Wire take-up device for shortening distribution network engineering wire laying

By designing a device with multiple hooks and winch, the problem of wire tightening in the prior art requires alternate use of wire tightening, achieving rapid wires and simplified operation.

CN119891008APending Publication Date: 2025-04-25NANCHONG POWER SUPPLY COMPANY STATE GRID SICHUANELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510013170.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-06
Publication Date
2025-04-25

AI Technical Summary

Technical Problem

In the existing distribution network project, the wire tightening requires the use of two tightening machines alternately, which is troublesome and requires high operation.

Method used

A device including a connecting frame, a first hook, a first winch, a steel cable and a steel frame is designed. By rotating the first shaft and the second shaft, the winch and the steel cable are driven to rotate, so that the second hook and the third hook can simultaneously pull the wire movement.

Benefits of technology

There is no need to use two wire tighteners alternately, it is easy to operate, can quickly lead wires and reduce operating requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119891008A_ABST
    Figure CN119891008A_ABST
Patent Text Reader

Abstract

The invention provides a take-up device for shortening distribution network engineering wire unwinding, which comprises a connecting frame and a first hook rotationally connected with the lower end of the connecting frame, a first shaft is mounted on the inner wall of the connecting frame, one end of the first shaft is rotationally connected with a first winch, and the outer surface of the first winch is sleeved with a first steel rope; a second shaft is further installed on the inner wall of the connecting frame, one end of the second shaft is rotationally connected with a second winch, the outer surface of the second winch is sleeved with a third steel rope, a third connecting rod is installed in the second steel frame, a second connecting rod is installed in the first steel frame, and a second connecting rod is installed in the second steel frame. And a second hook is mounted at the upper end of the first steel frame. According to the invention, the third hook is added on the basis of the original second hook, so that two tighteners do not need to be used alternately, and the second hook and the third hook can pull the electric wire to move at the same time, so that the electric wire can be quickly guided, and higher operation requirements are not needed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wire tighteners, and in particular to a wire take-up device for shortening the laying of wires in a distribution network project. Background Art

[0002] The wire tensioner, also called ratchet tensioner, is used to tighten the wire during the construction of overhead line installation. When using it, first loosen the wire rope or galvanized iron wire on the wire tensioner and fix it on the crossarm, clamp the wire with the wire clamp, and then turn the special wrench. Due to the anti-reversal effect of the ratchet, gradually wind the wire rope or galvanized iron wire around the ratchet drum to tighten the wire. Fix the tightened wire on the insulator. Then loosen the ratchet first to loosen the wire rope or galvanized iron wire, then loosen the wire clamp, and finally wind the wire rope or galvanized iron wire around the ratchet drum.

[0003] The existing distribution network engineering conductors need to use two tensioners alternately to achieve the effect of fast conductor, but the alternating use of the two tensioners is troublesome and has high operating requirements. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a device for shortening the wire laying and retracting of distribution network engineering conductors, so as to solve the technical problem in the related art that traditional tensioners need to be used alternately.

[0005] The present invention provides a device for shortening the wire laying and winding in a distribution network engineering, comprising a connecting frame and a first hook rotatably connected to the lower end of the connecting frame, a first shaft is installed on the inner wall of the connecting frame, one end of the first shaft is rotatably connected to a first winch, and a first steel cable is sleeved on the outer surface of the first winch, a second shaft is also installed on the inner wall of the connecting frame, one end of the second shaft is rotatably connected to a second winch, and a third steel cable is sleeved on the outer surface of the second winch;

[0006] It also includes a first steel frame and a second steel frame, wherein a third connecting rod is installed inside the second steel frame, a second connecting rod is installed inside the first steel frame, a second hook is installed at the upper end of the first steel frame, and a third hook is installed at the upper end of the second steel frame;

[0007] A first connecting rod is also installed inside the connecting frame, and the upper end of the first connecting rod is respectively connected to the second steel cable and the fourth steel cable, the upper end of the fourth steel cable is sleeved on the third connecting rod, and the upper end of the second steel cable is sleeved on the second connecting rod.

[0008] Furthermore, a first bevel gear is installed at one end of the first steel cable, a second bevel gear is installed at one end of the second winch, a third bevel gear is installed inside the connecting frame, and the third bevel gear is meshed with the first bevel gear and the second bevel gear.

