Tin furnace structure for selective wave soldering equipment and dismounting and mounting method
By designing a tin furnace transit truck and related control system for selective wave soldering equipment, the cumbersome process of disassembly and installation, safety hazards and capacity impacts of tin furnace disassembly and installation are solved, and automatic disassembly and installation are realized, and safety and production efficiency are improved.
Patent Information
- Application Number
- CN202411890744.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-20
- Publication Date
- 2025-03-28
AI Technical Summary
The disassembly and installation process of the tin furnace is complicated, with safety risks and affecting the production capacity of the equipment.
A tin furnace transit trolley for selective wave soldering equipment is designed, combining the trolley positioning mechanism, detection components and control components to realize the automatic disassembly and installation of the tin furnace.
The disassembly and installation process of the tin furnace is simplified, safety is improved, equipment waiting time is reduced, and production efficiency is improved.
Smart Images

Figure CN119703250A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wave soldering equipment, in particular to a tin furnace structure used for selective wave soldering equipment and a disassembly and installation method. Background Art
[0002] In the field of electronics manufacturing, selective wave soldering is a technology widely used in soldering electronic components, such as Figure 1 FIG. 5 is a partial schematic diagram of a selective wave soldering device 5. The tin furnace 52 is an important device for soldering electronic components. Figure 1 The figure also includes a tin furnace 52 and an installation assembly 53 connected to the tin furnace for installing the tin furnace. Conventional tin furnace disassembly and installation are both manually implemented. The tin furnace disassembly is specifically as follows: first stop the movement of the equipment, remove the tin furnace cover, take out the tin, turn off the heating of the tin furnace, unplug the tin furnace plug, remove the tin furnace installation screws, and manually lift the tin furnace out of the equipment. The tin furnace installation is specifically as follows: the personnel lift the tin furnace without tin into the equipment, install the tin furnace installation screws, plug the plug, turn on the tin furnace heating, put the solid tin into the tin furnace, wait for tinning, and after the tinning is completed, install the tin furnace cover to complete the installation.
[0003] In the process of implementing the prior art, the inventor discovered that:
[0004] The disassembly and installation of the tin furnace are both cumbersome, and during the disassembly process, personnel need to use a spoon to remove the high-temperature liquid tin and directly lift out the high-temperature tin furnace, which poses a high safety risk. In addition, the equipment will need to wait for a long time during the process of removing tin and melting tin, which affects production capacity.
[0005] Therefore, the present application provides a technical solution that is easy to disassemble and assemble a tin furnace, has high safety, and reduces the time occupied by equipment production, which has solved the technical problems in the prior art that the tin furnace is cumbersome to disassemble and assemble, has low safety, and affects the equipment production capacity. Summary of the invention
[0006] The purpose of the present invention is to provide a technical solution that is easy to disassemble and assemble a tin furnace, has high safety, and reduces the production time occupied by the equipment, so as to solve the technical problems in the prior art that the disassembly and assembly of the tin furnace is cumbersome, has low safety, and affects the equipment production capacity.
[0007] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a tin furnace structure for selective wave soldering equipment, comprising a tin furnace transfer cart, a cart positioning mechanism installed on the selective wave soldering equipment for positioning the tin furnace transfer cart, a detection component for detecting whether the tin furnace transfer cart is inserted into the cart positioning mechanism, and a control component for disassembling the tin furnace according to the detection result of the detection component, the tin furnace transfer cart comprises a cart frame, at least one cart tin furnace platform installed on the cart frame, one end of the cart frame is provided with a positioning component for positioning with the cart positioning mechanism, the cart positioning mechanism specifically comprises a guide rod assembly, and a plurality of positioning blocks in the positioning assembly are inserted into the gaps between the guide rods to realize the installation of the tin furnace transfer cart on the cart positioning mechanism of the selective wave soldering equipment.
[0008] Preferably, the cart tin furnace platform specifically includes: two parallel tin furnace support plates 1 and tin furnace support plates 2 for carrying the tin furnace; one end of the tin furnace support plate 1 and the tin furnace support plate 2 is connected to the cart frame; the other ends of the tin furnace support plate 1 and the tin furnace support plate 2 are respectively provided with tin furnace side blocks; the tin furnace support plate 1 and the tin furnace support plate 2 are respectively provided with tin furnace guide columns 1 and tin furnace guide columns 2 for positioning, and the tin furnace guide columns 1 and tin furnace guide columns 2 are diagonally arranged.
