A precast pipe pile static pressure construction verticality control device and method

By using a real-time monitoring and automatic adjustment verticality control device in the static pressure construction of precast pipe piles, the problem of pile verticality deviation was solved, construction quality and efficiency were improved, costs were reduced, and real-time monitoring and optimization of construction progress were achieved.

CN123064154APending Publication Date: 2026-11-10SHANDONG LUQIAO GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611106470.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-24
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

In the existing technology, the verticality deviation of the pile body is a serious problem during the static pressure construction of precast pipe piles. This causes the center lines of the pile body, pile cap, and pile hammer to deviate, affecting the bearing capacity and project quality. In addition, the large error of manual monitoring affects the construction progress.

Method used

A precast pipe pile static pressure construction verticality control device is adopted, including a support, a static pressure pile driver, a pipe pile monitor, and a fixing component. The device uses a GPS locator, a verticality sensor, and a signal transmitting device to monitor the position and verticality of the pipe pile in real time. It uses an LSTM neural network model to dynamically adjust and automatically control the adjustment amount of the outriggers of the static pressure pile driver, so as to achieve real-time feedback and optimization of verticality.

Benefits of technology

It improves the construction quality and efficiency of precast pipe piles, reduces manual intervention, lowers costs, and ensures the accuracy of pipe pile verticality by monitoring construction progress and quality in real time through a database.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064154A_ABST
    Figure CN123064154A_ABST
Patent Text Reader

Abstract

This invention relates to the field of precast pipe pile technology, and discloses a device and method for controlling the verticality of precast pipe piles during static pressure construction. The device includes: a support with four long outriggers at its bottom ends for providing support; a static pressure pile driver installed at the top center of the support, with a controller in its control room for pressing down the precast pipe pile; and a pipe pile monitor installed on the precast pipe pile for identifying the installation position and verticality parameters of the precast pipe pile within the construction area. This invention monitors the verticality of the pipe pile in real time through the pipe pile monitor and controls the static pressure pile driver to adjust the verticality in real time through the controller, greatly improving the construction quality and efficiency of precast pipe piles, reducing personnel input, and lowering costs. Simultaneously, the pressed precast pipe piles are transmitted to a database on a CPU server, facilitating real-time monitoring of the construction sequence and quality by construction personnel, and enabling real-time monitoring and adjustment of the entire construction process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of precast pipe pile technology, and in particular to a device and method for controlling the verticality of precast pipe piles during static pressure construction. Background Technology

[0002] Pile foundations are a key process for improving the bearing capacity of the foundation and reducing compressibility. They come in various forms, among which precast concrete pipe piles are widely used in soft soil treatment due to their advantages such as ease of production, reliable quality, and fast construction. Currently, construction mainly uses static pressure pile driving and hammer pile driving. Static pressure pile driving is favored because it produces no vibration or noise, has low cost, high quality, and is easy to operate.

[0003] While static pressure pile driving offers significant advantages, it often faces the problem of pile verticality deviation. The main causes include: failure to double-check verticality before driving, interference from underground obstacles, uneven site conditions and unstable pile driver chassis, improper soft soil foundation treatment, substandard quality of precast pipe piles, soil squeezing effect due to insufficient pile spacing and incorrect pile driving sequence, and inaccurate pile driver installation angle. Verticality deviation is a serious problem; if it causes the center lines of the pile body, pile cap, and pile hammer to deviate, it can easily lead to pile breakage, significantly reduce bearing capacity, affect project quality, and require emergency adjustments, impacting progress. Currently, two total stations are used to manually monitor verticality, and deviations in the pile body are corrected based on experience. However, this method has many shortcomings, such as inconsistent skill levels among surveyors, manual measurement errors, and errors from adjustments based on experience, easily leading to rework and severely affecting construction progress. Summary of the Invention

[0004] This invention provides a device and method for controlling the verticality of precast pipe piles under static pressure construction, in order to solve the above-mentioned technical problems in the prior art.

