormal changes in energy consumption and determine the load transfer phenomenon by monitoring the real-time energy consumption of all key devices (such as UPS, rectifier, inverter, battery pack, etc.) in the communication power supply system. The load transfer process should be kept smooth and stable, so the energy consumption change curves of the load transfer-in device and the load transfer-out device are analyzed to judge their adaptability. When it is found that the symmetry of the energy consumption change curves of the two is poor, a more suitable load transfer-in device can be screened by matching the power usage and calculating the adaptive power, thereby ensuring the effectiveness of the load transfer and the continuity of the system. During the screening process, if the key equipment that is adapted is not found, the system will generate a reminder message that the load transfer is not smooth, and notify the staff to take further measures. Through this series of intelligent monitoring and optimization operations, efficient management of the communication power supply system can be achieved, equipment failure rate can be reduced, equipment service life can be extended, maintenance costs can be reduced, and overall energy efficiency can be improved, ensuring that the communication equipment can operate stably under various conditions.
[0069] In addition, if Figure 5 As shown, another embodiment of the present invention further provides a load transfer control system for a communication power supply system, preferably using the load transfer control method as described above, including:
[0070] The energy consumption monitoring module is used to monitor the energy consumption of all key devices in the communication power supply system and analyze whether there is a load transfer process. If it is determined that a load transfer process occurs, the load transfer-out device and the load transfer-in device are determined;
[0071] The matching evaluation module is used to obtain the energy consumption change curves of the load transfer-out device and the load transfer-in device during the load transfer process, determine the degree of deviation between the two curves, and judge whether the load transfer-in device and the load transfer-out device match according to the degree of deviation;
[0072] The matching screening module is used to obtain the device information of the load transfer-in device when it is determined that the load transfer-in device and the load transfer-out device do not match, and screen out the best matching key device from the remaining key devices according to the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, and use it as the new load transfer-in device.
[0073] It can be understood that the load transfer control system of the communication power supply system of this embodiment monitors the energy consumption of all key devices in the target communication power supply and analyzes whether a load transfer process occurs. If it is determined that a load transfer process occurs, the load transfer-out device and the load transfer-in device are determined. Then, the energy consumption change curves of the load transfer-out device and the load transfer-in device during the load transfer process are obtained, and the degree of deviation between the two curves is determined, and whether the load transfer-in device and the load transfer-out device match is determined based on the degree of deviation. If it is determined that the load transfer-in device and the load transfer-out device do not match, the best matching key device is re-screened from the remaining key devices based on the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, and it is used as the new load transfer-in device. The load transfer control system of the present invention can accurately evaluate the symmetry of the two curves based on the degree of deviation between the energy consumption change curves of the load transfer-out device and the load transfer-in device. The lower the degree of deviation, the better the symmetry of the two curves, which means that the compatibility of the load transfer-out device and the load transfer-in device is higher; and, when the load transfer-in device and the load transfer-out device do not match, the best matching key device can be quickly re-screened from the remaining key devices as a new load transfer-in device based on the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, thereby realizing automated precise matching and accurately matching the load transfer-out device with the best load transfer-in device; thereby ensuring the smooth progress of the load transfer, avoiding system instability or efficiency reduction problems caused by incompatibility, enabling the communication power supply system to maintain efficient operation, reducing the equipment failure rate, and extending the equipment service life.
[0074] Optionally, the load transfer control system further includes:
[0075] The abnormality reminder module is used to generate abnormality reminder information when the best matching key device cannot be screened out from the remaining key devices.
[0076] It can be understood that the various modules of the system embodiment correspond to the various steps of the above method embodiment, so the working process and principle of each module will not be repeated here, and the corresponding reference is made to the various steps of the above method embodiment.
[0077] In addition, another embodiment of the present invention further provides an electronic device, including a processor and a memory, wherein the memory stores a computer program, and the processor executes the steps of the above method by calling the computer program stored in the memory.
[0078] In addition, another embodiment of the present invention further provides a computer-readable storage medium for storing a computer program for performing load transfer control of a communication power supply system, wherein the computer program executes the steps of the method described above when running on a computer.
[0079] The general form of computer readable storage media includes: floppy disk, flexible disk, hard disk, magnetic tape, any other magnetic medium, CD-ROM, any other optical medium, punch cards, paper tape, any other physical medium with a pattern of holes, random access memory (RAM), programmable read-only memory (PROM), erasable programmable read-only memory (EPROM), flash erasable programmable read-only memory (FLASH-EPROM), any other memory chip or cartridge, or any other medium that can be read by a computer. The instructions can further be transmitted or received by a transmission medium. The term transmission medium can include any tangible or intangible medium that can be used to store, encode or carry instructions for execution by a machine, and includes digital or analog communication signals or other intangible media that facilitate the communication of the above instructions. Transmission media include coaxial cables, copper wires and optical fibers, which include the wires of a bus used to transmit a computer data signal.
