A method for adjusting the water cut at the wellhead of both injection and production wells.

By assessing the injection-production balance by obtaining the wellhead production rate and injection volume, and generating anti-surge distance adjustment decisions, the problem of lagging wellhead water cut control in traditional same-well injection-production processes is solved, achieving precise control of wellhead water cut and extending the economical production period.

CN123064658APending Publication Date: 2026-11-10DAQING OILFIELD CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611577447.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-13
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

In traditional same-well injection and production processes, changes in the amount of fluid produced at the wellhead and the water cut lead to an increase in water treatment pressure, and there is a lack of effective real-time adjustment methods, making it difficult to accurately control the water cut at the wellhead.

Method used

By acquiring the wellhead production rate, water cut, and single-well injection rate, the injection-production balance is assessed, anti-impact distance adjustment decisions are generated, polished rod adjustment is calculated, and the downhole production pump discharge rate is changed to achieve the target water cut.

Benefits of technology

It enables timely and accurate control of wellhead water cut, reduces oil well operating costs, extends the economical extraction period, and avoids the defects of lagging judgment in traditional processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064658A_ABST
    Figure CN123064658A_ABST
Patent Text Reader

Abstract

This application relates to the field of oilfield development technology, specifically to a method for adjusting the wellhead water cut of a co-injection and co-production well. The method includes: obtaining the wellhead production rate and current wellhead water cut of the co-injection and co-production well, and obtaining the single-well injection rate to obtain the current injection-production ratio; generating an anti-slip distance adjustment decision based on the single-well injection rate, wellhead production rate, and water absorption characteristics of the reinjection layer; calculating the target injection-production ratio required to adjust the current wellhead water cut to the target wellhead water cut based on the target wellhead water cut and the formation fluid mass conservation relationship; calculating the required polished rod adjustment amount based on the target injection-production ratio and the current injection-production ratio, combined with the influence of polished rod anti-slip distance changes on the production pump discharge rate; adjusting the polished rod anti-slip distance on the surface according to the polished rod adjustment amount to change the downhole production pump discharge rate, so that the wellhead water cut of the co-injection and co-production well reaches the target wellhead water cut. This application significantly improves the accuracy of wellhead water cut control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of oilfield development technology, specifically to a method for adjusting the water cut at the wellhead of injection and production wells in the same well. Background Technology

[0002] Simultaneous production and injection technology allows for direct downhole oil-water separation of produced fluids. The separated water is directly reinjected into the injection layer, lifting low-water-content produced fluids to the surface. Production and injection occur simultaneously within the same wellbore, serving a dual purpose. This technology offers several advantages: First, it controls ineffective fluid production, reduces water production from oil wells, increases the connection between oil and water wells, expands the number of injection points, and improves the swept volume, enabling continuous and economically efficient oil well production and effectively extending the oilfield development cycle. Second, it effectively alleviates subsequent water treatment pressure, assists in water well injection, reduces surface water injection volume, decreases the scale and number of surface oil and gas gathering and transportation systems, and lowers energy consumption and water treatment costs for surface equipment.

[0003] In traditional in-well injection-production processes, increases in wellhead fluid production and water cut lead to increased pressure in subsequent water treatment, while decreases in wellhead production and water cut cause difficulties in gathering, transportation, and metering. The injection-production ratio (injection-production ratio) is fixed by the pump diameter and plunger area difference determined during pump selection. The water cut of the produced fluid at the wellhead can be improved by adjusting the anti-surge distance of the polished rod. However, since the produced and reinjected formations are located downhole, conventional surface metering methods cannot directly reflect the production status of in-well injection-production. Once the formation fluid properties or the water absorption capacity of the injection layer changes, the timeliness of the injection-production balance assessment is low, making it difficult to adjust the anti-surge distance in a timely manner to control the water cut at the wellhead. Furthermore, there is a lack of an accurate conversion model from the target water cut to the polished rod adjustment amount, making it difficult to accurately achieve the desired water cut target in one go. Summary of the Invention

[0004] To address the aforementioned technical problems, this application provides a method for adjusting the water cut at the wellhead of both injection and production wells in the same well, thereby resolving the existing issues.

[0005] The method for adjusting the water cut at the wellhead of a simultaneous injection and production well in this application adopts the following technical solution:

[0006] One embodiment of this application provides a method for adjusting the water cut at the wellhead of both injection and production wells in the same well, the method comprising the following steps:

[0007] Obtain the wellhead production rate and current wellhead water cut of the same injection and production wells, and obtain the injection volume of a single well to obtain the current injection-production ratio;

[0008] Based on the single-well injection volume, the wellhead fluid production volume, and the water absorption characteristics of the reinjection layer, the injection-production balance status of the injection-production wells in the same well is evaluated, and an anti-surge distance adjustment decision is generated.

[0009] When the adjustment is triggered, the target injection-production ratio required to adjust from the current wellhead water cut to the target wellhead water cut is calculated based on the target wellhead water cut and the formation fluid mass conservation relationship.

[0010] The required polishing rod adjustment amount is calculated by combining the target injection-production ratio and the current injection-production ratio with the influence of the polishing rod anti-scraping distance change on the production pump discharge rate.

[0011] Adjust the ground clearance of the polished rod according to the polished rod adjustment amount to change the discharge rate of the downhole production pump, so that the wellhead water cut of the injection and production wells in the same well reaches the target wellhead water cut.

[0012] In one embodiment, the process of obtaining the current injection-to-production ratio is as follows:

[0013] Within each evaluation period, the wellhead fluid production is obtained through a wellhead flow metering device, and the average wellhead fluid production and average single-well injection volume of the current evaluation period and a preset number of historical evaluation periods are obtained.

