Heat pump system control method, device, heat pump system and readable storage medium

By placing the phase change thermal storage device between the compressor and condenser in the heat pump system and using a parallel piping design, refrigerant diversion is achieved, solving the problem of low thermal storage efficiency in existing technologies and improving heat exchange efficiency and system reliability.

CN122881266BActive Publication Date: 2026-11-10GUANGDONG VANWARD ELECTRIC
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611356093.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-09-03
Publication Date
2026-11-10
Estimated Expiration
2046-09-03

AI Technical Summary

Technical Problem

In existing heat pump systems, the phase change thermal storage device is located on the condenser outlet side or in the terminal water circuit, resulting in a large amount of irreversible loss of heat energy due to factors such as heat exchange temperature difference and heat dissipation in the pipeline, and a significant reduction in thermal storage efficiency.

Method used

The phase change thermal storage device is installed on the first exhaust pipe between the compressor and the condenser, and a second exhaust pipe is installed in parallel. During off-peak hours when the temperature of the phase change material is insufficient, the two pipes are controlled to be opened simultaneously, so that part of the refrigerant flows through the phase change thermal storage device for heat storage, and the remaining refrigerant directly enters the condenser for heating, thus realizing refrigerant diversion.

Benefits of technology

It improves the heat exchange efficiency of the phase change thermal storage device, recovers high-grade superheated sensible heat, reduces the refrigerant temperature at the condenser inlet, reduces irreversible entropy production, maintains the compressor operating within a reasonable pressure and temperature range, ensures uninterrupted heating capacity, and enhances the reliability of system operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122881266B_ABST
    Figure CN122881266B_ABST
Patent Text Reader

Abstract

This application relates to the field of heat pump system technology, and discloses a heat pump system control method, device, heat pump system, and readable storage medium. The method is applied to a heat pump system including a compressor, a condenser, a phase change thermal storage device, a first exhaust pipe, and a second exhaust pipe. The first and second exhaust pipes are connected in parallel between the compressor and the condenser. The method includes: acquiring the power supply period and the phase change material temperature of the phase change thermal storage device; if the power supply period is during off-peak hours and the phase change material temperature is below a first temperature threshold, then controlling both the first and second exhaust pipes to be open, so that a portion of the refrigerant flows through the phase change thermal storage device for heat storage. The phase change thermal storage device of this application directly exchanges heat with the refrigerant, resulting in a large temperature difference during heat exchange, which significantly increases the quality of the actual heat energy absorbed by the phase change thermal storage device and substantially improves the thermal storage efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of heat pump system technology, and in particular to a heat pump system control method, apparatus, heat pump system, and readable storage medium. Background Technology

[0002] To reduce electricity costs, some existing heat pump products are equipped with phase change thermal storage devices. When electricity prices are low, the phase change thermal storage devices store heat for use during peak hours. However, the phase change thermal storage devices in current heat pump systems are usually located on the condenser outlet side or in the terminal water circuit. During this process, a large amount of irreversible heat energy is lost due to factors such as heat exchange temperature difference and pipeline heat dissipation, which greatly reduces the quality of the actual heat energy absorbed by the phase change thermal storage device and significantly reduces the thermal storage efficiency. Summary of the Invention

[0003] The first technical problem solved by the present invention is to provide a heat pump system control method that can significantly improve the heat storage efficiency of the phase change heat storage device in the heat pump system.

[0004] The second technical problem solved by the present invention is to provide a heat pump system control device that can significantly improve the heat storage efficiency of the phase change heat storage device in the heat pump system.

[0005] The third technical problem solved by the present invention is to provide a heat pump system that can significantly improve the heat storage efficiency of the phase change heat storage device in the heat pump system.

[0006] The fourth technical problem solved by the present invention is to provide a computer-readable storage medium that can significantly improve the heat storage efficiency of phase change heat storage devices in heat pump systems.

[0007] The first technical problem mentioned above is solved by the following technical solution: A heat pump system control method is disclosed, the method being applied to a heat pump system including a compressor, a condenser, a phase change thermal storage device, a first exhaust pipe, and a second exhaust pipe, wherein the first exhaust pipe and the second exhaust pipe are connected in parallel between the compressor and the condenser. The method includes: acquiring the power supply period and the phase change material temperature of the phase change thermal storage device; if the power supply period is an off-peak period and the phase change material temperature is less than a first temperature threshold, then controlling both the first exhaust pipe and the second exhaust pipe to be open, so that a portion of the refrigerant flows through the phase change thermal storage device for heat storage.

[0008] Compared with existing technologies, the heat pump system control method of the present invention has the following advantages: In related technologies, if the refrigerant discharged from the compressor flows directly to the condenser, the high-temperature refrigerant generally undergoes a cooling stage (sensible heat transfer), an isothermal condensation stage (latent heat transfer), and a subcooling stage (sensible heat transfer). In other words, if the refrigerant flows directly through the condenser, there is not much sensible heat transfer, resulting in significant irreversible losses, which restricts the energy efficiency of the heat pump system. In the present invention, the phase change heat storage device is installed on the first exhaust pipe between the compressor and the condenser, and the first exhaust pipe and the second exhaust pipe are connected in parallel. During off-peak electricity hours, when the temperature of the phase change material is below the first temperature threshold, the two pipes are controlled to be simultaneously turned on, allowing part of the refrigerant to flow through the phase change heat storage device for heat storage.

[0009] On the one hand, since the phase change heat storage device is directly arranged between the compressor and the condenser, some of the refrigerant flows through the phase change heat storage device to release heat. Compared with the existing heat pump system where the phase change heat storage device is arranged on the condenser outlet side or in the terminal water circuit, the phase change heat storage device of this application directly exchanges heat with the refrigerant, resulting in a larger heat exchange temperature difference and higher heat exchange efficiency. At the same time, the phase change heat storage device can recover some of the high-grade superheated sensible heat, storing the high-temperature sensible heat that would otherwise be discharged to the environment by the large temperature difference in the condenser, reducing the refrigerant temperature at the condenser inlet, reducing the heat transfer temperature difference in the condenser, and reducing the newly generated irreversible entropy production inside the condenser, thereby improving the heat pump energy efficiency. On the other hand, if all the refrigerant flows through the heat storage device, the phase change material is prone to excessive heat absorption and overheating. At the same time, the refrigerant releases a large amount of heat in the heat storage device, causing excessive drops in refrigerant temperature and pressure, which can easily lead to abnormal fluctuations in the compressor's discharge back pressure, affecting the compressor's operating conditions and even triggering high-pressure / low-pressure protection shutdown. Therefore, this invention achieves refrigerant diversion through parallel pipelines, with only a portion of the refrigerant flowing through the phase change heat storage device to release and store heat, while the remaining refrigerant directly enters the condenser to supply heat to the outside. During the heat storage process, the heat pump can continuously output heating capacity, and heat storage and heating are carried out simultaneously, without causing interruption of heating or reduction in heating capacity on the user side. At the same time, it can control the total heat exchange of the phase change heat storage device, avoid overheating of the phase change material and drastic fluctuations in refrigerant conditions, maintain the compressor operating within a reasonable pressure and temperature range, and improve the reliability of system operation.