[0009] Preferably, the tin furnace transfer cart further comprises: a UPS power supply arranged on the cart frame, which is used for electrically heating the tin furnace carried by the tin furnace platform of the cart.
[0010] Preferably, the guide rod assembly comprises at least guide rod 1 and guide rod 2 separated by a preset distance, and chamfers are respectively provided on the ends of the opposite end faces of guide rod 1 and guide rod 2 for inserting the cart frame to facilitate the insertion of the cart frame.
[0011] Preferably, the detection component specifically includes: a safety switch respectively arranged on the cart frame and the guide rod one; a cart positioning detection cylinder installed on the guide rod one; the cart positioning detection air rod at least includes a cylinder and a positioning column connected to the cylinder, and the positioning block is provided with a positioning hole for inserting the positioning column.
[0012] Preferably, a plurality of balls are mounted on the side end surface of the guide rod of the guide rod assembly to facilitate the insertion of the cart frame.
[0013] Preferably, the cart frame is also provided with an adjustable shock-absorbing pad.
[0014] Preferably, the tin furnace guide column 1 and the tin furnace guide column 2 are also respectively provided with locking holes, which are used to lock the tin furnace to the tin furnace support plate 1 and the tin furnace support plate 2 by butterfly screws after the tin furnace is installed on the tin furnace guide column 1 and the tin furnace guide column 2 of the tin furnace support plate 1 and the tin furnace support plate 2.
[0015] The present application also provides a method for disassembling a tin furnace structure of a selective wave soldering device, comprising the following steps: a control component issues a disassembly instruction for the tin furnace; a tin furnace transfer cart is pushed to be inserted into the cart positioning mechanism, and when the safety switch of the detection component senses that the tin furnace transfer cart is inserted into the cart positioning mechanism, a cart positioning detection cylinder extends a positioning column and is inserted into the positioning hole; the soldering platform of the selective wave soldering device descends to move the tin furnace to the cart tin furnace platform, the cart positioning detection cylinder retracts, the tin furnace transfer cart exits the cart positioning mechanism, and the tin furnace disassembly is completed.
[0016] The present application also provides an installation method for a tin furnace structure of a selective wave soldering device, comprising the following steps: preheating a tin furnace placed on a tin furnace transfer cart through a UPS power supply of a cart frame to facilitate electrothermal tinning of the tin in the tin furnace; obtaining an installation instruction for the tin furnace issued by a control component; pushing the tin furnace transfer cart to insert into the cart positioning mechanism, and when the safety switch of the detection component senses that the tin furnace transfer cart is inserted into the cart positioning mechanism, the cart positioning detection cylinder extends a positioning column and inserts into the positioning hole; the soldering platform of the selective wave soldering device rises to connect the tin furnace on the cart tin furnace platform of the tin furnace transfer cart to the soldering platform, the cart positioning detection cylinder retracts, the tin furnace transfer cart exits the cart positioning mechanism, and the tin furnace installation is completed.
[0017] Compared with the prior art, the beneficial effects of the present invention are as follows: through the tin furnace structure and disassembly and installation method for selective wave soldering equipment provided by the present application, the steps of disassembling and installing the tin furnace are simplified, and there is no need to use a spoon to remove the high-temperature liquid tin and directly lift out the tin furnace in a high-temperature state, which is highly safe. Moreover, the time wasted in taking out tin and melting tin is eliminated, the effective working time of the equipment is increased, and the production efficiency of the equipment is increased. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a partial structural schematic diagram of wave soldering equipment in the prior art;
[0019] Figure 2 A schematic structural diagram of a tin furnace structure for selective wave soldering equipment provided by the present invention and a partial structure of the wave soldering equipment being assembled;
[0020] Figure 3 A three-dimensional diagram of a tin furnace structure for selective wave soldering equipment provided by the present invention;
[0021] Figure 4 A three-dimensional diagram of the structure of the tin furnace transfer cart of the present invention;
[0022] Figure 5 is a three-dimensional diagram of the cart positioning mechanism of the present invention;
[0023] Figure 6It is a schematic flow chart of a method for disassembling a tin furnace structure for selective wave soldering equipment in the present invention;