[0014] The ratio of the average injection rate per well to the average production rate at the wellhead is determined as the current injection-production ratio.

[0015] In one embodiment, obtaining the injection volume of a single well includes:

[0016] A dynamic model of the same-well injection-production rod string system is constructed. The calculated load of the dynamic model includes the load generated by the downhole production pump and injection pump during operation. Based on the surface suspension point parameters and the dynamic model, the pump-end dynamometer diagrams of the production pump and injection pump are obtained by reverse calculation. The single-well injection volume is determined according to the pump-end dynamometer diagram of the injection pump and the operating parameters of the pumping unit.

[0017] In one embodiment, determining the single-well injection volume based on the pump end indicator diagram of the injection pump and the operating parameters of the pumping unit includes:

[0018] The difference between the maximum and minimum displacements is extracted from the horizontal axis of the pump end indicator diagram of the injection pump, and is taken as the effective stroke of the injection pump.

[0019] The injection volume of a single well is calculated based on the effective stroke, the number of strokes in the operating parameters of the pumping unit, and the structural parameters of the injection pump.

[0020] In one embodiment, the process of generating the anti-slip distance adjustment decision is as follows:

[0021] Based on the single-well injection volume and wellhead production volume of multiple assessment cycles, the injection-production fluctuation characteristics that characterize the stability of the injection-production state are determined, and based on the water absorption characteristics of the reinjection layer, the water absorption evolution characteristics that characterize the trend of the water absorption capacity of the reinjection layer are determined.

[0022] Based on the characteristics of injection-production fluctuations, water absorption evolution, and expected water cut deviation, an anti-surge distance adjustment decision is generated, wherein the expected water cut deviation is determined based on the current wellhead water cut and the target wellhead water cut.

[0023] In one embodiment, the determination of the injection-production fluctuation characteristics includes:

[0024] Based on the single-well injection volume and wellhead production volume of the historical assessment period, the historical injection-production ratio sequence is obtained. Based on the historical injection-production ratio sequence, the injection-production ratio of the future assessment period is predicted to obtain the predicted injection-production ratio sequence.

[0025] The injection-production fluctuation characteristics are obtained by calculating the ratio of the fluctuation of the predicted injection-production ratio sequence to the fluctuation of the historical injection-production ratio sequence.

[0026] In one embodiment, determining the water absorption evolution characteristics includes:

[0027] Obtain the single-well injection volume and injection pressure for the current evaluation period, calculate the current reinjection layer water absorption index, and obtain the benchmark water absorption index under the benchmark operating conditions.

[0028] The water absorption evolution characteristics are determined based on the comparison between the current reinjection layer water absorption index and the benchmark water absorption index.

[0029] In one embodiment, the injection-production fluctuation characteristics and the water absorption evolution characteristics are fused to obtain the injection-production intervention coefficient. The injection-production intervention coefficient and the expected deviation of the water content are input into a pre-trained control decision model. Based on the output of the control decision model, it is determined whether to trigger the adjustment of the anti-surge distance of the polished rod.

[0030] In one embodiment, before calculating the desired target injection-production ratio, the method further includes obtaining the formation water cut of the injection and production wells in the same well.

[0031] In one embodiment, the calculation process of the target injection-to-enzyme ratio is as follows:

[0032] Based on the preset condition of ignoring the oil content of the reinjected fluid, the formation fluid material conservation relationship is taken as the equality of wellhead oil production and formation oil production. Based on the formation fluid material conservation relationship, a conversion model is constructed that includes the target injection-production ratio, the formation water cut, and the target wellhead water cut. The target injection-production ratio is calculated through this conversion model.

[0033] In one embodiment, the calculation process of the target injection-to-enzyme ratio is as follows:

[0034] The target wellhead oil cut is determined based on the target wellhead water cut, and the formation oil cut is determined based on the formation water cut. The ratio of the target wellhead oil cut to the formation oil cut is calculated, and the difference between this ratio and the value 1 is determined as the target injection-production ratio.

[0035] In one embodiment, the influence of the change in the anti-surge distance of the polished rod on the output pump is characterized by the pump efficiency change rate, and the process of obtaining the pump efficiency change rate includes:

[0036] Under stable operating conditions, the reference anti-surge distance and the corresponding reference liquid production volume are obtained. The anti-surge distance of the polished rod is adjusted to multiple test positions, and the test liquid production volume corresponding to each test position is obtained. Based on the positional change of multiple test positions relative to the reference anti-surge distance and the relative change rate of the corresponding test liquid production volume relative to the reference liquid production volume, the pump efficiency change rate is obtained by fitting.

[0037] In one embodiment, the process of determining the required adjustment amount of the guide rod is as follows:

[0038] Based on the current injection-production ratio and the target injection-production ratio, the target relative change in the output pump discharge is determined, and the ratio of the target relative change to the pump efficiency change rate is determined as the required polished rod adjustment amount.

[0039] In one embodiment, before adjusting the ground-based anti-slip distance of the light pole according to the light pole adjustment amount, the method further includes:

[0040] Based on the current polished rod height and the polished rod adjustment amount, the target polished rod height is determined, and a pre-set safe height range for injection and production wells in the same well is obtained. When the target polished rod height is within the safe height range, the step of adjusting the polished rod anti-scraping distance on the ground is executed.

[0041] In one embodiment, adjusting the ground-level anti-collision distance of the light pole according to the light pole adjustment amount includes:

[0042] With the pumping unit shut down, release the axial lock on the polished rod, change the suspension height of the polished rod outside the packing box at the wellhead according to the polished rod adjustment amount, and relock the polished rod. Then, start the pumping unit to resume injection and production operations in the same well.