[0010] In one embodiment, the method further includes: when the phase change thermal storage device is detected to have completed thermal storage, controlling the first exhaust pipe to disconnect and controlling the second exhaust pipe to open.

[0011] In one embodiment, the method further includes: during the heat storage process of the phase change thermal storage device, obtaining the current outlet water temperature and comparing the current outlet water temperature with the target outlet water temperature; if the current outlet water temperature is lower than the target outlet water temperature, increasing the operating frequency of the compressor.

[0012] In one embodiment, the outlet of the condenser is connected to an outlet pipe, which includes an outlet pipe section arranged in parallel with the water flow heat exchange channel of the phase change thermal storage device. The method further includes: if it is determined that the power supply period is a peak power period and the temperature of the phase change material is greater than the current outlet water temperature, then the target outlet water temperature and the return water temperature rise rate of the heat pump system are obtained; if the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold or the return water temperature rise rate is less than a preset rate, then the outlet pipe section is controlled to disconnect and the water flow heat exchange channel of the phase change thermal storage device is controlled to open, so that the water to be heated first enters the condenser for heating, then flows through the phase change thermal storage device for secondary heating, and then flows out from the outlet pipe.

[0013] In one embodiment, when the phase change thermal storage device is detected to have completed heat release, the method further includes: controlling the outlet pipe section to be open and controlling the water flow heat exchange channel of the phase change thermal storage device to be closed, so that the water to be heated undergoes condensation heat exchange in the condenser and flows directly out from the outlet pipe.

[0014] In one embodiment, the method further includes: if the power supply period is a normal power supply period, then obtaining the current outlet water temperature of the heat pump system; if the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold and the phase change material temperature is less than a second temperature threshold, then controlling a portion of the refrigerant to store heat in the phase change heat storage device, and another portion of the refrigerant directly entering the condenser for condensation and heat exchange.

[0015] In one embodiment, a solenoid valve is provided on the first exhaust pipe, and the method further includes: if the power supply period is a low-voltage period and the phase change material temperature is less than a first temperature threshold, then the solenoid valve is opened with a first target opening degree; if the power supply period is a normal-voltage period, the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold and the phase change material temperature is less than a second temperature threshold, then the solenoid valve is opened with a second target opening degree; the first target opening degree is greater than the second target opening degree.

[0016] The second technical problem mentioned above is solved by the following technical solution: A heat pump system control device includes: an acquisition module for acquiring the power supply period and the phase change material temperature of the phase change heat storage device; and a control module for controlling both the first exhaust pipe and the second exhaust pipe to be open if the power supply period is during off-peak hours and the phase change material temperature is less than a first temperature threshold, so that a portion of the refrigerant flows through the phase change heat storage device for heat storage.

[0017] Compared with the prior art, the heat pump system control device of the present invention has the following advantages: the phase change heat storage device is installed on the first exhaust pipe between the compressor and the condenser, and the first exhaust pipe and the second exhaust pipe are connected in parallel; during off-peak electricity hours, when the temperature of the phase change material is less than the first temperature threshold, the two pipes are controlled to be simultaneously turned on, so that part of the refrigerant flows through the phase change heat storage device for heat storage. On the one hand, the phase change heat storage device of this application directly exchanges heat with the refrigerant, resulting in a large heat exchange temperature difference and higher heat exchange efficiency. At the same time, the phase change heat storage device can recover part of the high-grade superheated sensible heat, preserving the high-temperature sensible heat that would originally be discharged to the environment by the large temperature difference in the condenser, thereby reducing the refrigerant temperature at the condenser inlet, reducing the heat transfer temperature difference in the condenser, and reducing the newly generated irreversible entropy production inside the condenser, thereby improving the heat pump energy efficiency. On the other hand, this application achieves refrigerant diversion through parallel pipelines, with only a portion of the refrigerant flowing through the phase change thermal storage device to release and store heat, while the remaining refrigerant directly enters the condenser to supply heat to the outside. During the heat storage process, the heat pump can continuously output heating capacity, and heat storage and heating are carried out simultaneously, without causing interruption of heating or reduction of heating capacity on the user side. At the same time, it can control the total heat exchange of the phase change thermal storage device, avoid overheating of the phase change material and drastic fluctuations in refrigerant conditions, maintain the compressor operating within a reasonable pressure and temperature range, and improve the reliability of system operation.

[0018] The third technical problem mentioned above is solved by the following technical solution: A heat pump system includes a compressor, a condenser, a phase change heat storage device, a first exhaust pipe, a second exhaust pipe, a processor, and a memory. The memory stores a computer program, and the processor executes the computer program to implement the above-described heat pump system control method.

[0019] Compared with the prior art, the heat pump system of the present invention has the following advantages: the phase change heat storage device is installed on the first exhaust pipe between the compressor and the condenser, and the first exhaust pipe and the second exhaust pipe are connected in parallel; during off-peak electricity hours, when the temperature of the phase change material is less than the first temperature threshold, the two pipes are controlled to be simultaneously turned on, so that part of the refrigerant flows through the phase change heat storage device for heat storage. On the one hand, the phase change heat storage device of this application directly exchanges heat with the refrigerant, resulting in a large heat exchange temperature difference and higher heat exchange efficiency. At the same time, the phase change heat storage device can recover part of the high-grade superheated sensible heat, preserving the high-temperature sensible heat that would otherwise be discharged to the environment by the large temperature difference in the condenser, thereby reducing the refrigerant temperature at the condenser inlet, reducing the heat transfer temperature difference in the condenser, and reducing the newly generated irreversible entropy production inside the condenser, thereby improving the heat pump energy efficiency. On the other hand, this application achieves refrigerant diversion through parallel pipelines, with only a portion of the refrigerant flowing through the phase change thermal storage device to release and store heat, while the remaining refrigerant directly enters the condenser to supply heat to the outside. During the heat storage process, the heat pump can continuously output heating capacity, and heat storage and heating are carried out simultaneously, without causing interruption of heating or reduction of heating capacity on the user side. At the same time, it can control the total heat exchange of the phase change thermal storage device, avoid overheating of the phase change material and drastic fluctuations in refrigerant conditions, maintain the compressor operating within a reasonable pressure and temperature range, and improve the reliability of system operation.

