All-glass curtain wall adsorption assembly equipment

By designing the adsorption and assembly equipment of the full glass curtain wall, and using suction cups and adjustable fixed structures, the problem of poor positioning effect during installation of the existing glass curtain wall is solved, achieving a more stable and accurate installation process and higher efficiency.

CN119572028AInactive Publication Date: 2025-03-07CHUZHOU JINPENG BUILDING DECORATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411849330.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-16
Publication Date
2025-03-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing glass curtain walls have poor limiting effect during installation, which is prone to shaking and misalignment, and the installation process is time-consuming and labor-intensive and inefficient.

Method used

A fully glass curtain wall adsorption assembly device is designed, including a suction cup arranged on the suction cup fixing seat, which is provided with a cavity connecting the suction cup and a fan is connected through a communication pipe to maintain the suction joint force. One end of the suction cup fixing seat is connected to the placing seat by connecting ropes. A plurality of joint sleeves are provided on the connecting ropes, and connected by threaded screws to form an adjustable fixing structure.

Benefits of technology

The installation stability and accuracy of the glass curtain wall are significantly improved, simplified the installation process and improved efficiency by simplifying the installation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119572028A_ABST
    Figure CN119572028A_ABST
Patent Text Reader

Abstract

According to the technical scheme, the full-glass curtain wall adsorption assembly equipment comprises a suction cup arranged on a suction cup fixing base, a cavity communicating with the suction cup is formed in the suction cup fixing base, and the cavity communicates with a fan through a communicating pipe; one end of the suction cup fixing seat is connected with the placing seat through a first connecting rope, the first connecting rope is sleeved with a plurality of joint sleeves, the joint sleeves are connected in a threaded screwing mode, and after the joint sleeves are connected into a whole, the joint sleeves can be connected with the suction cup fixing seat and the placing seat in a threaded screwing mode; a connecting block is fixed on one side of the placing seat, and a bolt hole connected with an adjusting bolt or a rope is formed in the connecting block. The adsorption assembly equipment has the advantages that various fixing modes can be selected according to actual requirements, so that the adsorption assembly equipment is suitable for different mounting environments, and when the glass curtain wall is mounted, the positioning position of the glass curtain wall is more stable, the mounting position is more accurate, and the mounting effect is better.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of glass curtain wall installation equipment, in particular to a full-glass curtain wall adsorption assembly equipment. Background Art

[0002] Glass curtain wall refers to the building's external protective structure or decorative structure, which has a supporting structural system that can have a certain displacement ability relative to the main structure and does not share the forces exerted on the main structure; the wall has two types of glass: single-layer and double-layer glass; glass curtain wall is a beautiful and novel method of building wall decoration, and is a prominent feature of the era of modernist high-rise buildings.

[0003] When installing existing glass curtain walls, operators rely on hand-held limiters on both sides of the glass. On the one hand, the limiting effect of the glass curtain wall is not good, and the glass curtain wall is often prone to shaking and misalignment. On the other hand, the installation process is time-consuming and labor-intensive, and the installation efficiency is low. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention aims to provide an all-glass curtain wall adsorption assembly device.

[0005] The technical solution of the present invention is as follows: a full-glass curtain wall adsorption assembly device, comprising a suction cup arranged on a suction cup fixing seat, wherein the suction cup fixing seat is provided with a cavity connected to the suction cup, and the cavity is connected to a fan through a connecting pipe;

[0006] One end of the suction cup fixing seat is connected to the placement seat through a first connecting rope, and a plurality of section sleeves are sleeved on the first connecting rope. The plurality of section sleeves are threadedly connected to each other, and after being connected into one, they can be threadedly connected to the suction cup fixing seat and the placement seat;

[0007] A connecting block is fixed on one side of the placing seat, and a bolt hole for connecting an adjusting bolt or a wire rope is opened on the connecting block.

[0008] Preferably, a threaded connection portion is fixed on one end of the sleeve, and a threaded groove portion is opened inside the other end. When the two sleeves are connected, the threaded connection portion on one sleeve is threadably engaged in the threaded groove portion on the other sleeve.

[0009] Preferably, a positioning card is fixed in the inner wall of the segment sleeve, and the positioning cards in two adjacent segment sleeves are connected by a second connecting rope;

[0010] When a plurality of the segment sleeves are connected, both ends thereof are respectively connected to the suction cup fixing seat and the placement seat through the second connecting rope.

[0011] Preferably, when the connecting block is connected to the adjusting bolt, the end of the adjusting bolt is connected to a clamping block, and the clamping block is arranged parallel to the connecting block.

