An automated production line for rare earth permanent magnet materials
By introducing a pressurization and demolding mechanism into the automated production line for rare earth permanent magnet materials, precise pressing and efficient demolding of the blanks were achieved, solving the problem of blank adhesion and improving production efficiency and product quality.
Patent Information
- Application Number
- CN202611404601.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-10
- Publication Date
- 2026-11-10
AI Technical Summary
In existing automated production lines for rare earth permanent magnet materials, after pressing, the blanks tend to stick to the surface of the mold or press head, leading to difficulties in demolding and damage.
The design employs a combination of a pressure mechanism and a demolding mechanism, including a bidirectional spiral rod, a spiral sleeve, a pressure plate, a lifting cylinder, an adsorption magnetic block, and a striking head, to achieve efficient demolding through precise control of pressure and vibration.
It improves the compaction effect and demolding success rate of rare earth permanent magnet materials, reduces blank damage, and lowers the cost of manual cleaning and maintenance.
Smart Images

Figure CN123072913A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of rare earth permanent magnet material preparation technology, specifically relating to an automated production line for rare earth permanent magnet materials. Background Technology
[0002] The production of permanent magnet materials is transforming and upgrading from traditional manual operation to automation and intelligence. However, existing permanent magnet material molding production lines rely heavily on manual intervention, resulting in problems such as low production efficiency, poor product consistency, and high demolding breakage rate. This is of great significance for improving the high-value utilization level of my country's rare earth resources and promoting the high-quality development of the industry.
[0003] Patent CN108682528B discloses an automated production line for rare earth permanent magnet materials, including an automatic weighing machine, a magnetic field forming press, a dry isostatic press, a pressing moving chamber, a cutting chamber, a transition chamber, a storage chamber, a conveying mechanism II, and a sintering furnace; the pressing moving chamber is equipped with a pressing moving device; and a waste material recovery device is installed below the cutting chamber. Beneficial effects: This invention processes the pressed green blanks before sintering using a sawing method, resulting in high processing efficiency, low magnetic powder loss, and high utilization. This invention enables unmanned and flexible production, realizing a magnetic field forming system that eliminates the need for mold changes, plastic bag packaging, and forming workers, reducing operators, saving production costs, and improving production efficiency.
[0004] The above-mentioned device also has the following problems: Although the device has achieved the basic pressing function, in the actual production process, the pressure control accuracy of the hydraulic system is limited, making it difficult to accurately adjust the pressing pressure according to the material characteristics. Moreover, after pressing, the blank is easy to stick to the mold or press head surface, making demolding difficult and causing the blank to break. Summary of the Invention
[0005] The purpose of this invention is to provide an automated production line for rare earth permanent magnet materials to solve the problem that the blanks easily adhere to the surface of the mold or press head after pressing, making demolding difficult and causing the blanks to break.
[0006] To achieve the above objectives, the present invention provides an automated production line for rare earth permanent magnet materials, including a frame, a feeding mechanism on the left side of the frame, a pressing and forming mechanism on the left side of the feeding mechanism, the pressing and forming mechanism and the feeding mechanism being connected by a conveyor belt, the feeding mechanism and the frame being connected by a conveyor belt, a pressurizing mechanism on the side wall of the frame, a demolding mechanism on the inner wall of the frame, and a monitoring and cleaning mechanism on the top of the frame. The pressurizing mechanism includes a bidirectional spiral rod, a spiral sleeve, a connecting arm, a push block, a sliding frame, a buffer rod, and a pressure plate. The bidirectional spiral rod is rotatably connected to the bottom of the frame. A motor is installed on the left side of the bidirectional spiral rod, and the bidirectional spiral rod is fixedly connected to the output end of the motor. The spiral sleeve is movably connected to the outer circumferential surface of the bidirectional spiral rod. A movable key is provided between the inner walls of the spiral sleeve, and the movable key is located in the spiral groove on the outer circumferential surface of the bidirectional spiral rod. The connecting arm is fixedly connected to the outer wall of the spiral sleeve. The push block is fixedly connected to the outer wall of the connecting arm. The sliding frame is slidably connected to the inner wall of the frame. The buffer rod is slidably connected to the inner wall of the sliding frame. The buffer rod and the push block are fixedly connected. The sliding frame and the push block are connected by a spring, and the spring is sleeved on the outer circumferential surface of the buffer rod. The pressure plate is fixedly connected to the outer wall of the sliding frame, and the pressure plate is slidably connected to the inner wall of the frame.
