Cement test block curing device and method for construction site

By designing a construction site cement test block maintenance device including support system, rotation system, maintenance system, spray system and power system, the problems of low efficiency and low space utilization of traditional maintenance methods are solved, efficient test block maintenance and automated spraying are achieved, and manual workload and errors are reduced.

CN119635815APending Publication Date: 2025-03-18SHANGHAI CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411978565.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-31
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

The traditional maintenance methods of cement test blocks on the construction site are inefficient and the environment is not standard, and there are problems such as large sampling workload, frequent sampling errors, low space utilization, and frequent artificial sprinkling and moisturizing.

Method used

Design a cement test block maintenance device on construction site, including support system, rotation system, maintenance system, spray system and power system. The test block maintenance bin is arranged through the Ferris wheel three-dimensional space to achieve efficient maintenance space utilization, and use an automated spray system to reduce the workload of manual spraying.

Benefits of technology

The utilization rate of maintenance space is improved, the working intensity of sample sampling and staked test blocks is reduced, the wrong sampling and placement of test blocks is avoided, and the workload of manual spraying is saved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119635815A_ABST
    Figure CN119635815A_ABST
Patent Text Reader

Abstract

The invention relates to a construction site cement test block curing device and method.The device comprises a supporting system, a rotating system, a curing system, a spraying system and a power system, the supporting system comprises supporting columns, a base and a main shaft, and the main shaft transmits loads to the base through the supporting columns on the two sides; the rotating system comprises a rotating shaft, force bearing rods and tie bars, the force bearing rods are welded to the rotating shaft, and the force bearing rods in each row are connected through the tie bars; the maintenance system comprises a test block bin and an inhaul cable, the test block bin comprises a box body and partition plates, the partition plates are arranged in the box body at intervals, drainage holes are formed in the bottom of the test block bin, one end of the inhaul cable is fixed to the joint of the bearing rod and the tie bar, and the other end of the inhaul cable is fixed to the partition plates; the spraying system comprises a water source, a pump machine, a water inlet pipe and a spraying opening, and the pump machine is started at regular time for spraying; the power system regularly controls the rotating shaft to rotate. According to the curing system of the cement test block curing device on the construction site, the utilization rate of curing space is increased, and the workload is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a cement test block curing device and method at a construction site. Background Art

[0002] Cement test blocks at construction sites are usually placed in standard curing rooms for curing. Due to the large number of curing test blocks, a large construction site often requires several or even dozens of standard curing rooms. The conventional curing method is to arrange workers to place demoulding test blocks directly in curing cabinets and take them out for testing when they are due. This curing method has the following disadvantages:

[0003] First, the sampling workload is large. For multi-layer storage, you need to bend over to get the test blocks on the bottom layer, and you need to raise your hands to get the test blocks on the top layer. Multiple and frequent sampling and placement is very physically demanding.

[0004] Second, there is a certain probability of sampling errors. Since the test blocks have the same appearance, there is a high probability that the test blocks that have not reached the curing period will be taken away prematurely.

[0005] Third, the process requires frequent manual watering to keep the surface moist. Cement curing has extremely high humidity requirements, and watering is often required multiple times a day to keep the surface moist.

[0006] Fourth, the space utilization is insufficient. Even if multi-layer containers are used, due to the height limit of people, the basic function is controlled at around 4 layers, and the utilization rate of the upper layer space is extremely low.

[0007] Therefore, how to provide a construction site cement test block maintenance device and method is a technical problem that technical personnel in this field urgently need to solve. Summary of the invention

[0008] Aiming at the problems of low efficiency and irregular curing environment in traditional concrete test block curing, a device and method for curing cement test blocks at construction site are proposed. The method adopts a multi-layer cargo curing system to achieve three-dimensional and efficient application of the curing box through multi-layer curing. The water temperature and water circulation are guaranteed based on an automatic constant temperature system and a regular water supply device.

[0009] In order to solve the above technical problems, the present invention includes the following technical solutions:

[0010] A construction site cement test block curing device, comprising:

[0011] A support system, the support system comprising a support column, a base and a main shaft, the main shaft transferring the load to the base through the support columns on both sides;

[0012] A rotating system, the rotating system comprising a rotating shaft, a load-bearing rod and a tie rod, the load-bearing rod is welded on the rotating shaft, and each row of the load-bearing rods is connected by a tie rod;

[0013] The maintenance system comprises a test block bin and a cable. The test block bin comprises a box body and a partition. The partition is arranged in the box body at intervals. A drainage hole is arranged at the bottom of the test block bin. One end of the cable is fixed to the junction of the load-bearing rod and the tie rod, and the other end of the cable is fixed to the partition.

[0014] A spray system, the spray system comprising a water source, a pump, a water inlet pipe and a spray port, the pump being started at a fixed time for spraying;

[0015] The power system includes a power supply, a driving gear, a transmission belt, a passive gear, and a timer. The timer sets the power start time. When the specified time is reached, the power starts to automatically control the driving gear to rotate, and the passive gear is rotated through the transmission belt, thereby rotating the rotating shaft.

