Anti-sedimentation apron structure and process

By using a combination technology of transversely controlled sinking ribs and longitudinal structural ribs in building dispersion, the problem of failure to consider the difference between the building and surrounding ground settlement in traditional dispersion design is solved, and the stability and durability of the dispersion structure are improved, and structural damage is avoided.

CN119640849APending Publication Date: 2025-03-18SHANGHAI CONSTRUCTION MANAGEMENT VOCATIONAL & TECHNICAL COLLEGE (SHANGHAI REAL ESTATE SCHOOL OF SHANGHAI GARDEN SCHOOL SHANGHAI GARDEN SCHOOL)
0 Cites 0 Cited by

Patent Information

Application Number
CN202510128126.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-05
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

Traditional water dispersed designs fail to fully consider the settlement differences between the building and the surrounding ground, resulting in uneven settlement causing problems such as malfunctioning joints, water accumulation and structural damage.

Method used

The combination technology of transversely controlled sinking ribs and longitudinal structural ribs is adopted to connect the exterior wall of the building by anchoring, controlling the settlement difference between the dispersed water and the building, and forming a uniform settlement transition surface in the dispersed water area.

Benefits of technology

It effectively avoids cracks and structural damage caused by settlement differences, improves the stability and durability of the water-spreading structure, and ensures the structural safety and durability of the building.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

According to the anti-sedimentation apron structure, on the basis of a traditional apron method, a sedimentation control anchoring rib, especially a transverse sedimentation control rib, is additionally arranged, one end of the sedimentation control anchoring rib is sealed in an anchoring mode and connected into a building outer wall, a main body part of the sedimentation control anchoring rib is embedded in apron, and longitudinal structural ribs are distributed on the sedimentation control anchoring rib. The transverse sinking control ribs effectively control the sinking difference between the aproll and the building outer wall, the problem of staggered joints caused by uneven sinking is avoided, and meanwhile a uniform sinking transition face is formed within the transverse width range of the aproll. The longitudinal structural bars are arranged to coordinate longitudinal settlement deformation of the aproll, so that the stability and durability of the structure are further improved. The structure can ensure settlement deformation coordination between indoor and outdoor walls and the ground, and cracks and structural damage caused by differential settlement are avoided. Through the combination of two technical means of transverse gradual change settlement and longitudinal coordinated settlement, effective control over building apron settlement is achieved, the engineering implementation effect is good, and high application value and popularization prospects are achieved.