Power construction operation vehicle capable of changing orientation of equipment

By integrating the clamping components and track components on the power construction work vehicle, the problem of direction adjustment during installation of power equipment is solved, an efficient and accurate installation process is achieved, and construction efficiency and emergency repair speed are improved.

CN119796037AActive Publication Date: 2025-04-11STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED +2
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202510052117.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-14
Publication Date
2025-04-11
Estimated Expiration
2045-01-14

AI Technical Summary

Technical Problem

When installing power equipment, it is difficult for existing power construction vehicles to effectively adjust the orientation of the equipment, resulting in complex installation process and increasing construction difficulty and time.

Method used

A power construction vehicle that can change the orientation of the equipment is designed, using clamping components and track components to achieve precise docking and installation of the power equipment through the drive frame and the flip assembly.

Benefits of technology

Through this technical means, the installation efficiency can be improved, the construction difficulty can be reduced, the construction time of power emergency repairs can be reduced, the emergency repair speed can be improved, and more construction scenarios can be adapted to.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119796037A_ABST
    Figure CN119796037A_ABST
Patent Text Reader

Abstract

The invention discloses an electric power construction operation vehicle capable of changing the equipment orientation, and particularly relates to the technical field of electric power construction, the electric power construction operation vehicle comprises an electric power construction operation vehicle body, a container is arranged on the electric power construction operation vehicle body, an allocation and transportation assembly, a clamping assembly and an accessory box are installed on the electric power construction operation vehicle body, and the clamping assembly comprises a driving frame and a clamping jaw assembly; the clamping jaw assembly comprises a clamping seat and clamping arms, the clamping seat is installed on the power construction operation vehicle in a turnover mode through a driving frame, the two clamping arms are arranged and do translational motion of getting close to or getting away from each other on the clamping seat, and the crawler belt assemblies are arranged on the upper side and the lower side of each clamping seat. In the auxiliary installation process, the crawler belt assemblies can be controlled to move to drive the to-be-installed facilities to swing, transversely move and rotate, then the to-be-installed facilities with installation holes can be accurately in butt joint during installation, the installation efficiency can be improved, the construction difficulty can be lowered, and the first-aid repair speed can be increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electric power construction, and in particular to an electric power construction work vehicle capable of changing the direction of equipment. Background Art

[0002] As the development direction of power transmission engineering technology, the focus is on studying ultra-high voltage (above 1 million volts) AC transmission and DC transmission technology to form a larger power network. The final application of electricity is inseparable from the vast transmission grid and various power facilities required by the grid. Therefore, in power engineering, the construction and inspection and maintenance of power equipment are also important parts of ensuring stable power transmission.

[0003] The infrastructure of the power system mainly includes power stations, substations and various types of transmission lines. The transmission circuit is mainly composed of cables and frames supporting cables. The transmission lines mainly include high-voltage transmission lines and distribution lines. Among them, the purpose of the distribution line is to transmit electric energy from the substation to the user, which is the last link in the power system.

[0004] For example, the basic power equipment of the distribution line cannot be separated from equipment such as utility poles and support frames. During the actual construction or maintenance work, it is necessary to straighten the utility poles or reinstall new utility poles and support frames and other power equipment in the corresponding positions when replacing them. At this time, the lifting equipment on the power construction work vehicle can be used to lift the power equipment first, and then move it to the designated position and lower it. However, it should be noted that during the actual installation process, it is necessary to ensure the accuracy of the position of the power equipment to ensure accurate installation. At this time, it is necessary to position and support the bottom of the power equipment. For example, use the clamping assembly (such as a forklift structure) provided on the power construction work vehicle to position the bottom of the power equipment, thereby facilitating the precise installation of the power equipment.

[0005] Since most of the existing electric poles are cylindrical cement pole structures, they only need to be buried in the designated position during actual installation. Therefore, the above-mentioned equipment can quickly and effectively install electric poles and other mechanical equipment such as support frames that only need to be buried. However, for some special locations, in order to increase the service life of electric poles or support frames, steel structures will also be used. Such structures cannot be directly buried in the soil, and pile foundations need to be cast in advance, and then they are installed on the pile foundations through structures such as bolts. Therefore, in the actual use of the electric construction work vehicle, the orientation of the installed electric equipment also needs to be considered to ensure that the electric equipment can accurately fit the pre-buried bolts. Therefore, based on the above-mentioned electric construction work vehicle, After the work vehicle uses the clamping assembly to fix the bottom of the facility, it is necessary to adjust the actual position and posture of the power construction work vehicle to adjust the actual angle of the installation facility. If there are other buildings or objects blocking the actual work site, or in order to effectively carry the replacement power equipment, the overall size of the power construction work vehicle is relatively large, it is not easy to adjust the posture of the power construction work vehicle, and then in the actual installation process, it will increase the difficulty of construction. If the clamping assembly is cancelled to fix the bottom of the facility, the danger of the installation process is increased, and the installation operation time is also increased, affecting the construction and maintenance efficiency of the distribution line, especially for power emergency repair construction, affecting the emergency repair speed. Summary of the invention