[0007] According to the above technical solution, the pressurizing mechanism further includes a lifting cylinder, an upper pressure plate, and a support frame. The lifting cylinder is slidably connected to the outer wall of the frame, the upper pressure plate is disposed at the bottom of the lifting cylinder, and the support frame is fixedly connected to the top of the frame.
[0008] According to the above technical solution, the pressurizing mechanism further includes a sliding plate, a connecting column, a lower pressing block, and a guide block. The sliding plate is slidably connected to the outer wall of the support frame, the connecting column is fixedly connected to the bottom of the sliding plate, the lower pressing block is fixedly connected to the bottom of the upper pressing plate, the guide block is fixedly connected to the top of the connecting column, the lower pressing block and the guide block are slidably connected, and the lower pressing block and the connecting column are slidably connected. The top of the rare earth permanent magnet material inside the frame can be fully compressed, making the rare earth permanent magnet material more compact, thereby improving the compaction effect of the production line on the rare earth permanent magnet material.
[0009] According to the above technical solution, the demolding mechanism includes a baffle and a limiting seat. The baffle is slidably connected to the outer wall of the pressure plate, and the limiting seat is fixedly connected to the outer wall of the baffle. The limiting seat is connected to the inner wall of the frame by a spring, and the baffle is located on the movement trajectory of the connecting column.
[0010] According to the above technical solution, the demolding mechanism further includes a transverse slide and an adsorption magnetic block. The transverse slide is fixedly connected to the outer wall of the lifting cylinder, and the adsorption magnetic block is fixedly connected to the outer wall of the transverse slide.
[0011] According to the above technical solution, the demolding mechanism further includes an armature, a vibrating block, and a striking head. The vibrating block is slidably connected to the inner wall of the frame, the armature is fixedly connected to the outer wall of the vibrating block, and the striking head is fixedly connected to the outer wall of the vibrating block. The striking head is connected to the inner wall of the frame by a spring, and the inner wall of the frame is located on the movement trajectory of the striking head. The striking head is reset by a spring and then strikes the inner wall of the frame, causing the inner wall of the frame to vibrate, thereby improving the demolding effect of the device on the finished rare earth permanent magnet material inside.
[0012] According to the above technical solution, the monitoring and cleaning mechanism includes a pressure sensor and a display screen. The pressure sensor is fixedly connected to the outer wall of the buffer rod, and the display screen is disposed on the outer wall of the pressure sensor.
[0013] According to the above technical solution, the monitoring and cleaning mechanism further includes a contact head and a cleaning slot. The contact head is disposed on the outer wall of the pressure sensor, the outer wall of the frame is located on the movement trajectory of the contact head, and the cleaning slot is opened on the inner wall of the connecting column.
[0014] According to the above technical solution, the monitoring and cleaning mechanism further includes a scraper and a handle. The scraper is slidably connected to the bottom of the connecting column, and the handle is fixedly connected to the outer wall of the scraper. The residue of rare earth permanent magnet materials will be scraped off by the scraper, thereby reducing the cost of manual cleaning and maintenance. The scraper and handle need to be removed during the movement of the device.
