A prefabricated assembled simply supported beam bridge deck continuous structure and its construction method

By combining multi-fold trapezoidal steel plates with polyurethane concrete, the problems of easy cracking, easy damage to expansion joints, and complex construction of continuous structures of simply supported beam bridge decks are solved, achieving the prefabricated assembly construction effect with high vertical stiffness, good adaptability to expansion and contraction deformation, and reliable connection.

CN123064086APending Publication Date: 2026-11-10HARBIN INST OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611375660.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-07
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing bridge deck continuous structures are prone to cracking, expansion joints are easily damaged, construction is complex, and load-bearing performance is poor. In particular, it is difficult to achieve prefabricated assembly construction with high vertical stiffness, good adaptability to expansion and contraction deformation, and reliable connection in simply supported beam bridges.

Method used

The bridge adopts a composite structure of multi-fold trapezoidal steel plates and polyurethane concrete. The steel plates are bent into a corrugated shape in the longitudinal direction of the bridge, and polyurethane concrete is filled in the bent sections. The straight sections at both ends are directly connected to the bridge deck pavement. The bridge is prefabricated in the factory and then quickly assembled on site.

Benefits of technology

It achieves high vertical stiffness, low expansion and contraction resistance, clear force transmission path, reliable connection, fast construction and controllable quality, good structural durability, convenient maintenance, and reduces construction interference with traffic and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064086A_ABST
    Figure CN123064086A_ABST
Patent Text Reader

Abstract

This invention discloses a prefabricated assembled simple-supported beam bridge deck continuous structure and its construction method. The prefabricated components of this structure are composed of multiple multi-folded trapezoidal steel plates arranged at 100mm intervals, with adjacent trapezoidal steel plates facing each other at their top edges. The trapezoidal steel plates are 1000mm long, 10cm wide, and 4mm thick, with 300mm straight sections at each end and a 400mm bend in the middle forming trapezoidal corrugations with a wave height of 10mm and a wave pitch of 80mm. Polyurethane concrete is used to fill only the gaps in the bend in the middle section of the steel plates, leaving the straight sections at both ends empty. The components are prefabricated in 1000mm sections at the prefabrication yard, with adjacent sections joined using polyurethane adhesive. The straight sections are welded to or anchored with pre-reserved reinforcing bars in the pavement layer, followed by the pouring of anchoring concrete. The overall top surface is flush with the concrete pavement layer, and an asphalt layer is laid on top. The structure of this invention possesses both high vertical stiffness and minimal expansion and contraction resistance, enabling factory prefabrication and rapid on-site assembly, with reliable connections and good durability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of bridge engineering technology, and in particular to a prefabricated assembled simply supported beam bridge deck continuous structure and its construction method. Background Technology

[0002] Simply supported beam bridges are widely used in small and medium span highway and municipal bridges in my country due to their low cost, simple design, clear stress distribution, and convenient construction.

[0003] A continuous simply supported beam bridge retains the mechanical properties of a simply supported beam bridge while providing a continuous driving lane for vehicles, thus improving driving comfort.

[0004] However, existing continuous bridge deck structures have the following prominent problems:

[0005] First: The stress is complex, making it prone to cracking.

[0006] The continuous slab of the bridge deck is located at the point of maximum deformation at the beam end. It bears the rotational deformation and longitudinal tensile and compressive deformation of the beam under various loads. Moreover, the deformation of two adjacent beams is not completely synchronous, and the stress situation is extremely complex.

[0007] The existing structure deforms at the beam ends due to vehicle loads or temperature after a short period of use, causing cracks in the pavement layer of the continuous bridge deck structure.

[0008] Second, expansion joint devices are prone to damage.

[0009] Expansion joints are the weakest link in a bridge structure, directly bearing the impact of repeated vehicle loads. Even minor unevenness can cause significant impacts under vehicle loads, severely affecting their service life.