[0016] Furthermore, the partition divides the box into a 20 cm×20 cm maintenance partition, and a gap is left between the partition and the bottom of the box to ensure that water flows freely in the box.

[0017] Furthermore, the support column, base and main shaft adopt a full steel structure, and the main shaft can bear the weight of 6 test block bins and load-bearing rods.

[0018] Furthermore, the cable is a steel wire rope, and both ends of the steel wire rope are fixed by drilling holes and forming a straight knot.

[0019] The present invention also provides a method for curing cement test blocks at a construction site, the method comprising the following steps:

[0020] Step S1, providing the construction site cement test block curing device for standby;

[0021] Step S2: The maintenance personnel place the test block in the maintenance bin;

[0022] Step S3: according to the maintenance cycle, set a regular rotation cycle so that when the maintenance cycle is reached, the maintenance bin returns to its original position;

[0023] Step S4: according to the spraying requirements, a reasonable spraying interval is set. After the setting is completed, the spraying system automatically sprays. During the spraying process, the entire device automatically and slowly rotates one circle based on the rotating axis to ensure that all test blocks are sprayed;

[0024] Step S5: After the curing time of the test block is reached, the curing personnel take away the test block that has been cured in the curing bin;

[0025] Step S6, repeating steps S2 to S5 until the protective maintenance of all test blocks at the construction site is completed.

[0026] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0027] The invention provides a construction site cement test block curing device and method, the device comprises a support system, a rotation system, a curing system, a spraying system and a power system, the support system comprises a support column, a base and a main shaft, the main shaft transmits the load to the base through the support columns on both sides; the rotation system comprises a rotating shaft, a load-bearing rod and a tie rod, the load-bearing rod is welded on the rotating shaft, and each row of the load-bearing rods is connected by the tie rod; the curing system comprises a test block bin and a cable, the test block bin comprises a box body and a partition, the partition is arranged in the box body at intervals, a drainage hole is arranged at the bottom of the test block bin, one end of the cable is fixed to the intersection of the load-bearing rod and the tie rod, and the other end of the cable is fixed to the partition; the spraying system comprises a water source, a pump, a water inlet pipe and a spraying port, the pump is started at a fixed time to spray; the power system comprises a power supply, a driving gear, a transmission belt, a passive gear and a timer, the timer sets the power supply start time, and when the specified time is reached, the power supply starts to automatically control the driving gear to rotate, and the passive gear is rotated through the transmission belt, so that the rotating shaft is rotated. The cement test block curing device on the construction site arranges the test block curing chamber in a Ferris wheel-like three-dimensional space, which improves the utilization rate of the curing space. The test block sampling and placement are at the same height, which reduces the intensity of sampling and placement work and avoids the wrong taking and placement of test blocks. In addition, the automatic spraying setting saves the workload of manual spraying. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 A three-dimensional diagram of a cement test block curing device at a construction site according to an embodiment of the present invention;

[0029] Figure 2 It is a schematic plan view of a cement test block curing device at a construction site according to an embodiment of the present invention;

[0030] Figure 3 The present invention is a schematic diagram of a test block bin of a construction site cement test block curing device according to an embodiment of the present invention.

[0031] In the figure:

[0032] 1-support column, 2-main shaft, 3-rotating shaft, 4-load-bearing rod, 5-tie rod, 6-test block bin, 7-cable, 8-partition, 9-drain hole, 10-water source, 11-pump, 12-water inlet pipe, 13-sprinkler outlet. DETAILED DESCRIPTION

[0033] The following is a further detailed description of a construction site cement test block curing device and method provided by the present invention in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become more apparent from the following description.

[0034] Embodiment 1: Combination of the following Figures 1 to 3 , the construction site cement test block curing device and method of the present invention are described in detail.

[0035] Please continue to refer to Figures 1 to 3 A cement test block curing device for a construction site, the device comprises a support system, a rotation system, a curing system, a spraying system and a power system, the support system comprises a support column 1, a base (not shown) and a main shaft 2, the main shaft 2 transfers the load to the base through the support columns 1 on both sides; the rotation system comprises a rotating shaft 3, a load-bearing rod 4 and a tie rod 5, the load-bearing rod 4 is welded to the rotating shaft 3, and each row of the load-bearing rod 4 is connected by the tie rod 5; the curing system comprises a test block bin 6 and a cable 7, the test block bin 6 comprises a box body and a partition 8, the partition 8 is arranged in the box body at intervals, for example, the test block bin 6 is divided by the partition 8 to form a three-dimensional grid structure. A drainage hole 9 is provided at the bottom of the test block bin 6, one end of the cable 7 is fixed at the junction of the load-bearing rod 4 and the tie rod 5, and the other end of the cable 7 is fixed on the partition 8; the spraying system includes a water source 10, a pump 11, a water inlet pipe 12 and a spray port 13, and the pump 11 is started at a fixed time for spraying; the power system includes a power supply, a driving gear, a transmission belt, a passive gear, and a timer. The timer sets the power start time, and when the specified time is reached, the power starts to automatically control the driving gear to rotate, and the passive gear is rotated through the transmission belt, thereby rotating the rotating shaft 3. The cement test block curing device on the construction site arranges the test block curing bin in a Ferris wheel-like three-dimensional space, which improves the utilization rate of the curing space. The test block sampling and setting are at the same height, which reduces the sampling and setting work intensity, avoids the wrong taking and wrong placement of the test block, and saves the manual spraying workload through the automatic spraying setting.

