Special-shaped whole bullet lifting appliance and lifting method

By using a combination of suspenders and adapter blocks, the problem of large-angle rotation required for special-shaped boom lifting is solved, the operation process is simplified, the lifting efficiency is improved, and the workpiece complexity and cost are reduced.

CN119612331AActive Publication Date: 2025-03-14HEBEI HANGUANG HEAVY IND
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411706399.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-26
Publication Date
2025-03-14
Estimated Expiration
2044-11-26

AI Technical Summary

Technical Problem

The prior art requires a large angle rotation along the axis circumference when lifting a special-shaped bomb, which increases the complexity and cost of the tooling or bracket, and is cumbersome to operate and inefficient.

Method used

The combination of suspenders and adapter blocks is adopted to adjust the relative positions of suspenders, adapter blocks and special-shaped bullets to lift the special-shaped bullets, avoiding large angle rotation along the axis circumference.

Benefits of technology

The design of tooling or brackets is simplified, the operation difficulty and time is reduced, the lifting efficiency is improved, and the direct and rapid lifting of special-shaped bullets is realized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119612331A_ABST
    Figure CN119612331A_ABST
Patent Text Reader

Abstract

According to the special-shaped whole bomb lifting tool base lifting method, during lifting, the adaptive block is installed between the lifting belt and a special-shaped whole bomb, lifting of the special-shaped whole bomb is achieved by adjusting the relative positions of the lifting belt, the adaptive block and the special-shaped whole bomb, and the problem that in the prior art, the special-shaped whole bomb needs to rotate by a large angle in the circumferential direction of a shaft before and after lifting is solved; and a tool bracket with a circumferential large-angle rotating mechanism is needed, multiple persons need to cooperate for synchronous operation, and the hoisting efficiency is low. The lifting appliance comprises more than one lifting unit; the hoisting unit comprises a hoisting belt and a plurality of adaptive blocks; the hanging belt is a flexible hanging belt and bypasses the special-shaped whole bullet; holes are formed in the two ends of the lifting belt and used for being matched with the lifting hooks; a plurality of adaptive blocks are arranged between the special-shaped whole bullet and the hanging belt; the two sides of each protruding structure body in the circumferential direction are each provided with an adaptive block.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of slings, and in particular relates to a special-shaped whole-bullet sling and a lifting method. Background Art

[0002] In order to meet special requirements such as air inlets or aerodynamic layout, the cross-section of some missile bodies (or partial compartments of missile bodies) is not circular, but has a partially protruding special-shaped structure on the basis of a full circle, so that the missile body formed is a special-shaped whole missile; these locally protruding special-shaped structures are mostly below the special-shaped whole missile. When lifting the special-shaped whole missile, the protruding special-shaped structure interferes with the lifting equipment. In order to avoid damage or destruction caused by the protruding special-shaped structure during the lifting or hoisting process, a common method is to rotate the special-shaped whole missile in one direction along the circumference until the protruding special-shaped structure rotates to the top of the special-shaped whole missile, and then lift the special-shaped whole missile. After the special-shaped whole missile is lifted and placed on other tooling or brackets, the special-shaped whole missile is rotated in the opposite direction along the circumference to the initial state.

[0003] The above method requires the special-shaped whole bomb to be rotated at a large angle along the circumferential direction, and requires the tooling or bracket to have a large-angle circumferential rotation mechanism, which increases the complexity of the tooling or bracket and increases the size, weight and cost; at the same time, the special-shaped whole bomb needs to be rotated at a large angle along the circumferential direction before and after lifting, and multiple operators need to cooperate and operate the rotating handwheel synchronously. The operation process is cumbersome and takes a lot of time, which increases the workload and operation difficulty. In addition, the special-shaped whole bomb cannot be directly and quickly lifted onto the bracket, and the lifting efficiency is low, which affects the equipment support efficiency. Summary of the invention

[0004] In view of this, the present invention provides a lifting device for a special-shaped whole bomb, which comprises a sling and a plurality of adapter blocks. When lifting, the adapter blocks are installed between the sling and the special-shaped whole bomb, and the lifting of the special-shaped whole bomb is achieved by adjusting the relative positions of the sling, the adapter blocks and the special-shaped whole bomb, thereby solving the problems that the special-shaped whole bomb needs to be rotated at a large angle along the circumference of the axis before and after lifting, requires a tooling bracket with a large-angle circumferential rotation mechanism, requires multiple people to cooperate and operate synchronously, and has low lifting efficiency.

[0005] The technical solution of the present invention is: a special-shaped whole-bomb lifting device, comprising: one or more lifting units;

[0006] The lifting unit comprises: a sling and a plurality of adapter blocks; the sling is a flexible sling, which is passed around the special-shaped bomb; openings are provided at both ends of the sling for cooperating with the hook;

[0007] A plurality of adapter blocks are arranged between the special-shaped whole bomb and the sling; one adapter block is arranged on both sides of each protruding structure in the circumferential direction.

[0008] As a preferred embodiment of the present invention, the adapter block is an arc-shaped block, and its outer arc surface is concentric with the inner arc surface; the width of the adapter block is greater than the width of the sling.