[0005] According to a first aspect of the present invention, a device for controlling the verticality of precast pipe piles under static pressure construction is provided.

[0006] The precast pipe pile static pressure construction verticality control device includes:

[0007] The support has four longboat-shaped outriggers at its bottom ends to provide support.

[0008] A static pressure pile driver is installed at the top center of the support. The control room of the static pressure pile driver is equipped with a controller for pressing down the precast pipe pile.

[0009] A pipe pile monitor is installed on the precast pipe pile to identify the installation position and verticality parameters of the precast pipe pile within the construction area.

[0010] A fixing component, installed on the precast pipe pile, is used to house the pipe pile monitor.

[0011] Optionally, the fixing assembly includes an upper insert sleeve and a lower insert sleeve, both of which are fixedly connected to the precast pipe pile by bolts. A support plate is fixed to the bottom of the lower insert sleeve, and the pipe pile monitor is installed in the support plate to prevent the pipe pile monitor from slipping out of the upper and lower insert sleeves.

[0012] Optionally, both the upper and lower insert sleeves are elastic bands. When the pipe pile monitor is inserted into the upper and lower insert sleeves, the upper and lower insert sleeves undergo elastic deformation.

[0013] Optionally, the pipe pile monitor includes a GPS locator, a verticality sensor, and a signal transmitting device. The GPS locator, the verticality sensor, and the signal transmitting device are electrically connected to each other and are used to identify the installation position and verticality parameters of the precast pipe piles within the construction area.

[0014] Optionally, the signal transmitting device is communicatively connected to the data processing component.

[0015] Optionally, the data processing component is used to receive data collected by the GPS locator and the verticality sensor, and to perform data processing.

[0016] Optionally, the data processing component is connected to the monitoring client.

[0017] Optionally, the monitoring client can be a PC, a mobile phone, or a PDA.

[0018] According to a second aspect of the present invention, an intelligent verticality control method for static pressure construction of precast pipe piles is provided, using the precast pipe pile static pressure construction verticality control device described in any one of the above claims, comprising the following intelligent control steps:

[0019] Data initialization before construction: Import the geological survey report of the construction site and establish a soil layer parameter database containing the depth of each soil layer, side friction resistance, and compression modulus; import the pile group design parameters and construction sequence and establish a pile group construction model.

[0020] Real-time data acquisition: During the pile driving process, the pipe pile monitor synchronously acquires the X / Y inclination angle, penetration depth, and pile driving force data of the precast pipe pile at a frequency of 1Hz, and transmits them to the data processing component;

[0021] Verticality layered dynamic adjustment: Based on the current penetration depth and corresponding soil layer parameters, the outrigger adjustment coefficient at that depth is calculated using the dynamic adjustment coefficient formula. The mapping relationship between the outrigger adjustment amount and the verticality change is corrected, the optimal adjustment amount of the outrigger corresponding to the static pressure pile driver is calculated, and the adjustment is automatically executed by the controller.

[0022] Optionally, the verticality layered dynamic adjustment step uses an LSTM neural network model structure to predict verticality and proactively control the verticality of the pipe piles.

[0023] In practical applications, the method described in this invention can be implemented in the following form, specifically:

[0024] Including the calculation process for the verticality layer dynamic adjustment coefficient:

[0025] Enter the current depth of penetration, h;

[0026] Traverse the soil layer parameter database, find the soil layer i where the soil depth h is located, and obtain the compression modulus E_si and side friction f_si of soil layer i;

[0027] Read the reference parameters: reference adjustment coefficient ( ), reference compression modulus ( ), reference side friction ( ); and substitute the outrigger adjustment coefficient into the outrigger adjustment coefficient calculation formula to calculate the outrigger adjustment coefficient at this depth. .

[0028] The formula for calculating the outrigger adjustment coefficient includes:

[0029] ;

[0030] In the formula: Indicates the outrigger adjustment factor; Indicates the benchmark adjustment factor; Indicates the reference compression modulus; This indicates the compression modulus of the corresponding soil layer; Indicates the reference side friction resistance; This represents the side friction resistance of the corresponding soil layer.

