A gear precision hot forging die assembly and method

By optimizing the combination of precision hot forging dies for gears, the problems of high material flow resistance, high forming load and material waste in traditional processes have been solved, thereby improving the forging accuracy and mechanical properties of gears and achieving stable mass production.

CN123102905APending Publication Date: 2026-11-17MINGYUE LAKE LABORATORY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611590060.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-14
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional gear precision hot forging forming process has problems such as high material flow resistance, high forming load, severe die wear, serious material waste, and insufficient precision and performance of forgings in the final forging stage.

Method used

A combination of upsetting die, pre-forging die, final forging die, and punching die is used. By forming a positioning structure at the center of the upsetting die, a pre-thinning boss at the center of the pre-forging die, and a flow-limiting and material-locking structure, the material flow path is optimized, flash formation is reduced, and the filling quality of the tooth profile is improved.

Benefits of technology

This reduces material flow resistance and forming load in the final forging stage, decreases material loss, improves gear forging precision and mechanical properties, and enables stable mass production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123102905A_ABST
    Figure CN123102905A_ABST
Patent Text Reader

Abstract

This invention discloses a precision hot forging die assembly and method for gears. The die assembly includes: an upsetting die with a concave-convex forming structure in its central region for forming a positioning structure at the center of the upsetting blank; a pre-forging die with a pre-thinning boss in its central region for axially thinning the central region of the upsetting blank to form a central thin-walled skin; the pre-forging die also has a base pre-forming cavity for pre-forming the outer base region of the upsetting blank, and the outer region of the pre-forging die has no toothed cavity; a final forging die including a central clearance region and an outer forming region, the central clearance region corresponding to the central thin-walled skin; and an outer toothed cavity in the outer forming region; and a punching die including a punch for punching away the central thin-walled skin to form a central through hole. This invention effectively reduces material flow resistance and forming load in the final forging stage, reduces subsequent trimming and material loss, and improves gear forging accuracy and mechanical properties.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of metal plastic forming and gear precision forging technology, specifically relating to a gear precision hot forging forming die combination and method, applicable to the precision segmented forming of disc gears, coupled gears, automotive transmission gears, engineering machinery gears and reducer gears with central holes and peripheral tooth structures. Background Technology

[0002] Gears are key basic components in automotive transmissions, reducers, construction machinery, and other mechanical transmission systems. Their forming quality directly affects transmission accuracy, load-bearing capacity, and service life.

[0003] Traditional gear manufacturing typically involves forging to obtain a blank, followed by machining processes such as turning, hobbing, shaping, and grinding to achieve the final tooth profile. This method involves numerous processing steps, limited material utilization, and subsequent cutting may disrupt the original flow lines of the forged metal in the tooth profile area. With the increasing demands for gear precision and performance in the automotive, construction machinery, and aerospace industries, precision hot forging technology for gears has gained widespread application due to its ability to achieve continuous metal flow lines, high material utilization, and excellent mechanical properties.

[0004] Currently, the traditional precision hot forging process for gears involves: first, heating the round bar and then upsetting it to form a blank; then, pre-forging to initially distribute the material; finally, final forging to complete the gear shape; and finally, trimming and subsequent processing. The final forging stage typically employs open die forging, where flash grooves are set around the parting surface of the die. This allows excess material to flow out along the entire parting surface at the end of the final forging, forming continuous flash to accommodate excess metal and ensure cavity filling. However, this process has the following drawbacks: During final forging, the flow resistance of the central material filling the tooth cavity is high, resulting in a high final forging load. This not only requires larger tonnage forging equipment, increasing equipment investment and energy consumption, but also exacerbates die wear and shortens die life. Simultaneously, the complex tooth cavity structure and narrow tooth grooves result in high material outflow resistance in the central area, while the outer material easily flows out along the parting surface, leading to insufficient filling and defects such as missing material at the tooth tip and groove, affecting the tooth profile accuracy and mechanical properties of the forging. Furthermore, excess material flows out along the entire parting surface at the end of final forging, forming continuous flash. The flash volume accounts for a large proportion of the forging volume, causing serious material waste and requiring specialized trimming processes and equipment for removal, increasing production steps, die costs, and labor time. The trimming process may also lead to forging deformation or poor cut quality. Summary of the Invention

[0005] In view of the above-mentioned shortcomings of the existing technology, the purpose of this invention is to provide a gear precision hot forging die combination and method. This invention can effectively reduce the material flow resistance and forming load in the final forging stage, reduce subsequent trimming and material loss, and improve the forging accuracy and mechanical properties of gears.