[0012] Preferably, two fixing ropes are fixed to the bottom of the suction cup fixing seat, and the ends of the fixing ropes are connected to positioning nails;

[0013] After the clamping block is positioned, two positioning nails are respectively fixed on the wall or the ground to form a triangle positioning between the two positioning nails and the clamping block.

[0014] Preferably, a storage groove is provided at the top of the placement seat, and a plurality of through holes are provided in the placement seat in the vertical direction.

[0015] Preferably, a mounting block is fixedly arranged on the top of the suction cup fixing seat, a positioning sleeve is arranged on the top of the mounting block, and a lever is arranged on the positioning sleeve.

[0016] Preferably, a cushion block is clamped on the top of the placement seat, and a limiting groove for assisting in limiting the position of the lever is provided at the middle position of the top of the cushion block.

[0017] Preferably, the placement seat and the connection block are vertically or obliquely arranged, and the height of the placement seat is greater than the height of the connection block.

[0018] Preferably, a threaded connection slot is provided on the suction cup fixing seat at one end of the first connection rope, and the first connection rope is welded to the suction cup fixing seat.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] 1. According to actual needs, a variety of fixing methods can be selected, so that the adsorption assembly equipment is suitable for different installation environments. When installing the glass curtain wall, the positioning of the glass curtain wall is more stable, the installation position is more accurate, and the installation effect is better;

[0021] 2. The glass curtain wall can be adsorbed indoors by the suction cup, and then the suction cup is restricted indoors, so that the glass curtain wall can be positioned indoors, which is convenient for operators to install the glass curtain wall and improves installation efficiency;

[0022] 3. The position of the glass curtain wall can be fine-tuned indoors through a lever, making the installation position of the glass curtain wall more accurate, facilitating the later fixing operation of the glass curtain wall, and achieving better actual application effects. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The disclosure of the present invention is described with reference to the accompanying drawings. It should be understood that the drawings are only for illustrative purposes and are not intended to limit the scope of protection of the present invention. In the drawings, the same reference numerals are used to refer to the same components. Among them:

[0024] Figure 1 It is a structural schematic diagram of the all-glass curtain wall adsorption assembly equipment of the present invention;

[0025] Figure 2 This is a schematic diagram of the structure of the first connecting rope of the present invention when it is tilted;

[0026] Figure 3 It is a structural schematic diagram of the section sleeve of the present invention;

[0027] Figure 4 This is a schematic diagram of the structure of the present invention when the joint sleeves are connected into a rod shape;

[0028] Figure 5 It is a schematic diagram of the structure of the fixing rope of the present invention installed on the suction cup fixing seat;

[0029] Figure 6 It is a schematic diagram of the overall structure of the placement seat of the present invention;

[0030] Figure 7 This is a schematic diagram of the structure of the cushion block of the present invention being arranged on a placement seat;

[0031] Figure 8 It is a structural schematic diagram of the lever connected to the suction cup fixing seat of the present invention;

[0032] Fig. 9 It is a schematic diagram of the internal structure of the suction cup fixing seat of the present invention.

[0033] Explanations in the figure: 10, suction cup; 20, suction cup fixing seat; 21, cavity; 22, mounting block; 221, positioning sleeve; 222, lever; 23, threaded connection notch; 30, section sleeve; 31, threaded connection part; 32, threaded groove part; 33, positioning card; 34, second connecting rope; 40, first connecting rope; 50, placement seat; 51, storage slot; 52, through hole; 60, connecting block; 61, bolt hole; 70, adjusting bolt; 80, clamping block; 90, fan; 91, connecting pipe; 100, fixing rope; 101, positioning nail; 110, cushion block; 111, limiting groove. DETAILED DESCRIPTION

[0034] It is easy to understand that according to the technical solution of the present invention, without changing the essential spirit of the present invention, a person skilled in the art can propose a variety of interchangeable structural modes and implementation modes. Therefore, the following specific implementation modes and drawings are only exemplary descriptions of the technical solution of the present invention, and should not be regarded as the whole of the present invention or as a limitation or restriction to the technical solution of the present invention.