[0006] In order to enable the entire electric construction work vehicle to solve the orientation problem of the installed electric equipment, thereby eliminating the need to adjust the posture of the electric construction work vehicle, saving operation time and improving efficiency, the present application provides an electric construction work vehicle that can change the orientation of the equipment.

[0007] The present application provides an electric construction vehicle capable of changing the direction of the equipment, which adopts the following technical solution:

[0008] An electric power construction vehicle capable of changing the orientation of equipment comprises an electric power construction vehicle, a transport assembly, a clamping assembly and an accessory box are installed on the electric power construction vehicle, the clamping assembly comprises a driving frame and a clamping claw assembly, the driving frame is installed on the electric power construction vehicle, the clamping claw assembly comprises a clamping seat and two clamping arms, the clamping seat is rotatably connected to the driving frame, the rotation axis of the clamping seat is arranged in a horizontal direction, and a flip assembly for driving the clamping seat to rotate is arranged on the driving frame; the two clamping arms are slidably connected to the clamping seat in a horizontal direction, the two clamping arms slide to move away from or approach each other, and the clamping seat is also provided with a driving assembly for driving the two clamping arms to slide;

[0009] Track assemblies are provided on the upper and lower sides of each set of clamping seats. The track assemblies include a track frame and tracks. The track frame is provided with multiple sets of track wheels. The tracks are wrapped around the track wheels. The sides of the tracks on the two sets of clamping arms that are close to each other form a clamping working surface for clamping the electric poles. One set of track wheels is a self-powered driving wheel.

[0010] Optionally, the drive assembly is provided with two groups, and the two groups of drive assemblies respectively control the sliding of the two clamping arms; the drive assembly includes two connecting rods arranged in parallel and at intervals, and the two ends of the connecting rods are respectively rotatably connected to the clamping arms and the clamping seat, and the rotation axis of the connecting rods is arranged in the vertical direction, and the connecting line of the two connecting rods and their adjacent end points forms a parallelogram; one of the connecting rods is connected to a motor for driving its own rotation.

[0011] Optionally, the driving frame includes a transverse guide rail, a transverse frame, a lifting frame and a turning frame. The transverse guide rail is installed on the electric construction work vehicle, the transverse frame is slidably installed on the transverse guide rail, and the transverse guide rail is provided with a transverse driver for driving the transverse frame to slide; the lifting frame is vertically slidably installed on the transverse frame, and a lifting driver for driving the lifting frame to move vertically is provided between the lifting frame and the transverse frame; the turning frame is rotatably installed on the lifting frame, and a turning driver for driving the turning frame to turn is provided between the turning frame and the lifting frame, and the clamping seat is fixedly installed on the turning frame.

[0012] Optionally, the transport assembly includes a boom and a lifting drive, a hook assembly is provided at the end of the boom, the boom is rotatably mounted on the electric construction work vehicle, the lifting drive is arranged between the electric construction work vehicle and the boom, and the lifting drive is used to drive the boom for lifting operations.

[0013] Optionally, an elastic frame is provided on the track frame, and an auxiliary wheel is provided at a position of the elastic frame corresponding to the clamping working surface. The auxiliary wheel rolls in contact with the inner wall of the track to assist in supporting the track, and one end of the elastic frame corresponding to the auxiliary wheel has an elastic force approaching the clamping working surface of the track assembly.

[0014] Optionally, two groups of the elastic frames are symmetrically arranged on each of the track frames, and the ends of the two groups of elastic frames away from each other are rotatably installed on the track frame, and the two groups of elastic frames are cross-arranged, and protrusion structures are provided on the two groups of elastic frames, and an elastic structural member is provided between the two protruding structures, which is used to provide opposite elastic forces to the two groups of protruding structures, so that one end of the two groups of elastic frames corresponding to the auxiliary wheels are close to the clamping working surface of the track, and a balancing frame is rotatably installed on one end of the elastic frame corresponding to the clamping working surface of the track, and auxiliary wheels are rotatably installed on both ends of the balancing frame.