[0009] As a preferred embodiment of the present invention, the adapter block is made of flexible material.

[0010] As a preferred embodiment of the present invention, when the lifting device includes an odd number of lifting units, one of the lifting units is arranged at the position of the plumb line of the center of mass of the special-shaped whole bullet as the central lifting unit, the symmetry line of the lifting belt of the central lifting unit coincides with the plumb line of the center of mass of the special-shaped whole bullet, and the remaining lifting units are symmetrically arranged on both sides of the plumb line of the center of mass of the special-shaped whole bullet along the axial direction;

[0011] When the lifting device comprises an even number of lifting units, the even number of lifting units are symmetrically arranged on both sides of the plumb line of the center of mass of the special-shaped whole bomb along the axial direction.

[0012] As a preferred embodiment of the present invention, the sling is a single-point sling, comprising a lifting unit; the lifting unit is arranged at the position of the plumb line of the center of mass of the special-shaped whole bullet, and the plumb line of the center of mass of the special-shaped whole bullet is within the central symmetry plane of the sling;

[0013] The rated load of the sling is greater than twice the gravity of the entire special-shaped bomb.

[0014] As a preferred embodiment of the present invention, the sling is a double-hanging-point sling, comprising two lifting units; the two lifting units are symmetrically arranged along the axial direction of the special-shaped whole bomb on both sides of the plumb line of the center of mass of the special-shaped whole bomb;

[0015] The rated load of the sling is greater than one times the gravity of the whole special-shaped bomb.

[0016] In addition, the present invention provides a method for lifting a special-shaped whole bomb, using a single-hanging-point sling, comprising the following steps:

[0017] S1: Initially, the longitudinal axis of the special-shaped whole bomb is placed horizontally on the tooling or bracket, the lifting equipment is started, the hook of the lifting equipment is adjusted to be just above the center of mass of the special-shaped whole bomb, and the hook is lowered;

[0018] S2: Hang the opening at one end of the sling on the hook of the lifting equipment, and hang the other end on the hook of the lifting equipment after passing under the special-shaped whole bomb. At this time, the plumb line of the center of mass of the special-shaped whole bomb is within the central symmetry plane of the sling, and there is a gap between the sling and the special-shaped whole bomb for placing the adapter block;

[0019] S3: An adapter block is installed between the special-shaped whole bullet and the sling, and an adapter block is placed on both sides of each protruding structure along the circumferential direction of the whole bullet. The inner arc surface of each adapter block contacts the circumferential surface of the special-shaped whole bullet, and the outer arc surface of the adapter block contacts the sling or leaves a gap;

[0020] S4: adjusting the position of the adapter block along the circumference of the special-shaped whole bullet, so that the adapter blocks placed on both sides of the protruding structure have a gap with the protruding structure, and the adapter blocks placed on both sides of each protruding structure are symmetrical with respect to the central axis of the protruding structure; the adapter blocks placed on one side of the plumb line of the center of mass of the whole bullet and the adapter blocks placed on the other side of the plumb line of the center of mass of the whole bullet are symmetrical with respect to the plumb line of the center of mass of the whole bullet;

[0021] S5: adjusting the position of the adapter block along the longitudinal direction of the special-shaped whole bullet, so that the front end surface and the rear end surface of the adapter block are respectively on the front and rear sides of the plumb line of the center of mass of the special-shaped whole bullet, and the distance from the front end surface of the adapter block to the plumb line of the center of mass of the special-shaped whole bullet is equal to the distance from the rear end surface to the plumb line of the center of mass of the special-shaped whole bullet;

[0022] S6: Keep the adapter block in position and raise the hook until the sling just contacts the outer arc surface of the adapter block. During the process of raising the hook, keep the plumb line of the center of mass of the special-shaped whole projectile in the central symmetry plane of the sling 91; until the special-shaped whole projectile is separated from the tooling or bracket, continue to raise it until the set safety distance is reached between the special-shaped whole projectile and the tooling or bracket, and complete the lifting of the special-shaped whole projectile.

[0023] In addition, the present invention provides a method for lifting a special-shaped whole bomb, using a double-hanging-point lifting device, comprising the following steps:

[0024] S1: Adjust the special-shaped whole bomb to make the longitudinal axis of the special-shaped whole bomb horizontal, start two lifting devices with one hook each, or start one lifting device with two hooks;

[0025] Adjust the first hook of the lifting equipment to be just above the center of mass of the special-shaped whole projectile, move forward a distance in a direction parallel to the longitudinal axis of the special-shaped whole projectile, adjust the second hook of the lifting equipment to be just above the center of mass of the special-shaped whole projectile, move backward the same distance in a direction parallel to the longitudinal axis of the special-shaped whole projectile; drop the first hook and the second hook;

[0026] S2: Hang the opening at one end of one of the slings on the first hook, and the other end of the sling passes through the opening at the end and then passes under the special-shaped whole bullet and hangs on the first hook; at this time, the plumb line of the center of mass of the special-shaped whole bullet is parallel to the central symmetry plane of the sling, and there is a gap between the sling and the special-shaped whole bullet for placing the adapter block;

[0027] S3: Using the same method as above, hang the opening at one end of another sling on the second hook, and the other end of the sling passes under the special-shaped whole bullet and then passes through the opening at the end and hangs on the second hook; at this time, the center of mass plumb line of the special-shaped whole bullet is parallel to the central symmetry plane of the sling; there is a gap between the sling and the special-shaped whole bullet for placing the adapter block.

