A construction equipment and method for hard rock tunnel excavation and support

By designing construction equipment with adjustable top and side support plates, the problems of cumbersome equipment assembly and limited space in hard rock tunnel construction have been solved, simplifying operation and providing all-round support, thus improving the flexibility and safety of tunnel construction.

CN122812684BActive Publication Date: 2026-11-17RAILWAY NO 5 BUREAU GRP FIRST ENG CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611318199.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-08-28
Publication Date
2026-11-17
Estimated Expiration
2046-08-28

AI Technical Summary

Technical Problem

Existing tunnel support devices are cumbersome to assemble in hard rock tunnel construction and are limited by the confined space inside the tunnel, making them difficult for construction workers to operate.

Method used

A construction device including a top support plate and side support plates was designed. The position of the support plates is adjusted by using a lifting mechanism and a side extension mechanism. Combined with a pressure relief mechanism and a sealing bladder, it can achieve free extension and retraction and all-round support.

Benefits of technology

It simplifies construction operations, adapts to the limited space inside the tunnel, improves the flexibility and safety of the support, effectively protects the tunnel structure, and prevents water droplet leakage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122812684B_ABST
    Figure CN122812684B_ABST
Patent Text Reader

Abstract

This invention discloses a hard rock tunnel excavation and support construction equipment and method, relating to the field of tunnel construction technology. The hard rock tunnel excavation and support construction equipment includes: a frame, on which a top support plate is fixedly installed, and a lifting mechanism is provided below the frame for adjusting the position of the top support plate via the frame; and side support plates, with side support plates symmetrically hinged at both ends of the top support plate. A side extension mechanism is correspondingly provided on the side of the side support plate facing the frame, and the side extension mechanism is installed on the frame. The side extension mechanism is used to drive the side support plate to adjust its angle around the hinge axis between the side support plate and the top support plate. This invention, through the lifting of the top support plate and the rotation and extension of the side support plates, allows for flexible extension and retraction within the limited space of the tunnel, easily achieving zoned support for the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of tunnel construction technology, specifically relating to a hard rock tunnel excavation and support construction equipment and method. Background Technology

[0002] With the continuous advancement of major infrastructure construction in my country, such as transportation, water conservancy, and energy, projects like the Sichuan-Tibet Railway, the Western Water Diversion Project, and deep-earth resource development are constantly emerging. Hard rock tunnels, as key control projects, generally employ equipment such as tunnel boring machines, blasting, or initial excavation. Regardless of the excavation method used, during construction, it is necessary to support the tunnel walls after excavating a section to prevent deformation or collapse of the surrounding rock and ensure the safe progress of construction within the tunnel.

[0003] Existing tunnel support devices support the tunnel by connecting and cooperating multiple jacks and support plates. However, these support devices need to be assembled before support is provided and disassembled after support is provided. The process is cumbersome and difficult for construction workers to assemble due to the limited space inside the tunnel. Summary of the Invention

[0004] The purpose of this invention is to provide a simple and reasonably designed hard rock tunnel excavation and support construction equipment and method to solve the above problems.

[0005] The present invention achieves the above objectives through the following technical solutions: In a first aspect, the present invention provides a hard rock tunnel excavation and support construction device, comprising: A frame, on the top of which a top support plate is fixedly installed, and on the bottom of which a lifting mechanism is provided, the lifting mechanism being used to adjust the position of the top support plate through the frame; Side support plate, the two ends of the top support plate are symmetrically hinged to the side support plate, and the side support plate is provided with a side extension mechanism on the side facing the frame. The side extension mechanism is installed on the frame and is used to drive the side support plate to adjust the angle around the hinge axis between the side support plate and the top support plate. The frame includes a main frame and a sub-frame, with the sub-frame fixedly installed on top of the main frame; It also includes a pressure relief mechanism, which is disposed between the top support plate and the main frame. The pressure relief mechanism includes a sliding plate, a balance rope, and a balance component. A groove is provided on the side of the side support plate away from the main frame. The sliding plate is slidably connected to the side support plate through the groove. A through hole is provided at the upper end of the side support plate. A balance rope is fixedly connected to the upper end of the sliding plate. The end of the balance rope away from the sliding plate passes through the through hole and is connected to the output end of the balance component. The balance component is used to balance the position of the sliding plate in the groove. A first guide roller is provided on the side of the side support plate facing the main frame. The balance rope rubs against the first guide roller. The top support plate has baffles fixedly installed at both ends of its upper part, and the baffles vertically cover the through hole position and the connection position between the slide plate and the rope.