[0015] Optionally, the surface of the track is provided with an elastic support structure, which includes an inner nest and a sliding column. The inner nest is embedded in the track, the sliding column is slidably installed in the inner nest, and a first elastic member is provided between the sliding column and the inner nest. The first elastic member provides an outward elastic force to the inner nest, and a contact protection member is installed on the outside of the sliding column.

[0016] Optionally, the contact protection member includes a point contact member, one point contact member corresponds to a group of the elastic support structures, the point contact members are fixedly mounted on the sliding column, and the point contact members are distributed in a rectangular array on the track assembly.

[0017] Optionally, the contact protection member includes a strip contact member, which is vertically distributed on the track, and multiple strip contact members are evenly distributed on the track. One strip contact member corresponds to multiple elastic support structures, and the multiple elastic support structures are arranged along the length direction of the strip contact member. Multiple sliding columns are fixedly connected to one strip contact member.

[0018] Optionally, the contact protection member is a rope-type contact member, which is provided in plurality and evenly spaced on the track, the rope contact member is vertically arranged on the track, and one rope contact member corresponds to two groups of elastic support structures, the inner nest in the elastic support structure at one end of the rope contact member is fixedly installed in the track, a guide member is fixedly installed at the other end of the track corresponding to the rope contact member, the inner nest at the corresponding guide member is vertically slidably installed in the guide member, a second elastic member is provided in the guide member for providing a vertical elastic force to the inner nest in the guide member, and the two ends of the rope contact member are respectively fixedly connected to two sliding columns.

[0019] In summary, this application includes the following beneficial technical effects:

[0020] The beneficial effects of the present invention are as follows: by arranging a group of track assemblies on the clamping arm, the present invention can assist the dispatching assembly to transport, unload and assist in the installation of the facilities to be installed, and in the process of assisting the installation, each group of track assemblies can be controlled to drive the facilities to be installed to swing, move laterally and rotate, so that the facilities to be installed with installation holes can be accurately docked during installation, which can improve the installation efficiency and reduce the construction difficulty, especially for power emergency repair construction, which can further reduce the construction time and improve the emergency repair speed, and the power construction work vehicle provided in this embodiment has diverse functions, simple operation, high practicality, and can adapt to more construction scenarios. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0022] Figure 2 It is a schematic diagram of the overall structure of the clamping assembly of the present invention.

[0023] Figure 3 This is a state diagram of the clamping assembly of the present invention cooperating with the transport assembly to take out the electric pole from the cargo box.

[0024] Figure 4This is a state diagram of the transfer assembly of the present invention cooperating with the clamping assembly to install the utility pole.

[0025] Figure 5 This is a diagram showing the state of the clamping assembly of the present invention being lowered after clamping the utility pole.

[0026] Figure 6 This is a state diagram of the clamping working surfaces of the two sets of crawler assemblies of the present invention moving in the same direction and driving the electric pole to move horizontally.

[0027] Figure 7 This is a state diagram of the clamping working surfaces of the two sets of crawler assemblies of the present invention driving the electric pole to rotate when moving in the opposite direction.

[0028] Figure 8 This is a state diagram of the present invention when the upper and lower crawlers move in opposite directions to drive the electric pole to swing.

[0029] Fig. 9 It is a schematic diagram of the structure when the present invention is adapted to a multi-prism type facility to be installed.

[0030] Fig.10 It is a schematic diagram of the coordination between the elastic supporting structure of the present invention and the edge of a multi-prism-shaped facility to be installed.

[0031] Fig.11 It is a schematic diagram of the distribution of the point contact members of the present invention on the crawler track.

[0032] Fig.12 Schematic diagram of the distribution of the strip contact members of the present invention on the track.

[0033] Fig.13 This is a schematic diagram of the crawler adopting the strip contact element of the present invention when driving the facility to be installed to swing.

[0034] Fig.14 It is a schematic diagram of the matching state of the rope-type contact and the elastic supporting structure of the present invention.

[0035] Fig.15 It is a schematic diagram of the installation between the rope-type contact member and the crawler track of the present invention.

[0036] Fig.16 This is a state diagram of the rope-type contact of the present invention when it is normally stretched.

[0037] Fig.17 This is a state diagram when the edges of the polygonal column type facility to be installed of the present invention produce relative swinging to cause the rope type contact piece to be twisted.