[0031] In addition, the LSTM verticality deviation prediction algorithm flow is also included:

[0032] The 6-dimensional feature data collected in the last 30 seconds are substituted into the normalization formula for normalization processing to obtain normalized feature data.

[0033] The normalization formula is as follows:

[0034] ;

[0035] In the formula: Represents normalized feature data. This represents the raw data measured on-site. This represents the statistical extreme value of the corresponding feature in the historical construction training set, and is a fixed parameter during the model calibration stage.

[0036] The normalized feature data is converted into the input format required by the LSTM model and input into the LSTM neural network model to obtain the predicted values ​​of the tilt angles in the X and Y directions for the next 10 seconds.

[0037] Substituting the predicted tilt angles in the X and Y directions into the inverse normalization formula yields the actual prediction deviation.

[0038] The inverse normalization formula is as follows:

[0039] ;

[0040] In the formula: This represents the actual predicted value after restoration; This represents the normalized predicted value; This represents the statistical extreme value of the corresponding feature in the historical construction training set, and is a fixed parameter during the model calibration stage.

[0041] The technical solution provided by this invention may include the following beneficial effects:

[0042] This invention monitors the verticality of precast pipe piles in real time using a pipe pile monitor and controls the static pressure pile driver to adjust the verticality in real time via a controller. This significantly improves the construction quality and efficiency of precast pipe piles, reduces manpower input, and lowers costs. Simultaneously, the driven precast pipe piles are transmitted to the CPU server's database, allowing construction personnel to monitor the construction sequence and quality in real time, facilitating real-time monitoring and adjustment of the entire construction process.

[0043] It should be understood that the above general description and the following detailed description are exemplary and explanatory only, and are not intended to limit the invention. Attached Figure Description

[0044] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.

[0045] Figure 1 This is a schematic diagram of the overall structure of a precast pipe pile static pressure construction verticality control device according to an exemplary embodiment;

[0046] Figure 2 This is an enlarged schematic diagram of point A of a precast pipe pile static pressure construction verticality control device according to an exemplary embodiment;

[0047] Figure 3 This is a flowchart illustrating an intelligent verticality control method for static pressure construction of precast pipe piles, according to an exemplary embodiment.

[0048] In the picture:

[0049] 1. Static pile driver; 11. Long outriggers of pile driver; 2. Precast pipe pile; 3. Pipe pile monitor; 4. Fixing components; 41. Upper insert sleeve; 42. Lower insert sleeve; 43. Bolt; 44. Support plate; 5. Controller. Detailed Implementation

[0050] The following description and accompanying drawings fully illustrate specific embodiments described herein to enable those skilled in the art to practice them. Some portions and features of certain embodiments may be included in or replace portions and features of other embodiments. The scope of the embodiments herein includes the entire scope of the claims, as well as all available equivalents of the claims.

[0051] In this document, the terms "comprising," "including," or any other variations thereof are intended to cover a non-exclusive inclusion, such that a structure, apparatus, or device that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a structure, apparatus, or device. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the structure, apparatus, or device that includes said element. The various embodiments described herein are presented in a progressive manner, with each embodiment focusing on its differences from other embodiments. Similar or identical parts between embodiments can be referred to interchangeably.

[0052] The terms "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer" used in this document to indicate orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings. They are used solely for the convenience of describing the document and for simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the invention. In the description herein, unless otherwise specified and limited, the terms "installed," "connected," and "linked" should be interpreted broadly. For example, they can refer to mechanical or electrical connections, or internal connections between two elements; they can be direct connections or indirect connections through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms according to the specific circumstances.

[0053] In this document, unless otherwise stated, the term "multiple" means two or more.

[0054] In this article, the character " / " indicates that the objects before and after it are in an "or" relationship. For example, A / B means: A or B.