[0006] As a further optimization of the present invention, one end of the top support plate is hinged with multiple side support plates. Along the tunnel travel direction, the multiple side support plates are arranged in sequence. When the top support plate is in the first support position, under the drive of the corresponding side extension mechanism, the multiple side support plates swing in sequence to the second support position in the direction away from the frame.

[0007] As a further optimization of the present invention, the side extension mechanism includes a first telescopic drive member, a second telescopic drive member, and a third telescopic drive member. In the vertical direction, the first telescopic drive member, the second telescopic drive member, and the third telescopic drive member are arranged sequentially from top to bottom. The telescopic ends of the first telescopic drive member, the second telescopic drive member, and the third telescopic drive member are rotatably connected to the side support plate. The drive end of the first telescopic drive member is rotatably mounted on the sub-frame, and the drive ends of the second telescopic drive member and the third telescopic drive member are both rotatably mounted on the main frame.

[0008] As a further optimization of the present invention, the balancing assembly includes a second guide roller, a slide block, a limiting roller, and a balancing shaft. The second guide roller is rotatably mounted on the sub-frame. The second guide roller is correspondingly arranged with the balancing rope, and the end of the balancing rope away from the slide block passes around the second guide roller and rubs against the second guide roller. The ends of the paired balancing ropes away from the slide block are bolted to the balancing shaft. The axis of the balancing shaft is aligned with the axis of the second guide roller. The two ends of the balancing shaft are rotatably connected to limiting rollers, and the limiting rollers slide with the slide block through limiting grooves.

[0009] As a further optimization of the present invention, side reinforcement plates are fixedly installed at both the front and rear ends of the side support plate along the tunnel travel direction. The side reinforcement plates are inclined and when the side support plate swings to the second support position, the adjacent side reinforcement plates rub against each other.

[0010] As a further optimization of the present invention, a sealing bladder is provided on the outer end face of the side reinforcement plate, and when the side support plate swings to the second support position, the adjacent sealing bladders seal and abut against each other.

[0011] As a further optimization of the present invention, the lifting mechanism includes a support leg, an inner column, and a lifting drive component. The lower end of the main frame is fixedly connected to the support leg, and the inner column is slidably installed inside the support leg. The lower end of the inner column is fixedly connected to a mounting base. The driving end of the lifting drive component is located on the support leg, and the telescopic end of the lifting drive component is located on the mounting base. A guide column is fixedly installed on the upper end of the mounting base, and a guide cylinder is fixedly installed on one side of the support leg. The upper end of the guide column passes through the guide cylinder and is slidably connected to the guide cylinder. A limit block is fixedly connected to the end of the guide column located above the guide cylinder, and the sliding direction of the guide column and the guide cylinder is consistent with the sliding direction of the support leg and the inner column.

[0012] As a further optimization of the present invention, it also includes a traveling mechanism, which includes a protective shell, a traveling auxiliary wheel, a traveling main wheel, a traveling drive component, and a guide rail. The protective shell is fixedly installed at the lower end of the mounting base, and the traveling auxiliary wheel and the traveling main wheel are rotatably installed inside the protective shell. The output end of the traveling drive component is drivenly connected to the traveling main wheel. The guide rail is laid on the tunnel floor, and the traveling auxiliary wheel and the traveling main wheel are respectively in rolling cooperation with the guide rail.

[0013] Secondly, the present invention provides a method for hard rock tunnel excavation and support construction, which is applied to a hard rock tunnel excavation and support construction equipment. The construction method includes the following steps: The lifting mechanism moves the frame and the top support plate up to the first support position to support the top area of ​​the tunnel. The symmetrically arranged side extension mechanism drives the corresponding side support plate to extend to the second support position to support the side area of ​​the tunnel.

