Construction equipment energy-saving management system and method for building construction
By analyzing the monitoring data of construction equipment, generating equipment management strategies and implementing management instructions, the serious problem of energy waste in construction equipment management is solved, and efficient energy conservation control and energy utilization are achieved.
Patent Information
- Application Number
- CN202411939314.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-26
- Publication Date
- 2025-04-18
AI Technical Summary
The construction equipment management at the construction site has problems such as long-term idleness and unreasonable operation, which leads to serious energy waste and lacks real-time and accurate energy consumption monitoring and analysis methods, making it difficult to take targeted energy-saving measures.
By identifying and analyzing the collected construction equipment monitoring data, generating equipment management strategies, and generating management instructions based on the strategy, accurate and reliable management and control of construction equipment is achieved, ensuring that the equipment saves energy without affecting the working effect.
Accurate energy-saving control of construction equipment is achieved, the accuracy and reliability of equipment management is ensured, the intelligence of energy-saving control and energy utilization rate are improved, and energy waste is significantly reduced.
Smart Images

Figure CN119854677A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy-saving management of construction equipment, and in particular to an energy-saving management system and method for construction equipment used in construction. Background Art
[0002] With the continuous development of the construction industry, a large number of construction equipment are needed in the construction process. However, there are often some problems in the traditional construction equipment management, which leads to serious energy waste. Therefore, it is particularly important to carry out effective energy-saving control of construction equipment.
[0003] However, the current construction equipment management on construction sites has problems such as long-term idling and unreasonable operation, resulting in a large amount of unnecessary energy consumption. At the same time, there is a lack of real-time and accurate monitoring and analysis methods for the energy consumption of equipment, making it difficult to take targeted energy-saving measures. Moreover, some existing equipment management systems have relatively single functions and cannot comprehensively cover all aspects of energy-saving management, and cannot form an effective energy-saving control system, which greatly reduces the energy-saving control effect of construction equipment.
[0004] Therefore, in order to overcome the above-mentioned defects, the present invention provides a construction equipment energy-saving management system and method for building construction. Summary of the invention
[0005] The present invention provides a construction equipment energy-saving management system and method for building construction, which is used to identify and analyze the collected monitoring data of the construction equipment, so as to realize accurate and effective understanding of the operating conditions of each construction equipment during operation, thereby realizing generating an equipment management strategy for each construction equipment according to the identification and analysis results, and finally, generating a management instruction for each construction equipment according to the obtained equipment management strategy, realizing accurate and reliable management and control of each construction equipment according to the management instruction, ensuring that each construction equipment saves a lot of energy resources without affecting the working effect, ensuring the accuracy and reliability of the energy-saving control of each construction equipment, improving the intelligence and energy utilization rate of the energy-saving control, and ensuring the energy-saving control effect.
[0006] The present invention provides a construction equipment energy-saving management system for building construction, comprising:
[0007] A data acquisition module, used to collect monitoring data of construction equipment in real time according to a preset time period;
[0008] An equipment management strategy generation module is used to transmit the monitoring data of the construction equipment to the monitoring terminal for identification and analysis, and output the equipment management strategy for the construction equipment according to the identification and analysis results;
[0009] The management control module is used to read the equipment management strategy, determine the management instructions for each construction equipment, and manage and control the corresponding construction equipment based on the management instructions.
[0010] Preferably, a construction equipment energy-saving management system for building construction, a data acquisition module, comprises:
[0011] An equipment label building unit, used for obtaining equipment numbers of all construction equipment and building an equipment label of each construction equipment according to the equipment number of the construction equipment;
[0012] A block connection unit, used to construct a data receiving block and to construct a plurality of data storage blocks according to the device tag, wherein the data receiving block is connected to the plurality of data storage blocks respectively;
[0013] An instruction generation unit, used for reading a preset time period, constructing a start acquisition time node and an end acquisition time node according to the preset time period, and generating a data acquisition instruction according to the start acquisition time node and the end time node;
[0014] The acquisition storage unit is used to load the data acquisition instruction in the data receiving block, and at the same time, collect the monitoring data of each construction equipment in real time according to the loading result, and transmit the collected monitoring data to the corresponding data storage block.