[0038] Description of reference numerals:

[0039] 1. Electric power construction vehicle; 11. Cargo box; 2. Transportation assembly; 21. Crane arm; 22. Lifting drive; 23. Hook assembly; 3. Clamping assembly; 31. Drive frame; 311. Transverse guide rail; 312. Transverse frame; 313. Lifting frame; 314. Turning frame; 32. Clamping claw assembly; 321. Clamping seat; 322. Clamping arm; 33. Track assembly; 331. Track frame; 332. Track wheel; 33 3. Track; 34. Elastic frame; 341. Auxiliary wheel; 342. Balance frame; 35. Elastic support structure; 351. Inner nesting; 352. Sliding column; 353. First elastic member; 36. Contact protection member; 361. Point contact member; 362. Strip contact member; 363. Rope contact member; 37. Guide member; 371. Second elastic member; 4. Accessory box; 5. Facilities to be installed; 51. Install pile foundation. DETAILED DESCRIPTION

[0040] The following is combined with Figure 1-17 This application is described in further detail.

[0041] The embodiment of the present application discloses an electric power construction vehicle with a changeable equipment orientation, including an electric power construction vehicle 1, a cargo box 11 is provided on the electric power construction vehicle 1, a dispatching assembly 2, a clamping assembly 3 and an accessory box 4 are installed on the electric power construction vehicle 1 (the accessory box 4 is used to place common electric power construction tools), the dispatching assembly 2 includes a boom 21 and a lifting driver 22, a hook assembly 23 is provided at the end of the boom 21, the boom 21 is rotatably installed on the electric power construction vehicle 1, and the lifting driver 22 is arranged between the electric power construction vehicle 1 and the electric power construction vehicle 1, and is used to drive the boom 21 for lifting operations (wherein the lifting driver 22 includes a rotating driving structure for driving the boom 21 to rotate horizontally, a swinging driving structure for driving the boom 21 to swing up and down, a telescopic driving system for driving the boom 21 to telescope, and a cable winding mechanism for driving the hook assembly 23 to rise and fall, etc., and the above-mentioned equipment are all commonly used driving equipment for dispatching assemblies in the prior art, such as hydraulic cylinders, hydraulic systems and winches, etc., so this embodiment will not be explained in detail);

[0042] The clamping assembly 3 includes a driving frame 31 and a clamping jaw assembly 32. The clamping jaw assembly 32 includes a clamping seat 321 and a clamping arm 322. The clamping seat 321 can be flipped on the electric power construction work vehicle 1 through the driving frame 31, that is, the clamping jaw assembly 32 can be flipped up and down along the horizontal axis. The clamping arm 322 is arranged in two groups. The two groups of clamping arms 322 are movably mounted on the clamping seat 321, and the two groups of clamping arms 322 make a translational movement on the clamping seat 321 to move closer to or away from each other.

[0043] Furthermore, track assemblies 33 are provided on the upper and lower sides of each group of clamping seats 321, that is, the track assemblies 33 cooperate with the clamping arms 322 to form two groups on the left and right, and each group of clamping arms 322 includes two upper and lower groups, for a total of four groups of tracks 333 (the track assemblies 33 mentioned in this embodiment are at least two in the upper and lower directions, and three, four or even more groups can also be provided). The track assembly 33 includes a track frame 331 and a track 333. The track frame 331 is provided with multiple groups of track wheels 332, and the track 333 is mounted outside the track wheels 332. A clamping working surface is formed on the side close to the track 333 on the two groups of clamping arms 322, and one group of track wheels 332 is a driving wheel for driving the track assembly 33 to move. In this embodiment, the four track assemblies 33 are independently controlled and can be freely adjusted according to actual usage conditions. As for the drive control of the track assembly 33, it is an existing solution for controlling track products in the prior art. Therefore, this embodiment will not be explained in detail.

[0044] It should be noted that the technology of the clamping jaw assembly 32 can refer to the mechanical clamping jaw structure, and it only needs to be able to control the two groups of clamping arms 322 to move closer or farther away from each other. Simply, the two groups of clamping arms 322 can be slidably installed on the clamping base 321, and clamping drivers (such as hydraulic cylinders) are provided on the clamping base 321 to drive the two groups of clamping arms 322 to move horizontally, so as to realize the clamping control of the clamping arms 322. At the same time, the method described in the appendix of the specification of the present invention can also be adopted. Figure 6 As shown in the figure, two parallel connecting rods can be used to connect the clamp arm 322 and the clamp seat 321 to form a parallelogram structure, and a rotation driver (such as a motor) is provided to drive one of the connecting rods to swing. By driving one of the connecting rods to swing, the clamp arm 322 can be driven to produce translational motion. This scheme is a commonly used connection and drive scheme in mechanical clamps, and will not be explained in detail in this embodiment.

