Silo interior construction platform and mounting method and dismounting method thereof
Through the combined structure of the central column, motor platform and spiral motor, the threaded sleeve is used to realize the rotation installation and removal of the construction platform inside the silo, which solves the safety hazard of the construction platform inside the silo falling from a high altitude and realizes a safe and efficient construction process.
Patent Information
- Application Number
- CN202510850332.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-24
- Publication Date
- 2025-09-12
AI Technical Summary
The existing internal construction platform of the silo has a safety hazard of falling from high altitude during the installation and dismantling process.
The combined structure of the central column, motor platform, spiral motor and threaded sleeve is adopted, and the platform truss and motor platform can be installed and removed by rotation through threaded connection, avoiding high-altitude operations.
The safe and convenient installation and dismantling of the construction platform is achieved, the safety hazard of falling from height is avoided, and the construction efficiency and safety are improved.
Smart Images

Figure CN120625845A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, and in particular to a silo internal construction platform and an installation method and a dismantling method thereof. Background Art
[0002] The internal construction platform of a silo is a platform structure used for construction, inspection or maintenance work on the silo and the silo roof. Due to the high height and narrow interior space of the silo, the design of the construction platform is to provide workers with a safe and stable working space for installation, removal, repair, cleaning or inspection. The construction and dismantling of the internal construction platform of the silo is a time-consuming project. The existing technology is to first erect temporary support columns at the same height as the silo, and then overlap trusses around the support columns to connect them to the silo wall, and lay boards on top of the trusses as platform boards. During dismantling, the trusses are manually removed one by one on a platform as high as tens of meters, and then the support columns are removed. The installation and dismantling of the platform require working at high altitudes, which poses a safety hazard of falling from heights. Summary of the Invention
[0003] The purpose of the present invention is to provide a silo internal construction platform and its installation method and dismantling method, so as to solve the potential safety hazard of the platform falling from a high altitude during the installation or dismantling process.
[0004] In order to solve the above technical problems, the present invention provides a silo internal construction platform, comprising:
[0005] The central column is composed of several standard sections;
[0006] a motor platform, located on the periphery of the central column and detachably connected to the central column;
[0007] A plurality of spiral motors are located in a circular array outside the central column and distributed on the motor platform, each of the spiral motors comprising a motor body disposed on the motor platform and a threaded rod connected to an output shaft of the motor body;
[0008] A platform truss having a central through hole, wherein the platform truss is sleeved around the periphery of the central column through the central through hole, and the inner diameter of the central through hole is larger than the maximum outer diameter of the central column;
[0009] A threaded sleeve is fixedly arranged at the lower end of the platform truss, the threaded sleeve coincides with the axis of the central through hole of the platform truss, the threaded sleeve is threadedly connected to the threaded rod of each screw motor, and the threaded sleeve is detachably connected to the central column.
[0010] Furthermore, in the silo internal construction platform provided by the present invention, the motor platform and the threaded sleeve are both detachably connected to the central column at a corresponding height through respective locking mechanisms.
[0011] Furthermore, in the silo internal construction platform provided by the present invention, the locking mechanism includes a plurality of grooves arranged around the central column, and locking members inserted into or pulled out of the grooves.
[0012] Furthermore, in the silo internal construction platform provided by the present invention, the motor platform is a circular plate or a square plate with a center hole.
[0013] Furthermore, in the silo internal construction platform provided by the present invention, the standard section is a tubular member with an inner flange.
