Fabricated building collaborative design method and system based on BIM

By analyzing designer roles and responsibilities in prefabricated building collaborative design, adjusting editing permissions, identifying building elements, detecting design conflicts, simulating component stress distribution, evaluating structural stability, planning construction sequences, and predicting costs, the problems of uneven information flow and poor adaptability to market changes in traditional methods are solved, and more efficient project management and construction coordination are achieved.

CN119579112AActive Publication Date: 2025-03-07中核第七研究设计院有限公司

Patent Information

Application Number
CN202411743587.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-30
Publication Date
2025-03-07
Estimated Expiration
2044-11-30

AI Technical Summary

Technical Problem

The traditional prefabricated building collaborative design method lacks the analysis and editing authority allocation of designer roles and responsibilities, resulting in uneven information flow and untimely update and conveying key information, which increases workload and error risks, and cannot effectively predict and adapt to market changes, resulting in project cost overruns and construction delays.

Method used

A prefabricated building collaborative design method based on BIM is provided. By analyzing the role positioning and scope of responsibilities of multiple designers, adjusting designer editing permissions, identifying building elements and matching label information, detecting design conflicts, generating design change records, simulating component stress distribution, evaluating structural stability, planning construction sequences, and predicting costs.

Benefits of technology

It improves the accuracy and efficiency of project management, reduces design errors, foresees and solves early problems, avoids modifications in the construction stage, effectively controls the project budget, and improves the coordination of architectural design and construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119579112A_ABST
    Figure CN119579112A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building information models, in particular to a BIM-based fabricated building collaborative design method and system, and the method comprises the following steps: based on project personnel information, analyzing role positioning and responsibility ranges of a plurality of designers, adjusting the editing authority of the designers, matching task demands, and according to input design information, carrying out the collaborative design of a fabricated building; and identifying the various types of building elements and matching the labeling information, and generating the labeling information of the building elements. According to the method, by analyzing role positioning and responsibility ranges of multiple designers, allocating design editing permissions, improving the accuracy and efficiency of project management, analyzing building design and carrying out conflict detection on building elements, design errors are reduced, and by combining structural stability analysis, problems are foreseen and solved in the early stage of design, and the design efficiency is improved. According to the method, modification in the construction stage is avoided, project budget is effectively controlled through construction sequence planning, resource demand prediction and cost calculation, and the collaboration of building design and construction is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building information modeling, and in particular to a method and system for collaborative design of prefabricated buildings based on BIM. Background Art

[0002] The field of building information modeling technology focuses on using digital information models to manage the design, construction and maintenance processes of construction projects. By providing a three-dimensional, real-time and dynamic building design database, it helps architects, engineers and construction teams to achieve efficient circulation and updating of information during the life cycle of a building, and conduct multi-dimensional simulations, including geometry, spatial relationships, geographic information, and properties of building components, such as material performance and cost, to improve the accuracy of engineering design, optimize resource allocation, reduce costs, and predict potential problems through simulation analysis to achieve efficient and economical project management.

[0003] Among them, the collaborative design method of prefabricated buildings focuses on optimizing the design, manufacturing and assembly processes of prefabricated building elements, aiming to improve the design efficiency and construction accuracy of prefabricated building projects. By integrating the data and workflows of all project participants on a digital platform, real-time sharing of design data and building information can be achieved, and a high degree of design collaboration and precise control of engineering construction can be achieved. The construction speed and quality of construction projects can be improved, and the cost and time consumption caused by errors can be reduced. It is applied to highly standardized and modular prefabricated building projects to discover and solve potential design and construction problems in the early stages of the project, so as to achieve the smooth completion and quality assurance of construction projects.

[0004] Traditional collaborative design methods for prefabricated buildings lack analysis of designer roles and responsibilities and allocation of editing permissions, resulting in uneven distribution of information flow within the project team. Key information cannot be updated or communicated to relevant responsible persons in a timely manner. Real-time conflict detection and change records rely on manual intervention, which increases workload and the risk of errors. The capabilities for automated construction planning and cost control are limited, and the inability to effectively predict and adapt to market changes leads to project cost budget overruns. In the case of large fluctuations in resource availability, it is difficult to quickly adjust construction plans and cost budgets, resulting in project delays and cost increases, reduced construction efficiency and increased project costs. Summary of the invention

[0005] In order to solve the technical problems existing in the prior art, the embodiment of the present invention provides a method and system for collaborative design of prefabricated buildings based on BIM. The technical solution is as follows:

[0006] On the one hand, a BIM-based prefabricated building collaborative design method is provided, the method comprising:

[0007] S1: Based on the project personnel information, by analyzing the role positioning and responsibilities of multiple designers, adjusting the designer's editing permissions, matching the task requirements, and according to the input design information, identifying multiple types of architectural elements and matching the annotation information, generating architectural element annotation information;

[0008] S2: Based on the architectural element annotation information, analyze the design input, detect the spatial layout conflicts of multiple architectural elements in the design, send prompt information, record the design changes, and generate design change record data;

[0009] S3: using the design change record data, extracting the position, size, and material information of multiple building components according to the target building design information, simulating the stress distribution and deformation of multiple components, predicting the stability of multiple structural elements, evaluating the integrity of the building design, and generating structural stability analysis results;

[0010] S4: Analyze the dependency relationship between multiple building components according to the structural stability analysis results, plan the construction sequence of the target building design in combination with the resource availability of the target engineering project, and generate project construction sequence information;

[0011] S5: Using the project construction sequence information, according to the project scale and design complexity, predict the human and material resources required for the project, and calculate the project cost in combination with real-time market dynamics to generate project cost forecast information.