[0006] The technical solution of this invention is implemented as follows:

[0007] The present invention provides a gear precision hot forging forming die assembly, including an upsetting die, a pre-forging die, a final forging die, and a punching die.

[0008] The central area of ​​the upsetting die is provided with a concave-convex forming structure, which is used to form a positioning structure in the center of the upsetting blank.

[0009] The pre-forging die has a pre-thinning boss in the central area that cooperates with the positioning structure of the upsetting billet. The pre-thinning boss is also used to axially thin the central area of ​​the upsetting billet, so that the central area of ​​the pre-forging part forms a thin-walled skin that is solidly connected with the outer matrix. The pre-forging die also has a matrix pre-forming cavity, which is used to complete the pre-forming of the outer matrix area of ​​the upsetting billet. The outer area of ​​the pre-forging die has no toothed cavity.

[0010] The final forging die includes a central clearance area and a peripheral forming area. The central clearance area is correspondingly provided with the central thin-walled skin. The peripheral forming area is provided with a peripheral tooth-shaped cavity for completing the final tooth forming.

[0011] The punching die includes a punch used to punch away the thin-walled skin in the center after final forging, forming a central through hole.

[0012] Furthermore, the upsetting die includes a lower upsetting die and an upper upsetting die. The upper surface of the lower upsetting die has a recessed circular groove in the central area, and the lower surface of the upper upsetting die has a protruding frustum corresponding to the recessed circular groove in the central area. The recessed circular groove and the protruding frustum together constitute a concave-convex forming structure.

[0013] Furthermore, the pre-forging die includes a lower pre-forging die and an upper pre-forging die. The upper surface of the upper pre-forging die has a boss in the central area that cooperates with the positioning structure. At the same time, the lower surface of the upper pre-forging die is provided with a groove corresponding to the boss. The boss and the groove together constitute a central pre-forging thin boss.

[0014] Furthermore, a material receiving chamber connected to the preformed cavity of the pre-forging die is provided in the corner transition area of ​​the preformed cavity of the pre-forging die. This chamber is used to guide and receive the local excess material flowing to the corner transition area during the pre-forging process, so as to reduce local material accumulation and flow blockage.

[0015] Furthermore, the material receiving chamber is arc-shaped.

[0016] Furthermore, the outer forming area of ​​the final forging die is provided with a toothed cavity to extrude the outer base area of ​​the pre-forging part and guide the outer material to flow into the toothed cavity to form the final tooth shape.

[0017] Furthermore, a flow-limiting and material-locking structure is provided around the tooth-shaped cavity of the final forging die near the parting surface to throttle and block the material flowing to the outside of the parting surface at the end of the final forging, ensuring that the tooth-shaped cavity is filled first, and restricting the material exceeding the predetermined forming volume of the tooth-shaped cavity to the controlled area corresponding to the flow-limiting and material-locking structure.

[0018] Furthermore, the flow-limiting and material-locking structure includes a flow-limiting surface facing the inner side of the parting surface and a material-locking step connected to the flow-limiting surface; the flow-limiting and material-locking structure is composed of a continuous circumferential flow-limiting and material-locking unit or a plurality of circumferentially spaced flow-limiting and material-locking units around the periphery of the eye-tooth shaped cavity.

[0019] Furthermore, the punching die includes a punch, a central positioning structure, a peripheral limiting structure, and a support structure; the central positioning structure is coaxially arranged with the central thin-walled connecting skin; the punch is used to punch away the central thin-walled connecting skin to form a central through hole; the support structure is located around the central positioning structure and is used to contact the bottom surface of the final forging; the support structure is arranged around the area corresponding to the central through hole, with a blanking space left in the center to facilitate the smooth discharge of the punched-away central thin-walled connecting skin; the peripheral limiting structure is located radially outside the support structure and cooperates with at least one of the gear base or tooth profile area to limit the radial expansion and axial deformation of the gear base during the punching process.