[0009] Furthermore, a first sliding column is slidably connected to the upper end of the first steel frame, the upper end of the first sliding column is connected to the lower end of the second hook, a first spiral groove is provided on the outer surface of the first sliding column, a first protrusion is also installed on the inner wall of the first steel frame, one end of the first protrusion is slidably connected to the inside of the first spiral groove, and a first spring is also installed on the inner wall of the first steel frame.

[0010] Furthermore, a second sliding column is slidably connected to the upper end of the second steel frame, the upper end of the second sliding column is connected to the lower end of the third hook, a second spiral groove is provided on the outer surface of the second sliding column, a second protrusion is also installed on the inner wall of the second steel frame, one end of the second protrusion is slidably connected to the inside of the second spiral groove, and a second spring is also installed on the inner wall of the second steel frame.

[0011] Furthermore, the other end of the second shaft passes through the connecting frame, one end of the connecting frame is rotatably connected to a rotating rod, the upper end of the rotating rod is rotatably connected to a ratchet, and the second shaft passes through the ratchet.

[0012] Furthermore, a square column is slidably connected inside the second shaft, one end of the second sliding column passes through the second bevel gear, one end of the first bevel gear is provided with a square groove, and one end of the square column is used to be inserted into the square groove.

[0013] Furthermore, a handle is installed at the other end of the square column, a plug is installed at one end of the handle, and a round hole is also provided at one end of the second shaft. The plug is used to be inserted into the inside of the round hole, and the plug is gap-matched with the round hole.

[0014] Furthermore, the third bevel gear is slidably connected inside the connecting frame, and the third bevel gear is operably meshed with the first bevel gear and the second bevel gear.

[0015] Furthermore, a square shaft column is installed on one side of the third bevel gear, the square shaft column passes through the connecting frame, and a trapezoidal block is installed on one side of the square shaft column.

[0016] A third spring is installed on the outer surface of the square shaft column, and the other side of the third spring is connected to the connecting frame;

[0017] One side of the square shaft column is rotatably connected to one side of the third bevel gear.

[0018] The working principle of the present invention is as follows: by rotating the first shaft and the second shaft, the first shaft drives the first winch to rotate, the first winch pulls the first steel cable to shrink and wrap around the outer surface of the first winch, the first steel frame and the second hook are moved by pulling the first steel cable, and the third steel cable is driven to rotate by the second shaft, the third steel cable pulls the third steel cable to shrink and wrap around the outer surface of the second winch, and the second steel frame and the third hook are moved by pulling the third steel cable, so that the second hook and the third hook can pull the wire to move at the same time.

[0019] Compared with the prior art, the present invention has the following beneficial effects: by adding a third hook on the basis of the original second hook, it is no longer necessary to use two wire tensioners alternately, so that the second hook and the third hook can simultaneously pull the wire to move, thereby quickly conducting the wire without high operating requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0021] Figure 2 It is a main cross-sectional view of the present invention as a whole.

[0022] Figure 3 It is a schematic structural diagram of the rotating rod and the ratchet wheel of the present invention.

[0023] Figure 4 It is a structural schematic diagram of the connecting frame of the present invention.

[0024] Figure 5 It is a top view of the present invention as a whole.

[0025] Description of Figure Numbers:

[0026] 1. Connecting frame; 2. First hook; 3. First shaft; 4. First winch; 5. First steel cable; 6. First connecting rod; 7. Second steel cable; 8. First steel frame; 9. Second connecting rod; 10. First sliding column; 11. Second hook; 12. First bevel gear; 13. Second bevel gear; 14. Third bevel gear; 15. Second shaft; 16. Second winch; 17. Third steel cable; 18. Fourth steel cable; 19. Third connecting rod; 20. Second steel Frame; 21, second slide column; 22, third hook; 23, rotating rod; 24, first spiral groove; 25, first spring; 26, first protrusion; 27, second spiral groove; 28, second spring; 29, second protrusion; 30, square groove; 31, square column; 32, handle; 33, round hole; 34, plug; 35, ratchet; 36, square frame; 37, threaded rod; 38, tapered column; 39, trapezoidal block; 40, square shaft column; 41, third spring.

[0027] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical solution and beneficial effects of the present invention more clearly understood, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0029] In the description of the present invention, it should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of the present specification are only used to match the contents disclosed in the specification for people familiar with the technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change of the proportion relationship or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in the present specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of the relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.

