Through the combination of controller and prefabricated wiring disk, and the feedback of relays and indicator lights, the rapid and accurate verification of DCS wiring of AUMA actuator is achieved, solving the problem of large wiring workload and error-prone in DCS transformation, and improving work efficiency and accuracy.
Patent Information
- Application Number
- CN202510450864.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-11
- Publication Date
- 2025-08-05
AI Technical Summary
During the localization transformation of DCS, the wiring workload of the AUMA actuator is large and error-prone, and the existing technology cannot achieve fast and accurate wiring verification.
A device including a controller and a prefabricated wiring disk is designed, and the DCS command is received through the controller and connected to the prefabricated wiring disk, signal transmission is realized using the normally open contacts of the relay, indicator lights and buttons are set for feedback on the wiring status, and wiring accuracy and efficiency are ensured.
Improve the accuracy and working efficiency of DCS wiring of AUMA actuator, reduce the occurrence of errors, and ensure the wiring quality.
Smart Images

Figure CN120428684A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of actuators, and in particular relates to a device suitable for quickly checking DCS wiring of an AUMA actuator. Background Art
[0002] Distributed control systems (DCSs) are the core of power plant unit control. Existing imported systems suffer from insufficient autonomy and high external dependence. Achieving complete DCS autonomy and control is essential for ensuring energy security. Currently, the domestic transformation of DCS systems for thermal power generators is in full swing. During this process, all actuators on the DCS side must be rewired. After wiring is complete, the wires must be individually actuated, and only after the actuation is normal can power be turned on. This is a labor-intensive and error-prone task. To address these challenges, a rapid wiring verification device was designed for the widely used AUMA actuators. Summary of the Invention
[0003] The present invention aims to solve the above-mentioned technical problems and provides a device suitable for quickly checking the DCS wiring of AUMA actuators.
[0004] In order to achieve the above object, the present invention adopts the following technical solutions: A device suitable for quickly checking the DCS wiring of an AUMA actuator comprises: a controller and a prefabricated wiring panel. The controller is used to receive on and off instructions from a DCS. The controller is connected to the prefabricated wiring panel via a communication cable. The prefabricated wiring panel and the AUMA actuator wiring panel are connected for signal transmission.
[0005] The device is suitable for quickly checking the DCS wiring of an AUMA actuator. The controller includes an open command indicator light, a close command indicator light, a power switch knob, a power indicator light, an open feedback button, a close feedback button, and a fault button. The open command from the DCS is connected in series with the open command indicator light, the control command from the DCS is connected in series with the close command indicator light, the open feedback button is connected in series with the coil of the first relay, the close feedback button is connected in series with the coil of the second relay, and the fault button is connected in series with the coil of the third relay.
[0006] The device is suitable for quickly checking the DCS wiring of AUMA actuators. The power switch knob is used to power on the controller. The controller has a built-in rechargeable 24V power supply module. When the power switch knob is rotated to the start position, the power indicator light is normally on, indicating that the device has been powered on and can be used normally.
[0007] In the device suitable for quickly checking the DCS wiring of an AUMA actuator, the normally open contact of the first relay serves as the connection point between the terminals 39 and 40 of the prefabricated wiring board.
[0008] The device for rapid verification of DCS wiring of AUMA actuators is described, wherein the normally open contact of the second relay serves as the connection point of terminals 35 and 36 of the prefabricated wiring board; In the device suitable for quickly checking the DCS wiring of an AUMA actuator, the normally open contact of the third relay serves as the connection point of the 14th and 16th terminals of the prefabricated wiring board. Beneficial effects
[0009] 1. The present invention provides a device suitable for quickly checking the DCS wiring of AUMA actuators, which not only improves the accuracy of wiring verification but also ensures the verification quality.
[0010] 2. The present invention is suitable for large-scale AUMA actuator wiring verification during DCS reconstruction by providing an on command indicator light, an off command indicator light, a power switch knob, a power indicator light, an on feedback button, a off feedback button, and a fault button, which can greatly improve work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is the overall structure of the device of the present invention; Figure 2 This is the appearance layout diagram of the controller of the present invention; Figure 3 The internal electrical schematic diagram of the controller of the present invention; Figure 4 The wiring diagram of the controller of the present invention and the prefabricated wiring board; Figure 5 This is a structural diagram of a prefabricated wiring panel. DETAILED DESCRIPTION
[0012] Reference Figures 1-4 A device for quickly verifying DCS wiring on AUMA actuators features components including a controller 1 and a prefabricated wiring panel 3. The controller receives on / off commands from the DCS and is connected to the prefabricated wiring panel 3 via a connecting cable 2 for signal transmission. Signal verification is achieved by operating the controller 1, and the prefabricated wiring panel 3 interfaces with the AUMA actuator wiring panel for signal transmission.