[0014] In order to solve the above technical problems, the present invention also provides a method for installing a construction platform inside a silo, comprising:
[0015] Step S201, installing the first standard section of the central column on the silo floor;
[0016] Step S202: detachably connect the motor platform to the first standard section on the silo floor, so that the motor platform is sleeved and installed on the periphery of the first standard section;
[0017] Step S203: Install each screw motor on a motor platform on the silo floor;
[0018] Step S204: Sleeve the threaded sleeve around the outer periphery of the first standard section on the silo floor, and thread the threaded sleeve onto the threaded rod of each screw motor;
[0019] Step S205: Install the platform truss on the threaded sleeve around the first standard section on the silo floor, so that the platform truss is sleeved on the first standard section through the central through hole, and the first standard section is used as the previous standard section;
[0020] Step S206, hoisting and installing the next standard section on the previous standard section;
[0021] Step S207: Release the connection between the threaded sleeve and the previous standard section, keep the motor platform locked with the previous standard section, control the synchronous rotation of each spiral motor to drive the threaded sleeve and the platform truss on it to rotate along the previous standard section and rise on the next standard section, and lock the threaded sleeve with the next standard section;
[0022] Step S208: Keep the threaded sleeve locked with the next standard section, release the connection between the motor platform and the previous standard section, control the synchronous rotation of the spiral motors to drive the motor platform to vertically lift along the previous standard section onto the next standard section, and lock the motor platform with the next standard section;
[0023] Step S209, repeating steps S206 to S208, so that the platform truss and the motor platform rise alternately until the platform truss rises to the top of the silo, and then fixing the platform truss to the silo wall to complete the rotation installation of the construction platform inside the silo.
[0024] Furthermore, the method for installing the internal construction platform of the silo provided by the present invention also includes a method for installing a center column, which adopts the method of installing one standard section and alternately controlling the platform truss and the motor platform to be lifted to the installation height of the standard section; or after installing all standard sections to form a complete center column, the platform truss and the motor platform are alternately controlled to be lifted to the top of the center column.
[0025] In order to solve the above technical problems, the present invention further provides a method for dismantling the internal construction platform of a silo, comprising:
[0026] Step S210, releasing the connection between the platform truss and the silo wall;
[0027] Step S211: Release the connection between the motor platform and the standard section at the height where it is located, maintain the connection between the threaded sleeve and the standard section at the height where it is located, control the synchronous rotation of each spiral motor to drive the motor platform to descend vertically, and lock the motor platform after the descending height to the standard section at the height where it is located;
[0028] Step S212: Release the connection between the threaded sleeve and the standard section at its height, maintain the locked connection between the motor platform and the standard section at its height, control the synchronous rotation of the spiral motors to drive the threaded sleeve and the platform truss on it to rotate and descend relative to the standard section, and lock the threaded sleeve after it is lowered to the standard section at its height;
[0029] Step S213, repeating steps S211 to S212, so that the motor platform and the platform truss are alternately lowered until the motor platform is lowered to the silo floor;
[0030] Step S214: dismantle the platform truss, threaded sleeve, screw motor, and motor platform on the silo floor to complete the rotation and dismantling of the construction platform inside the silo.
[0031] Furthermore, the method for dismantling the internal construction platform of the silo provided by the present invention also includes a method for dismantling the central column, which adopts the method of hoisting and dismantling the standard sections of the central column from top to bottom after step S214; or adopts the method of hoisting and dismantling the standard sections of the central column from top to bottom after the platform truss is lowered to the height of one standard section before step S214; and the standard sections above the platform truss are removed by lowering the platform truss and temporarily placed on the platform truss. After the platform truss is lowered to the ground of the silo, the standard sections temporarily placed on the platform truss are first hoisted to the ground of the silo, and then the dismantling operation of step S214 is performed.
