Construction method of structural member with decorative effect
By prefading the building structure with self-fluidic pouring raw materials and specific processes, the safety hazards, high costs and long decoration cycle of existing building decoration are solved, and the integration and diversified decoration effect of the decoration structure and the main structure are achieved.
Patent Information
- Application Number
- CN202411816334.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-11
- Publication Date
- 2025-03-14
AI Technical Summary
The existing building decoration has problems such as safety hazards of material peeling, high cost, difficulty in repairing, and long decoration cycle, and the decoration structure and main structure cannot form a perfect whole.
Self-fluidized casting raw materials are used to prepare SD IC dry powder, water, admixture, fibers, and basic colorants according to the ratio, and the components of the building structure are prefabricated through specific processes and molds to form structural components with decorative effects.
The integration of the decoration structure and the main structure is achieved, the decoration defects and safety hazards are reduced, the construction cycle is shortened, the cost is reduced, the structure life is improved, and the diversified decoration effect of the wall is achieved.
Smart Images

Figure CN119610329A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction, and in particular to a construction method of a structural component with decorative effects. Background Art
[0002] Existing house structures are generally constructed by brickwork, concrete pouring, precast concrete and the like, but the walls of houses constructed by the above methods cannot achieve decoration effects such as comfort and beauty.
[0003] Specifically, the main problems that decoration solves are the color, flatness, smoothness, and shape of the existing structure surface. Decoration mainly refers to the treatment of the surface of the main structure of the house (such as painting, coloring or color separation, or adding shapes) to make it comfortable and beautiful. The essence of decoration is to treat the surface of the existing structure or attach other decoration materials on the basis of the existing structure. The problems existing in the decoration of existing buildings include: safety hazards such as the falling off of decoration materials, high costs, difficult repairs, and long decoration cycles. In other words, in current buildings, the decoration structure and the main structure cannot form a perfect whole. Summary of the invention
[0004] The technical problem to be solved by the present application is to propose a construction method of a structural component with decorative effect in view of the above-mentioned deficiencies in the prior art.
[0005] A construction method for a structural member with decorative effect, the construction method comprising:
[0006] Step 100, preparing casting raw materials: using SD IC dry powder, water, additives, fiber, and basic colorant to prepare self-fluidizing casting raw materials according to a proportion; the SD IC dry powder includes white silicate cement, white silica fume, 325 mesh quartz powder, quartz sand, kaolin, nano-CaO, nano-Na2O, calcium carbonate, and titanium dioxide;
[0007] Step 200, preparing the mold: cleaning the mold joint surface, evenly applying mold release oil on the mold joint surface, and assembling the mold to form a casting space;
[0008] Step 300, pouring the prepared casting raw material into the mold, and vibrating the mold at the same time, so that the mold can be poured with materials in a vibrating state;
[0009] Step 400, after pouring, vacuuming the mold to remove bubbles in the poured structure;
[0010] Step 500, curing and demoulding:
[0011] Send the mold as a whole to the steam curing room for steam curing for more than 12 hours at a temperature not lower than 80 degrees;
[0012] Lower the temperature in the steaming room so that the temperature difference between the steaming room and the outside of the growth room is less than 20℃;
[0013] Demolding the components;
[0014] Steam the components again for no less than 48 hours at a temperature no lower than 90 degrees;
[0015] The components are cooled down gradually; when the component temperature is no higher than the ambient temperature by 20°C, the components are placed in a natural environment for curing, and eventually the component temperature is consistent with the ambient temperature.
[0016] Optionally, step 100 includes:
[0017] Using one or more basic colorants to prepare a colorant of a desired color, and mixing the prepared colorant with water, and stirring evenly to form colorant water;
[0018] Mix SDI C dry powder and colorant water in proportion and stir for more than 15 minutes to mix the materials evenly;
[0019] Add the additive to the evenly stirred material, and then continue stirring for more than 5 minutes to make the material evenly stirred;
[0020] Continue to add the fibers and continue stirring for more than 10 minutes to mix the material evenly and achieve self-fluidization.
[0021] Optionally, the fibers are polypropylene fibers.
[0022] Optionally, in step 200, before assembling the molds, the process also includes: arranging prefabricated steel bars or meshes, corrugated pipes and other structural reinforcement components and / or pre-embedded connecting components connected to other components inside the mold assembly space according to the design of the cast finished structure.
[0023] Optionally, in step 300, during pouring, pouring is performed into the mold at the same position, and the pouring raw material flows in the mold by gravity to fill the pouring space of the mold.
[0024] Optionally, in step 300, pouring is performed continuously and the pouring time does not exceed 30 minutes.