[0012] As a further solution of the present invention, the building element annotation information includes size and material information of the building elements, a building element location data set, and an editing authority allocation record; the design change record data includes a timestamp of the change operation, identity information of the person responsible for the change, and modification location information; the structural stability analysis results include identified structural weakness information, predicted component deformation, and building structure integrity assessment results; the project construction sequence information includes priority sorting information of construction tasks, a list of resources required for multiple tasks, and construction phase time planning information; the project cost forecast information includes building material cost calculation results, labor cost estimation information, and equipment and tool forecast costs.

[0013] As a further solution of the present invention, based on the project personnel information, by analyzing the role positioning and scope of responsibilities of multiple designers, adjusting the designer editing permissions, matching the task requirements, and identifying multiple types of architectural elements and matching the annotation information according to the input design information, the specific steps of generating the architectural element annotation information are as follows:

[0014] S101: Based on the project personnel information, collect the role and responsibility information of multiple members in the project team, analyze the work scope of multiple designers, including circuit planning and pipeline planning, and obtain the role positioning analysis results;

[0015] S102: Based on the role positioning analysis result, and according to the role positioning and the scope of responsibilities, editing permissions are assigned to multiple designers to obtain permission configuration records;

[0016] S103: Using the permission configuration record, annotate the building elements in the input design information, including doors, windows, walls, stairs, wires and water pipes, and generate building element annotation information.

[0017] As a further solution of the present invention, based on the architectural element annotation information, the design input is analyzed, the spatial layout conflicts of multiple architectural elements in the design are detected, prompt information is sent, and the design changes are recorded. The specific steps of generating the design change record data are:

[0018] S201: using the architectural element annotation information, identifying and detecting layout conflicts between multiple architectural elements, including spatial overlaps between doors and stairs, and obtaining conflict detection results;

[0019] S202: Based on the conflict detection result, according to the conflict position information, matching prompt information and sending it to the designer, obtaining a conflict handling prompt message;

[0020] S203: Based on the conflict handling prompt message, the design changes of the target project are recorded in real time, including the modified architectural elements, the modifier, and the modification time, and design change record data is generated.

[0021] As a further solution of the present invention, the design change record data is used to extract the position, size, and material information of multiple building components according to the target building design information, simulate the stress distribution and deformation of multiple components, predict the stability of multiple structural elements, evaluate the integrity of the building design, and generate the structural stability analysis results in the following specific steps:

[0022] S301: extracting key parameters of multiple building components in the target design, including position, size and material type, using the design change record data to obtain component information extraction data;

[0023] S302: extracting data based on the component information, analyzing and identifying intersections, contact points and pressure areas between components, and obtaining component interaction analysis results;

[0024] S303: Using the component interaction analysis results, simulate the stress distribution of multiple components under actual loads, calculate deformation, predict the stability of the structure and evaluate the integrity of the building design, and generate structural stability analysis results.

[0025] As a further solution of the present invention, the specific formula for calculating the deformation is:

[0026]

[0027] Among them, F represents the force applied to the component, L represents the length of the component, w represents the width of the component, t represents the thickness of the component, E represents the elastic modulus of the material, and S is the theoretical deformation of the component under a given load, which is used to evaluate the stability and safety of the component under actual load conditions.

[0028] As a further solution of the present invention, according to the structural stability analysis results, the dependency relationship between multiple building components is analyzed, and the construction sequence of the target building design is planned in combination with the resource availability of the target engineering project. The specific steps of generating the project construction sequence information are as follows:

[0029] S401: Identify dependencies between multiple building components based on the structural stability analysis result, evaluate construction sequences required for multiple constructions, and obtain component dependency data;

[0030] S402: Analyze project resource information, including material supply, human resources, and availability of engineering equipment, based on the component dependency data to obtain project resource availability information;

[0031] S403: Based on the project resource availability information, taking into account the dependencies of multiple building components and the availability of project resources, planning the construction sequence of the project, and adjusting resource allocation of multiple construction phases to generate project construction sequence information.

[0032] As a further solution of the present invention, the project construction sequence information is used to predict the human and material resources required for the project according to the project scale and design complexity, and the project cost is calculated in combination with real-time market dynamics. The specific steps of generating project cost forecast information are as follows:

[0033] S501: Based on the project construction sequence information and taking into account the project scale, the types and quantities of materials required in multiple construction phases are evaluated to generate a material resource requirement list;

[0034] S502: Based on the material resource requirement list, analyzing the human resources and construction equipment required in multiple construction phases, and generating human resources and equipment requirement information;

[0035] S503: Using the manpower and equipment demand information, according to the manpower, material and construction equipment demand, combined with the real-time market price, the construction cost of the target project is calculated to generate project cost forecast information.

[0036] As a further solution of the present invention, the specific formula for calculating the construction cost of the target project is:

[0037] C=((p×r+q×s+t×u)×v)×w

[0038] Among them, C represents the total construction cost, which is used to estimate the total cost required to complete the entire construction project, p represents the unit price of human resources, which represents the market salary of different types of human resources, r represents the number of human resources required for unit scale, q represents the unit price of material resources, which is directly related to the material cost, s represents the number of material resources required for unit scale, t represents the usage rate of construction equipment, u represents the equipment usage time required for unit scale, v represents the project scale, and w is the comprehensive adjustment coefficient, which is used to adjust the total cost according to other external factors.