[0045] By adopting the above technical solution, in actual use, the electric power construction work vehicle 1 can be used to carry many electric power construction tools, and the cargo box 11 can be used to transport and load some of the facilities to be installed 5. For example, one or more electric poles can be placed in the cargo box 11 for transportation (this embodiment is mainly explained with the transportation and installation of electric poles. Therefore, the facilities to be installed 5 proposed in this embodiment refer to electric poles unless otherwise specified). After the facilities to be installed 5 are transported to the corresponding place, the posture of the electric power construction work vehicle 1 is adjusted to fix it near the construction and installation site, and then the electric pole can be lifted with the help of the transportation component 2. At this time, referring to the attached figure of the specification, the two sets of clamping arms 322 can be controlled to approach each other to align the electric poles. The bottom end of the pole is clamped, and at the same time, the top of the pole is grasped and lifted with the help of the transportation component 2, and the pole is gradually verticalized by cooperating with the flip control of the clamping claw component 32. For cement poles that can be directly buried in the pit, after adjusting the posture of the pole, the clamping claw component 32 directly releases the pole and then lowers it. However, for some steel poles that cannot be directly pre-buried and need to be installed on the installation pile foundation 51 or other types of facilities to be installed 5 (such as equipment brackets and small distribution boxes, etc.), in the actual installation process, it is necessary to make specific adjustments to the bottom position of the installation facility 5, which involves fine adjustments such as swinging, moving and rotating the installation facility 5. The technical solution provided in this embodiment is adopted, and reference is made to the attached manual. Figure 8 When the clamping working surfaces of the upper and lower crawlers 333 on each set of clamping arms 322 move synchronously in opposite directions (the left and right crawler assemblies 33 need to be synchronized, that is, the clamping working surfaces of the left and right crawler assemblies 333 are relatively adapted in the same direction), the facility 5 to be installed can be driven to swing. When the clamping working surfaces of the crawler assemblies 33 on the left and right crawler arms 322 move synchronously in the same direction (because the two sets of crawler assemblies 33 are symmetrically arranged, when the clamping working surfaces move in the same direction, the two sets of crawlers 333 actually rotate in opposite directions, and vice versa), when clamping the facility 5 to be installed, refer to the attached manual. Figure 7 , can drive the installation 5 to move horizontally, and then adjust the bottom movement of the installation 5, and when the clamping working surfaces of the left and right crawler assemblies 33 move in the opposite direction, refer to the attached manual Figure 7 , which can drive the facility to be installed 5 to rotate, so that the facility to be installed 5 with the installation hole can be accurately connected with the bolt structure on the installation pile foundation 51 during installation, thereby improving the installation efficiency and reducing the construction difficulty, especially for power emergency repair construction, which can further reduce the construction time and improve the emergency repair speed. The power construction work vehicle 1 provided in this embodiment has diverse functions, simple operation, high practicality, and can adapt to more construction scenarios.

[0046] In the above embodiment, the driving frame 31 includes a transverse guide rail 311, a transverse frame 312, a lifting frame 313 and a turning frame 314. The transverse guide rail 311 is fixedly installed on the electric construction work vehicle 1, the transverse frame 312 is laterally slidably installed on the transverse guide rail 311, and a transverse drive such as a hydraulic cylinder is arranged between the transverse guide rail 311 and the transverse frame 312 for driving the transverse movement of the transverse frame 312, and the lifting frame 313 is vertically slidably installed on the transverse frame 312, and a lifting drive such as a hydraulic cylinder is arranged between the lifting frame 313 and the transverse frame 312 for driving the lifting frame 313 to move vertically. Hydraulic cylinder, the flip frame 314 is rotatably installed on the lifting frame 313, and a flip driver (such as a rotatably connected flip driving hydraulic cylinder) for driving the flip frame 314 to flip is arranged between the flip frame 314 and the lifting frame 313, and the clamp seat 321 is fixedly installed on the flip frame 314. In addition to being able to adjust the installation facility 5 with the help of the crawler assembly 33, after the electric construction work vehicle 1 stops, the driving frame 31 can drive the clamp assembly 32 to generate lateral movement, lifting and flipping and other movements, thereby further improving the diversity of driving the installation facility 5 and increasing the functionality of the equipment.