[0025] Optionally, in step 100, a plurality of colorants of different colors are prepared using a basic colorant, and the prepared colorants of different colors are mixed with water respectively, and stirred evenly to form a plurality of groups of colorant waters of different colors; based on the plurality of groups of colorant waters of different colors, a plurality of groups of casting raw materials of different colors are prepared according to the proportions;
[0026] In step 300, a plurality of groups of casting materials of different colors are cast separately.
[0027] Optionally, the construction method further comprises: coding and packaging the components.
[0028] The construction method provided by the present application makes the decoration structure and the main structure into an integral structure, and prefabricates the components of the building structure through specific materials and specific processes, methods, and molds. The surface of the prefabricated structural components can directly achieve the effect that can only be achieved by the decoration of the original house wall. Therefore, it has the following advantages: First, it reduces the defects and safety hazards caused by the original house decoration. Second, it shortens the construction cycle of the house, reduces the cost of house construction, and increases the life of the house structure. Third, it saves indoor space and reduces the deadweight of the structure. Fourth, it is no longer necessary to carry out secondary decoration, and can achieve diversified (different colors, different shapes) decorative (artistic) effects of the wall, as well as the overall beauty. Fifth, it is maintenance-free and has low maintenance costs. Sixth, it is environmentally friendly, energy-saving, green and low-carbon. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a flow chart of the construction method of the structural component with decorative effect in the embodiment of the present application. DETAILED DESCRIPTION
[0030] The following is the specific embodiment of the present application and in conjunction with the accompanying drawings, the technical scheme of the present application is further described, but the present application is not limited to these embodiments. In the following description, specific details such as specific configuration and components are provided only to help fully understand the embodiments of the present application. Therefore, it should be clear to those skilled in the art that various changes and modifications can be made to the embodiments described herein without departing from the protection scope of the present application. In addition, for clarity and brevity, the description of known functions and structures has been omitted.
[0031] It should be noted that, in the absence of conflict, the embodiments and features of the embodiments in this application can be combined with each other.
[0032] The present application provides a construction method for a structural member with a decorative effect, which can make a decorative structure and a main structure into an integral structure.
[0033] Figure 1 is a flow chart of a construction method of a structural component with decorative effect in an embodiment of the present application. Figure 1 In the present invention, the construction method includes: steps 100 to 500.
[0034] Step 100, preparing casting raw materials: using SDI C dry powder, water, additives, fiber, and basic colorant to prepare self-fluidizing casting raw materials according to a proportion; the SDI C dry powder includes white silicate cement, white silica fume, 325 mesh quartz powder, quartz sand, kaolin, nano-CaO, nano-Na2O, calcium carbonate, and titanium dioxide;
[0035] Step 200, prepare the mold: clean the mold joint surface, evenly apply mold release oil on the mold joint surface, and assemble the mold to form a casting space.
[0036] Step 300, pouring the prepared casting raw material into the mold, and vibrating the mold at the same time, so that the mold can be poured with materials in a vibrating state.
[0037] Step 400, after pouring, the mold is evacuated to discharge the bubbles in the poured structure.
[0038] Step 500, curing and demoulding. Step 500 includes:
[0039] Send the mold as a whole to the steam curing room for steam curing for more than 12 hours at a temperature not lower than 80 degrees;
[0040] Lower the temperature in the steaming room so that the temperature difference between the steaming room and the outside of the growth room is less than 20℃;
[0041] Demolding the components;
[0042] Steam the components again for no less than 48 hours at a temperature no lower than 90 degrees;
[0043] The components are cooled down gradually; when the component temperature is no higher than the ambient temperature by 20°C, the components are placed in a natural environment for curing, and eventually the component temperature is consistent with the ambient temperature.
[0044] In this application, the SD IC dry powder includes white silicate cement, white silica fume, 325 mesh quartz powder, quartz sand, kaolin, nano-CaO, nano-Na2O, calcium carbonate, and titanium dioxide. More specifically, the raw materials and their corresponding mass parts are as follows:
[0045] White Portland cement: 1.0;
[0046] White silica fume: 0.1-0.5;
[0047] 325 mesh quartz powder: 0.2-0.5;
[0048] Quartz sand: 0.6-1.5;
[0049] Kaolin: 0.05-0.18;
[0050] Nano-CaO: 0.02-0.08;
[0051] Nano Na2O: 0.01-0.04;
[0052] Calcium carbonate: 0.02-0.06;
[0053] Titanium dioxide: 0.003-0.12.
[0054] In step 100, the casting raw material is mixed with composite material, water, admixture, fiber, and basic coloring agent. Specifically, step 100 includes: step 101-step 104.
