A method for intelligent interlocking control of ore unloading and fixed hydraulic breaker in underground mine ore pass

By using intelligent interlocking control between ore unloading and crushing operations, combined with receiving capacity calculation and segmented cycle control, the problems of inaccurate ore unloading judgment and cross-operation risks in existing technologies have been solved, achieving precise ore unloading and efficient continuity of safe operations.

CN123105326APending Publication Date: 2026-11-17ANHUI TONGGUAN INTELLIGENT TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611447327.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-17
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing ore unloading methods cannot accurately determine whether the ore pass can receive the current batch of ore, and there are risks of cross-operation and safety hazards. They are also difficult to adapt to unique working conditions such as large blockages and material bridging at underground ore passes.

Method used

By using the single unloading permit of the loader as the control object and combining it with the calculation model of the receiving capacity of the chute, the unloading permit window and the crushing operation window are mutually exclusive and switched. After crushing, the permit is checked to ensure safe return to the original position. The segmented cycle control and double re-checking mechanism are adopted to accurately match the unloading volume and the receiving capacity.

Benefits of technology

It enables precise quantitative calculation of the ore receiving capacity at the ore pass, reduces the probability of blockage and bridging accidents, avoids the risk of cross-operations, improves operational safety and efficiency, and ensures the continuity and safety of ore unloading operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123105326A_ABST
    Figure CN123105326A_ABST
Patent Text Reader

Abstract

This invention discloses an intelligent interlocking control method for ore unloading and fixed breaker hammer in underground mine ore chute, relating to the field of underground mine transportation technology. The method includes the following steps: S1, ore unloading intention identification; S2, estimated ore unloading volume determination; S3, ore chute opening status acquisition; S4, receiving capacity calculation; S5, determining the ore unloading permit window status; S6, opening the crushing operation window after verification; S7, crushing operation execution and window closure; S8, double verification after crushing; S9, restoring the ore unloading permit determination. By integrating three positive contribution parameters—screen opening area, material drop per unit time, and material surface descent speed—with three negative attenuation parameters—stacking height, large block obstruction degree, and bridging risk—and quantifying the receiving capacity R after weight correction, it is then compared with the estimated ore unloading volume Q and safety margin S for graded control of ore unloading permits. This achieves accurate prediction before ore unloading, thereby reducing the probability of blockages and bridging accidents.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of underground mine transportation technology, and in particular to an intelligent interlocking control method for ore unloading in underground mine ore passes and for fixed hydraulic breakers. Background Technology

[0002] In underground mining, loaders are responsible for transporting ore extracted from the stope to the ore pass or designated unloading point and unloading it into the ore pass, thus completing the ore transfer and transportation, which is the conventional operation mode for underground ore transfer. However, due to the uneven particle size of the ore in the stope and the presence of large-diameter lumps, abnormal conditions such as large ore blockage, screen obstruction, bridging of material in the ore shed, and excessive ore accumulation are prone to occur at the ore pass. These conditions directly hinder the normal unloading of ore from the ore pass, affect the ore extraction efficiency, and may also bring corresponding production safety risks. To address these issues, fixed breaker hammers are usually used on-site to crush the blockage and large ore lumps at the ore pass to maintain the normal operation of the ore pass system.

[0003] However, existing ore unloading methods still have various problems. First, they cannot convert the current state of the ore pass into the amount of ore that can still be received. Furthermore, they are prone to continuing unloading when the receiving capacity is insufficient. There is also a risk of overlapping operations between loader unloading and breaker hammer operation. After breaker hammer operation, it is impossible to determine whether it has receiving capacity, and it is also impossible to determine whether it is suitable to resume unloading operations.

[0004] In the existing technology, there are also corresponding solutions for the coordinated control of the crushing process in mines.

[0005] Chinese invention patent CN122362945A discloses a method, apparatus, storage medium, and electronic device for collaborative unloading at a crushing outlet. The method includes: acquiring multi-source sensor data and performing time synchronization and robust preprocessing on the multi-source sensor data to obtain multi-source sensor state variables that meet a pre-set confidence level; performing congestion assessment and prediction based on the multi-source sensor state variables and the expected arrival time series of dump trucks to obtain congestion assessment and prediction results; constructing a target optimization function based on the congestion assessment and prediction results, dump truck queue information, and target constraint information to obtain vehicle optimization command information and crushing outlet equipment setpoints; performing hierarchical control based on the vehicle optimization command information and crushing outlet equipment setpoints to obtain control feedback results; and performing state management based on the control feedback results. The collaborative unloading method for a crushing outlet provided by this invention can achieve collaborative control of material unloading at the crushing outlet.

