Municipal engineering construction safety intelligent management system and method

By designing a municipal engineering construction intelligent management system, the problem of lack of safety supervision due to small project volume during construction is solved, and intelligent planning and management of construction safety is realized, real-time monitoring and early warning of safety hazards, and effectively avoid safety accidents.

CN119624735APending Publication Date: 2025-03-14GUOZI (QINGDAO) DIGITAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411662813.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-20
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

During municipal engineering construction, there is a lack of complete safety supervision due to small project volume, especially in complex construction environments, which leads to increased construction risks and is difficult to ensure the safety and stability of the construction process.

Method used

Design a municipal engineering construction safety intelligent management system, including the platform and user ends, and conduct safety management analysis through the construction analysis module, generate safety layout models and safety management plans, monitor the construction area in real time, conduct condition safety analysis and operation safety analysis, generate a comprehensive evaluation curve, and conduct safety awareness assessment.

Benefits of technology

Through the intelligent management system, small contractors can carry out intelligent safety management, realize intelligent planning and management of construction safety, monitor safety indicators in real time, promptly detect and warn of potential safety hazards, and effectively avoid the occurrence of safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119624735A_ABST
    Figure CN119624735A_ABST
Patent Text Reader

Abstract

The invention discloses a municipal engineering construction safety intelligent management system and method, and belongs to the technical field of municipal engineering construction safety management, and the method comprises the steps: a user arranges and uploads construction information, and marks a construction supervision region according to the construction information; performing safety management analysis on the construction information to obtain a safety management scheme; generating a safety layout model according to the safety management scheme and the construction supervision area; determining a layout application model according to the safety layout model and the safety management scheme; arranging each safety device according to the arrangement application model; performing real-time monitoring on the construction supervision area to obtain monitoring data, and performing condition safety analysis and operation safety analysis on the monitoring data to obtain a corresponding condition safety analysis result and an operation safety analysis result; analyzing the condition safety analysis result and the operation safety analysis result to generate a comprehensive evaluation curve; and performing safety awareness assessment according to the comprehensive assessment curve to obtain a safety awareness assessment result.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of municipal engineering construction safety management, and specifically relates to a municipal engineering construction safety intelligent management system and method. Background Art

[0002] In the field of municipal engineering construction, safety management has always been a crucial link. With the acceleration of urbanization, the number of municipal projects continues to increase, and the scale and complexity of construction are also increasing, which puts higher requirements on construction safety management. At present, there are some relatively complete safety management systems on the market. These systems mainly rely on manual supervision, equipment supervision, and multi-party collaborative supervision to ensure the safety of municipal engineering construction.

[0003] However, with the development of cities and the continuous improvement of infrastructure, municipal facilities such as roads, green belts, and pipelines often need to be expanded, renovated, or repaired. In this process, due to the small amount of work, most of the current construction does not have perfect safety supervision and relies entirely on the construction team's own management capabilities. Moreover, the construction area is usually located in the main roads of the city or busy traffic areas, with dense traffic and pedestrian flow and complex traffic conditions, which aggravates the construction risks. In particular, many of the above-mentioned projects are contracted by small contractors without sound management measures. In this case, if there is a lack of a complete safety management system, it will be difficult to ensure the safety and stability of the construction process if it relies solely on construction supervisors for management.

[0004] Based on this, in order to solve the above problems, the present invention provides a municipal engineering construction safety intelligent management system and method. Summary of the invention

[0005] In order to solve the problems existing in the above-mentioned solutions, the present invention provides a municipal engineering construction safety intelligent management system and method.

[0006] The purpose of the present invention can be achieved through the following technical solutions:

[0007] A municipal engineering construction safety intelligent management system, including a platform end and a user end;

[0008] The platform end includes a construction analysis module;

[0009] The construction analysis module is used to perform construction analysis, obtain construction information uploaded by users, and mark the construction supervision area in a preset municipal information map according to the construction information;

[0010] Performing safety management analysis on the construction information to obtain a safety management plan;

[0011] Generate a safety layout model according to the safety management plan and the construction supervision area, and mark the equipment introduction data of each safety device in the safety layout model; send the safety layout model and the safety management plan to the user terminal.

