Refrigeration storage system operation control method and device, refrigeration storage system and storage medium
By automatically setting the operating temperature of the cold storage system, the problem of over-cooling in the cold storage system in the existing technology is solved according to the electricity bill and parameters of the electricity price period, and the energy consumption and operation and maintenance costs are reduced.
Patent Information
- Application Number
- CN202411910971.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-24
- Publication Date
- 2025-03-11
AI Technical Summary
When the electricity price period changes in existing cold storage systems, they rely on manual experience to set the operating temperature, resulting in overcooling and increasing energy consumption and operation and maintenance costs.
By determining the operating electricity bill and automatically setting the corresponding operating temperature according to the electricity bill and the parameters of each electricity price period to control the operation of the cold storage system.
It realizes automatic setting of the operating temperature of the cold storage system during each electricity price period, accurately controls the operating temperature and electricity consumption, and reduces energy consumption and operation and maintenance costs.
Smart Images

Figure CN119594665A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of cold storage technology, and in particular to a method and device for controlling the operation of a cold storage system, a cold storage system, a storage medium, and a computer program product. Background Art
[0002] Cold storage systems can be used to store meat, fish, fresh vegetables and fruits, and to preserve and refrigerate items. Cold storage systems usually use the power grid to provide electricity. In order to prevent the items stored in the cold storage from rotting, the cold storage system needs to provide refrigeration in real time according to the demand of the cold storage. The power grid divides a day into multiple electricity price periods according to the changes in the power grid load, and the electricity prices for each electricity price period are different. At present, it is usually time-consuming and laborious to preset the operating temperature of the cold storage system in each electricity price period based on manual experience. In addition, the method of setting the operating temperature of each electricity price period based on manual experience often causes an oversupply of cold storage systems, increases the energy consumption of the cold storage systems, and increases the operation and maintenance costs of the cold storage systems. Summary of the invention
[0003] The present disclosure provides a control method, device, cold storage system, storage medium and computer program product for the operation of a cold storage system. The method can determine the operating electricity fee and, based on the operating electricity fee and the parameters corresponding to each electricity price period, determine the operating temperature corresponding to each electricity price period, so as to control the operation of the cold storage system. The operating temperature can be automatically set and the energy consumption of the cold storage system can be reduced.
[0004] According to a first aspect of the present disclosure, a method for controlling the operation of a cold storage system is provided, comprising: when the power supply mode of the cold storage system is the grid power supply mode, determining a plurality of first operating electricity charges according to the operating hours, electricity prices, first operating temperatures and power consumption coefficients corresponding to each electricity price period of the grid, and the volume information of the cold storage system; wherein the number of the electricity price period is multiple; setting a second operating electricity charge of the cold storage system based on the plurality of first operating electricity charges; determining a second operating temperature corresponding to each electricity price period according to the operating hours, electricity prices and power consumption coefficients corresponding to each electricity price period, and the second operating electricity charge and the volume information; determining a current electricity price period corresponding to the current time, and controlling the operation of the cold storage system according to the second operating temperature corresponding to the current electricity price period.
[0005] Optionally, the power consumption coefficient corresponding to the electricity price period is determined according to the first operating temperature corresponding to the electricity price period, the power consumption and the power consumption duration corresponding to the first operating temperature, and the volume information.
[0006] Optionally, determining the power consumption coefficient corresponding to the electricity price period based on the first operating temperature corresponding to the electricity price period, the power consumption and the power consumption duration corresponding to the first operating temperature, and the volume information includes: calculating a first product of the first operating temperature and the power consumption, and a second product of the power consumption duration and the volume information; and taking the quotient of the first product and the second product as the power consumption coefficient corresponding to the electricity price period.
[0007] Optionally, determining multiple first operating electricity charges based on the operating hours, electricity prices, first operating temperatures and power consumption coefficients corresponding to each electricity price period of the power grid, and the volume information of the cold storage system includes: determining the electricity charge calculation parameters for each electricity price period based on the operating hours and electricity prices corresponding to each electricity price period; determining the sum of the electricity charge calculation parameters for all electricity price periods based on the electricity charge calculation parameters for each electricity price period; determining the sum of the operating hours based on the operating hours corresponding to each electricity price period; determining the first parameter based on the sum of the electricity charge calculation parameters and the sum of the operating hours; determining the second parameter for each electricity price period based on the first operating temperature and power consumption coefficient corresponding to each electricity price period, and the volume information; and calculating the product of the first parameter for each electricity price period and the second parameter to determine the multiple first operating electricity charges.
[0008] Optionally, determining the first parameter according to the sum of the electricity cost calculation parameters and the sum of the operating time includes: calculating a quotient of the sum of the electricity cost calculation parameters and the sum of the operating time to determine the first parameter.
[0009] Optionally, determining the second parameter of each electricity price period based on the first operating temperature and power consumption coefficient corresponding to each electricity price period, and the volume information includes: calculating the product of the power consumption coefficient corresponding to each electricity price period and the volume information, and calculating the quotient of this product and the corresponding first operating temperature to determine the second parameter of each electricity price period.
[0010] Optionally, determining the second operating temperature corresponding to each electricity price period based on the operating hours, electricity price and power consumption coefficient corresponding to each electricity price period, as well as the second operating electricity fee and the volume information includes: determining the time period electricity fee corresponding to each electricity price period based on the operating hours corresponding to each electricity price period and the second operating electricity fee; determining the time period power consumption corresponding to each electricity price period based on the time period electricity fee and electricity price corresponding to each electricity price period; determining the second operating temperature corresponding to each electricity price period based on the time period power consumption, operating hours, power consumption coefficient and the volume information corresponding to each electricity price period.
[0011] Optionally, determining the time period electricity fee corresponding to each electricity price period based on the operating time corresponding to each electricity price period and the second operating electricity fee includes: determining the total operating time of all electricity price periods based on the operating time corresponding to each electricity price period; determining the proportion of the operating time of each electricity price period based on the operating time corresponding to each electricity price period and the total operating time; calculating the product of the second operating electricity fee and the proportion of the operating time of each electricity price period to determine the time period electricity fee corresponding to each electricity price period.
[0012] Optionally, determining the time period power consumption corresponding to each electricity price period according to the time period power charges and power prices corresponding to each electricity price period includes: calculating the quotient of the time period power charges and power prices corresponding to each electricity price period to determine the time period power consumption corresponding to each electricity price period.
[0013] Optionally, determining the second operating temperature corresponding to each electricity price period based on the time period power consumption, operating duration, power consumption coefficient and the volume information corresponding to each electricity price period includes: calculating the product of the operating duration, power consumption coefficient and the volume information corresponding to each electricity price period to determine the third parameter corresponding to each electricity price period; calculating the quotient of the third parameter corresponding to each electricity price period and the time period power consumption to determine the second operating temperature corresponding to each electricity price period.
[0014] Optionally, setting the second operating electricity fee of the cold storage system based on the multiple first operating electricity fees includes: determining a maximum operating electricity fee and a minimum operating electricity fee among the multiple first operating electricity fees; setting the second operating electricity fee based on the maximum operating electricity fee and the minimum operating electricity fee, wherein the maximum operating electricity fee>the second operating electricity fee>the minimum operating electricity fee.