[0010] Third, the existing improvement schemes are complex to construct and have poor load-bearing performance.

[0011] Currently, some solutions have emerged that combine V-shaped steel plates, corrugated steel plates, and elastic materials. However, these solutions either require extensive on-site welding and casting operations, making it difficult to guarantee construction quality, or they are difficult to balance vertical stiffness and deformation capacity.

[0012] In addition, existing solutions often use complex irregular-shaped steel bars, such as Z-shaped bars, to connect steel plates to pavement layers. The force transmission path is not direct, and the reliability of the connection is greatly affected by the quality of on-site construction.

[0013] Therefore, in view of the technical problems of existing continuous bridge deck structures of simply supported beam bridges being prone to cracking, easy damage to expansion joints, complex construction and poor stress performance, it is an urgent technical problem to be solved by those skilled in the art to provide a new type of continuous bridge deck structure with high vertical stiffness, low resistance to expansion and contraction deformation, and capable of factory prefabrication, rapid on-site assembly and reliable connection. Summary of the Invention

[0014] In view of this, the present invention provides a prefabricated assembled simply supported beam bridge deck continuous structure and its construction method.

[0015] To solve the above-mentioned technical problems, the present invention adopts the following technical solution:

[0016] A prefabricated assembled simple-supported beam bridge deck continuous structure is provided at the structural joint between two adjacent simple-supported beams, and includes at least one prefabricated component.

[0017] Each prefabricated component is made up of multiple multi-fold trapezoidal steel plates arranged laterally along the bridge, and the total width of each prefabricated component is 1000mm.

[0018] Each of the aforementioned multi-fold trapezoidal steel plates is divided into three sections along the longitudinal direction of the bridge:

[0019] The section is straight for 300mm at each end, without any bends;

[0020] The middle 400mm section is a bending section, where the steel plate is bent back and forth to form a multi-fold trapezoidal corrugated shape;

[0021] The polyurethane concrete filling layer is used only to fill the gaps between the bent sections of the adjacent multi-fold trapezoidal steel plates;

[0022] The polyurethane concrete has a compressive strength of 60 MPa and an elastic modulus of 1600 MPa.

[0023] The gaps between adjacent steel plates in the straight sections at both ends are not filled with polyurethane concrete;

[0024] The prefabricated components in two adjacent sections are bonded together with polyurethane adhesive.

[0025] The upper edges of the straight sections at both ends of the multi-fold trapezoidal steel plate are flush with the concrete pavement layer of the bridge deck.

[0026] The straight section is directly welded to the reserved steel bars in the concrete pavement layer of the bridge deck, or anchored by planting or anchoring steel bars; after welding or anchoring is completed, anchoring concrete is poured in the area of ​​the straight section.

[0027] The overall top surface height of the precast component is consistent with the height of the concrete pavement layer of the simply supported beam bridge deck, and then an asphalt layer is laid on top of it.

[0028] Preferably, each of the multi-fold trapezoidal steel plates is a vertically placed steel plate, made of bridge structural steel, and has an anti-corrosion coating on its surface;

[0029] The steel plate has a total length of 1000mm, a width of 10cm, and a thickness of 4mm.

[0030] Preferably, two adjacent multi-fold trapezoidal steel plates are arranged with their upper edges facing each other; the distance between adjacent multi-fold trapezoidal steel plates is 100mm.

[0031] Preferably, the wave height of the multi-fold trapezoidal corrugations is 10 mm and the wave pitch is 80 mm.

[0032] The crests and troughs are connected by straight lines, and the transitions between the crests and troughs are rounded.

[0033] Preferably, an adhesive layer is provided between the polyurethane concrete filling layer and the inner wall of the bent section of the multi-fold trapezoidal steel plate.

[0034] Preferably, the multi-fold trapezoidal steel plate is made of Q345qD bridge structural steel, and the anti-corrosion coating is epoxy zinc-rich paint or hot-dip galvanized layer.