[0055] In this article, the term "and / or" describes an association between objects, indicating that three relationships can exist. For example, A and / or B means: A or B, or A and B.

[0056] It should be understood that although the steps in the flowchart are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order constraint on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the diagram may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the sub-steps or stages of other steps.

[0057] Where there is no conflict, the embodiments and features in the embodiments of the present invention can be combined with each other.

[0058] Figures 1-2 An embodiment of a precast pipe pile static pressure construction verticality control device of the present invention is shown.

[0059] like Figure 1 As shown, the precast pipe pile static pressure construction verticality control device according to an embodiment of the present invention includes a support, an RTK positioning base station on one side of the support, a static pressure pile driver 1 installed at the top center of the support, a precast pipe pile 2 clamped in the middle of the static pressure pile driver 1, a pipe pile monitor 3 fixed on the outer surface of the precast pipe pile 2 by a fixing component 4, a controller 5 installed in the control room of the static pressure pile driver 1, and a pile driver support leg 11 provided at each of the four ends of the bottom of the support. The CPU processor can calculate the height of the pile driver support leg 11 that needs to be adjusted for the static pressure pile driver 1 to continue construction, and thus control the extension and retraction of the pile driver support leg 11.

[0060] like Figure 2As shown, the fixing component 4 includes an upper insertion sleeve 41 and a lower insertion sleeve 42. Both the upper insertion sleeve 41 and the lower insertion sleeve 42 are fixedly connected to the precast pipe pile 2 by bolts 43. A support plate 44 is fixed to the bottom of the lower insertion sleeve 42. The pipe pile monitor 3 is installed in the support plate 44, which prevents the pipe pile monitor 3 from slipping out of the upper insertion sleeve 41 and the lower insertion sleeve 42. Both the upper insertion sleeve 41 and the lower insertion sleeve 42 are elastic bands. When the pipe pile monitor 3 is inserted into the upper insertion sleeve 41 and the lower insertion sleeve 42, the upper insertion sleeve 41 and the lower insertion sleeve 42 undergo elastic deformation. The pile monitor 3 includes a GPS locator, a verticality sensor, and a signal transmitting device. The GPS locator, the verticality sensor, and the signal transmitting device are electrically connected to identify the installation position and verticality parameters of the precast pipe piles 2 within the construction area. The verticality sensor can acquire the verticality information of the pipe piles and send the acquired verticality information to the CPU processor of the data processing component through the signal transmitting device. The verticality information of the pipe piles and the comparison information with the preset verticality information are also synchronously stored in the database of the data processing component for subsequent inspection.

[0061] The GPS locator can measure and acquire the location information of the pipe pile, and send it to the CPU processor of the data processing component through the signal transmitting device, and compare it with the preset pipe pile location information in the CPU processor.

[0062] The signal transmitting device is communicatively connected to the data processing component, which is used to receive and process data collected by the GPS locator and the verticality sensor. The data processing component is also communicatively connected to the monitoring client, which can be a PC, mobile phone, or PDA.

[0063] Figure 3 An embodiment of the intelligent verticality control method for static pressure construction of precast pipe piles according to the present invention is shown.

[0064] like Figure 3 As shown in the embodiment of the present invention, an intelligent verticality control method for static pressure construction of precast pipe piles includes the following steps:

[0065] Step S101, Pre-construction data initialization: Import the geological survey report of the construction site and establish a soil layer parameter database containing the depth of each soil layer, side friction resistance, and compression modulus; import the pile group design parameters and construction sequence and establish a pile group construction model.

[0066] Step S103, Real-time data acquisition: During the pile driving process, the pipe pile monitor synchronously acquires the X / Y inclination angle, penetration depth, and pile driving force data of the precast pipe pile at a frequency of 1Hz, and transmits them to the data processing component;

[0067] Step S105, Verticality Layered Dynamic Adjustment: Based on the current soil depth and corresponding soil layer parameters, calculate the outrigger adjustment coefficient at this depth using the dynamic adjustment coefficient formula. The mapping relationship between the outrigger adjustment amount and the verticality change is corrected, the optimal adjustment amount of the outrigger corresponding to the static pressure pile driver is calculated, and the adjustment is automatically executed by the controller.