[0039] On the other hand, a BIM-based prefabricated building collaborative design system is provided, and the system is applied to a BIM-based prefabricated building collaborative design method, and the system includes:

[0040] The authority management module is based on project personnel information. By analyzing the role information and responsibilities of multiple members of the design team, it adjusts the editing permissions of multiple designers, matches task requirements, and generates editing permission allocation records;

[0041] The information annotation module identifies a plurality of building elements in the input design information based on the editing authority allocation record, including doors, windows, and stairs, and matches the annotation information according to the type, size, and material of the elements to generate the building element annotation information;

[0042] The element conflict detection module uses the architectural element annotation information to analyze the relative positions of multiple architectural elements in the spatial layout, detect spatial layout conflicts and send prompt information to designers, record design changes, including the executor and time of the changes, and generate design change record data;

[0043] The building design analysis module uses the design change history record to extract the location, size, and material information of multiple building components, simulates the stress distribution and deformation of multiple components under actual loads, evaluates the stability of structural elements and the integrity of the building design, and generates structural stability analysis results;

[0044] The construction sequence planning module uses the structural stability analysis results to analyze the dependencies between multiple building components, combines the availability of project resources, plans the construction sequence, and generates project construction sequence information;

[0045] The construction cost calculation module analyzes and predicts the manpower and material requirements of the target project based on the project construction sequence information, analyzes the project cost in combination with market dynamics, and generates project cost forecast information.

[0046] The beneficial effects brought about by the technical solution provided by the embodiment of the present invention include at least:

[0047] By analyzing the roles and responsibilities of multiple designers, allocating design editing permissions, improving the accuracy and efficiency of project management, analyzing architectural design and performing conflict detection on architectural elements, reducing design errors, and combining structural stability analysis to foresee and solve problems in the early stages of design to avoid modifications during the construction phase. Through construction sequence planning, resource demand forecasting and cost calculation, the project budget is effectively controlled, thereby improving the coordination of architectural design and construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0049] Figure 1 It is a schematic diagram of the workflow of the present invention;

[0050] Figure 2 This is a detailed flow chart of S1 of the present invention;

[0051] Figure 3 This is a detailed flow chart of S2 of the present invention;

[0052] Figure 4 This is a detailed flow chart of S3 of the present invention;

[0053] Figure 5 This is a detailed flow chart of S4 of the present invention;

[0054] Figure 6 This is a detailed flow chart of S5 of the present invention;

[0055] Figure 7 It is a system flow chart of the present invention. DETAILED DESCRIPTION

[0056] The technical solution of the present invention is described below in conjunction with the accompanying drawings.

[0057] In the embodiments of the present invention, words such as "exemplarily" and "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "example" in the present invention should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of the word "example" is intended to present the concept in a specific way. In addition, in the embodiments of the present invention, the meaning expressed by "and / or" can be both, or it can be either of the two.

[0058] In the embodiments of the present invention, "image" and "picture" can sometimes be used interchangeably. It should be noted that when the difference between them is not emphasized, the meanings they intend to express are the same. "of", "corresponding, relevant" and "corresponding" can sometimes be used interchangeably. It should be noted that when the difference between them is not emphasized, the meanings they intend to express are the same.

[0059] In the embodiments of the present invention, sometimes a subscript such as W1 may be written as a non-subscript such as W1. When the difference is not emphasized, the meanings to be expressed are the same.

[0060] In order to make the technical problems, technical solutions and advantages to be solved by the present invention more clear, a detailed description will be given below with reference to the accompanying drawings and specific embodiments.

[0061] The embodiment of the present invention provides a method for collaborative design of prefabricated buildings based on BIM, such as Figure 1 The flowchart of the BIM-based prefabricated building collaborative design method is shown in the figure. The processing flow of the method may include the following steps:

[0062] S1: Based on the project personnel information, by analyzing the role positioning and responsibilities of multiple designers, adjusting the designer's editing permissions, matching the task requirements, and according to the input design information, identifying multiple types of architectural elements and matching the annotation information, generating architectural element annotation information;

[0063] S2: Based on the annotation information of architectural elements, analyze the design input, detect the spatial layout conflicts of various architectural elements in the design, send prompt information, record the design changes, and generate design change record data;

[0064] S3: Using the design change record data, according to the target building design information, extract the location, size, and material information of multiple building components, simulate the stress distribution and deformation of multiple components, predict the stability of multiple structural elements, evaluate the integrity of the building design, and generate structural stability analysis results;

[0065] S4: Analyze the dependencies among multiple building components based on the structural stability analysis results, plan the construction sequence of the target building design in combination with the resource availability of the target engineering project, and generate project construction sequence information;

[0066] S5: Use the project construction sequence information to predict the human and material resources required for the project based on the project scale and design complexity, combine with real-time market dynamics, calculate the project cost, and generate project cost forecast information.

[0067] The building element annotation information includes the size and material information of the building elements, the building element location data set, and the editing permission allocation record. The design change record data includes the timestamp of the change operation, the identity information of the person responsible for the change, and the modification location information. The structural stability analysis results include the identified structural weakness information, the predicted component deformation, and the building structure integrity assessment results. The project construction sequence information includes the priority sorting information of the construction tasks, the list of resources required for multiple tasks, and the construction phase time planning information. The project cost forecast information includes the building material cost calculation results, the labor cost estimation information, and the equipment and tool forecast costs.

