Electric power iron tower foundation pile drilling equipment and dumping method thereof
By adopting the gantry structure and mobile power source design in the drilling equipment of the foundation pile of the power tower, the problem of soil slag and rock chips falling during drill bit cleaning is solved, which improves work efficiency and avoids equipment damage.
Patent Information
- Application Number
- CN202411867500.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-18
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2044-12-18
AI Technical Summary
When drilling holes in existing drilling rig equipment, the rock chips and slag accumulated by the drill bit are easily dropped into the pile hole or the base of the equipment, resulting in reduced drill bit efficiency and equipment damage.
A power tower foundation pile drilling equipment was designed, using a gantry structure, which pushed the gantry to slide through moving the power source, so that the drill bit could be away from the drill holes and the base of the equipment to clean the slag on the drill bit.
It effectively solves the problem of soil slag and rock chips falling when drill bits are cleaned, improves the working efficiency of the drill bits, and avoids damage to the equipment base.
Smart Images

Figure CN119572155A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of electric tower pile foundation construction equipment, in particular to an electric power tower foundation pile drilling device and a soil discharge method thereof. Background Art
[0002] In the field of power transmission and transformation engineering technology, the foundation construction of large-scale power transmission line power towers is an important link. These power towers usually need to be installed in areas with few pedestrians such as mountain tops. Due to geographical restrictions, the construction of the tower foundation pile holes usually needs to be carried out by manual excavation. This method is not only inefficient, but also has great safety hazards, so large drilling rigs are generally used for drilling.
[0003] When drilling a hole, the drill bit of the existing drilling rig equipment will accumulate rock chips and soil debris after breaking the rock, so the drill bit needs to be regularly lifted out of the hole and cleaned. However, since the drill bit is located above the foundation pile hole and in the middle of the equipment base, it is very inconvenient to move and remove it, and some of the fallen soil debris and rock chips will fall into the foundation pile hole drilled by the drill bit or the equipment base, which not only makes it easy for the drill bit to repeatedly grind the same rock chips and reduce work efficiency, but may also cause malfunction of the equipment base and damage the drilling rig. Summary of the invention
[0004] The purpose of the present invention is to provide a power tower foundation pile drilling device and a soil discharge method thereof, which solves the problem in the prior art that soil residues and rock cuttings easily fall into the pile hole or the equipment base when the drill bit is cleaning the residue, thereby reducing the working efficiency of the drill bit.
[0005] To achieve the above object, the technical solution of the present invention is as follows: a power tower foundation pile drilling device, the drilling device comprising:
[0006] A base, wherein a plurality of mobile power sources are arranged on the base;
[0007] A gantry, wherein the gantry comprises a horizontal beam and two vertical beams, wherein the horizontal beam is slidably mounted between the two vertical beams, wherein the sliding direction of the horizontal beam is parallel to the length direction of the vertical beams, wherein the vertical beams are slidably mounted on the base, wherein the power output ends of a plurality of mobile power sources respectively push the ends of the two vertical beams, wherein the sliding direction of the vertical beams is perpendicular to the length direction of the vertical beams and the vertical beams are close to or away from the base when sliding;
[0008] A plurality of power heads, wherein the plurality of power heads are fixedly mounted on the crossbeam;
[0009] A drill rod, which is detachably mounted on the bottom end surface of the horizontal beam, the axis of which is parallel to the length direction of the vertical beam, and is driven to rotate by the power output ends of a plurality of power heads;
[0010] A drill bit is fixedly mounted on the bottom end of the drill rod.
[0011] As an optional solution, a guide beam is fixedly mounted on the bottom end surface of the vertical beam;
[0012] A plurality of guide rails are arranged on the top surface of the base, and the guiding direction of the guide rails is parallel to the sliding direction of the vertical beam;
[0013] A sliding plate is provided between the bottom end surface of the guide beam and the base, and a connecting rail is provided on a side of the sliding plate close to the guide rail;
[0014] The length direction of the connecting slide rail is consistent with the guiding direction of the guiding slide rail, and the connecting slide rail is slidably connected to the guiding slide rail.