[0015] Preferably, a construction equipment energy-saving management system for building construction, an equipment management strategy generation module, comprises:
[0016] A data analysis unit, used to read and analyze the monitoring data of each construction equipment based on the monitoring terminal, and determine the real-time operating status of each construction equipment at different times;
[0017] Normal operation determination unit, used for:
[0018] Obtaining a reference operating state interval of the construction equipment, and comparing the real-time operating state of each construction equipment at different times with the reference operating state interval to determine whether the construction equipment is operating normally;
[0019] If the real-time operating status of the construction equipment at different times belongs to the reference operating status interval, it is determined that the construction equipment is operating normally;
[0020] Otherwise, it is determined that the construction equipment is operating abnormally;
[0021] Management policy generation unit, used to:
[0022] According to the judgment result, when all the construction equipment are in normal operation, a first equipment management strategy is generated;
[0023] Otherwise, a second device management policy is generated.
[0024] Preferably, a construction equipment energy-saving management system for building construction, a management control module, comprises:
[0025] A device management policy reading unit, used to obtain the obtained device management policy, and read the device management policy to obtain target text data corresponding to the device management policy;
[0026] A management instruction generation unit is used to:
[0027] Extract the terminal tags of each construction equipment, and perform object segmentation on the target text data based on the terminal tags to obtain the equipment management execution target corresponding to each construction equipment;
[0028] Determine the management items for the corresponding construction equipment, the specific execution parameters corresponding to each management item, and the start and close timestamps of each construction equipment based on the equipment management execution objectives;
[0029] Obtaining an instruction generation element based on the management project of each construction equipment, the specific execution parameters corresponding to each management project and the start and close timestamp of each construction equipment, and retrieving an instruction element set from a preset instruction library based on the instruction generation element;
[0030] Logically combine the instruction elements in the instruction element set to construct management instructions for each construction equipment;
[0031] Management control unit for:
[0032] Perform equipment self-check on each construction equipment based on the management instruction construction result, and extract the configuration parameters of each construction equipment after the equipment self-check passes;
[0033] Based on the configuration parameters, the energy-saving interval without performance interference of each construction equipment is determined. At the same time, the energy-saving control target of the construction equipment is determined based on the specific execution parameters corresponding to each management project. When the sum of the energy-saving control targets of each management project is within the energy-saving interval without performance interference, the management control mechanism of the construction equipment is started. Otherwise, the equipment management strategy is returned.
[0034] Based on the startup result, the linkage control lines for different construction equipment are determined according to the start-up and closing timestamps of each construction equipment, and a distributed instruction transmission channel is constructed based on the linkage control lines;
[0035] The generated management instructions are sent to each construction equipment based on the distributed instruction transmission channel, and each construction equipment is managed and controlled based on the sending result.
[0036] Preferably, a construction equipment energy-saving management system for building construction, a management control module, comprises:
[0037] A result acquisition unit is used to monitor the management and control results of the construction equipment in real time, and obtain the corresponding operation characteristics of each construction equipment at different times based on the real-time monitoring results;
[0038] A recording unit, for allocating an independent recording table to each construction equipment based on the equipment identity of each construction equipment, and recording the corresponding operation characteristics of each construction equipment at different times in the corresponding independent recording table based on the time development sequence;
[0039] The report generation unit is used to generate energy-saving control reports for each construction equipment based on the recorded results, and periodically transmit the energy-saving control reports to the management terminal for visual display.
[0040] The present invention provides a construction equipment energy-saving management method for building construction, comprising:
[0041] Step 1: Collect monitoring data of construction equipment in real time according to a preset time period;
[0042] Step 2: Transmit the monitoring data of the construction equipment to the monitoring terminal for identification and analysis, and output the equipment management strategy for the construction equipment according to the identification and analysis results;
[0043] Step 3: Read the equipment management strategy, determine the management instructions for each construction equipment, and manage and control the corresponding construction equipment based on the management instructions.
[0044] Preferably, a construction equipment energy-saving management method for building construction, in step 1, real-time collection of monitoring data of the construction equipment according to a preset time period includes:
[0045] Obtain equipment numbers of all construction equipment, and construct equipment tags for each construction equipment according to the equipment numbers of the construction equipment;
[0046] Constructing a data receiving block, and constructing a plurality of data storage blocks according to the device tag, wherein the data receiving block is connected to the plurality of data storage blocks respectively;
[0047] Reading a preset time period, and constructing a start collection time node and an end collection time node according to the preset time period, and generating a data collection instruction according to the start collection time node and the end time node;
[0048] The data acquisition instruction is loaded in the data receiving block. At the same time, the monitoring data of each construction equipment is collected in real time according to the loading result, and the collected monitoring data is transmitted to the corresponding data storage block.