[0032] Compared with the prior art, the present invention has the following beneficial effects:
[0033] The invention provides a silo internal construction platform and an installation method and a dismantling method thereof. The platform truss and the central column are connected to each other through a threaded sleeve and a screw motor thread. During the installation of the construction platform inside the silo, after the first standard section of the central column is installed on the ground of the silo, the platform truss can be installed on the first standard section on the ground of the silo; after the subsequent standard sections are successively added to the first standard section, the platform truss and the motor platform are alternately raised by controlling the synchronous rotation of each spiral motor through the threaded matching connection structure of each spiral motor and the threaded sleeve, until the platform truss rises to the top of the silo, the platform truss is fixedly connected to the silo wall, and the rotation installation of the construction platform inside the silo is completed; during the dismantling of the construction platform inside the silo, after the connection of the platform truss on the silo wall is released, the motor platform and the platform truss are alternately lowered by controlling the synchronous rotation of each spiral motor through the threaded matching connection structure of each spiral motor and the threaded sleeve, until the motor platform descends to the ground of the silo, and the platform bridge can be dismantled on the ground of the silo, avoiding the safety hazard of falling from a high altitude during the installation and dismantling operations of the platform truss at high altitude. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 This is a schematic diagram of the elevation structure of the platform truss of the internal construction platform of the silo in the raised state;
[0035] Figure 2 This is a schematic diagram of the elevation structure of the motor platform of the internal construction platform of the silo in the raised state;
[0036] Figure 3 It is a schematic diagram of the plan structure of the construction platform inside the silo;
[0037] Figure 4 This is an enlarged view of the detachable connection at the motor platform through the locking mechanism;
[0038] Figures 5 to 8 It is a process structure diagram of the installation method of the construction platform inside the silo or a reverse process structure diagram of the removal method;
[0039] As shown in the figure:
[0040] 100. Construction platform inside silo;
[0041] 110, center column, 111, standard section;
[0042] 120, motor platform;
[0043] 130. Screw motor, 131. Motor body, 132. Threaded rod;
[0044] 140, threaded sleeve;
[0045] 150, platform truss;
[0046] 160. Locking mechanism, 161. Groove, 162. Locking member. DETAILED DESCRIPTION
[0047] The present invention will be described in detail below with reference to the accompanying drawings. The advantages and features of the present invention will become more apparent from the following description. It should be noted that the drawings are all in a very simplified form and are not accurately scaled, and are only used to facilitate and clearly illustrate the embodiments of the present invention.
[0048] Please refer to Figures 1 to 4 In order to solve the above technical problems, the embodiment of the present invention provides a silo internal construction platform 100, including a central column 110, a motor platform 120, a spiral motor 130, a threaded sleeve 140 and a platform truss 150, wherein:
[0049] The central column 110 is composed of a number of standard sections 111 spliced together.
[0050] The motor platform 120 is located on the periphery of the central column 110 and is detachably connected to the central column 110. The motor platform 120 can be a circular plate or a square plate with a central hole. The shape of the central hole can be adapted to the cross-sectional shape of the central column 110.
[0051] Multiple spiral motors 130 are located in a circular array around the periphery of the central column 110 and distributed on the motor platform 120. Each spiral motor 130 includes a motor body 131 disposed on the motor platform 120 and a threaded rod 132 connected to the output shaft of the motor body 131. Four spiral motors 130 are shown in the figure, but the number is not limited to four. The number can be matched to the driving force of the threaded sleeve 140.
[0052] The platform truss 150 has a central through hole, and the platform truss 150 is sleeved around the periphery of the central column 110 through the central through hole. The inner diameter of the central through hole is larger than the maximum outer diameter of the central column 110. The platform truss 150 includes a frame body and a platform plate thereon.
[0053] The threaded sleeve 140 is fixedly arranged at the lower end of the platform truss 150 , and the axis of the threaded sleeve 140 coincides with the axis of the central through hole of the platform truss 150 . The threaded sleeve 140 is threadedly connected to the threaded rod 132 of each of the spiral motors 130 , and the threaded sleeve 140 is detachably connected to the central column 110 .
[0054] The embodiment of the present invention further provides a method for installing a silo internal construction platform 100, comprising:
[0055] Step S201, please refer to Figure 5 , install the first standard section 111 of the center column 110 on the silo floor.