[0020] Another aspect of the present invention provides a method for precision hot forging of gears, which is achieved using the aforementioned gear precision hot forging die combination, specifically including the following steps:

[0021] S1: The heated round bar is placed in an upsetting mold for upsetting to obtain a disc-shaped upsetting blank; during the upsetting process, a positioning structure is formed in the center of the upsetting blank through the concave and convex forming structure in the central area of ​​the upsetting mold;

[0022] S2: After the upsetting billet is flipped over, it is placed in the pre-forging mold so that the positioning structure of the upsetting billet matches the central pre-thickening boss. The central pre-thickening boss is used to axially thin the central area of ​​the upsetting billet, thereby forming a central thin-walled skin that is solidly connected to the outer matrix in the central area of ​​the pre-forging part. At the same time, the pre-forming of the outer matrix area is completed through the matrix pre-forming cavity, and no tooth shape is formed in the pre-forging stage.

[0023] S3: Place the pre-forged part in the final forging die for final forging. Use the outer toothed cavity of the final forging die to guide the material to flow to the corresponding area of ​​the tooth groove to complete the final tooth forming.

[0024] S4: Place the final forging in the punching die and punch away the thin-walled skin in the center to form a central through hole.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] 1. This invention uses a central pre-embedded thin boss in the central region of the pre-forging die to axially thin the central region of the upsetting billet, forming a thin-walled skin in the central region of the pre-forging part that maintains a solid connection with the surrounding matrix. This thin-walled skin serves as a low-resistance replenishment source for the outward flow of material from the central region during the final forging stage. Simultaneously, the peripheral region of the pre-forging die does not have tooth-shaped cavities corresponding to the final gear tooth profile, allowing the peripheral tooth-shaped region to retain the material flow space required for final forging. The final tooth profile is formed by the peripheral tooth-shaped cavities of the final forging die during the final forging stage. During final forging, the material in the central region can smoothly replenish outward through the thin-walled skin, while the peripheral material flows towards the corresponding tooth groove area under the guidance of the tooth-shaped cavity. This effectively shortens the material flow path, reduces material flow resistance and final forging load, and ensures that the tooth-shaped cavity, especially the tooth groove area, is fully filled, significantly improving the tooth filling quality and tooth profile accuracy of the gear forging.

[0027] 2. This invention provides a flow-limiting and material-locking structure around the toothed cavity of the final forging die, near the parting surface. This structure includes a flow-limiting surface facing inward toward the parting surface and a material-locking step connected to the flow-limiting surface. During the final forging process, the flow-limiting surface and the material-locking step throttle and block the material flowing outward toward the parting surface at the end of the final forging, allowing the toothed cavity to be filled first. A small amount of material exceeding the predetermined forming volume of the toothed cavity is confined to the controlled area corresponding to the flow-limiting and material-locking structure, rather than flowing out along the entire parting surface to form traditional continuous flash. This effectively reduces flash volume and material loss, thereby effectively reducing or even eliminating subsequent trimming. This improves material utilization, reduces trimming processes, trimming dies, and time consumption, and effectively avoids problems such as forging deformation and poor cut quality that may occur during trimming.

[0028] 3. This invention utilizes the concave-convex forming structure in the central region of the upsetting die to create a positioning structure at the center of the upsetting billet. This positioning structure cooperates with the central pre-upsetting boss in the central region of the pre-forging die during the subsequent pre-forging process, achieving centering and positioning of the billet within the pre-forging die. The upsetting die employs a concave-convex forming structure composed of a recessed circular groove in the central region of the upper surface of the lower upsetting die and a protruding circular platform in the central region of the lower surface of the upper upsetting die. During the upsetting process, the central region of the billet is locally compressed from both sides, allowing the positioning structure to form synchronously with the upsetting process without additional steps. Simultaneously, the central clearance area of ​​the final forging die is correspondingly set with the central thin-walled connecting skin, providing space for the local axial deformation of the central thin-walled connecting skin and coordinating material flow between the central region and the outer base region. The punching die, through its central positioning structure, support structure, and outer limiting structure, restricts the radial expansion and axial deformation of the gear base during the punching process. The above settings can jointly ensure the blank alignment accuracy, cavity alignment accuracy and forging quality stability in the multi-step forging process, which is conducive to the stable and mass production of precision hot forging of gears.

[0029] 4. The present invention provides a material receiving chamber in the corner transition area of ​​the preformed cavity of the pre-forging die, which is connected to the preformed cavity of the base body. This chamber can guide and accommodate the local excess material flowing to the corner transition area during the pre-forging process, thereby reducing local material accumulation and flow blockage. This reduces local deformation resistance and forming load, and provides a more uniform flowable material for the outer tooth area in the final forging stage, thereby further improving tooth filling. Attached Figure Description

[0030] Figure 1 This is a schematic diagram of the upsetting die of the present invention.