[0015] As an optional solution, an avoidance groove is provided on any of the guide beams;
[0016] The length direction of the guide beam is parallel to the sliding direction of the vertical beam;
[0017] The two ends of the avoidance groove respectively penetrate the two end surfaces of the guide beam located in the sliding direction of the vertical beam, the axis of the avoidance groove is parallel to the length direction of the guide beam, and a mounting plate is provided at one end of the avoidance groove away from the mobile power source;
[0018] There are two mobile power sources, which are respectively located at the ends of two vertical beams. The power output end of the mobile power source extends from one end of the avoidance groove and extends from the other end of the avoidance groove. The mobile power source is fixedly connected to the guide beam through the mounting plate.
[0019] As an optional solution, the guide rail is evenly divided into a plurality of sections along the sliding direction of the vertical beam, and the length of the connecting rail is greater than the distance between any two adjacent guide rail sections.
[0020] As an optional solution, the moving power source is a driving hydraulic cylinder, and the extension and retraction direction of the piston of the driving hydraulic cylinder is parallel to the sliding direction of the vertical beam.
[0021] As an optional solution, the drill rod is a multi-stage drill rod, and the multi-stage drill rods are detachably connected together by pins.
[0022] As an optional solution, a clamping plate is slidably provided on the base, the sliding direction of the clamping plate is perpendicular to the axis of the drill rod, the distance between the top surface of the clamping plate and the crossbeam is greater than the length of any level of the drill rod, and the clamping plate clamps the connection position of two adjacent drill rods.
[0023] A method for discharging soil from a foundation pile of an electric power tower, using a drilling device for the foundation pile of an electric power tower, the method comprising:
[0024] In the drilling step, the power head stops working, and the crossbeam moves upward to drive the drill bit to be lifted out of the drill hole.
[0025] In the soil discharge step, the mobile power source pushes the vertical beam to slide, and the drill bit follows the vertical beam to slide to a position away from the drill hole. At this time, the power head is restarted.
[0026] The invention discloses a power tower foundation pile drilling device and a soil discharge method thereof, which have the beneficial effects compared with the prior art in that: the gantry of the embodiment of the invention is slidably installed on the base, the sliding power of the gantry is provided by a plurality of mobile power sources, the gantry can slide on the base, and when cleaning the residual soil on the drill bit, the on-site personnel can move the drill bit to an area away from the borehole and the equipment base for cleaning, thereby solving the problem in the prior art that soil residue and rock cuttings are easily dropped into the pile hole or the equipment base when the drill bit is cleaned, thereby reducing the working efficiency of the drill bit. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 is an overall schematic diagram of a power tower foundation pile drilling device according to an embodiment of the present invention;
[0028] Figure 2 1 is an overall schematic diagram of the gantry of the power tower foundation pile drilling equipment according to the embodiment of the present invention after movement;
[0029] Figure 3 The power tower foundation pile drilling equipment of the embodiment of the present invention is Figure 2 A partial enlarged view of point A;
[0030] Figure 4 Schematic diagram of a drill bit and a drill rod of a power tower foundation pile drilling device according to an embodiment of the present invention;
[0031] Figure 5 Schematic diagram of a gantry frame of a power tower foundation pile drilling device according to an embodiment of the present invention;
[0032] Figure 6 The power tower foundation pile drilling equipment of the embodiment of the present invention is Figure 5 A partial enlarged view of point B;
[0033] Figure 7 Schematic diagram of the base of the power tower foundation pile drilling equipment according to an embodiment of the present invention;
[0034] Figure 8 Schematic diagram of guide beam installation of power tower foundation pile drilling equipment according to an embodiment of the present invention;
[0035] Fig. 9 is a cross-sectional view of a power tower foundation pile drilling device according to an embodiment of the present invention at a position where a slide rail is connected;
[0036] In the figure, 1, drill bit; 2, drill rod; 201, connector; 202, latch; 203, rod body; 3, gantry; 301, cross beam; 302, vertical beam; 303, guide beam; 3031, avoidance groove; 3032, mounting plate; 3033, sliding plate; 3034, connecting rail; 304, power head; 4, base; 401, guide rail; 402, mobile power source. DETAILED DESCRIPTION
[0037] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0038] In the description of the present invention, it should be noted that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.