[0068] See also Figure 2 ,Based on the project personnel information, by analyzing the role positioning and responsibilities of multiple designers,adjusting the designer's editing permissions, matching the task requirements, and identifying multiple types of architectural elements and matching the annotation information according to the input design information,the specific steps for generating architectural element annotation information are:

[0069] S101: Based on the project personnel information, collect the role and responsibility information of multiple members in the project team, analyze the work scope of multiple designers, including circuit planning and pipeline planning, and obtain the role positioning analysis results;

[0070] In sub-step S101, based on the project personnel information, through data collection and content analysis, the roles and responsibilities of each member of the project team are collected and organized, including data entry and role definition processes. The system will automatically import the basic information of employees from the human resources management system, including name, title, historical project experience, etc., and obtain information on responsibilities and expertise through semi-structured interviews and questionnaires, such as the design field in which the individual is good at, and the specific work in circuit or pipeline planning in the past. Text analysis techniques such as natural language processing are used to parse the collected text data, extract keywords and phrases from it, and identify the designer role classification. The designers are grouped according to their responsibilities and expertise through cluster analysis methods. Each group represents a role positioning, such as circuit planner, pipeline engineer, etc., and the role positioning analysis results are obtained.

[0071] S102: Based on the role positioning analysis result, editing permissions are assigned to multiple designers according to the role positioning and the scope of responsibilities, and permission configuration records are obtained;

[0072] In sub-step S102, based on the role positioning analysis results, the rule-based permission allocation system is used to configure permissions and define the permission levels corresponding to each role type. Circuit planners obtain editing permissions for circuit-related design documents, while pipeline engineers are limited to the pipeline design part. The system will retrieve the role positioning analysis results from the database and automatically match the responsibilities of each designer with the corresponding permission template. In the permission allocation process, a decision support module is used to handle complex permission conflicts and dependencies to ensure that the reasonable allocation of permissions will not affect the overall security and data consistency of the project. After the permission configuration is completed, the generated permission configuration record lists the name, role, and corresponding permission details of each designer to ensure that the design team can collaborate efficiently without permission conflicts.

[0073] S103: Using the permission configuration record, annotating the building elements in the input design information, including doors, windows, walls, stairs, wires and water pipes, and generating building element annotation information;

[0074] In sub-step S103, based on the authority configuration record, information annotation and data linking technology are used to annotate the architectural elements in the input design information, and the design drawings and related technical documents are imported from the project management software. The target file includes the information of unannotated architectural elements. The system identifies the designers who have access to the target file through the authority configuration record and automatically provides them with annotation tools. The designers use the target tools to annotate the doors, windows, walls, stairs, wires and water pipes in the drawings, and check the accuracy and completeness of each annotation in real time. Image recognition algorithms and pattern matching algorithms are used in the process to ensure that each annotation accurately corresponds to the shape and position of the actual element. The generated architectural element annotation information includes element type, size, position, and annotator information. The target data is stored in the project database for subsequent design and construction.

[0075] See also Figure 3 ,Based on the annotation information of architectural elements, analyze the design input, detect the spatial layout conflicts of various architectural elements in the design, send prompt information, and record the design changes. The specific steps of generating design change record data are:

[0076] S201: using the building element annotation information, identifying and detecting layout conflicts between multiple building elements, including spatial overlaps of doors and stairs, and obtaining conflict detection results;

[0077] In sub-step S201, based on the annotation information of architectural elements, a spatial analysis algorithm is used to identify layout conflicts between multiple architectural elements. All annotated architectural element information, including the position, size and type of each element, is extracted from the database. Using spatial analysis techniques, such as a two-dimensional geometric overlap detection algorithm, the system calculates the spatial relationship between every two elements and pays attention to element combinations that are prone to cause problems, such as doors and stairs. When it is detected that the opening range of the door overlaps with the space of the staircase entrance, the algorithm will mark the conflict. The analysis process not only depends on the physical size of the elements, but also takes into account their functional requirements, such as sufficient space must be left for the opening of the door, and the stairs need to meet the safety entry and exit specifications. After the analysis is completed, the conflict detection results are generated, listing the conflict type, involved elements, and location information.

[0078] S202: Based on the conflict detection result and the conflict position information, matching prompt information is sent to the designer to obtain a conflict handling prompt message;

[0079] In sub-step S202, based on the conflict detection results, a customized notification dispatch system is used to send conflict handling prompt messages to the designer. According to the specific location information in the conflict detection results, targeted prompt information is generated through the internal message creation module. For example, if a spatial conflict between a door and a staircase is detected, a suggestion message is automatically generated to adjust the position of the door or staircase to resolve the conflict. The generated prompt information includes the conflict type, suggested modification measures, and impact assessment. The messages sent will record the sending time and recipient information to ensure that each designer receives it in a timely manner and can respond quickly to the conflict.

[0080] S203: Based on the conflict handling prompt message, the design changes of the target project are recorded in real time, including the modified architectural elements, the modifier, and the modification time, and the design change record data is generated;

[0081] In sub-step S203, based on the conflict handling prompt message, real-time data tracking technology is used to record all design changes. When the designer modifies the design of the building element according to the prompt message, the design change record function is triggered. The modification includes changing the position and size of the element. Each modification requires confirmation by the designer. The design change data recorded by the system includes the specific information of the modified building element, the name of the designer who performs the modification, the exact time when the modification is completed, and the comparison of the elements before and after the modification, which helps the project team to clearly understand the impact of each modification. In this way, the generated design change record data provides a comprehensive and traceable design modification history for project management, ensuring the integrity of project documents and the accuracy of updates.