[0030] See also Figures 1 to 5 The present invention provides a device for shortening the wire laying and winding in the distribution network engineering, comprising a connecting frame 1 and a first hook 2 rotatably connected to the lower end of the connecting frame 1, a first shaft 3 is installed on the inner wall of the connecting frame 1, one end of the first shaft 3 is rotatably connected to a first winch 4, and a first steel cable 5 is sleeved on the outer surface of the first winch 4, a second shaft 15 is also installed on the inner wall of the connecting frame 1, one end of the second shaft 15 is rotatably connected to a second winch 16, and a third steel cable 17 is sleeved on the outer surface of the second winch 16; and the first steel frame 8 and the connecting frame 1 are also provided. A second steel frame 20, a third connecting rod 19 is installed inside the second steel frame 20, a second connecting rod 9 is installed inside the first steel frame 8, a second hook 11 is installed at the upper end of the first steel frame 8, and a third hook 22 is installed at the upper end of the second steel frame 20; a first connecting rod 6 is also installed inside the connecting frame 1, and the upper ends of the first connecting rod 6 are respectively connected to the second steel cable 7 and the fourth steel cable 18, the upper end of the fourth steel cable 18 is sleeved on the third connecting rod 19, and the upper end of the second steel cable 7 is sleeved on the second connecting rod 9.

[0031] The existing distribution network engineering conductors need to use two tensioners alternately to achieve the effect of fast conductor, but the alternating use of two tensioners is troublesome and has high operation requirements;

[0032] according to Figure 1 As shown, by adding a third hook 22 on the basis of the original second hook 11, it is no longer necessary to use two wire tensioners alternately, so that the second hook 11 and the third hook 22 can simultaneously pull the wire to move, thereby quickly conducting the wire without requiring high operation requirements;

[0033] Specifically, according to Figure 1As shown, by rotating the first shaft 3 and the second shaft 15, the first shaft 3 drives the first winch 4 to rotate, the first winch 4 pulls the first steel cable 5 to shrink and wrap around the outer surface of the first winch 4, the first steel frame 8 and the second hook 11 are moved by the first steel cable 5, and the third steel cable 17 is driven to rotate by the second shaft 15, the third steel cable 17 is pulled to shrink and wrap around the outer surface of the second winch 16, and the second steel frame 20 and the third hook 22 are moved by the third steel cable 17, so that the second hook 11 and the third hook 22 can pull the wire to move at the same time.

[0034] A first bevel gear 12 is installed at one end of the first steel cable 5, a second bevel gear 13 is installed at one end of the second capstan 16, and a third bevel gear 14 is installed inside the connecting frame 1, and the third bevel gear 14 is meshed with the first bevel gear 12 and the second bevel gear 13. Since the third bevel gear 14 is meshed with the first bevel gear 12 and the second bevel gear 13, when the second shaft 15 rotates clockwise, the second bevel gear 13 at one end of the second shaft 15 will mesh and drive the third bevel gear 14 to rotate, and the third bevel gear 14 will mesh and drive the first bevel gear 12 to rotate counterclockwise, so that the second capstan 16 can recycle the fourth steel cable 18 while the first steel cable 5 releases the second steel cable 7, so that the device can be used and operated in a multifunctional manner.

[0035] The upper end of the first steel frame 8 is slidably connected with the first sliding column 10, and the upper end of the first sliding column 10 is connected to the lower end of the second hook 11. The outer surface of the first sliding column 10 is provided with a first spiral groove 24, and the inner wall of the first steel frame 8 is also installed with a first protrusion 26, one end of the first protrusion 26 is slidably connected to the inside of the first spiral groove 24, and the inner wall of the first steel frame 8 is also installed with a first spring 25; the upper end of the second steel frame 20 is slidably connected with the second sliding column 21, the upper end of the second sliding column 21 is connected to the lower end of the third hook 22, and the outer surface of the second sliding column 21 is provided with a second spiral groove 27, and the inner wall of the second steel frame 20 is also installed with a second protrusion 29, one end of the second protrusion 29 is slidably connected to the inside of the second spiral groove 27, and the inner wall of the second steel frame 20 is also installed with a second spring 28.

[0036] The working principle of the second hook 11 is the same as that of the third hook 22. Figure 2 As shown, when the second hook 11 hooks the wire, the first steel cable 5 pulls the first steel frame 8 and the second hook 11 to slide toward the connecting frame 1. Due to the large resistance at the wire, when the second hook 11 pulls the wire, the wire will pull the second hook 11 to slide away from the connecting frame 1, so that the second hook 11 will be pulled to the first slide column 10 to slide, and is slidably connected to the first spiral groove 24 through the first protrusion 26, so that the first slide column 10 drives the second hook 11 to rotate, and the second hook 11 drives one end of the wire to rotate, so that the wire is wrapped around the outer surface of the second hook 11, and one end of the wire is twisted, so as to increase the strength of one end of the wire and reduce the occurrence of the wire being torn and broken.