[0015] Optionally, the cold storage system includes a cold storage temperature control device or a refrigeration equipment; controlling the operation of the cold storage system according to the second operating temperature corresponding to the current electricity price period includes: sending the second operating temperature corresponding to the current electricity price period to the cold storage temperature control device or the refrigeration equipment, so that the cold storage temperature control device or the refrigeration equipment performs operating temperature control processing of the cold storage system according to this second operating temperature.
[0016] Optionally, the light intensity of the current environment is obtained; and according to the light intensity, it is determined that the power supply mode of the cold storage system is the grid power supply mode or the photovoltaic power supply mode.
[0017] Optionally, when the power supply mode of the cold storage system is a photovoltaic power supply mode, a cold storage operating temperature corresponding to the photovoltaic power supply mode is obtained; and based on the cold storage operating temperature, the operation of the cold storage system is controlled.
[0018] Optionally, the cold storage system includes a cold storage temperature control device or a refrigeration equipment; controlling the operation of the cold storage system based on the cold storage operating temperature includes: sending the cold storage operating temperature to the cold storage temperature control device or the refrigeration equipment, so that the cold storage temperature control device or the refrigeration equipment performs operating temperature control processing of the cold storage system according to the cold storage operating temperature.
[0019] Optionally, the electricity price period includes: a peak electricity price period, a valley electricity price period, and a flat electricity price period; the first operating temperature includes: a peak operating temperature corresponding to the peak electricity price period, a valley operating temperature corresponding to the valley electricity price period, and a flat operating temperature corresponding to the flat electricity price period; the power consumption coefficient includes: a peak power consumption coefficient corresponding to the peak electricity price period, a valley power consumption coefficient corresponding to the valley electricity price period, and a flat power consumption coefficient corresponding to the flat electricity price period.
[0020] According to a second aspect of the present disclosure, a control device for the operation of a cold storage system is provided, comprising: a cost calculation module for determining a plurality of first operating electricity charges according to the operating hours, electricity prices, first operating temperatures and power consumption coefficients corresponding to the various electricity price periods of the power grid, and the volume information of the cold storage system when the power supply mode of the cold storage system is the power grid power supply mode; wherein the number of the electricity price periods is multiple; a cost setting module for setting a second operating electricity charge for the cold storage system based on the plurality of first operating electricity charges; a temperature determination module for determining a second operating temperature corresponding to each electricity price period according to the operating hours, electricity prices and power consumption coefficients corresponding to the various electricity price periods, and the second operating electricity charge and the volume information; an operation operation module for determining a current electricity price period corresponding to the current time, and controlling the operation of the cold storage system according to the second operating temperature corresponding to the current electricity price period.
[0021] According to a third aspect of the present disclosure, a control device for cold storage system operation is provided, comprising: a memory; and a processor coupled to the memory, wherein the processor is configured to execute the control method for cold storage system operation as described above based on instructions stored in the memory.
[0022] According to a fourth aspect of the present disclosure, a cold storage system is provided, comprising: a cold storage temperature control device or a refrigeration device, and a control device for the operation of the cold storage system as described above.
[0023] According to a fifth aspect of the present disclosure, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and when the instructions are executed by a processor, the control method for the operation of the cold storage system as described above is implemented.
[0024] According to a sixth aspect of the present disclosure, a computer program product is provided, wherein the computer program product stores computer instructions, and when the computer instructions are executed by a processor, the control method for the operation of the cold storage system as described above is implemented.
[0025] The control method, device, cold storage system, storage medium and computer program product of the cold storage system operation disclosed in the present invention determine the operating electricity fee and the operating temperature corresponding to each electricity price period according to the operating electricity fee and the parameters corresponding to each electricity price period, so as to control the operation of the cold storage system. The operating temperature of the cold storage system in each electricity price period can be automatically set, and the operating temperature and electricity consumption of the cold storage system can be accurately controlled, thereby reducing the energy consumption of the cold storage system, reducing the operation and maintenance costs of the cold storage system, and improving the user experience. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] By describing the embodiments of the present disclosure in more detail in conjunction with the accompanying drawings, the above and other purposes, features and advantages of the present disclosure will become more apparent. The accompanying drawings are used to provide a further understanding of the embodiments of the present disclosure and constitute a part of the specification. Together with the embodiments of the present disclosure, they are used to explain the present disclosure and do not constitute a limitation of the present disclosure. The above and other purposes and advantages of the present disclosure will be further described below in conjunction with specific embodiments and with reference to the accompanying drawings. In the accompanying drawings, the same or corresponding technical features or components will be represented by the same or corresponding figure marks.
[0027] Figure 1 Schematic diagram of some embodiments of the control method for cold storage system operation according to the present disclosure;
[0028] Figure 2 A schematic diagram of a flow chart of determining a power consumption coefficient in some embodiments of a method for controlling operation of a cold storage system according to the present disclosure;
[0029] Figure 3 A schematic diagram of a process for determining a first operation electricity fee in some embodiments of a method for controlling operation of a cold storage system according to the present disclosure;
[0030] Figure 4 A schematic diagram of a flow chart of determining a second operating temperature in some embodiments of a method for controlling operation of a cold storage system according to the present disclosure;
[0031] Figure 5 A schematic diagram of a flow chart of determining a power supply mode in some embodiments of a control method for operation of a cold storage system according to the present disclosure;
[0032] Fig. 6A Schematic diagram of modules of some embodiments of the control device for operating the cold storage system according to the present disclosure; Figure 6BSchematic diagram of modules of some embodiments of the control device for operating the cold storage system according to the present disclosure;
[0033] Fig. 7A A schematic diagram of a module of a cost calculation module in some embodiments of a control device for operation of a cold storage system according to the present disclosure; Figure 7B A schematic diagram of a temperature determination module in some embodiments of a control device for cold storage system operation according to the present disclosure;
[0034] Figure 8 Schematic diagram of modules of some further embodiments of the control device for operating the cold storage system according to the present disclosure. DETAILED DESCRIPTION
[0035] Exemplary embodiments of the present disclosure will be described below in conjunction with the accompanying drawings. For the sake of clarity and conciseness, not all features of the embodiments are described in the specification. However, it should be understood that many implementation-specific settings must be made in the process of implementing the embodiments in order to achieve the specific goals of the developer, for example, to meet those restrictions related to the device and the service, and these restrictions may vary depending on the implementation. In addition, it should be understood that although the development work may be very complex and time-consuming, it is only a routine task for those skilled in the art who benefit from the content of this disclosure.
[0036] It should be noted that the relative arrangement of components and steps, the numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present disclosure unless specifically stated otherwise.
[0037] Those skilled in the art can understand that the terms "first" and "second" in the embodiments of the present disclosure are only used to distinguish different steps, devices or modules, etc., and neither represent any specific technical meaning nor indicate the necessary logical order between them.
[0038] It should also be understood that in the embodiments of the present disclosure, “plurality” may refer to two or more than two, and “at least one” may refer to one, two, or more than two.
[0039] It should also be understood that any component, data or structure mentioned in the embodiments of the present disclosure can generally be understood as one or more, unless explicitly limited or otherwise indicated in the context.
[0040] In addition, the term "and / or" in the present disclosure is only a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in the present disclosure generally indicates that the associated objects before and after are in an "or" relationship.
[0041] It should also be understood that the description of the various embodiments in the present disclosure focuses on the differences between the various embodiments, and the same or similar aspects thereof can be referenced to each other, and for the sake of brevity, they will not be described one by one.
[0042] At the same time, it should be understood that for the convenience of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship.
[0043] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the present disclosure, its application, or uses.