[0006] However, although the existing patents mentioned above can achieve coordinated control of unloading at the crushing outlet, the existing technologies only achieve coordinated control of unloading and crushing from the perspective of traffic flow scheduling and vehicle queue optimization, which makes it difficult to guarantee the safety and feasibility of subsequent ore unloading. At the same time, their adaptability to the special working conditions of large block blockage at the underground chute and bridging of materials is still significantly insufficient. Summary of the Invention

[0007] The purpose of this application is to provide an intelligent interlocking control method for ore unloading in underground mine ore passes and fixed hydraulic breakers, which solves the problem that existing ore unloading methods cannot determine whether the ore pass can receive the current ore before unloading.

[0008] This invention takes the single unloading permit of a loader as the control object. By comparing the receiving capacity R of the chute with the expected unloading volume Q of the loader, it performs mutually exclusive switching between the unloading permit window and the crushing operation window. After crushing, it re-verifies the receiving capacity R' and the safe return status of the breaker hammer before restoring the unloading permit.

[0009] A method for intelligent interlocking control of ore unloading and fixed hydraulic breaker in underground mine ore chute, specifically including the following steps:

[0010] S1, Unloading Intent Recognition: When the loader approaches the chute opening, the system recognizes its unloading intent;

[0011] S2, Determining the expected unloading volume: Data is obtained through on-board weighing. In the absence of a weighing system, the expected unloading volume is estimated by combining the rated volume of the bucket, the loading rate, and the bulk density of the ore.

[0012] S3, Cutter Opening Status Data: Collects data on the open area of ​​the chute screen, the material accumulation height, the amount of material falling per unit time, and the risk status of the material shed.

[0013] S4, Receiving Capacity Calculation: The current ore receiving capacity of the ore pass is obtained through a comprehensive calculation model, and the safety margin is used to accurately determine whether the current unloading can be accepted.

[0014] S5, Determine the status of the ore unloading permit window: Compare the receiving capacity with the expected ore unloading volume, and control the ore unloading permit window in stages;

[0015] S6, Open the crushing operation window after verification: After generating the crushing requirement, do not start crushing directly. First, complete the safety condition verification. Open the crushing operation window after all safety conditions are met.

[0016] S7, Crushing Operation Execution and Window Closure: During the crushing operation window, the fixed breaker handles large pieces, blockages, and material bridging issues at the chute.

[0017] S8, Dual Re-verification after Crushing: After the crushing window is closed, two verifications are executed simultaneously;

[0018] S9, resume ore unloading permission determination: determining whether to continue the ore unloading operation according to different review results.

[0019] As a further improvement of the present invention, in steps S1 to S5, the estimated ore unloading amount is Q, the ore receiving capacity is R, and the safety margin is S. The hierarchical control ore unloading permission window is specifically as follows: when R ≥ Q + S, the ore unloading permission window is opened to allow normal ore unloading; when Q ≤ R < Q + S, an ore unloading restriction instruction is output; when R < Q and the ore pass opening can recover on its own, the ore unloading permission window is closed, and a prompt to wait for ore unloading is given; when R < Q and there are blockage situations such as jamming, bridging, and severe grid screen occlusion, the ore unloading permission window is closed, and a crushing processing demand is generated at the same time. Through multi-level comparison and determination of the ore pass opening receiving capacity, the estimated ore unloading amount and the safety margin, refined hierarchical management and control of ore unloading permission is realized, which can differentially match ore unloading permissions, automatically identify blockage working conditions and trigger crushing processing demands, so as to avoid the material blockage risk caused by blind ore unloading when the receiving capacity is insufficient from the source.

[0020] As a further improvement of the present invention, Q is specifically the estimated amount of ore that the scraper will unload into the ore pass this time. Q preferentially uses on-board weighing data; when the on-board weighing data cannot be measured, Q is calculated according to different quantities, and the calculation formula of Q is as follows:

[0021] Q=V×η×ρ,

[0022] Wherein, V is the rated volume of the bucket, η is the loading rate, and ρ is the bulk density of the ore. Adopting a dual-mode design that prioritizes on-board weighing data and uses volume formula estimation as a fallback, while ensuring the measurement accuracy of the ore unloading amount, it can adapt to different equipment working conditions with or without an on-board weighing system, ensuring that the basic parameters for interlocking control are stably obtainable.