[0015] The beneficial effects of this invention are: 1. In this invention, with the cooperation of the connecting arm, push block, lifting cylinder, and pressure plate, the connecting arm converges towards the center, causing the push block to converge towards the center. Subsequently, the buffer rod, pushed by the push block, will drive the sliding frame to move under the limit of the frame. During the movement, the sliding frame will push the pressure plate. Then, the pressure plate moves to extrude and plasticize the rare earth permanent magnet material inside the frame. This step is controlled by the mechanical pitch of the bidirectional screw rod, and the pressure of the pressure plate on the plasticizing of the internal rare earth permanent magnet material can be freely adjusted. The lifting cylinder reciprocates under the limit of the frame. During the reciprocating movement, the lifting cylinder drives the lower pressing block to reciprocate under the limit of the guide block. Then, during the movement, the lower pressing block applies pressure to the rare earth permanent magnet material at the bottom through the connecting column, so that the top of the rare earth permanent magnet material inside the frame can be fully squeezed, making the rare earth permanent magnet material more compact, thereby improving the compaction effect of the production line on the rare earth permanent magnet material.
[0016] 2. In this invention, with the cooperation of the pressure plate, baffle, and armature, after the pressure plate has finished compressing the rare earth permanent magnet material inside, the connecting column will contact the baffle during its downward movement. After being compressed, the baffle will move downward under the limit of the limiting seat. Then, the baffle will block the outer wall of the pressure plate and replace the pressure plate in compressing the rare earth permanent magnet material inside. When the rare earth permanent magnet material is fully compressed, the baffle will be reset by the spring and then lose contact with the surface of the rare earth permanent magnet material, thus preventing the rare earth permanent magnet material from adhering to the outer wall of the pressure plate during the demolding process and causing demolding failure. After the armature is attracted, it will cause the vibrating block to slide along the limit of the frame. Then, it will cause the striking head to stretch the spring between the frame and the armature. After the armature loses the limit of the attracted magnetic block, the striking head will be reset by the spring and then strike the inner wall of the frame. This will cause the inner wall of the frame to vibrate, thereby improving the demolding effect of the device on the finished rare earth permanent magnet material inside.
[0017] 3. With the cooperation of the connecting column, handle, and scraper, the device is started and run without load. As the connecting column moves downward, it will adsorb the rare earth permanent magnet material residue on the inner wall of the frame, thus adsorbing and removing the rare earth permanent magnet material. Then, the scraper is placed at the bottom of the connecting column, and then the handle is manually pulled to make the scraper slide under the magnetic attraction of the connecting column. The rare earth permanent magnet material residue will then be scraped off by the scraper, thereby reducing the manual cleaning and maintenance costs. During the movement of the device, the scraper and handle need to be removed. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a schematic diagram of the feeding mechanism structure of the present invention; Figure 3 This is a schematic diagram of the bidirectional helical rod structure of the present invention; Figure 4 This is a schematic diagram of the pressurization mechanism of the present invention; Figure 5 This is a schematic diagram of the connecting column structure of the present invention; Figure 6 This is a schematic diagram of the adsorption magnet structure of the present invention; Figure 7 This is the invention Figure 6 Enlarged schematic diagram of a portion of the structure at point A; Figure 8 This is a schematic diagram of the pressure sensor structure of the present invention.
[0019] The markings in the diagram are as follows: 1. Frame; 2. Feeding mechanism; 3. Pressing and forming mechanism; 4. Conveyor belt; 5. Pressing mechanism; 501. Bidirectional spiral rod; 502. Spiral sleeve; 503. Connecting arm; 504. Push block; 505. Sliding frame; 506. Buffer rod; 507. Pressure plate; 508. Lifting cylinder; 509. Upper pressure plate; 510. Support frame; 511. Sliding plate; 512. Connecting column; 513. Lower pressure block; 514. Guide block; 6. Demolding mechanism; 601. Baffle; 602. Limit seat; 603. Transverse slide; 604. Adsorption magnetic block; 605. Armature; 606. Vibration block; 607. Knocking head; 7. Monitoring and cleaning mechanism; 701. Pressure sensor; 702. Display screen; 703. Contact head; 704. Cleaning slot; 705. Scraper; 706. Handle. Detailed Implementation
[0020] The specific embodiments of the present invention will now be described in detail with reference to the accompanying drawings, but it should be understood that the scope of protection of the present invention is not limited to the specific embodiments.