[0047] It should be noted that, in addition to assisting the installation of new utility poles, the above-mentioned equipment can also straighten tilted collapsed utility poles, and has strong functionality. At the same time, in addition to cylindrical utility poles, the facilities to be installed 5 also include some non-cylindrical polygonal column structures, such as multi-cornered columns, multi-cornered frames, and rectangular distribution boxes. Such polygonal facilities to be installed 5 have edge structures, and the fewer the edges, the sharper the edge structures. Although the equipment itself will provide rounded or chamfered structures at the edges, the above-mentioned implementation method is prone to slipping when facing the edges of such facilities to be installed 5, and unlike the cylindrical structure, the outer wall position of the polygonal facilities to be installed 5 will change when rotating. Therefore, in order to make the crawler 333 better adapt and fit the edges of the facilities to be installed 5 and drive them effectively, the present embodiment also provides the following technical solutions. For details, refer to the attached manual. Fig. 9 An elastic frame 34 is provided on the track frame 331, and an auxiliary wheel 341 is provided at the position of the elastic frame 34 corresponding to the clamping working surface. The auxiliary wheel 341 rolls and fits with the inner wall of the track 333 to form an auxiliary support for the track 333, and one end of the elastic frame 34 corresponding to the auxiliary wheel 341 has an elastic force approaching the clamping working surface of the track assembly 33, so that the position of the track 333 corresponding to the clamping working surface can have an inwardly concave elastic force. When clamping the facility 5 to be installed, it can be concave according to the situation to increase the fitting effect with the facility 5 to be installed, and improve the clamping stability and operating stability.

[0048] The two ends of the balancing frame 342 are rotatably mounted on the auxiliary wheels 341, thereby increasing the support range of the auxiliary wheels 341 and improving the support effect of the auxiliary wheels 341 on the auxiliary wheels 341.

[0049] Furthermore, in the process of the crawler 333 clamping working surface moving to drive the installation 5 to be installed to move or rotate, if the crawler 333 is only a plane structure, when facing the edge of the installation 5, the actual contact is relatively small, and when the crawler 333 moves, the carrying capacity of the installation 5 to be installed is also weakened, affecting the adjustment efficiency. For this reason, refer to the attached manual. Fig.10 The present embodiment also provides the following technical solution: the surface of the crawler 333 is provided with an elastic support structure 35, the elastic support structure 35 includes an inner nest 351 and a slide post 352, the inner nest 351 is embedded and installed in the crawler 333, the slide post 352 is slidably installed in the inner nest 351, and a first elastic member 353 is provided between the slide post 352 and the inner nest 351, the first elastic member 353 provides an outward elastic force (such as a spring) to the inner nest 351, and a contact protection member 36 is installed on the outside of the slide post 352, so that it can be in contact with the facility to be installed 5 When the crawler 333 moves on the surface of the facility 5 to be installed, it can better adapt to the shape of the surface of the facility 5 to be installed. For example, when the track 333 encounters the edge of the facility 5 to be installed, the sliding column 352 closest to the edge of the facility 5 to be installed is compressed, but the remaining parts are affected by the shape of the facility 5 to be installed, and some parts will not be compressed and will contact the two side parts of the edge of the facility 5 to be installed in the form of a convexity. Then, when the crawler 333 moves, the sliding columns 352 on both sides of the edge of the facility 5 to be installed can generate a certain thrust for the facility 5 to be installed, thereby improving the driving effect of the facility 5 to be installed.

[0050] Furthermore, the contact protection member 36 as the intermediate structure between the installation 5 and the slide column 352 can be a flexible structure or an elastic structure, which can provide a certain buffer to protect the surface of the installation 5. Therefore, the contact protection member 36 can be a point contact member 361, and one point contact member 361 corresponds to a group of elastic support structures 35. The point contact member 361 is fixedly installed on the slide column 352. Fig.11 The point contact members 361 are distributed in a rectangular array on the track assembly 33, thereby improving the adaptation effect of the elastic support structure 35 and providing more adaptability space.

[0051] In addition, refer to the instructions attached Fig.12 The contact protection member 36 can also be a strip contact member 362, which is vertically distributed on the track 333, and multiple strip contact members 362 are evenly distributed on the track 333. One strip contact member 362 corresponds to multiple elastic support structures 35, and multiple elastic support structures 35 are arranged along the length direction of the strip contact member 362, that is, multiple sliding columns 352 are fixedly connected to one strip contact member 362, thereby improving the support strength of the strip contact member 362 and improving the support effect.