[0082] See also Figure 4, using the design change record data, according to the target building design information, extract the location, size, and material information of multiple building components, simulate the stress distribution and deformation of multiple components, predict the stability of multiple structural elements, evaluate the integrity of the building design, and generate the structural stability analysis results in the following specific steps:

[0083] S301: extracting key parameters of multiple building components in the target design, including position, size and material type, using the design change record data to obtain component information extraction data;

[0084] In sub-step S301, the design change record data is used to extract multiple key parameters of building components in the target design through data mining technology, and the design change records stored in the database are accessed. The target record describes the content of each design change, including the changed component type, location, size and material type. Data extraction algorithms such as SQL query and regular expression matching are used to standardize the target data to ensure a unified information format for subsequent analysis. During the process, the parameters of each building component such as location coordinates, length, width and type of material used are clearly recorded to form structured component information extraction data. The target data is stored in a special analysis module for structural analysis.

[0085] S302: extracting data based on component information, analyzing and identifying intersections, contact points and pressure areas between components, and obtaining component interaction analysis results;

[0086] In sub-step S302, data is extracted based on component information, and geometric and physical analysis tools are used to identify intersections, contact points and pressure areas between components. The collision detection function in the CAD software and the customized spatial analysis script are used. The target tool can process a large amount of component data and identify the spatial relationships that cause structural problems. By analyzing the relative position and size of each pair of components, potential intersections and contact points are marked. For the analysis of pressure areas, mechanical simulation software is used. The software predicts the maximum pressure under normal use based on the material properties and connection methods of the components. After the analysis is completed, the component interaction analysis results are generated. The target results explain the identified problem areas and their impact on structural safety.

[0087] S303: Using the component interaction analysis results, simulate the stress distribution of multiple components under actual loads, calculate the deformation, predict the stability of the structure and evaluate the integrity of the building design, and generate structural stability analysis results;

[0088] The specific formula for calculating deformation is:

[0089]

[0090] Among them, F represents the force applied to the component, L represents the length of the component, w represents the width of the component, t represents the thickness of the component, E represents the elastic modulus of the material, and S is the theoretical deformation of the component under a given load, which is used to evaluate the stability and safety of the component under actual load conditions.

[0091] formula:

[0092]

[0093] Detailed explanation of the formula and the process of formula calculation and derivation:

[0094] The formula is used to calculate the theoretical deformation of components and evaluate the stability of building structures under load.

[0095] Parameter meaning and setting value:

[0096] F is the force applied to the component, assumed to be 1000N, representing the stress state of the building component under load.

[0097] L is the length of the component, assumed to be 2m, representing the length of a supporting beam.

[0098] E is the elastic modulus of the material, which is assumed to be 2×10 9 Pa reflects the material's ability to resist deformation.

[0099] w is the width of the component, assumed to be 0.1m, representing the width of a supporting beam.

[0100] t is the thickness of the component, assumed to be 0.01m.

[0101] Substitute the parameters into the formula for calculation:

[0102]

[0103]

[0104]

[0105] The result 0.001m indicates that under given load and material properties, the deformation of the component is 0.001 meter. The result is used to confirm the reliability and safety of component design and analyze the stability in practical applications.

[0106] See also Figure 5 ,According to the results of structural stability analysis, the dependencies between multiple building components are analyzed, and the construction sequence of the target building design is planned in combination with the resource availability of the target engineering project. The specific steps for generating project construction sequence information are as follows:

[0107] S401: According to the structural stability analysis results, identify the dependency relationship between multiple building components, evaluate the construction sequence required for multiple constructions, and obtain component dependency relationship data;

[0108] In sub-step S401, based on the results of structural stability analysis, dependency analysis technology is used to identify the interdependencies between building components. Using the results provided by the structural analysis software, the target results show the behavior and interaction of each component when subjected to force. The interaction between the target components is converted into a dependency graph using a graph theory algorithm, in which nodes represent components and edges represent the dependencies between components. By analyzing the target dependencies, it is determined which components are key support elements and which components need to be constructed first. In the process, the algorithm takes into account the physical location, size and functional importance of the components to ensure the scientificity and rationality of the construction sequence. The component dependency data obtained lists all components and their dependencies, providing a basis for further planning of the construction sequence.

[0109] S402: Analyze project resource information, including material supply, human resources, and availability of engineering equipment, based on component dependency data to obtain project resource availability information;

[0110] In sub-step S402, based on the component dependency data, the information of project resources is analyzed, and a resource matching algorithm is used to define project resources including material supply, human resources and engineering equipment. By connecting to the supply chain management system, the supply status of materials is obtained in real time, including inventory, arrival time and price information. For human resources, the skills, work schedules and geographical locations of existing staff are analyzed to determine the available human resources. The availability of engineering equipment is also obtained through the equipment management system, which records the usage, maintenance cycle and performance status of each equipment. After integrating the target information, the optimization algorithm is used to analyze and predict the resources, generate project resource availability information, and ensure maximum efficiency and cost-effectiveness of resource allocation.