[0043] In one embodiment, after adjusting the ground-level anti-collision distance of the light pole according to the light pole adjustment amount, the method further includes:

[0044] In the next evaluation cycle after the resumption of injection and production operations in the same well, the current wellhead water cut is reacquired. If the reacquired current wellhead water cut does not reach the target wellhead water cut, it is determined whether the current polished rod height is at the boundary of the safe height range. If it is not at the boundary, the step of re-evaluating the injection and production balance status of the injection and production wells in the same well is triggered to generate the anti-surge distance adjustment decision. If it is at the boundary, the anti-surge distance adjustment operation is stopped.

[0045] This application has at least the following beneficial effects:

[0046] This application comprehensively assesses the injection-production balance by acquiring single-well injection volume, wellhead production volume, and water absorption characteristics of the reinjection layer, and generates anti-surge distance adjustment decisions. This breaks the limitation of indirect observation of downhole conditions, transforming traditional lagging manual judgment into dynamic perception based on injection-production fluctuations and water absorption evolution characteristics. It can timely and accurately capture changes in formation fluid properties or water absorption capacity, avoiding ineffective control or missing the optimal intervention opportunity, effectively solving the problem of low timeliness in injection-production balance assessment in traditional processes. Secondly, a quantitative mapping model between the target water cut and the anti-surge distance adjustment amount is established. When adjustment is triggered, the target injection-production balance is strictly calculated based on the formation fluid mass conservation relationship. By comparing the impact of the polished rod anti-surge distance on the production pump discharge rate, the required polished rod adjustment amount is accurately calculated. This process successfully transforms the macroscopic target wellhead water cut into precise surface mechanical operation commands, significantly improving the control accuracy of the wellhead water cut. Finally, without changing the downhole dual-pump tubing structure, replacing the pump body, or altering the surface stroke and stroke rate of the pumping unit, the downhole production pump discharge rate and injection-production ratio can be flexibly changed simply by adjusting the surface polished rod anti-surge distance. This effectively curbs the rapid rise in wellhead water cut, alleviates surface water treatment pressure, greatly reduces the operating cost of the oil well, and extends the economically effective production period of the same injection-production well. Attached Figure Description

[0047] Figure 1 This is a schematic diagram of the injection and production tubing structure in the same well. In the diagram, 101 is the production pump, 102 is the sealing piston, 103 is the bridge packer, 104 is the bridge channel, 105 is the bridge packer, 106 is the injection pump, 107 is the oil-water separator, 108 is the produced fluid, 109 is the reinjection water, 110 is the formation fluid, 111 is the reinjection layer, and 112 is the produced layer.

[0048] Figure 2 A flowchart illustrating the steps of a method for adjusting the water cut at the wellhead of a co-injection and production well, as provided in this application. Detailed Implementation

[0049] The following, in conjunction with the accompanying drawings, details a specific scheme for adjusting the water cut at the wellhead of a co-injection and production well provided in this application.

[0050] The rod pump in-well injection-production system differs in structure from the conventional rod pump system. It features two pumps operating simultaneously downhole: an injection pump and a production pump. The production pump is located above the injection pump, and an interface exists within the rod string system (i.e., the location of the production pump). A schematic diagram of the in-well injection-production tubing structure is shown below. Figure 1 As shown, Figure 1 In the diagram, 101 is the production pump, 102 is the sealing piston, 103 is the bridge packer, 104 is the bridge channel, 105 is the bridge packer, 106 is the injection pump, 107 is the oil-water separator, 108 is the produced fluid, 109 is the reinjection water, 110 is the formation fluid, 111 is the reinjection layer, and 112 is the produced layer.

[0051] Formation produced fluid enters the downhole oil-water separator from the lower produced layer and is separated into lower water and upper oil-rich produced fluid in a short time. The separated lower water is circulated back into the injection layer by the injection pump; the separated upper oil-rich produced fluid is lifted to the surface by the production pump, realizing simultaneous injection and production in the same wellbore, and dual use of one well.

[0052] According to field statistics, injection pump failures account for over 90% of all failures in rod pump-based injection-production systems, while production pumps typically function normally. Assuming the production pump is operating normally, it employs a dual-plunger structure (differential type). The larger plunger is located at the top, bearing the discharge pressure during the upstroke, while the smaller plunger is located at the bottom, bearing the discharge pressure during the downstroke. The static load of the production pump is the stable load component borne by the plungers during the upstroke and downstroke, caused by the liquid column pressure and gravity, and forms the basis for calculating the total load.

[0053] Formula for static load of pump during the top stroke: ;

[0054] Formula for static load of pump during downstroke: ;

[0055] In the above formula, The static load of the pump is extracted during the upstroke. The static load of the pump is extracted during the downstroke. It is the diameter of the large plunger of the extraction pump. It is the diameter of the small plunger of the extraction pump. It is the diameter of the sucker rod. The absolute pressure at the pump outlet, in Pa. The absolute pressure at the pump inlet, in Pa. It is the sum of the weights of the large and small plungers of the extraction pump. It is the total weight of the sucker rod string.