[0012] Furthermore, the method for safety management analysis of construction information includes:

[0013] Determine each safety hazard according to the construction information; analyze each safety hazard to obtain various solutions;

[0014] Screen each of the solutions to obtain a target solution, and determine a safety management plan according to the target solution.

[0015] Furthermore, the method for screening each solution includes:

[0016] Obtain the safety reserve information of the user; estimate the safety cost of each solution according to the safety reserve information;

[0017] Estimate the effectiveness value of each solution for solving each safety hazard; mark the effectiveness value as XGi, where i represents the corresponding safety hazard, i = 1, 2,..., n, and n is a positive integer;

[0018] According to the formula Calculate the method value of each solution;

[0019] In the formula: PA is the method value; b1 and b2 are both proportionality coefficients, and the value range is 0 < b1 ≤ 1, 0 < b2 ≤ 1; CB is the safety cost; βi is the weight coefficient of the corresponding safety hazard;

[0020] Sort each solution in descending order of the method value, and select the solution ranked first as the target solution.

[0021] Furthermore, the value range of the effectiveness value is [60, 100].

[0022] Furthermore, the method for generating the safety layout model is:

[0023] Generate a background model according to the construction supervision area, identify each safety protection device corresponding to the safety management plan, set the three-dimensional model corresponding to each safety protection device, and mark it as the safety device model;

[0024] Identify each candidate location within the construction supervision area; perform location combination according to each safety protection device and each candidate location to form several installation combination methods; screen each of the installation combination methods to obtain a target installation combination method; mark the remaining installation combination methods as potential installation combination methods;

[0025] Each security device model and the background model are combined according to the target installation combination mode to obtain a security deployment model.

[0026] The user terminal includes an information module, a security deployment module and a monitoring module;

[0027] The information module is used for users to organize and upload construction information.

[0028] The security deployment module is used to deploy various security devices, receive the security deployment model and security management plan sent by the platform end; determine the deployment application model according to the security deployment model and the security management plan; and deploy various security devices according to the deployment application model.

[0029] Furthermore, the method for determining the deployment application model according to the security deployment model and the security management solution includes:

[0030] When the user does not adjust the security deployment model, the security deployment model is marked as a deployment application model.

[0031] When the user adjusts the security deployment model, the adjusted security deployment model is marked as a deployment transition model, and the deployment transition model is analyzed by a preset adjustment evaluation model to obtain a corresponding adjustment evaluation result;

[0032] When the adjustment assessment result is qualified, the deployment transition model is marked as a deployment application model;

[0033] When the adjustment evaluation result is that the adjustment is unqualified, the user is prompted to readjust until the deployment application model is obtained.

[0034] Furthermore, the expression of the adjusted evaluation model is:

[0035]

[0036] Where: (s, f) is the input data, s is the deployment transition model, and f is the safety management plan; s→f means that the deployment transition model meets the safety requirements of the safety management plan; the output data is the adjusted evaluation value BP(s, f), and the adjusted evaluation value is 1 or 0;

[0037] By adjusting the evaluation model for analysis, the corresponding adjusted evaluation value is obtained;

[0038] When the adjusted assessment value is 1, the assessment adjustment is qualified;

[0039] When the adjustment evaluation value is 0, the evaluation adjustment fails.

[0040] The monitoring module is used to monitor the construction supervision area in real time, obtain monitoring data, perform conditional safety analysis and operation safety analysis on the monitoring data, and obtain corresponding conditional safety analysis results and operation safety analysis results; the operation safety analysis result is that the operation meets the safety requirements or abnormal operation behavior; the conditional safety analysis result is that the condition meets the safety requirements or abnormal conditions;

[0041] Analyze the real-time conditional safety analysis results and operation safety analysis results to obtain the comprehensive risk value corresponding to each time; generate a comprehensive assessment curve based on the comprehensive risk value corresponding to each time, with the horizontal axis being time and the vertical axis being the comprehensive risk value; conduct a safety awareness assessment based on the comprehensive assessment curve to obtain the corresponding safety awareness assessment result; integrate the conditional safety analysis results, operation safety analysis results, the comprehensive assessment curve and the safety awareness assessment result into safety supervision data, and display the safety supervision data to users.