[0044] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered as part of the specification.
[0045] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.
[0046] In addition, in order to avoid obscuring the present disclosure due to unnecessary details, only the processing steps and / or device structures closely related to at least the scheme according to the present disclosure are shown in the drawings, and other details that are not closely related to the present disclosure are omitted. It should also be noted that similar reference numerals and letters in the drawings indicate similar items, and therefore once an item is defined in one drawing, it does not need to be discussed again for subsequent drawings.
[0047] Figure 1 Schematic diagram of some embodiments of the control method for cold storage system operation according to the present disclosure, such as Figure 1 As shown, the control method for the operation of the cold storage system includes steps S101-S104.
[0048] Step S101, when the power supply mode of the cold storage system is the grid power supply mode, multiple first operating electricity charges are determined according to the operating time, electricity price, first operating temperature and power consumption coefficient corresponding to each electricity price period of the grid, and volume information of the cold storage system.
[0049] There are multiple electricity price periods. The cold storage system can be a variety of cold storage systems for storing items; when the power supply mode of the cold storage system is the grid power supply mode, the cold storage system is powered by the grid, and the grid can be a city power grid, etc.
[0050] Step S102: setting a second operating electricity fee for the cold storage system based on a plurality of first operating electricity fees.
[0051] Step S103, determining the second operating temperature corresponding to each electricity price period according to the operating time, electricity price and power consumption coefficient corresponding to each electricity price period, as well as the second operating electricity fee and volume information.
[0052] Step S104, determining a current electricity price period corresponding to the current time, and controlling the operation of the cold storage system according to a second operating temperature corresponding to the current electricity price period.
[0053] The control method for the operation of a cold storage system disclosed in the present invention determines the operating electricity cost of the cold storage system, and determines the operating temperature corresponding to each electricity price period according to the operating electricity cost and the parameters corresponding to each electricity price period, so as to control the operation of the cold storage system; the operating temperature of the cold storage system in each electricity price period can be automatically set, and the situation that the operating temperature is set unreasonablely due to relying on manual experience to set the operating temperature, which causes the operating temperature to be lower than the actual required operating temperature, resulting in problems such as excessive cold supply in the cold storage; the operating temperature and electricity consumption of the cold storage system can be accurately controlled, thereby reducing the energy consumption of the cold storage system; the electricity cost can be accurately controlled, thereby reducing the operation and maintenance costs of the cold storage system.
[0054] In some embodiments, the power grid can be divided into multiple electricity price periods according to the load changes of the power grid, and the electricity price periods of the power grid can be obtained through various existing methods. The electricity price periods may include: peak electricity price periods, valley electricity price periods, flat electricity price periods, etc.; and the electricity prices corresponding to the peak electricity price periods, valley electricity price periods, flat electricity price periods, etc. are different.
[0055] The first operating temperature can be set by the user according to the items stored in the cold storage system to meet the storage requirements of the items. The first operating temperature includes the peak operating temperature corresponding to the peak electricity price period, the valley operating temperature corresponding to the valley electricity price period, and the flat operating temperature corresponding to the flat electricity price period; among them, the peak operating temperature (the highest operating temperature of the cold storage)> the flat operating temperature> the valley operating temperature (the lowest operating temperature of the cold storage).
[0056] The power consumption coefficient includes a peak power consumption coefficient corresponding to a peak power price period, a valley power consumption coefficient corresponding to a valley power price period, and a flat power consumption coefficient corresponding to a flat power price period. The second operating temperature includes an operating temperature corresponding to a peak power price period, a valley power price period, a flat power price period, etc.
[0057] By determining the parameters corresponding to peak electricity price periods, trough electricity price periods, and flat electricity price periods, the operating temperature, electricity consumption, etc. of the cold storage system during the peak electricity price periods, trough electricity price periods, and flat electricity price periods can be accurately controlled.
[0058] Figure 2FIG. 1 is a flow chart of determining the power consumption coefficient in some embodiments of the control method for the operation of the cold storage system according to the present disclosure, such as Figure 2 As shown:
[0059] Step S201, determining a power consumption coefficient corresponding to the electricity price period according to a first operating temperature corresponding to the electricity price period, power consumption and power consumption duration corresponding to the first operating temperature, and volume information.
[0060] The power consumption coefficient is an indicator that characterizes the power consumption of the cold storage system. Different cold storage systems may have different power consumption coefficients. By determining the power consumption coefficient of the cold storage system, the energy efficiency of the cold storage system can be determined. Based on the power consumption coefficient, the operating electricity fee, operating temperature and other information can be accurately determined. The power consumption coefficient of the cold storage system can be displayed so that users can know the energy consumption indicators of the cold storage system.
[0061] There are many methods for determining the power consumption coefficient corresponding to the electricity price period. For example, a first product of the first operating temperature and the power consumption, and a second product of the power consumption time and the volume information are calculated; and the quotient of the first product and the second product is used as the power consumption coefficient corresponding to the electricity price period.
[0062] By taking the power consumption of the cold storage system at the first operating temperature, corresponding to unit time and unit volume, as the power consumption coefficient of the cold storage system, the energy consumption level of the cold storage system can be accurately determined, and information such as the operating electricity fee and operating temperature can be accurately determined.
[0063] In some embodiments, the cold storage system includes a plurality of input modules, and the operator can input the volume information of the cold storage system through the input modules as the volume , the stored item information is type A, the storage type of the item is fresh-keeping or refrigeration, etc. The power consumption coefficient can be calculated when receiving the calculation instruction, or it can be calculated and stored in advance.
[0064] The cold storage system can automatically set the first operating temperature according to the stored item type information, etc.; the first operating temperature can also be manually set by the user through the input module. The first operating temperature includes: the peak operating temperature corresponding to the peak electricity price period, the valley operating temperature corresponding to the valley electricity price period, the flat operating temperature corresponding to the flat electricity price period, etc.; the peak operating temperature can be the highest operating temperature of the cold storage system The trough operating temperature can be the lowest operating temperature of the cold storage system. The flat operating temperature can be the normal operating temperature of the cold storage system .
[0065] The power consumption and power consumption duration corresponding to the first operating temperature may be determined in real time or in advance. For example, the power consumption and power consumption duration of the cold storage system at the first operating temperature may be collected in real time or in advance through a variety of power equipment, the power consumption may be the cumulative power consumption, and the power consumption duration may be the cumulative power consumption duration.
[0066] Power consumption refers to power consumption, which includes the maximum operating temperature of the cold storage. Corresponding W1 and the lowest operating temperature of the cold storage Corresponding W2, and normal operating temperature of cold storage Corresponding W3. The power consumption time includes: Corresponding T1 and the lowest operating temperature of the cold storage Corresponding T2, and normal operating temperature of cold storage Corresponding T3.
[0067] The power consumption coefficient calculation can be started by timing setting, automatic or manual. The first product of the first operating temperature and the power consumption is calculated as , calculate the second product of power consumption time and volume information as , the quotient of the first product and the second product is used as the power consumption coefficient corresponding to the electricity price period.
[0068] The formula for calculating the power consumption coefficient is as follows:
[0069] = (Formula 1);
[0070] in, is the nth first operating temperature; Wn is the power usage or power consumption corresponding to the nth first operating temperature, Tn is the power usage time corresponding to the nth first operating temperature; n is 1, 2, 3; V1 is the capacity of the cold storage system.