[0037] according to Figure 2 and Figure 3 As shown, the other end of the second shaft 15 passes through the connecting frame 1, one end of the connecting frame 1 is rotatably connected to the rotating rod 23, the upper end of the rotating rod 23 is rotatably connected to the ratchet 35, and the second shaft 15 passes through the ratchet 35; the interior of the second shaft 15 is slidably connected to the square column 31, one end of the second sliding column 21 passes through the second bevel gear 13, one end of the first bevel gear 12 is provided with a square groove 30, and one end of the square column 31 is used to insert into the interior of the square groove 30; a handle 32 is installed at the other end of the square column 31, and a plug 34 is installed at one end of the handle 32, and a circular hole 33 is also provided at one end of the second shaft 15, and the plug 34 is used to insert into the interior of the circular hole 33, and the plug 34 and the circular hole 33 are clearance-matched.

[0038] according to Figure 2 and Figure 3 As shown, when the first capstan 4 and the second capstan 16 need to rotate simultaneously and in the same direction, the handle 32 is pushed to slide toward one end, and the handle 32 drives the square column 31 to slide toward one end, and the square column 31 is inserted into the interior of the square groove 30. When the second shaft 15 rotates, the second shaft 15 will drive the square column 31 to rotate, and the square column 31 drives the first bevel gear 12 and the second capstan 16 to rotate, so that the first capstan 4 and the second capstan 16 can rotate simultaneously and in the same direction.

[0039] It should be noted that when the handle 32 slides to one end, the plug 34 at one end of the handle 32 will be inserted into the inside of the circular hole 33. Due to the clearance fit between the plug 34 and the circular hole 33, the plug 34 is snap-fastened inside the circular hole 33.

[0040] It should be noted that when the rotating rod 23 rotates, the rotating rod 23 drives the ratchet 35 to rotate, and the ratchet 35 drives the second shaft 15 to rotate. The working principle of the rotating rod 23 and the ratchet 35 is the existing technology and will not be described in detail.

[0041] The third bevel gear 14 is slidably connected to the inside of the connecting frame 1, and the third bevel gear 14 is operably engaged with the first bevel gear 12 and the second bevel gear 13; a square shaft column 40 is installed on one side of the third bevel gear 14, the square shaft column 40 passes through the connecting frame 1, and a trapezoidal block 39 is installed on one side of the square shaft column 40; a square frame 36 is installed on one side of the connecting frame 1, and a threaded rod 37 is threadedly connected to the upper end of the square frame 36, and a conical column 38 is installed on the lower end of the threaded rod 37, and the conical column 38 is used to abut against the trapezoidal block 39; a third spring 41 is installed on the outer surface of the square shaft column 40, and the other side of the third spring 41 is connected to the connecting frame 1; one side of the square shaft column 40 is rotatably connected to one side of the third bevel gear 14.

[0042] By rotating the threaded rod 37, the threaded rod 37 drives the cone column 38 to slide downward, and the cone column 38 slides downward to abut against the trapezoidal block 39, so that the cone column 38 squeezes the trapezoidal block 39 to slide to one side, and the trapezoidal block 39 drives the square shaft column 40 to slide to one side. Figure 5 As shown, the third bevel gear 14 is driven to slide to one side by the square shaft column 40, so that the third bevel gear 14 is engaged with the second bevel gear 13 and the first bevel gear 12. In this way, when the second bevel gear 13 rotates, the second bevel gear 13 drives the third bevel gear 14 to rotate, and the third bevel gear 14 drives the first bevel gear 12 to rotate.

[0043] It should be particularly noted that one side of the square shaft column 40 is rotatably connected to the inside of the third bevel gear 14 , so when the third bevel gear 14 rotates, the square shaft column 40 will not affect the third bevel gear 14 .