[0042] Furthermore, the monitoring data includes personnel location data, and a method for acquiring the personnel location data includes:

[0043] A positioning unit is provided, through which the user installs positioning software in the mobile phones of each construction worker to obtain the positioning authority of the corresponding construction worker;

[0044] The user sets the positioning time interval according to the construction time, and the positioning software is used for real-time positioning within the positioning time interval to obtain corresponding personnel positioning data, which is then transmitted to the positioning unit.

[0045] Furthermore, the method for evaluating security awareness based on the comprehensive evaluation curve includes:

[0046] Fitting the comprehensive evaluation curve to obtain a comprehensive evaluation function, marking the comprehensive evaluation function as HG(t), where t is time;

[0047] According to the formula Calculate the cumulative evaluation value at the corresponding time;

[0048] Where: PBt is the cumulative evaluation value; [t1, t2] are the two time endpoints of the evaluation period, and t2 is the current time;

[0049] A security awareness assessment result is determined according to the cumulative assessment value.

[0050] A municipal engineering construction safety intelligent management method, the method comprising:

[0051] Users organize and upload construction information, and the platform marks the construction supervision area in the preset municipal information map based on the construction information;

[0052] Conduct safety management analysis on construction information and obtain safety management solutions;

[0053] Generate a safety layout model according to the safety management plan and the construction supervision area, and mark the equipment introduction data of each safety equipment in the safety layout model;

[0054] Determine the deployment application model based on the security deployment model and security management plan; arrange various security devices based on the deployment application model;

[0055] Conduct real-time monitoring of the construction supervision area, obtain monitoring data, conduct conditional safety analysis and operation safety analysis on the monitoring data, and obtain corresponding conditional safety analysis results and operation safety analysis results;

[0056] Analyze the results of conditional safety analysis and operation safety analysis to obtain the comprehensive risk value corresponding to each time; generate a comprehensive assessment curve based on the comprehensive risk value corresponding to each time; conduct safety awareness assessment based on the comprehensive assessment curve to obtain the safety awareness assessment result.

[0057] Compared with the prior art, the present invention has the following beneficial effects:

[0058] The present invention solves the problem of lack of perfect safety supervision in the current municipal engineering construction process due to the small amount of engineering, especially the safety management problem in complex construction environments such as the expansion, renovation or repair of municipal facilities such as roads, green belts and pipelines. Through platform management analysis, it helps many small contractors to carry out intelligent safety management. Users only need to upload construction information to the platform to realize intelligent planning and management of construction safety, which greatly facilitates the contractor's remote management of construction safety. At the same time, various monitoring data are collected and analyzed at the user end to avoid data leakage; through intelligent management, the system can monitor various safety indicators in the construction process in real time, including personnel activities, equipment status, environmental parameters, etc., and timely discover and warn potential safety hazards, thereby effectively avoiding the occurrence of safety accidents. This can not only protect the life safety of construction personnel, but also reduce property losses and construction delays caused by construction accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0060] Figure 1 This is a principle block diagram of the present invention. DETAILED DESCRIPTION

[0061] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0062] like Figure 1 As shown, a municipal engineering construction safety intelligent management system includes a platform end and a user end;

[0063] The platform end includes a construction analysis module;

[0064] The construction analysis module is used to analyze the construction information uploaded by the user. The platform presets a municipal information map, obtains the user's construction information, and marks the construction supervision area in the municipal information map according to the construction information. The construction supervision area is the area where the municipal construction needs to be supervised for safety, and is generally composed of the construction area and its possible transition area;

[0065] Conduct safety management analysis on construction information to obtain a safety management plan; generate a three-dimensional data model based on the safety management plan and construction supervision area, mark it as a safety deployment model, and mark the purpose, function, effect and other equipment introduction data of each safety device in the safety deployment model; send the safety deployment model and safety management plan to the user end.

[0066] In one embodiment, the method for performing safety management analysis on construction information is to perform analysis based on existing technologies to implement a safety management plan for the municipal engineering project.

[0067] In one embodiment, a method for performing safety management analysis on construction information includes:

[0068] Determine various possible safety risks based on construction information and mark them as potential safety hazards; analyze each potential safety hazard and determine solutions to solve them, which can be set in combination with current safety management measures, requirements, historical records, etc.;

[0069] Screen various solutions, determine the target solution, and determine the security management plan based on the target solution.