[0023] As a further improvement of the present invention, R is specifically the current receiving capacity of the ore pass opening, R is used to judge whether the current ore pass opening can receive ore, and the calculation formula of R is as follows:

[0024] R=αA+βD+γL-δH-εB-ζJ,

[0025] Wherein, A is the open area of ​​the screen, specifically the effective open flow area of ​​the screen at the chute opening; D is the amount of ore falling per unit time, specifically the amount of ore falling through the chute opening per unit time; L is the descent rate of the ore surface, specifically the rate at which the ore surface falls within the chute; H is the accumulation height, specifically the ore accumulation height above the screen at the chute opening; B is the degree of large block obstruction, specifically the proportion of large ore blocks obstructing the screen opening and the chute opening; J is the risk of bridging, specifically the risk level of bridging and blockage at the chute opening; and α, β, γ, δ, ε, and ζ are the weighting correction coefficients corresponding to A, D, L, H, B, and J, respectively. It integrates positive contribution parameters such as screen flow, material discharge rate, and material level drop with negative attenuation parameters such as accumulation height, large block obstruction, and shed material risk. By unifying the dimensions through corresponding weight correction coefficients, it can accurately quantify the actual ore receiving capacity of the ore pass in multiple dimensions, providing a reliable quantitative basis for the graded control of ore unloading permits.

[0026] As a further improvement of the present invention, the weighting correction coefficient is used to uniformly convert input parameters with different physical dimensions into the dimension of receiving capacity R. The α characterizes the contribution intensity of the grid screen flow area to the receiving capacity. The larger the α is, the more significant the influence of the grid screen opening area on the ore pass receiving capacity. The α is used to convert the area dimension into the dimension of receiving capacity R. The value of α depends on the grid screen opening ratio, the matching degree between the screen hole size and the average particle size of the ore. The larger the screen hole and the higher the opening ratio, the higher the value of α.

[0027] The β characterizes the contribution of real-time material discharge smoothness to the current receiving capacity R. The larger the β is, the better the instantaneous material discharge rate can reflect the actual receiving capacity of the ore pass. The β is used to convert the flow rate dimension into the receiving capacity R dimension. The β is affected by the ore pass diameter, the ore wall friction coefficient and the ore flowability. The β value is higher for blocky ores with large ore pass diameter and good flowability.

[0028] The value of γ represents the contribution of the material level descent rate inside the ore pass to the receiving capacity of the wellhead. The larger the value of γ, the stronger the constraint of the internal material discharge capacity on the wellhead receiving margin. γ is used to combine the velocity dimension with the effective cross-sectional area of ​​the ore pass. γ is directly related to the effective cross-sectional area of ​​the ore pass and the lower ore discharge system. The higher the value of γ, the stronger the lower ore discharge capacity and the larger the cross-sectional area of ​​the ore pass.

[0029] The δ is a negative attenuation coefficient, which characterizes the degree to which the wellhead stacking height weakens the receiving capacity. The larger the δ is, the faster the remaining receiving space decreases at the same stacking height. The δ is used to convert the height dimension into the occupied receiving volume by combining the ore repose angle and the effective bearing area of ​​the wellhead. The value of δ depends on the ore repose angle and the effective bearing area of ​​the wellhead. The larger the ore repose angle, the more space it occupies at the same height, and the larger its δ value. The smaller the wellhead area, the more obvious the compression of the receiving capacity by the stacking height, and thus the larger the δ is.

[0030] ε is a negative attenuation coefficient, which characterizes the degree to which the large ore blocks the screen and weakens the receiving capacity. The larger the ε is, the more significant the impact of the large block blockage on the flow capacity. ε is used to convert the blockage ratio or blockage level into the attenuation of the receiving capacity. The value of ε is strongly correlated with the screen aperture size and the distribution of large ore particles. When the screen aperture size is close to the particle size, the blockage will be accompanied by clogging and a sharp drop in flow efficiency. At this time, the value of ε will increase significantly. When the large ore is much larger than the screen aperture, it will only form a single point blockage. At this time, the value of ε will decrease relatively.

[0031] The ζ is a negative attenuation coefficient, representing the degree to which the potential risks of bridging and blockage reduce the receiving capacity. A larger ζ indicates a more stringent restriction on unloading permits due to blockage risk. ζ is used to convert the dimensionless risk level into a safe reduction in receiving capacity. The value of ζ depends on the ore's cohesiveness, particle size distribution, and ore pass cross-sectional shape. Ore with high mud content and a tendency to arch has a higher ζ value. Rectangular ore passes are more prone to bridging than circular ones, thus requiring a larger ζ. This set of weighting correction coefficients has clear physical meaning and a well-defined basis for value selection. It can uniformly convert input parameters of different dimensions into receiving capacity dimensions and flexibly adjust the intensity of each influencing factor according to the ore pass structure, ore characteristics, and sieve parameters, effectively improving the operational adaptability and quantitative accuracy of the receiving capacity calculation model.