[0028] S4: installing adapter blocks between the special-shaped whole bullet and the two slings respectively, wherein the inner arc surface of the adapter block contacts the circular surface of the special-shaped whole bullet, and the outer arc surface of the adapter block contacts the sling or leaves a gap;

[0029] S5: adjusting the position of the adapter block between the special-shaped whole bullet and one of the slings along the circumference of the special-shaped whole bullet, so that the adapter blocks placed on both sides of each protruding structure have a gap with the protruding structure, the two adapter blocks placed on both sides of each protruding structure are symmetrical with respect to the central axis of the protruding structure, and the adapter blocks placed on one side of the plumb line of the center of mass of the whole bullet and the adapter blocks placed on the other side of the plumb line of the center of mass of the whole bullet are symmetrical with respect to the plumb line of the center of mass of the whole bullet;

[0030] S6. Using the same method as above, adjust the position of the adapter block between the special-shaped whole bomb and another sling along the circumference of the special-shaped whole bomb;

[0031] S7: adjusting the position of the adapter block between the special-shaped whole bullet and one of the slings along the longitudinal direction of the special-shaped whole bullet, so that the front end face and the rear end face of the adapter block are respectively on the front and rear sides of the central symmetry plane of the sling, and the distance from the front end face of the adapter block to the central symmetry plane of the sling is equal to the distance from the rear end face of the adapter block to the central symmetry plane of the sling;

[0032] S8: Using the same method as above, adjust the position of the adapter block between the special-shaped whole bullet and another sling along the longitudinal direction of the special-shaped whole bullet;

[0033] S9: Keep the positions of the two sets of adapter blocks unchanged, and slowly raise the first hook and the second hook until the slings in the two lifting units just touch the outer arc surfaces of the corresponding adapter blocks. During the process of raising the hooks, keep the plumb line of the center of mass of the special-shaped whole projectile parallel to the central symmetry planes of the two slings respectively;

[0034] S10: Keep the positions of the two sets of adapter blocks unchanged, continue to slowly raise the hook until the special-shaped whole bomb is separated from the tooling or bracket, and continue to raise it until the special-shaped whole bomb and the tooling or bracket reach the set safety distance, completing the lifting of the special-shaped whole bomb.

[0035] Beneficial effects:

[0036] (1) The present invention adopts a sling and an adapter block to cooperate with each other. The sling ensures that the sling and the contact surface area of ​​the special-shaped whole bullet are in full contact, thereby reducing the pressure and force of the special-shaped whole bullet in the contact surface area;

[0037] At the same time, the sling can be adapted to the lifting of special-shaped whole bombs with different diameters, and has strong versatility. As long as it is within the carrying range of the sling, the special-shaped whole bomb can be lifted, and there is no need to develop multiple types of slings to adapt to the lifting of special-shaped whole bombs with different cross-sectional diameters;

[0038] Installing an adapter block between the sling and the special-shaped whole bomb can meet the needs of locally protruding special-shaped structures arranged at various angles along the circumference of the special-shaped whole bomb, greatly increasing the versatility of the special-shaped whole bomb lifting device and lifting method.

[0039] (2) In the present invention, by adjusting the circumferential positions of the plurality of adapter blocks between the sling and the special-shaped whole bomb, the plurality of adapter blocks are arranged on both sides of the plumb line of the center of mass of the special-shaped whole bomb, so that the plurality of adapter blocks separated on both sides of the plumb line of the center of mass of the special-shaped whole bomb are symmetrical about the plumb line, thereby ensuring that the resultant force applied to the special-shaped whole bomb by the plurality of adapter blocks during the lifting process of the special-shaped whole bomb falls on the plumb line of the special-shaped whole bomb, thereby ensuring that the special-shaped whole bomb will not rotate in the circumferential direction during the lifting process, and there is no need to rotate the whole bomb in the circumferential direction after the special-shaped whole bomb is lifted.

[0040] (3) In the present invention, the special-shaped whole bomb does not need to be rotated at a large circumferential angle before and after the hoisting of the special-shaped whole bomb, and thus the tooling or bracket does not need to have a large circumferential angle rotation mechanism, which reduces the workload and operating difficulty, realizes direct and rapid hoisting of the special-shaped whole bomb, and improves the hoisting efficiency.

[0041] (4) The present invention is applicable to single-lifting point lifting, and only one lifting hook is needed for the lifting equipment to complete the lifting of the entire irregular bomb, thereby reducing the difficulty of lifting operation and improving the lifting security.