[0024] Figure 7 It is a schematic flow chart of the installation method of the tin furnace structure used for the selective wave soldering equipment in the present invention;
[0025] In the figure:
[0026] 100. A tin furnace structure for selective wave soldering equipment;
[0027] 1. Tin furnace transfer cart;
[0028] 11. Trolley frame; 12. Trolley tin furnace platform; 121. Tin furnace support plate 1; 122. Tin furnace support plate 2; 123. Tin furnace side block; 124. Tin furnace guide column 1; 125. Tin furnace guide column 2; 1251. Locking hole; 13. Positioning assembly; 131. Positioning block; 1311. Positioning hole; 14. UPS power supply;
[0029] 2. Cart positioning mechanism;
[0030] 21. Guide rod assembly; 211. Guide rod 1; 212. Guide rod 2; 2121. Ball;
[0031] 3. Detection assembly; 31. Safety switch; 32. Cart positioning detection cylinder; 33. Cylinder; 34. Positioning column;
[0032] 4. Control components;
[0033] 5. Selective wave soldering equipment; 51. Soldering platform; 52. Tin furnace;
[0034] 53. Mounting components for tin furnace installation. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] See also Figure 2-Figure 5The present invention provides a technical solution: a tin furnace structure 100 for selective wave soldering equipment, comprising a tin furnace transfer cart 1, a cart positioning mechanism 2 installed on the selective wave soldering equipment 5 for positioning the tin furnace transfer cart 1, a detection component 3 for detecting whether the tin furnace transfer cart 1 is inserted into the cart positioning mechanism 2, and a control component 4 for disassembling the tin furnace 52 according to the detection result of the detection component 3. The tin furnace transfer cart 1 comprises a cart frame 11, at least one cart tin furnace platform 12 installed on the cart frame 11, one end of the cart frame 11 is provided with a positioning component 13 for positioning with the cart positioning mechanism 2, the cart positioning mechanism 2 specifically comprises a guide rod assembly 21, and a plurality of positioning blocks 131 in the positioning assembly 13 are inserted into the gaps between the guide rods to realize the installation of the tin furnace transfer cart 1 on the cart positioning mechanism 2 of the selective wave soldering equipment 5.
[0037] Specifically, the tin furnace transfer cart 1 is used to transfer the tin furnace 52 to the welding platform 51 of the selective wave soldering equipment 5 or to transfer from the welding platform 51 of the selective wave soldering equipment 5 to the tin furnace 52. It can be understood that the design of the tin furnace transfer cart 1 in the present application is to enable the tin furnace 52 to be disassembled or installed more easily, thereby eliminating the cumbersome problem of disassembling or installing the tin furnace 52 directly on the selective wave soldering equipment 5 in the past.
[0038] The specific trolley frame 11 of the tin furnace transfer trolley 1 is used to realize the transportation of the tin furnace 52. As shown in the figure, the trolley frame 11 is formed by overlapping two parallel, right-angled frames, one side of which is parallel to the ground and is equipped with a conveying wheel, such as a fixed wheel or a heavy-loaded universal wheel to realize the movement of the trolley frame 11. The other side is perpendicular to the ground and is provided with a handrail for pushing the trolley frame 11.
[0039] At least one trolley tin furnace platform 12 is installed on the trolley frame 11. Specifically, a support frame for carrying the trolley tin furnace platform 12 is also provided on one side of the two right-angled frames perpendicular to the ground, and one or more trolley tin furnace platforms 12 can be installed on the support frame.
[0040] Furthermore, the cart tin furnace platform 12 specifically includes: two parallel tin furnace support plates 121 and 122 for carrying the tin furnace 52; one end of the tin furnace support plate 121 and 122 is connected to the cart frame 11; the other ends of the tin furnace support plate 121 and 122 are respectively provided with tin furnace side blocks 123; the tin furnace support plate 121 and 122 are respectively provided with tin furnace guide columns 124 and 125 for positioning, and the tin furnace guide columns 124 and 125 are diagonally arranged.
[0041] Specifically, the tin furnace support plate 1 121 and the tin furnace support plate 2 122 can be directly connected to the support frame of the cart frame 11, or can be connected to the support frame of the cart frame 11 through a connecting plate. The tin furnace side block 123 is used to limit the movement of the tin furnace 52 along the long side direction of the support plate 2. The tin furnace guide column 1 124 is arranged on the tin furnace support plate 1 121, and the tin furnace guide column 2 125 is arranged on the tin furnace support plate 2 122, which are used to further limit the position of the tin furnace. The diagonal arrangement of the tin furnace guide column 1 124 and the tin furnace guide column 2 125 can more stably ensure that the tin furnace 52 is fixed to the tin furnace support plate 1 121 and the tin furnace support plate 2 122.
