A method for energy efficiency evaluation and fault-tolerant operation optimization of dual-winding shaft-driven generators
By uniformly assessing the winding current, temperature, and insulation status of dual-winding shaft generators, coordinating power distribution between windings and power plant regulation, the problems of power distribution differences between windings and lag in busbar voltage regulation in existing technologies are solved, achieving more efficient energy efficiency assessment and fault-tolerant operation.
Patent Information
- Application Number
- CN202611577228.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-13
- Publication Date
- 2026-11-10
AI Technical Summary
Existing dual-winding shaft-driven generators suffer from problems such as differences in power distribution between windings, high-load operation of local windings, waste of available generating capacity, inaccurate unloading, and lag in bus voltage regulation during energy efficiency assessment and fault-tolerant operation optimization. These issues make it difficult to meet the requirements of balanced winding load and coordinated operation of the power plant.
By collecting data on shaft power, busbar and winding, an efficiency evaluation benchmark is established, and the evaluation of winding current, temperature and insulation status is unified. The power distribution between windings and the power regulation of the power station are coordinated. The remaining carrying capacity of the unrestricted winding is utilized, and the current is transferred first when the busbar voltage is normal and the power of the power station is reduced when abnormal.
It achieves winding protection, power balancing and busbar stability, reduces the risk of local overload and regulation lag, and improves the reliability of energy efficiency judgment and fault-tolerant operation continuity of shaft-driven generators.
Smart Images

Figure CN123074331A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of operation optimization technology, and in particular to a method for energy efficiency evaluation and fault-tolerant operation optimization of a dual-winding shaft-driven generator. Background Technology
[0002] The field of operation optimization technology involves the status monitoring, parameter analysis, strategy adjustment, and control scheme configuration of equipment and systems during operation. It is mainly used to clarify the operating characteristics, resource consumption, fault states, and operational constraints of the operating object. Among these, the energy efficiency assessment and fault-tolerant operation optimization of dual-winding shaft-driven generators refers to analyzing and evaluating the operating energy consumption, power generation status, and winding operating status of motors with dual-winding structures and related to power generation devices, and adjusting the control parameters during operation.
[0003] The existing dual-winding shaft generator operation control mainly relies on total output power, busbar voltage status, and conventional protection signals as the basis for judgment. During operation, the energy efficiency status is usually judged first based on the overall power generation of the shaft generator, and then the power is adjusted in combination with the busbar operation. The output power, peak current, temperature rise status, and insulation status of the two windings are mostly presented in the form of independent protection or alarm. The load difference between the windings is mainly handled by manual experience or fixed control strategies. When one winding experiences current approaching the limit, temperature rise, or insulation decline, the risk is often eliminated by reducing the overall power or protection action, rather than sharing the burden with the remaining load capacity of the other winding. When the busbar voltage is abnormal, there is also a lack of unified judgment and coordinated control between the winding-side adjustment and the power station power adjustment.
[0004] The above solution has the following technical problems: First, the power generation efficiency assessment mainly focuses on the overall input-output relationship, which makes it difficult to reflect the power distribution differences between the two sets of windings, resulting in a deviation between the energy efficiency judgment of the shaft-driven generator and the actual load state of the windings.
[0005] Second, risks such as winding current exceeding limits, temperature rise, and insulation degradation usually trigger alarms or protection separately. There is a lack of a unified logic for determining the limiting winding, which can easily lead to situations where local windings operate under continuous high load.
[0006] Third, existing power regulation tends to reduce overall load, failing to fully utilize the remaining load-bearing capacity of unrestricted windings, which can easily lead to a waste of available power generation capacity and reduce the continuous power supply capacity of shaft-driven power generation systems.
[0007] Fourth, when the power between windings is unbalanced, if adjustments are made solely based on fixed allocation or manual intervention, the unloading power will be difficult to accurately match the actual risk level, which may result in insufficient or excessive unloading.
[0008] Fifth, there is a lack of linkage judgment between busbar voltage deviation and winding abnormality, and the triggering boundary of current transfer and power reduction of the power station is unclear, which can easily lead to adjustment lag, increased busbar fluctuation or insufficient power station power coordination.
[0009] Therefore, the existing scheme, characterized by overall power assessment, decentralized protection judgment, fixed power regulation and coordination based on human experience, is difficult to meet the requirements of dual-winding shaft generators for balanced winding load, local fault tolerance, busbar stability control and power plant coordinated operation. Summary of the Invention
[0010] The purpose of this invention is to provide a method for energy efficiency assessment and fault-tolerant operation optimization of a dual-winding shaft-driven generator. This method enables the dual-winding shaft-driven generator to uniformly assess power generation efficiency and winding limitation status based on shaft end input, output of both windings, busbar operating status, and winding current, temperature, and insulation status during power generation operation. Furthermore, when current, temperature, or insulation limitations occur in the windings, the method coordinates and adjusts the power distribution between windings and the power station power setpoint to meet the energy efficiency assessment and fault-tolerant operation control requirements of dual-winding shaft-driven generators in power systems.
[0011] To achieve the above objectives, the present invention adopts the following technical solution: a method for energy efficiency evaluation and fault-tolerant operation optimization of a dual-winding shaft-driven generator, comprising the following steps: S1. Collect shaft-end power data, busbar operation data, first winding data, and second winding data; calculate shaft-end input power based on the shaft-end power data, calculate first winding output power based on the first winding data, calculate second winding output power based on the second winding data, and calculate shaft belt power generation efficiency based on the first winding output power, the second winding output power, and the shaft-end input power; S2. For each winding, multiply the current output power by the ratio of the rated current limit to the peak phase current to obtain the allowable current power. Record the portion of the current output power that exceeds the allowable current power as the current unloading power. S3. The windings with the current unloading power, winding temperature reaching the set temperature protection value, or insulation resistance lower than the set insulation protection value are identified as limiting windings. The current unloading power of the limiting winding is compared with the portion of the current output power of the limiting winding that exceeds the average output power of the two sets of windings. The larger value is identified as the limiting winding unloading power. S4. Subtract the current output power of the unrestricted winding from the allowable current power of the unrestricted winding to obtain the acceptable power of the unrestricted winding; when the busbar voltage deviation does not exceed the set voltage protection setting, generate a winding current reference transfer command based on the portion of the unloaded power of the restricted winding that does not exceed the acceptable power of the unrestricted winding, and generate a power station reference reduction command based on the portion of the unloaded power of the restricted winding that exceeds the acceptable power of the unrestricted winding; when the busbar voltage deviation exceeds the set voltage protection setting, generate a power station reference reduction command based on the unloaded power of the restricted winding.
[0012] Furthermore, in S1, the shaft torque sampling value and shaft speed sampling value are collected through the shaft end sensor interface; the busbar voltage sampling value and busbar rated voltage value are collected through the AC busbar measurement interface; the first winding three-phase current sampling value, first winding end voltage sampling value and first winding temperature sampling value are collected through the first winding measurement interface; and the second winding three-phase current sampling value, second winding end voltage sampling value and second winding temperature sampling value are collected through the second winding measurement interface. The acquisition process also includes a verification process, which specifically establishes a source mapping relationship between the interface identifier of each measurement interface and the corresponding sample value. When the interface identifier of any sample value is inconsistent with the preset interface identifier table, the corresponding sample value is deleted.