[0021] Example 1, as Figures 1-8 As shown, an automated production line for rare earth permanent magnet materials includes a frame 1. A feeding mechanism 2 is provided on the left side of the frame 1, and a pressing and forming mechanism 3 is provided on the left side of the feeding mechanism 2. The pressing and forming mechanism 3 is connected to the feeding mechanism 2 by a conveyor belt 4. The feeding mechanism 2 is also connected to the frame 1 by a conveyor belt 4. A pressing mechanism 5 is provided on the side wall of the frame 1, a demolding mechanism 6 is provided on the inner wall of the frame 1, and a monitoring and cleaning mechanism 7 is provided on the top of the frame 1. The pressurizing mechanism 5 includes a bidirectional spiral rod 501, a spiral sleeve 502, a connecting arm 503, a push block 504, a sliding frame 505, a buffer rod 506, and a pressure plate 507. The bidirectional spiral rod 501 is rotatably connected to the bottom of the frame 1. A motor is provided on the left side of the bidirectional spiral rod 501, and the bidirectional spiral rod 501 is fixedly connected to the output end of the motor. The spiral sleeve 502 is movably connected to the outer circumferential surface of the bidirectional spiral rod 501. A movable key is provided between the inner walls of the spiral sleeve 502, and the movable key is located in the spiral groove on the outer circumferential surface of the bidirectional spiral rod 501. The connecting arm 503 is fixedly connected to the outer wall of the spiral sleeve 502, the push block 504 is fixedly connected to the outer wall of the connecting arm 503, the sliding frame 505 is slidably connected to the inner wall of the frame 1, the buffer rod 506 is slidably connected to the inner wall of the sliding frame 505, the buffer rod 506 is fixedly connected to the push block 504, the sliding frame 505 and the push block 504 are connected by a spring, and the spring is sleeved on the outer circumferential surface of the buffer rod 506, the pressure plate 507 is fixedly connected to the outer wall of the sliding frame 505, and the pressure plate 507 is slidably connected to the inner wall of the frame 1.
[0022] The pressurizing mechanism 5 also includes a lifting cylinder 508, an upper pressure plate 509, and a support frame 510. The lifting cylinder 508 is slidably connected to the outer wall of the frame 1, the upper pressure plate 509 is disposed at the bottom of the lifting cylinder 508, and the support frame 510 is fixedly connected to the top of the frame 1.
[0023] The pressurizing mechanism 5 further includes a sliding plate 511, a connecting column 512, a lower pressing block 513, and a guide block 514. The sliding plate 511 is slidably connected to the outer wall of the support frame 510. The connecting column 512 is fixedly connected to the bottom of the sliding plate 511. The lower pressing block 513 is fixedly connected to the bottom of the upper pressing plate 509. The guide block 514 is fixedly connected to the top of the connecting column 512. The lower pressing block 513 and the guide block 514 are slidably connected. The lower pressing block 513 and the connecting column 512 are also slidably connected. The top of the rare earth permanent magnet material inside the frame 1 can be fully compressed, making the rare earth permanent magnet material more compact, thereby improving the compaction effect of the production line on the rare earth permanent magnet material.
[0024] The demolding mechanism 6 includes a baffle 601 and a limiting seat 602. The baffle 601 is slidably connected to the outer wall of the pressure plate 507, and the limiting seat 602 is fixedly connected to the outer wall of the baffle 601. The limiting seat 602 is connected to the inner wall of the frame 1 by a spring. The baffle 601 is located on the movement trajectory of the connecting column 512.
[0025] The demolding mechanism 6 also includes a transverse slide 603 and an adsorption magnetic block 604. The transverse slide 603 is fixedly connected to the outer wall of the lifting cylinder 508, and the adsorption magnetic block 604 is fixedly connected to the outer wall of the transverse slide 603.