[0020] The fourth technical problem mentioned above is solved by the following technical solution: A computer-readable storage medium storing a computer program that, when run on a processor, executes the above-described heat pump system control method.

[0021] Compared with the prior art, the computer-readable storage medium of the present invention has the following advantages: The phase change thermal storage device is installed on the first exhaust pipe between the compressor and the condenser, and the first exhaust pipe and the second exhaust pipe are connected in parallel. During off-peak electricity hours, when the temperature of the phase change material is below a first temperature threshold, both pipes are controlled to be simultaneously turned on, allowing some refrigerant to flow through the phase change thermal storage device for heat storage. On the one hand, the phase change thermal storage device of this application directly exchanges heat with the refrigerant, resulting in a large heat exchange temperature difference and higher heat exchange efficiency. Simultaneously, the phase change thermal storage device can recover some high-grade superheated sensible heat, preserving the high-temperature sensible heat that would otherwise be discharged to the environment from the condenser at a large temperature difference. This reduces the refrigerant temperature at the condenser inlet, decreases the heat transfer temperature difference in the condenser, and reduces the newly generated irreversible entropy production inside the condenser, thereby improving the heat pump efficiency. On the other hand, this application achieves refrigerant diversion through parallel pipelines, with only a portion of the refrigerant flowing through the phase change thermal storage device to release and store heat, while the remaining refrigerant directly enters the condenser to supply heat to the outside. During the heat storage process, the heat pump can continuously output heating capacity, and heat storage and heating are carried out simultaneously, without causing interruption of heating or reduction of heating capacity on the user side. At the same time, it can control the total heat exchange of the phase change thermal storage device, avoid overheating of the phase change material and drastic fluctuations in refrigerant conditions, maintain the compressor operating within a reasonable pressure and temperature range, and improve the reliability of system operation. Attached Figure Description

[0022] To more clearly illustrate the technical solutions of this application, the accompanying drawings used in the embodiments will be briefly described below. It should be understood that the following drawings only show some embodiments of this application and therefore should not be considered as a limitation on the scope of protection of this application. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0023] Figure 1 A flowchart illustrating the first embodiment of the heat pump system control method provided in this application; Figure 2 A schematic diagram of a heat pump system structure is provided in this application; Figure 3 A flowchart illustrating a second embodiment of the heat pump system control method provided in this application; Figure 4 A flowchart illustrating the third embodiment of the heat pump system control method provided in this application; Figure 5 A flowchart illustrating the fourth embodiment of the heat pump system control method provided in this application; Figure 6 Another schematic diagram of a heat pump system structure provided in this application; Figure 7 A flowchart illustrating the fifth embodiment of the heat pump system control method provided in this application; Figure 8A flowchart illustrating the sixth embodiment of the heat pump system control method provided in this application; Figure 9 Another schematic diagram of a heat pump system structure provided in this application; Figure 10 This application provides a schematic diagram of a heat pump system structure in a specific implementation; Figure 11 This is a schematic diagram of the structure of the heat pump system control device provided in this application.

[0024] Explanation of icon numbers: 101-Phase change thermal storage device; 102-Compressor; 103-Evaporator; 104-Condenser; 105-Gas-liquid separator; 106-Water circuit three-way valve; 107-Throttle valve; 108-Solenoid valve; 109-Check valve; 110-First exhaust pipe; 111-Second exhaust pipe; 112-Water outlet pipe; 113-Water flow heat exchange channel; 114-Water outlet section. Detailed Implementation

[0025] The technical solutions in the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments.

[0026] The components of the embodiments of this application described and illustrated in the accompanying drawings can be arranged and designed in a variety of different configurations. Therefore, the following detailed description of the embodiments of this application provided in the drawings is not intended to limit the scope of the claimed application, but merely to illustrate selected embodiments of the application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.

[0027] In the following, the terms “comprising,” “having,” and their cognates, which may be used in various embodiments of this application, are intended only to indicate a particular feature, number, step, operation, element, component, or combination thereof, and should not be construed as excluding, firstly, the presence of one or more other features, numbers, steps, operations, elements, components, or combinations thereof, or adding the possibility of one or more features, numbers, steps, operations, elements, components, or combinations thereof.

[0028] Furthermore, the terms "first," "second," and "third" are used only to distinguish descriptions and should not be interpreted as indicating or implying relative importance.

[0029] Unless otherwise specified, all terms used herein (including technical and scientific terms) shall have the same meaning as commonly understood by one of ordinary skill in the art to which the various embodiments of this application pertain. Terms (such as those defined in commonly used dictionaries) shall be interpreted as having the same meaning as in their contextual meaning in the relevant technical field and shall not be construed as having an idealized or overly formal meaning, unless clearly defined in the various embodiments of this application.

[0030] It is understood that the method of this application is applied to the heat pump system control system. For ease of explanation, the following embodiments are described in detail with the heat pump system control system as the execution subject.

[0031] The following detailed description of some embodiments of this application is provided in conjunction with the accompanying drawings. Unless otherwise specified, the following embodiments and features can be combined with each other.

[0032] Please refer to Figure 1 , Figure 1 This is a flowchart illustrating a first embodiment of the heat pump system control method provided in this application. The heat pump system includes a compressor, a condenser, a phase change heat storage device, a first exhaust pipe, and a second exhaust pipe. The first exhaust pipe and the second exhaust pipe are connected in parallel between the compressor and the condenser. The heat pump system control method includes: Step S101: Obtain the power supply period and the phase change material temperature of the phase change thermal storage device.

[0033] Step S102: If the power supply period is during off-peak hours and the phase change material temperature is less than the first temperature threshold, then control both the first exhaust pipe and the second exhaust pipe to be open so that some refrigerant flows through the phase change heat storage device for heat storage.

[0034] In this embodiment, as Figure 2 As shown, Figure 2 This application provides a schematic diagram of a heat pump system structure. A compressor 102 and a condenser 104 are respectively installed at both ends of a first exhaust pipe 110. A phase change thermal storage device 101 is installed on the first exhaust pipe 110. A second exhaust pipe 111 is installed between the compressor 102 and the condenser 104. It should be noted that the phase change thermal storage device 101 (PCM thermal storage device) is filled with a phase change material for storing and releasing heat. The phase change material can be selected from PCM materials with different phase change temperatures according to the application temperature requirements, such as paraffin-based, hydrate-based, or fatty acid-based phase change materials. Preferably, the phase change material temperature of the phase change thermal storage device 101 is higher than the condensation saturation temperature of the condenser 104. Devices for controlling the connection or disconnection of the pipelines are also provided on the first exhaust pipe 110 and the second exhaust pipe 111. These can be various switching devices, which are not shown in the figure.