[0070] In one embodiment, the method for screening various solutions is to screen based on existing technologies, such as feeding back various solutions to users, and allowing users to select corresponding solutions as target solutions.

[0071] In one embodiment, the method for screening various solutions includes:

[0072] Obtain various safety devices that the user has, such as enclosures, warning signs, etc., integrate them into safety reserve information, and a safety reserve information management function can be opened for the user, and the user can adjust the safety reserve information at any time;

[0073] Estimate the safety costs of each solution based on the safety reserve information;

[0074] Estimate the effectiveness values of each solution for solving each safety hazard. It can be set according to the corresponding safety protection effect, accident incidence rate after application, etc. For example, define the value range of the effectiveness value as [60, 100], that is, the lowest standard effectiveness value that can be used as a solution is 60, which is the maximum allowable hazard occurrence probability. If no corresponding safety hazard has occurred after application, the effectiveness value is 100, and other values are reduced accordingly according to the hazard occurrence probability to obtain each effectiveness value; for example, the highest allowable hazard probability incidence rate is marked as A, and then 0 - A corresponds to 100 - 60, such as 0.5A corresponds to 80, and then calculate the effectiveness values of each hazard incidence rate according to the hazard incidence rate.

[0075] Mark the obtained effectiveness value as XGi, where i represents the corresponding safety hazard, i = 1, 2,..., n, and n is a positive integer;

[0076] According to the formula Calculate the method values of each solution;

[0077] In the formula: PA is the method value; b1 and b2 are both proportionality coefficients, and the value range is 0 < b1 ≤ 1, 0 < b2 ≤ 1; CB is the safety cost; βi is the weight coefficient of the corresponding safety hazard, which is set according to the loss proportion of all safety hazards occurring.

[0078] Sort each solution in descending order according to the method value, and select the solution ranked first as the target solution.

[0079] In one embodiment, the method for generating a safety layout model is: arrange various safety protection devices, etc. in the form of a model in the construction supervision area according to the safety management plan, and then generate a three-dimensional model of the construction supervision area, and integrate it into a safety layout model.

[0080] In one embodiment, the method for generating a safety layout model is:

[0081] Generate a background model according to the construction supervision area, identify each safety protection device corresponding to the safety management plan, set the three-dimensional model corresponding to each safety protection device, and mark it as a safety device model;

[0082] Identify the locations where various safety protection equipment can be installed in the construction supervision area and mark them as candidate locations; combine the locations according to the safety protection equipment and the candidate locations to form several groups of installation combination methods, that is, each group can meet the safety requirements according to the combination method, such as enclosure setting, monitoring equipment setting, etc.; screen the installation combination methods to obtain the target installation combination method; mark the remaining installation combination methods as potential installation combination methods;

[0083] The security equipment models and background models are combined according to the target installation combination method to obtain a security deployment model.

[0084] In one embodiment, the impact change value corresponding to each potential installation combination method adjusted from the target safe combination method is determined according to the screening process of the installation combination method, that is, each impact value is determined and calculated according to the screening process of the installation combination method. According to the existing screening method of the application, the impact value can be a priority value, a safety value, etc., marked as an impact value, and the impact change value between the two is determined according to the adjustment change, so as to facilitate the display of the corresponding impact change value when the user makes adjustments.

[0085] In one embodiment, various installation combinations are screened according to existing methods, such as evaluating from multiple perspectives such as cost, construction difficulty, construction impact, and traffic impact, and a combination with the highest priority is selected as a target safety combination.

[0086] The user terminal includes an information module, a security deployment module and a monitoring module;

[0087] The information module is used for users to organize and upload construction information, which includes relevant information such as construction area, construction project, mechanical equipment to be applied, etc.; users send the construction information to the platform end through the information module.

[0088] The safety deployment module is used to set various safety devices, which refer to various safety devices used in the safety management solution, such as cameras, fences, warning signs, etc.; the safety deployment model and safety management solution sent by the receiving platform are adjusted by the user according to the needs, such as replacing different types of safety equipment, adjusting the position of each safety equipment, etc.; the safety deployment model adjusted by the user is marked as a deployment transition model;

[0089] The platform loads and sets the adjustment assessment model at the user end. The adjustment assessment model is used to analyze the layout transition model and determine whether the layout transition model meets the safety requirements of the safety management plan. That is, adjustment operations such as replacement and movement of safety equipment can be performed, but it cannot cause it to fail to meet the corresponding construction safety requirements. The layout transition model is analyzed by the adjustment assessment model to obtain the corresponding adjustment assessment results;

[0090] When the adjustment assessment result is qualified, the deployment transition model is marked as a deployment application model;

[0091] When the adjustment evaluation result is that the adjustment is unqualified, the user is prompted to readjust or return to the original state until the deployment application model is obtained.