[0111] S403: Based on the project resource availability information, considering the dependency relationship of multiple building components and the availability of project resources, planning the construction sequence of the project, and adjusting the resource allocation of multiple construction stages to generate project construction sequence information;

[0112] In sub-step S403, based on the project resource availability information and combined with the component dependency data, the project construction sequence is planned and resource allocation is adjusted. The scheduling module of the construction management software is used to import the component dependency and resource availability data. The linear programming and scheduling optimization algorithms are used to calculate the optimal construction sequence, and the resource allocation is adjusted to match the sequence requirements. During the process, the demand and urgency of resources at each construction stage are considered, and resources are allocated to key tasks and time-sensitive engineering activities in priority. In resource allocation, the system automatically adjusts the allocation plan of manpower, materials and equipment to adapt to changes in the project schedule and actual conditions. After completion, the generated project construction sequence information describes the start and end time of each construction stage, the main resources required and their allocation, to ensure that the project is efficiently advanced as planned.

[0113] See also Figure 6 , using the project construction sequence information, according to the project scale and design complexity, predicting the human and material resources required for the project, combining real-time market dynamics, calculating the project cost, and generating project cost forecast information. The specific steps are:

[0114] S501: Based on the project construction sequence information and considering the project scale, the types and quantities of materials required in multiple construction phases are evaluated to generate a material resource requirement list;

[0115] In sub-step S501, based on the project construction sequence information, demand analysis and resource planning algorithms are used to evaluate the types and quantities of materials required for multiple construction stages. The construction plan imported from the construction sequence database specifies the work content and estimated schedule for each construction stage. The material requirement planning method is used to automatically calculate the specific types and quantities of materials required based on the construction tasks of each stage, such as infrastructure construction, main structure construction, etc., including estimating the consumption rate of each material and making adjustments based on historical data and construction standards. The material resource requirement list generated after completion lists all materials that need to be purchased from the beginning to the end of the project, including steel, concrete, wires, etc. The specifications, quantity and expected use time period of each material provide precise guidance for material procurement and logistics arrangements.

[0116] S502: Based on the material resource requirement list, analyze the human resources and construction equipment required in multiple construction stages, and generate human resources and equipment requirement information;

[0117] In sub-step S502, based on the material resource requirement list, the human resources and equipment management system is used to analyze and calculate the human resources and construction equipment required for each construction stage. The system parses the material requirement list, determines the construction stage and quantity of each material, and derives the labor intensity and technical requirements of the corresponding work. Combined with the overall schedule of the project, resource scheduling algorithms such as linear programming are used to optimize the allocation of human resources and equipment, including calculating the number of workers required for each stage and the usage time of various types of equipment to ensure efficient use of resources. Taking into account the actual availability of manpower and equipment, dynamic adjustments are made to cope with delays or resource shortages. The generated manpower and equipment demand information includes a staffing table and equipment usage plan to ensure the continuity and efficiency of resource supply during the construction process.

[0118] S503: Using the manpower and equipment demand information, according to the manpower, material and construction equipment demand, combined with the real-time market price, the construction cost of the target project is calculated to generate project cost forecast information;

[0119] The specific formula for calculating the construction cost of the target project is:

[0120] C=(p×r+q×s+t×u)×v)×w

[0121] Among them, C represents the total construction cost, which is used to estimate the total cost required to complete the entire construction project, p represents the unit price of human resources, which represents the market salary of different types of human resources, r represents the number of human resources required for unit scale, q represents the unit price of material resources, which is directly related to the material cost, s represents the number of material resources required for unit scale, t represents the usage rate of construction equipment, u represents the equipment usage time required for unit scale, v represents the project scale, and w is the comprehensive adjustment coefficient, which is used to adjust the total cost according to other external factors.

[0122] formula:

[0123] C=((p×r+q×s+t×u)×v)×w

[0124] Detailed explanation of the formula and the process of formula calculation and derivation:

[0125] Formulas are used to calculate and predict total construction costs for a variety of building designs.

[0126] Parameter meaning and setting value:

[0127] p is the unit price of human resources, assuming that each working hour requires 25 yuan.

[0128] r is the number of human resources required for a unit project size. Assume that 1 unit of construction project requires 1,000 working hours.

[0129] q is the unit price of material resources. Assume that the market price of concrete is 120 yuan / cubic meter.

[0130] s is the quantity of material resources required per unit project size. Assume that 1 unit of construction project requires 500 cubic meters of concrete.

[0131] t is the usage rate of construction equipment, assumed to be 100 yuan / hour.

[0132] u is the equipment usage time required for a unit project size. It is assumed that a construction project of 1 unit requires the use of construction equipment for 300 hours.

[0133] v is the project size, assuming the project size is 2.

[0134] w is the comprehensive adjustment coefficient, which takes into account factors such as region and season. It is assumed to be 1.05, indicating that there is a 5% cost increase to cope with possible risks or changes.

[0135] Substitute the parameters into the formula for calculation:

[0136] C=((25×1000+120×500+100×300)×2)×1.05

[0137] C=((25000+60000+30000)×2)×1.05

[0138] C = (115000 × 2) × 1.05

[0139] C = 230000 × 1.05

[0140] C=241500

[0141] The result 241500 indicates that the total cost of the project is 241500 yuan. This value is used to evaluate and predict the total cost of the target building design and help evaluate the project risk of the design.