[0071] Will Substituting W1, T1 into formula 1, we can determine K1, which is the peak power consumption coefficient K corresponding to the peak electricity price period. 波峰 ;Will Substituting W2, T2 into formula 1, we can determine K2, which is the valley power consumption coefficient K corresponding to the valley electricity price period. 波谷 ;Will Substituting W3, T3 into formula 1, we can determine K3, which is the flat power consumption coefficient K corresponding to the flat electricity price period. 波平 .
[0072] Figure 3 FIG. 1 is a flow chart of determining the first operation electricity fee in some embodiments of the control method for the operation of the cold storage system according to the present disclosure, such as Figure 3 As shown:
[0073] Step S301, determining the electricity fee calculation parameters for each electricity price period according to the operation time and electricity price corresponding to each electricity price period.
[0074] Step S302: determining the sum of the electricity fee calculation parameters for all electricity fee time periods according to the electricity fee calculation parameters for each electricity fee time period.
[0075] Step S303: determining the total running time according to the running time corresponding to each electricity price period.
[0076] Step S304, determining a first parameter according to the sum of the electricity fee calculation parameters and the sum of the operating time.
[0077] Step S305 , determining the second parameter of each electricity price period according to the first operating temperature and power consumption coefficient corresponding to each electricity price period, and the volume information.
[0078] Step S306, calculating the product of the first parameter and the second parameter in each electricity price period to determine a plurality of first operating electricity charges.
[0079] Through the parameters corresponding to each electricity price period and the cold storage capacity, multiple first operating electricity charges are determined. Based on the multiple first operating electricity charges, the second operating electricity charges of the cold storage system can be reasonably set to avoid abnormal operation of the cold storage system due to unreasonable setting of the freight and electricity charges of the cold storage. The operating electricity charges of the cold storage system can be controlled, and the operation and maintenance costs of the cold storage system can be reduced.
[0080] There are many methods for determining the first parameter. For example, the quotient of the sum of the electricity cost calculation parameters and the sum of the operating time is calculated to determine the first parameter. By taking the quotient of the sum of the electricity cost calculation parameters and the sum of the operating time as the first parameter, the first parameter can characterize the average power consumption information of the cold storage system operation, which can improve the accuracy of the operation electricity cost determination.
[0081] There are many methods for determining the second parameter of each electricity price period. For example, the product of the power consumption coefficient and the volume information corresponding to each electricity price period is calculated, and the quotient of this product and the corresponding first operating temperature is calculated to determine the second parameter of each electricity price period. By taking the quotient of the product of the power consumption coefficient and the volume information and the corresponding first operating temperature as the second parameter, the second parameter can characterize the operating power consumption parameters of the cold storage system in each electricity price period, which can improve the accuracy of determining the operating electricity fee.
[0082] In some embodiments, the cold storage system can obtain the electricity price corresponding to each electricity price period through a variety of existing methods; the electricity fee can be determined by calculating the product of the electricity price and the power consumption or power usage. The electricity price period includes: peak electricity price period, valley electricity price period, flat electricity price period, etc. The electricity price includes: peak electricity price E1 corresponding to the peak electricity price period, valley electricity price E2 corresponding to the valley electricity price period, and flat electricity price E3 corresponding to the flat electricity price period.
[0083] The operating time corresponding to each electricity price period can be determined for a set period such as one day, one month, or two months. The operating time includes peak operating time T1 corresponding to the peak electricity price period, trough operating time T2 corresponding to the trough electricity price period, and flat operating time T3 corresponding to the trough electricity price period.
[0084] According to the peak operation time T1 and the peak electricity price E1 corresponding to the peak electricity price period, the electricity fee calculation parameter for the peak electricity price period is determined to be E1*T1; according to the valley operation time T2 and the valley electricity price E2 corresponding to the valley electricity price period, the electricity fee calculation parameter for the valley electricity price period is determined to be E2*T2; according to the flat operation time T3 and the valley electricity price E3 corresponding to the flat electricity price period, the electricity fee calculation parameter for the flat electricity price period is determined to be E3*T3.
[0085] According to the electricity cost calculation parameters of each electricity price period, the sum of the electricity cost calculation parameters of all electricity price periods is determined to be: E1*T1+ E2*T2+ E3*T3. According to the operating time corresponding to each electricity price period, the sum of the operating time is determined to be: T1+ T2+T3. According to the sum of the electricity cost calculation parameters and the sum of the operating time, the first parameter is determined to be: (E1*T1+ E2*T2+ E3*T3) / (T1+T2+ T3).
[0086] According to the first operating temperature and power consumption coefficient corresponding to each electricity price period, and the volume information, the second parameter of each electricity price period is determined. For example, the second parameter of the peak electricity price period is: (K 波峰 *V1) / C1; the second parameter of the valley electricity price period is: (K 波谷 *V1) / C2; the second parameter of the valley electricity price period is: (K 波平 *V1) / C3.
[0087] The formula for calculating the first running electricity fee is as follows:
[0088] = (Formula 2);
[0089] = (Formula 3);
[0090] = (Formula 4);
[0091] There are many ways to set the second operating electricity fee of the cold storage system. For example, among multiple first operating electricity fees, determine the maximum operating electricity fee and the minimum operating electricity fee; set the second operating electricity fee, where the maximum operating electricity fee> the second operating electricity fee> the minimum operating electricity fee. The user can manually set the second operating fee based on multiple first operating electricity fees; or automatically set the second operating fee by setting rules, and the setting rules can be multiple rules, for example, setting the second operating fee to the average of the maximum operating electricity fee and the minimum operating electricity fee, etc.
[0092] By determining the lowest operating electricity charge of the cold storage system and the highest operating electricity charge of the cold storage system among multiple first operating electricity charges, the operating electricity charge of the cold storage system can be reasonably set based on the lowest operating electricity charge and the highest operating electricity charge, thereby avoiding abnormal operation of the cold storage system due to unreasonable setting of freight and electricity charges. The operating electricity charge of the cold storage system can be controlled, thereby reducing the operation and maintenance costs of the cold storage system.
[0093] In some embodiments, the following can be determined based on the calculation results of the three first operating electricity charges: < , that is, the minimum operating electricity cost of the cold storage system is , the maximum operating electricity cost of the cold storage system is , the intermediate operation electricity cost of the cold storage system is The second operating electricity fee of the cold storage system within a set period of one day, one month, two months, etc. can be set to F, where < < .
[0094] Figure 4 FIG. 1 is a flow chart of determining the second operating temperature in some embodiments of the control method for the operation of the cold storage system according to the present disclosure, such as Figure 4 As shown:
[0095] Step S401, determining the time period electricity fee corresponding to each electricity price period according to the operation time corresponding to each electricity price period and the second operation electricity fee.
[0096] Step S402, determining the time period power consumption corresponding to each electricity price period according to the time period electricity charges and electricity prices corresponding to each electricity price period.
[0097] Step S403, determining a second operating temperature corresponding to each electricity price period according to the period power consumption, operating time, power consumption coefficient and volume information corresponding to each electricity price period.
[0098] The second operating temperature corresponding to each electricity price period is determined by the second operating electricity charge, the parameters corresponding to each electricity price period, the volume of the cold storage system, etc. The operating temperature of each electricity price period can be automatically and accurately set according to the set operating charge, the total operating electricity charge of each electricity price period can be controlled, and the operating temperature and electricity consumption of the cold storage system can be accurately controlled, thereby reducing the energy consumption of the cold storage system and reducing the operation and maintenance costs of the cold storage system.