[0039] In the description of the present invention, it should be understood that the terms "connected", "connected", "fixed" and the like used in the present invention should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or a welding connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0040] like Figures 1 to 9 As shown, a preferred embodiment of the present invention provides a power tower foundation pile drilling device, which includes: a drill bit 1, a drill rod 2, a gantry 3 and a base 4.
[0041] The base 4 is provided with a plurality of mobile power sources.
[0042] The gantry 3 includes a cross beam 301 and two vertical beams 302. The cross beam 301 is slidably installed between the two vertical beams 302. The angles between the cross beam 301 and the two vertical beams 302 are both 90°. The sliding direction of the cross beam 301 is parallel to the length direction of the vertical beams 302. The moving power of the cross beam 301 in this direction is provided by a lifting hydraulic cylinder arranged on the gantry 3. The vertical beams 302 are slidably installed on the base 4. The power output ends of the plurality of moving power sources respectively push the two vertical beams 302. At the ends of the vertical beams 302, a plurality of the mobile power sources are evenly distributed at the ends of the two vertical beams 302 to balance the thrust received by the vertical beams 302. The sliding direction of the vertical beams 302 is perpendicular to the length direction of the vertical beams 302 and the vertical beams 302 move closer to or away from the base 4 when sliding. The sliding of the vertical beams 302 means the sliding of the gantry 3. The sliding direction of the vertical beams 302 is the sliding direction of the gantry 3. The center of gravity of the gantry 3 is always located on the base 4 during the sliding process.
[0043] Several of the power heads 304 are fixedly installed on the beam 301, and the fixed ends of several of the power heads 304 are fixedly installed on the top surface of the beam 301. The power head 304 is a motor, the fixed end of the power head 304 is the motor body, and the power output end of the power head 304 is the motor shaft.
[0044] The drill rod 2 is detachably mounted on the bottom end surface of the horizontal beam 301 , the axis of the drill rod 2 is parallel to the length direction of the vertical beam 302 , and the drill rod 2 is driven to rotate by the power output ends of a plurality of power heads 304 .
[0045] There is no further limitation on the number of power heads 304 here. When there is only one power head 304, the power output end of the power head 304 is plugged into the tail of the drill rod 2 to drive the drill rod 2 to rotate; when there are multiple power heads 304, several of the power heads 304 are arranged in a circular array around the axis of the drill rod 2, and the power output ends of several of the power heads 304 cooperate with the tail of the drill rod 2 through gears to drive the group to rotate. At this time, the rotation directions of the power output ends of several of the power heads 304 are all in the same rotation direction.
[0046] The drill bit 1, spiral blades, main supporting rod and alloy teeth, the bottom end surface of the main supporting rod is provided with a portion for crushing soil, the top end surface of the main supporting rod is provided with a connecting portion for connecting to the drill rod 2, the side wall of the main supporting rod is provided with spiral blades along the radial direction of the main supporting rod, the feed end and the contact position of the spiral blades with the bottom of the borehole are provided with alloy teeth, the drill bit 1 is fixedly installed on the bottom end of the drill rod 2 through the connecting portion and is driven to rotate by the drill rod 2, and the drill bit 1 rotates and crushes the soil to drill a borehole.
[0047] Based on this, when the drilling equipment needs to discharge soil, the horizontal beam 301 moves up to lift the drill rod 2 and the drill bit 1 out of the borehole, and several of the moving components work simultaneously and push the vertical beam 302 to slide on the base 4 so that the gantry 3 is away from the borehole and the equipment base 4, so that the drilling equipment can clean the drill bit 1 at a position away from the borehole and the equipment base 4, thereby solving the problem in the prior art that when the drill bit 1 is cleaning the slag, soil residue and rock cuttings are easily dropped into the pile hole or the equipment base 4, thereby reducing the working efficiency of the drill bit 1.
[0048] Furthermore, if Figures 1 to 9 As shown, guide beams 303 are fixedly mounted on the bottom end surfaces of the two vertical beams 302 of the gantry 3 .
[0049] A plurality of guide rails 401 are respectively disposed on the top surface of the base 4 . The guiding direction of the guide rails 401 is parallel to the sliding direction of the vertical beam 302 . One of the groove walls of the guide rail 401 faces the base 4 .