[0013] The controller includes an on-command indicator light, an off-command indicator light, a power switch knob, a power indicator light, an on-feedback button, an off-feedback button and a fault button. The on-command from the DCS is connected in series with the on-command indicator light, the off-command from the DCS is connected in series with the off-command indicator light, the on-feedback button is connected in series with the coil of the first relay, the off-feedback button is connected in series with the coil of the second relay, and the fault button is connected in series with the coil of the third relay.
[0014] The power switch knob is used to power on the controller. The controller has a built-in rechargeable 24V power module. When the power switch knob is rotated to the start position, the power indicator light lights up normally, indicating that the device has been powered on and can be used normally.
[0015] Send an open command from the DCS and observe whether the open command indicator light 4 of the control device lights up normally; send a close command from the DCS and observe whether the close command indicator light 5 of the control device lights up normally; if the wiring on the DCS side of the actuator is correct, the indicator lights can light up normally.
[0016] Simulate feedback signals from the device. Press the On Feedback button 7 to see if the On feedback indicator on the DCS screen is lit normally. Press the Off Feedback button 8 to see if the Off feedback indicator on the DCS screen is lit normally. Press the Fault button 9 to see if the Fault indicator on the DCS screen is lit normally.
[0017] The normally open contact of the first relay serves as a connection point between the terminals 39 and 40 of the prefabricated wiring board.
[0018] The normally open contact of the second relay serves as the connection point between the terminals 35 and 36 of the prefabricated terminal block; The normally open contact of the third relay serves as the connection point between the 14th and 16th terminals of the prefabricated wiring board.
[0019] The DCS opens the command as the connection point of terminals 2 and 11 of the prefabricated terminal board; The DCS comes to close the command as the connection point of the 3 and 11 terminals of the prefabricated wiring panel.
[0020] When checking the DCS wiring of the AUMA actuator, the prefabricated terminal block can be directly connected to the sunflower terminal block of the auma actuator, so that the wiring verification work can be carried out quickly without having to disassemble the wiring, which greatly improves work efficiency.
Claims
1. A device suitable for quickly checking the DCS wiring of AUMA actuators, characterized by: It consists of a controller and a prefabricated wiring board. The controller is used to receive the opening and closing instructions issued by the DCS. The controller is connected to the prefabricated wiring board through a communication cable. The prefabricated wiring board is connected to the AUMA actuator wiring board for signal transmission.
2. The device for quickly checking the DCS wiring of an AUMA actuator according to claim 1 is characterized by: The controller includes an on-command indicator light, an off-command indicator light, a power switch knob, a power indicator light, an on-feedback button, an off-feedback button and a fault button. The on-command from the DCS is connected in series with the on-command indicator light, the off-command from the DCS is connected in series with the off-command indicator light, the on-feedback button is connected in series with the coil of the first relay, the off-feedback button is connected in series with the coil of the second relay, and the fault button is connected in series with the coil of the third relay.
3. The device for quickly checking the DCS wiring of an AUMA actuator according to claim 2 is characterized by: The power switch knob is used to power on the controller. The controller has a built-in rechargeable 24V power module. When the power switch knob is rotated to the start position, the power indicator light lights up normally, indicating that the device has been powered on and can be used normally.
4. The device for quickly checking the DCS wiring of an AUMA actuator according to claim 3 is characterized by: The normally open contact of the first relay serves as a connection point between the terminals 39 and 40 of the prefabricated wiring board.
5. The device for quickly checking the DCS wiring of an AUMA actuator according to claim 4 is characterized by: The normally open contact of the second relay serves as the connection point between the terminals 35 and 36 of the prefabricated wiring board.
6. The device for quickly checking the DCS wiring of an AUMA actuator according to claim 5 is characterized by: The normally open contact of the third relay serves as the connection point between the 14th and 16th terminals of the prefabricated wiring board.