[0035] Preferably, the anchoring concrete is micro-expansion high-strength concrete.

[0036] A construction method for a precast assembled simply supported beam bridge deck continuous structure includes the following steps:

[0037] Step 1: Process multi-fold trapezoidal steel plates in the prefabrication yard. Each multi-fold trapezoidal steel plate is 1000mm long, 10cm wide, and 4mm thick. The two ends are 300mm straight, and the middle 400mm is bent into multi-fold trapezoidal corrugations with a corrugation height of 10mm and a corrugation pitch of 80mm. The surface of the steel plate is treated with anti-corrosion.

[0038] The multiple multi-fold trapezoidal steel plates are arranged horizontally at 100mm intervals with their upper edges facing each other. The gaps between adjacent steel plates in the middle 400mm bending section are filled with polyurethane concrete with a compressive strength of 60MPa and an elastic modulus of 1600MPa. The gaps between the straight sections at both ends are left empty and unfilled. Each 1000mm width constitutes one unit, thus completing the prefabrication.

[0039] Step 2: Hoist the precast components to the structural joint, and apply polyurethane adhesive between adjacent precast components for bonding and assembly.

[0040] Step 3: Weld the straight sections at both ends of the multi-fold trapezoidal steel plate to the reserved reinforcing bars of the concrete pavement layer of the bridge deck. If there are no reserved reinforcing bars, anchor them by planting or anchoring reinforcing bars.

[0041] Step 4: Pour anchoring concrete in the straight section area to anchor the straight section and the concrete pavement layer of the bridge deck into a whole;

[0042] Step 5: Complete the pavement construction on the premise that the top surface of the precast component is at the same height as the concrete pavement layer of the bridge deck, and finally lay the asphalt layer on top.

[0043] The present invention achieves the following technical effects compared to the prior art:

[0044] 1. High vertical stiffness and minimal resistance to expansion and contraction:

[0045] This invention uses a vertically placed multi-fold trapezoidal corrugated steel plate, which is bent in the middle into a multi-fold trapezoidal corrugated structure with a wave height of 10mm and a wave pitch of 80mm. Vertically, it can form a support stiffness that is much greater than that of traditional structures, and can directly and efficiently bear the vertical load of passing vehicles, avoiding settlement and depression at the expansion joint.

[0046] Meanwhile, the special corrugated shape allows the steel plate to bend and deform freely along the longitudinal direction of the bridge, giving the expansion joint excellent adaptability to expansion and deformation, and adapting to the longitudinal displacement of the bridge caused by temperature changes and load disturbances.

[0047] By filling the steel plate bending section with polyurethane concrete with an elastic modulus of only 1600MPa, the frictional compression resistance inside the structure during expansion and contraction can be further reduced. Ultimately, through the combination of the two structures, the problem that traditional expansion joints cannot simultaneously take into account both load-bearing capacity and deformation adaptability is perfectly solved.

[0048] 2. Clear force transmission path and reliable connection:

[0049] The present invention sets 300mm straight sections at both ends of the corrugated steel plate. During construction, the straight sections can be directly welded to the reserved steel bars in the bridge deck pavement layer, or they can be directly anchored to the bridge structure by rebar installation. The load transfer path is direct and clear, and there is no need to make complicated Z-shaped or U-shaped steel bar fitting connections like in traditional structures.

[0050] After completing the welding or anchoring work, the anchoring concrete is poured to form a solid integral connection between the expansion joint and the bridge body. Even under the repeated action of vehicle dynamic loads over a long period of time, there will be no loosening of the connection or displacement of the structure, which fully guarantees the reliability of the connection for long-term use.

[0051] 3. Factory prefabrication ensures controllable quality and allows for rapid on-site assembly:

[0052] The steel plate bending, anti-corrosion treatment, and polyurethane concrete filling processes of this invention can all be completed in the prefabrication yard. Generally, they can be prefabricated in 1000mm increments. The industrialized prefabrication mode can stably control the dimensional accuracy and material properties of the components and avoid quality fluctuations caused by on-site operations.