[0035] In this embodiment, during the operation of the heat pump system, the heat pump system control system acquires the power supply period and the phase change material temperature of the phase change heat storage device 101. If it is determined that the power supply period is a low-voltage period and the phase change material temperature is less than the first temperature threshold, then it determines to enter the heat storage mode. At this time, the heat pump system control system controls both the first exhaust pipe 110 and the second exhaust pipe 111 to be open, so that part of the refrigerant output from the compressor 102 flows through the phase change heat storage device 101, so that this part of the refrigerant exchanges heat with the phase change material in the phase change heat storage device 101, thereby realizing heat storage in the phase change heat storage device 101.

[0036] In one embodiment, the phase change material filled in the phase change heat storage device 101 is preferably paraffin RT60, with a phase change temperature (melting point) of approximately 60°C. The first temperature threshold is the designed maximum heat absorption value of the phase change material; exceeding this value significantly reduces heat exchange efficiency. The phase change material is paraffin RT60, with a designed maximum heat absorption value of 63°C. This phase change temperature matches the designed water supply temperature of the heat pump system. When the exhaust temperature of the compressor 102 is higher than 60°C, the phase change material is in the phase change plateau region where it transitions from a solid to a liquid state, efficiently absorbing exhaust superheat to achieve heat storage. In heat storage mode, when the heat pump system control system determines that the power supply period is during off-peak hours and the phase change material temperature is less than 63°C, a portion of the refrigerant (high-temperature, high-pressure superheated gas) discharged from the compressor 102 enters the phase change heat storage device 101, transferring a portion of the superheated energy to the paraffin RT60 for rapid heat storage. This causes the paraffin RT60 to gradually melt from a solid state near the phase change temperature of approximately 60°C, thereby enabling the phase change heat storage device 101 to perform heat storage. The other part of the refrigerant goes directly into the condenser 104.

[0037] In this embodiment, the phase change heat storage device 101 is installed on the first exhaust pipe 110 between the compressor 102 and the condenser 104. The first exhaust pipe 110 and the second exhaust pipe 111 are connected in parallel. During off-peak hours, when the temperature of the phase change material is below the first temperature threshold, both pipes are controlled to be simultaneously turned on, allowing some refrigerant to flow through the phase change heat storage device 101 for heat storage. On the one hand, the phase change heat storage device 101 of this application directly exchanges heat with the refrigerant, resulting in a large heat exchange temperature difference and higher heat exchange efficiency. At the same time, the phase change heat storage device 101 can recover some high-grade superheated sensible heat, storing the high-temperature sensible heat that would otherwise be discharged to the environment by the large temperature difference in the condenser 104. This reduces the refrigerant temperature at the inlet of the condenser 104, decreases the heat transfer temperature difference in the condenser 104, and reduces the newly generated irreversible entropy production inside the condenser 104, thereby improving the heat pump efficiency. On the other hand, this application achieves refrigerant diversion through parallel pipelines, with only a portion of the refrigerant flowing through the phase change heat storage device 101 to release and store heat, while the remaining refrigerant directly enters the condenser 104 to supply heat to the outside. During the heat storage process, the heat pump can continuously output heating capacity to the outside, and heat storage and heating are carried out simultaneously, without causing interruption of heating or reduction of heating capacity on the user side. At the same time, it can control the total heat exchange of the phase change heat storage device 101, avoid overheating of the phase change material and drastic fluctuations in refrigerant conditions, maintain the compressor 102 operating within a reasonable pressure and temperature range, and improve the operational reliability of the heat pump system.

[0038] Please refer to Figure 3 , Figure 3 This is a flowchart illustrating a second embodiment of the heat pump system control method provided in this application. The difference between the second embodiment and the first embodiment is that the method further includes: Step S201: When the phase change thermal storage device is detected to have completed thermal storage, the first exhaust pipe is disconnected and the second exhaust pipe is opened.

[0039] In this embodiment, when the heat pump system control system detects that the phase change heat storage device 101 has completed heat storage, it controls the first exhaust pipe 110 to disconnect and controls the second exhaust pipe 111 to open. In this way, the refrigerant discharged by the compressor 102 cannot enter the phase change heat storage device 101 through the first exhaust pipe 110, but can only enter the condenser 104 directly through the second exhaust pipe 111 for condensation and heat exchange, so as to restore the normal working state of the heat pump system.

[0040] In this embodiment, the heat pump system control system disconnects the first exhaust pipe 110 and connects the second exhaust pipe 111 when the phase change heat storage device 101 completes heat storage. This avoids the refrigerant discharged by the compressor 102 from still entering the phase change heat storage device 101 after it has completed heat storage, which would cause the phase change material to easily absorb excessive heat and overheat (thereafter the phase change heat storage device 101 is in a state of visible heat exchange, with low heat exchange efficiency, which would affect the heat pump energy efficiency). This helps to improve the energy efficiency of the heat pump system and makes it easier to maintain the pressure of the heat pump system within a reasonable pressure and temperature range, thereby improving the reliability of system operation.

[0041] Please refer to Figure 4 , Figure 4 This is a flowchart illustrating a third embodiment of the heat pump system control method provided in this application. The difference between the third embodiment and the first to second embodiments is that the method further includes: Step S301: During the heat storage process of the phase change thermal storage device, the current outlet water temperature is obtained and compared with the target outlet water temperature.

[0042] Step S302: If the current outlet water temperature is lower than the target outlet water temperature, increase the operating frequency of the compressor.

[0043] In this embodiment, during the heat storage process of the phase change thermal storage device 101 controlled by the heat pump system, the current outlet water temperature is acquired and compared with the target outlet water temperature. If the current outlet water temperature is lower than the target outlet water temperature, the operating frequency of the compressor 102 is increased. Specifically, the heat pump system control system increases the operating frequency of the compressor 102 to the target frequency, which is determined by querying a preset temperature difference-frequency mapping table based on the difference between the current outlet water temperature and the target outlet water temperature.