[0014] The present invention has at least the following beneficial effects: The present invention sets up a top support plate and a side support plate, adjusts the height of the top support plate by means of a lifting mechanism, and adjusts the rotation angle of the side support plate by means of a side extension mechanism, so as to realize the support of the top support plate for the tunnel top area and the support of the side support plate for the tunnel inner wall side. The device can be extended and retracted freely, is not limited to the limited space of the tunnel, and is easy to operate. Furthermore, a pressure-relief mechanism is installed between the top support plate and the main frame. The pressure-relief mechanism includes a sliding plate, a balance rope, and a balance component. When the hard rock block on one side of the tunnel wall is longitudinally squeezed, the sliding plate tends to slide down the slide groove. With the help of the balance component dragging the balance rope, the sliding plate is given a resistance force to slide down. Thus, while the sliding plate and the side support plate provide support to the tunnel wall, the impact energy is absorbed by the buffer of the balance rope, protecting the side support plate from instantaneous impact damage. In addition, inclined side reinforcement plates are fixedly installed at both the front and rear ends of the side support plate. Even if a protruding stone extends into the front of the previous side support plate, the protruding stone can be broken by the movement of the side reinforcement plate of the next side support plate relative to the side reinforcement plate of the previous side support plate, thereby reducing the squeezing force of the remaining stone on the side support plate after being broken. Furthermore, sealing bladders are installed on the outside of the inclined side reinforcement plates, so that when the second support position is in place, the adjacent sealing bladders seal and abut against each other, thus sealing the gap between the adjacent side support plates. In the face of hard rock tunnels with high moisture content, this effectively prevents water droplets from accumulating and dripping from the tunnel. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is the invention Figure 1 A schematic diagram of a partial sectional view of the frontal structure; Figure 3 This is a partial cross-sectional structural schematic diagram of the frame, top support plate, side support plate and pressure relief mechanism of the present invention; Figure 4 This is the invention Figure 3 Enlarged view of point A in the middle; Figure 5 This is a partial structural diagram of the pressure-relieving mechanism of the present invention in its initial position; Figure 6 This is a partial structural diagram of the pressure-relief mechanism of the present invention when it is in the pressure-relief position; Figure 7 This is the invention Figure 1 A top-view structural diagram; Figure 8 This is the present invention. Figure 7 Enlarged view at point B in the middle; Figure 9 This is a partial structural schematic diagram of the traveling mechanism and lifting mechanism of the present invention.

[0016] In the diagram: 1. Traveling mechanism; 11. Lifting drive component; 12. Inner column; 13. Mounting base; 14. Protective shell; 15. Guide rail; 16. Traveling auxiliary wheel; 17. Traveling drive component; 18. Traveling main wheel; 19. Guide column; 110. Guide cylinder; 111. Limit block; 2. Lifting mechanism; 21. Outrigger; 3. Frame; 31. Main frame; 32. Sub-frame; 33. Reinforcing beam; 4. Top support plate; 41. Top reinforcing plate; 5. Side support plate; 51. Through hole; 52. Side reinforcement plate; 6. Side extension mechanism; 61. First telescopic drive component; 62. Second telescopic drive component; 63. Third telescopic drive component; 7. Baffle; 8. Pressure relief mechanism; 81. Slide plate; 811. Slide groove; 82. First guide roller; 83. Balance rope; 84. Second guide roller; 85. Slide seat; 851. Limiting groove; 86. Limiting roller; 87. Balance shaft; 9. Sealing bladder; 10. Support plate. Detailed Implementation

[0017] The present application will now be described in further detail with reference to the accompanying drawings. It should be noted that the following specific embodiments are only used to further illustrate the present application and should not be construed as limiting the scope of protection of the present application. Those skilled in the art can make some non-essential improvements and adjustments to the present application based on the above application content.

[0018] In the description of the embodiments of this application, it should be understood that the terms "upper", "lower", "left", "right", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship that the product of this application is usually placed in, or the orientation or positional relationship that is commonly understood by those skilled in the art. They are only used to facilitate the description of this application and simplify the description, and are not intended to indicate or imply that the device or component referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application.