[0049] Compared with the prior art, the present invention has the following beneficial effects:
[0050] By identifying and analyzing the collected monitoring data of construction equipment, we can accurately and effectively understand the operating conditions of each construction equipment during operation, so as to generate equipment management strategies for each construction equipment based on the identification and analysis results. Finally, management instructions for each construction equipment are generated based on the obtained equipment management strategy, so that accurate and reliable management and control of each construction equipment can be achieved according to the management instructions, ensuring that each construction equipment saves a lot of energy resources without affecting the work results, ensuring the accuracy and reliability of energy-saving control of each construction equipment, improving the intelligence and energy utilization rate of energy-saving control, and ensuring the energy-saving control effect.
[0051] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures specifically pointed out in this application document.
[0052] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0054] Figure 1 This is a structural diagram of a construction equipment energy-saving management system for building construction in an embodiment of the present invention;
[0055] Figure 2 This is a structural diagram of a data acquisition module in a construction equipment energy-saving management system for building construction according to an embodiment of the present invention;
[0056] Figure 3 The present invention is a flowchart of a method for energy-saving management of construction equipment used in building construction according to an embodiment of the present invention. DETAILED DESCRIPTION
[0057] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0058] In one embodiment, a construction equipment energy-saving management system for building construction is provided, such as Figure 1 As shown, including:
[0059] A data acquisition module, used to collect monitoring data of construction equipment in real time according to a preset time period;
[0060] An equipment management strategy generation module is used to transmit the monitoring data of the construction equipment to the monitoring terminal for identification and analysis, and output the equipment management strategy for the construction equipment according to the identification and analysis results;
[0061] The management control module is used to read the equipment management strategy, determine the management instructions for each construction equipment, and manage and control the corresponding construction equipment based on the management instructions.
[0062] In this embodiment, the preset time period is set in advance, for example, it may be one hour or one day.
[0063] In this embodiment, the monitoring data may be information such as the operating power, operating temperature, and operating time of the construction equipment.
[0064] In this embodiment, the equipment management strategy may be a method or measure determined after analyzing the monitoring data of the construction equipment to effectively control the energy saving of the construction equipment.
[0065] In this embodiment, the management instruction may be instruction information generated according to the equipment management strategy and used to control the operating status of the construction equipment.
[0066] In this embodiment, the management control may be to control the operating time, operating status, load, etc. of each construction equipment, so as to achieve the purpose of energy saving.
[0067] The working principle and beneficial effects of the above technical solution are: by identifying and analyzing the collected monitoring data of construction equipment, an accurate and effective understanding of the operating conditions of each construction equipment during operation can be achieved, thereby generating an equipment management strategy for each construction equipment based on the identification and analysis results, and finally, generating management instructions for each construction equipment based on the obtained equipment management strategy, so as to achieve accurate and reliable management and control of each construction equipment according to the management instructions, ensuring that each construction equipment saves a lot of energy resources without affecting the work effect, ensuring the accuracy and reliability of the energy-saving control of each construction equipment, improving the intelligence and energy utilization rate of the energy-saving control, and ensuring the energy-saving control effect.
[0068] In one embodiment, a construction equipment energy-saving management system for building construction is provided, such as Figure 2As shown, the data acquisition module includes:
[0069] An equipment label building unit, used for obtaining equipment numbers of all construction equipment and building an equipment label of each construction equipment according to the equipment number of the construction equipment;
[0070] A block connection unit, used to construct a data receiving block and to construct a plurality of data storage blocks according to the device tag, wherein the data receiving block is connected to the plurality of data storage blocks respectively;
[0071] An instruction generation unit, used for reading a preset time period, constructing a start acquisition time node and an end acquisition time node according to the preset time period, and generating a data acquisition instruction according to the start acquisition time node and the end time node;
[0072] The acquisition storage unit is used to load the data acquisition instruction in the data receiving block, and at the same time, collect the monitoring data of each construction equipment in real time according to the loading result, and transmit the collected monitoring data to the corresponding data storage block.
[0073] In this embodiment, the equipment number may be the equipment model of each construction equipment extracted from a preset equipment management library, so that an equipment label is constructed according to the equipment number to distinguish different construction equipment.
[0074] In this embodiment, the data receiving block may be a mechanism for receiving monitoring data.
[0075] In this embodiment, the data storage block can be a mechanism for storing monitoring data of corresponding construction equipment, wherein the data storage block corresponds one-to-one to the equipment number of the construction equipment, and one data receiving block is connected to multiple data storage blocks.