[0013] Furthermore, the calculation steps for shaft-driven power generation efficiency include: The shaft torque sample value, shaft speed sample value, first winding terminal voltage sample value, first winding three-phase current sample value, second winding terminal voltage sample value, and second winding three-phase current sample value are obtained within the same calculation cycle. The shaft end mechanical power is calculated using the shaft torque sample value and shaft speed sample value, and the shaft end mechanical power in the power generation direction is determined as the shaft end input power. Simultaneously, the output power of the first winding and the output power of the second winding are calculated using the sampled values of the winding terminal voltage and the three-phase current, respectively. The power value after adding the output power of the two windings is compared with the input power at the shaft end to generate the shaft belt power generation efficiency.
[0014] Furthermore, the steps for determining the allowable current power and the current offload power include: For each winding, the current output power of the corresponding winding, the sampled value of the three-phase current of the corresponding winding, and the rated current limit stored in the generator controller are obtained. The peak value of the phase current is determined according to the sampled value of the three-phase current of the corresponding winding. The rated current limit is then multiplied by the peak value of the phase current and the ratio is processed before multiplying by the current output power to obtain the current allowable power of the corresponding winding. Compare the current output power of the corresponding winding with the current allowable power of the corresponding winding. When the current output power of the corresponding winding is greater than the current allowable power of the corresponding winding, the excess part is determined as the current unloading power of the corresponding winding. When the current output power does not exceed the current allowable power, the current unloading power is recorded as 0.
[0015] Furthermore, the process of determining the peak value of the phase current specifically includes: The three-phase current sampling values of the corresponding winding within the same current evaluation period are obtained. The absolute value of each phase current sampling value is processed separately, and the absolute value with the largest value in the same phase is selected as the candidate value of the corresponding phase current peak value. The candidate value of the phase current peak value with the largest value is determined as the phase current peak value of the corresponding winding.
[0016] Furthermore, the specific steps for determining the limiting winding unload power are as follows: The current unloading power, winding temperature, insulation resistance and current output power of each winding are obtained, and the windings whose current unloading power is greater than 0, whose winding temperature reaches the set temperature protection value or whose insulation resistance is lower than the set insulation protection value are identified as the restricted windings. The power deviation is obtained by summing the output power of the first winding and the output power of the second winding, calculating the average output power of the two windings, and extracting the portion of the current output power of the limiting winding that exceeds the average output power of the two windings. The current unloading power of the limiting winding is compared with the power deviation, and the larger of the two values is determined as the unloading power of the limiting winding.
[0017] Furthermore, when both the first winding and the second winding are determined to be the limiting windings, the winding limiting priority is generated by the triggering sequence of current over-limit, temperature protection and insulation protection. The limiting status of the corresponding windings is output in sequence according to the winding limiting priority, and the limiting winding unloading power of the corresponding windings is recorded respectively.
[0018] Furthermore, the steps for issuing the winding current given transfer command are as follows: The current output power of the unrestricted winding, the allowable power of the unrestricted winding current, the unloaded power of the restricted winding, the busbar voltage deviation, and the set voltage protection value are obtained. The portion of the allowable power of the unrestricted winding current that exceeds the current output power of the unrestricted winding is determined as the power that the unrestricted winding can receive. When the unloading power of the restricted winding is not greater than the receiveable power of the unrestricted winding, the unloading power of the restricted winding is determined as the inter-winding transfer power value, the power reduction of the power station is determined to be 0, and the winding current given transfer command is issued.
[0019] Furthermore, the steps for issuing a power plant power setpoint reduction command are as follows: When the unloading power of the restricted winding is greater than the acceptable power of the unrestricted winding, the acceptable power of the unrestricted winding is determined as the power transfer value between the windings, and the portion of the unloading power of the restricted winding that exceeds the acceptable power of the unrestricted winding is determined as the power reduction value of the power station, and a power reduction command for the power station is issued. Simultaneously, when the busbar voltage deviation exceeds the set voltage protection value, the power setpoint of the power station is reduced by using the unloading power of the limiting winding as the power reduction value of the power station.
[0020] Furthermore, the calculation process for the busbar voltage deviation is as follows: Collect multiple consecutive instantaneous busbar voltage samples within the acquisition period, delete the busbar voltage samples whose valid sampling channel is marked as invalid, and square the retained busbar voltage samples. The multiple values after squaring are averaged according to the number of samples, and the square root of the average value is taken to obtain the effective value of the busbar voltage. The difference between the effective value of the busbar voltage and the rated value of the busbar is calculated to obtain the busbar voltage deviation.
[0021] Compared with the prior art, the advantages and positive effects of the present invention are as follows: An efficiency evaluation benchmark is established by using the shaft-end input power and the dual-winding output power. The peak phase current is converted into the current allowable power, and current over-limit, temperature protection, and insulation degradation are uniformly included in the winding limitation criterion. The unloading amount is determined in combination with the winding power balancing requirements. When the busbar voltage is normal, the current is transferred within the remaining load range of the unrestricted winding first. The power station power is reduced for the excess. When the busbar voltage is abnormal, the power station power is directly reduced. This enables the winding protection, power balancing, busbar stability and power station coordination to form a closed loop, reducing the risk of local overload and regulation lag, and improving the reliability of shaft-driven power generation efficiency judgment and the continuity of fault-tolerant operation. Attached Figure Description
[0022] Figure 1 This is the main flowchart for the energy efficiency evaluation and fault-tolerant operation optimization of the dual-winding shaft generator of the present invention; Figure 2 This is a schematic diagram of the operating scenario of the generator set driven by the motor shaft of the present invention; Figure 3 This is a schematic diagram of the dual-winding data acquisition and source mapping of the present invention; Figure 4 This is a schematic diagram illustrating the effect of the present invention on limiting winding identification and unloading power determination; Figure 5 This is a schematic diagram illustrating the effect of inter-winding power transfer and power station power setting reduction in this invention. Detailed Implementation
[0023] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.
[0024] Example Please see Figures 1 to 5 This embodiment provides a method for evaluating the energy efficiency and optimizing the fault-tolerant operation of a dual-winding shaft-driven generator. In practical applications, such as when the generator set is driven by the main shaft system and the dual-winding stators are connected to the AC busbars and linked with the power management cabinet of the power station, the shaft-end sensors, winding measurement circuits, busbar measurement circuits, and generator controllers jointly participate in the determination of the power generation status and the power regulation, including the following steps: S1: Collect shaft-end power data, busbar operation data, first winding data, and second winding data; determine the shaft-end input power based on the shaft-end power data, determine the first winding output power based on the first winding data, determine the second winding output power based on the second winding data, and determine the shaft belt power generation efficiency based on the first winding output power, the second winding output power, and the shaft-end input power.
[0025] Shaft-end power data is the field measurement data of the mechanical work input from the main shaft system to the shaft-driven generator, consisting of shaft-end torque and shaft-end speed signals. The shaft-end torque signal is output by a torque sensor installed at the shaft system measurement location, and the shaft-end speed signal is output by the shaft-end speed measurement circuit. Both signals, upon entering the generator controller, undergo channel source confirmation before being buffered in the same operating cycle. Busbar operating data is the operating status data of the AC busbar, including busbar voltage sampling values, busbar rated voltage configuration values, and busbar measurement channel status. The busbar rated voltage configuration value is stored in the electrical parameter area of the power management cabinet or generator controller for subsequent busbar voltage deviation judgment.