[0056] Step S202, please refer to Figure 5 The motor platform 120 is detachably connected to the first standard section 111 on the silo floor, so that the motor platform 120 is sleeved and installed on the periphery of the first standard section 111.
[0057] Step S203, please refer to Figure 5 , each screw motor 130 is installed on the motor platform 120 on the silo floor.
[0058] Step S204, please refer to Figure 5 , a threaded sleeve 140 is sleeved on the periphery of the first standard section 111 on the silo floor, and the threaded sleeve 140 is threadedly connected to the threaded rod 132 of each screw motor 130 .
[0059] Step S205, please refer to Figure 5 , install the platform truss 150 on the threaded sleeve 140 around the first standard section 111 on the silo floor, so that the platform truss 150 is sleeved on the first standard section 111 through the center through hole, and the first standard section 111 is used as the previous standard section 111.
[0060] Step S206, please refer to Figure 6 , hoist and install the rear standard section 111 on the front standard section 111.
[0061] Step S207, please refer to Figure 6, release the connection between the threaded sleeve 140 and the previous standard section 111, keep the motor platform 120 locked with the previous standard section 111, control the synchronous rotation of each spiral motor 130 to drive the threaded sleeve 140 and the platform truss 150 thereon to rotate and rise along the previous standard section 111 on the next standard section 111, and lock the threaded sleeve 140 with the next standard section 111. That is, this step S207 is the platform truss 150 rotating and rising, wherein the dynamic changes of the platform truss 150 rotating and rising are as follows Figure 2 to Figure 1 The changing process is shown.
[0062] Step S208, please refer to Figure 6 , keep the threaded sleeve 140 locked and connected with the next standard section 111, release the connection between the motor platform 120 and the previous standard section 111, control the synchronous rotation of each spiral motor 130 to drive the motor platform 120 to vertically lift along the previous standard section 111 on the next standard section 111, and lock the motor platform 120 with the next standard section 111. That is, step S208 is the rise of the motor platform 120, wherein the rising process of the motor platform 120 is as follows Figures 1 to 2 The changing process is shown.
[0063] Step S209, please refer to Figures 7 and 8 Repeat steps S206 to S208 to alternately raise the platform truss 150 and the motor platform 120 until the platform truss 150 rises to the top of the silo, then fix the platform truss 150 to the silo wall to complete the rotational installation of the construction platform 100 inside the silo.
[0064] The embodiment of the present invention provides a silo internal construction platform 100 and its installation method, wherein the platform truss 150 and the center column 110 are connected by a threaded sleeve 140 and a screw motor 130. During the installation and construction of the silo internal construction platform 100, after the first standard section 111 of the center column 110 is installed on the silo floor, the platform truss 150 can be installed on the first standard section 111 on the silo floor. After the subsequent standard sections 111 are sequentially added to the first standard section 111, the platform truss 150 and the motor platform 120 are alternately raised by the threaded connection structure of each screw motor 130 and the threaded sleeve 140, and the synchronous rotation of each screw motor 130 controls the alternating rise of the platform truss 150 and the motor platform 120 until the platform truss 150 rises to the top of the silo. The platform truss 150 is then fixed to the silo wall, completing the rotational installation of the silo internal construction platform 100, avoiding the safety hazard of the platform truss 150 falling from a height during high-altitude installation.
[0065] In order to realize the rotational installation of the platform truss 150, the installation method of the internal construction platform 100 of the silo provided in an embodiment of the present invention also includes an installation method of the center column 110. A standard section 111 can be installed, and the platform truss 150 and the motor platform 120 can be alternately controlled to be lifted to the installation height of the standard section 111. Figures 5 to 8 This example illustrates an installation method in which one standard section 111 is installed to control the rotation and elevation of the platform truss 150. However, the method for rotating and elevating the platform truss 150 is not limited to the above method. Alternatively, after all standard sections 111 are installed to form a complete center column 110, the platform truss 150 and the motor platform 120 can be alternately controlled to be raised to the top of the center column 110.