[0052] It should be noted that when the above embodiment is adopted, if the equipment needs to swing and adjust the multi-faceted installation facility 5, refer to the attached manual. Fig.13 If the edge of the facility 5 to be installed is relatively sharp, when the crawler 333 moves relative to the facility 5 to be installed and causes the facility 5 to swing, the facility 5 to be installed will swing with the contact protection member 36 on the crawler 333. At this time, if a simple point contact member 361 or strip contact member 362 structure is used, a large friction is easily formed between the swing of the facility 5 to be installed and the contact protection member 36, which is easy to cause damage to the protective paint layer on the surface of the facility 5 to be installed. Therefore, this embodiment also provides the following technical solutions, specifically, refer to the attached manual Figures 14 to 17The contact protection member 36 is a rope-type contact member 363, and the rope-type contact members 363 are provided in plurality, and the plurality of rope-type contact members 363 are evenly distributed on the crawler 333, and the rope-type contact members 363 are vertically provided on the crawler 333, and one rope-type contact member 363 corresponds to two sets of elastic support structures 35, wherein the rope-type contact member 363 corresponds to the crawler 333 and the inner nest 351 in the elastic support structure 35 at one end of the other set of crawlers 333 on the clamping arm 322 where the crawler 333 is located, and is fixedly installed in the crawler 333, and a guide member 37 is fixedly installed at the position of the other end of the crawler 333 corresponding to the rope-type contact member 363, and the inner nest 351 at the corresponding guide member 37 is vertically slidably installed in the guide member 37, and a second elastic member 371 (such as a spring) is provided in the guide member 37 for providing a vertical elastic force to the inner nest 351 in the guide member 37, and the two ends of the rope-type contact member 363 are respectively fixedly connected to the two sliding posts 352;

[0053] It should be noted that, in the two corresponding contact protection members 36 in the upper and lower track assemblies 33, the inner nest 351 at one end close to each other is relatively fixed to the track 333. For example, the inner nest 351 at the bottom end of the rope contact member 363 located at the top is fixedly connected to the group of tracks 333, and the inner nest 351 at the top end of the rope contact member 363 located at the bottom is fixedly connected to the group of tracks 333. The other ends of both can produce vertical sliding. Therefore, in actual use, when the track 333 initially contacts the inclined facility 5 to be installed, if the rope contact member 363 contacts the edge of the facility 5 to be installed, the rope contact member 363 will be squeezed and produce a twisted configuration adapted to the inclined edge of the facility 5 to be installed. Please refer to the attached manual for details. Fig.17 The rope contact piece 363 produces a certain degree of twisting, and its movable end can be pulled and moved to adapt to the edge of the facility to be installed 5. Therefore, when the deflection of the facility to be installed 5 is subsequently adjusted, the rope contact piece 363 can produce adaptive recovery or continue to twist deformation, reducing the relative displacement and friction loss with the surface of the facility to be installed 5, and further improving the safety and practicality of the equipment.

[0054] It should be noted that the above three solutions of the contact protection member 36 can be used in combination with each other and are not limited to being used alone.

[0055] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An electric power construction vehicle capable of changing the direction of equipment, comprising an electric power construction vehicle, on which a transport assembly and a gripping assembly are installed, characterized in that: The clamping assembly includes a driving frame and a clamping jaw assembly, the driving frame is connected to the electric power construction work vehicle; the clamping jaw assembly includes a clamping seat and two clamping arms, the clamping seat is rotatably connected to the driving frame, the rotation axis of the clamping seat is arranged in the horizontal direction, and the driving frame is provided with a flipping assembly for driving the clamping seat to rotate; the two clamping arms are slidably connected to the clamping seat in the horizontal direction, the two clamping arms slide to move away from or approach each other, and the clamping seat is also provided with a driving assembly for driving the two clamping arms to slide; track assemblies are arranged on the upper and lower sides of each group of clamping seats, the track assembly includes a track frame and a track, and a plurality of groups of track wheels are arranged on the track frame, the track is wrapped around the track wheel, and the side close to the track on the two groups of clamping arms forms a clamping working surface for clamping the electric pole, and one group of track wheels is a self-propelled driving wheel.

2. The electric construction vehicle capable of changing the direction of the equipment according to claim 1, characterized in that: The driving components are provided with two groups, and the two groups of driving components respectively control the sliding of the two clamping arms; the driving components include two connecting rods arranged in parallel and at intervals, and the two ends of the connecting rods are respectively rotatably connected to the clamping arms and the clamping seat, and the rotation axis of the connecting rods is arranged in the vertical direction, and the connecting line of the two connecting rods and their adjacent end points forms a parallelogram; one of the connecting rods is connected to a motor for driving its own rotation.