[0055] Step 101, using one or more basic colorants to prepare a colorant of a desired color, and mixing the prepared colorant with water, and stirring evenly to form colorant water;
[0056] Step 102, mixing the SDI C dry powder and the colorant water in proportion, and stirring for more than 15 minutes to mix the materials evenly;
[0057] Step 103, adding an additive to the uniformly stirred material, and then continuing to stir for more than 5 minutes to uniformly stir the material;
[0058] Step 104, continue to add fibers, and then continue stirring for more than 10 minutes to stir the materials evenly and achieve self-fluidization.
[0059] Specifically, in step S101, the type of basic colorant required, the ratio of the basic colorant and the amount of the basic colorant are determined according to the color required by the design, and the ratio of the required colorant to water is determined. In addition, if there are two or more colors of the component, separate calculations and proportions are required. The basic colorants of different colors determined in the above steps are mixed evenly to form a colorant of the required color. Finally, water and the adjusted colorant are mixed evenly according to the set ratio to form the colorant water required later. In addition, it should be noted that when configuring a colorant of one color, a basic colorant of one color or multiple basic colorants of different colors can be used for configuration.
[0060] In step 102, first, SDIC dry powder and colorant water are mixed evenly according to proportion. In step 103, admixtures are added continuously and mixed evenly. In step 104, fibers are added continuously and mixed evenly. Fibers are used to increase strength and toughness and prevent cracks from appearing on the outer surface of components. In a specific embodiment, the fibers are polypropylene fibers. Thus, a self-fluidizing casting raw material is obtained through steps 101 to 104.
[0061] In step 200, the mold is prepared: the mold joint surface is cleaned, mold release oil is evenly applied on the mold joint surface, and the mold is combined to form a casting space. In this step, the role of the mold release oil is to solve the normal separation of the casting structure and the mold after casting, so as to ensure the quality of the casting structure surface. Further, in step 200, before the mold is combined, it also includes: according to the design of the finished casting structure, prefabricated steel bars or meshes, corrugated pipes and other structural reinforcement components and / or pre-embedded connection embedded components connected to other components are arranged inside the mold combination space.
[0062] In step 300, the casting material prepared in step 100 is cast into the mold, and the mold is vibrated at the same time, so that the mold is cast in a vibrating state. Further, in step 300, during casting, casting is performed in the mold at the same position, and the casting material fills the casting space of the mold in a self-flowing manner in the mold, and in step 300, the casting is continuous and the casting time does not exceed 30 minutes.
[0063] In one embodiment of the present application, the construction method further includes: coding and packaging the components.
[0064] In step 400, after pouring, the mold is evacuated to form a negative pressure inside the mold relative to the space outside the mold after pouring. The main function of this step is to discharge the bubbles in the structure formed after pouring to improve the flatness, smoothness, consistency and other decorative effects of the outer surface of the structure.
[0065] In step 500, the curing and demoulding include: sending the mold as a whole to a steam curing room for steam curing for more than 12 hours at a temperature not lower than 80 degrees; lowering the temperature in the steam curing room so that the temperature difference between the inside of the steam curing room and the outside of the curing room is less than 20 degrees; demoulding the component; steam curing the component again for not less than 48 hours at a temperature not lower than 90 degrees; cooling the component, gradually cooling it; when the temperature of the component is not higher than the ambient temperature by 20 degrees, placing the component in a natural environment for curing in the natural environment, and finally the temperature of the component is consistent with the ambient temperature.
[0066] In one embodiment of the present application, if there are two or more colors of the component, separate calculations and proportions are required. Based on the design of multiple colors, in step 100, a plurality of different colors of colorants are respectively configured using a basic colorant, and the configured colorants of the plurality of different colors are respectively mixed with water and stirred evenly to form a plurality of groups of colorant waters of different colors; based on the plurality of groups of colorant waters of different colors, a plurality of groups of casting raw materials of different colors are respectively prepared according to the proportions; in step 300, the plurality of groups of casting raw materials of different colors are separately cast.
[0067] When the component has two or more colors, step 100 specifically includes:
[0068] Using the basic colorant to prepare a plurality of different colored colorants, respectively, and mixing the prepared colorants of the plurality of different colors with water respectively, and stirring evenly to form a plurality of groups of colorant waters of different colors;
[0069] Mixing a plurality of different colored colorant waters with the SDI C dry powder in proportion to obtain a plurality of mixed materials corresponding to different colors, and stirring the plurality of mixed materials for more than 15 minutes to uniformly stir the plurality of mixed materials;
[0070] Add additives to multiple groups of mixed materials respectively, and then continue stirring for more than 5 minutes to stir the multiple groups of mixed materials evenly;
[0071] Continue to add fibers to the multiple groups of mixed materials, and then continue to stir for more than 10 minutes to stir the multiple groups of mixed materials evenly and achieve self-fluidization.