[0066] The present invention further provides a method for dismantling the internal construction platform 100 of the silo, wherein the dismantling method is the reverse process of the installation method, comprising:
[0067] Step S210, please refer to Figure 8 , release the connection of the platform truss 150 on the silo wall.
[0068] Step S211, please refer to Figures 8 to 7 , the connection between the motor platform 120 and the standard section 111 at the height where it is located is released, the threaded sleeve 140 is kept connected to the standard section 111 at the height where it is located, the spiral motors 130 are controlled to rotate synchronously to drive the motor platform 120 to descend vertically, and the motor platform 120 after the descending height is locked and connected to the standard section 111 at the height where it is located. Step S211 is the process of controlling the motor platform 120 to descend. The direction of rotation of the spiral motor 130 when driving the motor platform 120 to descend is opposite to the direction of rotation when the motor platform 120 is ascending.
[0069] Step S212, releases the connection between the threaded sleeve 140 and the standard section 111 at its height, keeps the motor platform 120 locked in connection with the standard section 111 at its height, controls the synchronous rotation of each spiral motor 130, drives the threaded sleeve 140 and the platform truss 150 thereon to rotate and descend relative to the standard section 111, and locks the threaded sleeve 140 after descending to the standard section 111 at its height. That is, step S212 is the process of controlling the platform truss 150 to rotate and descend. Wherein, according to the spacing between the threaded sleeve 140 and the motor platform 120, the order of step S212 and step S211 can be interchanged. Wherein, the direction of rotation when the spiral motor 130 drives the platform truss 150 to rotate and descend is opposite to the direction of rotation when the platform truss 150 is driven to rotate and ascend.
[0070] Step S213 , repeating steps S211 to S212 , so that the motor platform 120 and the platform truss 150 are alternately lowered until the motor platform 120 is lowered to the silo floor.
[0071] In step S214 , the platform truss 150 , the threaded sleeve 140 , the screw motor 130 , and the motor platform 120 are removed from the silo floor, completing the rotational removal of the construction platform 100 inside the silo.
[0072] The embodiment of the present invention provides an internal silo construction platform 100 and a dismantling method thereof. The platform truss 150 and the center column 110 are connected by a threaded sleeve 140 and a spiral motor 130. When the internal silo construction platform 100 is dismantled, after the connection of the platform truss 150 to the silo wall is released, the threaded sleeve 140 and the spiral motor 130 are connected by a threaded sleeve 140. Through the synchronous rotation of each spiral motor 130, the motor platform 120 and the platform truss 150 are controlled to alternately descend until the motor platform 120 descends to the silo floor, thereby realizing the dismantling construction of the platform bridge on the silo floor, avoiding the safety hazard of the platform truss 150 falling from a high altitude during the high-altitude dismantling operation.
[0073] The method for dismantling the construction platform 100 inside the silo provided in an embodiment of the present invention also includes a method for dismantling the central column 110. After step S214, the standard sections 111 of the central column 110 can be hoisted and removed from top to bottom. Alternatively, before step S214, after the platform truss 150 is lowered to the height of one standard section 111, the standard sections 111 above it are removed by the lowered platform truss 150 and temporarily placed on the platform truss 150. After the platform truss 150 is lowered to the silo floor, the standard sections 111 temporarily placed on the platform truss 150 are first hoisted to the silo floor before performing the dismantling construction in step S214.