[0042] (5) The present invention can also be applied to double-lifting point lifting, that is, lifting of special-shaped whole-body items is performed by two hooks of a lifting device or two hooks provided by more than two lifting devices. The lifting load of a single hook during double-lifting point lifting is half of the lifting load of a single hook during single-lifting point lifting, thereby reducing the load-bearing requirements for a single hook of the lifting device, reducing the difficulty of lifting operation, and improving the lifting security. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a front view of the special-shaped whole-bullet sling of the present invention in use;

[0044] Figure 2 This is a schematic diagram of the state of lifting with a single lifting point;

[0045] Figure 3 This is a schematic diagram of the state of lifting with double lifting points;

[0046] Among them, 1-sling, 2-adaptation block one, 3-adaptation block two, 4-adaptation block three, 5-adaptation block four, 6-special-shaped whole bullet, 7-protruding structure one, 8-protruding structure two, 9-center of mass of special-shaped whole bullet, 10-center of mass plumb line. DETAILED DESCRIPTION

[0047] In order to better understand the present invention, the technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0048] Embodiment 1:

[0049] This embodiment provides a special-shaped whole bomb lifting device, which is used for lifting a special-shaped whole bomb having protruding structures on both sides of the outer surface.

[0050] like Figure 1 As shown, the special-shaped whole-bomb lifting device comprises: one or more lifting units; the lifting unit comprises: a sling 1 and a plurality of adapter blocks, wherein the sling 1 is a flexible sling, which is passed around the special-shaped whole bomb; openings are provided at both ends of the sling 1 for cooperating with the hook of the lifting equipment; a plurality of adapter blocks are provided in the area where the special-shaped whole bomb 6 contacts the sling 1; two adapter blocks are correspondingly provided for each protruding structure, and the two adapter blocks are respectively located on both sides of the protruding structure along the circumference of the special-shaped whole bomb.

[0051] In this example, there is a protruding structure on each side of the outer surface of the special-shaped bomb, namely protruding structure one 7 and protruding structure two 8; based on this, each lifting unit is provided with four adapter blocks, namely adapter block one 2, adapter block two 3, adapter block three 4, and adapter block four 5.

[0052] The sling 1 is a flat belt-shaped structure with an opening at each end for cooperating with the hook; to facilitate the lifting of the hook, the size of the opening is larger than the hook size of the lifting equipment; the length of the sling 1 is larger than the circumference of the special-shaped whole bomb 6; the sling 1 is made of a flexible material, and when it contacts the special-shaped whole bomb 6 and each adapter block (i.e., adapter block one 2, adapter block two 3, adapter block three 4, adapter block four 5) under the action of external force, the contact surface is completely fitted, so that the external force can be evenly applied to the contact area.

[0053] Each adapter block has the same structural dimensions and mass; the adapter block is an arc-shaped block with concentric inner and outer arc surfaces. The radius of the inner arc surface of the adapter block is the same as the radius of the special-shaped whole bomb 6, so that the inner arc surface of the adapter block can fit the outer surface of the special-shaped whole bomb 6; the radius of the outer arc surface of the adapter block is larger than the maximum radial dimension of the protruding structure 1 7 and the protruding structure 2 8 (that is, the adapter block protrudes from the protruding structure 1 7 and the protruding structure 2 8 in the radial direction), thereby preventing the protruding structure 1 7 and the protruding structure 2 8 from contacting the sling 1.

[0054] The two end faces of the adapter block along the axial direction of the special-shaped whole bullet 6 are the front end face and the rear end face. The front end face of the adapter block is parallel to the rear end face. The distance between the front and rear end faces of the adapter block is the width (such as Figure 2 and Figure 3 L2 in the figure is greater than the width of the sling 1 (as Figure 2 and Figure 3 L1); the adapter block is made of a flexible material. When it contacts the special-shaped whole bomb 6 and the sling 1 under the action of external force, the contact surface is completely fitted, and the external force can be evenly applied to the contact area.

[0055] The adapting block is located at the intersection of the two circumferential side surfaces of the special-shaped whole bullet 6 with the inner arc surface and the outer arc surface, and has rounded corners.

[0056] Several adapter blocks are installed between the sling 1 and the special-shaped whole bomb 6, and one adapter block is arranged on both sides of each protruding structure. The adapter block is adjustable along the circumference of the special-shaped whole bomb 6 between the sling 1 and the special-shaped whole bomb 6 (before lifting, the position of each adapter block is manually adjusted).

[0057] When the special-shaped whole bomb lifting device includes an odd number of lifting units, one of the lifting units is arranged at the position of the center of mass plumb line 10 of the special-shaped whole bomb 6 (let it be the central lifting unit), the symmetry line of the sling 1 of the central lifting unit coincides with the center of mass plumb line 10 of the special-shaped whole bomb, and the remaining lifting units are symmetrically arranged on both sides of the center of mass plumb line 10 of the special-shaped whole bomb 6 along the axial direction of the special-shaped whole bomb.

[0058] When the special-shaped whole bomb lifting device comprises an even number of lifting units, the even number of lifting units are symmetrically arranged on both sides of the plumb line 10 of the center of mass of the special-shaped whole bomb along the axial direction.