[0076] The working principle and beneficial effects of the above technical solution are: obtaining the equipment number to create a unique equipment label for each construction equipment in order to identify and distinguish different construction equipment; by establishing a data receiving block and multiple data storage blocks corresponding to the equipment label, and establishing a connection relationship between them, at the same time, according to the data acquisition instructions, the collection and storage of monitoring data are effectively realized, and a large number of construction equipment can be effectively distinguished and managed, thereby ensuring clear management of monitoring data. The regularity and timeliness of monitoring data collection can be effectively guaranteed by presetting the time period, which can effectively facilitate subsequent data identification and analysis.
[0077] In one embodiment, a construction equipment energy-saving management system for building construction is provided, and an equipment management strategy generation module includes:
[0078] A data analysis unit, used to read and analyze the monitoring data of each construction equipment based on the monitoring terminal, and determine the real-time operating status of each construction equipment at different times;
[0079] Normal operation determination unit, used for:
[0080] Obtaining a reference operating state interval of the construction equipment, and comparing the real-time operating state of each construction equipment at different times with the reference operating state interval to determine whether the construction equipment is operating normally;
[0081] If the real-time operating status of the construction equipment at different times belongs to the reference operating status interval, it is determined that the construction equipment is operating normally;
[0082] Otherwise, it is determined that the construction equipment is operating abnormally;
[0083] Management policy generation unit, used to:
[0084] According to the judgment result, when all the construction equipment are in normal operation, a first equipment management strategy is generated;
[0085] Otherwise, a second device management policy is generated.
[0086] In this embodiment, the reference operating state may be pre-set, representing the operating state of the corresponding construction equipment during normal operation, wherein the operating state refers to the operating power, current, and other states of the construction equipment.
[0087] In this embodiment, the first equipment management strategy refers to a management strategy for equipment management corresponding to when all construction equipment is in normal operating state, for example, it may be to keep all construction equipment in the current operating state and continue to work.
[0088] In this embodiment, the second equipment management strategy refers to a management strategy for managing equipment when abnormal operating conditions exist in all construction equipment, for example: when there is an overload, etc., load balancing and other operations are performed on all construction equipment when there is an overload, thereby achieving the purpose of energy saving.
[0089] The working principle and beneficial effect of the above technical solution are: by real-time determining whether all construction equipment is in normal operating state, the corresponding first equipment management strategy and second equipment management strategy are generated, thereby effectively realizing effective management of construction equipment in different operating states, thereby improving the effectiveness and accuracy of management strategy generation.
[0090] In one embodiment, a construction equipment energy-saving management system for building construction is provided, the management control module comprising:
[0091] A device management policy reading unit, used to obtain the obtained device management policy, and read the device management policy to obtain target text data corresponding to the device management policy;
[0092] A management instruction generation unit is used to:
[0093] Extract the terminal tags of each construction equipment, and perform object segmentation on the target text data based on the terminal tags to obtain the equipment management execution target corresponding to each construction equipment;
[0094] Determine the management items for the corresponding construction equipment, the specific execution parameters corresponding to each management item, and the start and close timestamps of each construction equipment based on the equipment management execution objectives;
[0095] Obtaining an instruction generation element based on the management project of each construction equipment, the specific execution parameters corresponding to each management project and the start and close timestamp of each construction equipment, and retrieving an instruction element set from a preset instruction library based on the instruction generation element;
[0096] Logically combine the instruction elements in the instruction element set to construct management instructions for each construction equipment;
[0097] Management control unit for:
[0098] Perform equipment self-check on each construction equipment based on the management instruction construction result, and extract the configuration parameters of each construction equipment after the equipment self-check passes;
[0099] Based on the configuration parameters, the energy-saving interval without performance interference of each construction equipment is determined. At the same time, the energy-saving control target of the construction equipment is determined based on the specific execution parameters corresponding to each management project. When the sum of the energy-saving control targets of each management project is within the energy-saving interval without performance interference, the management control mechanism of the construction equipment is started. Otherwise, the equipment management strategy is returned.
[0100] Based on the startup result, the linkage control lines for different construction equipment are determined according to the start-up and closing timestamps of each construction equipment, and a distributed instruction transmission channel is constructed based on the linkage control lines;
[0101] The generated management instructions are sent to each construction equipment based on the distributed instruction transmission channel, and each construction equipment is managed and controlled based on the sending result.
[0102] In this embodiment, the target text data refers to the data text corresponding to the device management policy obtained after the device management policy is read, that is, the text content.