[0044] In one embodiment, the heat pump system is used to heat the indoor environment. The current outlet water temperature is the actual indoor temperature, and the target outlet water temperature is the target indoor temperature set by the user. If the heat pump system control system determines that the actual indoor temperature is less than the target indoor temperature and the temperature difference between the actual indoor temperature and the target indoor temperature is 1 degree, it queries the preset temperature difference and frequency mapping table to determine that the compressor 102 frequency is increased by 10%. Then, based on the current operating frequency of the compressor 102 and the target increase ratio of 10%, the target frequency can be determined, and the operating frequency of the compressor 102 is increased to the target frequency.

[0045] In this embodiment, the heat pump system controls the phase change thermal storage device 101 to acquire the current outlet water temperature during the thermal storage process and compares the current outlet water temperature with the target outlet water temperature. If the current outlet water temperature is lower than the target outlet water temperature, the operating frequency of the compressor 102 is increased to the target frequency to ensure that the thermal storage process of the phase change thermal storage device 101 does not affect the normal operation of the heat pump system, and to ensure that the heat pump system can maintain its heating effect during the thermal storage process, thus ensuring the user's experience.

[0046] Please refer to Figure 5 , Figure 5 This is a flowchart illustrating the fourth embodiment of the heat pump system control method provided in this application. The difference between the fourth embodiment and the first to third embodiments is that the outlet of the condenser is connected to an outlet pipe, which includes an outlet pipe section arranged in parallel with the water flow heat exchange channel 113 of the phase change heat storage device. The method further includes: Step S401: If it is determined that the power supply period is the peak power period and the phase change material temperature is greater than the current outlet water temperature, then obtain the target outlet water temperature and return water temperature rise rate of the heat pump system.

[0047] Step S402: If the temperature difference between the current outlet water temperature and the target outlet water temperature is less than the preset temperature difference threshold or the return water temperature rise rate is less than the preset rate, then the outlet water pipe section is disconnected and the water flow heat exchange channel of the phase change heat storage device is opened, so that the water to be heated first enters the condenser for heating, then flows through the phase change heat storage device for secondary heating and then flows out from the outlet water pipe.

[0048] In this embodiment, as Figure 6 As shown, Figure 6 This is a schematic diagram of another heat pump system structure provided in this application; the outlet of the condenser 104 is connected to an outlet pipe 112, and the outlet pipe 112 includes an outlet pipe section 114 arranged in parallel with the water flow heat exchange channel 113 of the phase change heat storage device 101; it can be understood that the outlet pipe 112 and the water flow heat exchange channel 113 are provided with devices for controlling the opening and closing of the circuit, which are not limited here. It can be controlled that the water to be heated output from the condenser 104 flows directly out of the outlet through the outlet pipe 112, or it can be controlled that the water to be heated output from the condenser 104 first flows through the outlet pipe 112, then flows through the phase change heat storage device 101 for secondary heating, and then flows through the water flow heat exchange channel 113 and flows out of the outlet of the outlet pipe 112.

[0049] In this embodiment, during the operation of the heat pump system, the heat pump system control system acquires the power supply period and the phase change material temperature of the phase change heat storage device 101. If it is determined that the power supply period is a peak power period and the phase change material temperature is greater than the current outlet water temperature, the target outlet water temperature and return water temperature rise rate of the heat pump system are further acquired. If the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold or the return water temperature rise rate is less than a preset rate, the phase change heat storage device 101 is determined to enter the heat release mode. At this time, the heat pump system control system controls the outlet water pipe 112 to disconnect and controls the water flow heat exchange channel 113 of the phase change heat storage device 101 to open, so that the water to be heated first enters the condenser 104 for heating, and then flows through the phase change heat storage device 101 for secondary heating before flowing out from the outlet water pipe 112. It should be noted that the current outlet water temperature is the outlet water temperature of the condenser 104, the target outlet water temperature is the desired outlet water temperature of the condenser 104 set by the user, and the return water temperature rise rate refers to the rate at which the water temperature in the water circuit of the heat pump system rises.

[0050] It should be noted that during the heat release process of the phase change heat storage device 101, the heat pump system control system controls the first exhaust pipe 110 to disconnect and controls the second exhaust pipe 111 to open, so that the refrigerant discharged by the compressor 102 directly enters the condenser 104 for condensation and heat exchange.

[0051] In one embodiment, when the phase change thermal storage device is detected to have completed heat release, the method further includes: Step S403: Control the water outlet pipe section to be open and control the water flow heat exchange channel of the phase change heat storage device to be closed, so that the water to be heated can be condensed and exchanged in the condenser and flow out directly from the water outlet pipe.

[0052] In this embodiment, when the heat pump system control system detects that the phase change thermal storage device 101 has completed heat release, it controls the outlet pipe section 114 to be open and controls the water flow heat exchange channel 113 of the phase change thermal storage device 101 to be closed, so that the water to be heated can undergo condensation heat exchange in the condenser 104 and flow directly out from the outlet pipe 112. It should be noted that if it is determined that the power supply period is not a peak power period, the phase change material temperature is not greater than the current outlet water temperature, the temperature difference between the current outlet water temperature and the target outlet water temperature is not less than a preset temperature difference threshold, or the return water temperature rise rate is not less than a preset rate, then it is determined that the phase change thermal storage device 101 has completed heat release.

[0053] In this embodiment, the heat pump system control system, if it is determined that the power supply period is a peak power period and the phase change material temperature is greater than the current outlet water temperature, acquires the target outlet water temperature and return water temperature rise rate of the heat pump system. If either the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold or the return water temperature rise rate is less than a preset rate, then the outlet water pipe section 114 is disconnected and the water flow heat exchange channel 113 of the phase change heat storage device 101 is opened, so that the water to be heated first enters the condenser 104 for heating, then flows through the phase change heat storage device 101 for secondary heating, and then flows out from the outlet water pipe 112. This reduces the heating capacity required by the compressor 102 during peak power periods, that is, reduces the power load of the compressor 102 during peak power periods. Part of the heating task is transferred to the phase change heat storage device 101, realizing the transfer of power load and reducing the power consumption of the heat pump system during peak power periods, thus reducing the operating cost of the heat pump system.

[0054] Please refer to Figure 7 , Figure 7 This is a flowchart illustrating the fifth embodiment of the heat pump system control method provided in this application. The difference between the fifth embodiment and the first to fourth embodiments is that the method further includes: Step S501: If the power supply period is a normal power supply period, then obtain the current outlet water temperature of the heat pump system.

[0055] In step S502, if the temperature difference between the current outlet water temperature and the target outlet water temperature is less than the preset temperature difference threshold and the phase change material temperature is less than the second temperature threshold, then a portion of the refrigerant is controlled to store heat in the phase change heat storage device, and the other portion of the refrigerant directly enters the condenser for condensation and heat exchange.