[0026] The first and second winding data correspond to the operational measurement data of two independent windings in a dual-winding shaft-driven generator. Each winding's data includes sampled values of the three-phase current, winding terminal voltage, winding temperature, and insulation resistance. The three-phase current sampled values are used to determine the winding current load; the winding terminal voltage sampled values are used to determine the winding output power; the winding temperature sampled values are used for temperature protection interlocking; and the insulation resistance test values are used for insulation protection interlocking. The data for the two windings are stored separately according to their winding numbers. Data from the first winding must not be written into the second winding buffer, and vice versa.
[0027] S101: Collect shaft torque and shaft speed sampling values through the shaft end sensor interface; collect busbar voltage and busbar rated voltage values through the AC busbar measurement interface; collect first winding three-phase current, first winding end voltage, and first winding temperature sampling values through the first winding measurement interface; and collect second winding three-phase current, second winding end voltage, and second winding temperature sampling values through the second winding measurement interface.
[0028] After receiving shaft torque and shaft speed sample values, the shaft-end sensor interface writes the sampling source, sampling period, and channel status into the shaft-end data buffer. The shaft torque sample value reflects the torque state transmitted from the propulsion shaft to the shaft-driven generator, while the shaft speed sample value reflects the speed state of the shaft-driven generator rotor as it travels along the shaft system. When the controller reads these two types of sample values, it first confirms that the sampling channel is valid, then confirms that the sampling period matches the winding measurement period, and then sends them to the shaft-end input power determination process.
[0029] The AC busbar measurement interface continuously receives busbar voltage sampling values. The rated busbar voltage value is read from the power plant parameter configuration area and is not temporarily generated from the instantaneous sampling channel. The busbar voltage sampling value and the rated busbar voltage value are used together for subsequent busbar voltage deviation judgment. The busbar voltage deviation result is used in the inter-winding power transfer permission judgment and power plant power setpoint reduction judgment in S4.
[0030] The first and second winding measurement interfaces are respectively connected to the current transformer, voltage measurement circuit, and temperature measurement point of the corresponding winding. The three-phase current sampling values are entered into the current evaluation buffer according to phase, the winding terminal voltage sampling values are entered into the output power determination buffer, and the winding temperature sampling values are entered into the winding protection buffer. If a channel disconnection, incomplete message, or inconsistent sampling period occurs at the measurement interface, the controller will mark the corresponding sampling value as invalid and retain the channel anomaly record for fault tracing.
[0031] S102: The acquisition process also includes a verification process, which establishes a source mapping relationship between the interface identifier of each measurement interface and the corresponding sample value. When the interface identifier of any sample value is inconsistent with the preset interface identifier table, the corresponding sample value is deleted.
[0032] The source mapping relationship is a binding record between sampled values and interface identities, including interface identifier, sampling type, winding affiliation, sampling period, and channel status. A preset interface identifier table is stored in the generator controller parameter area, recording the legitimate identities of shaft-end sensor interfaces, busbar measurement interfaces, first winding measurement interfaces, and second winding measurement interfaces. After receiving a sampled value, the controller first reads the interface identifier carried by the sampled value and then matches it with the preset interface identifier table. If a match is found, the sampled value enters the corresponding cache; if a mismatch is found, the sampled value is removed from the valid data of the current operating cycle, and a source mismatch status is written to the acquisition record.
[0033] This verification process is designed to prevent incorrect winding data attribution due to field wiring adjustments, measurement board replacements, or communication channel misconnections. Data returned from the first winding measurement interface is only permitted to enter the first winding processing link, and data returned from the second winding measurement interface is only permitted to enter the second winding processing link. Data returned from the busbar measurement interface must not be used as winding terminal voltage data, and data returned from the shaft end sensor interface must not be used as electrical output data. If duplicate sampling values occur within the same sampling period, the controller retains data with correct interface identification, valid channel status, and sampling period consistent with the current processing period; other duplicate data are entered into the anomaly log and are not included in the current period's judgment.
[0034] S103: Obtain the shaft torque sampling value, shaft speed sampling value, first winding terminal voltage sampling value, first winding three-phase current sampling value, second winding terminal voltage sampling value, and second winding three-phase current sampling value within the same calculation cycle. Use the shaft torque sampling value and shaft speed sampling value to determine the shaft end mechanical power, and determine the shaft end mechanical power in the power generation direction as the shaft end input power.
[0035] The same calculation cycle is the operating cycle in which the controller synchronously processes data from the shaft end, windings, and busbars. Within this cycle, the controller first checks the sampling cycle identifiers of the shaft end sampled values, winding end voltage sampled values, and winding three-phase current sampled values. Data with matching cycles enters the current calculation cache, while data with inconsistent cycles is temporarily stored in the matching cache. If the data to be matched still cannot be effectively matched in subsequent processing cycles, an exception record is written and the power determination process exits. In the first effective cycle after the equipment starts, the controller uses the current sampled value, which has completed source verification, as the initial valid input; in subsequent cycles, the current valid sampled value is used to update the operating status, and the previous valid status is retained as a reference status for exception handling.
[0036] Before the shaft torque and shaft speed sampling values are incorporated into the shaft end mechanical power determination process, the controller first reads the shaft system's operating direction. When the shaft system's operating direction matches the power generation operating direction, the shaft end mechanical power is written as the shaft end input power into the efficiency evaluation cache. When the shaft system's operating direction does not match the power generation operating direction, the controller marks the current cycle as a non-power generation operating state and suspends the shaft-driven power generation efficiency update. If the shaft torque or shaft speed sampling value is missing, the controller does not use the missing data to determine the new shaft end input power and sets the shaft end input status to a pending confirmation state. The winding protection judgment continues to be executed based on the valid measurement data on the winding side.
[0037] S104: The output power of the first winding and the output power of the second winding are determined by the sampled values of the winding terminal voltage and the three-phase current, respectively. The output state after merging the output power of the two windings is processed in correspondence with the input power at the shaft end to generate the shaft belt power generation efficiency.
[0038] After the source verification and period alignment of the first winding terminal voltage sampling value and the first winding three-phase current sampling value are completed, the controller determines the output power of the first winding. The second winding terminal voltage sampling value and the second winding three-phase current sampling value are used to determine the output power of the second winding using the same criteria. Both sets of winding output power include winding affiliation, processing period, and effective status. Subsequent current allowable power judgment, limiting winding judgment, and power transfer judgment are all read according to this affiliation relationship.
[0039] The shaft-driven generator efficiency is used to record the energy conversion status of the generator set within the current power generation cycle. The controller combines the output power of the first winding and the output power of the second winding into the generator's electrical output status, and then establishes a correspondence with the shaft-end input power. When the shaft-end input power is valid, the shaft-driven generator efficiency record is updated; when the shaft-end input power is in a pending confirmation state, the efficiency record retains the previous valid state and adds a pending confirmation mark. This record is entered into the operation monitoring, duty alarm record, and fault tracing record to view the changes in the generator's power generation status during normal operation, single-winding limitation, double-winding limitation, and power station downscaling.