[0099] There are many methods for determining the time period electricity charges corresponding to each electricity price period. For example, according to the operation time corresponding to each electricity price period, the total operation time of all electricity price periods is determined; according to the operation time corresponding to each electricity price period and the total operation time, the operation time proportion of each electricity price period is determined; the product of the second operation electricity charge and the operation time proportion of each electricity price period is calculated to determine the time period electricity charge corresponding to each electricity price period.
[0100] By using the second operating electricity fee and the parameters corresponding to each electricity price period to determine the time period electricity fee corresponding to each electricity price period, the electricity consumption in each electricity price period can be accurately controlled, thereby reducing the energy consumption of the cold storage system; the electricity fee can be accurately controlled, thereby reducing the operating cost of the cold storage system.
[0101] In some embodiments, according to the operating durations T1, T2, and T3 corresponding to the peak electricity price period, the valley electricity price period, and the flat electricity price period, the total operating duration of all electricity price periods is determined to be: T1+ T2+ T3.
[0102] According to the operating time and total operating time corresponding to the peak electricity price period, the proportion of operating time in the peak electricity price period is determined as: T1 / (T1+ T2+ T3); according to the operating time and total operating time corresponding to the valley electricity price period, the proportion of operating time in the valley electricity price period is determined as: T2 / (T1+ T2+ T3); according to the operating time and total operating time corresponding to the flat electricity price period, the proportion of operating time in the flat electricity price period is determined as: T3 / (T1+ T2+ T3).
[0103] Calculate the product of the second operation electricity fee and the operation time ratio of the peak electricity price period, and determine the period electricity fee corresponding to the peak electricity price period as follows: = ; Calculate the product of the second operation electricity fee and the operation time ratio of the valley electricity price period, and determine the period electricity fee corresponding to the valley electricity price period as = ; Calculate the product of the second operation electricity fee and the operation time ratio of the flat electricity price period, and determine the period electricity fee corresponding to the flat electricity price period as = ; where F= + + .
[0104] There are many methods for determining the time period power consumption corresponding to each electricity price period. For example, the quotient of the time period power charge and the power price corresponding to each electricity price period is calculated to determine the time period power consumption corresponding to each electricity price period. By using the quotient of the time period power charge and the power price as the time period power consumption, the power consumption of each electricity price period can be controlled, thereby achieving the controllability of the total power consumption of the cold storage system, and being able to accurately control the operating temperature and power consumption of the cold storage system.
[0105] In some embodiments, the quotient of the time period electricity fee and the electricity price corresponding to the peak electricity price period is calculated to determine the time period electricity consumption corresponding to the peak electricity price period as follows: = ; Calculate the quotient of the electricity fee and electricity price for the time period corresponding to the valley electricity price period, and determine the power consumption for the time period corresponding to the valley electricity price period as = ; Calculate the quotient of the electricity fee and electricity price for the period corresponding to the flat electricity price period, and determine the power consumption for the period corresponding to the flat electricity price period as = .
[0106] There are many methods for determining the second operating temperature corresponding to each electricity price period. For example, the product of the operating time, power consumption coefficient and volume information corresponding to each electricity price period is calculated to determine the third parameter corresponding to each electricity price period; the quotient of the third parameter corresponding to each electricity price period and the period power consumption is calculated to determine the second operating temperature corresponding to each electricity price period.
[0107] The second operating temperature corresponding to each electricity price period is determined by the second operating electricity fee and the parameters corresponding to each electricity price period, the volume of the cold storage system, etc., and the operating temperature of each electricity price period can be set automatically and accurately, which can avoid problems such as excessive cold supply in the cold storage due to relying on manual experience to set the operating temperature. The operating temperature and electricity consumption of the cold storage system can be accurately controlled, which reduces the energy consumption of the cold storage system and reduces the operation and maintenance costs of the cold storage system.
[0108] In some embodiments, the product of the operation time, power consumption coefficient and volume information corresponding to the peak electricity price period is calculated to determine the corresponding third parameter J1= ; Calculate the quotient of the third parameter corresponding to the peak electricity price period and the power consumption during the period, and determine the second operating temperature corresponding to the peak electricity price period as = = .
[0109] Calculate the product of the operating time, power consumption coefficient and volume information corresponding to the valley electricity price period, and determine the corresponding third parameter as J2= ; Calculate the quotient of the third parameter corresponding to the valley electricity price period and the power consumption during the period, and determine the second operating temperature corresponding to the valley electricity price period as = = .
[0110] Calculate the product of the operating time, power consumption coefficient and volume information corresponding to the flat electricity price period, and determine the corresponding third parameter J3= Calculate the quotient of the third parameter corresponding to the valley electricity price period and the power consumption during the period, and determine the second operating temperature corresponding to the flat electricity price period as = = .
[0111] if , and At least one of them cannot meet the cooling demand of the cold storage system, and the second operation electricity fee F can be adjusted to recalculate , and , until , and Both meet the cooling needs of the cold storage system.
[0112] The cold storage system includes a cold storage temperature control device or a refrigeration device, and sends a second operating temperature corresponding to the current electricity price period to the cold storage temperature control device or the refrigeration device, so that the cold storage temperature control device or the refrigeration device performs cold storage operating temperature control processing according to the second operating temperature. The cold storage temperature control device or the refrigeration device can be a variety of existing cold storage temperature control devices or refrigeration equipment, and a variety of cold storage operating temperature control processing methods can be used. After sending the second operating temperature to the cold storage temperature control device or the refrigeration device, monitoring processing is performed; if it is determined that the current electricity price period corresponding to the current time has changed, the new second operating temperature is obtained and sent to the cold storage temperature control device or the refrigeration device.
[0113] The second operating temperature corresponding to the current electricity price period is sent to the cold storage temperature control device or refrigeration equipment. The cold storage system operation is controlled by the cold storage temperature control device or refrigeration equipment based on the second operating temperature. The operating temperature of the cold storage system can be accurately controlled and the energy consumption of the cold storage system can be reduced.
[0114] In some embodiments, if it is determined that the current electricity price period corresponding to the current time is a peak electricity price period, the period corresponding to the Fenggu electricity price period Sent to the cold storage temperature control device or refrigeration equipment, the cold storage temperature control device or refrigeration equipment according to Carry out temperature control processing for cold storage operation.
[0115] If the current electricity price period corresponding to the current time is determined to be the valley electricity price period, Sent to the cold storage temperature control device or refrigeration equipment, the cold storage temperature control device or refrigeration equipment according to Carry out temperature control processing for cold storage operation.
[0116] If it is determined that the current electricity price period corresponding to the current time is a flat electricity price period, Sent to the cold storage temperature control device or refrigeration equipment, the cold storage temperature control device or refrigeration equipment according to Carry out temperature control processing for cold storage operation.
[0117] Figure 5 FIG. 1 is a flow chart of determining a power supply mode in some embodiments of the control method for operating a cold storage system according to the present disclosure, such as Figure 5 As shown:
[0118] Step S501, obtaining the light intensity of the current environment.
[0119] Step S502: determining whether the power supply mode of the cold storage system is a grid power supply mode or a photovoltaic power supply mode according to the light intensity.
[0120] By providing two power supply modes for the cold storage system, namely photovoltaic power supply mode and grid power supply mode, and selecting the mode according to the light intensity, the cold storage system can achieve a more energy-saving effect, reduce the grid power consumption of the cold storage system, and reduce the operation and maintenance costs of the cold storage system.