[0019] like Figure 1 , Figure 2 As shown, the present invention provides a hard rock tunnel excavation and support construction equipment, comprising: A frame 3 is provided, with a top support plate 4 fixedly installed on the top of the frame 3 and a lifting mechanism 2 provided on the bottom of the frame 3. The lifting mechanism 2 is used to adjust the position of the top support plate 4 through the frame 3. Side support plate 5, the two ends of the top support plate 4 are symmetrically hinged to the side support plate 5, and the side support plate 5 facing the frame 3 is provided with a side extension mechanism 6. The side extension mechanism 6 is installed on the frame 3 and is used to drive the side support plate 5 to adjust the angle around the hinge axis between the side support plate 5 and the top support plate 4.

[0020] like Figure 2The diagram shows the structure when the top support plate 4 is in the first support position and the side support plate 5 is in the second support position. It can be seen that the rotating hinge between the side support plate 5 and the top support plate 4 allows the entire device to be freely extended and retracted. It does not need to be disassembled after each support. The side support plate 5 can be rotated toward the side of the frame 3 with the help of the side extension mechanism 6, and the top support plate 4 can be moved down by the lifting mechanism 2. The volume of the device shrinks after being stored, and it is not limited by the limited space in the tunnel. The operation is simple for construction personnel.

[0021] It should be noted that the top support plate 4 being in the first support position refers to the position when the top support plate 4 moves up to abut the top of the tunnel, while the side support plate 5 being in the second support position refers to the position when the side support plate 5 is swayed to abut the side wall of the tunnel.

[0022] For example, see [link to relevant documentation]. Figure 1 One end of the top support plate 4 is hinged with multiple side support plates 5. Along the tunnel travel direction, the multiple side support plates 5 are arranged in sequence. When the top support plate 4 is in the first support position, under the drive of the corresponding side extension mechanism 6, the multiple side support plates 5 swing in sequence away from the frame 3 to the second support position. That is, the multiple side support plates 5 swing outward one by one, which is suitable for the limited construction space in the tunnel. The unfolding process is more stable. Moreover, the multiple side support plates 5 share the pressure of the surrounding rock. The pressure is distributed to multiple side support plates 5, avoiding single-point overload and significantly improving the overall support bearing capacity and safety.

[0023] For example, see [link to relevant documentation]. Figure 2 The frame 3 includes a main frame 31 and a sub-frame 32, with the sub-frame 32 fixedly installed above the main frame 31; The side-expansion mechanism 6 includes a first telescopic drive member 61, a second telescopic drive member 62, and a third telescopic drive member 63. These three members are arranged sequentially from top to bottom along the vertical direction. The telescopic ends of the first, second, and third telescopic drive members 61, 62, and 63 are rotatably connected to the side support plate 5. The drive end of the first telescopic drive member 61 is rotatably mounted on the sub-frame 32, while the drive ends of the second and third telescopic drive members 62 and 63 are rotatably mounted on the main frame 31. Through the coordinated drive of the first, second, and third telescopic drive members 61, 62, and 63, the side support plate 5 can swing smoothly when it swings out to the second support position or swings back to its initial position. Furthermore, the first, second, and third telescopic drive members 61, 62, and 63 provide multi-point support for the side support plate 5.

[0024] It should be noted that a reinforcing beam 33 is also fixedly installed on the main frame 31 to strengthen the support strength of the main frame 31; wherein, the first telescopic drive component 61, the second telescopic drive component 62 and the third telescopic drive component 63 are hydraulic telescopic cylinders, electric telescopic cylinders or electric telescopic cylinders, and no limitation is made here.

[0025] For example, see [link to relevant documentation]. Figure 1 and Figure 9 The lifting mechanism 2 includes a support leg 21, an inner column 12, and a lifting drive component 11. The lower end of the main frame 31 is fixedly connected to the support leg 21. The inner column 12 is slidably installed inside the support leg 21. The lower end of the inner column 12 is fixedly connected to a mounting base 13. The driving end of the lifting drive component 11 is located on the support leg 21, and the telescopic end of the lifting drive component 11 is located on the mounting base 13. A guide column 19 is fixedly installed on the upper end of the mounting base 13. A guide cylinder 110 is fixedly installed on one side of the support leg 21. The upper end of the guide column 19 passes through the guide cylinder 110 and is slidably connected to the guide cylinder 110. A limit block 111 is fixedly connected to one end of the guide column 19 located above the guide cylinder 110. The sliding direction of the guide column 19 and the guide cylinder 110 is the same as the sliding direction of the support leg 21 and the inner column 12.