[0042] In addition, considering the problem that the tin furnace transfer cart 1 will carry the heated tin furnace 52 for transfer transportation, the tin furnace guide column 1 124 and the tin furnace guide column 2 125 are also respectively provided with locking holes 1251, which are used to lock the tin furnace 52 to the tin furnace support plate 1 121 and the tin furnace support plate 2 122 by butterfly screws after the tin furnace 52 is installed on the tin furnace guide column 124 and the tin furnace guide column 2 125 of the tin furnace support plate 121 and the tin furnace support plate 2 122.
[0043] Specifically, the tin furnace 52 is fixed to the tin furnace transfer cart 1 by locking the butterfly screws to the locking holes 1251 of the tin furnace guide column 1 124 and the tin furnace guide column 2 125 .
[0044] Furthermore, the tin furnace transfer cart 1 also includes: a UPS power supply 14 arranged on the cart frame 11, which is used to electrically heat the tin furnace 52 carried by the cart tin furnace platform 12.
[0045] It is conceivable that when the selective wave soldering equipment 5 needs to replace the tin furnace 52, the UPS power supply 14 can be used to preheat the tin furnace 52 carrying tin on the tin furnace platform 12 on the tin furnace transfer cart 1, thereby saving the previous need to first install the tin furnace 52 without tin on the selective wave soldering equipment 5, and then install screws, plugs, etc., and finally put the solid tin into the tin furnace 52 for tinning, which requires a long waiting time and affects the production capacity.
[0046] One end of the cart frame 11 is provided with a positioning assembly 13 for achieving positioning with the cart positioning mechanism 2. Specifically, positioning blocks 131 are respectively provided on one end of the two right-angled frames parallel to the ground to achieve positioning of the cart positioning mechanism 2 inserted into the selective wave soldering equipment 5.
[0047] Furthermore, an adjustable shock-absorbing pad is also provided on the cart frame 11. It is understandable that when the tin furnace transfer cart 1 is inserted through the gap between the guide rods in the guide rod assembly 21 of the cart positioning mechanism 2, if the insertion is too fast, the tin furnace transfer cart 1 may hit the guide rods, so an adjustable shock-absorbing pad is provided to effectively reduce the impact of the cart.
[0048] The trolley positioning mechanism 2 is installed in the wave soldering equipment, and is used for positioning the trolley 1 in the tin furnace when the tin furnace 52 needs to be disassembled or installed. As shown in the accompanying drawings, the trolley positioning mechanism is installed at the bottom of the selective wave soldering equipment. The trolley positioning mechanism 2 includes a guide rod assembly 21, and the guide rod assembly 21 at least includes a guide rod 1 211 and a guide rod 2 212 separated by a preset distance. It can be understood that the guide rod assembly 21 is mainly used for inserting the positioning blocks 131 on the two right-angled shelves. Obviously, the guide rod assembly 21 can only be used for positioning one of the positioning blocks 131 of the two right-angled shelves by the guide rod 1 211 and the guide rod 2 212, and the guide rod 3 and the guide rod 4 can also be set to position the other, that is, the guide rod 1 211, the guide rod 2 212 and the guide rod 3 and the guide rod 4 respectively position the two positioning blocks 131 of the two right-angled shelves.
[0049] Furthermore, the ends of the two opposite end surfaces of the guide rod 1 211 and the guide rod 2 212 for inserting the cart frame 11 are chamfered to facilitate the insertion of the cart frame 11. It should be understood that the chamfers are provided so that the ends of the two opposite end surfaces of the guide rod 1 211 and the guide rod 2 212 form an outer eight-shaped shape, thereby more conveniently realizing the insertion of the right-angled frame of the cart frame 11.
[0050] A detection component 3 is used to detect whether the tin furnace transfer trolley 1 is inserted into the trolley positioning mechanism 2. It can be understood that the setting of the detection component 3 can enable the tin furnace transfer trolley 1 to locate whether it is inserted into place after being inserted into the trolley positioning structure.
[0051] Furthermore, a plurality of balls 2121 are installed on the opposite end surfaces of the guide rod 1 211 and the guide rod 2 212 to facilitate the insertion of the cart frame 11 .