[0056] In this embodiment, the heat pump system control system acquires the power supply period during the operation of the heat pump system. If the power supply period is determined to be a period of normal power supply, the current outlet water temperature of the heat pump system is acquired. If the temperature difference between the current outlet water temperature and the target outlet water temperature is determined to be less than a preset temperature difference threshold and the phase change material temperature is less than a second temperature threshold, the system determines to enter the normal operation mode. At this time, the heat pump system control system controls a portion of the refrigerant to store heat in the phase change heat storage device 101, while the other portion of the refrigerant directly enters the condenser 104 for condensation and heat exchange. It should be noted that the second temperature threshold is less than the first temperature threshold. In one embodiment, the phase change material filled in the phase change heat storage device 101 is preferably paraffin RT60. The first temperature threshold is the designed maximum heat absorption value of the phase change material temperature, which is 63°C. The second temperature threshold is less than the first temperature threshold, which is 58°C.

[0057] It should be noted that during the normal operation of the phase change thermal storage device 101, the heat pump system control system controls the outlet water pipe 112 to be opened and controls the water flow heat exchange channel 113 of the phase change thermal storage device 101 to be closed, so that the water to be heated can be condensed and exchanged in the condenser 104 and flow directly out from the outlet water pipe 112, thus preventing the heat stored in the phase change thermal storage device 101 from being used during normal operation.

[0058] In this embodiment, the heat pump system control system, if it determines that the power supply period is a normal power supply period, acquires the current outlet water temperature of the heat pump system. If the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold and the phase change material temperature is less than a second temperature threshold, then a portion of the refrigerant is controlled to store heat in the phase change heat storage device 101, while the other portion of the refrigerant directly enters the condenser 104 for condensation and heat exchange. This achieves simultaneous heat storage in the phase change heat storage device 101 and condensation and heat exchange in the condenser 104, ensuring both heat storage in the phase change heat storage device 101 and normal operation of the heat pump system, thus improving the user experience of the heat pump system.

[0059] Please refer to Figure 8 , Figure 8 This is a flowchart illustrating the sixth embodiment of the heat pump system control method provided in this application. The difference between the sixth embodiment and the first to fifth embodiments is that a solenoid valve is provided on the first exhaust pipe, and the method further includes: Step S601: If the power supply period is during off-peak hours and the phase change material temperature is less than the first temperature threshold, then the solenoid valve is opened at the first target opening degree.

[0060] Step S602: If the power supply period is a normal power supply period, the temperature difference between the current outlet water temperature and the target outlet water temperature is less than the preset temperature difference threshold, and the phase change material temperature is less than the second temperature threshold, then the solenoid valve is opened at the second target opening degree.

[0061] In this embodiment, as Figure 9 As shown, Figure 9This application provides another schematic diagram of a heat pump system structure; wherein, a solenoid valve 108 is installed on the first exhaust pipe 110, and the solenoid valve 108 is located between the compressor 102 and the phase change heat storage device 101. The solenoid valve 108 can control the opening or closing of the first exhaust pipe 110. If the heat pump system control system determines that the power supply period is a low-voltage period and the phase change material temperature is less than a first temperature threshold, then the solenoid valve 108 is opened at a first target opening degree, thereby opening the first exhaust pipe 110. If the heat pump system control system determines that the power supply period is a normal-voltage period, the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold, and the phase change material temperature is less than a second temperature threshold, then the solenoid valve 108 is opened at a second target opening degree, thereby opening the first exhaust pipe 110. The first target opening degree is greater than the second target opening degree.

[0062] In one embodiment, the first target opening is 100%, and the second target opening is 50%.

[0063] In this embodiment of the heat pump system control system, if the power supply period is during off-peak hours and the phase change material temperature is below a first temperature threshold, the solenoid valve 108 is opened at a first target opening degree. If the power supply period is during normal hours, the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold, and the phase change material temperature is less than a second temperature threshold, the solenoid valve 108 is opened at a second target opening degree, where the first target opening degree is greater than the second target opening degree. Different opening degrees are used to open the solenoid valve 108 for different operating conditions. When the phase change heat storage device 101 needs centralized heat storage, the solenoid valve 108 is opened at the first target opening degree to improve the efficiency of refrigerant entering the phase change heat storage device 101, thereby improving the heat storage efficiency of the phase change heat storage device 101. When the heat pump system needs to balance the heat storage of the phase change heat storage device 101 and the normal heating of the water to be heated, the solenoid valve 108 is opened at the first target opening degree to control the amount of refrigerant entering the phase change heat storage device 101, so as to balance the heat storage of the phase change heat storage device 101 and the normal heating of the water to be heated, and ensure the user's experience.

[0064] In one specific embodiment, such as Figure 10 As shown, Figure 10This application provides a schematic diagram of a heat pump system structure in a specific implementation. The main components of the heat pump system include: a phase change heat storage device 101, a compressor 102, an evaporator 103, a condenser 104, a gas-liquid separator 105, a water three-way valve 106, a throttle valve 107, a solenoid valve 108, a one-way valve 109, a first exhaust pipe 110, a second exhaust pipe 111, a water outlet pipe 112, a water flow heat exchange channel 113, and a water outlet section 114; the first exhaust pipe 110 and the second exhaust pipe 111... A phase change heat storage device 101 is installed on the first exhaust pipe 110, and a solenoid valve 108 is installed on the first exhaust pipe 110. The solenoid valve 108 is located between the compressor 102 and the phase change heat storage device 101. The outlet of the condenser 104 is connected to an outlet pipe 112. The outlet pipe 112 includes an outlet pipe section 114 that is connected in parallel with the water flow heat exchange channel 113 of the phase change heat storage device 101. A three-way valve is also installed on the outlet pipe 112.