[0026] When it is necessary to raise the top support plate 4, the lifting drive component 11 drives the mounting base 13, causing the inner column 12 to slide down, thereby lifting the outrigger 21 and realizing the upward movement of the frame 3. That is, the top support plate 4 also moves upward synchronously with the frame 3. The guide column 19 and the guide cylinder 110 provide guidance and constraint for the upward sliding of the outrigger 21 relative to the inner column 12. It should be noted that the lifting drive component 11 can be a hydraulic telescopic cylinder, an electric telescopic cylinder, or an electrically operated telescopic cylinder; no limitation is made here.

[0027] For example, see [link to relevant documentation]. Figure 2 It also includes a pressure relief mechanism 8, located between the top support plate 4 and the main frame 31. (See further details...) Figure 3 and Figure 4 The pressure-relieving mechanism 8 includes a sliding plate 81, a balance rope 83, and a balance component. The side support plate 5 has a groove 811 on the side away from the main frame 31. The sliding plate 81 is slidably connected to the side support plate 5 through the groove 811. The upper end of the side support plate 5 has a through hole 51. The upper end of the sliding plate 81 is fixedly connected to the balance rope 83. The end of the balance rope 83 away from the sliding plate 81 passes through the through hole 51 and is connected to the output end of the balance component. The balance component is used to balance the position of the sliding plate 81 in the groove 811. The side support plate 5 is provided with a first guide roller 82 on the side facing the main frame 31. The balance rope 83 rubs against the first guide roller 82. Because hard rock tunnels are subject to high stress and prone to sudden compression, when hard rock blocks on one side of the tunnel wall are subjected to longitudinal compression, the resulting compressive force under gravity is applied downward (or to the lower left) to the slide plate 81, causing the slide plate 81 to tend to slide down along the slide groove 811. This prevents the slide plate 81 from resisting the surrounding rock and thus relieves the pressure. At this time, the dragging of the balance rope 83 by the balance component provides a resistance force to the slide plate 81 as it slides down. Thus, while the slide plate 81 and the side support plate 5 provide support to the tunnel wall, the buffering effect of the balance rope 83 absorbs the impact energy and protects the side support plate 5 from instantaneous impact damage. Furthermore, baffles 7 are fixedly installed at both ends of the upper part of the top support plate 4, and the baffles 7 vertically cover the position of the through hole 51 and the connection position of the slide plate 81 and the rope. The baffles 7 prevent the debris falling from the inner wall of the tunnel from blocking the slide groove 811 and prevent the debris from falling into the through hole 51.

[0028] Continue to refer to Figure 3 The balancing assembly includes a second guide roller 84, a slide block 85, a limiting roller 86, and a balancing shaft 87. The second guide roller 84 is rotatably mounted on the sub-frame 32. The second guide roller 84 is correspondingly arranged with the balancing rope 83, and the end of the balancing rope 83 away from the slide block 81 passes around the second guide roller 84 and rubs against it. The ends of the paired balancing ropes 83 away from the slide block 81 are fastened to the balancing shaft 87. The axis of the balancing shaft 87 is aligned with the axis of the second guide roller 84. Figure 3 As shown, the centerline height of the second guide roller 84 is lower than that of the first guide roller 82 and the centerline height of the balance shaft 87. The two ends of the balance shaft 87 are rotatably connected to the limiting rollers 86, and the limiting rollers 86 slide with the slide block 85 through the limiting groove 851.