[0059] As an example, the special-shaped whole-bomb sling is a single-point sling, such as Figure 2 As shown, the special-shaped whole-bullet sling includes a lifting unit, which is arranged at the position of the center-of-mass plumb line 10 of the special-shaped whole-bullet 6, and the center-of-mass plumb line 10 of the special-shaped whole-bullet is in the central symmetry plane of the sling 1; the adapter block 1 2 and the adapter block 3 4 are symmetrical along the center-of-mass plumb line 10 of the special-shaped whole-bullet 6 (i.e., the plumb line passing through the center-of-mass 9 of the special-shaped whole-bullet), and the adapter block 2 3 and the adapter block 4 5 are symmetrical along the center-of-mass plumb line 10 of the special-shaped whole-bullet 6. For a single-hanging-point sling, the rated load of the sling 1 is greater than twice the gravity of the special-shaped whole-bullet 6.

[0060] As an example, the special-shaped whole-bomb sling is a double-hanging-point sling, such as Figure 3 As shown, the special-shaped whole-bullet sling includes two lifting units, which are symmetrically arranged along the axis of the special-shaped whole bullet on both sides of the plumb line 10 of the center of mass of the special-shaped whole bullet 6; in the lifting units on each side, the adapter block 1 2 and the adapter block 3 4 are symmetrical along the symmetry line of the sling 1, and the adapter block 2 3 and the adapter block 4 5 are symmetrical along the symmetry line of the sling 1. For the double-hanging-point sling, the rated load of the sling 1 is greater than one times the gravity of the special-shaped whole bullet 6.

[0061] Embodiment 2:

[0062] This embodiment provides a method for lifting a special-shaped whole bomb at a single lifting point, that is, the special-shaped whole bomb lifting device used in the lifting method has only one lifting unit in the above embodiment 1; the method comprises the following steps:

[0063] S1. Initially, the longitudinal axis of the special-shaped whole bomb 6 is horizontally placed on the tooling or bracket, the lifting equipment is started, the hook of the lifting equipment is adjusted to be just above the center of mass 9 of the special-shaped whole bomb, and the hook is lowered;

[0064] S2, hang an opening at one end of the sling 1 on the hook of the lifting equipment, and pass the other end of the sling 1 under the special-shaped whole bomb 6 and hang it on the hook of the lifting equipment. At this time, the plumb line 10 passing through the centroid of the special-shaped whole bomb is in the central symmetry plane of the sling 1, and there is a gap between the sling 1 and the special-shaped whole bomb 6 for placing the adapter block;

[0065] S3. Install an adapter block between the special-shaped whole bomb 6 and the sling 1, and place an adapter block on both sides of each protruding structure along the circumferential direction of the whole bomb. The inner arc surface of each adapter block contacts the circumferential surface of the special-shaped whole bomb 6, and the outer arc surface of the adapter block contacts the sling 1 or leaves a gap; in this example, adapter block 1 2 and adapter block 2 3 are located on both sides of the protruding structure 1 7 along the circumferential direction of the special-shaped whole bomb 6, and adapter block 3 4 and adapter block 4 5 are located on both sides of the protruding structure 2 8 along the circumferential direction of the special-shaped whole bomb 6.

[0066] S4. Adjust the position of the adapter block along the circumference of the special-shaped whole bullet 6 so that there is a gap between the adapter blocks placed on both sides of the protruding structure and the protruding structure, and the adapter blocks placed on both sides of each protruding structure are symmetrical with respect to the central axis of the protruding structure; the adapter blocks placed on one side of the plumb line of the center of mass of the whole bullet and the adapter blocks placed on the other side of the plumb line of the center of mass of the whole bullet are symmetrical with respect to the plumb line 10 of the center of mass of the whole bullet.

[0067] Therefore, in this example, by adjustment, a gap is left between the adapter block 2, the adapter block 23 and the protruding structure 1 7, and a gap is left between the adapter block 3 4, the adapter block 4 5 and the protruding structure 2 8, so that the angle between the central axis of the adapter block 2 and the central axis of the protruding structure 7 is D, the angle between the central axis of the adapter block 23 and the central axis of the protruding structure 7 is C, the angle between the central axis of the adapter block 3 4 and the central axis of the protruding structure 2 8 is B, and the angle between the central axis of the adapter block 4 5 and the central axis of the protruding structure 2 8 is A; C and D are equal, A and B are equal, the angle between the adapter block 2 3 and the plumb line 10 of the center of mass 9 of the special-shaped whole bullet is E, the angle between the adapter block 4 5 and the plumb line 10 of the center of mass 9 of the special-shaped whole bullet is F, and E and F are equal.

[0068] S5, adjust the position of the adapter block along the longitudinal direction of the special-shaped whole bullet 6, so that the front end face and the rear end face of the adapter block are respectively on the front and rear sides of the plumb line 10 of the center of mass of the special-shaped whole bullet, and the distance from the front end face of the adapter block to the plumb line 10 of the center of mass of the special-shaped whole bullet is equal to the distance from the rear end face to the plumb line 10 of the center of mass of the special-shaped whole bullet. Figure 2 As shown;

[0069] S6. Keep the adapter block in position (before the sling 1 contacts the adapter block, use tooling or manual methods to ensure that the adapter block remains in position), slowly raise the hook until the sling 1 just contacts the outer arc surface of the adapter block, and keep the plumb line 10 of the center of mass of the special-shaped whole bomb in the central symmetry plane of the sling 1 during the process of raising the hook; until the special-shaped whole bomb 6 is separated from the tooling or bracket, continue to raise it until there is a sufficient safety distance between the special-shaped whole bomb 6 and the tooling or bracket, and complete the lifting of the special-shaped whole bomb 6.