3. The electric construction vehicle capable of changing the direction of the equipment according to claim 2, characterized in that: The driving frame includes a transverse guide rail, a transverse moving frame, a lifting frame and a turning frame. The transverse guide rail is installed on the electric construction work vehicle, the transverse moving frame is slidably installed on the transverse guide rail, and a transverse moving driver for driving the transverse moving frame to slide is provided on the transverse guide rail; the lifting frame is vertically slidably installed on the transverse moving frame, and a lifting driver for driving the lifting frame to move vertically is provided between the lifting frame and the transverse moving frame; The turning frame is rotatably mounted on the lifting frame, a turning driver for driving the turning frame to turn is arranged between the turning frame and the lifting frame, and the clamping seat is fixedly mounted on the turning frame.

4. The electric construction vehicle capable of changing the direction of the equipment according to claim 3, characterized in that: The transport assembly includes a boom and a lifting drive. A hook assembly is provided at the end of the boom. The boom is rotatably mounted on the electric power construction work vehicle. The lifting drive is provided between the electric power construction work vehicle and the boom. The lifting drive is used to drive the boom for lifting operations.

5. The electric construction vehicle capable of changing the direction of the equipment according to claim 4, characterized in that: An elastic frame is arranged on the track frame, and an auxiliary wheel is arranged at a position corresponding to the clamping working surface of the elastic frame. The auxiliary wheel rolls and fits with the inner wall of the track to assist in supporting the track, and one end of the elastic frame corresponding to the auxiliary wheel has elastic force to approach the clamping working surface of the track assembly.

6. The electric construction vehicle capable of changing the direction of the equipment according to claim 5, characterized in that: Two groups of elastic frames are symmetrically arranged on each track frame, and the ends of the two groups of elastic frames that are away from each other are rotatably installed on the track frame, and the two groups of elastic frames are cross-arranged, and protruding structures are arranged on the two groups of elastic frames, and an elastic structure member is arranged between the two protruding structures, which is used to provide opposite elastic forces to the two groups of protruding structures, so that one end of the two groups of elastic frames corresponding to the auxiliary wheels are close to the clamping working surface of the track, and a balancing frame is rotatably installed on one end of the elastic frame corresponding to the clamping working surface of the track, and auxiliary wheels are rotatably installed on both ends of the balancing frame.

7. The electric construction vehicle capable of changing the direction of the equipment according to claim 6, characterized in that: The surface of the track is provided with an elastic support structure, which includes an inner nest and a sliding column. The inner nest is embedded in the track, and the sliding column is slidably installed in the inner nest. A first elastic member is provided between the sliding column and the inner nest, and the first elastic member provides an outward elastic force to the inner nest. A contact protection member is installed on the outside of the sliding column.

8. The electric construction vehicle capable of changing the direction of the equipment according to claim 7, characterized in that: The contact protection member includes a point contact member, one point contact member corresponds to a group of the elastic support structures, the point contact member is fixedly mounted on the sliding column, and each point contact member is distributed in a rectangular array on the track assembly.

9. The electric construction vehicle capable of changing the direction of the equipment according to claim 7, characterized in that: The contact protection member includes a strip contact member, which is vertically distributed on the track, and multiple strip contact members are evenly distributed on the track. One strip contact member corresponds to multiple elastic support structures, and the multiple elastic support structures are arranged along the length direction of the strip contact member. Multiple sliding columns are fixedly connected to one strip contact member.

10. The electric construction vehicle capable of changing the direction of the equipment according to claim 7, characterized in that: The contact protection member is a rope-type contact member, and a plurality of rope-type contact members are arranged, and the plurality of rope-type contact members are evenly spaced on the crawler, and the rope-type contact member is vertically arranged on the crawler, and one rope-type contact member corresponds to two groups of elastic support structures, and the inner nest in the elastic support structure at one end of the rope contact member is fixedly installed in the crawler, and a guide member is fixedly installed at the other end of the crawler corresponding to the rope contact member, and the inner nest at the corresponding guide member is vertically slidably installed in the guide member, and a second elastic member for providing a vertical elastic force to the inner nest in the guide member is arranged in the guide member, and the two ends of the rope-type contact member are respectively fixedly connected to the two sliding columns.

Citation Information

Patent Citations

  • Brick truck with loading and unloading device

    CN102991396A

  • Bridge underwater detection climbing type robot and working method

    CN112077858A

  • Mechanical gripper module for grabbing and erecting electric pole and pole erecting robot

    CN118478336A

  • Crawler-type six-axis unexploded ordnance removing robot

    CN222155595U