[0029] like Figure 5 As shown, in the initial state, under the balance of the two sliding plates 81, the balance shaft 87 is centrally distributed, and the balance rope 83 is always taut. After the side support plate 5 and the sliding plate 81 are in the second support position, taking the right side as an example, when the hard rock block on the right side of the tunnel wall is longitudinally squeezed, it causes the right sliding plate 81 to have a tendency to slide down along the slide groove 811. At this time, with the help of the transmission of the paired balance ropes 83, the frictional squeezing force of the left sliding plate 81 against the left side of the tunnel wall is used as the resistance force for the right sliding plate 81 to slide down. That is, the left and right sliding plates 81 restrain each other, so that the right sliding plate 81 does not resist the hard rock of the surrounding rock to give pressure, while also effectively preventing the right sliding plate 81 from sliding down excessively, ensuring the supporting role of the sliding plate 81 on the hard rock of the tunnel. Furthermore, continue to refer to Figure 6 Taking the right-side slide 81 sliding down as an example, the pressure from falling gravel on the right-side slide 81 causes it to slide down. At this time, Figure 6The pressure-relief mechanism 8 is positioned in the pressure-relief position. Under the restraint of the right-side balance rope 83, the balance shaft 87 is dragged to the right, causing the limit roller 86 to move to the right. Meanwhile, the balance shaft 87 drags the left-side balance rope 83, causing the left-side slide plate 81 to slide upwards. Figure 6 The solid and dashed lines indicate the positions of the two balance ropes 83 after their displacement. It can be seen that the length of the balance rope 83 between the balance shaft 87 and the second guide roller 84 on the left is greater than the length of the balance rope 83 between the balance shaft 87 and the second guide roller 84 on the right. Furthermore, the increase in the length of the balance rope 83 between the balance shaft 87 and the second guide roller 84 on the left is greater than the decrease in the length of the balance rope 83 between the balance shaft 87 and the second guide roller 84 on the right. In other words, the upward sliding distance of the left slide plate 81 is greater than the downward sliding distance of the right slide plate 81, thereby increasing the frictional resistance experienced by the left slide plate 81 to resist the downward force of the right slide plate 81.

[0030] For example, see [link to relevant documentation]. Figure 7 and Figure 8 Along the tunnel's direction of travel, side reinforcement plates 52 are fixedly installed at both the front and rear ends of the side support plates 5. The side reinforcement plates 52 are inclined. It should be noted that a top reinforcement plate 41 is also fixedly installed at the lower end of the top support plate 4. When the side support plate 5 swings to the second support position, adjacent side reinforcement plates 52 rub against each other, ensuring no gaps between adjacent side support plates 5 and preventing loose stones from falling into the supported construction area and injuring workers. Furthermore, the inclined side reinforcement plates 52, when the next side support plate 5 swings outward after the previous side support plate 5 has swung to the second support position, can be bent by the movement of the side reinforcement plates 52 relative to the previous side support plate 5, even if a protruding stone extends into the front of the previous side support plate 5, thereby reducing the compressive force of the remaining stones on the side support plate 5.

[0031] For example, see [link to relevant documentation]. Figure 8 The outer end face of the side reinforcement plate 52 is provided with a sealing bladder 9. When the side support plate 5 swings to the second support position, the adjacent sealing bladders 9 seal against each other. With the sealing contact of the sealing bladders 9, the gap between the adjacent side support plates 5 is sealed. During the excavation and support of hard rock tunnels, water from the surrounding rock fissures can seep into the inner wall surface of the tunnel through rock joints and cracks, forming seepage, dripping water or local water accumulation. The sealing bladders 9 effectively block the water droplets that accumulate and drip in the tunnel. In addition to blocking the gravel, the baffle 7 can also block the water droplets that accumulate and drip in the tunnel from entering the through hole 51 and the gap between the side support plate 5 and the top support plate 4. The water droplets that accumulate and drip can slide down the surface of the side support plate 5 and the top support plate 4 to the lower end of the side support plate 5 and drip down. Alternatively, workers can set up an additional container below the lower end of the side support plate 5 to collect water droplets for washing hands and faces during construction and for physical cooling. This is not limited here.

[0032] It should be noted that, as Figure 8 As shown, a support plate 10 is also fixedly installed between the front and rear end side reinforcement plates 52 of a side support plate 5 to provide compression support for the lateral compression of the side reinforcement plate 52.

[0033] For example, see [link to relevant documentation]. Figure 1 and Figure 9 The device of the present invention also includes a traveling mechanism 1, which includes a protective shell 14, a traveling auxiliary wheel 16, a traveling main wheel 18, a traveling drive component 17, and a guide rail 15. The protective shell 14 is fixedly installed at the lower end of the mounting base 13. The traveling auxiliary wheel 16 and the traveling main wheel 18 are rotatably installed inside the protective shell 14. The output end of the traveling drive component 17 is drivenly connected to the traveling main wheel 18. The guide rail 15 is laid on the tunnel floor, and the traveling auxiliary wheel 16 and the traveling main wheel 18 are respectively in rolling cooperation with the guide rail 15. By pre-laying the guide rail 15 in the center in the tunnel, the traveling drive component 17 drives the traveling main wheel 18, causing the traveling main wheel 18 to roll along the guide rail 15. With the help of the rolling of the traveling auxiliary wheel 16 and the guide rail 15, the device moves smoothly along the laying direction of the guide rail 15 and is not affected by ground gravel. For example, the traveling drive component 17 is a motor equipped with a reducer.