[0103] In this embodiment, the terminal label refers to a marking symbol that can distinguish different construction equipment.
[0104] In this embodiment, object splitting refers to splitting the target text data into equipment management policies corresponding to each construction equipment according to the terminal tags.
[0105] In this embodiment, the equipment management execution target refers to the effect or purpose that needs to be achieved when controlling and managing each construction equipment.
[0106] In this embodiment, the specific execution parameters refer to the specific management steps and action parameters corresponding to the corresponding management items of the construction equipment, wherein the management items include the start time, the shutdown time and the standby status.
[0107] In this embodiment, the start and close timestamp refers to the specific time information corresponding to the start and close of each construction equipment.
[0108] In this embodiment, the instruction generation element refers to the parameters constituting the management instruction, that is, the content that the management instruction needs to contain.
[0109] In this embodiment, the preset instruction library is set in advance and stores a variety of instruction elements internally, wherein the instruction element is a code program that constitutes an instruction.
[0110] In this embodiment, the configuration parameters refer to the specific operating conditions of each construction equipment, including information such as operating power, current passing through, and maximum load.
[0111] In this embodiment, the energy-saving interval without performance interference refers to a numerical range in which each construction equipment can effectively save energy without affecting the performance effect when performing energy-saving control.
[0112] In this embodiment, the energy-saving control target refers to the expected energy-saving value when each construction equipment is managed and controlled by the specific execution parameters corresponding to each management project.
[0113] In this embodiment, the management and control mechanism refers to a plan or strategy for managing and controlling the construction equipment.
[0114] The working principle and beneficial effects of the above technical solution are as follows: by reading the equipment management strategy and performing object splitting on the read target text data according to the terminal tag of each construction equipment, the equipment management execution target corresponding to each construction equipment is effectively determined, and the management items of the construction equipment, the specific execution parameters corresponding to each management item and the start and close timestamp of each construction equipment are further locked according to the equipment management execution target, which provides support and convenience for building management instructions. Secondly, according to the obtained management items, the specific execution parameters corresponding to each management item and the start and close timestamp of each construction equipment, the corresponding instruction element set is retrieved from the preset instruction library, so as to realize accurate and effective generation of management instructions according to the instruction element set. Finally, each construction equipment is self-checked, and the management control of each construction equipment is verified after the self-check is passed, and the management control mechanism of the construction equipment is started after the verification is passed, so as to realize effective management and control of each construction equipment according to the management instructions, ensure the coordination between equipment and improve the energy-saving effect.
[0115] In one embodiment, a construction equipment energy-saving management system for building construction is provided, and a management control unit includes:
[0116] Monitoring subunit, used to:
[0117] Build a distributed monitoring mechanism and connect it with various construction equipment;
[0118] Based on the docking results, the operating status of each construction equipment after management and control is monitored in real time, and the monitoring results are sorted and recorded based on the time series to obtain the status sequence of each construction equipment;
[0119] Optimize subunits for:
[0120] Determine the state characteristics of each construction equipment in the operation stage based on the state sequence, and determine whether each construction equipment has invalid standby and no-load operation based on the state characteristics;
[0121] When there is invalid standby and no-load operation, determine the target time corresponding to the invalid standby and no-load operation, and obtain the optimization parameters of the equipment management strategy based on the invalid standby, no-load operation and the corresponding target time;
[0122] The equipment management strategy is optimized based on the optimization parameters, and each construction equipment is managed and controlled based on the optimization results.
[0123] In this embodiment, the distributed monitoring mechanism refers to a solution that can monitor the operation status of each construction equipment. Each construction equipment corresponds to a monitoring node, and there is no conflict or influence between the construction equipment.
[0124] In this embodiment, the state sequence refers to the monitoring results obtained after monitoring the operating status of each construction equipment after management and control, and the specific operating conditions of each construction equipment at different times.
[0125] In this embodiment, the state feature refers to the specific operation status of each construction equipment during the operation stage.
[0126] In this embodiment, the target time refers to the specific time information corresponding to the invalid standby and no-load operation of the construction equipment.
[0127] In this embodiment, the optimization parameters refer to specific data for optimizing the device management strategy, including the optimized content and specific parameters for optimizing the optimized content.