[0074] Please refer to Figure 1 、 Figure 2 and Figure 4In order to achieve the purpose of detachably connecting the motor platform 120 to the center column 110, and to achieve the purpose of detachably connecting the threaded sleeve 140 to the center column 110, the silo internal construction platform 100 provided by the embodiment of the present invention has the motor platform 120 and the threaded sleeve 140 detachably connected to the center column 110 at corresponding heights via respective locking mechanisms 160. The locking mechanism 160 can offset torsional forces and prevent the motor platform 120 or the threaded sleeve 140 from rotating with it. The locking mechanism 160 includes a plurality of grooves 161 arranged around the center column 110, and a locking member 162 that is inserted into or removed from the grooves 161. When the locking member 162 is inserted into the groove 161 at the corresponding position on the center column 110, the locking mechanism 160 connects the motor platform 120 and the threaded sleeve 140 to the center column 110. When the locking member 162 is pulled out of the groove 161 at the corresponding position on the center column 110, the locking mechanism 160 removes the motor platform 120 or the threaded sleeve 140 from the center column 110. The locking member 162 can be a plate along the radial direction of the center column 110, such as a telescopic plate. Of course, the locking mechanism 160 is not limited to the above method, and can also be a locking bolt that is detachably connected between the motor platform 120 and the center column 110. Correspondingly, the center column 110 is provided with a number of threaded holes connected to the locking bolts at equal intervals along its height direction. When the locking bolt is a tie bolt, the threaded hole on the center column 110 can be a through hole. To achieve rapid locking and unlocking, the locking mechanism can also be a latch. Inserting the latch maintains the locked connection, and removing the latch releases the connection. The locking mechanism 160 on the motor platform 120 is preferably located at its lower end to avoid obstruction by the threaded sleeve 140. The locking mechanism 160 on the threaded sleeve 140 can be located at its upper or lower end, or alternatively, on the platform truss 150.
[0075] Please refer to Figures 1 to 2 In order to avoid the threaded sleeve 140 from obstructing the central column 110 during rotation, the embodiment of the present invention provides an internal construction platform 100 for a silo, wherein the standard section 111 is a tubular member having an inner flange. The tubular member may be a round tube. Adjacent standard sections 111 are detachably connected via the flange threads on the inner flange. The standard section 111 with an inner flange can ensure that the gap between the threaded sleeve 140, the central through hole of the platform truss 150 and the central column 110 is small, thereby avoiding excessive gaps that affect the stability and reliability of the rotation and lifting of the platform truss 150 and the threaded sleeve 140 relative to the central column 110.
[0076] The internal construction platform 100 of the silo provided by the embodiment of the present invention changes the installation and removal of the platform truss 150 from high altitude to the silo ground, thereby improving the safety and ease of construction workers in disassembling and assembling the platform truss 150, and can avoid the safety hazard of falling from high altitude when disassembling and assembling the platform truss at high altitude. The platform truss has the advantages of convenient disassembly and assembly, high safety and high efficiency.
[0077] The present invention is not limited to the specific embodiments described above. Obviously, the embodiments described above are only some embodiments of the embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention described, all other embodiments obtained by ordinary technicians in this field fall within the scope of protection of the present invention. Those skilled in the art can make other levels of modifications and changes to the present invention. In this way, if these modifications and changes of the present invention fall within the scope of the claims of the present invention, the present invention is also intended to include these changes and changes.
Claims
1. A silo internal construction platform, characterized in that: include: The central column is composed of several standard sections; a motor platform, located on the periphery of the central column and detachably connected to the central column; A plurality of spiral motors are located in a circular array outside the central column and distributed on the motor platform, each of the spiral motors comprising a motor body disposed on the motor platform and a threaded rod connected to an output shaft of the motor body; A platform truss having a central through hole, wherein the platform truss is sleeved around the periphery of the central column through the central through hole, and the inner diameter of the central through hole is larger than the maximum outer diameter of the central column; A threaded sleeve is fixedly arranged at the lower end of the platform truss, the threaded sleeve coincides with the axis of the central through hole of the platform truss, the threaded sleeve is threadedly connected to the threaded rod of each screw motor, and the threaded sleeve is detachably connected to the central column.
2. The silo internal construction platform according to claim 1, characterized in that: The motor platform and the threaded sleeve are both detachably connected to the central column at a corresponding height through respective locking mechanisms.