[0121] The cold storage system can be equipped with a photovoltaic power generation system or an independent photovoltaic power generation system. The use of a photovoltaic power generation system for power supply can reduce the power consumption of the cold storage system. When the power supply mode of the cold storage system is the photovoltaic power supply mode, the cold storage operating temperature corresponding to the photovoltaic power supply mode is obtained; based on the cold storage operating temperature, the operation of the cold storage system is controlled.
[0122] By setting the cold storage operating temperature and controlling the cold storage system operation according to the cold storage operating temperature, using the electricity of the photovoltaic system can reduce the grid electricity consumption of the cold storage system, and can reduce the operation and maintenance costs of the cold storage system.
[0123] The cold storage system includes a cold storage temperature control device or refrigeration equipment, which sends the cold storage operating temperature to the cold storage temperature control device or refrigeration equipment so that the cold storage temperature control device or refrigeration equipment can perform cold storage operating temperature control processing.
[0124] Sending the cold storage operating temperature to the cold storage temperature control device or refrigeration equipment, using the electricity of the photovoltaic power generation system through the cold storage temperature control device or refrigeration equipment, and controlling the cold storage system operation based on the cold storage operating temperature can reduce the grid electricity consumption of the cold storage system and reduce the operation and maintenance costs of the cold storage system.
[0125] In some embodiments, the cold storage system can have two power supply modes. The light intensity of the environment in which the cold storage system is located is detected by an existing light intensity detection device. If the light intensity is greater than the light intensity threshold a, it means that the electric energy provided by the photovoltaic power generation system can meet the power demand of the cold storage, and the power supply mode of the cold storage system is determined to be the photovoltaic power supply mode. The user can be reminded whether to switch to the photovoltaic power supply mode; if the light intensity is less than or equal to the light intensity threshold a, the power supply mode of the cold storage system is determined to be the grid power supply mode.
[0126] When it is determined that the power supply mode of the cold storage system is the photovoltaic power supply mode, determine whether the photovoltaic power generation system is operating normally. If the photovoltaic power generation system is operating normally, switch to the photovoltaic power supply mode. If the photovoltaic power generation system cannot operate normally, it prompts that the photovoltaic power supply mode switching has failed.
[0127] When the power supply mode of the cold storage system is the photovoltaic power supply mode, the cold storage operation temperature Ca corresponding to the photovoltaic power supply mode is obtained, and the operation of the cold storage system is controlled based on the cold storage operation temperature Ca. The cold storage operation temperature Ca can be a preset temperature value of the cold storage manually set by the user. The user can set the value of Ca according to the items in the cold storage. Different items can be set with the same Ca, and the same product can also be set with different Ca; the cold storage operation temperature Ca can also be automatically set according to the items in the cold storage.
[0128] In some embodiments, Fig. 6A As shown, the present disclosure provides a control device 60 for operating a cold storage system, including a cost calculation module 61 , a cost setting module 62 , a temperature determination module 63 and an operation module 64 .
[0129] When the power supply mode of the cold storage system is the grid power supply mode, the cost calculation module 61 determines multiple first operating electricity charges according to the operating time, electricity price, first operating temperature and power consumption coefficient corresponding to each electricity price period of the grid, and the volume information of the cold storage system; wherein the number of electricity price periods is multiple.
[0130] The fee setting module 62 sets the second operating electricity fee of the cold storage system based on the multiple first operating electricity fees. The fee setting module 62 can determine the maximum operating electricity fee and the minimum operating electricity fee among the multiple first operating electricity fees; and set the second operating electricity fee, wherein the maximum operating electricity fee> the second operating electricity fee> the minimum operating electricity fee.
[0131] The temperature determination module 63 determines the second operating temperature corresponding to each electricity price period according to the operating time, electricity price and power consumption coefficient corresponding to each electricity price period, as well as the second operating electricity fee and volume information.
[0132] The operation module 64 determines the current electricity price period corresponding to the current time, and controls the operation of the cold storage system according to the second operation temperature corresponding to the current electricity price period. The operation module 64 can send the second operation temperature corresponding to the current electricity price period to the cold storage temperature control device or refrigeration equipment, so that the cold storage temperature control device or refrigeration equipment performs cold storage operation temperature control processing according to the second operation temperature.
[0133] In some embodiments, Figure 6B As shown, the present disclosure provides a control device 60 ′ for cold storage system operation, which includes a power consumption coefficient determination module 65 and a power supply mode determination module 66 in addition to a cost calculation module 61 , a cost setting module 62 , a temperature determination module 63 and an operation module 64 .
[0134] The power consumption coefficient determination module 65 determines the power consumption coefficient corresponding to the electricity price period according to the first operating temperature corresponding to the electricity price period, the power consumption and the power consumption duration corresponding to the first operating temperature, and the volume information. For example, the power consumption coefficient determination module 65 calculates a first product of the first operating temperature and the power consumption, and a second product of the power consumption duration and the volume information; the power consumption coefficient determination module 65 uses the quotient of the first product and the second product as the power consumption coefficient corresponding to the electricity price period.
[0135] In some embodiments, Fig. 7A As shown, the cost calculation module 61 includes: a first determining unit 611, a second determining unit 612, a third determining unit 613 and a cost determining unit 614. The first determining unit 611 determines the electricity cost calculation parameters of each electricity price period according to the operation time and electricity price corresponding to each electricity price period; the first determining unit 611 determines the sum of the electricity cost calculation parameters of all electricity price periods according to the electricity cost calculation parameters of each electricity price period; the first determining unit 611 determines the sum of the operation time according to the operation time corresponding to each electricity price period.
[0136] The second determination unit 612 determines the first parameter according to the sum of the electricity cost calculation parameters and the sum of the operation durations. For example, the second determination unit 612 calculates the quotient of the sum of the electricity cost calculation parameters and the sum of the operation durations to determine the first parameter.
[0137] The third determination unit 613 determines the second parameter of each electricity price period according to the first operating temperature and the power consumption coefficient corresponding to each electricity price period, and the volume information. For example, the third calculation unit 613 calculates the product of the power consumption coefficient and the volume information corresponding to each electricity price period, and calculates the quotient of the product and the corresponding first operating temperature to determine the second parameter of each electricity price period.
[0138] The fee determination unit 614 calculates the product of the first parameter and the second parameter in each electricity price period to determine a plurality of first operation electricity fees.
[0139] In some embodiments, Figure 7B As shown, the temperature determination module 63 includes: a time period fee determination unit 631, a time period power consumption determination unit 632 and an operating temperature determination unit 633.
[0140] The time period fee determination unit 631 determines the time period electricity fee corresponding to each electricity price period according to the operation time corresponding to each electricity price period and the second operation electricity fee.
[0141] For example, the time period fee determination unit 631 determines the total operating time of all electricity price time periods based on the operating time corresponding to each electricity price time period; the time period fee determination unit 631 determines the operating time proportion of each electricity price time period based on the operating time corresponding to each electricity price time period and the total operating time; the time period fee determination unit 631 calculates the product of the second operating electricity fee and the operating time proportion of each electricity price time period to determine the time period electricity fee corresponding to each electricity price time period.
[0142] The power consumption determination unit 632 determines the power consumption corresponding to each electricity price period according to the power charges and electricity prices corresponding to each electricity price period. For example, the power consumption determination unit 632 calculates the quotient of the power charges and electricity prices corresponding to each electricity price period to determine the power consumption corresponding to each electricity price period.