[0032] As a further improvement of the present invention, in steps S6-S9, the crushing operation window and the unloading permit window are strictly mutually exclusive and cannot be opened simultaneously. The safety condition verification specifically confirms that the loader has exited the breaker's motion envelope and the flyrock risk zone, that no personnel or other equipment have entered the site, and that the breaker is in normal condition. The first of the dual verification is to re-detect the chute opening status and calculate the updated receiving capacity R'. The second of the dual verification is to confirm the safe return of the breaker. The safe return of the breaker includes stopping the impact, the hammer head withdrawing from the unloading area, the boom avoiding the loader's route, and the hydraulic pressure being within a safe range. Through the strict mutual exclusion mechanism between the unloading permit window and the crushing operation window, the triple safety verification before crushing starts, and the dual verification of the receiving capacity retest and the full-dimensional safe return of the breaker after crushing, a complete safety closed loop is formed from operation isolation, pre-emptive prevention and control to post-event confirmation, effectively eliminating the risk of cross-operations, while ensuring the feasibility of unloading recovery and the safety of equipment posture.

[0033] As a further improvement of the present invention, the core comparison parameter for verifying the chute receiving capacity and determining whether to restore the unloading permit is the expected unloading volume Q_next for the next shovel. Q_next is calculated using the same formula as Q. If, after verification, R' ≥ the expected unloading volume Q_next + safety margin S, and the breaker has safely returned to its original position, then the unloading permit window is reopened, and the unloading operation resumes. If R' does not meet the unloading requirements for the next shovel, then the unloading window remains closed, triggering subsequent actions such as continued crushing and manual inspection. By using the expected unloading volume for the next shovel as the core comparison benchmark, combined with the updated chute receiving capacity and the breaker's safe return to its original position, and implementing graded handling, the feasibility of unloading in the next work cycle can be predicted in advance, avoiding secondary blockages caused by incomplete crushing. Simultaneously, when working conditions are not up to standard, subsequent handling procedures can be triggered promptly, balancing operational safety and continuity.

[0034] As a further improvement of the present invention, the restricted ore unloading instruction is specifically set as segmented beat control. The segmented beat control is specifically that when Q≤R<Q+S, the optimal number of ore unloading segments and tipping rate are automatically calculated according to the current available margin of R and the blanking amount per unit time D, the current ore unloading is split into multiple segments according to the margin of R, and R and the blanking speed are re-measured in real time after each segment of ore unloading is completed. If the blanking is smooth and R rises back to the standard, the next segment is continued; if R drops to the critical value, the ore unloading is automatically paused and waited, and at the same time, the opening and speed of the scraper tipper are matched based on the principle that the ore unloading rate ≤ the real-time blanking rate. The segmented beat control is used to realize the dynamic balance of unloading while blanking, so as to avoid instantaneous blockage caused by one-time ore unloading. When the receiving capacity margin at the ore pass opening is insufficient, the optimal number of ore unloading segments and tipping rate are dynamically calculated according to the real-time margin and blanking amount, and control is carried out through segmented re-measurement, dynamic start-stop and the principle that the ore unloading rate does not exceed the real-time blanking rate, so as to realize the dynamic balance of unloading while blanking, and effectively avoid the instantaneous blockage risk caused by one-time full-volume ore unloading.

[0035] As a further improvement of the present invention, the splitting of the multiple segments distinguishes different scenarios of insufficient margin according to the dominant attenuation factor of R, and automatically matches the corresponding segmentation mode and single-segment ore unloading amount distribution:

[0036] When H causes space-type insufficient margin, a decreasing segmentation with more segments in the front and fewer in the rear is adopted. The judgment condition for the space-type insufficient margin is that the δH term accounts for more than 50% in the contribution proportion of R insufficiency. The decreasing segmentation is split into 2 segments by default. The first segment of the decreasing segmentation unloads 55%-60% of the total ore amount Q of this time, and uses the initially sufficient blanking space for rapid unloading. After the first segment is completed, wait for the material surface to drop, and unload the remaining 40%-45% of the ore amount after H falls back to the safety threshold;