[0052] Specifically, by installing the ball bearings 2121 on the two opposite end surfaces of the guide rod 1 211 and the guide rod 212, the tin furnace transfer cart 1 can enter more conveniently.
[0053] Furthermore, the detection component 3 specifically includes: a safety switch 31 respectively arranged on the cart frame 11 and the guide rod 211; a cart positioning detection cylinder 32 installed on the guide rod 211; the cart positioning detection cylinder 32 at least includes a cylinder 52 and a positioning column 34 connected to the cylinder 52, and the positioning block 131 is provided with a positioning hole 1311 for inserting the positioning column 34.
[0054] Specifically, when the tin furnace transfer trolley 1 is pushed to the gap between the guide rods of the trolley positioning mechanism 2 and is in place, the safety switch 31 receives a signal and then the positioning column 34 of the trolley positioning detection cylinder 32 extends and is inserted into the positioning hole 1311 of the positioning column 34 to achieve positioning.
[0055] It should be noted that only when the safety positioning switches on the cart frame 11 and the guide rod 211 receive signals, the positioning column 34 of the cart positioning detection cylinder 32 will be extended, thereby improving the safety of the tin furnace transfer cart 1.
[0056] It should also be noted that the positioning column 34 connected to the cylinder 52 can be a single one and then inserted into the positioning hole 1311 on the positioning block 131. It can also be that there are several positioning heads on the positioning column 34, and there are positioning holes 1311 corresponding to the several positioning heads on the positioning block 131. Of course, the positioning head can also be conical, and the conical positioning head corresponds to the expanded positioning hole 1311. It can be understood that the positioning of multiple positioning heads can more stably realize the fixing of the tin furnace transfer trolley 1 by the trolley positioning mechanism 2.
[0057] It should also be noted that the detection component 3 also includes a detection component 3 for detecting the tin content in the tin furnace 52, so as to determine whether the tin furnace 52 needs to be replaced.
[0058] A control component 4 is used to disassemble the tin furnace 52 according to the detection result of the detection component 3. Specifically, after receiving the detection signal of the detection component 3, the control component 4 determines the disassembly of the tin furnace 52. For example, when the control component 4 receives a signal from the detection component 3 that the tin furnace 52 has a low content and needs to be replaced, the control component 4 disassembles the tin furnace 52 after receiving the signal. It is understandable that after the tin furnace 52 is disassembled, the tin furnace 52 filled with tin needs to be installed. In the present application, when the control component 4 receives the signal that the tin content in the tin furnace 52 is low, the tin furnace 52 filled with solid tin and installed on the tin furnace transfer cart 1 is preheated. After the tin furnace 52 with a low tin content is disassembled, the tin furnace 52 in liquid state after preheating is installed on the cart positioning mechanism 2 through the tin furnace transfer cart 1, and it is replaced by the welding platform 51 of the selective wave soldering equipment 5.
[0059] It can be seen that compared with the previous disassembly of the tin furnace 52, the present application does not need to remove the tin first, turn off the heating of the tin furnace 52, unplug the plug of the tin furnace 52, and other cumbersome, dangerous, and inefficient disassembly and assembly. Compared with the previous installation of the tin furnace 52, the present application does not need to heat the solid tin to liquid tin after the cumbersome installation of the tin furnace 52, which requires a long time to wait and affects the installation of production capacity.
[0060] like Figure 6 As shown, based on a tin furnace structure 100 for selective wave soldering equipment provided in an embodiment of the present application, the present application also provides a disassembly method based on the structure, comprising the following steps:
[0061] S100: The control component 4 issues a disassembly instruction for the tin furnace 52;
[0062] S110: Push the tin furnace transfer trolley 1 to insert into the trolley positioning mechanism 2. When the safety switch 31 of the detection component 3 senses that the tin furnace transfer trolley 1 is inserted into the trolley positioning mechanism 2, the trolley positioning detection cylinder 32 extends the positioning column 34 and inserts it into the positioning hole 1311;
[0063] S120: The selective wave soldering equipment 5 descends to move the tin furnace 52 to the cart tin furnace platform 12, the cart positioning detection cylinder 32 retracts, the tin furnace transfer cart 1 exits the cart positioning mechanism 2, and the tin furnace 52 is disassembled.