[0050] A sliding plate 3033 is arranged between the bottom end surface of the guide beam 303 and the base 4, the top end surface of the sliding plate 3033 is in contact with the bottom end surface of the guide beam 303, the bottom end surface of the sliding plate 3033 is in contact with the base 4, a connecting rail 3034 is arranged on the side of the sliding plate 3033 close to the guide rail 401, and the length direction of the sliding plate 3033 is parallel to the length direction of the connecting rail 3034.
[0051] The length direction of the connecting slide rail 3034 is consistent with the guiding direction of the guiding slide rail 401. The connecting slide rail 3034 is used to cooperate with the installed groove wall toward the sliding plate 3033. The connecting slide rail 3034 is slidingly connected to the guiding slide rail 401. At this time, one of the groove walls of the guiding slide rail 401 is located above the connecting slide rail 3034 to limit the vertical displacement of the sliding plate 3033 when sliding, thereby making the gantry 3 slide more smoothly on the base 4.
[0052] Furthermore, if Figures 1 to 9 As shown, an avoidance groove 3031 is provided on any of the guide beams 303 .
[0053] The length direction of the guide beam 303 is parallel to the sliding direction of the vertical beam 302 .
[0054] The two ends of the avoidance groove 3031 respectively penetrate the two end surfaces of the guide beam 303 located in the sliding direction of the gantry 3, the axis of the avoidance groove 3031 is parallel to the length direction of the guide beam 303, and a mounting plate 3032 is provided at one end of the avoidance groove 3031 away from the mobile power source 402.
[0055] The power output end of the mobile power source 402 extends into one end of the avoidance groove 3031 and extends out from the other end of the avoidance groove 3031. The central opening of the mounting plate 3032 is used to avoid the mobile power source 402 from extending out from the center position of the mounting plate 3032. Two opposite fixing plates are arranged on the end face of the mounting plate 3032 away from the avoidance groove 3031. Screw holes are arranged on both fixing plates and the screw holes are oriented opposite to each other. The mobile power source 402 is fixedly connected to the guide beam 303 through the fixing plates on the mounting plate 3032. Since the mass of the overall structure of the gantry 3 is large, the inertia generated when it moves is also large. The setting of the avoidance groove 3031 enables the mobile power source 402 to be pulled from the front of the guide beam 303 to avoid the gantry beam sliding out of the guide rail 401 which may be caused by pushing the gantry beam, thereby making the movement process of the gantry beam with a larger mass more controllable.
[0056] Furthermore, if Figures 1 to 9 As shown, the guide rail 401 is evenly divided into several sections along the sliding direction of the gantry 3, and the length of the connecting rail 3034 is greater than the distance between any two adjacent sections of the guide rail 401. At this time, the two ends of the connecting rail 3034 are flush with the two ends of the guide beam 303, that is, the connecting rail 3034 is of the same length as the guide beam 303. The guide rail 401 is arranged in sections, which saves the manufacturing materials of the corresponding rails and avoids the maintenance difficulties that may be caused by the excessive length of the rails.
[0057] The number of segments of the guide rail 401 is not further limited here, and the guide rail 401 can be designed according to the length of the gantry 3 that needs to slide and the overall length of the base 4 equipment.
[0058] Furthermore, if Figures 1 to 8 As shown, the mobile power source 402 is a driving hydraulic cylinder, and the extension and retraction direction of the piston of the driving hydraulic cylinder is parallel to the sliding direction of the gantry 3, that is, the fixed end of the mobile power source 402 is the cylinder body of the driving hydraulic cylinder, and the power output end of the mobile power source 402 is the piston of the driving hydraulic cylinder. The cylinder body of the driving hydraulic cylinder is fixedly connected to the base 4 and the cylinder body of the driving hydraulic cylinder is parallel to the sliding direction of the gantry 3. The liquid inlet and outlet ends of the cylinder body of the driving hydraulic cylinder are both connected to the base 4, and the base 4 provides hydraulic action, and the piston of the driving hydraulic cylinder passes through the avoidance groove 3031 and is fixedly connected to the mounting plate 3032.