[0044] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A device for shortening the wire laying and collecting in a distribution network engineering, comprising a connecting frame (1) and a first hook (2) rotatably connected to the lower end of the connecting frame (1), characterized in that: A first shaft (3) is mounted on the inner wall of the connecting frame (1), one end of the first shaft (3) is rotatably connected to a first winch (4), an outer surface of the first winch (4) is sleeved with a first steel cable (5), a second shaft (15) is also mounted on the inner wall of the connecting frame (1), one end of the second shaft (15) is rotatably connected to a second winch (16), an outer surface of the second winch (16) is sleeved with a third steel cable (17); It also comprises a first steel frame (8) and a second steel frame (20), wherein a third connecting rod (19) is installed inside the second steel frame (20), a second connecting rod (9) is installed inside the first steel frame (8), a second hook (11) is installed at the upper end of the first steel frame (8), and a third hook (22) is installed at the upper end of the second steel frame (20); A first connecting rod (6) is also installed inside the connecting frame (1), and the upper end of the first connecting rod (6) is respectively connected to a second steel cable (7) and a fourth steel cable (18), the upper end of the fourth steel cable (18) is sleeved on the third connecting rod (19), and the upper end of the second steel cable (7) is sleeved on the second connecting rod (9).

2. A device for shortening the wire laying and collecting in a distribution network engineering as claimed in claim 1, characterized in that: A first bevel gear (12) is installed at one end of the first steel cable (5), a second bevel gear (13) is installed at one end of the second capstan (16), and a third bevel gear (14) is installed inside the connecting frame (1), and the third bevel gear (14) is meshed with the first bevel gear (12) and the second bevel gear (13).

3. A device for shortening the wire laying and collecting in a distribution network engineering as claimed in claim 1, characterized in that: The upper end of the first steel frame (8) is slidably connected to a first sliding column (10), the upper end of the first sliding column (10) is connected to the lower end of the second hook (11), the outer surface of the first sliding column (10) is provided with a first spiral groove (24), the inner wall of the first steel frame (8) is also provided with a first protrusion (26), one end of the first protrusion (26) is slidably connected to the inside of the first spiral groove (24), and the inner wall of the first steel frame (8) is also provided with a first spring (25).

4. A device for shortening the wire laying and collecting in a distribution network engineering as claimed in claim 2, characterized in that: The upper end of the second steel frame (20) is slidably connected to a second sliding column (21), the upper end of the second sliding column (21) is connected to the lower end of the third hook (22), the outer surface of the second sliding column (21) is provided with a second spiral groove (27), the inner wall of the second steel frame (20) is also provided with a second protrusion (29), one end of the second protrusion (29) is slidably connected to the inside of the second spiral groove (27), and the inner wall of the second steel frame (20) is also provided with a second spring (28).

5. A device for shortening the wire laying and collecting in a distribution network engineering as claimed in claim 4, characterized in that: The other end of the second shaft (15) passes through the connecting frame (1), one end of the connecting frame (1) is rotatably connected to a rotating rod (23), the upper end of the rotating rod (23) is rotatably connected to a ratchet (35), and the second shaft (15) passes through the ratchet (35).

6. A device for shortening the wire laying and collecting in a distribution network engineering as claimed in claim 5, characterized in that: A square column (31) is slidably connected inside the second shaft (15), one end of the second sliding column (21) passes through the second bevel gear (13), one end of the first bevel gear (12) is provided with a square groove (30), and one end of the square column (31) is used to be inserted into the square groove (30); A handle (32) is installed at the other end of the square column (31), a plug (34) is installed at one end of the handle (32), and a round hole (33) is also provided at one end of the second shaft (15). The plug (34) is used to be inserted into the inside of the round hole (33), and the plug (34) and the round hole (33) are clearance-matched.

7. A device for shortening the wire laying and collecting in a distribution network engineering as claimed in claim 2, characterized in that: The third bevel gear (14) is slidably connected inside the connecting frame (1), and the third bevel gear (14) is operably meshed with the first bevel gear (12) and the second bevel gear (13).

8. A device for shortening the wire laying and collecting in a distribution network engineering as claimed in claim 7, characterized in that: A square shaft column (40) is installed on one side of the third bevel gear (14), the square shaft column (40) passes through the connecting frame (1), and a trapezoidal block (39) is installed on one side of the square shaft column (40).

9. A device for shortening the wire laying and collecting in a distribution network engineering as claimed in claim 7, characterized in that: A square frame (36) is installed on one side of the connecting frame (1); a threaded rod (37) is threadedly connected to the upper end of the square frame (36); a conical column (38) is installed at the lower end of the threaded rod (37); and the conical column (38) is used to abut against a trapezoidal block (39).

10. A device for shortening the wire laying and collecting in a distribution network engineering as claimed in claim 8, characterized in that: A third spring (41) is installed on the outer surface of the square shaft column (40), and the other side of the third spring (41) is connected to the connecting frame (1); One side of the square shaft column (40) is rotatably connected to one side of the third bevel gear (14).