[0056] During the upstroke, the upper valve of the production pump is closed and the lower valve is open. The pressure-bearing area of ​​the plunger is the cross-sectional area of ​​the large plunger minus the cross-sectional area of ​​the sucker rod. The first term of the formula The second term represents the downward thrust generated by the discharge pressure acting on the upper surface of the plunger. This represents the upward thrust generated by the suction pressure acting on the lower surface of the plunger; the difference between the two is the net load generated by the liquid column, plus the plunger's own weight. Weight of the rod This yields the total static load that the suspension point needs to withstand. The calculation principle for the downstroke is the same, but the pressure-bearing area is replaced by the cross-sectional area of ​​a small plunger. This reflects the change in the pressure-bearing area caused by the change in valve state during the downstroke. In addition to the static load, the production pump and injection pump are also affected by dynamic loads during operation. These dynamic loads are caused by the variable speed motion of the sucker rod (inertial load), elastic vibration (vibration load), and frictional resistance (friction load), which are superimposed on the static load to form the total load. A dynamic model of the same well's production and injection rod system is constructed by integrating the various loads generated by the production and injection pumps during operation. Then, based on the measured surface suspension point parameters (such as suspension point load and displacement) and the aforementioned dynamic model, the pump-end dynamometer diagrams of the production and injection pumps are obtained using the existing Gibbs model-based back-calculation method.

[0057] This application provides an embodiment of a method for adjusting the wellhead water cut of a co-injection and co-production well. Specifically, the method is described below. Please refer to [link to relevant documentation]. Figure 2 The method includes the following steps:

[0058] Within one evaluation cycle (1 hour of continuous operation in this embodiment), the wellhead production rate is obtained through a multiphase flow metering system at the wellhead of the same injection and production wells, and the current wellhead water cut is obtained through a water cut analyzer. Based on the dynamometer diagrams of the production pump and injection pump obtained from the above kinetic model, combined with the measured production rate, water cut, and other production parameters at the wellhead, five monitoring data reflecting the production status of the same injection and production wells can be calculated. The definitions and calculation methods of each data point are explained below.

[0059] (a) Wellhead fluid production (Unit: m³ / h)

[0060] Definition: The total volume of liquid actually extracted to the surface from the wellhead of the same injection and production well per hour, including oil and water.

[0061] Calculation method: After the produced fluid is lifted to the surface, the total amount of produced fluid is measured in real time through a multiphase flow metering system. The cumulative flow rate during one evaluation cycle of the well operation period is recorded as the wellhead production.

[0062] (ii) Current wellhead water cut (Dimensionless, usually expressed as a percentage)

[0063] Definition: The volume fraction of water in the produced fluid at the wellhead during the current assessment period.

[0064] Calculation method: After the produced fluid is lifted to the surface, the water cut of the produced fluid at the wellhead is continuously monitored using a water cut analyzer. The average value within the current evaluation period during the well's operation is taken as the current wellhead water cut. .

[0065] (iii) Wellhead oil production (Unit: t / h)

[0066] Definition: The volume of crude oil actually extracted from the wellhead to the surface per hour, converted into mass.

[0067] Calculation method: ,in, The current wellhead water cut, This refers to the density of crude oil.

[0068] (iv) Injection volume per well (Unit: m³ / h)

[0069] Definition: The volume of liquid injected into the reinjection layer by the injection pump per hour.

[0070] Calculation method: Calculated based on the dynamometer diagram of the injection pump and the operating parameters of the pumping unit. First, the difference between the maximum and minimum displacements is extracted from the abscissa of the dynamometer diagram of the injection pump, which is taken as the effective stroke of the injection pump. Then, calculate the injection volume of a single well. In the formula, n is the number of strokes, which are the operating parameters of the pumping unit. This is the effective cross-sectional area of ​​the injection pump plunger. To ensure dimensional consistency, all parameters are converted to international standard units (length in meters, area in m²) before being substituted into the above formula, thus obtaining the effective stroke. The unit is m, and the calculated injection volume is ultimately converted to m³ / h.

[0071] (v) Water absorption index of reinjection layer (Unit: m³ / (h·MPa))

[0072] Definition: Injection volume per unit equivalent wellhead injection pressure, characterizing the water absorption capacity of the reinjection layer.

[0073] Calculation method: , This refers to the converted wellhead injection pressure (converting the injection pressure at the injection layer to the equivalent pressure value at the wellhead). It's based on the apparent water absorption index calculation formula. However, while conventional injection wells allow direct measurement of the injection pressure at the wellhead, in in-well injection-production wells, the injection is pumped in at the bottom of the well. Therefore, the converted wellhead injection pressure is used. Equivalent replacement wellhead water injection pressure. Among them, , This is the injection pressure of the reinjection layer, which is equivalently replaced by the injection pump discharge pressure obtained from the analysis of the injection pump terminal indicator diagram. It is the density of the liquid inside the wellbore. It is gravitational acceleration. This refers to the pump hanger depth of the injection pump. To ensure dimensional consistency, the converted wellhead injection pressure is calculated. At that time, density The unit is kg / m³. Take 9.8 m / s², The unit is m. The unit is Pa, and the calculation is as follows. The unit is Pa, in calculation It is necessary to The unit is converted from Pa to MPa.

[0074] For water-drive blocks, the life-cycle operating characteristics of the same-well injection-production technology vary significantly with the development stage. In the early stages of development (low and medium water cut), the formation energy is relatively abundant, the production layer has a strong fluid supply capacity, the reinjection layer has a good original pore structure, and the apparent water absorption index is at a high level, making it easy to maintain the injection-production balance. In the middle and late stages of development (high and ultra-high water cut), the production layer experiences significant water flooding, and the water cut of the wellhead fluid rises sharply. At this time, the reinjection layer is subjected to long-term scouring by injected water, causing clay minerals to migrate and hydrate and expand, leading to pore throat blockage, decreased permeability, and a decreasing apparent water absorption index. The injection-production balance becomes fragile, requiring frequent adjustments to the injection-production ratio to curb the rapid rise in water cut and extend the economical production period.