[0040] S2: For each winding, the current output power is converted according to the current limiting relationship between the rated current limit and the peak phase current to obtain the current allowable power. The part of the current output power that exceeds the current allowable power is recorded as the current unloading power.
[0041] The allowable current power is the power state that the corresponding winding is allowed to continue to bear under the current stress. The rated current limit is stored in the generator controller protection parameter area and comes from the generator's factory electrical parameters, protection setting documents, or power plant commissioning parameters. The peak phase current is obtained from the three-phase current sampling values of the corresponding winding within the same current evaluation cycle, and is used to reflect the highest stress point of the winding's current load. The current unloading power is the power state that needs to be released from the winding after the current output power exceeds the allowable current power, and is subsequently used for limiting winding identification and fault-tolerant power regulation.
[0042] S201: For each winding, obtain the current output power of the corresponding winding, the sampled value of the three-phase current of the corresponding winding, and the rated current limit stored in the generator controller. Determine the peak value of the phase current based on the sampled value of the three-phase current of the corresponding winding, and use the current limiting relationship between the rated current limit and the peak value of the phase current for current output power processing to obtain the current allowable power of the corresponding winding.
[0043] The current output power is determined by S1 and written to the corresponding winding's operating buffer. Three-phase current sampling values are provided by the corresponding winding's measurement interface; interface identification verification, phase identification confirmation, and cycle alignment have been completed before proceeding to this step. The rated current limit is read from the controller's protection parameter area, which has access control; changes to the setting value are recorded in the parameter change log. If the rated current limit reading fails, the controller does not generate a new allowable current power and puts the corresponding winding into protection verification status to prevent further increase in winding load when protection boundaries are lacking.
[0044] The processing sequence for allowable current power is as follows: first, confirm the validity of the three-phase current sampling values; then, determine the phase current peak value; and finally, correct the current output power load status according to the current limiting relationship between the rated current limit and the phase current peak value. When the phase current peak value does not trigger the current protection boundary, the allowable current power maintains a normal load status; when the phase current peak value triggers the current protection boundary, the allowable current power enters a restricted load status. The restricted load status is written into the winding current limiting record and used as the input for S3 to determine the limiting winding.
[0045] S202: Obtain the three-phase current sampling values of the corresponding winding within the same current evaluation period, process the absolute value of each phase current sampling value, and select the absolute value with the largest amplitude within the same phase as the corresponding phase current peak candidate value. The phase current peak candidate value with the largest value is determined as the phase current peak value of the corresponding winding.
[0046] The same current evaluation cycle is consistent with the protection judgment cycle of the generator controller. The controller archives the three-phase current sampling values according to winding affiliation and phase. First, data with incorrect interface identification, invalid channel status, missing phase identification, or mismatched sampling cycle are removed. Then, peak values are extracted from the retained data. Absolute value processing is performed on the current sampling value of each phase to ensure that the actual current amplitude of that phase can still be obtained when the AC current alternates between positive and negative.
[0047] The controller selects the sampling state with the largest amplitude within each phase as the candidate value for the phase current peak, and then determines the phase current peak value of the winding from the candidate values of each phase. The phase current peak value record includes the winding affiliation, the phase from which the peak value originates, the evaluation period, and the valid sampling state. If a phase sampling is missing, the controller marks that phase as a missing phase sampling state and forms a temporary current evaluation state with the remaining valid phases; if there are no valid samples in any phase, the controller sets the phase current peak value of that winding to an unconfirmed state and prioritizes protection verification in S3.
[0048] S203: Compare the current output power of the corresponding winding with the current allowable power of the corresponding winding. When the current output power of the corresponding winding is greater than the current allowable power of the corresponding winding, the excess part is determined as the current unloading power of the corresponding winding. When the current output power does not exceed the current allowable power, the current unloading power is recorded as zero unloading state.
[0049] The controller will only perform an over-limit judgment after the current output power and the current allowable power belong to the same winding, the same processing cycle, and are both in an effective state. When the current output power is higher than the current allowable power, the controller writes the excess portion into the current unloading power record and simultaneously writes the current over-limit trigger state. When the current output power is not higher than the current allowable power, the current unloading power record is in a zero unloading state. The zero unloading state still enters S3, which, together with the temperature protection state and the insulation protection state, is used to determine whether the winding is restricted.
[0050] If the current output power is invalid, the controller pauses updating the current unloading power of the corresponding winding and sets the output power status of that winding to pending confirmation. If the allowable current power is in an unconfirmable state, the controller does not directly treat that winding as an unrestricted winding capable of handling loads, but instead enters a restricted state for verification. The current unloading power, zero unloading state, and pending confirmation state are all written into the winding current limiting record, which is subsequently read by the restricted winding judgment process.
[0051] S3: The winding with current unloading power, winding temperature reaching the set temperature protection value, or insulation resistance lower than the set insulation protection value is identified as the limiting winding. The current unloading power of the limiting winding is compared with the portion of the current output power of the limiting winding that exceeds the average output power of the two sets of windings. The larger value is identified as the limiting winding unloading power.
[0052] The limiting winding is the winding that is protected and constrained during the current operating cycle due to current, temperature, or insulation condition. Temperature protection settings are stored in the generator controller's temperature protection parameter area and are derived from the generator winding insulation class, cooling method, and commissioning settings. Insulation protection settings are stored in the insulation monitoring parameter area and are derived from the electrical insulation protection settings. The limiting winding unloaded power is a control variable used for subsequent power transfer and power plant downsizing, reflecting the load that needs to be released from the limiting winding.
[0053] S301: Obtain the current unloading power, winding temperature, insulation resistance and current output power of each winding, and identify the windings with current unloading power greater than zero unloading state, winding temperature reaching the set temperature protection value or insulation resistance lower than the set insulation protection value as restricted windings.
[0054] The controller reads the current unloading power, winding temperature, insulation resistance, and current output power of the first and second windings respectively, according to their winding affiliation. The current unloading power comes from S2, the winding temperature from the corresponding winding temperature measuring point, the insulation resistance from the insulation monitoring circuit, and the current output power from S1. After reading, affiliation verification is performed first. The temperature, current, insulation, and output power of the first winding can only be used for the first winding's limitation judgment; the second winding is processed according to the same rules. When affiliation identifiers conflict, the corresponding winding enters a pending verification state and is not considered an unrestricted winding for power reception.
[0055] The limitation judgment establishes trigger states for overcurrent, temperature protection, and insulation protection respectively. The overcurrent trigger state is activated when the current unloading power is higher than the zero unloading state; the temperature protection trigger state is activated when the winding temperature reaches the protection boundary corresponding to the set temperature protection value; and the insulation protection trigger state is activated when the insulation resistance is lower than the protection boundary corresponding to the set insulation protection value. If any trigger state is activated, the winding is determined to be a limited winding. If none of the three trigger states are activated and the measurement status is valid, the winding enters the unlimited winding candidate state, allowing S4 to determine its load-bearing capacity.
[0056] S302: After summing the output power of the first winding and the output power of the second winding, determine the average value of the output power of the two windings, extract the part of the current output power of the limiting winding that exceeds the average value of the output power of the two windings, and obtain the power deviation.