[0072] In step 300, multiple groups of casting materials of different colors are cast separately, and finally multiple colors are formed on the structural components.
[0073] In one embodiment of the present application, when a component is composed of only one color, based on the design of one color, in step 100, a colorant of one color is configured using a basic colorant, and the configured colorant of one color is mixed with water and stirred evenly to form a colorant water of one color; then, based on the colorant water of one color, a casting material of one color is prepared according to the ratio; in step 300, the casting material of one color is cast.
[0074] Step 100 specifically includes:
[0075] Using one or more basic colorants to prepare a colorant of a desired color, and mixing the prepared colorant with water, and stirring evenly to form a colorant water;
[0076] The colorant water obtained in the previous part and the SDI C dry powder are mixed in proportion to obtain a mixture, and stirred for more than 15 minutes to stir the mixture uniformly;
[0077] Add the admixture to the well-mixed material, and then continue to stir for more than 5 minutes to make the mixture well-mixed;
[0078] Continue adding the fibers and continue stirring for 10 minutes more to homogenize the mixture and make it self-fluidizing.
[0079] In step 300, casting materials of one color are cast separately, and finally a single color is formed on the structural member.
[0080] It can be seen from the above steps that the construction method provided in the present application makes the decoration structure and the main structure into an integral structure, and prefabricates the components of the building structure through specific materials and specific processes, methods, and molds. The surface of the prefabricated structural components can directly achieve the effect that can only be achieved by decoration of the original house wall.
[0081] In some embodiments, the decorative structural member is a wall, a board, a staircase, a window casing or a molding.
[0082] In this embodiment, the construction method includes: step 100-step 500; wherein, step 100, preparing casting raw materials: using SDI C dry powder, water, additives, fibers, and basic colorants in a proportion to prepare self-fluidizing casting raw materials. Step 200, preparing the mold: cleaning the mold joint surface, evenly applying mold release oil on the mold joint surface, and assembling the mold to form a casting space. Step 300, pouring the prepared casting raw materials into the mold, and vibrating the mold at the same time, so that the mold can cast the material in a vibrating state. Step 400, after pouring, vacuuming the mold to discharge the bubbles in the cast structure. Step 500, curing and demolding. Step 500 includes: sending the mold as a whole to a steam curing room for steam curing for more than 12 hours at a temperature not lower than 80 degrees; lowering the temperature in the steam curing room so that the temperature difference between the inside of the steam curing room and the outside of the curing room is less than 20 degrees; demoulding the component; steam curing the component again for not less than 48 hours at a temperature not lower than 90 degrees; cooling the component, gradually cooling it; when the temperature of the component is not higher than the ambient temperature by 20 degrees, placing the component in a natural environment, allowing the component to be cured in the natural environment, and finally the temperature of the component is consistent with the ambient temperature.
[0083] In one embodiment, step 100 includes: using one or more basic colorants to prepare a colorant of a desired color, and mixing the prepared colorant with water, and stirring evenly to form colorant water; mixing SDIC dry powder and colorant water in proportion, and stirring for more than 15 minutes to stir the materials evenly; adding an additive to the stirred materials, and then continuing to stir for more than 5 minutes to stir the materials evenly; continuing to add fibers, and then continuing to stir for more than 10 minutes to stir the materials evenly to achieve self-fluidization.
[0084] In one embodiment, the fibers are polypropylene fibers.
[0085] In one embodiment, in step 200, before assembling the molds, the process also includes: arranging prefabricated steel bars or meshes, corrugated pipes and other structural reinforcement components and / or pre-embedded connecting components connected to other components inside the mold assembly space according to the design of the cast finished structure.
[0086] In one embodiment, in step 300, during pouring, pouring is performed into the mold at the same position, and the pouring material flows by itself in the mold to fill the pouring space of the mold.
[0087] In one embodiment, in step 300, pouring is performed continuously and the pouring time does not exceed 30 minutes.
[0088] In one embodiment, in step 100, a plurality of colorants of different colors are prepared using a basic colorant, and the prepared colorants of different colors are mixed with water respectively, and stirred evenly to form a plurality of groups of colorant waters of different colors; based on the plurality of groups of colorant waters of different colors, a plurality of groups of casting raw materials of different colors are prepared according to the proportions;
[0089] In step 300, a plurality of groups of casting materials of different colors are cast separately.