[0035] Example 1

[0036] like Figure 1 As shown, a full-glass curtain wall adsorption assembly device includes a suction cup 10 arranged on a suction cup fixing seat 20, a cavity 21 connected to the suction cup 10 is provided in the suction cup fixing seat 20, and the cavity 21 is connected to a fan 90 through a connecting pipe 91;

[0037] One end of the suction cup fixing seat 20 is connected to the placement seat 50 through a first connecting rope 40, and a plurality of section sleeves 30 are sleeved on the first connecting rope 40. The plurality of section sleeves 30 are threadedly connected to each other, and after being connected into one, they can be threadedly connected to the suction cup fixing seat 20 and the placement seat 50;

[0038] A connecting block 60 is fixed to one side of the placement seat 50 , and a bolt hole 61 for connecting an adjusting bolt 70 is formed on the connecting block 60 .

[0039] When the adjusting bolt 70 is connected to the connecting block 60, a clamping block 80 is connected to the end of the adjusting bolt 70. The clamping block 80 is arranged parallel to the connecting block 60. When the adjusting bolt 70 works, the clamping block 80 is driven to move, and is clamped to the connecting position by the clamping block 80 and the mounting seat 50, thereby limiting the position of the first connecting rope 40.

[0040] Specifically, the suction cup 10 is adsorbed onto the glass curtain wall to be installed. During the adsorption process of the suction cup 10, the fan 90 works to extract the gas in the suction cup 10 at all times, so that the suction cup 10 always maintains the suction force, which has a better connection effect on the glass curtain wall. One end of the first connecting rope 40 is clamped to the connection position by the placement seat 50 and the clamping block 80, thereby limiting the position of the suction cup 10.

[0041] When the section sleeve 30 on the first connecting rope 40 is separated, the connection and positioning of the suction cup 10 is completely performed by the first connecting rope 40. Figure 1 As shown, the first connecting rope 40 is set in a horizontal state, so that the suction cup 10 can withstand the maximum tension, thereby being suitable for the installation and fixation of heavier glass curtain walls;

[0042] like Figure 2 As shown, the first connecting rope 40 is set to an inclined state, so that the clamping block 80 and the mounting seat 50 can be clamped at more positions, so that the fixing range is wider and the actual application effect is better.

[0043] Example 2

[0044] A full-glass curtain wall adsorption assembly device, comprising a suction cup 10 arranged on a suction cup fixing seat 20, wherein a cavity 21 connected to the suction cup 10 is provided in the suction cup fixing seat 20, and a fan 90 is connected to the cavity 21 through a connecting pipe 91;

[0045] One end of the suction cup fixing seat 20 is connected to the placement seat 50 through a first connecting rope 40, and a plurality of section sleeves 30 are sleeved on the first connecting rope 40. The plurality of section sleeves 30 are threadedly connected to each other, and after being connected into one, they can be threadedly connected to the suction cup fixing seat 20 and the placement seat 50;

[0046] A connecting block 60 is fixed to one side of the placement seat 50 , and a bolt hole 61 for connecting an adjusting bolt 70 is formed on the connecting block 60 .

[0047] A positioning card 33 is fixed in the inner wall of the segment sleeve 30, and the positioning cards 33 in two adjacent segment sleeves 30 are connected by a second connecting rope 34;

[0048] When multiple sleeves 30 are connected, both ends thereof are respectively connected to the suction cup fixing seat 20 and the placing seat 50 through the second connecting rope 34, so that the placing seat 50 and the suction cup fixing seat 20 can be connected not only through the first connecting rope 34, but also through the combination of the sleeve 30 and the second connecting rope 34, so that the placing seat 50 and the suction cup fixing seat 20 are not easily separated, and the actual application effect is better.

[0049] like Figure 3 As shown, multiple sleeves 30 are screwed together into an integrated unit, so that the multiple sleeves 30 can be used as fixing rods. Through this structural setting, the connection position between the suction cup fixing seat 20 and the placement seat 50 can be made more stable. When the suction cup 10 adsorbs the glass curtain wall, the user can hold the whole composed of the sleeves 30, so as to facilitate the user to adjust the position of the glass curtain wall.

[0050] A threaded connection portion 31 is fixed at one end of the sleeve 30, and a threaded groove portion 32 is opened inside the other end. When the two sleeves 30 are connected, the threaded connection portion 31 on one sleeve 30 is threadedly engaged in the threaded groove portion 32 on the other sleeve 30. Through this structural setting, the sleeves 30 can be quickly connected to each other to form a rod-like structure. In addition, the hole inside the sleeve 30 is larger than the thickness of the first connecting rope 40, so that the sleeves 30 can be suspended on the first connecting rope 40 when separated.