[0057] The average output power of the two windings is used to reflect the load sharing status of the two windings in the current cycle. The controller reads the first winding output power and the second winding output power obtained from S1, and after confirming that both are in a valid state, forms an average load reference for the two windings. This reference is only used to compare whether the current output power of the limiting winding deviates from the load sharing status of the two windings, and does not change the original records of the first winding output power and the second winding output power.
[0058] When the current output power of the limiting winding is higher than the average output power of the two windings, the excess constitutes a power deviation. This power deviation indicates that the limiting winding is both under protective constraint and bearing an output load higher than the average load shared by both windings. When the current output power of the limiting winding is not higher than the average load reference, the power deviation is recorded as zero deviation. If the output power of either winding is invalid, the controller suspends updating the power deviation and maintains the limiting judgment based on current, temperature, and insulation protection trigger states.
[0059] S303: Compare the current unloading power of the limiting winding with the power deviation, and determine the larger of the two values as the unloading power of the limiting winding.
[0060] The determination of the limiting winding unloading power considers both current protection requirements and load sharing requirements between windings. Current unloading power reflects the unloading demand caused by current over-limit, while power deviation reflects the higher portion of the limiting winding's load relative to the average load of the two windings. The controller compares the two types of unloading demands according to their association with the same winding and records the larger unloading demand in the limiting winding unloading power record. If the current unloading power is zero but a power deviation exists, the limiting winding unloading power uses the power deviation; if the power deviation is zero but current unloading power exists, the limiting winding unloading power uses the current unloading power.
[0061] When a winding enters a restricted winding state due to temperature or insulation protection, but neither the current unloading power nor the power deviation constitutes an effective unloading demand, the controller records the protection trigger status according to the protection strategy and prevents the winding from continuing to increase load in S4 according to the restricted state. After the restricted winding unloading power is generated, it is written to the power regulation buffer. The buffer content includes the restricted winding affiliation, trigger source, unloading basis, effective status, and output destination. S4 reads this buffer to generate a winding current setpoint transfer command or a substation power setpoint reduction command.
[0062] S304: When both the first winding and the second winding are determined to be restricted windings, the winding restriction priority is generated by the triggering sequence of current over-limit, temperature protection and insulation protection. The restriction status of the corresponding winding is output in sequence according to the winding restriction priority, and the restricted winding unloading power of the corresponding winding is recorded respectively.
[0063] When both the first and second windings enter the restricted state simultaneously, the controller will no longer directly use either winding as an unrestricted winding to bear the load. The controller reads the current over-limit trigger status, temperature protection trigger status, and insulation protection trigger status of both sets of windings, and reads the entry sequence of each trigger status to generate winding restriction priorities. The trigger sequence is determined by the control cycle record when the protection status first takes effect, which indicates which set of windings enters the restricted state first.
[0064] According to the winding limit priority, the controller outputs the first winding limit status and the second winding limit status sequentially, and records the corresponding unloaded power of the limited winding. If the triggering sequence of the two windings cannot be confirmed, the controller will keep both windings as limited windings and enter the power setpoint downgrading priority processing, without sending a current setpoint for additional load to either winding. In subsequent operating cycles, if the current, temperature, and insulation status of a certain winding recover to within the protection boundary, the controller will remove it from the limited winding recording and re-enter the non-limited winding load-bearing capacity judgment.
[0065] S4: Subtract the current output power of the unrestricted winding from the allowable current power of the unrestricted winding to obtain the power that the unrestricted winding can receive; when the bus voltage deviation does not exceed the set voltage protection setting, generate a winding current reference transfer command based on the portion of the unloaded power of the restricted winding that does not exceed the power that the unrestricted winding can receive; generate a power station reference reduction command based on the portion of the unloaded power of the restricted winding that exceeds the power that the unrestricted winding can receive; when the bus voltage deviation exceeds the set voltage protection setting, generate a power station reference reduction command based on the unloaded power of the restricted winding.
[0066] The unrestricted winding's receiveable power is the load margin that the unrestricted winding can still handle within the current allowable power range. The winding current setpoint transfer command is sent to the dual-winding shaft-driven generator current control loop to reduce the limiting winding current setpoint and increase the unrestricted winding current setpoint. The power station power setpoint reduction command is sent to the power station power management cabinet to reduce the power generation setpoint of the shaft-driven generator set on the power station side. Busbar voltage deviation is used to determine whether inter-winding transfer is permissible; when the busbar voltage enters the protection state, the controller prioritizes maintaining the busbar voltage stabilization interlock.
[0067] S401: Obtain the current output power of the unrestricted winding, the allowable power of the unrestricted winding current, the unloaded power of the restricted winding, the busbar voltage deviation, and the set voltage protection value. Determine the portion of the allowable power of the unrestricted winding current that exceeds the current output power of the unrestricted winding as the power that the unrestricted winding can receive.
[0068] The current output power of the unrestricted winding comes from S1, the allowable power of the unrestricted winding current comes from S2, the unloaded power of the restricted winding comes from S3, the busbar voltage deviation comes from the effective value processing result of the busbar measurement circuit, and the set voltage protection setting comes from the substation voltage protection parameter area. After reading these data, the controller first verifies the processing cycle and attribution relationship. If the cycle is inconsistent, the controller maintains the previous effective control state and waits for the next cycle to re-determine; if the winding attribution is inconsistent, the power transfer command is not output, and the attribution anomaly is recorded.
[0069] The determination of the acceptable power of the unrestricted winding is based on the premise that the winding has not triggered overcurrent, temperature protection, or insulation protection. When the allowable power of the unrestricted winding current is higher than the current output power, the excess carrying capacity is taken as the acceptable power. When the allowable power of the unrestricted winding current is not higher than the current output power, the acceptable power is recorded as zero. If the allowable power of the unrestricted winding current cannot be confirmed, the controller will not transfer the unloaded power from the restricted winding to this winding, but will instead proceed to the power setpoint reduction judgment.
[0070] S402: Collect multiple consecutive instantaneous busbar voltage samples within the acquisition period, delete the busbar voltage samples whose valid identification is invalid, and process the valid values of the retained busbar voltage samples; process the difference between the valid value processing result and the rated busbar voltage value to obtain the busbar voltage deviation.
[0071] The instantaneous busbar voltage sample value is acquired by the AC busbar measurement interface. Along with the sample value, a valid sampling channel identifier is also sent to the controller. The valid sampling channel identifier is determined by the busbar measurement channel self-test, interface source matching, message integrity, and sampling period consistency. Invalid instantaneous busbar voltage sample values are deleted and recorded as busbar voltage sampling anomalies. The retained instantaneous busbar voltage sample values enter the valid value processing process, forming a valid busbar voltage state.
[0072] The controller calculates the difference between the effective busbar voltage state and the rated busbar voltage to obtain the busbar voltage deviation. When the busbar voltage deviation does not exceed the protection boundary corresponding to the set voltage protection setting, the power transfer path between windings remains open. When the busbar voltage deviation exceeds the protection boundary corresponding to the set voltage protection setting, the busbar voltage protection status takes effect, and the controller no longer adds load to the unrestricted windings but transfers the unloaded power from the restricted windings to the power setpoint reduction path of the substation. If the effective busbar voltage state cannot be formed, the controller sets the busbar voltage deviation to a pending confirmation state and processes it according to the voltage protection priority criteria.