[0075] Existing same-well injection-production processes use daily data as statistical parameters, suitable for routine production reports and performance evaluations. This embodiment aims to achieve dynamic control of wellhead water cut in same-well injection-production, requiring a shorter operational assessment cycle. Simultaneously, to eliminate the impact of random fluctuations in the single-stroke flow of the production and injection pumps and improve the reliability of same-well injection-production operational parameter calculations, a continuous 1-hour assessment cycle is chosen, increasing the response speed from daily to hourly levels to meet the need for precise water cut control in same-well injection-production wells. Monitoring data reflecting the same-well injection-production production status are acquired for each assessment cycle, specifically including: wellhead fluid production. Current wellhead water cut Oil production at the wellhead Single well injection volume Water absorption index of reinjection layer .

[0076] This application calculates the injection volume of a single well for injection and production in any evaluation period. With wellhead fluid production The ratio of injection to production is used as the injection-production ratio for that assessment period. It is used to reflect the material balance relationship between injection and production in a single well within the same injection and production cycle. This indicates that the injection is greater than the extraction. This indicates that production exceeds injection. The injection-production ratio (IPR) of a single well with the same injection and production capacity is collected for a predetermined number of historical evaluation periods (e.g., the most recent 24) during operation, and arranged in ascending order of time to form a historical IPR sequence. A time-series prediction algorithm is used to predict the IPR sequence for multiple future evaluation periods based on the historical IPR sequence. In this embodiment, the multiple future evaluation periods are preferably the time period corresponding to the next shift (in an 8-hour format, i.e., the next 8 evaluation periods). In this embodiment, the time-series prediction algorithm preferably uses the ARIMA algorithm; in other embodiments, exponential smoothing algorithms or XGBoost algorithms can also be used.

[0077] Calculate and obtain the injection-production fluctuation characteristics of a single well in the same injection and production process, specifically reflected in the injection-production state deviation. This is used to characterize the stability of the injection-production balance state of a single well within the same injection-production system. In the formula, This represents the fluctuation level of the historical injection-production ratio sequence. In this example, it is the standard deviation of the injection-production ratio over a historical evaluation period, covering a complete natural day of injection and production in the same well (e.g., the most recent 24 hours), which can reflect the diurnal response characteristics of the formation. This predicts the volatility of the injection-to-production ratio sequence. In this example, it represents the standard deviation of the predicted injection-to-production ratio for a future evaluation period, corresponding to the working time of one shift (8 hours), meeting the refined requirements for implementing injection-to-production control schemes on-site. Specifically, when the system is in a stable state, i.e., the volatility of the historical injection-to-production ratio sequence... When it equals zero, the injection-collection state deviation will be... The value is set to 1.

[0078] When the injection and production status deviates A value greater than 1 indicates that the actual fluctuation exceeds normal expectations, and abnormal conditions such as a sudden drop in the water absorption capacity of the reinjection layer, aggravated water flooding in the produced layer, or ineffective circulation of injected water along high-permeability channels may occur. Timely adjustment of the injection-production ratio or remedial measures such as increased injection or profile control are necessary. When the injection-production state deviates... A value less than 1 indicates that the injection-production system may gradually enter a stable dynamic equilibrium state in the short term, and the economical production period can be extended without additional intervention. The injection-production balance of a single well in the same well depends not only on the injection-production ratio value of the current assessment period, but also on whether the reinjection layer can maintain the target injection-production ratio in the long term (i.e., dynamic sustainability).

[0079] Water absorption index of reinjection layer It directly reflects the dynamic evolution of the physical properties (permeability, porosity, pore throat structure) of the reinjection layer during the water injection development process, and is a key indicator for evaluating the water absorption performance of the reinjection layer in the same injection and production well. The larger the value, the stronger the water absorption capacity of the reinjection layer, and the easier the injection. This application uses the following formula to calculate the water absorption evolution characteristics of a single injection-production well of the same well, specifically reflected in the rate of change of reinjection water absorption characteristics. , In the formula, It is the benchmark water absorption index under the benchmark operating conditions. It is obtained by taking the average value of the reinjection layer water absorption index obtained in each evaluation period during the initial production stage of injection and production wells of the same well or the recovery to stable production stage after the most recent well bottom operation, and using it as the benchmark water absorption index of a single injection and production well of the same well.

[0080] Change rate of reinjection water absorption characteristics These are characterizing parameters of the dynamic evolution of reinjection layer properties, reflecting the sustainability of the injection-production balance in a single well and the feasibility of water cut regulation. When At higher levels, the injection-production balance has a maintainable physical basis, allowing the injection-production system to finely control the wellhead water cut through frequent anti-surge distance adjustments; when At lower pressures, the reinjection layer is in a rapid deterioration phase. Frequent pressure fluctuations will subject the reinjection layer rock skeleton to alternating loads. For reservoirs that have already experienced clay mineral expansion, this alternating stress will accelerate particle detachment and migration, significantly shortening the economical mining period.

[0081] The injection-production fluctuation characteristics and the water absorption evolution characteristics are fused to obtain the injection-production intervention coefficient. : ; , These are the first intervention weight and the second intervention weight, respectively. Historical data from each evaluation period of a single well under the same injection-production development model in a water-drive block are collected and objectively weighted using the entropy method. For ease of engineering implementation, the first intervention weight is preferred in this embodiment. The value is 0.6, the second intervention weight. The value is 0.4.