[0036] In this embodiment, more preferably, the partition 8 divides the box into 20 cm×20 cm maintenance partitions, and a gap is left between the partition 8 and the bottom of the box (ie, the box bottom) to ensure that water flows freely in the box.

[0037] In this embodiment, more preferably, the support column 1 , the base and the main shaft 2 are made of a full steel structure, and the main shaft 2 can bear the weight of the six test block bins 6 and the load-bearing rods 4 .

[0038] In this embodiment, more preferably, the cable 7 is a steel wire rope, and both ends of the steel wire rope are fixed by punching holes and forming a straight knot.

[0039] Please continue to refer to Figures 1 to 3 The present invention also provides a method for curing cement test blocks at a construction site, the curing method comprising the following steps:

[0040] Step S1, providing the construction site cement test block curing device for standby;

[0041] Step S2: The maintenance personnel place the test block in the maintenance bin;

[0042] Step S3: according to the maintenance cycle, set a regular rotation cycle so that when the maintenance cycle is reached, the maintenance bin returns to its original position;

[0043] Step S4, according to the spraying requirements, set a reasonable spraying interval time. After setting, the spraying system automatically sprays. During the spraying process, the entire device automatically rotates slowly around the rotating shaft 3 for one circle to ensure that all test blocks are sprayed.

[0044] Step S5: After the curing time of the test block is reached, the curing personnel take away the test block that has been cured in the curing bin;

[0045] Step S6, repeating steps S2 to S5 until the protective maintenance of all test blocks at the construction site is completed.

[0046] Figures 1 to 3 The above examples are preferred implementations of the present invention, but the implementations of the present invention are not limited to the above examples.

[0047] The above-mentioned embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A construction site cement test block curing device, characterized in that: include: A support system, the support system comprising a support column, a base and a main shaft, the main shaft transferring the load to the base through the support columns on both sides; A rotating system, the rotating system comprising a rotating shaft, a load-bearing rod and a tie rod, the load-bearing rod is welded on the rotating shaft, and each row of the load-bearing rods is connected by a tie rod; The maintenance system comprises a test block bin and a cable. The test block bin comprises a box body and a partition. The partition is arranged in the box body at intervals. A drainage hole is arranged at the bottom of the test block bin. One end of the cable is fixed to the junction of the load-bearing rod and the tie rod, and the other end of the cable is fixed to the partition. A spray system, the spray system comprising a water source, a pump, a water inlet pipe and a spray port, the pump being started at a fixed time for spraying; The power system includes a power supply, a driving gear, a transmission belt, a passive gear, and a timer. The timer sets the power start time. When the specified time is reached, the power starts to automatically control the driving gear to rotate, and the passive gear is rotated through the transmission belt, thereby rotating the rotating shaft.

2. The construction site cement test block curing device according to claim 1, characterized in that: The partition divides the box into 20cm×20cm maintenance partitions, and a gap is left between the partition and the bottom of the box to ensure that water flows freely in the box.

3. The construction site cement test block curing device according to claim 2, characterized in that: The support column, base and main shaft adopt all-steel structure, and the main shaft can bear the weight of 6 test block bins and load-bearing rods.

4. The construction site cement test block curing device according to claim 3 is characterized in that: The cable is a steel wire rope, and both ends of the steel wire rope are fixed by punching holes and straight knots.

5. A method for curing cement test blocks at a construction site, characterized in that: The steps include: Step S1, providing the construction site cement test block curing device according to any one of claims 1 to 4 for standby use; Step S2: The maintenance personnel place the test block in the maintenance bin; Step S3: according to the maintenance cycle, set a regular rotation cycle so that when the maintenance cycle is reached, the maintenance bin returns to its original position; Step S4: according to the spraying requirements, a reasonable spraying interval is set. After the setting is completed, the spraying system automatically sprays. During the spraying process, the entire device automatically and slowly rotates one circle based on the rotating axis to ensure that all test blocks are sprayed; Step S5: After the curing time of the test block is reached, the curing personnel take away the test block that has been cured in the curing bin; Step S6, repeating steps S2 to S5 until the protective maintenance of all test blocks at the construction site is completed.