[0065] The compressor 102 compresses the refrigerant, generating high-temperature, high-pressure superheated gas to provide power for the system. The condenser 104, connected to the compressor 102's exhaust port, condenses the high-temperature, high-pressure gaseous refrigerant into a liquid state and releases heat to the water side. The evaporator 103, connected to the condenser 104 via a throttling device, absorbs heat from the ambient air, causing the liquid refrigerant to evaporate into a gaseous state. The gas-liquid separator 105, installed before the compressor 102's suction port, prevents liquid refrigerant from entering the compressor 102, protecting it. The phase change heat storage device 101 (PCM heat storage device) is located on the first exhaust pipe 110 between the compressor 102's exhaust port and the condenser 104. It is filled with phase change material to store and release heat. The phase change material can be selected from PCM materials with different phase change temperatures, such as paraffin-based, hydrate-based, or fatty acid-based phase change materials, depending on the application temperature requirements. A solenoid valve 108 is installed between the compressor 102 exhaust port and the phase change heat storage device 101 to control whether the high-temperature, high-pressure superheated gas is diverted into the phase change heat storage device 101 for heat storage. A one-way valve 109 is installed between the phase change heat storage device 101 and the condenser 104 on the second exhaust pipe 111 to prevent refrigerant from flowing backwards. A water circuit three-way valve 106 is installed on the water outlet pipe 112 to control the opening and closing of the water flow heat exchange channel 113 and the water outlet pipe section 114. A throttling valve 107 is installed on the throttling pipe between the condenser 104 and the evaporator 103 to control the throttling and pressure reduction of the refrigerant. Therefore, the heat pump system of this application has a compact structure and low modification cost. It only requires adding the phase change heat storage device 101, the exhaust branch solenoid valve 108, and the water circuit three-way valve 106 to the existing heat pump system, without changing the core structure of the heat pump host, facilitating the upgrading and application of existing products.

[0066] If the heat pump system control system determines that the power supply period is during off-peak hours and the phase change material temperature is below the first temperature threshold, it determines to enter the heat storage mode. At this time, the heat pump system control system controls both the first exhaust pipe 110 and the second exhaust pipe 111 to be open, so that part of the refrigerant output from the compressor 102 flows through the phase change heat storage device 101, allowing this part of the refrigerant to exchange heat with the phase change material in the phase change heat storage device 101, thereby achieving heat storage in the phase change heat storage device 101. At the same time, the heat pump system control system controls the outlet water pipe section 114 to be open and controls the water flow heat exchange channel 113 of the phase change heat storage device 101 to be closed, so that the water to be heated undergoes condensation heat exchange in the condenser 104 and flows directly out from the outlet water pipe 112.

[0067] If the heat pump system control system determines that the power supply period is during peak power hours and the phase change material temperature is higher than the current outlet water temperature, it further obtains the target outlet water temperature and return water temperature rise rate of the heat pump system. If either the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold or the return water temperature rise rate is less than a preset rate, it determines to enter the heat release mode. At this time, the heat pump system control system controls the outlet water pipe 112 to disconnect and controls the water flow heat exchange channel 113 of the phase change heat storage device 101 to open, so that the water to be heated first enters the condenser 104 for heating, and then flows through the phase change heat storage device 101 for secondary heating before flowing out from the outlet water pipe 112. At the same time, the heat pump system control system controls the first exhaust pipe 110 to disconnect and controls the second exhaust pipe 111 to open, so that the refrigerant discharged by the compressor 102 directly enters the condenser 104 for condensation heat exchange.

[0068] If the heat pump system control system determines that the power supply period is a normal power supply period, it acquires the current outlet water temperature of the heat pump system. If it determines that the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold and the phase change material temperature is less than a second temperature threshold, it determines to enter the normal operation mode. At this time, the heat pump system control system controls a portion of the refrigerant to store heat in the phase change heat storage device 101, while the other portion of the refrigerant directly enters the condenser 104 for condensation and heat exchange. Simultaneously, the heat pump system control system controls the outlet water pipe 112 to be open and controls the water flow heat exchange channel 113 of the phase change heat storage device 101 to be closed, so that the water to be heated undergoes condensation and heat exchange in the condenser 104 and flows directly out from the outlet water pipe 112.

[0069] A phase change heat storage device 101 is installed on the first exhaust pipe 110 between the compressor 102 and the condenser 104. The first exhaust pipe 110 and the second exhaust pipe 111 are connected in parallel. During off-peak hours, when the temperature of the phase change material is below the first temperature threshold, both pipes are controlled to be simultaneously turned on, allowing some refrigerant to flow through the phase change heat storage device 101 for heat storage. On the one hand, the phase change heat storage device 101 of this application directly exchanges heat with the refrigerant, resulting in a large heat exchange temperature difference and higher heat exchange efficiency. At the same time, the phase change heat storage device 101 can recover some high-grade superheated sensible heat, storing the high-temperature sensible heat that would otherwise be discharged to the environment by the large temperature difference in the condenser 104. This reduces the refrigerant temperature at the inlet of the condenser 104, decreases the heat transfer temperature difference in the condenser 104, and reduces the newly generated irreversible entropy production inside the condenser 104, thereby improving the energy efficiency of the heat pump. On the other hand, this application achieves refrigerant diversion through parallel pipelines, with only a portion of the refrigerant flowing through the phase change heat storage device 101 to release and store heat, while the remaining refrigerant directly enters the condenser 104 to supply heat to the outside. During the heat storage process, the heat pump can continuously output heating capacity to the outside, and heat storage and heating are carried out simultaneously, without causing interruption of heating or reduction of heating capacity on the user side. At the same time, it can control the total heat exchange of the phase change heat storage device 101, avoid overheating of the phase change material and drastic fluctuations in refrigerant conditions, maintain the compressor 102 operating within a reasonable pressure and temperature range, and improve the reliability of system operation.

[0070] refer to Figure 11 , Figure 11 This is a schematic diagram of the structure of the heat pump system control device provided in this application. The heat pump system control device includes: The acquisition module 10 is used to acquire the power supply period and the temperature of the phase change material in the phase change thermal storage device.

[0071] The control module 20 is used to control both the first exhaust pipe and the second exhaust pipe to be turned on if the power supply period is during off-peak hours and the temperature of the phase change material is less than the first temperature threshold, so that some of the refrigerant flows through the phase change heat storage device for heat storage.

[0072] It is understood that the heat pump system control device in this embodiment corresponds to the heat pump system control method in the above embodiment. The options in the above embodiment are also applicable to this embodiment, so they will not be described again here.

[0073] This application also provides a heat pump system, exemplary of which includes a compressor, a condenser, a phase change heat storage device, a first exhaust pipe, a second exhaust pipe, a processor, and a memory, wherein the memory stores a computer program, and the processor executes the computer program to enable the heat pump system to perform the above-described heat pump system control method.

[0074] The processor can be an integrated circuit chip with signal processing capabilities. The processor can be a general-purpose processor, including at least one of a Central Processing Unit (CPU), Graphics Processing Unit (GPU), Network Processor (NP), Digital Signal Processor (DSP), Application-Specific Integrated Circuit (ASIC), Field-Programmable Gate Array (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, or discrete hardware components. The general-purpose processor can be a microprocessor or any conventional processor, capable of implementing or executing the methods, steps, and logic block diagrams disclosed in the embodiments of this application.