[0031] Figure 2 This is a schematic diagram of the structure of the pre-forging mold of the present invention.

[0032] Figure 3 This is a schematic diagram of the final forging die of the present invention.

[0033] Figure 4 This is a schematic diagram of the process for precision hot forging of gears according to the present invention.

[0034] Figure 5 These are schematic diagrams showing the morphology of the upsetting billet, pre-forging, and final forging.

[0035] Wherein: A-Central thin-walled connecting skin; 1-Upsetting die; 11-Upsetting lower die; 11a-Concave circular groove; 12-Upsetting upper die; 12a-Protruding truncated cone; 2-Pre-forging die; 21-Pre-forging lower die; 21a-Groove; 22-Pre-forging upper die; 22a-Boss; 22b-Material receiving chamber; 3-Final forging die; 31-Final forging lower die; 31a-Lower ejector rod; 31b-Flow limiting and material locking structure; 32-Final forging upper die; 32a-Upper ejector rod. Detailed Implementation

[0036] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of them. Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to represent selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.

[0037] It should be noted that similar reference numerals and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures. In the description of this invention, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the figures, or the orientation or positional relationship commonly used when the product is in use. They are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the invention. Furthermore, the terms "first," "second," and "third," etc., are only used to distinguish descriptions and should not be construed as indicating or implying relative importance. In addition, the terms "horizontal," "vertical," etc., do not indicate that the component is required to be absolutely horizontal or suspended, but can be slightly tilted. For example, "horizontal" simply means that its direction is more horizontal than "vertical," and does not mean that the structure must be completely horizontal, but can be slightly tilted. In the description of this invention, it should also be noted that, unless otherwise explicitly specified and limited, the terms "set," "install," "connect," and "link" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0038] The present invention provides a gear precision hot forging forming die assembly, including an upsetting die 1, a pre-forging die 2, a final forging die 3, and a punching die.

[0039] See Figure 1 The upsetting die 1 has a concave-convex forming structure in its central area to form a positioning structure at the center of the upsetting blank. In a specific implementation, the upsetting die 1 has a lower upsetting die 11 and an upper upsetting die 12. The upper surface of the lower upsetting die 11 has a recessed circular groove 11a in its central area, and the lower surface of the upper upsetting die 12 has a protruding frustum 12a corresponding to the recessed circular groove 11a in its central area. The recessed circular groove 11a and the protruding frustum 12a together constitute the concave-convex forming structure.

[0040] Here, the recessed circular groove in the central area of ​​the upper surface of the lower upsetting die and the protruding frustum in the central area of ​​the lower upsetting die together form a concave-convex forming structure. During upsetting, the round bar is heated to a temperature suitable for hot forging and then placed in the upsetting die for axial upsetting, causing the round bar to expand radially to form a disc-shaped upsetting billet. Furthermore, during the upsetting process, the recessed circular groove and protruding frustum of the upsetting die locally compress the central area of ​​the billet from both above and below, thereby forming a positioning structure at the center of the upsetting billet. This positioning structure serves as a positioning reference for the subsequent pre-forging stage, where the upsetting billet mates with the pre-advanced boss at the center of the pre-forging die, which helps ensure the centering accuracy of the billet during gear forging. Moreover, the concave-convex forming structure is completed simultaneously with upsetting without the need for additional processes.

[0041] See Figure 2 The pre-forging die 2 has a pre-thinning boss in the central area that cooperates with the positioning structure of the upsetting billet. The pre-thinning boss is also used to axially thin the central area of ​​the upsetting billet, so that the central area of ​​the pre-forging part forms a central thin-walled skin A that is solidly connected with the outer matrix. The pre-forging die 2 also has a matrix pre-forming cavity, which is used to complete the pre-forming of the outer matrix area of ​​the upsetting billet. The outer area of ​​the pre-forging die 2 has no toothed cavity, that is, the outer area of ​​the pre-forging die 2 does not have a toothed cavity corresponding to the final gear tooth shape, so that the outer toothed area retains the material flow space required for final forging.