[0092] Arrange various safety devices according to the deployment application model.

[0093] In one embodiment, the adjustment evaluation model is established based on the existing technology, as long as the corresponding analysis and judgment can be achieved.

[0094] In one embodiment, the expression for adjusting the evaluation model is:

[0095] Where: (s, f) is the input data, s is the deployment transition model, and f is the safety management plan; s→f means that the deployment transition model meets the safety requirements of the safety management plan; the output data is the adjusted evaluation value BP(s, f), and the adjusted evaluation value is 1 or 0;

[0096] It means that the layout transition model is checked based on the safety requirements to determine whether it meets the safety requirements. The judgment is made based on the existing verification judgment method and is expressed by the above expression, which does not reflect the corresponding judgment process.

[0097] By adjusting the evaluation model for analysis, the corresponding adjusted evaluation value is obtained;

[0098] When the adjusted assessment value is 1, the assessment adjustment is qualified;

[0099] When the adjustment evaluation value is 0, the evaluation adjustment fails.

[0100] The monitoring module is used to monitor the construction supervision area in real time, obtain corresponding monitoring data, the monitoring data includes video data, personnel positioning data and other related data, and perform conditional safety analysis and operation safety analysis based on the obtained monitoring data to obtain corresponding conditional safety analysis results and operation safety analysis results; the operation safety analysis results include operations that meet safety requirements and corresponding operation behaviors that do not meet safety requirements, which are marked as abnormal operation behaviors; the conditional safety analysis results include conditions that meet safety requirements and corresponding safety conditions that do not meet safety requirements, which are marked as abnormal conditions;

[0101] Analyze the conditional safety analysis results and operation safety analysis results obtained in real time to obtain the comprehensive risk value corresponding to each time; generate a comprehensive assessment curve based on the comprehensive risk value corresponding to each time, with the horizontal axis representing time and the vertical axis representing the comprehensive risk value, and subsequently use the comprehensive assessment curve to correct conventional risks in the construction process; fit the comprehensive assessment curve to obtain a comprehensive assessment function, and mark the comprehensive assessment function as HG(t), where t is time;

[0102] According to the formula Calculate the cumulative evaluation value at the corresponding time;

[0103] Where: PBt is the cumulative evaluation value; [t1, t2] are the two time endpoints of the evaluation period, which is set according to user needs, such as one day, three days, one week, one month, etc.; t2 is the current time;

[0104] When the cumulative assessment value is greater than the threshold X1, it indicates that the accumulated risk hazards during the assessment period exceed the user requirements; the assessed safety awareness does not meet the standards; and it is integrated into the safety awareness assessment result.

[0105] Integrate the conditional safety analysis results, operation safety analysis results, comprehensive assessment curves and safety awareness assessment results into safety supervision data, and display the safety supervision data to users.

[0106] In one embodiment, the method for collecting personnel positioning data is based on existing technologies, such as common wearable positioning devices, video personnel recognition and positioning, etc.

[0107] In one embodiment, a personnel location data collection method is supplemented in this embodiment:

[0108] The platform has built a positioning unit in the monitoring module. The positioning unit is used to install the corresponding employee software in the mobile phone. The employee software is used to perform real-time positioning after receiving instructions after authorization by the employee, obtain the corresponding personnel positioning collection data, and send the personnel positioning collection data to the positioning unit. The subsequent employee software can also send some information according to user needs, or preset other functions.

[0109] In one embodiment, the method for performing conditional safety analysis and operation safety analysis based on the acquired monitoring data is to use existing technology to perform safety assessment, that is, to evaluate whether the construction safety conditions meet the requirements and whether the construction operations can meet the safety requirements, and to use existing technology to evaluate and judge the monitoring data, including corresponding analysis of safety hazards such as surrounding pedestrians and vehicles; for example, for conditional safety analysis, the actual settings of various safety equipment can be combined with the deployment application model for comparison, and then a corresponding assessment can be performed.