[0026] The demolding mechanism 6 also includes an armature 605, a vibrating block 606, and a striking head 607. The vibrating block 606 is slidably connected to the inner wall of the frame 1, the armature 605 is fixedly connected to the outer wall of the vibrating block 606, and the striking head 607 is fixedly connected to the outer wall of the vibrating block 606. The striking head 607 is connected to the inner wall of the frame 1 by a spring, and the inner wall of the frame 1 is located on the movement trajectory of the striking head 607. The striking head 607 will be reset by the spring and then strike the inner wall of the frame 1, thereby causing the inner wall of the frame 1 to vibrate and thus improving the demolding effect of the device on the finished rare earth permanent magnet material inside.
[0027] Working Principle: This device is mainly used for the assembly line production of rare earth permanent magnet materials. During operation, the processed rare earth permanent magnet material is first placed inside the frame 1. Then, the bidirectional spiral rod 501 at the bottom of the device rotates. During rotation, the spiral groove on the circumferential surface of the bidirectional spiral rod 501 drives the spiral sleeve 502 to converge towards the center. The convergence of the spiral sleeve 502 towards the center drives the connecting arm 503 towards the center, which in turn drives the push block 504 towards the center. Subsequently, the buffer rod 506, pushed by the push block 504, causes the sliding frame 505 to move within the limits of the frame 1. During this movement, the sliding frame 505 pushes the pressure plate 507. The pressure plate 507 then compresses and plasticizes the rare earth permanent magnet material inside the frame 1. This step is controlled by the mechanical pitch of the bidirectional spiral rod 501, allowing for free adjustment of the pressure pressure exerted by the pressure plate 507 on the internal rare earth permanent magnet material. The push block 504 compresses the sliding frame 505... During the process, a spring between the sliding frame 505 and the push block 504 will be used to relieve some of the force, so as to avoid the force generated by the bidirectional spiral rod 501 being too rigid and causing wear and damage to the device mechanism. Then, when the rare earth permanent magnet material is placed inside the frame 1, the lifting cylinder 508 is activated to drive the lower pressing block 513 to move downward. The lower pressing block 513 moves downward, which drives the connecting column 512 to move. Then, the connecting column 512 moves downward to squeeze the rare earth permanent magnet material at the bottom. Then, the lifting cylinder 508 is activated to reciprocate under the limit of the frame 1. During the reciprocating movement, the lifting cylinder 508 drives the lower pressing block 513 to reciprocate under the limit of the guide block 514. Then, during the movement, the lower pressing block 513 will apply pressure to the rare earth permanent magnet material at the bottom through the connecting column 512, so that the top of the rare earth permanent magnet material inside the frame 1 can be fully squeezed, making the rare earth permanent magnet material more compact, thereby improving the compaction effect of the rare earth permanent magnet material in the production line.
[0028] After the pressure plate 507 has finished compressing the internal rare earth permanent magnet material, the connecting column 512 will contact the baffle 601 during its downward movement. The baffle 601, after being compressed, will move downward under the limit of the limiting seat 602. The baffle 601 will then block the outer wall of the pressure plate 507, replacing the pressure plate 507 in compressing the internal rare earth permanent magnet material. Once the rare earth permanent magnet material is fully compressed, the baffle 601 will return to its original position via a spring, losing contact with the surface of the rare earth permanent magnet material. This prevents the rare earth permanent magnet material from adhering to the outer wall of the pressure plate 507 during demolding, thus avoiding demolding failure. During the movement of the device, the lifting cylinder 508 moves. During the movement of the lifting cylinder 508, the horizontal slide block 603 will move, and the horizontal slide block 603 will move the magnetic adsorption block 604. During the movement of the magnetic adsorption block 604, the armature 605 will be attracted. After the armature 605 is attracted, it will drive the vibrating block 606 to slide along the limit of the frame 1. Then, it will drive the striking head 607 to stretch the spring between it and the frame 1. After the armature 605 loses the limit of the magnetic adsorption block 604, the striking head 607 will be reset by the spring and then strike the inner wall of the frame 1. This will cause the inner wall of the frame 1 to vibrate, thereby improving the demolding effect of the device on the finished rare earth permanent magnet material inside.