[0070] Embodiment 3:

[0071] This embodiment provides a double-lifting point lifting method for a special-shaped whole bomb, that is, the special-shaped whole bomb lifting device used in the lifting method has only two lifting units in the above embodiment 1; the method comprises the following steps:

[0072] S1, adjust the special-shaped whole bomb 6 to make the longitudinal axis of the special-shaped whole bomb 6 horizontal, start two lifting devices, each lifting device has a hook, or start the two hooks of a lifting device, adjust the first hook of the lifting device to be just above the center of mass 9 of the special-shaped whole bomb, move forward a distance L3 in a direction parallel to the longitudinal axis of the special-shaped whole bomb 6, adjust the second hook of the lifting device to be just above the center of mass 9 of the special-shaped whole bomb, move backward a distance L4 in a direction parallel to the longitudinal axis of the special-shaped whole bomb 6, L3 and L4 are equal, and drop the first hook and the second hook;

[0073] S2, hang the opening at one end of one of the slings 1 on the first hook of the lifting equipment, and the other end of the sling 1 passes through the opening at the end after passing under the special-shaped whole bomb 6 and hangs on the first hook of the lifting equipment; at this time, the center of mass plumb line 10 of the special-shaped whole bomb is parallel to the central symmetry plane of the sling, and there is a gap between the sling 1 and the special-shaped whole bomb 6 for placing the adapter block;

[0074] S3. Using the same method as above, hang the opening at one end of another sling 1 on the second hook of the lifting equipment, and the other end of the sling 1 passes through the opening at the end after passing under the special-shaped whole bomb 6 and is hung on the second hook of the lifting equipment; at this time, the center of mass plumb line 10 of the special-shaped whole bomb is parallel to the central symmetry plane of the sling; there is a gap between the sling 1 and the special-shaped whole bomb 6 for placing the adapter block.

[0075] like Figure 3 As shown, the distance from the center of mass plumb line 10 of the special-shaped whole bullet to the central symmetry plane of the left sling 1 is L3, and the distance to the central symmetry plane of the right sling 1 is L4, and L3 and L4 are equal.

[0076] S4, respectively install adapter blocks between the special-shaped whole bomb 6 and the two slings 1, and place adapter blocks 1 and 2 and 3 on both sides of the protruding structure 1 7 along the circumference direction of the special-shaped whole bomb 6, and place adapter blocks 3 and 4 and 5 on both sides of the protruding structure 2 8 along the circumference direction of the special-shaped whole bomb 6. The inner arc surface of the adapter block contacts the circular surface of the special-shaped whole bomb 6, and the outer arc surface of the adapter block contacts the sling 1 or leaves a gap;

[0077] S5, adjusting the position of the adapter block between the special-shaped whole bullet 6 and one of the slings 1 along the circumferential direction of the special-shaped whole bullet 6, leaving a gap between the adapter block 1 2, the adapter block 2 3 and the protruding structure 1 7, leaving a gap between the adapter block 3 4, the adapter block 4 5 and the protruding structure 2 8, the angle between the central axis of the adapter block 1 2 and the central axis of the protruding structure 1 7 is D, the angle between the central axis of the adapter block 2 3 and the central axis of the protruding structure 1 7 is C, the angle between the central axis of the adapter block 3 4 and the central axis of the protruding structure 2 8 is B, the angle between the central axis of the adapter block 4 5 and the central axis of the protruding structure 2 8 is A, C and D are equal, A and B are equal, the angle between the adapter block 2 3 and the plumb line 10 of the center of mass 9 of the special-shaped whole bullet is E, the angle between the adapter block 4 5 and the plumb line 10 of the center of mass 9 of the special-shaped whole bullet is F, and E and F are equal;

[0078] S6. Using the same method as above, adjust the position of the adapter block between the special-shaped whole bomb 6 and another sling 1 along the circumference of the special-shaped whole bomb 6: that is, the adapter blocks placed on both sides of each protruding structure leave a gap with the protruding structure, and the above gap is equal to the corresponding gap in step S5. The two adapter blocks placed on both sides of each protruding structure are symmetrical with respect to the central axis of the protruding structure, and the adapter blocks placed on one side of the plumb line of the center of mass of the whole bomb and the adapter blocks placed on the other side of the plumb line of the center of mass of the whole bomb are symmetrical with respect to the plumb line of the center of mass of the whole bomb.