[0110] In one embodiment, the method for analyzing the conditional safety analysis results and the operation safety analysis results obtained in real time is: perform a comprehensive risk assessment based on the existing technology to obtain the corresponding comprehensive risk value, such as presetting the risk values ​​corresponding to different abnormal behaviors and abnormal conditions, and perform a comprehensive calculation according to the corresponding proportion; it is also possible to establish a corresponding comprehensive risk assessment model based on the existing neural network, and establish a corresponding training set manually for training, the training set includes input data and output data, the input data is the surrounding environmental conditions, the safety analysis results of each condition and the operation safety analysis results, and the output data is the comprehensive risk value.

[0111] A municipal engineering construction safety intelligent management method, the method comprising:

[0112] Users organize and upload construction information, and the platform marks the construction supervision area in the preset municipal information map based on the construction information;

[0113] Conduct safety management analysis on construction information and obtain safety management solutions;

[0114] Generate a safety layout model according to the safety management plan and the construction supervision area, and mark the equipment introduction data of each safety equipment in the safety layout model;

[0115] Determine the deployment application model based on the security deployment model and security management plan; arrange various security devices based on the deployment application model;

[0116] Conduct real-time monitoring of the construction supervision area, obtain monitoring data, conduct conditional safety analysis and operation safety analysis on the monitoring data, and obtain corresponding conditional safety analysis results and operation safety analysis results;

[0117] Analyze the results of conditional safety analysis and operation safety analysis to obtain the comprehensive risk value corresponding to each time; generate a comprehensive assessment curve based on the comprehensive risk value corresponding to each time; conduct safety awareness assessment based on the comprehensive assessment curve to obtain the safety awareness assessment result.

[0118] The above formulas are all calculated by removing dimensions and taking their numerical values. The formula is a formula that is closest to the actual situation obtained by collecting a large amount of data and performing software simulation. The preset parameters and preset thresholds in the formula are set by technical personnel in this field according to actual conditions or obtained by simulating a large amount of data.

[0119] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A municipal engineering construction safety intelligent management system, characterized in that: It includes a platform side and a user side; The platform side includes a construction analysis module; The construction analysis module is used to conduct construction analysis, obtain the construction information uploaded by the user, and mark the construction supervision area in the preset municipal information map according to the construction information; Conduct safety management analysis on the construction information to obtain a safety management plan; Generate a safety layout model according to the safety management plan and the construction supervision area, and mark the equipment introduction data of each safety device in the safety layout model; Send the safety layout model and the safety management plan to the user side; The user side includes an information module, a safety layout module, and a monitoring module; The information module is used for the user to organize and upload construction information; The safety layout module is used to arrange each safety device, and receive the safety layout model and the safety management plan sent by the platform side; Determine the layout application model according to the safety layout model and the safety management plan; Arrange each safety device according to the layout application model; The monitoring module is used to conduct real-time monitoring on the construction supervision area, obtain monitoring data, conduct conditional safety analysis and operation safety analysis on the monitoring data, and obtain the corresponding conditional safety analysis result and operation safety analysis result; The operation safety analysis result is that the operation meets the safety requirements or abnormal operation behaviors; The conditional safety analysis result is that the conditions meet the safety requirements or abnormal conditions; Analyze the conditional safety analysis result and the operation safety analysis result obtained in real time to obtain the risk comprehensive value corresponding to each time; Generate a comprehensive evaluation curve according to the risk comprehensive value corresponding to each time, with the horizontal axis being time and the vertical axis being the risk comprehensive value; Conduct safety awareness evaluation according to the comprehensive evaluation curve to obtain the corresponding safety awareness evaluation result; Integrate the conditional safety analysis result, the operation safety analysis result, the comprehensive evaluation curve, and the safety awareness evaluation result into safety supervision data, and display the safety supervision data to the user.

2. According to claim 1, a municipal engineering construction safety intelligent management system is characterized in that: The method for conducting safety management analysis on construction information includes: Determine each safety hazard according to the construction information; Analyze each safety hazard to obtain each solution method; Screen each solution method to obtain the target solution method, and determine the safety management plan according to the target solution method.