[0143] The operating temperature determination unit 633 determines the second operating temperature corresponding to each electricity price period according to the period power consumption, operation duration, power consumption coefficient and volume information corresponding to each electricity price period. For example, the operating temperature determination unit 633 calculates the product of the operation duration, power consumption coefficient and volume information corresponding to each electricity price period to determine the third parameter corresponding to each electricity price period; the operating temperature determination unit 633 calculates the quotient of the third parameter corresponding to each electricity price period and the period power consumption to determine the second operating temperature corresponding to each electricity price period.
[0144] In some embodiments, the power supply mode determination module 66 obtains the light intensity of the environment in which the cold storage system is located; the power supply mode determination module 66 determines whether the power supply mode of the cold storage system is a grid power supply mode or a photovoltaic power supply mode according to the light intensity.
[0145] When the power supply mode of the cold storage system is the photovoltaic power supply mode, the operation module 64 obtains the cold storage operation temperature corresponding to the photovoltaic power supply mode; the operation module 64 controls the operation of the cold storage system based on the cold storage operation temperature. The operation module 64 can send the cold storage operation temperature to the cold storage temperature control device or refrigeration equipment, so that the cold storage temperature control device or refrigeration equipment performs temperature control operation according to the cold storage operation temperature.
[0146] In some embodiments, Figure 8 As shown, the control device 80 for the operation of the cold storage system includes: a memory 810 and a processor 820 coupled to the memory 810, and the processor 820 is configured to execute the control method for the operation of the cold storage system in each embodiment based on the instructions stored in the memory 810. The specific implementation can refer to the above embodiments, which will not be repeated here.
[0147] The control device 800 for cold storage system operation may further include an input / output interface 830 , a network interface 840 , a storage interface 850 , etc. These interfaces 830 , 840 , 850 , the memory 810 and the processor 820 may be connected, for example, via a bus 860 .
[0148] The memory 810 may include, for example, a system memory, a fixed non-volatile storage medium, etc. The system memory may store, for example, an operating system, an application program, a boot loader, and other programs.
[0149] The processor 820 may be implemented by a general purpose processor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistors and other discrete hardware components.
[0150] Among them, the input and output interface 830 provides a connection interface for input and output devices such as a display, a mouse, a keyboard, and a touch screen. The network interface 840 provides a connection interface for various networked devices. The storage interface 850 provides a connection interface for external storage devices such as SD cards and USB flash drives. The bus 860 can use any bus structure among a variety of bus structures. For example, the bus structure includes but is not limited to the Industry Standard Architecture (ISA) bus, the Micro Channel Architecture (MCA) bus, and the Peripheral Component Interconnect (PCI) bus.
[0151] In some embodiments, the present disclosure provides a cold storage system, including a cold storage temperature control device or refrigeration equipment, a control device for the operation of the cold storage system in any of the above embodiments. The cold storage system may also include an input module, an electricity price information module, a cold storage power consumption coefficient detection module, a storage module, etc.
[0152] The control device for the operation of the cold storage system can be connected to multiple input modules to obtain information such as the item type, the second operation electricity fee, etc. set by the user through the input module; the control device for the operation of the cold storage system can be connected to the electricity price information module to obtain the local electricity price period and the corresponding electricity price information through the electricity price information module.
[0153] The control device for the operation of the cold storage system can be connected to the cold storage power consumption coefficient detection module, and the cold storage volume parameters, time, cold storage electricity consumption, cold storage temperature and other information can be obtained through the cold storage power consumption coefficient detection module; the control device for the operation of the cold storage system can be connected to the storage module, and data can be stored through the storage module.
[0154] In some embodiments, the present disclosure provides a computer-readable storage medium, which stores computer instructions. When the instructions are executed by a processor, a control method for the operation of a cold storage system as in any of the above embodiments is implemented.
[0155] Computer readable storage media can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can include, for example, but is not limited to, a system, device or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive enumeration) of readable storage media can include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0156] The embodiments of the present disclosure may also be a computer program product, which includes computer program instructions. When the computer program instructions are executed by a processor, the processor executes the steps of the method according to various embodiments of the present disclosure described in the above “Exemplary Method” section of this specification.
[0157] The basic principles of the present disclosure are described above in conjunction with specific embodiments. However, it should be noted that the advantages, strengths, effects, etc. mentioned in the present disclosure are only examples and not limitations, and it cannot be considered that these advantages, strengths, effects, etc. are required by each embodiment of the present disclosure. In addition, the specific details disclosed above are only for the purpose of illustration and ease of understanding, and are not limitations. The above details do not limit the present disclosure to the necessity of adopting the above specific details to be implemented.
[0158] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the system embodiment, since it basically corresponds to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0159] The block diagrams of the devices, apparatuses, equipment, and systems involved in this disclosure are only illustrative examples and are not intended to require or imply that they must be connected, arranged, and configured in the manner shown in the block diagrams. As will be appreciated by those skilled in the art, these devices, apparatuses, equipment, and systems can be connected, arranged, and configured in any manner. Words such as "including," "comprising," "having," and the like are open words, referring to "including but not limited to," and can be used interchangeably therewith. The words "or" and "and" used herein refer to the words "and / or," and can be used interchangeably therewith, unless the context clearly indicates otherwise. The word "such as" used herein refers to the phrase "such as but not limited to," and can be used interchangeably therewith.
[0160] It should also be noted that in the apparatus, device and method of the present disclosure, each component or each step can be decomposed and / or recombined. Such decomposition and / or recombination should be regarded as equivalent solutions of the present disclosure.
[0161] The above description of the disclosed aspects is provided to enable any person skilled in the art to make or use the present disclosure. Various modifications to these aspects will be readily apparent to those skilled in the art, and the general principles defined herein may be applied to other aspects without departing from the scope of the present disclosure. Therefore, the present disclosure is not intended to be limited to the aspects shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
[0162] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present disclosure to the forms disclosed herein. Although multiple example aspects and embodiments have been discussed above, it will be appreciated by those skilled in the art that the above embodiments are merely illustrative and do not limit the scope of the present disclosure. It will be appreciated by those skilled in the art that the above embodiments may be combined, modified or replaced without departing from the scope and essence of the present disclosure.
Claims
1. A method for controlling the operation of a cold storage system, comprising: When the power supply mode of the cold storage system is the power supply mode of the power grid, a plurality of first operating electricity charges are determined according to the operating time, electricity price, first operating temperature and power consumption coefficient corresponding to each electricity price period of the power grid, and the volume information of the cold storage system; wherein the number of the electricity price period is multiple; Based on the plurality of first operating electricity charges, setting a second operating electricity charge for the cold storage system; Determining a second operating temperature corresponding to each electricity price period according to the operating time, electricity price and power consumption coefficient corresponding to each electricity price period, as well as the second operating electricity fee and the volume information; A current electricity price period corresponding to the current time is determined, and the operation of the cold storage system is controlled according to the second operating temperature corresponding to the current electricity price period.
2. The method of claim 1, further comprising: A power consumption coefficient corresponding to the electricity price period is determined according to a first operating temperature corresponding to the electricity price period, power consumption and power consumption duration corresponding to the first operating temperature, and the volume information.