[0079] S7, adjusting the position of the adapter block between the special-shaped whole bullet 6 and one of the slings 1 along the longitudinal direction of the special-shaped whole bullet 6, so that the front end face and the rear end face of the adapter block are respectively on the front and rear sides of the central symmetry plane of the sling 1, and the distance from the front end face of the adapter block to the central symmetry plane of the sling 1 is equal to the distance from the rear end face of the adapter block to the central symmetry plane of the sling 1;

[0080] S8, using the same method as above, adjust the position of the adapter block between the special-shaped whole bomb 6 and another sling 1 along the longitudinal direction of the special-shaped whole bomb 6;

[0081] S9, keep the positions of the two sets of adapter blocks unchanged, slowly raise the first hook and the second hook until the slings 1 in the two lifting units just touch the outer arc surface of the corresponding adapter block, and keep the plumb line 10 of the center of mass of the special-shaped whole bomb parallel to the central symmetry planes of the two slings 1 during the lifting of the hooks, and L3 and L4 are equal;

[0082] S10, keep the positions of the two sets of adapter blocks unchanged, continue to slowly raise the hook until the special-shaped whole bomb 6 is separated from the tooling or bracket, and continue to raise it until there is a sufficient safe distance between the special-shaped whole bomb 6 and the tooling or bracket. During the process of raising the hook, keep the plumb line 10 of the center of mass of the special-shaped whole bomb parallel to the central symmetry planes of the two slings 1, and L3 and L4 are equal, and complete the lifting of the special-shaped whole bomb 6.

[0083] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.

Claims

1. A special-shaped whole-bullet lifting device, used for lifting special-shaped whole-bullet with protruding structures on both sides of the outer surface; characterized in that: The sling comprises: one or more lifting units; The lifting unit comprises: a lifting belt (1) and a plurality of adapter blocks; the lifting belt (1) is a flexible lifting belt, which is passed around the special-shaped whole bomb; openings are provided at both ends of the lifting belt (1) for cooperating with the lifting hook; A plurality of adapter blocks are provided between the special-shaped bullet (6) and the sling (1); one adapter block is provided on each of the two circumferential sides of each protruding structure.

2. The special-shaped whole-bullet sling according to claim 1, characterized in that: The adapter block is an arc-shaped block, and its outer arc surface is concentric with the inner arc surface; the width of the adapter block is greater than the width of the sling (1).

3. The special-shaped whole-bullet sling according to claim 1 or 2, characterized in that: The adapter block is made of flexible material.

4. The special-shaped whole-bullet sling according to claim 1 or 2, characterized in that: When the lifting device includes an odd number of lifting units, one of the lifting units is arranged at the position of the center of mass plumb line (10) of the special-shaped whole bomb (6) as a central lifting unit, the symmetry line of the lifting belt (1) of the central lifting unit coincides with the center of mass plumb line (10) of the special-shaped whole bomb, and the remaining lifting units are symmetrically arranged on both sides of the center of mass plumb line (10) of the special-shaped whole bomb along the axial direction; When the lifting device comprises an even number of lifting units, the even number of lifting units are symmetrically arranged along the axial direction of the special-shaped whole bullet on both sides of the plumb line (10) of the center of mass of the special-shaped whole bullet.

5. The special-shaped whole-bullet sling according to claim 4, characterized in that: The lifting device is a single-hanging-point lifting device, comprising a lifting unit; the lifting unit is arranged at the location of the center-of-mass plumb line (10) of the special-shaped whole bullet (6), and the center-of-mass plumb line (10) of the special-shaped whole bullet is within the central symmetry plane of the lifting belt (1); The rated load of the sling (1) is greater than twice the gravity of the special-shaped whole bomb (6).

6. The special-shaped whole-bullet sling according to claim 4, characterized in that: The lifting device is a double-lifting-point lifting device, comprising two lifting units; the two lifting units are symmetrically arranged along the axial direction of the special-shaped whole bomb on both sides of the plumb line (10) of the center of mass of the special-shaped whole bomb (6); The rated load of the sling (1) is greater than one times the gravity of the special-shaped whole bomb (6).

7. A method for lifting a special-shaped whole bomb, characterized in that: The single-hanging-point sling according to claim 5 comprises the following steps: S1: Initially, the longitudinal axis of the special-shaped whole bomb (6) is horizontally placed on a tool or bracket, the lifting device is started, the hook of the lifting device is adjusted to be just above the center of mass (9) of the special-shaped whole bomb, and the hook is lowered; S2: The opening at one end of the sling (1) is hung on the hook of the lifting equipment, and the other end is passed under the special-shaped whole bomb (6) and then hung on the hook of the lifting equipment. At this time, the center of mass plumb line (10) of the special-shaped whole bomb is within the central symmetry plane of the sling (1), and there is a gap between the sling (1) and the special-shaped whole bomb (6) for placing the adapter block; S3: installing an adapter block between the special-shaped whole bullet (6) and the sling (1), with an adapter block placed on both sides of each protruding structure along the circumferential direction of the whole bullet, the inner arc surface of each adapter block contacts the circumferential surface of the special-shaped whole bullet (6), and the outer arc surface of the adapter block contacts the sling (1) or leaves a gap; S4: adjusting the position of the adapter block along the circumference of the special-shaped whole bullet (6) so that the adapter blocks placed on both sides of the protruding structure have a gap with the protruding structure, and the adapter blocks placed on both sides of each protruding structure are symmetrical with respect to the central axis of the protruding structure; the adapter blocks placed on one side of the plumb line of the center of mass of the whole bullet and the adapter blocks placed on the other side of the plumb line of the center of mass of the whole bullet are symmetrical with respect to the plumb line (10) of the center of mass of the whole bullet; S5: adjusting the position of the adapter block along the longitudinal direction of the special-shaped whole bullet (6) so that the front end surface and the rear end surface of the adapter block are respectively located at the front and rear sides of the plumb line (10) of the center of mass of the special-shaped whole bullet, and the distance from the front end surface of the adapter block to the plumb line (10) of the center of mass of the special-shaped whole bullet is equal to the distance from the rear end surface to the plumb line (10) of the center of mass of the special-shaped whole bullet; S6: Keep the adapter block in position and raise the hook until the sling (1) just contacts the outer arc surface of the adapter block. During the process of raising the hook, keep the plumb line (10) of the center of mass of the special-shaped whole projectile in the central symmetry plane of the sling 91; until the special-shaped whole projectile (6) is separated from the tooling or bracket, continue to raise the hook until the special-shaped whole projectile (6) and the tooling or bracket reach a set safety distance, and complete the lifting of the special-shaped whole projectile (6).