3. A municipal engineering construction safety intelligent management system according to claim 2, characterized in that: The method for screening each solution method includes: Obtain the user's safety reserve information; Estimate the safety cost of each solution method according to the safety reserve information; Estimate the effect value of each solution method for solving each safety hazard; Mark the effect value as XGi, where i represents the corresponding safety hazard, i = 1, 2,..., n, and n is a positive integer; According to the formula Calculate the method value of each solution method; In the formula: PA is the method value; b1 and b2 are both proportionality coefficients, and the value range is 0 < b1 ≤ 1, 0 < b2 ≤ 1; CB is the safety cost; βi is the weight coefficient of the corresponding safety hazard; Sort each solution method in descending order of the method value, and select the solution method ranked first as the target solution method.

4. A municipal engineering construction safety intelligent management system according to claim 3, characterized in that: The value range of the effect value is [60, 100].

5. The municipal engineering construction safety intelligent management system according to claim 1 is characterized in that: The method for generating the safety layout model is: Generate a background model according to the construction supervision area, identify each safety protection equipment corresponding to the safety management plan, set a three-dimensional model corresponding to each of the safety protection equipment, and mark it as a safety equipment model; Identify each candidate location in the construction supervision area; combine the locations according to each safety protection equipment and each candidate location to form several groups of installation combination methods; screen each of the installation combination methods to obtain a target installation combination method; mark the remaining installation combination methods as potential installation combination methods; Each security device model and the background model are combined according to the target installation combination mode to obtain a security deployment model.

6. The municipal engineering construction safety intelligent management system according to claim 1 is characterized in that: Methods for determining the deployment application model based on the security deployment model and security management solution include: When the user does not adjust the security deployment model, the security deployment model is marked as a deployment application model. When the user adjusts the security deployment model, the adjusted security deployment model is marked as a deployment transition model, and the deployment transition model is analyzed by a preset adjustment evaluation model to obtain a corresponding adjustment evaluation result; When the adjustment assessment result is qualified, the deployment transition model is marked as a deployment application model; When the adjustment evaluation result is that the adjustment is unqualified, the user is prompted to readjust until the deployment application model is obtained.

7. The municipal engineering construction safety intelligent management system according to claim 1 is characterized in that: The monitoring data includes personnel location data, and the methods for obtaining the personnel location data include: A positioning unit is provided, through which the user installs positioning software in the mobile phones of each construction worker to obtain the positioning authority of the corresponding construction worker; The user sets the positioning time interval according to the construction time, and the positioning software is used for real-time positioning within the positioning time interval to obtain corresponding personnel positioning data, which is then transmitted to the positioning unit.

8. The municipal engineering construction safety intelligent management system according to claim 7 is characterized in that: Methods for conducting security awareness assessment based on the comprehensive assessment curve include: Fitting the comprehensive evaluation curve to obtain a comprehensive evaluation function, marking the comprehensive evaluation function as HG(t), where t is time; According to the formula Calculate the cumulative evaluation value at the corresponding time; Where: PBt is the cumulative evaluation value; [t1, t2] are the two time endpoints of the evaluation period, and t2 is the current time; A security awareness assessment result is determined according to the cumulative assessment value.

9. A municipal engineering construction safety intelligent management method, characterized in that: A method for a municipal engineering construction safety intelligent management system as described in any one of claims 1 to 8 includes: Users organize and upload construction information, and the platform marks the construction supervision area in the preset municipal information map based on the construction information; Conduct safety management analysis on construction information and obtain safety management solutions; Generate a safety layout model according to the safety management plan and the construction supervision area, and mark the equipment introduction data of each safety equipment in the safety layout model; Determine the deployment application model based on the security deployment model and security management plan; arrange various security devices based on the deployment application model; Conduct real-time monitoring of the construction supervision area, obtain monitoring data, conduct conditional safety analysis and operation safety analysis on the monitoring data, and obtain corresponding conditional safety analysis results and operation safety analysis results; Analyze the results of conditional safety analysis and operation safety analysis to obtain the comprehensive risk value corresponding to each time; generate a comprehensive assessment curve based on the comprehensive risk value corresponding to each time; conduct safety awareness assessment based on the comprehensive assessment curve to obtain the safety awareness assessment result.