[0059] Furthermore, if Figure 4As shown, the drill rod 2 is a multi-stage drill rod, and the drill rod 2 at any pole includes a connector 201 and a rod body 203. The two adjacent stages of the drill rods 2 are detachably connected together by a pin 202. The front end of the rod body 203 of the drill rod 2 at any pole is provided with a connector 201 with a pin hole. The diameter of the connector 201 is larger than the diameter of the drill rod 2. The drill rod 2 at any pole is also provided with a pin hole at the corresponding position after being connected with the connector 201 of the next stage of the drill rod 2. The pin 202 simultaneously passes through the pin holes of the connector 201 and the rod body 203 of two adjacent drill rods 2 to connect the corresponding drill rods 2, so that the drill rod 2 of the drilling equipment can be disassembled during transportation, thereby ensuring the drilling effect of the drill rod 2 for drilling holes of different depths and facilitating transportation to complex environments such as mountainous areas for practical use.
[0060] Furthermore, a card plate is slidably provided on the base 4, and the sliding direction of the card plate is perpendicular to the axis of the drill rod 2. The sliding of the card plate can be completed manually by on-site personnel, and can also be slidably installed on the gantry 3; the distance between the top surface of the card plate and the crossbeam 301 of the gantry 3 is greater than the length of any level of the drill rod 2, and the contact surface of the card plate with the drill rod 2 can fit with the rod body 203 of the drill rod 2 when sliding. Since any pole drill rod 2 is provided with a connecting head 201 and the diameter of the connecting head 201 is greater than the diameter of the drill rod 2, when the card plate slides to contact the rod body 203 of the drill rod 2, the connecting head 201 will be stuck by the card plate and cannot be lowered, so that the card plate can clamp the connection position of two adjacent drill rods 2, so that the drilling equipment can disassemble and assemble the drill rod 2 step by step on site.
[0061] The preferred embodiment of the present invention further provides a method for discharging soil from a foundation pile of an electric power tower, including a drilling device for a foundation pile of an electric power tower, and the method for discharging soil comprises:
[0062] In the step of starting drilling, the power head 304 stops working, the crossbeam 301 moves upward, and the drill rod 2 drives the drill bit 1 to be lifted out of the drill hole.
[0063] In the soil discharge step, the mobile power source 402 pushes the vertical beam 302 to make the gantry 3 slide, and the drill bit 1 follows the gantry 3 to slide to a position away from the drilling hole. At this time, the power head 304 is restarted.
[0064] The working process of the present invention is as follows: first, the power head 304 stops working, and the crossbeam 301 of the gantry 3 moves up to lift the drill rod 2 and the drill bit 1 out of the working surface. It is determined whether it is necessary to disassemble the multi-stage drill rod 2 using the clamping plate and the latch 202 according to on-site requirements. Then, the gantry 3 is pushed to slide by the mobile power source 402, so that the gantry 3 slides along the guiding direction of the guide rail 401 to a position away from the borehole and the equipment base 4. Finally, the power head 304 is restarted to rotate the drill bit 1, thereby clearing out the soil debris and rock cuttings remaining on the drill bit 1, and the soil discharge operation of the drill bit 1 is completed.
[0065] In summary, the drilling equipment is implemented by slidingly installing the gantry 3 on which the drill rod 2 and the drill bit 1 are installed on the base 4, and using the mobile power source 402 to provide it with mobile power, so that the drill bit 1 of the drilling equipment can be moved to a position away from the borehole and the equipment base 4 for soil discharge. In order to ensure stability during the movement, the present drilling equipment is provided with a guide beam 303 at the bottom end of the vertical beam 302 of the gantry 3. The guide beam 303 cooperates with the guide slide rail 401 on the base 4, and can stably move the gantry 3 with a large mass to avoid equipment damage caused by shaking inertia; by setting the drill rod 2 as a multi-stage drill rod 2, the difficulty of transporting the drilling rig to complex terrain conditions is reduced, so that the present drilling equipment can adapt to the foundation pile drilling work of the power tower, thereby solving the problem in the prior art that when the drill bit 1 is cleaning slag, soil residue and rock cuttings are easily dropped into the pile hole or the equipment base 4, thereby reducing the working efficiency of the drill bit 1.