[0053] On-site construction only requires hoisting and positioning, applying polyurethane adhesive to the joints, welding or anchoring straight sections of steel bars, and finally pouring a small amount of anchoring concrete to complete the work. Compared with the traditional on-site pouring process, it greatly shortens the on-site construction time and can effectively reduce the interference of construction operations on traffic.

[0054] 4. Durable structure and easy maintenance:

[0055] The polyurethane concrete used as the core load-bearing filling material in this invention has excellent compressive and flexural strength, which is suitable for the stress characteristics of repeated deformation of expansion joints. The outer corrugated steel plate has also undergone professional anti-corrosion treatment in advance. The overall structure is not prone to fatigue cracking, corrosion damage and other problems during the long-term repeated expansion and contraction deformation of the bridge. Its service life is significantly longer than that of traditional expansion joint structures. Daily maintenance can be completed by simply cleaning the debris in the joint periodically. The maintenance cost is low and the operation is convenient. Attached Figure Description

[0056] Figure 1 This is a schematic longitudinal cross-sectional view of the simply supported beam bridge deck continuous structure of the present invention.

[0057] In the diagram, 1—multi-fold trapezoidal steel plate; 101—straight section (300mm at each end); 102—bent section (400mm in the middle); 2—polyurethane concrete filling layer (bent section only); 3—reserved reinforcing bars / anchoring bars; 4—anchoring concrete; 5—concrete pavement layer; 6—asphalt layer; 7—simply supported beam; 8—structural joint; 9—polyurethane adhesive (joint joint).

[0058] Figure 2 This is a schematic cross-sectional view of the multi-fold trapezoidal steel plate assembly of the present invention (showing the arrangement of steel plates within a 1000mm width section).

[0059] Figure 3 This is a schematic diagram of the structure of the single-piece multi-fold trapezoidal steel plate of the present invention (showing the straight sections at both ends and the bent section in the middle).

[0060] Figure 4 This is a partially enlarged schematic diagram showing the arrangement of the upper edges of two adjacent multi-fold trapezoidal steel plates and the polyurethane filling only of the bent sections (showing the corrugation dimensions).

[0061] Figure 5 This is a detailed schematic diagram of the on-site assembly (inter-connection polyurethane bonding) of the prefabricated components of the present invention and the connection (welding / anchoring + anchoring concrete) between the straight section and the pavement layer. Detailed Implementation

[0062] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0063] This invention discloses a prefabricated assembled continuous structure for simply supported beam bridge deck, which is set at the structural joint 8 between two adjacent simply supported beams 7 and includes at least one prefabricated component.

[0064] Each prefabricated component is made up of multiple multi-fold trapezoidal steel plates 1 arranged laterally along the bridge, and the total width of each prefabricated component is 1000mm;

[0065] Each multi-fold trapezoidal steel plate 1 is divided into three sections along the longitudinal direction of the bridge:

[0066] The section 101 is straight for 300mm at each end, without any bends;

[0067] The middle 400mm length is the bending section 102, where the steel plate is bent back and forth to form a multi-fold trapezoidal corrugated shape;

[0068] The polyurethane concrete filling layer 2 is only used to fill the gaps in the bent sections 102 between adjacent multi-fold trapezoidal steel plates 1;

[0069] The compressive strength of polyurethane concrete is 60 MPa, and the elastic modulus is 1600 MPa.

[0070] The gaps between adjacent steel plates in the straight sections 101 at both ends are not filled with polyurethane concrete;

[0071] Adjacent precast components are bonded together using polyurethane adhesive 9;

[0072] The upper edge of the straight section 101 at both ends of the multi-fold trapezoidal steel plate 1 is flush with the concrete pavement layer 5 of the bridge deck.