[0042] In specific implementation, the pre-forging mold 2 includes a lower pre-forging mold 21 and an upper pre-forging mold 22. The upper surface of the lower pre-forging mold 22 has a boss 21a that cooperates with the positioning structure in the central area. At the same time, the lower surface of the upper pre-forging mold 22 is provided with a groove 22a corresponding to the boss. The boss 21a and the groove 22a together constitute a central pre-upsetting thin boss. During pre-forging, the upsetting billet is flipped and placed in the pre-forging mold, and the boss is used to position the upsetting billet. During the pre-forging process, the boss and groove axially thin the central area of ​​the upsetting billet, causing the material in the central area to flow to the outer base area. A central thin-walled skin A with a thickness less than that of the outer base area is formed in the central area of ​​the pre-forged part, which can promote the flow of central material to the outer area, realizing differentiated pre-forming of the central area and the outer base area.

[0043] Furthermore, a material receiving chamber 22a, communicating with the pre-forming cavity of the base material, is provided in the corner transition area of ​​the pre-forging die 2. This chamber guides and accommodates excess material flowing into the corner transition area during the pre-forging process, thereby reducing local material accumulation and flow blockage. In this embodiment, the material receiving chamber is located on the upper pre-forging die 22. The specific shape and size of the material receiving chamber and its connection method with the pre-forming cavity can be adjusted according to the gear structure, billet volume, and material flow characteristics. Preferably, the material receiving chamber is arc-shaped, which effectively increases the smoothness of material flow, thereby effectively reducing local deformation resistance and forming load, and providing a more uniform flowable material to the outer tooth area in the final forging stage, improving tooth filling.

[0044] See Figure 3 The final forging die 3 includes a central clearance area and a peripheral forming area. The central clearance area corresponds to the central thin-walled connecting skin A. The peripheral forming area has a peripheral toothed cavity for completing the final toothed forming. In this embodiment, the final forging die 3 includes a lower final forging die 31 and an upper final forging die 32, which form a cavity. A first through hole and a second through hole are respectively provided on the lower final forging die 31 and the upper final forging die 32 corresponding to the center of the final forging die. A lower ejector rod 31a and an upper ejector rod 32a are respectively provided in the first through hole and the second through hole. The upper end face of the lower ejector rod and the lower end face of the upper ejector rod are both provided with concave structures. The corresponding areas of the lower ejector rod and the upper ejector rod form a central clearance area within the final forging die. The outer side of the central clearance area forms the peripheral forming area. During the final forging process, the central thin-walled skin can undergo local axial deformation within the central clearance area, providing deformation coordination space for the outer material to flow towards the toothed area. This reduces the constraint of the central area on the radial flow of the outer material, reduces the local deformation concentration caused by the intense material flow in the later stages of final forging, and also reduces the large-volume plastic deformation in the central area, which is beneficial for reducing the final forging forming load.

[0045] In specific implementation, a flow-limiting and material-locking structure 31b is provided near the parting surface on the periphery of the tooth-shaped cavity of the final forging die 3. In this embodiment, the flow-limiting and material-locking structure 31b is provided on the upper surface of the lower die of the final forging to throttle and block the material flowing to the outside of the parting surface at the end of the final forging, ensuring that the tooth-shaped cavity is filled first, and restricting a small amount of material exceeding the predetermined forming volume of the tooth-shaped cavity to the controlled area corresponding to the flow-limiting and material-locking structure, so as to reduce or avoid the formation of continuous flash.

[0046] Furthermore, the flow-limiting material-locking structure 31b includes a flow-limiting surface facing the inner side of the parting surface and a material-locking step connected to the flow-limiting surface; the flow-limiting material-locking structure is composed of a continuous circumferential arrangement or multiple circumferentially spaced flow-limiting material-locking units around the eye-tooth shaped cavity.

[0047] In this field, the parting surface is the contact surface in a forging die used to separate the forging die and remove the forging, while the flow-limiting surface refers to a surface in a forging die that has a certain aggregate shape and size and is provided to restrict or control the flow of material.

[0048] For a punching die, the punching die includes a punch used to punch away the central thin-walled connecting skin after final forging, forming a central through hole. Specifically, the punching die includes a punch, a central positioning structure, a peripheral limiting structure, and a support structure; the central positioning structure is coaxially arranged with the central thin-walled connecting skin and is used to center and position the final forging; the punch is used to punch away the central thin-walled connecting skin to form a central through hole; the support structure is located around the central positioning structure and contacts the bottom surface of the final forging, used to support the final forging and withstand the punching force during the punching process; the support structure is arranged around the area corresponding to the central through hole, with a blanking space in the center to facilitate the smooth discharge of the punched-away central thin-walled connecting skin; the peripheral limiting structure is located radially outside the support structure and is used to cooperate with at least one of the gear base or tooth profile area to limit the radial expansion and axial deformation of the gear base during the punching process.