[0073] S403: When the unloading power of the limiting winding is not greater than the power that the unlimited winding can receive, the unloading power of the limiting winding is determined as the power transfer value between windings, the power reduction of the power station is determined to be in a zero reduction state, and a winding current given transfer command is issued.
[0074] If the busbar voltage deviation does not trigger voltage protection, and the unrestricted winding's receiveable power is sufficient to cover the restricted winding's unloading power, the controller writes the restricted winding's unloading power into the inter-winding transfer power value. This inter-winding transfer power value is used to adjust the current setpoints of the two windings: the restricted winding's current setpoint decreases in the unloading direction, while the unrestricted winding's current setpoint increases in the receiving direction. At this time, the power reduction record for the substation is zero, and the substation power setpoint maintains the original control link.
[0075] After the winding current setpoint transfer command is issued, the controller reads the confirmation status returned by the current control loop. The confirmation status includes the limited winding setpoint reception status, the unlimited winding setpoint reception status, and the execution feedback status. When the confirmation status is valid, the inter-winding transfer for the current cycle is closed. When the confirmation status is invalid or has not returned, the controller does not continue to add new transfer amounts, maintains the previous valid setpoint status, and rereads the limited winding unloaded power, the unlimited winding receiveable power, and the busbar voltage deviation in the next cycle.
[0076] S404: When the unloading power of the limiting winding is greater than the acceptable power of the unlimited winding, the acceptable power of the unlimited winding is determined as the power transfer value between windings, and the portion of the unloading power of the limiting winding that exceeds the acceptable power of the unlimited winding is determined as the power reduction value of the power station, and a power reduction command for the power station is issued; at the same time, when the bus voltage deviation exceeds the set voltage protection setting, the power unloading power of the limiting winding is used as the power reduction value of the power station and a power reduction command for the power station is issued.
[0077] When the unloaded power of the limiting winding exceeds the power that the unlimited winding can receive, the controller writes the portion that the unlimited winding can handle into the inter-winding transfer power value, and the remaining portion into the power reduction value for the power station. The inter-winding transfer power value is sent to the current control loop of the dual-winding shaft-driven generator, and the power reduction value for the power station is sent to the power management cabinet. After receiving the reduction command, the power management cabinet reduces the power output setpoint of the shaft-driven generator set and returns a confirmation status to the generator controller.
[0078] When the busbar voltage deviation exceeds the set voltage protection threshold, the controller prioritizes the busbar voltage protection status as an interlocking condition, limiting the overall unloaded power of the windings to the substation's reduced power value and preventing it from being allocated to unrestricted windings. This prevents the addition of another set of winding loads when the busbar voltage has already deviated from the protection boundary. If the substation power reduction command is not confirmed, the controller maintains the restricted winding unloading status, records the unconfirmed substation command status, and continues to verify the busbar voltage, winding current, winding temperature, and insulation resistance in subsequent control cycles.
[0079] Through the above processing, the dual-winding shaft-driven generator completes power generation efficiency evaluation, winding limitation identification, inter-winding load transfer, and power station power reduction under motor operating conditions.
[0080] Specifically, the following is the complete process of energy efficiency assessment and fault-tolerant operation optimization for a dual-winding shaft-driven generator.
[0081] For example, the motor is a 1200kW dual-winding shaft-driven generator connected to a 690V AC busbar. The first and second windings are electrically designed for 600kW respectively, with a rated power factor set at 0.96. The rated power, busbar voltage level, single winding power level, and power factor setting values mentioned above are all confirmed by the motor nameplate, the power management cabinet parameter table, and the shaft-driven generator commissioning record, and are written into the generator controller's operating parameter area and protection parameter area.
[0082] In step S1, the shaft-end sensor interface acquires the shaft-end torque and shaft-end speed, the winding measurement interface acquires the terminal voltage, three-phase current, and winding temperature of the two sets of windings, and the busbar measurement interface acquires the AC busbar voltage. The shaft-end input power is determined using the shaft power conversion formula, which is: ;-----Equation (1) in, This refers to the input power at the shaft end, measured in kW. The torque at the shaft end is measured in N·m and is collected by a shaft end torque sensor. The shaft end speed is measured in r / min and is collected by the shaft end speed measurement circuit; 9550 is an engineering conversion factor used to convert torque and speed into mechanical power. The shaft end torque sampling value is 15915 N·m, and the shaft end speed sampling value is 720 r / min. Substituting these values into equation (1), the shaft end input power is approximately 1200 kW. This shaft end input power matches the rated power generation capacity of a 1200 kW dual-winding shaft-driven generator.
[0083] The output power of the first winding and the output power of the second winding are determined using the three-phase AC active power formula, which is: ;-----Equation (2) in, This refers to the winding output power, measured in kW. This is the winding line voltage, in V, which is collected by the corresponding winding terminal voltage measurement circuit. The winding line current is measured in A and is collected by the corresponding three-phase current measurement circuit of the winding. The power factor is read by the generator controller based on the voltage-current phase relationship or the parameters of the power management cabinet of the power station; 1000 is the power unit conversion factor. Under the stable power generation condition of the motor, the terminal voltage of the first winding is 690V, the line current is 510A, and the power factor is 0.96. Substituting into equation (2), the output power of the first winding is approximately 585kW; the terminal voltage of the second winding is 690V, the line current is 488A, and the power factor is 0.96. Substituting into equation (2), the output power of the second winding is approximately 560kW. The output power of both windings is close to the rated level of 600kW single winding, and the second winding still has the capacity to accept some transferred power.
[0084] The efficiency of shaft-driven power generation is determined using the power generation efficiency formula, which is: ;-----Equation (3) in, For shaft-driven power generation efficiency; This represents the output power of the first winding, in kW. This refers to the output power of the second winding, measured in kW. The input power at the shaft end is expressed in kW. The output power of the first winding and the output power of the second winding are determined by the winding terminal voltage, the three-phase current of the winding, and the power factor. The input power at the shaft end is determined by the shaft end torque and the shaft end speed. According to the above motor operating data, the output power of the first winding is approximately 585kW, the output power of the second winding is approximately 560kW, and the input power at the shaft end is approximately 1200kW. Substituting these values into equation (3), the shaft-driven power generation efficiency is approximately 95.4%. This efficiency value is within the engineering range for normal power generation operation of the shaft-driven generator, indicating that the data links between the shaft end mechanical input, the dual winding electrical output, and the busbar power receiving status are well-matched.
[0085] In step S2, the rated output power of a single winding is 600kW, the rated line voltage of the winding is 690V, the rated power factor is 0.96, and the corresponding rated current limit is set to 530A. This rated current limit is written into the generator controller from the motor protection setting table. During on-site commissioning, the current transformer ratio, winding terminal voltage level, and power factor setting value are recorded simultaneously to ensure that the current limit in the controller is consistent with the actual wiring state of the motor.