[0128] The working principle and beneficial effects of the above technical solution are: by constructing a distributed monitoring mechanism, real-time and effective monitoring of the management and control results of each construction equipment is achieved according to the distributed monitoring mechanism, and it is judged whether there is invalid standby and no-load operation based on the monitoring results. If it exists, the equipment management strategy is optimized, and each construction equipment is managed and controlled according to the optimization results, ensuring the reliability of the management and control of each construction equipment. At the same time, it ensures the accuracy and reliability of the energy-saving control of each construction equipment, and improves the intelligence of the energy-saving control and energy utilization rate.
[0129] In one embodiment, a construction equipment energy-saving management system for building construction is provided, the management control module comprising:
[0130] A result acquisition unit is used to monitor the management and control results of the construction equipment in real time, and obtain the corresponding operation characteristics of each construction equipment at different times based on the real-time monitoring results;
[0131] A recording unit, for allocating an independent recording table to each construction equipment based on the equipment identity of each construction equipment, and recording the corresponding operation characteristics of each construction equipment at different times in the corresponding independent recording table based on the time development sequence;
[0132] The report generation unit is used to generate energy-saving control reports for each construction equipment based on the recorded results, and periodically transmit the energy-saving control reports to the management terminal for visual display.
[0133] In this embodiment, the operation characteristics refer to the actual operation conditions of each construction equipment at different times.
[0134] In this embodiment, the device identity refers to parameter information that can distinguish different construction equipment, for example, it may be information such as the serial number of the construction equipment.
[0135] In this embodiment, the independent recording table refers to a table used to record the operation characteristics of each construction equipment separately.
[0136] The working principle and beneficial effects of the above technical solution are: by real-time monitoring of the management and control results of construction equipment, and recording the real-time monitoring results in a constructed independent record table, it is possible to accurately and effectively generate energy-saving control reports for each construction equipment, and periodically transmit the obtained energy-saving control reports to the management terminal for visual display, which is convenient for management personnel to effectively understand and view the energy-saving control effects, thereby ensuring the energy-saving control effects.
[0137] In one embodiment, a construction equipment energy-saving management system for building construction is provided, wherein the collection and storage unit comprises:
[0138] A monitoring device group determination subunit is used to obtain monitoring dimensions for monitoring construction equipment and determine a monitoring device group according to the monitoring dimensions;
[0139] At the same time, a monitoring device group is assigned to each construction equipment;
[0140] The monitoring subunit is used to monitor the corresponding construction equipment according to the monitoring equipment group and obtain the monitoring data corresponding to each construction equipment;
[0141] The transmission subunit is used to receive the monitoring data in real time according to the data acquisition instruction based on the data receiving block, and transmit the monitoring data to the corresponding data storage block.
[0142] In this embodiment, the monitoring dimensions are set in advance according to the monitoring requirements for monitoring the construction equipment.
[0143] In this embodiment, a monitoring device group is allocated to each construction equipment, which is a monitoring device group constructed by multi-dimensional monitoring devices for monitoring each construction equipment.
[0144] The working principle and beneficial effects of the above technical solution are: by determining the monitoring equipment group according to the monitoring dimension, a one-to-one correspondence between the monitoring equipment group and the construction equipment is achieved, thereby facilitating the monitoring of the corresponding construction equipment according to the monitoring equipment group, ensuring comprehensive and effective acquisition of monitoring data, and finally, storing the obtained monitoring data in the data storage block, providing reliable data support for determining the management and control strategy.
[0145] In one embodiment, a construction equipment energy-saving management system for building construction is provided, wherein the transmission subunit comprises:
[0146] A data reading subunit is used to read the collected monitoring data based on the data receiving block, and determine the data type and data source of the monitoring data;
[0147] A matching subunit, used to match the data source of the monitoring data with the device tag, and divide the monitoring data into multiple sub-monitoring data sets according to the matching result;
[0148] The data partitioning subunit is used to partition each sub-monitoring data set according to the data type to obtain multiple data segments of each sub-monitoring data set;
[0149] The data transmission subunit is used to transmit multiple data segments of each sub-monitoring data set to corresponding data storage blocks.
[0150] In this embodiment, the data type may be used to distinguish different data types of monitoring data.
[0151] In this embodiment, the data source refers to the monitoring object corresponding to the monitoring data (ie, the corresponding construction equipment), and thus may be a sub-monitoring data set obtained by matching the data source with the equipment label.
[0152] In this embodiment, the data segment may be the result of dividing the sub-monitoring data set based on the data type.
[0153] The working principle and beneficial effect of the above technical solution are: by determining the sub-monitoring data set and multiple data segments corresponding to the sub-monitoring data set, it is effectively guaranteed that the monitoring data is transmitted to the corresponding data storage block, ensuring the orderliness and accuracy of the data storage block in storing and organizing the monitoring data.