[0051] Example 3

[0052] like Figure 1 and Figure 4 As shown, a full-glass curtain wall adsorption assembly device includes a suction cup 10 arranged on a suction cup fixing seat 20, a cavity 21 connected to the suction cup 10 is provided in the suction cup fixing seat 20, and the cavity 21 is connected to a fan 90 through a connecting pipe 91;

[0053] One end of the suction cup fixing seat 20 is connected to the placement seat 50 through a first connecting rope 40, and a plurality of section sleeves 30 are sleeved on the first connecting rope 40. The plurality of section sleeves 30 are threadedly connected to each other, and after being connected into one, they can be threadedly connected to the suction cup fixing seat 20 and the placement seat 50;

[0054] A connecting block 60 is fixed to one side of the placement seat 50 , and a bolt hole 61 for connecting an adjusting bolt 70 is formed on the connecting block 60 .

[0055] When the adjusting bolt 70 is connected to the connecting block 60, a clamping block 80 is connected to the end of the adjusting bolt 70. The clamping block 80 is arranged parallel to the connecting block 60, which can conveniently clamp the connecting block 60 and the clamping block 80 to the connecting position to maintain the position stability after the connection.

[0056] Example 4

[0057] like Figure 1 As shown, a full-glass curtain wall adsorption assembly device includes a suction cup 10 arranged on a suction cup fixing seat 20, a cavity 21 connected to the suction cup 10 is provided in the suction cup fixing seat 20, and the cavity 21 is connected to a fan 90 through a connecting pipe 91;

[0058] One end of the suction cup fixing seat 20 is connected to the placement seat 50 through a first connecting rope 40, and a plurality of section sleeves 30 are sleeved on the first connecting rope 40. The plurality of section sleeves 30 are threadedly connected to each other, and after being connected into one, they can be threadedly connected to the suction cup fixing seat 20 and the placement seat 50;

[0059] A connecting block 60 is fixed to one side of the placement seat 50, and a bolt hole 61 for a connecting rope is opened on the connecting block 60. The rope passes through the bolt hole 61 and is then tied to a column portion away from the glass curtain wall, thereby limiting the position of the first connecting rope 40. This structural setting further improves the fixing method of the first connecting rope 40, making it more applicable. At the same time, the rope bundling method can facilitate users to use it, and the actual application effect is better.

[0060] Example 5

[0061] like Figure 5 As shown, a full-glass curtain wall adsorption assembly device includes a suction cup 10 arranged on a suction cup fixing seat 20, a cavity 21 connected to the suction cup 10 is provided in the suction cup fixing seat 20, and the cavity 21 is connected to a fan 90 through a connecting pipe 91;

[0062] One end of the suction cup fixing seat 20 is connected to the placement seat 50 through a first connecting rope 40, and a plurality of section sleeves 30 are sleeved on the first connecting rope 40. The plurality of section sleeves 30 are threadedly connected to each other, and after being connected into one, they can be threadedly connected to the suction cup fixing seat 20 and the placement seat 50;

[0063] A connecting block 60 is fixed to one side of the placement seat 50 , and a bolt hole 61 for connecting an adjusting bolt 70 is formed on the connecting block 60 .

[0064] Two fixing ropes 100 are fixed at the bottom of the suction cup fixing seat 20, and the ends of the fixing ropes 100 are connected with positioning nails 101;

[0065] After the clamping block 80 is positioned, the two positioning nails 101 are fixed to the wall or the ground respectively, until a triangle is formed between the two positioning nails 101 and the clamping block 80 .

[0066] After being clamped and limited by the placement seat 50 and the clamping block 80, the two fixing ropes 100 are fixed and placed in appropriate positions. In this way, a multi-point fixing method is formed, so that the position of the suction cup 10 is more stable. Even if damage occurs at a certain point, it will not affect the position limitation of the suction cup 10, which can improve the safety of glass curtain wall assembly and achieve better practical application effects.

[0067] like Figure 6 As shown, a storage groove 51 is provided on the top of the placement seat 50, and a plurality of through holes 52 are provided in the placement seat 50 in the vertical direction. Through this structure, pins can be inserted into the through holes 52 in the placement seat 50, and the position of the placement seat 50 can be limited by the pins, which can be another fixing method of the first connecting rope 40, thereby being suitable for more installation environments.

[0068] Example 6

[0069] like Figure 8 As shown, a mounting block 22 is fixedly arranged on the top of the suction cup fixing seat 20 , a positioning sleeve 221 is arranged on the top of the mounting block 22 , and a lever 222 is arranged on the positioning sleeve 221 .

[0070] like Figure 7-8 As shown, a cushion block 110 is clamped on the top of the placement seat 50 , and a limiting groove 111 for assisting the position of the limiting lever 222 is opened at the middle position of the top of the cushion block 110 .