3. The method of claim 2, wherein: The determining of the power consumption coefficient corresponding to the electricity price period according to the first operating temperature corresponding to the electricity price period, the power consumption and the power consumption duration corresponding to the first operating temperature, and the volume information comprises: Calculating a first product of the first operating temperature and the power consumption, and a second product of the power consumption duration and the volume information; The quotient of the first product and the second product is used as the power consumption coefficient corresponding to the electricity price period.
4. The method of claim 1, wherein: Determining a plurality of first operating electricity charges according to the operating time, electricity price, first operating temperature and power consumption coefficient corresponding to each electricity price period of the power grid, and the volume information of the cold storage system comprises: Determine the electricity fee calculation parameters for each electricity price period according to the operation time and electricity price corresponding to each electricity price period; According to the electricity fee calculation parameters of each electricity price period, determine the sum of the electricity fee calculation parameters of all electricity price periods; Determine the total running time according to the running time corresponding to each electricity price period; Determine a first parameter according to the sum of the electricity fee calculation parameters and the sum of the operating time; Determine a second parameter for each electricity price period according to the first operating temperature and power consumption coefficient corresponding to each electricity price period, and the volume information; The product of the first parameter and the second parameter in each electricity price period is calculated to determine the plurality of first operating electricity charges.
5. The method of claim 4, wherein: The determining of the first parameter according to the sum of the electricity fee calculation parameters and the sum of the running time comprises: The quotient of the sum of the electricity cost calculation parameters and the sum of the operating time is calculated to determine the first parameter.
6. The method of claim 4, wherein: Determining the second parameter of each electricity price period according to the first operating temperature and the power consumption coefficient corresponding to each electricity price period and the volume information includes: The product of the power consumption coefficient corresponding to each electricity price period and the volume information is calculated, and the quotient of the product and the corresponding first operating temperature is calculated to determine the second parameter of each electricity price period.
7. The method of claim 1, wherein: The determining of the second operating temperature corresponding to each electricity price period according to the operating time, electricity price and power consumption coefficient corresponding to each electricity price period, as well as the second operating electricity fee and the volume information comprises: Determining the time period electricity fee corresponding to each electricity price period according to the operation duration corresponding to each electricity price period and the second operation electricity fee; Determine the time period power consumption corresponding to each electricity price period according to the time period electricity charges and electricity prices corresponding to each electricity price period; The second operating temperature corresponding to each electricity price period is determined according to the time period power consumption, operation duration, power consumption coefficient and the volume information corresponding to each electricity price period.
8. The method of claim 7, wherein: The step of determining the time period electricity fee corresponding to each electricity price period according to the operation duration corresponding to each electricity price period and the second operation electricity fee comprises: Determine the total operation time of all electricity price periods according to the operation time corresponding to each electricity price period; Determine the proportion of the operating time of each electricity price period according to the operating time corresponding to each electricity price period and the total operating time; The product of the second operation electricity fee and the operation time proportion of each electricity price period is calculated to determine the time period electricity fee corresponding to each electricity price period.
9. The method of claim 7, wherein: Determining the time period power consumption corresponding to each electricity price period according to the time period power charges and power prices corresponding to each electricity price period includes: The quotient of the time period electricity fee and the electricity price corresponding to each electricity price period is calculated to determine the time period electricity consumption corresponding to each electricity price period.
10. The method of claim 7, wherein: The determining of the second operating temperature corresponding to each electricity price period according to the period power consumption, operation duration, power consumption coefficient and volume information corresponding to each electricity price period includes: Calculating the product of the operation time, the power consumption coefficient and the volume information corresponding to each electricity price period to determine a third parameter corresponding to each electricity price period; The quotient of the third parameter corresponding to each electricity price period and the period power consumption is calculated to determine the second operating temperature corresponding to each electricity price period.
11. The method of claim 1, wherein: The setting of the second operating electricity fee of the cold storage system based on the plurality of first operating electricity fees comprises: Determining a maximum operating electricity fee and a minimum operating electricity fee among the plurality of first operating electricity fees; The second operating electricity fee is set based on the maximum operating electricity fee and the minimum operating electricity fee, wherein the maximum operating electricity fee>the second operating electricity fee>the minimum operating electricity fee.
12. The method of claim 1, wherein: The cold storage system includes a cold storage temperature control device or refrigeration equipment; The controlling the operation of the cold storage system according to the second operating temperature corresponding to the current electricity price period includes: The second operating temperature corresponding to the current electricity price period is sent to the cold storage temperature control device or the refrigeration equipment, so that the cold storage temperature control device or the refrigeration equipment performs operating temperature control processing of the cold storage system according to the second operating temperature.
13. The method of claim 1, comprising: Get the light intensity of the current environment; According to the light intensity, it is determined that the power supply mode of the cold storage system is the grid power supply mode or the photovoltaic power supply mode.
14. The method of claim 13, comprising: When the power supply mode of the cold storage system is a photovoltaic power supply mode, obtaining a cold storage operating temperature corresponding to the photovoltaic power supply mode; Based on the cold storage operating temperature, the operation of the cold storage system is controlled.
15. The method of claim 14, wherein: The cold storage system includes a cold storage temperature control device or a refrigeration device; and controlling the operation of the cold storage system based on the cold storage operating temperature includes: The cold storage operating temperature is sent to the cold storage temperature control device or the refrigeration equipment, so that the cold storage temperature control device or the refrigeration equipment performs operating temperature control processing of the cold storage system according to the cold storage operating temperature.
16. The method according to any one of claims 1 to 15, wherein: The electricity price periods include: peak electricity price period, valley electricity price period, and flat electricity price period; The first operating temperature includes: a peak operating temperature corresponding to the peak electricity price period, a valley operating temperature corresponding to the valley electricity price period, and a flat operating temperature corresponding to the flat electricity price period; The power consumption coefficient includes: a peak power consumption coefficient corresponding to the peak electricity price period, a valley power consumption coefficient corresponding to the valley electricity price period, and a flat power consumption coefficient corresponding to the flat electricity price period.
17. A control device for the operation of a cold storage system, comprising: The fee calculation module is used to determine a plurality of first operating electricity charges according to the operating time, electricity price, first operating temperature and power consumption coefficient corresponding to each electricity price period of the power grid, and the volume information of the cold storage system when the power supply mode of the cold storage system is the power grid power supply mode; wherein the number of the electricity price period is multiple; A fee setting module, used for setting a second operating electricity fee of the cold storage system based on the plurality of first operating electricity fees; a temperature determination module, configured to determine a second operating temperature corresponding to each electricity price period according to the operating time, electricity price and power consumption coefficient corresponding to each electricity price period, as well as the second operating electricity fee and the volume information; The operation module is used to determine a current electricity price period corresponding to the current time, and control the operation of the cold storage system according to the second operation temperature corresponding to the current electricity price period.
18. A control device for the operation of a cold storage system, comprising: Memory; and a processor coupled to the memory, wherein the processor is configured to execute the control method for the operation of the cold storage system according to any one of claims 1 to 16 based on instructions stored in the memory.
19. A cold storage system, comprising: A cold storage temperature control device or refrigeration equipment, a control device for the operation of a cold storage system as described in claim 17 or 18.
20. A computer-readable storage medium storing computer instructions, wherein the instructions, when executed by a processor, implement the control method for operation of a cold storage system according to any one of claims 1 to 16.
21. A computer program product, wherein the computer program product stores computer instructions, and when the computer instructions are executed by a processor, the control method for the operation of a cold storage system according to any one of claims 1 to 16 is implemented.