[0073] The straight section 101 is directly welded to the reserved steel bar 3 in the concrete pavement layer 5 of the bridge deck, or anchored by planting or anchoring the steel bar 3; after welding or anchoring, the anchoring concrete 4 is poured in the area of ​​the straight section 101.

[0074] The overall top surface height of the precast components is consistent with the height of the concrete pavement layer of the simply supported beam 7 bridge deck, and then an asphalt layer 6 is laid on top of it.

[0075] Each multi-fold trapezoidal steel plate 1 is a vertically placed steel plate, made of bridge structural steel, and has an anti-corrosion coating on the surface;

[0076] The steel plate has a total length of 1000mm, a width of 10cm, and a thickness of 4mm.

[0077] Two adjacent multi-fold trapezoidal steel plates 1 are arranged with their upper edges facing each other; the distance between adjacent multi-fold trapezoidal steel plates 1 is 100mm.

[0078] The wave height of the multi-fold trapezoidal corrugated wave is 10mm, and the wave pitch is 80mm;

[0079] The crests and troughs are connected by straight lines, and the transitions between the crests and troughs are rounded.

[0080] An adhesive layer is provided between the polyurethane concrete filling layer 2 and the inner wall of the bent section 102 of the multi-fold trapezoidal steel plate 1.

[0081] The material of the multi-fold trapezoidal steel plate 1 is Q345qD bridge structural steel, and the anti-corrosion coating is epoxy zinc-rich paint or hot-dip galvanized layer.

[0082] Anchoring concrete 4 is micro-expansion high-strength concrete.

[0083] This invention also discloses a construction method for a prefabricated assembled simply supported beam bridge deck continuous structure, comprising the following steps:

[0084] Step 1: Process multi-fold trapezoidal steel plate 1 in the prefabrication yard. Each multi-fold trapezoidal steel plate 1 has a total length of 1000mm, a width of 10cm, and a thickness of 4mm. The two ends are straight sections of 300mm each, and the middle 400mm is bent into multi-fold trapezoidal corrugations with a corrugation height of 10mm and a corrugation pitch of 80mm. The surface of the steel plate is treated with anti-corrosion.

[0085] Multiple trapezoidal steel plates 1 are arranged horizontally at 100mm intervals with their upper edges facing each other. The gaps between adjacent steel plates in the middle 400mm bending section 102 are filled with polyurethane concrete with a compressive strength of 60MPa and an elastic modulus of 1600MPa. The gaps between the straight sections 101 at both ends are left empty and not filled. Each 1000mm width is considered a unit to complete the prefabrication.

[0086] Step 2: Hoist the precast components to structural joint 8, and apply polyurethane adhesive 9 between adjacent precast components for bonding and assembly.

[0087] Step 3: Weld the straight sections 101 at both ends of the multi-fold trapezoidal steel plate 1 to the reserved steel bars 3 of the bridge deck concrete pavement layer 5. If there are no reserved steel bars 3, anchor them by planting or anchoring steel bars 3.

[0088] Step 4: Pour anchoring concrete 4 in the straight section 101 area to anchor the straight section 101 and the bridge deck concrete pavement layer 5 into a whole.

[0089] Step 5: Complete the pavement construction on the premise that the top surface of the precast component is at the same height as the concrete pavement layer of the bridge deck, and finally lay the asphalt layer 6 on top.

[0090] Example 1:

[0091] like Figure 1 and Figure 2 As shown, a prefabricated assembled simple-supported beam bridge deck continuous structure is provided at the structural joint 8 between two adjacent simple-supported beams 7.

[0092] The continuous bridge deck structure includes at least one precast component, each precast component consisting of multiple multi-fold trapezoidal steel plates 1 arranged transversely along the bridge, with a total width of 1000mm for each component.

[0093] The multi-fold trapezoidal steel plate assembly is composed of multiple multi-fold trapezoidal steel plates arranged laterally along the bridge.