[0142] See also Figure 7 , a BIM-based prefabricated building collaborative design system, the BIM-based prefabricated building collaborative design system is used to execute the BIM-based prefabricated building collaborative design method, the system includes:

[0143] The authority management module is based on project personnel information. By analyzing the role information and responsibilities of multiple members of the design team, it adjusts the editing permissions of multiple designers, matches task requirements, and generates editing permission allocation records;

[0144] The information annotation module identifies various building elements in the input design information, including doors, windows, and stairs, based on the editing authority allocation record, and matches the annotation information according to the type, size, and material of the element to generate the architectural element annotation information;

[0145] The element conflict detection module uses the architectural element annotation information to analyze the relative positions of various architectural elements in the spatial layout, detect spatial layout conflicts and send prompt information to designers, record design changes, including the executor and time of the changes, and generate design change record data;

[0146] The building design analysis module uses the design change history to extract the location, size, and material information of multiple building components, simulates the stress distribution and deformation of multiple components under actual loads, evaluates the stability of structural elements and the integrity of the building design, and generates structural stability analysis results;

[0147] The construction sequence planning module uses the structural stability analysis results to analyze the dependencies between multiple building components, combines the availability of project resources, plans the construction sequence, and generates project construction sequence information;

[0148] The construction cost calculation module analyzes and predicts the manpower and material requirements of the target project based on the project construction sequence information, analyzes the project cost in combination with market dynamics, and generates project cost forecast information.

[0149] The above embodiments can be implemented in whole or in part by software, hardware (such as circuits), firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website, computer, server or data center to another website, computer, server or data center by wired (such as infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (for example, a floppy disk, a hard disk, a tape), an optical medium (for example, a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0150] It should be understood that the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. A and B can be singular or plural. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship, but it may also indicate an "and / or" relationship. Please refer to the context for specific understanding.

[0151] In the present invention, "at least one" means one or more, and "more than one" means two or more. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b, or c can be represented by: a, b, c, ab, ac, bc, or abc, where a, b, c can be single or multiple.

[0152] It should be understood that in various embodiments of the present invention, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.

[0153] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0154] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the above-described equipment, devices and units can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0155] In the several embodiments provided by the present invention, it should be understood that the disclosed devices, apparatuses and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another device, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0156] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0157] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0158] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in various embodiments of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0159] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A BIM-based prefabricated building collaborative design method, characterized in that: The method comprises: Based on the project personnel information, by analyzing the role positioning and responsibilities of multiple designers, the designer's editing permissions are adjusted to match the task requirements. Based on the input design information, multiple types of building elements are identified and the annotation information is matched to generate the building element annotation information. Based on the architectural element annotation information, the design input is analyzed, the spatial layout conflicts of various architectural elements in the design are detected, prompt information is sent, and design changes are recorded to generate design change record data; Utilizing the design change record data, based on the target building design information, extracting the location, size, and material information of multiple building components, simulating the stress distribution and deformation of multiple components, predicting the stability of multiple structural elements, evaluating the integrity of the building design, and generating structural stability analysis results; Analyze the dependency relationship between multiple building components according to the structural stability analysis results, plan the construction sequence of the target building design in combination with the resource availability of the target engineering project, and generate project construction sequence information; The project construction sequence information is used to predict the human and material resources required for the project based on the project scale and design complexity, and the project cost is calculated in combination with real-time market dynamics to generate project cost forecast information.

2. The BIM-based prefabricated building collaborative design method according to claim 1, characterized in that: The building element annotation information includes the size and material information of the building elements, the building element location data set, and the editing authority allocation record; the design change record data includes the timestamp of the change operation, the identity information of the person responsible for the change, and the modification location information; the structural stability analysis results include the identified structural weakness information, the predicted component deformation, and the building structure integrity assessment results; the project construction sequence information includes the priority sorting information of the construction tasks, the list of resources required for multiple tasks, and the construction phase time planning information; the project cost forecast information includes the building material cost calculation results, the labor cost estimation information, and the equipment and tool forecast costs.

3. The BIM-based prefabricated building collaborative design method according to claim 1, characterized in that: Based on the project personnel information, by analyzing the role positioning and responsibilities of multiple designers, adjusting the designer's editing permissions, matching the task requirements, and identifying various types of architectural elements and matching the annotation information based on the input design information, the specific steps for generating architectural element annotation information are as follows: Based on the project personnel information, collect the role and responsibility information of multiple members in the project team, analyze the work scope of multiple designers, including circuit planning and pipeline planning, and obtain the role positioning analysis results; Based on the role positioning analysis results, editing permissions are assigned to multiple designers according to role positioning and scope of responsibilities to obtain permission configuration records; Using the permission configuration record, architectural elements in the input design information are annotated, including doors, windows, walls, stairs, wires and water pipes, to generate architectural element annotation information.

4. The BIM-based prefabricated building collaborative design method according to claim 1, characterized in that: Based on the architectural element annotation information, the design input is analyzed, the spatial layout conflicts of various architectural elements in the design are detected, prompt information is sent, and the design changes are recorded. The specific steps of generating the design change record data are as follows: Using the architectural element annotation information, identifying and detecting layout conflicts between multiple architectural elements, including spatial overlaps of doors and stairs, and obtaining conflict detection results; Based on the conflict detection result, according to the conflict position information, the prompt information is matched and sent to the designer to obtain a conflict handling prompt message; Based on the conflict handling prompt message, the design changes of the target project are recorded in real time, including the modified architectural elements, the modifiers, and the modification time, and the design change record data is generated.