[0082] This application uses the injection and production status deviation of a single well under the current operating conditions in the same well as the injection and production process. and the rate of change of reinjection water absorption characteristics As two independent dimensions, representing the volatility of the injection-production system's future short-term operating conditions and the sustainability of the dynamic evolution of reinjection layer properties, respectively, an injection-production intervention coefficient is constructed through a weighted linear fusion method. This is used to comprehensively quantify the urgency of intervening and controlling the wellhead water cut under current formation conditions.

[0083] Injection intervention coefficient and the expected deviation of moisture content This serves as the input feature vector for a pre-trained control decision model. The expected water cut deviation is based on the current wellhead water cut. With the target wellhead water cut Determined, specifically defined as the difference between the two, that is It is used to characterize the degree to which the current water content deviates from the upper limit of economic mining.

[0084] The control decision-making model specifically adopts the SVM model, with a binary label y=1 indicating "adjustment of anti-surge distance is needed" and y=0 indicating "no adjustment of anti-surge distance is required". Under the same-well injection-production development mode in water-drive blocks, the corresponding injection-production intervention coefficient is calculated using each historical evaluation period as a time node. and the expected deviation of moisture content This forms a two-dimensional feature vector. Based on the actual times when manual anti-surge distance adjustments were performed in the historical production records of the same injection and production wells, the times of adjustment were... The evaluation period in which it occurs is called the execution period. And define the following tag rules: The execution cycle With execution cycle The two-dimensional feature vectors obtained from each evaluation cycle within the first 6 hours are marked as positive samples y=1 (the anti-scratching distance needs to be adjusted); in the remaining unmarked production cycles, the two-dimensional feature vectors obtained from the evaluation cycles with an equal number of positive samples are randomly selected and marked as negative samples y=0 (no need to adjust the anti-scratching distance).

[0085] After the regulatory decision-making model is deployed, data is collected in real time at the end of each evaluation cycle. and The model is then input, and based on the output of the control decision model, it is determined whether to trigger an adjustment to the anti-slip distance of the light rod: when the model outputs y=1, an anti-slip distance adjustment decision is automatically generated.

[0086] The injection-production well uses an adjustable effective stroke pump. By adjusting the anti-surge distance of the polished rod on the ground, the relative position of the piston reciprocating within the pump barrel is changed, and the effective stroke length of the plunger changes accordingly. Operators do not need to remove the downhole tubing, replace the pump body, or change the stroke and stroke parameters of the surface pumping unit. They can flexibly adjust the production pump discharge rate simply by adjusting the anti-surge distance of the polished rod on the ground. Moreover, the change in the production pump discharge rate in the injection-production system will change the injection-production ratio. Therefore, within the adjustable range of the injection-production ratio, the wellhead water cut can be effectively controlled.

[0087] This application is based on a quantitative calculation model to achieve accurate conversion from target wellhead water cut to polished rod adjustment. The core parameters and relationships are as follows:

[0088] When the control decision model outputs y=1, the anti-surge distance adjustment decision is automatically triggered. The wellhead fluid production data for the most recent 24 hours is collected. The average value was used as the pre-adjustment production volume, and the injection volume of a single well over the past 24 hours was collected. The average value of the two is used as the injection volume before adjustment, and the ratio of the two is determined as the current injection-production ratio. Simultaneously, the formation water cut of the injection and production wells in the same well was obtained. This value can be obtained through downhole testing under recent stable operating conditions; production planning constraint data corresponding to injection and production wells of the same type can be obtained, and the preset expected water cut threshold in this data can be determined as the target wellhead water cut. .

[0089] The effect of changes in the polished mast anti-surge distance on the production pump's output is defined as the pump efficiency change rate 'a'. This pump efficiency change rate represents the relative change in the production pump's output per unit length (cm) of the polished mast being raised or lowered. -1 .

[0090] For production pumps with different stroke specifications, the process of obtaining the pump efficiency change rate 'a' includes: under normal production and stable operating conditions in the same injection and production wells, firstly, recording the current baseline anti-surge distance of the polished rod. (Unit: cm), and obtain the corresponding baseline product volume. Then, without removing the discharge string, replacing the pump body, or changing the ground stroke and number of strokes, adjust the anti-surge distance of the polished rod to multiple test positions. (Unit: cm) Each test position should be evenly distributed within the adjustable effective stroke range of the pump; after adjusting to each test position, wait for the operating conditions to stabilize, and then obtain the test liquid volume corresponding to each test position. Based on the positional changes of multiple test locations relative to the reference anti-collision distance. And the corresponding rate of change of the test product volume relative to the baseline product volume. ,by For independent variable, Using i as the dependent variable, linear regression is performed using methods such as least squares, and the fitted regression coefficient is the pump efficiency change rate α; where i represents the i-th test location. This represents the anti-slip distance of the optical rod at the i-th test position. This represents the test liquid volume at the i-th test location.

[0091] When the adjustment is triggered, it is based on the target wellhead water cut. Based on the conservation relationship of formation fluid matter, calculate the required target injection-production ratio. The specific conversion model is as follows: based on the preset condition of ignoring the oil content of the reinjected fluid, the formation fluid material conservation relationship is taken as the equality of wellhead oil production and formation oil production. This is based on the target wellhead water cut. Determine the target wellhead oil cut And based on the formation water content Determine the oil content of the formation Calculate the ratio of the target wellhead oil cut to the formation oil cut, and determine the difference between this ratio and the value of 1 as the target injection-production ratio. ,Right now .

[0092] From the target injection ratio Compared to the current injection-production ratio Based on the pump efficiency change rate 'a', the required adjustment amount of the polished rod is calculated. Set the adjustment amount of the guide rod to... If raising is positive and lowering is negative, then the target relative change in the output pump discharge after adjustment is: The ratio of the relative change of the target to the pump efficiency change rate 'a' is determined as the required adjustment amount of the polished rod, i.e. .