[0049] The process diagram of using the above-mentioned gear precision hot forging die combination to achieve gear precision hot forging is shown below. Figure 4 As shown, the method specifically includes the following steps:

[0050] S1: First, heat the round bar to a suitable hot forging temperature, then place the heated round bar in an upsetting die for upsetting to obtain a disc-shaped upsetting billet; during the upsetting process, a positioning structure is formed in the center of the upsetting billet through the concave-convex forming structure in the central area of ​​the upsetting die.

[0051] S2: After the upsetting billet is flipped over, it is placed in the pre-forging mold, so that the positioning structure of the upsetting billet matches the central pre-thickening boss. The central pre-thickening boss is used to axially thin the central area of ​​the upsetting billet, so that the material in the central area of ​​the upsetting billet flows to the outer base area. This forms a thin-walled skin in the central area of ​​the pre-forging part with a thickness less than that of the outer base area and a solid connection with the outer base. At the same time, the pre-forming of the outer base area is completed through the base pre-forming cavity, and no tooth shape is formed in the pre-forging stage. A material receiving chamber connected to the base pre-forming cavity is set in the corner transition area of ​​the base pre-forming cavity of the pre-forging mold to guide and accommodate the local excess material flowing to the corner area during the pre-forging process, so as to reduce local material accumulation and flow blockage.

[0052] S3: The pre-forged part is placed in the final forging die for final forging. The outer toothed cavity of the final forging die is used to squeeze the edge area of ​​the pre-forged part, guiding the outer material to flow into the corresponding area of ​​the toothed groove in the toothed cavity to complete the final toothed forming. During the final forging process, the material flowing to the outside of the parting surface at the end of the final forging is throttled and blocked by the flow-limiting surface and the material-locking step, so that the toothed cavity is filled first, and the small amount of material exceeding the predetermined forming volume of the toothed cavity is restricted to the controlled area corresponding to the flow-limiting and material-locking structure. The central thin-walled skin corresponds to the central avoidance area of ​​the final forging die and undergoes local axial deformation during the final forging process to coordinate the material flow between the central area and the outer area.

[0053] S4: The final forging is placed in a punching die, and the central thin-walled connecting skin is punched out by a punch to form a central through hole. The radial expansion and axial deformation of the gear base and tooth region are restricted by the peripheral positioning and limiting structure of the punching die. The central thin-walled connecting skin is always in solid connection with the gear base before the punching process. The final tooth profile is formed in the final forging process. The central through hole is formed by the punching process after the final forging process is completed.

[0054] In one embodiment, a gear is hot-forged using the above method. Figure 5 The diagram shows the morphology of the upsetting billet, the pre-forging, and the final forging, where 5(a) is the upsetting billet. Figure 5 (b) is a pre-forged part. Figure 5 (c) is the final forging.

[0055] Finally, it should be noted that the above embodiments of the present invention are merely illustrative examples and not intended to limit the implementation of the invention. Those skilled in the art can make other variations and modifications based on the above description. It is impossible to exhaustively list all possible implementations here. All obvious variations or modifications derived from the technical solutions of this invention are still within the scope of protection of this invention.

Claims

1. A gear precision hot forging forming die assembly, characterized in that, Including upsetting dies, pre-forging dies, final forging dies, and punching dies; The central area of ​​the upsetting die is provided with a concave-convex forming structure, which is used to form a positioning structure at the center of the upsetting blank; The pre-forging die has a pre-thinning boss in the central area that cooperates with the positioning structure of the upsetting billet. The pre-thinning boss is also used to axially thin the central area of ​​the upsetting billet, so that the central area of ​​the pre-forging part forms a thin-walled skin that is solidly connected with the outer matrix. The pre-forging die also has a matrix pre-forming cavity for completing the pre-forming of the outer matrix area of ​​the upsetting billet, and the outer area of ​​the pre-forging die has no toothed cavity. The final forging die includes a central clearance area and a peripheral forming area. The central clearance area is correspondingly provided with the central thin-walled skin. The peripheral forming area is provided with a peripheral tooth-shaped cavity to complete the final tooth forming. The punching die includes a punch used to punch away the thin-walled skin in the center after final forging, forming a central through hole.