[0086] The allowable power current is determined according to the specified current limiting ratio using the following formula: ;-----Equation (4) in, This refers to the allowable power of the current, in kW. The current output power of the corresponding winding, in kW, is determined by S1; I_N is the rated current limit, in A, which is read from the protection parameter area of the generator controller. The peak value of the corresponding winding phase current, in amperes (A), is extracted from the sampled values of the corresponding three-phase current of the winding. The candidate peak values for the three-phase current of the first winding are 610A, 586A, and 579A, respectively; the controller selects 610A as the peak value for the first winding phase current. The candidate peak values for the three-phase current of the second winding are 502A, 496A, and 489A, respectively; the controller selects 502A as the peak value for the second winding phase current. Because the peak value of the first winding phase current exceeds the rated current limit of 530A, the first winding enters the current-limited judgment stage; the peak value of the second winding phase current does not exceed the rated current limit of 530A, so the second winding can continue to enter the unrestricted winding candidate judgment stage.
[0087] The current output power of the first winding is approximately 585kW, the rated current limit is 530A, and the peak phase current is 610A. Substituting these values into equation (4), the allowable current power of the first winding is approximately 508kW. The portion of the current output power of the first winding that exceeds the allowable current power is approximately 77kW. Therefore, the current unloaded power of the first winding is recorded as 77kW. This current unloaded power is entered into S3 as the basis for determining whether the first winding is designated as the current-side winding of the limiting winding.
[0088] In step S3, the motor winding temperature protection setting is determined according to the winding insulation class, cooling method, and commissioning settings. In this example, the winding temperature protection setting is set to 130℃. The insulation protection setting is determined according to the insulation monitoring requirements for low-voltage AC motors. In this example, the insulation resistance protection setting is set to 0.5MΩ. These settings are written into the generator controller's protection parameter area, and modified by maintenance personnel with commissioning privileges to form a parameter change record.
[0089] Based on the above operating data, the current unloading power of the first winding is approximately 77kW, the temperature of the first winding is 118℃, and the insulation resistance is 2.0MΩ. Although the temperature of the first winding has not reached the 130℃ temperature protection setting and the insulation resistance has not fallen below the 0.5MΩ insulation protection setting, the first winding already exhibits current unloading power; therefore, the first winding is designated as a restricted winding. The current unloading power of the second winding is zero, the temperature of the second winding is 105℃, the insulation resistance is 2.5MΩ, and neither temperature protection nor insulation protection has been triggered; therefore, the second winding enters the candidate state for an unrestricted winding.
[0090] Based on operating data showing an output power of approximately 585kW for the first winding and approximately 560kW for the second winding, the average output power of the two windings is approximately 572.5kW. The current output power of the first winding is higher than this average, with a power deviation of approximately 12.5kW. The controller sends this power deviation along with the first winding's current unloading power to determine the limiting winding unloading power. Since the first winding's current unloading power is approximately 77kW and the first winding's power deviation is approximately 12.5kW, the controller selects the larger value of 77kW as the first winding's limiting winding unloading power. This result indicates that the first winding's limitation in this cycle is primarily due to peak current, rather than solely caused by the load imbalance between the two windings.
[0091] If, during subsequent navigation conditions, the peak phase current of the first winding remains above the 530A rated current limit, and the temperature of the second winding rises to the 130℃ protection boundary, both windings will enter the limiting winding state. The controller records that the first winding was triggered by current over-limit and the second winding by temperature protection, and outputs the limiting state in the order of the protection states. At this time, the second winding will no longer be used as the receiving winding, and the unloaded power of the limiting windings corresponding to both windings will enter the power setpoint reduction path of the power station.
[0092] In step S4, the rated voltage of the AC busbar is 690V, and the voltage protection setting is set at 10% of the rated voltage of the busbar, corresponding to a protection boundary of 69V. This value is given by the voltage protection parameters of the power management cabinet of the substation and is consistent with the busbar voltage protection parameters in the shaft generator controller. When the busbar voltage deviation does not exceed 69V, the controller allows power transfer between the two windings; when the busbar voltage deviation exceeds 69V, the controller stops increasing the load on the unrestricted winding and instead outputs a substation power setpoint reduction command.
[0093] Based on the above data, the current output power of the second winding is approximately 560kW. The rated carrying capacity of the second winding is set at the 600kW level, and the peak phase current of the second winding does not exceed the rated current limit of 530A. The controller determines that the power that the second winding can receive is approximately 40kW. Since the first winding limits the unloading power to approximately 77kW, the second winding can only carry about 40kW of it, and the remaining approximately 37kW needs to be transferred to the power setpoint reduction path of the power station.
[0094] During busbar voltage measurement, when the effective busbar voltage is 684V and the rated busbar voltage is 690V, the busbar voltage deviation is 6V, which does not exceed the 69V voltage protection boundary. Therefore, the controller allows inter-winding power transfer. At this time, the first winding's restricted unloading power is approximately 77kW, and the second winding's receiveable power is approximately 40kW. The controller uses 40kW as the inter-winding power transfer value and the remaining approximately 37kW as the power setpoint reduction value for the power station. After receiving the inter-winding transfer command, the current control loop reduces the first winding current setpoint and increases the second winding current setpoint; after receiving the reduction command, the power station power management cabinet correspondingly reduces the power setpoint of the shaft-driven generator set.
[0095] Under another busbar voltage condition, when the effective busbar voltage drops to 616V while the rated busbar voltage remains at 690V, the busbar voltage deviation is 74V, exceeding the 69V voltage protection boundary. The controller then stops adding power to the second winding. At this point, the first winding's limit unloading power is approximately 77kW. This unloading power is no longer split into inter-winding transfer power and substation power reduction, but is instead output as a whole as the substation power setpoint reduction value to the substation power management cabinet.
[0096] Data shows that in a 1200kW, 690V dual-winding shaft-driven generator, when the shaft-end input power is approximately 1200kW, the two windings output approximately 585kW and 560kW respectively, with a total output of approximately 1145kW and a shaft-driven power generation efficiency of approximately 95.4%. When the peak phase current of the first winding rises to 610A and exceeds the rated current limit of 530A, the first winding generates approximately 77kW of limiting winding unloading power. When the second winding still has approximately 40kW of carrying capacity and the busbar voltage deviation does not exceed 69V, the controller prioritizes the power transfer between windings and reduces the remaining approximately 37kW to the power station setpoint. When the busbar voltage deviation exceeds 69V, all 77kW of unloading power is incorporated into the power station setpoint reduction.
[0097] The above are merely preferred embodiments of the present invention and are not intended to limit the present invention in any other way. Any person skilled in the art may make changes or modifications to the above-disclosed technical content to create equivalent embodiments that can be applied to other fields. However, any simple modifications, equivalent changes, and modifications made to the above embodiments based on the technical essence of the present invention without departing from the scope of the present invention shall still fall within the protection scope of the present invention.