[0094] like Figure 3 As shown, each multi-fold trapezoidal steel plate 1 is a vertically placed steel plate, made of bridge structural steel (such as Q345qD), and its surface is treated with anti-corrosion (such as coating with epoxy zinc-rich primer or hot-dip galvanizing) to ensure long-term durability in the bridge deck environment.

[0095] The steel plate has a total length of 1000mm, a width of 10cm, and a thickness of 4mm;

[0096] Each steel plate is divided into three sections along the longitudinal direction of the bridge:

[0097] The section 101 is straight for 300mm at each end, without any bends;

[0098] The middle 400mm length is the bending section 102, where the steel plate is bent back and forth to form a multi-fold trapezoidal corrugated shape with a wave height of 10mm and a wave pitch of 80mm.

[0099] The spacing between adjacent multi-fold trapezoidal steel plates 1 is 100mm.

[0100] like Figure 4 As shown, two adjacent multi-fold trapezoidal steel plates 1 are arranged with their upper sides facing each other.

[0101] like Figure 4 As shown, the polyurethane concrete filling layer 2 is only filled in the gap between adjacent multi-fold trapezoidal steel plates 1 corresponding to the middle 400mm bending section 102.

[0102] Polyurethane concrete uses low elastic modulus and high strength polyurethane concrete material with a compressive strength of 60MPa and an elastic modulus of 1600MPa.

[0103] The gaps between adjacent steel plates in the 300mm straight sections 101 at both ends are not filled with polyurethane concrete, maintaining a cavity state to facilitate on-site connection with the bridge deck pavement.

[0104] The combination of the aforementioned multi-fold trapezoidal steel plate 1 and polyurethane concrete filling layer 2 is prefabricated as a whole in the prefabrication yard, with each 1000mm width constituting a prefabricated component.

[0105] like Figure 5 As shown, during on-site construction, each prefabricated component is hoisted to structural joint 8, and adjacent prefabricated components are bonded together by applying polyurethane adhesive 9.

[0106] The upper edge of the straight sections 101 at both ends of the multi-fold trapezoidal steel plate 1 is flush with the concrete pavement layer 5 of the bridge deck.

[0107] The straight section 101 is directly welded to the reserved steel bar 3 in the pavement layer of the simply supported beam 7; if there is no reserved steel bar, it is anchored by planting or anchoring the steel bar 3.

[0108] After welding or anchoring is completed, anchoring concrete 4 is poured in the straight section 101 area to make the precast component and the bridge deck concrete pavement layer 5 form a stable whole.

[0109] The overall top surface height of the precast component is consistent with the height of the concrete pavement layer 5 of the simply supported beam bridge deck, and then an asphalt layer 6 is laid on top of it.

[0110] Example 2:

[0111] Based on Example 1, this example further optimizes some details.

[0112] The corrugated shape of the multi-fold trapezoidal steel plate 1 is a trapezoidal broken line, with straight lines connecting the crests and troughs, and rounded corners at the crests and troughs to reduce stress concentration.

[0113] An adhesive layer (such as epoxy resin primer) is provided between the polyurethane concrete filling layer 2 and the inner wall of the bent section of the multi-fold trapezoidal steel plate 1 to enhance the synergistic performance between the two.

[0114] When using rebar anchoring, the diameter and depth of the rebar should meet the anchoring requirements of the current "Specifications for Design of Strengthening Highway Bridges". The anchoring concrete 4 should be micro-expansion high-strength concrete to ensure a tight and reliable connection.

[0115] Example 3:

[0116] This embodiment provides a construction method for the above-mentioned continuous bridge deck structure, including the following steps:

[0117] Step 1 (Factory Prefabrication): Process multi-fold trapezoidal steel plates 1 in the prefabrication yard. Each steel plate is 1000mm long, 10cm wide, and 4mm thick.