[0066] It should be understood that the terms "first", "second", etc. are used in the present invention to describe various information, but such information should not be limited to these terms, and these terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present invention, the "first" information may also be referred to as the "second" information, and similarly, the "second" information may also be referred to as the "first" information. In addition, the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0067] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. A power tower foundation pile drilling device, characterized in that: The drilling equipment comprises: A base, wherein a plurality of mobile power sources are arranged on the base; A gantry, wherein the gantry comprises a horizontal beam and two vertical beams, wherein the horizontal beam is slidably mounted between the two vertical beams, wherein the sliding direction of the horizontal beam is parallel to the length direction of the vertical beams, wherein the vertical beams are slidably mounted on the base, wherein the power output ends of a plurality of mobile power sources respectively push the ends of the two vertical beams, wherein the sliding direction of the vertical beams is perpendicular to the length direction of the vertical beams and the vertical beams are close to or away from the base when sliding; A plurality of power heads, wherein the plurality of power heads are fixedly mounted on the crossbeam; A drill rod, which is detachably mounted on the bottom end surface of the horizontal beam, the axis of which is parallel to the length direction of the vertical beam, and is driven to rotate by the power output ends of a plurality of power heads; A drill bit is fixedly mounted on the bottom end of the drill rod.
2. The power tower foundation pile drilling equipment according to claim 1, characterized in that: A guide beam is fixedly mounted on the bottom end surface of the vertical beam; A plurality of guide rails are arranged on the top surface of the base, and the guiding direction of the guide rails is parallel to the sliding direction of the vertical beam; A sliding plate is provided between the bottom end surface of the guide beam and the base, and a connecting rail is provided on a side of the sliding plate close to the guide rail; The length direction of the connecting slide rail is consistent with the guiding direction of the guiding slide rail, and the connecting slide rail is slidably connected to the guiding slide rail.
3. The power tower foundation pile drilling equipment according to claim 2, characterized in that: Any of the guide beams is provided with an avoidance groove; The length direction of the guide beam is parallel to the sliding direction of the vertical beam; The two ends of the avoidance groove respectively penetrate the two end surfaces of the guide beam located in the sliding direction of the vertical beam, the axis of the avoidance groove is parallel to the length direction of the guide beam, and a mounting plate is provided at one end of the avoidance groove away from the mobile power source; There are two mobile power sources, which are respectively located at the ends of two vertical beams. The power output end of the mobile power source extends from one end of the avoidance groove and extends from the other end of the avoidance groove. The mobile power source is fixedly connected to the guide beam through the mounting plate.
4. The power tower foundation pile drilling equipment according to claim 2, characterized in that: The guide rail is evenly divided into a plurality of sections along the sliding direction of the vertical beam, and the length of the connecting rail is greater than the distance between any two adjacent guide rail sections.
5. The power tower foundation pile drilling equipment according to claim 1, characterized in that: The moving power source is a driving hydraulic cylinder, and the extension and retraction direction of the piston of the driving hydraulic cylinder is parallel to the sliding direction of the vertical beam.
6. The power tower foundation pile drilling equipment according to claim 1, characterized in that: The drill rod is a multi-stage drill rod, and the multi-stage drill rods are detachably connected together by latches.
7. The power tower foundation pile drilling equipment according to claim 6, characterized in that: A clamping plate is slidably arranged on the base, the sliding direction of the clamping plate is perpendicular to the axis of the drill rod, the distance between the top surface of the clamping plate and the crossbeam is greater than the length of any level of the drill rod, and the clamping plate clamps the connection position of two adjacent drill rods.
8. A method for discharging soil from foundation piles of an electric power tower, characterized in that: Using the power tower foundation pile drilling equipment described in claims 1-7, the soil discharge method includes: In the drilling step, the power head stops working, and the crossbeam moves upward to drive the drill bit to be lifted out of the drill hole; In the soil discharge step, the mobile power source pushes the vertical beam to slide, and the drill bit follows the vertical beam to slide to a position away from the drill hole. At this time, the power head is restarted.
Citation Information
Patent Citations
Hydraulic engineering driller
CN103225479A
Horizontal sleeve type connector for deep water manifold
CN103510927A
Directional exploration drilling equipment capable of actively discharging materials
CN116658075A
Detachable mountain miniature pile drilling machine
CN218971130U
Drilling apparatus
EP0087917A1