[0068] In the above optional embodiments, the verticality layered dynamic adjustment step uses an LSTM neural network model structure to predict verticality and control the verticality of the pipe pile in advance.

[0069] In practical applications, the method described in this invention can be implemented in the following form, specifically:

[0070] The system includes a process for calculating the dynamic adjustment coefficient for verticality stratification: Based on the current embedment depth h of the pipe pile, the system automatically matches the compression modulus E_si and side skin friction f_si of the corresponding soil layer in the soil parameter database, and then calculates the support adjustment coefficient at that depth using a formula. Because soft soil layers have lower compression modulus and lateral friction, the same adjustment amount of the outriggers will produce a greater change in verticality. The value is relatively large; while the hard soil layer The value is relatively small. This dynamic adjustment avoids the problems of insufficient adjustment in soft soil layers or excessive adjustment in hard soil layers, significantly improving the accuracy of a single adjustment.

[0071] In addition, the LSTM verticality deviation prediction algorithm flow is also included:

[0072] The system first normalizes the 6-dimensional feature data collected in the last 30 seconds, converting it into the input format required by the LSTM model, and then inputs it into the trained neural network model. The model calculates the predicted tilt angles in the X and Y directions for the next 10 seconds through forward propagation, and then performs inverse normalization to obtain the actual prediction deviation. When the system predicts that the verticality deviation will exceed a preset threshold within the next 10 seconds, it initiates adjustments in advance to nip the deviation in the bud. For example, if the measured deviation is 0.3% and the prediction is that it will reach 0.6% after 10 seconds, the system will immediately calculate the adjustment amount based on the equivalent deviation of 0.3% + 0.7 × 0.3% = 0.51%, intervening in advance.

[0073] When the equipment is working, place the RTK positioning base station and the static pressure pile driver 1 in the construction site, and fix the RTK positioning base station in the center of the construction site; install the controller 5 in the control room of the static pressure pile driver 1, and install the pipe pile monitor 3 on the precast pipe pile 2. The pipe pile 2 needs to be fixed with the fixing component 4 in advance to install the pipe pile monitor 3.

[0074] The location information of the pipe pile monitor 3 installed on the precast pipe pile 2 is obtained by the RTK positioning base station, the location of the pipe pile 2 at the construction site is determined, and its location information is transmitted to the CPU processor for comparison with the preset location information; construction can continue only when the pipe pile position matches the preset position.

[0075] During the process of the static pressure pile driver 1 driving the precast pipe pile 2 into the construction area, the pipe pile monitor 3 placed on the precast pipe pile 2 obtains the verticality information of the precast pipe pile 2 in real time, sends the verticality information of the precast pipe pile 2 to the CPU processor of the data processing component, compares it with the preset pipe pile verticality information in the CPU processor, and finally displays it on the monitoring client.

[0076] When there is an error in the verticality between the two, the CPU processor will calculate the height of the long boat support leg 11 of the static pile driver 1 that needs to be adjusted to continue construction, and transmit the data to the controller 5 installed on the static pile driver 1 for real-time adjustment of the static pile driver 1.

[0077] For example, if the verticality of the precast pipe pile 2 does not meet the requirements, if the precast pipe pile 2 shifts to the left with the control room as the axis, the hydraulic press on the right side of the static pressure pile driver 1 will be raised to apply a reaction force to the right side of the precast pipe pile 2; if the precast pipe pile 2 shifts to the right with the control room as the axis, the hydraulic press on the left side of the static pressure pile driver 1 will be raised to apply a reaction force to the left side of the precast pipe pile 2; when the pipe pile monitor 3 detects that the verticality information of the precast pipe pile 2 has been adjusted to be consistent with the preset data, normal construction can continue.