[0034] It should be noted that when using this hard rock tunnel excavation and support construction equipment, the travel drive component 17 is activated to make the main travel wheel 18 move along the guide rail 15, so that the equipment can be smoothly transported to the support area, and the travel drive component 17 is turned off. Next, the lifting drive 11 is activated, causing the inner column 12 to slide downwards towards the outrigger 21, lifting the frame 3 and moving the top support plate 4 to the first support position. Then, the first telescopic drive 61, the second telescopic drive 62, and the third telescopic drive 63 are activated, unfolding the side support plate 5 away from the frame 3 to the second support position. Thus, the top support plate 4 and the side support plate 5 provide all-round support for the tunnel wall, and the operation is simple. Moreover, multiple side support plates 5 are provided on both sides of the top support plate 4. When deployed, multiple side support plates 5 are deployed sequentially along the tunnel travel direction. When deployed, the side reinforcement plates 52 of adjacent side support plates 5 abut against each other, and the sealing bladder 9 at the outer end of the side reinforcement plate 52 seals against each other. When one side of the slide plate 81 is subjected to longitudinal compression by the tunnel rocks, the resulting compressive force is applied downward (or to the lower left) to the slide plate 81, causing the slide plate 81 to tend to slide down along the slide groove 811. This prevents the slide plate 81 from resisting the hard roof of the surrounding rock, thus achieving pressure relief. Furthermore, with the mutual restraint of the paired balance ropes 83, the frictional resistance of the other slide plate 81 is used to assist in preventing the slide plate 81 from sliding down, thereby ensuring that the slide plate 81 and the side support plate 5 provide support to the tunnel wall.

[0035] In another embodiment, the present invention also provides a hard rock tunnel excavation and support construction method, applied to a hard rock tunnel excavation and support construction equipment, the construction method comprising the following steps: The lifting mechanism 2 causes the frame 3 to move the top support plate 4 to the first support position to support the top area of ​​the tunnel. The symmetrically arranged side extension mechanism 6 drives the corresponding side support plate 5 to extend to the second support position to support the side area of ​​the tunnel.

[0036] This method enables step-by-step and zone-by-zone support of the tunnel wall. The equipment is easy to operate, requires no disassembly, and is simple to store and deploy within the limited space of the tunnel.

[0037] The embodiments described above are merely examples of several implementations of the present invention, and while the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the present invention. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of the present invention, and these modifications and improvements all fall within the scope of protection of the present invention.

Claims

1. A hard rock tunnel excavation and support construction equipment, characterized in that, include: A frame, on the top of which a top support plate is fixedly installed, and on the bottom of which a lifting mechanism is provided, the lifting mechanism being used to adjust the position of the top support plate through the frame; Side support plate, the two ends of the top support plate are symmetrically hinged to the side support plate, and the side support plate is provided with a side extension mechanism on the side facing the frame. The side extension mechanism is installed on the frame and is used to drive the side support plate to adjust the angle around the hinge axis between the side support plate and the top support plate. The frame includes a main frame and a sub-frame, with the sub-frame fixedly installed on top of the main frame; It also includes a pressure relief mechanism, which is disposed between the top support plate and the main frame. The pressure relief mechanism includes a sliding plate, a balance rope, and a balance component. A groove is provided on the side of the side support plate away from the main frame. The sliding plate is slidably connected to the side support plate through the groove. A through hole is provided at the upper end of the side support plate. A balance rope is fixedly connected to the upper end of the sliding plate. The end of the balance rope away from the sliding plate passes through the through hole and is connected to the output end of the balance component. The balance component is used to balance the position of the sliding plate in the groove. A first guide roller is provided on the side of the side support plate facing the main frame. The balance rope rubs against the first guide roller. The top support plate is fixedly provided with baffles at both ends of its upper part, and the baffles vertically cover the through hole position and the connection position between the slide plate and the rope. The balancing assembly includes a second guide roller, a slide block, a limiting roller, and a balancing shaft. The second guide roller is rotatably mounted on the sub-frame. The second guide roller is correspondingly arranged with the balancing rope, and the end of the balancing rope away from the slide block passes around the second guide roller and rubs against it. The ends of the paired balancing ropes away from the slide block are bolted to the balancing shaft. The axis of the balancing shaft is aligned with the axis of the second guide roller. The two ends of the balancing shaft are rotatably connected to limiting rollers, which slide against the slide block through limiting grooves.