[0093] To ensure the safety and effectiveness of the adjustment operation, before adjusting the ground-based anti-collision distance of the polished rod according to the aforementioned adjustment amount, it is necessary to determine the reference zero point and safe height range for the polished rod adjustment:

[0094] After well completion, slowly raise the polished rod using the workover rig, observing the weight indicator until the rod string shows a suspended weight. At this point, measure the distance from the top edge of the polished rod anti-detachment cap to the top edge of the wellhead packing box; this distance is the reference zero point for the anti-collision pump. This position ensures that the plunger does not touch the pump when the pumping unit reaches the bottom dead center, and at this time the production pump is in its rated pump efficiency working state.

[0095] The theoretical upper limit of the adjustment is to ensure that the downhole disconnector does not disengage when the pumping unit reaches top dead center. The maximum allowable safe travel distance of the disconnector is determined by extracting the upper and lower stroke clearances of the disconnector from the tubing structure parameters recorded in the well completion log. The maximum height that the bare pole can be safely raised to. From the formula It is determined that S represents the aforementioned surface stroke of the pumping unit. Therefore, the pre-set safe height range for injection and production wells in the same well is... .

[0096] In field applications, after obtaining the required adjustment amount of the guide rod based on the aforementioned conversion model, precise control is performed following a standardized procedure:

[0097] Based on the current pole height The required adjustment amount of the guide rod obtained from the aforementioned calculations Determine the height of the target light pole , .

[0098] At the height of the target light pole Located in the safe height range During this period, the steps for adjusting the anti-slip distance of the polished rod on the ground include: releasing the axial lock on the polished rod while the pumping unit is stopped; and adjusting the polished rod according to the adjustment amount. Change the suspension height of the polished rod outside the packing box at the wellhead and relock the polished rod; start the pumping unit to resume injection and production operations in the same well. The target polished rod height is calculated by superimposing the results. When the height exceeds the safe height range, the height is truncated to the boundary value corresponding to the safe height range, and then the step of adjusting the ground-based anti-collision distance of the bare pole is performed.

[0099] In the next assessment cycle after the resumption of injection and production operations in the same well, the current wellhead water cut will be re-acquired. If the current wellhead water cut obtained again does not reach the target wellhead water cut. When the current polished rod height is within the boundary of the safe height range, if it is not within the boundary, the step of re-evaluating the injection-production balance of the same well and generating the anti-impact distance adjustment decision is triggered to achieve closed-loop control of wellhead water cut and long-term precise control of oil well production status; if it is within the boundary, the adjustment is stopped and an early warning is output.

Claims

1. A method for adjusting the water cut at the wellhead of both injection and production wells in the same well, characterized in that, The method includes the following steps: Obtain the wellhead production rate and current wellhead water cut of the same injection and production wells, and obtain the injection volume of a single well to obtain the current injection-production ratio; Based on the single-well injection volume, the wellhead fluid production volume, and the water absorption characteristics of the reinjection layer, the injection-production balance status of the injection-production wells in the same well is evaluated, and an anti-surge distance adjustment decision is generated. When the adjustment is triggered, the target injection-production ratio required to adjust from the current wellhead water cut to the target wellhead water cut is calculated based on the target wellhead water cut and the formation fluid mass conservation relationship. The required polishing rod adjustment amount is calculated by combining the target injection-production ratio and the current injection-production ratio with the influence of the polishing rod anti-scraping distance change on the production pump discharge rate. Adjust the ground surface anti-surge distance of the polished rod according to the polished rod adjustment amount to change the discharge rate of the downhole production pump, so that the wellhead water cut of the injection and production wells in the same well reaches the target wellhead water cut.

2. The method for adjusting the water cut at the wellhead of a simultaneous injection and production well as described in claim 1, characterized in that, The process for obtaining the current injection-production ratio is as follows: Within each evaluation period, the wellhead fluid production is obtained through a wellhead flow metering device, and the average wellhead fluid production and average single-well injection volume of the current evaluation period and a preset number of historical evaluation periods are obtained. The ratio of the average injection rate per well to the average production rate at the wellhead is determined as the current injection-production ratio.

3. The method for adjusting the water cut at the wellhead of a simultaneous injection and production well as described in claim 2, characterized in that, The acquisition of the single-well injection volume includes: A dynamic model of the same-well injection-production rod string system is constructed. The calculated load of the dynamic model includes the load generated by the downhole production pump and injection pump during operation. Based on the surface suspension point parameters and the dynamic model, the pump-end dynamometer diagrams of the production pump and injection pump are obtained by reverse calculation. The single-well injection volume is determined according to the pump-end dynamometer diagram of the injection pump and the operating parameters of the pumping unit.

4. The method for adjusting the water cut at the wellhead of a simultaneous injection and production well as described in claim 3, characterized in that, The determination of the single-well injection volume based on the pump end indicator diagram of the injection pump and the operating parameters of the pumping unit includes: The difference between the maximum and minimum displacements is extracted from the horizontal axis of the pump end indicator diagram of the injection pump, and is taken as the effective stroke of the injection pump. The injection volume of a single well is calculated based on the effective stroke, the number of strokes in the operating parameters of the pumping unit, and the structural parameters of the injection pump.