[0029] Example 2, as Figures 1-8 As shown, based on Embodiment 1, the monitoring and cleaning mechanism 7 includes a pressure sensor 701 and a display screen 702. The pressure sensor 701 is fixedly connected to the outer wall of the buffer rod 506, and the display screen 702 is disposed on the outer wall of the pressure sensor 701.
[0030] The monitoring and cleaning mechanism 7 also includes a contact head 703 and a cleaning slot 704. The contact head 703 is disposed on the outer wall of the pressure sensor 701, and the outer wall of the frame 1 is located on the movement trajectory of the contact head 703. The cleaning slot 704 is opened on the inner wall of the connecting column 512.
[0031] The monitoring and cleaning mechanism 7 also includes a scraper 705 and a handle 706. The scraper 705 is slidably connected to the bottom of the connecting column 512, and the handle 706 is fixedly connected to the outer wall of the scraper 705. The device slides under the magnetic attraction of the connecting column 512. Subsequently, the rare earth permanent magnet material residue will be scraped off by the scraper 705, thereby reducing the cost of manual cleaning and maintenance. During the movement of the device, the scraper 705 and the handle 706 need to be removed.
[0032] Working principle: During the movement of the buffer rod 506, the pressure sensor 701 and the contact head 703 move together. The contact head 703 contacts the outer wall of the frame 1 during this movement. The pressure exerted on the contact head 703 after contact is displayed on the outer wall of the display screen 702, facilitating manual detection and data collection of the force during the pressurization process of the rare earth permanent magnet material. After use, the inner wall of the cleaning slot 704 is cleaned, a magnetic sheet is inserted, and then the device is started for air transport. As the connecting column 512 moves downward, it will adsorb the rare earth permanent magnet material residue on the inner wall of the frame 1, thus adsorbing and removing the rare earth permanent magnet material on the inner wall of the frame 1. Then, the scraper 705 is placed at the bottom of the connecting column 512, and then the handle 706 is manually pulled to make the scraper 705 slide under the magnetic attraction of the connecting column 512. The rare earth permanent magnet material residue will then be scraped off by the scraper 705, thereby reducing the manual cleaning and maintenance costs. During the movement of the device, the scraper 705 and the handle 706 need to be removed.
[0033] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the invention can be implemented in other specific forms without departing from its spirit or essential characteristics. Therefore, the embodiments should be considered in all respects as exemplary and non-limiting, and the scope of the invention is defined by the appended claims rather than the foregoing description. Thus, all variations falling within the meaning and scope of equivalents of the claims are intended to be included within the present invention. No reference numerals in the claims should be construed as limiting the scope of the claims.
[0034] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.
Claims
1. An automated production line for rare earth permanent magnet materials, characterized in that, The machine includes a frame (1), a feeding mechanism (2) is provided on the left side of the frame (1), a pressing and forming mechanism (3) is provided on the left side of the feeding mechanism (2), the pressing and forming mechanism (3) and the feeding mechanism (2) are connected by a conveyor belt (4), the feeding mechanism (2) and the frame (1) are also connected by a conveyor belt (4), a pressing mechanism (5) is provided on the side wall of the frame (1), a demolding mechanism (6) is provided on the inner wall of the frame (1), and a monitoring and cleaning mechanism (7) is provided on the top of the frame (1). The pressurizing mechanism (5) includes a bidirectional helical rod (501), a helical sleeve (502), a connecting arm (503), a push block (504), a sliding frame (505), a buffer rod (506), and a pressure plate (507). The bidirectional helical rod (501) is rotatably connected to the bottom of the frame (1). A motor is provided on the left side of the bidirectional helical rod (501), and the bidirectional helical rod (501) is fixedly connected to the output end of the motor. The helical sleeve (502) is movably connected to the outer circumferential surface of the bidirectional helical rod (501). A movable key is provided between the inner walls of the helical sleeve (502), and the movable key is located in the helical groove on the outer circumferential surface of the bidirectional helical rod (501). The connecting arm (503) is fixedly connected to the outer wall of the spiral sleeve (502), the push block (504) is fixedly connected to the outer wall of the connecting arm (503), the sliding frame (505) is slidably connected to the inner wall of the frame (1), the buffer rod (506) is slidably connected to the inner wall of the sliding frame (505), the buffer rod (506) is fixedly connected to the push block (504), the sliding frame (505) and the push block (504) are connected by a spring, and the spring is sleeved on the outer circumferential surface of the buffer rod (506), the pressure plate (507) is fixedly connected to the outer wall of the sliding frame (505), and the pressure plate (507) is slidably connected to the inner wall of the frame (1).