2. The hard rock tunnel excavation and support construction equipment according to claim 1, characterized in that, One end of the top support plate is hinged to multiple side support plates. Along the tunnel travel direction, the multiple side support plates are arranged in sequence. When the top support plate is in the first support position, under the drive of the corresponding side extension mechanism, the multiple side support plates swing in sequence away from the frame to the second support position.

3. The hard rock tunnel excavation and support construction equipment according to claim 2, characterized in that, The side extension mechanism includes a first telescopic drive component, a second telescopic drive component, and a third telescopic drive component. In the vertical direction, the first telescopic drive component, the second telescopic drive component, and the third telescopic drive component are arranged sequentially from top to bottom. The telescopic ends of the first telescopic drive component, the second telescopic drive component, and the third telescopic drive component are rotatably connected to the side support plate. The drive end of the first telescopic drive component is rotatably mounted on the sub-frame, and the drive ends of the second telescopic drive component and the third telescopic drive component are both rotatably mounted on the main frame.

4. The hard rock tunnel excavation and support construction equipment according to claim 3, characterized in that, Along the tunnel travel direction, the front and rear ends of the side support plate are fixedly equipped with side reinforcement plates. The side reinforcement plates are inclined and when the side support plate swings to the second support position, the adjacent side reinforcement plates rub against each other.

5. The hard rock tunnel excavation and support construction equipment according to claim 4, characterized in that, The outer end face of the side reinforcement plate is provided with a sealing bladder. When the side support plate swings to the second support position, the adjacent sealing bladders seal and abut.

6. The hard rock tunnel excavation and support construction equipment according to claim 3, characterized in that, The lifting mechanism includes a support leg, an inner column, and a lifting drive component. The lower end of the main frame is fixedly connected to the support leg, and the inner column is slidably installed inside the support leg. The lower end of the inner column is fixedly connected to a mounting base. The driving end of the lifting drive component is located on the support leg, and the telescopic end of the lifting drive component is located on the mounting base. A guide column is fixedly installed on the upper end of the mounting base, and a guide cylinder is fixedly installed on one side of the support leg. The upper end of the guide column passes through the guide cylinder and is slidably connected to the guide cylinder. A limit block is fixedly connected to the end of the guide column located above the guide cylinder, and the sliding direction of the guide column and the guide cylinder is consistent with the sliding direction of the support leg and the inner column.

7. The hard rock tunnel excavation and support construction equipment according to claim 6, characterized in that, It also includes a traveling mechanism, which includes a protective shell, a traveling auxiliary wheel, a traveling main wheel, a traveling drive component, and a guide rail. The protective shell is fixedly installed at the lower end of the mounting base. The traveling auxiliary wheel and the traveling main wheel are rotatably installed inside the protective shell. The output end of the traveling drive component is drivenly connected to the traveling main wheel. The guide rail is laid on the tunnel floor, and the traveling auxiliary wheel and the traveling main wheel are respectively in rolling cooperation with the guide rail.

8. A method for construction of support and excavation for hard rock tunnels, characterized in that, The construction method for the hard rock tunnel excavation and support equipment described in claim 1 includes the following steps: The lifting mechanism moves the frame and the top support plate up to the first support position to support the top area of ​​the tunnel. The symmetrically arranged side extension mechanism drives the corresponding side support plate to extend to the second support position to support the side area of ​​the tunnel.

Citation Information

Patent Citations

  • Roadway support structure capable of achieving multi-grade energy consumption collaborative yield and splicing method

    CN106812543A

  • Tunnel foundation pit supporting structure for tunnel construction

    CN222949891U