5. The method for adjusting the water cut at the wellhead of a simultaneous injection and production well as described in claim 1, characterized in that, The process of generating the anti-slip distance adjustment decision is as follows: Based on the single-well injection volume and wellhead production volume of multiple assessment cycles, the injection-production fluctuation characteristics that characterize the stability of the injection-production state are determined, and based on the water absorption characteristics of the reinjection layer, the water absorption evolution characteristics that characterize the trend of the water absorption capacity of the reinjection layer are determined. Based on the characteristics of injection-production fluctuations, water absorption evolution, and expected water cut deviation, an anti-surge distance adjustment decision is generated, wherein the expected water cut deviation is determined based on the current wellhead water cut and the target wellhead water cut.

6. The method for adjusting the water cut at the wellhead of an injection-production well as described in claim 5, characterized in that, The determination of the injection-production fluctuation characteristics includes: Based on the single-well injection volume and wellhead production volume of the historical assessment period, the historical injection-production ratio sequence is obtained. Based on the historical injection-production ratio sequence, the injection-production ratio of the future assessment period is predicted to obtain the predicted injection-production ratio sequence. The injection-production fluctuation characteristics are obtained by calculating the ratio of the fluctuation of the predicted injection-production ratio sequence to the fluctuation of the historical injection-production ratio sequence.

7. The method for adjusting the water cut at the wellhead of a simultaneous injection and production well as described in claim 5, characterized in that, The determination of the water absorption evolution characteristics includes: Obtain the single-well injection volume and injection pressure for the current evaluation period, calculate the current reinjection layer water absorption index, and obtain the benchmark water absorption index under the benchmark operating conditions. The water absorption evolution characteristics are determined based on the comparison between the current reinjection layer water absorption index and the benchmark water absorption index.

8. The method for adjusting the water cut at the wellhead of a simultaneous injection and production well as described in claim 5, characterized in that, The injection-production fluctuation characteristics and the water absorption evolution characteristics are fused to obtain the injection-production intervention coefficient. The injection-production intervention coefficient and the expected water content deviation are input into a pre-trained control decision model. Based on the output of the control decision model, it is determined whether to trigger the adjustment of the anti-surge distance of the polished rod.

9. The method for adjusting the water cut at the wellhead of a simultaneous injection and production well as described in claim 1, characterized in that, Before calculating the required target injection-production ratio, the method also includes obtaining the formation water cut of the injection and production wells in the same well.

10. The method for adjusting the water cut at the wellhead of an injection-production well as described in claim 9, characterized in that, The calculation process for the target injection-production ratio is as follows: Based on the preset condition of ignoring the oil content of the reinjected fluid, the formation fluid material conservation relationship is taken as the equality of wellhead oil production and formation oil production. Based on the formation fluid material conservation relationship, a conversion model is constructed that includes the target injection-production ratio, the formation water cut, and the target wellhead water cut. The target injection-production ratio is calculated through this conversion model.

11. The method for adjusting the water cut at the wellhead of an injection-production well as described in claim 10, characterized in that, The calculation process for the target injection-production ratio is as follows: The target wellhead oil cut is determined based on the target wellhead water cut, and the formation oil cut is determined based on the formation water cut. The ratio of the target wellhead oil cut to the formation oil cut is calculated, and the difference between this ratio and the value 1 is determined as the target injection-production ratio.

12. The method for adjusting the water cut at the wellhead of a simultaneous injection and production well as described in claim 1, characterized in that, The influence of the change in the anti-surge distance of the polished rod on the output pump is characterized by the pump efficiency change rate, and the process of obtaining the pump efficiency change rate includes: Under stable operating conditions, the reference anti-surge distance and the corresponding reference liquid production volume are obtained. The anti-surge distance of the polished rod is adjusted to multiple test positions, and the test liquid production volume corresponding to each test position is obtained. Based on the positional change of multiple test positions relative to the reference anti-surge distance and the relative change rate of the corresponding test liquid production volume relative to the reference liquid production volume, the pump efficiency change rate is obtained by fitting.

13. The method for adjusting the water cut at the wellhead of an injection-production well as described in claim 12, characterized in that, The process for determining the required adjustment amount of the optical rod is as follows: Based on the current injection-production ratio and the target injection-production ratio, the target relative change in the output pump discharge is determined, and the ratio of the target relative change to the pump efficiency change rate is determined as the required polished rod adjustment amount.

14. The method for adjusting the water cut at the wellhead of a simultaneous injection and production well as described in claim 1, characterized in that, Before adjusting the ground-level anti-collision distance of the optical pole according to the optical pole adjustment amount, the method further includes: Based on the current polished rod height and the polished rod adjustment amount, the target polished rod height is determined, and a pre-set safe height range for injection and production wells in the same well is obtained. When the target polished rod height is within the safe height range, the step of adjusting the polished rod anti-scraping distance on the ground is executed.

15. The method for adjusting the water cut at the wellhead of a simultaneous injection and production well as described in claim 1, characterized in that, The step of adjusting the anti-collision distance of the ground according to the adjustment amount of the optical pole includes: With the pumping unit shut down, release the axial lock on the polished rod, change the suspension height of the polished rod outside the packing box at the wellhead according to the polished rod adjustment amount, and relock the polished rod. Then, start the pumping unit to resume injection and production operations in the same well.

16. The method for adjusting the water cut at the wellhead of an injection-production well as described in claim 14, characterized in that, After adjusting the anti-collision distance of the ground according to the adjustment amount of the optical rod, the method further includes: In the next evaluation cycle after the resumption of injection and production operations in the same well, the current wellhead water cut is reacquired. If the reacquired current wellhead water cut does not reach the target wellhead water cut, it is determined whether the current polished rod height is at the boundary of the safe height range. If it is not at the boundary, the step of re-evaluating the injection and production balance status of the injection and production wells in the same well is triggered to generate the anti-surge distance adjustment decision. If it is at the boundary, the anti-surge distance adjustment operation is stopped.