8. A method for lifting a special-shaped whole bomb, characterized in that: The double lifting point sling according to claim 6 comprises the following steps: S1: adjusting the special-shaped whole bomb (6) so that the longitudinal axis of the special-shaped whole bomb (6) is horizontal, starting two lifting devices each having one lifting hook, or starting one lifting device having two lifting hooks; Adjust the first hook of the lifting device to the position directly above the mass center (9) of the special-shaped whole bomb, and move forward a certain distance in a direction parallel to the longitudinal axis of the special-shaped whole bomb (6); adjust the second hook of the lifting device to the position directly above the mass center (9) of the special-shaped whole bomb, and move backward the same distance in a direction parallel to the longitudinal axis of the special-shaped whole bomb (6); and lower the first hook and the second hook; S2: The opening at one end of one of the slings (1) is hung on the first hook, and the other end of the sling (1) is passed through the bottom of the special-shaped bullet (6) and then hung on the first hook through the opening at the end; at this time, the center of mass plumb line (10) of the special-shaped bullet is parallel to the central symmetry plane of the sling, and there is a gap between the sling (1) and the special-shaped bullet (6) for placing the adapter block; S3: Using the same method as above, hang the opening at one end of another sling (1) on the second hook, and the other end of the sling (1) passes through the bottom of the special-shaped bullet (6) and then hangs on the second hook through the opening at the end; at this time, the center of mass plumb line (10) of the special-shaped bullet is parallel to the central symmetry plane of the sling; there is a gap between the sling (1) and the special-shaped bullet (6) for placing the adapter block. S4: installing adapter blocks between the special-shaped whole bullet (6) and the two slings (1) respectively, wherein the inner arc surface of the adapter block contacts the circular surface of the special-shaped whole bullet (6), and the outer arc surface of the adapter block contacts the sling (1) or leaves a gap; S5: adjusting the position of the adapter block between the special-shaped whole bullet (6) and one of the slings (1) along the circumference of the special-shaped whole bullet (6), so that the adapter blocks placed on both sides of each protruding structure have a gap with the protruding structure, the two adapter blocks placed on both sides of each protruding structure are symmetrical with respect to the central axis of the protruding structure, and the adapter blocks placed on one side of the plumb line of the center of mass of the whole bullet and the adapter blocks placed on the other side of the plumb line of the center of mass of the whole bullet are symmetrical with respect to the plumb line of the center of mass of the whole bullet; S6, using the same method as above, adjusting the position of the adapter block between the special-shaped whole bomb (6) and another sling (1) along the circumference of the special-shaped whole bomb (6); S7: adjusting the position of the adapter block between the special-shaped whole bullet (6) and one of the slings (1) along the longitudinal direction of the special-shaped whole bullet (6), so that the front end face and the rear end face of the adapter block are respectively located on the front and rear sides of the central symmetry plane of the sling (1), and the distance from the front end face of the adapter block to the central symmetry plane of the sling (1) is equal to the distance from the rear end face of the adapter block to the central symmetry plane of the sling (1); S8: Using the same method as above, adjust the position of the adapter block between the special-shaped whole bomb (6) and another sling (1) along the longitudinal direction of the special-shaped whole bomb (6); S9: Keeping the positions of the two sets of adapter blocks unchanged, slowly raise the first hook and the second hook until the slings (1) in the two lifting units just touch the outer arc surfaces of the corresponding adapter blocks, and during the process of raising the hooks, keep the plumb line (10) of the center of mass of the special-shaped whole projectile parallel to the central symmetry planes of the two slings (1); S10: Keep the positions of the two sets of adapter blocks unchanged, continue to slowly raise the hook until the special-shaped whole bomb (6) is separated from the tooling or bracket, and continue to raise it until the special-shaped whole bomb (6) and the tooling or bracket reach a set safety distance, and complete the lifting of the special-shaped whole bomb (6).

Citation Information

Patent Citations

  • Flexible self-binding engine lifting appliance

    CN117466126A

  • Hoisting and fixing device for small objects for subway construction

    CN210682952U

  • Novel lifting appliance for large solid rocket engine

    CN217148269U

  • Rocket overturning and erecting lifting appliance

    CN221343583U

  • Apparatus and method for handling cargo using flexible support straps

    US4432689A