[0078] On-site construction personnel can obtain real-time information on the location and verticality of the pipe piles, as well as comparisons with preset information, through monitoring clients (such as PCs, mobile phones, or PDAs). Construction personnel can check and record pipe pile construction information in real time. After constructing one precast pipe pile 2, the pipe pile monitor 3 on the precast pipe pile 2 is removed and installed into the fixing component 4 of the next pile body. This process is repeated until the pipe pile construction of the entire area is completed.

[0079] This invention is not limited to the structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from its scope. The scope of this invention is limited only by the appended claims.

Claims

1. A device for controlling the verticality of precast pipe piles under static pressure construction, characterized in that, include: The support has four longboat-shaped outriggers at its bottom ends to provide support. A static pressure pile driver is installed at the top center of the support. The control room of the static pressure pile driver is equipped with a controller for pressing down the precast pipe pile. A pipe pile monitor is installed on the precast pipe pile to identify the installation position and verticality parameters of the precast pipe pile within the construction area. A fixing component, installed on the precast pipe pile, is used to house the pipe pile monitor.

2. The precast pipe pile static pressure construction verticality control device according to claim 1, characterized in that, The fixing assembly includes an upper insert sleeve and a lower insert sleeve, both of which are fixedly connected to the precast pipe pile by bolts. A support plate is fixed to the bottom of the lower insert sleeve, and the pipe pile monitor is installed in the support plate to prevent the pipe pile monitor from slipping out of the upper and lower insert sleeves.

3. The precast pipe pile static pressure construction verticality control device according to claim 2, characterized in that, Both the upper and lower insert sleeves are elastic bands. When the pipe pile monitor is inserted into the upper and lower insert sleeves, the upper and lower insert sleeves undergo elastic deformation.

4. The precast pipe pile static pressure construction verticality control device according to claim 3, characterized in that, The pipe pile monitor includes a GPS locator, a verticality sensor, and a signal transmitting device. The GPS locator, the verticality sensor, and the signal transmitting device are electrically connected to each other and are used to identify the installation position and verticality parameters of the precast pipe piles within the construction area.

5. The precast pipe pile static pressure construction verticality control device according to claim 4, characterized in that, The signal transmitting device is communicatively connected to the data processing component.

6. The precast pipe pile static pressure construction verticality control device according to claim 5, characterized in that, The data processing component is used to receive data collected by the GPS locator and the verticality sensor, and to process the data.

7. The precast pipe pile static pressure construction verticality control device according to claim 6, characterized in that, The data processing component communicates with the monitoring client.

8. The precast pipe pile static pressure construction verticality control device according to claim 7, characterized in that, The monitoring client can be a PC, mobile phone, or PDA.

9. A method for intelligent verticality control during static pressure construction of precast pipe piles, characterized in that, The precast pipe pile static pressure construction verticality control device according to any one of claims 1-8 includes the following intelligent control steps: Data initialization before construction: Import the geological survey report of the construction site and establish a soil layer parameter database containing the depth of each soil layer, side friction resistance, and compression modulus; import the pile group design parameters and construction sequence and establish a pile group construction model. Real-time data acquisition: During the pile driving process, the pipe pile monitor synchronously acquires the X / Y inclination angle, penetration depth, and pile driving force data of the precast pipe pile at a frequency of 1Hz, and transmits them to the data processing component; Verticality layered dynamic adjustment: Based on the current penetration depth and corresponding soil layer parameters, the outrigger adjustment coefficient at that depth is calculated using the dynamic adjustment coefficient formula. The mapping relationship between the outrigger adjustment amount and verticality change is corrected, the optimal adjustment amount of the outrigger corresponding to the static pressure pile driver is calculated, and the adjustment is automatically executed by the controller.

10. The intelligent verticality control method for static pressure construction of precast pipe piles according to claim 9, characterized in that, In the verticality layered dynamic adjustment step, an LSTM neural network model structure is used to predict verticality and control the verticality of the pipe pile in advance.