[0080] Those skilled in the art will appreciate that the embodiments of the present application can be provided as methods, systems, or computer program products. Therefore, the present application can adopt the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the present application can adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code. The scheme in the embodiments of the present application can be implemented in various computer languages, for example, object-oriented programming language Java and literal scripting language JavaScript, etc.
[0081] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0082] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0083] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0084] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0085] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
[0086] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A load transfer control method for a communication power supply system, characterized in that: Includes the following: Monitor the energy consumption of all key equipment in the communication power supply system and analyze whether there is a load transfer process. If a load transfer process is confirmed, determine the load transfer-out equipment and load transfer-in equipment; Obtain the energy consumption change curves of the load transfer-out device and the load transfer-in device during the load transfer process, determine the degree of deviation between the two curves, and judge whether the load transfer-in device and the load transfer-out device match based on the degree of deviation; If it is determined that the load transfer-in device and the load transfer-out device do not match, the device information of the load transfer-in device is obtained, and the best matching key device is selected from the remaining key devices based on the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, and it is used as the new load transfer-in device.
2. The load transfer control method of the communication power supply system according to claim 1, characterized in that: The process of obtaining the energy consumption change curves of the load-transferring device and the load-transferring device during the load transfer process and determining the degree of deviation between the two curves includes the following: Obtaining energy consumption change data of the load transfer-out device and the load transfer-in device within a preset time period during the load transfer process, and generating energy consumption change curves of the load transfer-out device and the load transfer-in device within the preset time period; The absolute value of the average slope of the two energy consumption change curves is calculated; The absolute value of the average slope corresponding to the load transfer-in device is divided by the absolute value of the average slope corresponding to the load transfer-out device to obtain the average slope ratio, and the average slope ratio is defined as the degree of deviation between the energy consumption change curves of the load transfer-out device and the load transfer-in device.
3. The load transfer control method of the communication power supply system according to claim 2, characterized in that: If the average slope ratio is greater than the preset threshold, it is determined that the load transfer-in device and the load transfer-out device match; if the average slope ratio is not greater than the preset threshold, it is determined that the load transfer-in device and the load transfer-out device do not match.
4. The load transfer control method of the communication power supply system according to claim 1, characterized in that: The process of selecting the best matching key device from other key devices according to the device information of the load transfer device and the degree of deviation of the energy consumption change curve includes the following contents: Determine the working power and purpose of electricity use based on the equipment information transferred into the load device; Select multiple target key devices with the same power usage as the load transfer device from other key devices; Divide the working power transferred by the load into the device by the average slope ratio to obtain the adapted power; The key device closest to the adapted power is selected from multiple target key devices and is used as the best matching key device.
5. The load transfer control method of the communication power supply system according to claim 1, characterized in that: Also included are the following: If the best matching key device cannot be screened out from the remaining key devices, an abnormal reminder message is generated.
6. The load transfer control method of the communication power supply system according to claim 1, characterized in that: The energy consumption of all key devices in the communication power supply system is monitored, and whether a load transfer process occurs is analyzed. If a load transfer process is determined, the process of determining the load transfer-out device and the load transfer-in device includes the following: Energy consumption of all key equipment in the communication power supply system is monitored. When the energy consumption of a certain key equipment decreases and the energy consumption of another key equipment increases, and the energy consumption changes of the two are the same, it is determined that a load transfer process has occurred. The key equipment with reduced energy consumption is defined as a load transfer-out device, and the key equipment with increased energy consumption is positioned as a load transfer-in device.
7. A load transfer control system for a communication power supply system, characterized in that: include: The energy consumption monitoring module is used to monitor the energy consumption of all key devices in the communication power supply system and analyze whether there is a load transfer process. If it is determined that a load transfer process occurs, the load transfer-out device and the load transfer-in device are determined; The matching evaluation module is used to obtain the energy consumption change curves of the load transfer-out device and the load transfer-in device during the load transfer process, determine the degree of deviation between the two curves, and judge whether the load transfer-in device and the load transfer-out device match according to the degree of deviation; The matching screening module is used to obtain the device information of the load transfer-in device when it is determined that the load transfer-in device and the load transfer-out device do not match, and screen out the best matching key device from the remaining key devices according to the device information of the load transfer-in device and the degree of deviation of the energy consumption change curve, and use it as the new load transfer-in device.
8. The load transfer control system of the communication power supply system according to claim 7, characterized in that: Also includes: The abnormality reminder module is used to generate abnormality reminder information when the best matching key device cannot be screened out from the remaining key devices.
9. An electronic device, characterized in that: The method comprises a processor and a memory, wherein the memory stores a computer program, and the processor executes the steps of the method according to any one of claims 1 to 6 by calling the computer program stored in the memory.
10. A computer-readable storage medium for storing a computer program for load transfer control of a communication power supply system, characterized in that: When the computer program is run on a computer, the steps of the method according to any one of claims 1 to 6 are executed.
Citation Information
Patent Citations
Park energy optimization method and device, electronic equipment and storage medium
CN119010054A
Cloud-end collaborative system and method for load identification
US20230070173A1