[0090] In one embodiment, the construction method further comprises: coding and packaging the components.
[0091] For more detailed instructions, please refer to the previous section on construction methods, which will not be repeated here.
[0092] Based on the above description, it can be known that the construction method provided by the present application makes the decoration structure and the main structure into an integral structure, and prefabricates the components of the building structure through specific materials and specific processes, methods, and molds. The surface of the prefabricated structural components can directly achieve the effect that can only be achieved by the decoration of the original house wall. Therefore, it has the following advantages: First, it reduces the defects and safety hazards caused by the original house decoration. Second, it shortens the cycle of house construction, reduces the cost of house construction, and increases the life of the house structure. Third, it saves indoor space and reduces the deadweight of the structure. Fourth, it is no longer necessary to carry out secondary decoration, and can achieve diversified (different colors, different shapes) decorative (artistic) effects of the wall, as well as the overall beauty. Fifth, it is maintenance-free and has low maintenance costs. Sixth, it is environmentally friendly, energy-saving, green and low-carbon.
[0093] In the above embodiments of the present application, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.
[0094] In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present application, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined. It should be noted that the terms used here are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, work, devices, components and / or combinations thereof.
[0095] The specific embodiments described herein are merely examples of the technical solutions of the present application. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the scope defined by the claims of the present application.
Claims
1. A construction method for a structural member with decorative effect, characterized in that: The construction method comprises: Step 100, preparing casting raw materials: using SDIC dry powder, water, admixture, fiber, and basic colorant to prepare self-fluidizing casting raw materials according to a proportion; the SDIC dry powder includes white silicate cement, white silica fume, 325 mesh quartz powder, quartz sand, kaolin, nano-CaO, nano-Na2O, calcium carbonate, and titanium dioxide; Step 200, preparing the mold: cleaning the mold joint surface, evenly applying mold release oil on the mold joint surface, and assembling the mold to form a casting space; Step 300, pouring the prepared casting raw material into the mold, and vibrating the mold at the same time, so that the mold can be poured with materials in a vibrating state; Step 400, after pouring, vacuuming the mold to remove bubbles in the poured structure; Step 500, curing and demoulding: Send the mold as a whole to the steam curing room for steam curing for more than 12 hours at a temperature not lower than 80 degrees; Lower the temperature in the steaming room so that the temperature difference between the steaming room and the outside of the growth room is less than 20℃; Demolding the components; Steam the components again for no less than 48 hours at a temperature no lower than 90 degrees; The components are cooled down gradually; when the component temperature is no higher than the ambient temperature by 20°C, the components are placed in a natural environment for curing, and eventually the component temperature is consistent with the ambient temperature.
2. The construction method of a structural member with decorative effect according to claim 1, characterized in that: Step 100 includes: Using one or more basic colorants to prepare a colorant of a desired color, and mixing the prepared colorant with water, and stirring evenly to form colorant water; Mix SDIC dry powder and colorant water in proportion and stir for more than 15 minutes to mix the materials evenly; Add the additive to the evenly stirred material, and then continue stirring for more than 5 minutes to make the material evenly stirred; Continue to add the fibers and continue stirring for more than 10 minutes to mix the material evenly and achieve self-fluidization.
3. The construction method of a structural member with decorative effect according to claim 2, characterized in that: The fibers are polypropylene fibers.
4. The construction method of a structural member with decorative effect according to claim 1, characterized in that: In step 200, before the molds are assembled, the process also includes: arranging prefabricated steel bars or meshes, corrugated pipes and other structural reinforcement components and / or pre-embedded connecting components connected to other components inside the mold assembly space according to the design of the cast finished structure.
5. The construction method of a structural member with decorative effect according to claim 1, characterized in that: In step 300, during pouring, pouring is performed into the mold at the same position, and the pouring raw material flows by itself in the mold to fill the pouring space of the mold.
6. The construction method of a structural member with decorative effect according to claim 1, characterized in that: In step 300, pouring is continued and the pouring time does not exceed 30 minutes.
7. The construction method of a structural member with decorative effect according to claim 2, characterized in that: In step 100, a plurality of colorants of different colors are prepared using a basic colorant, and the prepared colorants of different colors are mixed with water respectively, and stirred evenly to form a plurality of groups of colorant waters of different colors; based on the plurality of groups of colorant waters of different colors, a plurality of groups of casting raw materials of different colors are prepared according to the proportions; In step 300, a plurality of groups of casting materials of different colors are cast separately.
8. The construction method of a structural member with decorative effect according to claim 1, characterized in that: The construction method further comprises: coding and packaging the components.