2. The automated production line for rare earth permanent magnet materials according to claim 1, characterized in that, The pressurizing mechanism (5) also includes a lifting cylinder (508), an upper pressure plate (509), and a support frame (510). The lifting cylinder (508) is slidably connected to the outer wall of the frame (1), the upper pressure plate (509) is located at the bottom of the lifting cylinder (508), and the support frame (510) is fixedly connected to the top of the frame (1).
3. The automated production line for rare earth permanent magnet materials according to claim 2, characterized in that, The pressurizing mechanism (5) further includes a sliding plate (511), a connecting column (512), a lower pressing block (513), and a guide block (514). The sliding plate (511) is slidably connected to the outer wall of the support frame (510). The connecting column (512) is fixedly connected to the bottom of the sliding plate (511). The lower pressing block (513) is fixedly connected to the bottom of the upper pressing plate (509). The guide block (514) is fixedly connected to the top of the connecting column (512). The lower pressing block (513) and the guide block (514) are slidably connected. The lower pressing block (513) and the connecting column (512) are slidably connected.
4. The automated production line for rare earth permanent magnet materials according to claim 3, characterized in that, The demolding mechanism (6) includes a baffle (601) and a limiting seat (602). The baffle (601) is slidably connected to the outer wall of the pressure plate (507), and the limiting seat (602) is fixedly connected to the outer wall of the baffle (601). The limiting seat (602) is connected to the inner wall of the frame (1) by a spring. The baffle (601) is located on the movement trajectory of the connecting column (512).
5. The automated production line for rare earth permanent magnet materials according to claim 4, characterized in that, The demolding mechanism (6) also includes a transverse slide (603) and an adsorption magnetic block (604). The transverse slide (603) is fixedly connected to the outer wall of the lifting cylinder (508), and the adsorption magnetic block (604) is fixedly connected to the outer wall of the transverse slide (603).
6. The automated production line for rare earth permanent magnet materials according to claim 5, characterized in that, The demolding mechanism (6) further includes an armature (605), a vibrating block (606), and a striking head (607). The vibrating block (606) is slidably connected to the inner wall of the frame (1). The armature (605) is fixedly connected to the outer wall of the vibrating block (606). The striking head (607) is fixedly connected to the outer wall of the vibrating block (606). The striking head (607) is connected to the inner wall of the frame (1) by a spring. The inner wall of the frame (1) is located on the movement trajectory of the striking head (607).
7. The automated production line for rare earth permanent magnet materials according to claim 6, characterized in that, The monitoring and cleaning mechanism (7) includes a pressure sensor (701) and a display screen (702). The pressure sensor (701) is fixedly connected to the outer wall of the buffer rod (506), and the display screen (702) is set on the outer wall of the pressure sensor (701).
8. The automated production line for rare earth permanent magnet materials according to claim 7, characterized in that, The monitoring and cleaning mechanism (7) also includes a contact head (703) and a cleaning slot (704). The contact head (703) is located on the outer wall of the pressure sensor (701), and the outer wall of the frame (1) is located on the movement trajectory of the contact head (703). The cleaning slot (704) is opened on the inner wall of the connecting column (512).
9. An automated production line for rare earth permanent magnet materials according to claim 8, characterized in that, The monitoring and cleaning mechanism (7) also includes a scraper (705) and a handle (706). The scraper (705) is slidably connected to the bottom of the connecting column (512), and the handle (706) is fixedly connected to the outer wall of the scraper (705).
Citation Information
Patent Citations
An automated production line for rare earth permanent magnet materials
CN108682528B