[0118] The two ends are 300mm straight sections 101, and the middle 400mm is bent into a multi-fold trapezoidal corrugation (wave height 10mm, wave pitch 80mm).

[0119] The adjacent steel plates are spaced 100mm apart, arranged with their upper edges facing each other, and the steel plate surfaces are treated with anti-corrosion measures.

[0120] Then, the gap between the adjacent steel plates in the middle 400mm bending section 102 is filled with polyurethane concrete with a compressive strength of 60MPa and an elastic modulus of 1600MPa, while the gaps in the straight sections 101 at both ends are left empty.

[0121] The prefabricated components are manufactured in sections with a total width of 1000mm.

[0122] Step 2 (On-site hoisting and assembly): Transport the prefabricated components to the construction site and hoist them into place at the structural joint 8 between two adjacent simply supported beams 7;

[0123] Polyurethane adhesive 9 is applied between two adjacent precast components, and each segment is sequentially bonded and assembled into a whole along the transverse direction of the bridge.

[0124] If the surface of the main beam is uneven or there is a height difference between adjacent main beams, it is necessary to level it first or fill the gap with polyurethane mortar.

[0125] Step 3 (Straight Section Connection): Weld the straight sections 101 at both ends of the multi-fold trapezoidal steel plate 1 to the reserved steel bars 3 of the bridge deck concrete pavement layer 5;

[0126] If there are no pre-reserved steel bars, drill holes and install steel bars or set anchor steel bars 3 at the corresponding positions in the bridge deck pavement for anchoring.

[0127] Step 4 (Pouring Anchor Concrete): Erect formwork in the straight section 101 area and pour anchor concrete 4 to anchor the straight section 101 and the bridge deck concrete pavement layer 5 into a whole.

[0128] Step 5 (laying the pavement layer and asphalt): On the premise of ensuring that the top surface of the precast component is at the same height as the bridge deck concrete pavement layer 5, complete the construction of the remaining concrete pavement layer 5, and finally lay the asphalt layer 6 uniformly on top.

[0129] Therefore, it can be seen that the present invention, through the combination structure of vertical multi-fold trapezoidal corrugated steel plates and low-elasticity polyurethane concrete filling, effectively solves the industry pain points of easy cracking and settlement in continuous positions of traditional simply supported beam bridge decks and easy damage and high maintenance costs of traditional expansion joints. It has good vertical bearing capacity and longitudinal deformation adaptability, fast overall construction speed and controllable quality, and can meet the needs of continuous bridge deck construction of precast simply supported beam bridges of different spans, and has good prospects for promotion and application.

[0130] The above description is merely a preferred embodiment of the present invention and does not constitute any limitation on the technical scope of the present invention. Therefore, any minor modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of the present invention shall still fall within the scope of the technical solution of the present invention.

Claims

1. A prefabricated, assembled, continuously supported beam bridge deck structure, located at the structural joint (8) between two adjacent spans of simply supported beams (7), characterized in that, Includes at least one prefabricated component; Each prefabricated component is made up of multiple multi-fold trapezoidal steel plates (1) arranged laterally along the bridge, and the total width of each prefabricated component is 1000mm; Each of the aforementioned multi-fold trapezoidal steel plates (1) is divided into three sections along the longitudinal direction of the bridge: The section within 300mm of each end is straight (101) without any bends; The middle 400mm length is a bending section (102), where the steel plate is bent back and forth to form a multi-fold trapezoidal corrugated shape; The polyurethane concrete filling layer (2) is filled only in the gaps between the bent sections (102) between adjacent multi-fold trapezoidal steel plates (1); The polyurethane concrete has a compressive strength of 60 MPa and an elastic modulus of 1600 MPa. The gaps between adjacent steel plates in the straight sections (101) at both ends are not filled with polyurethane concrete; The prefabricated components of adjacent sections are bonded together by polyurethane adhesive (9); The upper edges of the straight sections (101) at both ends of the multi-fold trapezoidal steel plate (1) are flush with the concrete pavement layer (5) of the bridge deck; The straight section (101) is directly welded to the reserved steel bars (3) in the concrete pavement layer (5) of the bridge deck, or anchored by planting or anchoring steel bars (3); after welding or anchoring, anchoring concrete (4) is poured in the area of ​​the straight section (101). The overall top surface height of the precast component is consistent with the height of the concrete pavement layer of the simply supported beam (7), and an asphalt layer (6) is then laid on top of it.