2. The gear precision hot forging die assembly according to claim 1, characterized in that, The upsetting die includes a lower upsetting die and an upper upsetting die. The upper surface of the lower upsetting die has a recessed circular groove in the central area, and the lower surface of the upper upsetting die has a protruding frustum corresponding to the recessed circular groove in the central area. The recessed circular groove and the protruding frustum together constitute a concave-convex forming structure.

3. The gear precision hot forging die assembly according to claim 1, characterized in that, The pre-forging die includes a lower pre-forging die and an upper pre-forging die. The upper surface of the upper pre-forging die has a boss in the central area that cooperates with the positioning structure. At the same time, the lower surface of the upper pre-forging die is provided with a groove corresponding to the boss. The boss and the groove together constitute a central pre-forging thin boss.

4. The gear precision hot forging die assembly according to claim 3, characterized in that, A material receiving chamber connected to the preforming cavity of the base material is provided in the corner transition area of ​​the pre-forging die. This chamber is used to guide and receive the local excess material flowing to the corner transition area during the pre-forging process, so as to reduce local material accumulation and flow blockage.

5. The gear precision hot forging die assembly according to claim 4, characterized in that, The material storage compartment is arc-shaped.

6. The gear precision hot forging die assembly according to claim 1, characterized in that, The outer forming area of ​​the final forging die is provided with a toothed cavity to extrude the outer base area of ​​the pre-forged part and guide the outer material to flow into the toothed cavity to form the final tooth shape.

7. The gear precision hot forging die assembly according to claim 6, characterized in that, A flow-limiting and material-locking structure is provided around the tooth-shaped cavity of the final forging die, close to the parting surface, to throttle and block the material flowing to the outside of the parting surface at the end of the final forging, ensuring that the tooth-shaped cavity is filled first, and restricting the material exceeding the predetermined forming volume of the tooth-shaped cavity to the controlled area corresponding to the flow-limiting and material-locking structure.

8. The gear precision hot forging die assembly according to claim 7, characterized in that, The flow-limiting and material-locking structure includes a flow-limiting surface facing the inner side of the parting surface and a material-locking step connected to the flow-limiting surface; the flow-limiting and material-locking structure is composed of a continuous or multiple flow-limiting and material-locking units arranged circumferentially around the periphery of the eye-tooth shaped cavity.

9. The gear precision hot forging die assembly according to claim 1, characterized in that, The punching die includes a punch, a central positioning structure, a peripheral limiting structure, and a support structure. The central positioning structure is coaxially arranged with the central thin-walled connecting skin. The punch is used to punch away the central thin-walled connecting skin to form a central through hole. The support structure is located around the central positioning structure and is used to contact the bottom surface of the final forging. The support structure is arranged around the area corresponding to the central through hole, with a blanking space left in the center to facilitate the smooth discharge of the punched-away central thin-walled connecting skin. The peripheral limiting structure is located radially outside the support structure and cooperates with at least one of the gear base or tooth region to limit the radial expansion and axial deformation of the gear base during the punching process.

10. A method for precision hot forging of gears, characterized in that, The gear precision hot forging forming die assembly according to any one of claims 1-9 is used to achieve this, specifically including the following steps: S1: The heated round bar is placed in an upsetting mold for upsetting to obtain a disc-shaped upsetting blank; during the upsetting process, a positioning structure is formed in the center of the upsetting blank through the concave and convex forming structure in the central area of ​​the upsetting mold; S2: After the upsetting billet is flipped over, it is placed in the pre-forging mold so that the positioning structure of the upsetting billet matches the central pre-thickening boss. The central pre-thickening boss is used to axially thin the central area of ​​the upsetting billet, thereby forming a central thin-walled skin that is solidly connected to the outer matrix in the central area of ​​the pre-forging part. At the same time, the pre-forming of the outer matrix area is completed through the matrix pre-forming cavity, and no tooth shape is formed in the pre-forging stage. S3: Place the pre-forged part in the final forging die for final forging. Use the outer toothed cavity of the final forging die to guide the material to flow to the corresponding area of ​​the tooth groove to complete the final tooth forming. S4: Place the final forging in the punching die and punch away the thin-walled skin in the center to form a central through hole.