[0154] In one embodiment, a construction equipment energy-saving management method for building construction is provided. Figure 3 As shown, including:
[0155] Step 1: Collect monitoring data of construction equipment in real time according to a preset time period;
[0156] Step 2: Transmit the monitoring data of the construction equipment to the monitoring terminal for identification and analysis, and output the equipment management strategy for the construction equipment according to the identification and analysis results;
[0157] Step 3: Read the equipment management strategy, determine the management instructions for each construction equipment, and manage and control the corresponding construction equipment based on the management instructions.
[0158] The working principle and beneficial effects of the above technical solution are: by identifying and analyzing the collected monitoring data of construction equipment, an accurate and effective understanding of the operating conditions of each construction equipment during operation can be achieved, thereby generating an equipment management strategy for each construction equipment based on the identification and analysis results, and finally, generating management instructions for each construction equipment based on the obtained equipment management strategy, so as to achieve accurate and reliable management and control of each construction equipment according to the management instructions, ensuring that each construction equipment saves a lot of energy resources without affecting the work effect, ensuring the accuracy and reliability of the energy-saving control of each construction equipment, improving the intelligence and energy utilization rate of the energy-saving control, and ensuring the energy-saving control effect.
[0159] In one embodiment, a construction equipment energy-saving management method for building construction is provided. In step 1, monitoring data of the construction equipment is collected in real time according to a preset time period, including:
[0160] Obtain equipment numbers of all construction equipment, and construct equipment tags for each construction equipment according to the equipment numbers of the construction equipment;
[0161] Constructing a data receiving block, and constructing a plurality of data storage blocks according to the device tag, wherein the data receiving block is connected to the plurality of data storage blocks respectively;
[0162] Reading a preset time period, and constructing a start collection time node and an end collection time node according to the preset time period, and generating a data collection instruction according to the start collection time node and the end time node;
[0163] The data acquisition instruction is loaded in the data receiving block. At the same time, the monitoring data of each construction equipment is collected in real time according to the loading result, and the collected monitoring data is transmitted to the corresponding data storage block.
[0164] The working principle and beneficial effects of the above technical solution are: obtaining the equipment number to create a unique equipment label for each construction equipment in order to identify and distinguish different construction equipment; by establishing a data receiving block and multiple data storage blocks corresponding to the equipment label, and establishing a connection relationship between them, at the same time, according to the data acquisition instructions, the collection and storage of monitoring data are effectively realized, and a large number of construction equipment can be effectively distinguished and managed, thereby ensuring clear management of monitoring data. The regularity and timeliness of monitoring data collection can be effectively guaranteed by presetting the time period, which can effectively facilitate subsequent data identification and analysis.
[0165] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A construction equipment energy-saving management system for building construction, characterized in that: include: A data acquisition module, used to collect monitoring data of construction equipment in real time according to a preset time period; An equipment management strategy generation module is used to transmit the monitoring data of the construction equipment to the monitoring terminal for identification and analysis, and output the equipment management strategy for the construction equipment according to the identification and analysis results; The management control module is used to read the equipment management strategy, determine the management instructions for each construction equipment, and manage and control the corresponding construction equipment based on the management instructions.
2. The construction equipment energy-saving management system for building construction according to claim 1, characterized in that: Data acquisition module, including: An equipment label building unit, used for obtaining equipment numbers of all construction equipment and building an equipment label of each construction equipment according to the equipment number of the construction equipment; A block connection unit, used to construct a data receiving block and to construct a plurality of data storage blocks according to the device tag, wherein the data receiving block is connected to the plurality of data storage blocks respectively; An instruction generation unit, used for reading a preset time period, constructing a start acquisition time node and an end acquisition time node according to the preset time period, and generating a data acquisition instruction according to the start acquisition time node and the end time node; The acquisition storage unit is used to load the data acquisition instruction in the data receiving block, and at the same time, collect the monitoring data of each construction equipment in real time according to the loading result, and transmit the collected monitoring data to the corresponding data storage block.