Claims
1. A method for energy efficiency assessment and fault-tolerant operation optimization of a dual-winding shaft-driven generator, used for power generation status assessment and fault-tolerant power adjustment between the dual-winding shaft-driven generator, busbar, and power station, characterized in that, include: S1. Collect shaft end power data, busbar operation data, first winding data, and second winding data; The shaft end input power is calculated based on the shaft end power data, the first winding output power is calculated based on the first winding data, the second winding output power is calculated based on the second winding data, and the shaft belt power generation efficiency is calculated based on the first winding output power, the second winding output power, and the shaft end input power. S2. For each winding, multiply the current output power by the ratio of the rated current limit to the peak phase current to obtain the allowable current power. Record the portion of the current output power that exceeds the allowable current power as the current unloading power. S3. The windings with the current unloading power, winding temperature reaching the set temperature protection value, or insulation resistance lower than the set insulation protection value are identified as limiting windings. The current unloading power of the limiting winding is compared with the portion of the current output power of the limiting winding that exceeds the average output power of the two sets of windings. The larger value is identified as the limiting winding unloading power. S4. Subtract the current output power of the unrestricted winding from the current allowable power of the unrestricted winding to obtain the power that the unrestricted winding can receive. When the busbar voltage deviation does not exceed the set voltage protection setting, a winding current transfer command is generated based on the portion of the unloaded power of the limiting winding that does not exceed the power that the unrestricted winding can receive, and a power station power setting reduction command is generated based on the portion of the unloaded power of the limiting winding that exceeds the power that the unrestricted winding can receive; when the busbar voltage deviation exceeds the set voltage protection setting, a power station power setting reduction command is generated based on the unloaded power of the limiting winding.
2. The method for energy efficiency evaluation and fault-tolerant operation optimization of a dual-winding shaft-driven generator according to claim 1, characterized in that, In S1, shaft torque and shaft speed sampling values are collected through the shaft end sensor interface, busbar voltage and busbar rated voltage are collected through the AC busbar measurement interface, three-phase current, terminal voltage and temperature of the first winding are collected through the first winding measurement interface, and three-phase current, terminal voltage and temperature of the second winding are collected through the second winding measurement interface. The acquisition process also includes a verification process, which specifically establishes a source mapping relationship between the interface identifier of each measurement interface and the corresponding sample value. When the interface identifier of any sample value is inconsistent with the preset interface identifier table, the corresponding sample value is deleted.
3. The method for energy efficiency evaluation and fault-tolerant operation optimization of a dual-winding shaft-driven generator according to claim 1, characterized in that, The calculation steps for shaft-driven power generation efficiency include: The shaft torque sample value, shaft speed sample value, first winding terminal voltage sample value, first winding three-phase current sample value, second winding terminal voltage sample value, and second winding three-phase current sample value are obtained within the same calculation cycle. The shaft end mechanical power is calculated using the shaft torque sample value and shaft speed sample value, and the shaft end mechanical power in the power generation direction is determined as the shaft end input power. Simultaneously, the output power of the first winding and the output power of the second winding are calculated using the sampled values of the winding terminal voltage and the three-phase current, respectively. The power value after adding the output power of the two windings is compared with the input power at the shaft end to generate the shaft belt power generation efficiency.
4. The method for energy efficiency evaluation and fault-tolerant operation optimization of a dual-winding shaft-driven generator according to claim 1, characterized in that, The steps for determining the allowable current power and the current offload power include: For each winding, the current output power of the corresponding winding, the sampled value of the three-phase current of the corresponding winding, and the rated current limit stored in the generator controller are obtained. The peak value of the phase current is determined according to the sampled value of the three-phase current of the corresponding winding. The rated current limit is then multiplied by the peak value of the phase current and the ratio is processed before multiplying by the current output power to obtain the current allowable power of the corresponding winding. Compare the current output power of the corresponding winding with the current allowable power of the corresponding winding. When the current output power of the corresponding winding is greater than the current allowable power of the corresponding winding, the excess part is determined as the current unloading power of the corresponding winding. When the current output power does not exceed the current allowable power, the current unloading power is recorded as 0.
5. The method for energy efficiency evaluation and fault-tolerant operation optimization of a dual-winding shaft-driven generator according to claim 4, characterized in that, The process of determining the peak phase current specifically includes: The three-phase current sampling values of the corresponding winding within the same current evaluation period are obtained. The absolute value of each phase current sampling value is processed separately, and the absolute value with the largest value in the same phase is selected as the candidate value of the corresponding phase current peak value. The candidate value of the phase current peak value with the largest value is determined as the phase current peak value of the corresponding winding.
6. The method for energy efficiency evaluation and fault-tolerant operation optimization of a dual-winding shaft-driven generator according to claim 1, characterized in that, The specific steps for determining the limit of winding unloading power are as follows: The current unloading power, winding temperature, insulation resistance and current output power of each winding are obtained, and the windings whose current unloading power is greater than 0, whose winding temperature reaches the set temperature protection value or whose insulation resistance is lower than the set insulation protection value are identified as the restricted windings. The power deviation is obtained by summing the output power of the first winding and the output power of the second winding, calculating the average output power of the two windings, and extracting the portion of the current output power of the limiting winding that exceeds the average output power of the two windings. The current unloading power of the limiting winding is compared with the power deviation, and the larger of the two values is determined as the unloading power of the limiting winding.
7. The method for energy efficiency evaluation and fault-tolerant operation optimization of a dual-winding shaft-driven generator according to claim 6, characterized in that, When both the first winding and the second winding are determined to be the limiting windings, the winding limiting priority is generated by the triggering sequence of current over-limit, temperature protection and insulation protection. The limiting status of the corresponding windings is output in sequence according to the winding limiting priority, and the limiting winding unloading power of the corresponding windings is recorded respectively.
8. The method for energy efficiency evaluation and fault-tolerant operation optimization of a dual-winding shaft-driven generator according to claim 1, characterized in that, The steps for issuing a winding current given transfer command are as follows: The current output power of the unrestricted winding, the allowable power of the unrestricted winding current, the unloaded power of the restricted winding, the busbar voltage deviation, and the set voltage protection value are obtained. The portion of the allowable power of the unrestricted winding current that exceeds the current output power of the unrestricted winding is determined as the power that the unrestricted winding can receive. When the unloading power of the restricted winding is not greater than the receiveable power of the unrestricted winding, the unloading power of the restricted winding is determined as the inter-winding transfer power value, the power reduction of the power station is determined to be 0, and the winding current given transfer command is issued.
9. The method for energy efficiency evaluation and fault-tolerant operation optimization of a dual-winding shaft-driven generator according to claim 8, characterized in that, The steps for issuing a power plant power setpoint reduction command are as follows: When the unloading power of the restricted winding is greater than the acceptable power of the unrestricted winding, the acceptable power of the unrestricted winding is determined as the power transfer value between the windings, and the portion of the unloading power of the restricted winding that exceeds the acceptable power of the unrestricted winding is determined as the power reduction value of the power station, and a power reduction command for the power station is issued. Simultaneously, when the busbar voltage deviation exceeds the set voltage protection value, the power setpoint of the power station is reduced by using the unloading power of the limiting winding as the power reduction value of the power station.
10. The method for energy efficiency evaluation and fault-tolerant operation optimization of a dual-winding shaft-driven generator according to claim 9, characterized in that, The calculation process for busbar voltage deviation is as follows: Collect multiple consecutive instantaneous busbar voltage samples within the acquisition period, delete the busbar voltage samples whose valid sampling channel is marked as invalid, and square the retained busbar voltage samples. The multiple values after squaring are averaged according to the number of samples, and the square root of the average value is taken to obtain the effective value of the busbar voltage. The difference between the effective value of the busbar voltage and the rated value of the busbar is calculated to obtain the busbar voltage deviation.