[0075] The memory can be, but is not limited to, Random Access Memory (RAM), Read Only Memory (ROM), Programmable Read-Only Memory (PROM), Erasable Programmable Read-Only Memory (EPROM), Electrically Erasable Programmable Read-Only Memory (EEPROM), etc. The memory is used to store computer programs, and the processor can execute the computer programs accordingly after receiving execution instructions.

[0076] This application also provides a computer storage medium for storing the computer program used in the aforementioned heat pump system. The computer storage medium can be a readable storage medium, a non-volatile storage medium, or a volatile storage medium. For example, the computer storage medium may include, but is not limited to, various media capable of storing program code, such as a USB flash drive, a portable hard drive, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk.

[0077] In the several embodiments provided in this application, it should be understood that the disclosed apparatus and methods can also be implemented in other ways. The apparatus embodiments described above are merely illustrative. For example, the flowcharts and block diagrams in the accompanying drawings show the architecture, functionality, and operation of possible implementations of apparatus, methods, and computer program products according to various embodiments of this application. In this regard, each block in a flowchart or block diagram may represent a module, segment, or portion of code containing one or more executable instructions for implementing a specified logical function. It should also be noted that, in alternative implementations, the functions marked in the blocks may occur in a different order than those marked in the drawings. For example, two consecutive blocks may actually be executed substantially in parallel, and they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in the block diagram and / or flowchart, and combinations of blocks in the block diagram and / or flowchart, can be implemented using a dedicated hardware-based system that performs the specified function or action, or using a combination of dedicated hardware and computer instructions.

[0078] In addition, the functional modules or units in the various embodiments of this application can be integrated together to form an independent part, or each module can exist independently, or two or more modules can be integrated to form an independent part.

[0079] If the aforementioned functions are implemented as software functional modules and sold or used as independent products, they can be stored in a readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or a part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a heat pump system to execute all or part of the steps of the methods described in the various embodiments of this application.

[0080] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application.

Claims

1. A control method for a heat pump system, characterized in that, The method is applied to a heat pump system, which includes a compressor, a condenser, a phase change heat storage device, a first exhaust pipe, and a second exhaust pipe. The first exhaust pipe and the second exhaust pipe are connected in parallel between the compressor and the condenser. The phase change heat storage device is installed on the first exhaust pipe. The method includes: Obtain the power supply period and the temperature of the phase change material in the phase change thermal storage device; If the power supply period is during off-peak hours and the temperature of the phase change material is less than the first temperature threshold, then both the first exhaust pipe and the second exhaust pipe are controlled to be open so that some refrigerant flows through the phase change heat storage device for heat storage. The method further includes: If the power supply period is a normal power supply period, then obtain the current outlet water temperature of the heat pump system; If the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold and the temperature of the phase change material is less than a second temperature threshold, then a portion of the refrigerant is controlled to store heat in the phase change heat storage device, and another portion of the refrigerant directly enters the condenser for condensation and heat exchange, so that the water to be heated undergoes condensation and heat exchange in the condenser and flows directly out from the outlet pipe.

2. The heat pump system control method according to claim 1, characterized in that, The method further includes: When the phase change thermal storage device is detected to have completed thermal storage, the first exhaust pipe is disconnected and the second exhaust pipe is opened.

3. The heat pump system control method according to claim 1, characterized in that, The method further includes: During the heat storage process of the phase change thermal storage device, the current outlet water temperature is obtained and compared with the target outlet water temperature; If the current outlet water temperature is lower than the target outlet water temperature, then the operating frequency of the compressor is increased.

4. The heat pump system control method according to claim 1, characterized in that, The condenser's outlet is connected to a water outlet pipe, which includes a water outlet pipe section arranged in parallel with the water flow heat exchange channel of the phase change thermal storage device. The method further includes: If it is determined that the power supply period is a peak power period and the temperature of the phase change material is greater than the current outlet water temperature, then the target outlet water temperature and return water temperature rise rate of the heat pump system are obtained. If the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold or the return water temperature rise rate is less than a preset rate, then the outlet water pipe section is disconnected and the water flow heat exchange channel of the phase change heat storage device is opened, so that the water to be heated first enters the condenser for heating, then flows through the phase change heat storage device for secondary heating, and then flows out from the outlet water pipe.

5. The heat pump system control method according to claim 4, characterized in that, When the phase change thermal storage device is detected to have completed heat release, the method further includes: The outlet pipe section is controlled to be open and the water flow heat exchange channel of the phase change heat storage device is controlled to be closed, so that the water to be heated can be condensed and exchanged in the condenser and flow directly out from the outlet pipe.

6. The heat pump system control method according to claim 1, characterized in that, The first exhaust pipe is equipped with a solenoid valve, and the method further includes: If the power supply period is during off-peak hours and the temperature of the phase change material is less than the first temperature threshold, then the solenoid valve is opened at the first target opening degree. If the power supply period is a normal power supply period, the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold, and the phase change material temperature is less than a second temperature threshold, then the solenoid valve is opened at the second target opening degree. The first target opening is greater than the second target opening.

7. A heat pump system control device, characterized in that, The heat pump system control device is applied to the heat pump system as described in claim 1, and the heat pump system control device comprises: The acquisition module is used to acquire the power supply period and the temperature of the phase change material in the phase change thermal storage device; The control module is used to control both the first exhaust pipe and the second exhaust pipe to be turned on if the power supply period is during off-peak hours and the temperature of the phase change material is less than a first temperature threshold, so that a portion of the refrigerant flows through the phase change heat storage device for heat storage. The control module is further configured to obtain the current outlet water temperature of the heat pump system if the power supply period is a normal power supply period. If the temperature difference between the current outlet water temperature and the target outlet water temperature is less than a preset temperature difference threshold and the temperature of the phase change material is less than a second temperature threshold, then a portion of the refrigerant is controlled to store heat in the phase change heat storage device, and another portion of the refrigerant directly enters the condenser for condensation and heat exchange, so that the water to be heated undergoes condensation and heat exchange in the condenser and flows directly out from the outlet pipe.

8. A heat pump system, characterized in that, The heat pump system includes a compressor, a condenser, a phase change heat storage device, a first exhaust pipe, a second exhaust pipe, a processor, and a memory. The memory stores a computer program, and the processor executes the computer program to implement the heat pump system control method according to any one of claims 1-6.

9. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores a computer program that, when run on a processor, executes the heat pump system control method according to any one of claims 1-6.

Citation Information

Patent Citations

  • Heat-pump water heater system

    CN110793199A

  • Air source heat pump

    CN122566400A