[0071] In this way, the user can use the lever 222 to adjust the position of the suction cup fixing seat 20, thereby adjusting the position of the glass curtain wall to be installed, which is suitable for the installation of heavier glass curtain walls.

[0072] The placement seat 50 and the connection block 60 are vertically or inclinedly arranged, and the height of the placement seat 50 is greater than the height of the connection block 60, which can further improve its application range.

[0073] like Fig. 9 As shown, a threaded connection slot 23 is provided on the suction cup fixing seat 20 at one end of the first connection rope 40 , and the first connection rope 40 and the suction cup fixing seat 20 are welded.

[0074] The technical scope of the present invention is not limited to the contents in the above description. Those skilled in the art can make various deformations and modifications to the above embodiments without departing from the technical idea of ​​the present invention, and these deformations and modifications should all fall within the protection scope of the present invention.

Claims

1. A full glass curtain wall adsorption assembly device, characterized in that: It comprises a suction cup (10) arranged on a suction cup fixing seat (20), wherein a cavity (21) connected to the suction cup (10) is provided in the suction cup fixing seat (20), and the cavity (21) is connected to a fan (90) via a connecting pipe (91); One end of the suction cup fixing seat (20) is connected to the placement seat (50) via a first connection rope (40); a plurality of sleeves (30) are sleeved on the first connection rope (40); the plurality of sleeves (30) are threadedly connected to each other, and after being connected as one, they can be threadedly connected to the suction cup fixing seat (20) and the placement seat (50); A connecting block (60) is fixed to one side of the placement seat (50), and a bolt hole (61) for connecting an adjusting bolt (70) or a wire rope is provided on the connecting block (60).

2. The all-glass curtain wall adsorption assembly equipment according to claim 1, characterized in that: A threaded connection portion (31) is fixed at one end of the sleeve (30), and a threaded groove portion (32) is provided inside the other end. When the two sleeves (30) are connected, the threaded connection portion (31) on one sleeve (30) is threadedly screwed into the threaded groove portion (32) on the other sleeve (30).

3. The all-glass curtain wall adsorption assembly equipment according to claim 2 is characterized in that: A positioning card (33) is fixed in the inner wall of the segment sleeve (30), and the positioning cards (33) in two adjacent segment sleeves (30) are connected by a second connecting rope (34); When a plurality of the segment sleeves (30) are connected, both ends thereof are respectively connected to the suction cup fixing seat (20) and the placement seat (50) via a second connection rope (34).

4. The all-glass curtain wall adsorption assembly equipment according to claim 3 is characterized in that: When the adjusting bolt (70) is connected to the connecting block (60), the end of the adjusting bolt (70) is connected to a clamping block (80), and the clamping block (80) is arranged parallel to the connecting block (60).

5. The all-glass curtain wall adsorption assembly equipment according to claim 4 is characterized in that: Two fixing ropes (100) are fixed at the bottom of the suction cup fixing seat (20), and the ends of the fixing ropes (100) are connected with positioning nails (101); After the clamping block (80) is positioned, two positioning nails (101) are respectively fixed to the wall or the ground, until a triangle positioning is formed between the two positioning nails (101) and the clamping block (80).

6. The all-glass curtain wall adsorption assembly equipment according to claim 5, characterized in that: A storage groove (51) is provided at the top of the placement seat (50), and a plurality of through holes (52) are provided in the placement seat (50) in a vertical direction.

7. The all-glass curtain wall adsorption assembly equipment according to claim 6, characterized in that: A mounting block (22) is fixedly arranged on the top of the suction cup fixing seat (20), a positioning sleeve (221) is arranged on the top of the mounting block (22), and a lever (222) is arranged on the positioning sleeve (221).

8. The all-glass curtain wall adsorption assembly equipment according to claim 7, characterized in that: A cushion block (110) is clamped on the top of the placement seat (50), and a limiting groove (111) for assisting the position of the limiting lever (222) is provided at the middle position of the top of the cushion block (110).

9. The all-glass curtain wall adsorption assembly equipment according to claim 7, characterized in that: The placement seat (50) and the connection block (60) are vertically arranged or inclined, and the height of the placement seat (50) is greater than the height of the connection block (60).

10. The all-glass curtain wall adsorption assembly equipment according to claim 7, characterized in that: A threaded connection notch (23) is provided on the suction cup fixing seat (20) at one end of the first connection rope (40), and the first connection rope (40) and the suction cup fixing seat (20) are welded.