5. The BIM-based prefabricated building collaborative design method according to claim 1, characterized in that: The specific steps of using the design change record data, extracting the position, size, and material information of multiple building components according to the target building design information, simulating the stress distribution and deformation of multiple components, predicting the stability of multiple structural elements, and evaluating the integrity of the building design to generate the structural stability analysis results are as follows: Using the design change record data, extracting key parameters of multiple building components in the target design, including position, size and material type, to obtain component information extraction data; Extract data based on the component information, analyze and identify intersections, contact points and pressure areas between components, and obtain component interaction analysis results; The component interaction analysis results are used to simulate the stress distribution of multiple components under actual loads, calculate deformation, predict the stability of the structure, evaluate the integrity of the building design, and generate structural stability analysis results.

6. The BIM-based prefabricated building collaborative design method according to claim 5 is characterized in that: The specific formula for calculating the deformation is: Among them, F represents the force applied to the component, L represents the length of the component, w represents the width of the component, t represents the thickness of the component, E represents the elastic modulus of the material, and S is the theoretical deformation of the component under a given load, which is used to evaluate the stability and safety of the component under actual load conditions.

7. The BIM-based prefabricated building collaborative design method according to claim 1, characterized in that: According to the structural stability analysis results, the dependencies between multiple building components are analyzed, and the construction sequence of the target building design is planned in combination with the resource availability of the target engineering project. The specific steps for generating the project construction sequence information are as follows: According to the structural stability analysis results, the dependency relationship between multiple building components is identified, the construction sequence required for multiple constructions is evaluated, and component dependency relationship data is obtained; Analyze project resource information, including material supply, human resources, and availability of engineering equipment, based on the component dependency data to obtain project resource availability information; Based on the project resource availability information, the project construction sequence is planned in consideration of the dependency relationship between multiple building components and the availability of project resources, and resource allocation in multiple construction phases is adjusted to generate project construction sequence information.

8. The BIM-based prefabricated building collaborative design method according to claim 1, characterized in that: Using the project construction sequence information, according to the project scale and design complexity, predicting the human and material resources required for the project, combining real-time market dynamics, calculating the project cost, and generating the project cost forecast information are as follows: Based on the construction sequence information of the project, taking into account the project scale, evaluating the types and quantities of materials required for multiple construction phases, and generating a material resource requirement list; Based on the material resource requirement list, analyzing the human resources and construction equipment required in multiple construction phases, and generating human resources and equipment requirement information; The manpower and equipment demand information is used to calculate the construction cost of the target project based on the manpower, material and construction equipment requirements in combination with real-time market prices to generate project cost forecast information.

9. The BIM-based prefabricated building collaborative design method according to claim 8, characterized in that: The specific formula for calculating the construction cost of the target project is: C=((p×r+q×s+t×u)×v)×w Among them, C represents the total construction cost, which is used to estimate the total cost required to complete the entire construction project, p represents the unit price of human resources, which represents the market salary of different types of human resources, r represents the number of human resources required for unit scale, q represents the unit price of material resources, which is directly related to the material cost, s represents the number of material resources required for unit scale, t represents the usage rate of construction equipment, u represents the equipment usage time required for unit scale, v represents the project scale, and w is the comprehensive adjustment coefficient, which is used to adjust the total cost according to other external factors.

10. A BIM-based prefabricated building collaborative design system, the BIM-based prefabricated building collaborative design system is used to implement the BIM-based prefabricated building collaborative design method according to any one of claims 1 to 9, characterized in that: The system comprises: The authority management module is based on project personnel information. By analyzing the role information and responsibilities of multiple members of the design team, it adjusts the editing permissions of multiple designers, matches task requirements, and generates editing permission allocation records; The information annotation module identifies a plurality of building elements in the input design information based on the editing authority allocation record, including doors, windows, and stairs, and matches the annotation information according to the type, size, and material of the elements to generate the building element annotation information; The element conflict detection module uses the architectural element annotation information to analyze the relative positions of multiple architectural elements in the spatial layout, detect spatial layout conflicts and send prompt information to designers, record design changes, including the executor and time of the changes, and generate design change record data; The building design analysis module uses the design change history record to extract the location, size, and material information of multiple building components, simulate the stress distribution and deformation of multiple components under actual loads, evaluate the stability of structural elements and the integrity of the building design, and generate structural stability analysis results; The construction sequence planning module uses the structural stability analysis results to analyze the dependencies between multiple building components, combines the availability of project resources, plans the construction sequence, and generates project construction sequence information; The construction cost calculation module analyzes and predicts the manpower and material requirements of the target project based on the project construction sequence information, analyzes the project cost in combination with market dynamics, and generates project cost forecast information.

Citation Information

Patent Citations

  • Fabricated building design method based on BIM

    CN117195365A

  • Building material and structure selection method and system

    CN117852125A

  • Fabricated steel-concrete composite structure application method based on BIM (Building Information Modeling) technology

    CN118296689A

  • Intelligent cost estimation system based on CAD, coma cloud big data and BIM technology

    CN118521362A

  • BIM-based fabricated building data collaborative management method and system

    CN118760665A

Cited By

  • Fabricated building component management method and system based on BIM

    CN120124174A

  • Fabricated building design construction optimization management system and method based on BIM

    CN120297913A

  • Collaborative design optimization method for forward design of water supply and drainage BIM

    CN120850422A

  • Safety management system and method for building construction based on digital twinning

    CN120911843A