3. The silo internal construction platform according to claim 2, characterized in that: The locking mechanism includes a plurality of grooves arranged around the central column, and locking members inserted into or pulled out of the grooves.
4. The silo internal construction platform according to claim 1, characterized in that: The motor platform is a circular plate or a square plate with a central hole.
5. The silo internal construction platform according to claim 1, characterized in that: The standard section is a tubular member with an inner flange.
6. A method for installing a construction platform inside a silo according to any one of claims 1 to 5, characterized in that: include: Step S201, installing the first standard section of the central column on the silo floor; Step S202: detachably connect the motor platform to the first standard section on the silo floor, so that the motor platform is sleeved and installed on the periphery of the first standard section; Step S203: Install each screw motor on a motor platform on the silo floor; Step S204: Sleeve the threaded sleeve around the outer periphery of the first standard section on the silo floor, and thread the threaded sleeve onto the threaded rods of each screw motor; Step S205: Install the platform truss on the threaded sleeve around the first standard section on the silo floor, so that the platform truss is sleeved on the first standard section through the central through hole, and the first standard section is used as the previous standard section; Step S206, hoisting and installing the next standard section on the previous standard section; Step S207: Release the connection between the threaded sleeve and the previous standard section, keep the motor platform locked with the previous standard section, control the synchronous rotation of each spiral motor to drive the threaded sleeve and the platform truss on it to rotate along the previous standard section and rise on the next standard section, and lock the threaded sleeve with the next standard section; Step S208: Keep the threaded sleeve locked with the next standard section, release the connection between the motor platform and the previous standard section, control the synchronous rotation of the spiral motors to drive the motor platform to vertically lift along the previous standard section onto the next standard section, and lock the motor platform with the next standard section; Step S209, repeating steps S206 to S208, so that the platform truss and the motor platform rise alternately until the platform truss rises to the top of the silo, and then fixing the platform truss to the silo wall to complete the rotation installation of the construction platform inside the silo.
7. The method for installing a construction platform inside a silo according to claim 6, characterized in that: It also includes a method for installing the center column, which involves installing one standard section and then alternately controlling the platform truss and the motor platform to lift them to the installation height of the standard section; or installing all standard sections to form a complete center column and then alternately controlling the platform truss and the motor platform to lift them to the top of the center column.
8. A method for dismantling a construction platform inside a silo according to any one of claims 1 to 5, characterized in that: include: Step S210, releasing the connection between the platform truss and the silo wall; Step S211: Release the connection between the motor platform and the standard section at the height where it is located, maintain the connection between the threaded sleeve and the standard section at the height where it is located, control the synchronous rotation of each spiral motor to drive the motor platform to descend vertically, and lock the motor platform after the descending height to the standard section at the height where it is located; Step S212: Release the connection between the threaded sleeve and the standard section at its height, maintain the locked connection between the motor platform and the standard section at its height, control the synchronous rotation of the spiral motors to drive the threaded sleeve and the platform truss on it to rotate and descend relative to the standard section, and lock the threaded sleeve after it is lowered to the standard section at its height; Step S213, repeating steps S211 to S212, so that the motor platform and the platform truss are alternately lowered until the motor platform is lowered to the silo floor; Step S214: dismantle the platform truss, threaded sleeve, screw motor, and motor platform on the silo floor to complete the rotation and dismantling of the construction platform inside the silo.
9. The method for dismantling the internal construction platform of a silo according to claim 8, characterized in that: The method also includes a method for dismantling the central column, which adopts the method of hoisting and dismantling the standard sections of the central column from top to bottom after step S214; or adopts the method of, before step S214, after the platform truss is lowered to the height of one standard section, removing the standard section above it by lowering the platform truss and temporarily placing it on the platform truss, and after the platform truss is lowered to the ground of the silo, first hoisting the standard section temporarily placed on the platform truss to the ground of the silo, and then executing the dismantling construction of step S214.