[0064] Specifically, before the control component 4 issues a disassembly instruction, the detection component 3 sends a signal indicating that the tin content in the tin furnace 52 in use is low to the control component 4. After receiving the signal, the control component 4 issues a disassembly instruction, and the welding platform 51 of the selective wave soldering equipment 5 moves to the waiting position. The user inserts the tin furnace transfer cart 1 into the cart positioning mechanism 2, and the cart positioning detection cylinder 32 extends and inserts into the positioning hole 1311 of the positioning block 131 to achieve the positioning of the tin furnace transfer cart 1. The welding platform 51 carries the tin content with low content and moves all the way to the top of the tin furnace transfer cart 1. The personnel unplug the plug of the tin furnace 52, loosen the mounting nut of the tin furnace 52, and the welding platform 51 starts to descend, and the tin furnace 52 is placed on the cart tin furnace platform 12. The cart tin furnace platform 12 is provided with a tin furnace guide column, and the tin furnace 52 is chamfered along the tin furnace guide column and inserted into the cart tin furnace platform 12. When it reaches the bottom, the tin furnace 52 is placed and has been positioned. The welding platform 51 returns to the waiting position, the cart positioning detection cylinder 32 retracts, and the equipment prompts the personnel to take out the tin furnace transfer cart 1. The personnel take out the tin furnace transfer cart 1, and the tin furnace 52 is disassembled.
[0065] like Figure 7 As shown, based on a tin furnace structure 100 for a selective wave soldering device provided in an embodiment of the present application, the present application also provides an installation method of the tin furnace structure 100 for a selective wave soldering device, comprising the following steps:
[0066] S200: preheating the tin furnace 52 placed on the tin furnace transfer cart 1 through the UPS power supply 14 of the cart frame 11, so as to facilitate the electrothermal tinization of the tin in the tin furnace 52;
[0067] S210: Obtaining the installation instruction of the tin furnace 52 issued by the control component 4;
[0068] S220: Push the tin furnace transfer trolley 1 to insert into the trolley positioning mechanism 2. When the safety switch 31 of the detection component 3 senses that the tin furnace transfer trolley 1 is inserted into the trolley positioning mechanism 2, the trolley positioning detection cylinder 32 extends the positioning column 34 and inserts it into the positioning hole 1311;
[0069] S230: The welding platform 51 of the selective wave soldering equipment 5 rises to connect the tin furnace 52 of the tin furnace transfer trolley 1 on the tin furnace platform 12 to the welding platform 51, the trolley positioning detection cylinder 32 retracts, the tin furnace transfer trolley 1 exits the trolley positioning mechanism 2, and the installation of the tin furnace 52 is completed.
[0070] Specifically, before the control component 4 issues the installation instruction, the control instruction first receives a signal indicating that the tin content in the tin furnace 52 is low. At the time of receiving the signal or a period of time later, the control component 4 issues an instruction to preheat the tin furnace 52 to be installed, and the personnel preheat the tin furnace 52 placed on the tin furnace transfer cart 1 through the UPS power supply 14 of the cart frame 11, so as to facilitate the electrothermal tinization of the tin in the tin furnace 52. After the tin furnace 52 with a low content is disassembled, the control component 4 issues an instruction to install the tin furnace 52, and the welding platform 51 of the selective wave soldering equipment 5 moves to the waiting position. The user inserts the tin furnace transfer cart 1 into the cart positioning mechanism 2, and the cart positioning detection cylinder 32 extends and inserts into the positioning hole 1311 of the positioning block 131 to realize the positioning of the tin furnace transfer cart 1. The welding platform 51 moves to the bottom of the cart tin furnace platform 12 and starts to rise, connecting the tin furnace 52 of the tin furnace transfer cart 1 to the welding platform 51. The personnel install the tin furnace 52 installation nut, plug in the tin furnace 52 plug, and the welding platform 51 returns to the waiting position. The cart positioning detection cylinder 32 retracts, and the equipment prompts the personnel to take out the tin furnace transfer cart 1. The personnel take out the tin furnace transfer cart 1, and the installation of the tin furnace 52 is completed.