3. The construction equipment energy-saving management system for building construction according to claim 1, characterized in that: Device management policy generation module, including: A data analysis unit, used to read and analyze the monitoring data of each construction equipment based on the monitoring terminal, and determine the real-time operating status of each construction equipment at different times; Normal operation determination unit, used for: Obtaining a reference operating state interval of the construction equipment, and comparing the real-time operating state of each construction equipment at different times with the reference operating state interval to determine whether the construction equipment is operating normally; If the real-time operating status of the construction equipment at different times belongs to the reference operating status interval, it is determined that the construction equipment is operating normally; Otherwise, it is determined that the construction equipment is operating abnormally; Management policy generation unit, used to: According to the judgment result, when all the construction equipment are in normal operation, a first equipment management strategy is generated; Otherwise, a second device management policy is generated.
4. The construction equipment energy-saving management system for building construction according to claim 1, characterized in that: Management control module, including: A device management policy reading unit, used to obtain the obtained device management policy, and read the device management policy to obtain target text data corresponding to the device management policy; A management instruction generation unit is used to: Extract the terminal tags of each construction equipment, and perform object segmentation on the target text data based on the terminal tags to obtain the equipment management execution target corresponding to each construction equipment; Determine the management items for the corresponding construction equipment, the specific execution parameters corresponding to each management item, and the start and close timestamps of each construction equipment based on the equipment management execution objectives; Obtaining an instruction generation element based on the management project of each construction equipment, the specific execution parameters corresponding to each management project and the start and close timestamp of each construction equipment, and retrieving an instruction element set from a preset instruction library based on the instruction generation element; Logically combine the instruction elements in the instruction element set to construct management instructions for each construction equipment; Management control unit for: Perform equipment self-check on each construction equipment based on the management instruction construction result, and extract the configuration parameters of each construction equipment after the equipment self-check passes; Based on the configuration parameters, the energy-saving interval without performance interference of each construction equipment is determined. At the same time, the energy-saving control target of the construction equipment is determined based on the specific execution parameters corresponding to each management project. When the sum of the energy-saving control targets of each management project is within the energy-saving interval without performance interference, the management control mechanism of the construction equipment is started. Otherwise, the equipment management strategy is returned. Based on the startup result, the linkage control lines for different construction equipment are determined according to the start-up and closing timestamps of each construction equipment, and a distributed instruction transmission channel is constructed based on the linkage control lines; The generated management instructions are sent to each construction equipment based on the distributed instruction transmission channel, and each construction equipment is managed and controlled based on the sending result.
5. The construction equipment energy-saving management system for building construction according to claim 1, characterized in that: Management control module, including: A result acquisition unit is used to monitor the management and control results of the construction equipment in real time, and obtain the corresponding operation characteristics of each construction equipment at different times based on the real-time monitoring results; A recording unit, for allocating an independent recording table to each construction equipment based on the equipment identity of each construction equipment, and recording the corresponding operation characteristics of each construction equipment at different times in the corresponding independent recording table based on the time development sequence; The report generation unit is used to generate energy-saving control reports for each construction equipment based on the recorded results, and periodically transmit the energy-saving control reports to the management terminal for visual display.
6. A construction equipment energy-saving management method for building construction, characterized in that: include: Step 1: Collect monitoring data of construction equipment in real time according to a preset time period; Step 2: Transmit the monitoring data of the construction equipment to the monitoring terminal for identification and analysis, and output the equipment management strategy for the construction equipment according to the identification and analysis results; Step 3: Read the equipment management strategy, determine the management instructions for each construction equipment, and manage and control the corresponding construction equipment based on the management instructions.
7. A construction equipment energy-saving management method for building construction according to claim 6, characterized in that: In step 1, monitoring data of construction equipment is collected in real time according to a preset time period, including: Obtain equipment numbers of all construction equipment, and construct equipment tags for each construction equipment according to the equipment numbers of the construction equipment; Constructing a data receiving block, and constructing a plurality of data storage blocks according to the device tag, wherein the data receiving block is connected to the plurality of data storage blocks respectively; Reading a preset time period, and constructing a start collection time node and an end collection time node according to the preset time period, and generating a data collection instruction according to the start collection time node and the end time node; The data acquisition instruction is loaded in the data receiving block. At the same time, the monitoring data of each construction equipment is collected in real time according to the loading result, and the collected monitoring data is transmitted to the corresponding data storage block.
Citation Information
Patent Citations
Real-time energy saving linkage control device and method for intelligent building
CN102650876A
Monitoring management system based on building equipment
CN115564333A
Building construction process intelligent management system based on BIM technology
CN116862447A
Intelligent construction site monitoring system based on GIS system
CN116976625A
Low-carbon building construction management and control method and system based on smart perception
CN118037136A
Cited By
Intelligent building and facility management system based on artificial intelligence
CN120409956A