2. The prefabricated assembled simply supported beam bridge deck continuous structure according to claim 1, characterized in that, Each of the multi-fold trapezoidal steel plates (1) is a vertically placed steel plate made of bridge structural steel and has an anti-corrosion coating on its surface; The steel plate has a total length of 1000mm, a width of 10cm, and a thickness of 4mm.

3. The prefabricated assembled simply supported beam bridge deck continuous structure according to claim 1, characterized in that, The two adjacent multi-fold trapezoidal steel plates (1) are arranged with their upper edges facing each other; the distance between the adjacent multi-fold trapezoidal steel plates (1) is 100mm.

4. The prefabricated assembled simply supported beam bridge deck continuous structure according to claim 1, characterized in that, The wave height of the multi-fold trapezoidal corrugation is 10 mm, and the wave pitch is 80 mm. The crests and troughs are connected by straight lines, and the transitions between the crests and troughs are rounded.

5. A prefabricated assembled simply supported beam bridge deck continuous structure according to claim 1, characterized in that, An adhesive layer is provided between the polyurethane concrete filling layer (2) and the inner wall of the bent section (102) of the multi-fold trapezoidal steel plate (1).

6. A prefabricated assembled simply supported beam bridge deck continuous structure according to claim 2, characterized in that, The multi-fold trapezoidal steel plate (1) is made of Q345qD bridge structural steel, and the anti-corrosion coating is epoxy zinc-rich paint or hot-dip galvanized layer.

7. A prefabricated assembled simply supported beam bridge deck continuous structure according to claim 1, characterized in that, The anchoring concrete (4) is micro-expansion high-strength concrete.

8. A construction method for a precast assembled simply supported beam bridge deck continuous structure, characterized in that, Includes the following steps: Step 1: Process multi-fold trapezoidal steel plates (1) in the prefabrication yard. Each multi-fold trapezoidal steel plate (1) has a total length of 1000mm, a width of 10cm, and a thickness of 4mm. The two ends are straight sections (101) with a length of 300mm at each end. The middle 400mm is bent into multi-fold trapezoidal corrugations with a corrugation height of 10mm and a corrugation spacing of 80mm. The surface of the steel plate is treated with anti-corrosion. The multiple trapezoidal steel plates (1) are arranged horizontally at 100mm intervals with their upper edges facing each other. The gaps between adjacent steel plates in the middle 400mm bending section (102) are filled with polyurethane concrete with a compressive strength of 60MPa and an elastic modulus of 1600MPa. The gaps between the straight sections (101) at both ends are left empty and not filled. Each 1000mm width is considered a unit to complete the prefabrication. Step 2: Hoist the precast components to the structural joint (8), and apply polyurethane adhesive (9) between adjacent precast components for bonding and assembly; Step 3: Weld the straight sections (101) at both ends of the multi-fold trapezoidal steel plate (1) to the reserved steel bars (3) of the concrete pavement layer (5) of the bridge deck. If there are no reserved steel bars (3), anchor them by planting or anchoring steel bars (3). Step 4: Pour anchoring concrete (4) in the straight section (101) area to anchor the straight section (101) and the concrete pavement layer (5) of the bridge deck into a whole; Step 5: Complete the pavement construction on the premise that the top surface of the precast component is at the same height as the concrete pavement layer of the bridge deck, and finally lay the asphalt layer on top (6).