[0071] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A tin furnace structure for selective wave soldering equipment, characterized in that: It includes a tin furnace transfer cart, a cart positioning mechanism installed on a selective wave soldering device for positioning the tin furnace transfer cart, a detection component for detecting whether the tin furnace transfer cart is inserted into the cart positioning mechanism, and a control component for disassembling the tin furnace according to the detection result of the detection component. The tin furnace transfer cart includes a cart frame, at least one cart tin furnace platform installed on the cart frame, one end of the cart frame is provided with a positioning component for positioning with the cart positioning mechanism, and the cart positioning mechanism specifically includes a guide rod assembly, and a plurality of positioning blocks in the positioning assembly are inserted into the gaps between the guide rods to realize the installation of the tin furnace transfer cart on the cart positioning mechanism of the selective wave soldering device.
2. The tin furnace structure according to claim 1, characterized in that: The cart tin furnace platform specifically includes: Two tin furnace support plates 1 and 2 arranged in parallel and used for supporting the tin furnace; One end of the tin furnace support plate 1 and the tin furnace support plate 2 is connected to the trolley frame; The other ends of the tin furnace support plate 1 and the tin furnace support plate 2 are respectively provided with tin furnace side stoppers; The tin furnace support plate 1 and the tin furnace support plate 2 are respectively provided with a tin furnace guide column 1 and a tin furnace guide column 2 for positioning, and the tin furnace guide column 1 and the tin furnace guide column 2 are arranged diagonally.
3. The tin furnace structure according to claim 1, characterized in that: The tin furnace transfer cart also includes: The UPS power supply arranged on the trolley frame is used for electrically heating the tin furnace carried by the tin furnace platform of the trolley.
4. The tin furnace structure according to claim 1, characterized in that: The guide rod assembly comprises at least a guide rod 1 and a guide rod 2 separated by a preset distance. The ends of the opposite end surfaces of the guide rod 1 and the guide rod 2 for inserting the trolley frame are chamfered to facilitate the insertion of the trolley frame.
5. The tin furnace structure according to claim 4, characterized in that: The detection component specifically includes: Safety switches are respectively arranged on the cart frame and the guide rod; A trolley positioning detection cylinder mounted on guide rod one; The cart positioning detection gas rod at least includes a cylinder and a positioning column connected to the cylinder, and the positioning block is provided with a positioning hole for inserting the positioning column.
6. The tin furnace structure according to claim 4, characterized in that: A plurality of balls are also installed on the opposite end surfaces of the guide rod 1 and the guide rod 2 to facilitate the insertion of the cart frame.
7. The tin furnace structure according to claim 1, characterized in that: The cart frame is also provided with an adjustable shock-absorbing pad.
8. The tin furnace structure according to claim 2, characterized in that: The tin furnace guide column 1 and the tin furnace guide column 2 are also respectively provided with locking holes, which are used to lock the tin furnace to the tin furnace support plate 1 and the tin furnace support plate 2 by butterfly screws after the tin furnace is installed on the tin furnace guide column 1 and the tin furnace guide column 2 of the tin furnace support plate 1 and the tin furnace support plate 2.
9. The method for disassembling a tin furnace structure for selective wave soldering equipment according to any one of claims 1 to 8, characterized in that: The following steps are involved: The control component issues a disassembly instruction for the tin furnace; The tin furnace transfer cart is pushed to be inserted into the cart positioning mechanism. When the safety switch of the detection component senses that the tin furnace transfer cart is inserted into the cart positioning mechanism, the cart positioning detection cylinder extends the positioning column and is inserted into the positioning hole; The selective wave soldering equipment descends to move the tin furnace to the trolley tin furnace platform, the trolley positioning detection cylinder retracts, the tin furnace transfer trolley exits the trolley positioning mechanism, and the tin furnace disassembly is completed.
10. The method for installing a tin furnace structure for selective wave soldering equipment according to any one of claims 1 to 8, characterized in that: The following steps are involved: The tin furnace placed on the tin furnace transfer cart is preheated through the UPS power supply of the cart frame to facilitate the electrothermal tinning of the tin in the tin furnace; Obtain the installation instructions of the tin furnace issued by the control component; The tin furnace transfer cart is pushed to be inserted into the cart positioning mechanism. When the safety switch of the detection component senses that the tin furnace transfer cart is inserted into the cart positioning mechanism, the cart positioning detection cylinder extends the positioning column and is inserted into the positioning hole; The soldering platform of the selective wave soldering equipment rises to connect the tin furnace on the tin furnace platform of the trolley of the tin furnace transfer trolley to the soldering platform, the trolley positioning detection cylinder retracts, the tin furnace transfer trolley exits the trolley positioning mechanism, and the tin furnace installation is completed.