[0037] When B and D cause overflow-type insufficient margin, uniform equal segmentation is adopted. The judgment condition for the overflow-type insufficient margin is that the εB term accounts for the highest proportion in the contribution proportion of R insufficiency or D is lower than 60% of the rated value. The uniform equal segmentation is split into 3 segments by default, and the unloading amount of Q in each segment is 30%-35%. The ore unloading amount of each segment strictly matches the current blanking capacity, and the maximum ore unloading amount of a single segment is set not to exceed D × the single-segment safety duration. The uniform equal segmentation is used to ensure that the unloaded ore can fall in time and avoid accumulation and superposition on the surface of the grizzly. Distinguishing the space-type and overflow-type insufficient margin scenarios based on the dominant attenuation factor of the receiving capacity, and automatically matching the differentiated number of segments and the single-segment ore unloading amount distribution strategy, can accurately adapt the ore unloading rhythm for different causes, and give consideration to operation efficiency while effectively avoiding ore accumulation and blockage.

[0038] The advantages of the present invention are:

[0039] 1. A multi-parameter fusion quantitative calculation model for ore receiving capacity at ore chutes was constructed, achieving precise matching between single-shovel unloading demand and ore chute carrying capacity, overcoming the limitation of existing technologies that can only conduct congestion assessment from a macro-level traffic flow scheduling perspective. By integrating three positive contribution parameters—screen opening area, material drop rate per unit time, and material surface descent rate—with three negative attenuation parameters—stacking height, large block obstruction degree, and shed risk—the receiving capacity R is quantified after weight correction. This R is then compared with the expected single-shovel unloading volume Q and safety margin S, and unloading permits are managed in a tiered manner, achieving accurate prediction of unloading in advance, thereby reducing the probability of blockages and shed accidents.

[0040] 2. A segmented unloading control method based on the causes of insufficient discharge capacity matches differentiated segmented unloading strategies for different types of insufficient receiving capacity, solving the problem that existing technologies can only delay unloading and disrupt the operation rhythm when faced with insufficient discharge capacity. Under restricted unloading conditions, for space-type insufficient discharge capacity dominated by stacking height, a decreasing segmentation method with more material at the beginning and less at the end is adopted to make full use of the initial discharge space to improve efficiency. For flow-type insufficient discharge capacity dominated by large blocks and slow discharge, uniform and equal-volume segmentation is adopted to strictly match the discharge capacity to avoid accumulation. At the same time, the tipping parameters are dynamically adjusted according to the principle that the unloading rate does not exceed the real-time discharge rate, realizing a dynamic balance of unloading and discharge simultaneously, maximizing the efficiency of unloading operation without clogging. Meanwhile, the segmented unloading process can gradually improve the flow conditions at the wellhead by taking advantage of the self-guiding effect of the falling ore. As the material level drops due to the displacement of large blocks after each unloading, the receiving capacity of the chute will gradually recover rather than continuously decline. Without investing in additional unblocking equipment, the self-regulating capability of the chute system is enhanced, making restricted unloading not only a risk management measure, but also an effective way to assist in unblocking the wellhead.

[0041] 3. A strict mutual exclusion and interlocking mechanism was established between the ore unloading permit window and the crushing operation window, along with a triple safety check before crushing commences. This avoids the risk of cross-operations in the confined underground space and compensates for the shortcomings of existing parallel and collaborative modes in safety management. The control logic mandates that the two types of windows cannot be opened simultaneously. After a crushing demand is generated, three safety conditions must be checked sequentially: the loader must be out of the risk zone, no personnel have entered the site, and the breaker hammer is in normal condition. Only after all three conditions are met can the crushing window be opened. This directly eliminates the safety hazards of cross-operations from the process perspective, improving the inherent safety level of the operation. Moreover, the rigid mutual exclusion does not separate the ore unloading and crushing processes. Instead, a closed-loop logic—automatic triggering of crushing when ore unloading is obstructed and automatic initiation of crushing after safety checks—achieves seamless process connection. While significantly improving safety management standards, the response speed and operational continuity of process connections are also enhanced, resulting in improved safety and efficiency.

[0042] 4. A dual-verification mechanism was designed after crushing to jointly determine the conditions for resuming unloading based on both operational conditions and equipment safety. This solves the problems of existing technologies that directly resume unloading after crushing and lack effectiveness verification and safety confirmation. After the crushing window closes, two verifications are performed simultaneously: First, the parameters at the chute are re-collected to calculate the updated receiving capacity R', verifying the actual effect of crushing and clearing. Second, the complete return status of the breaker hammer stopping impact, hammer head retraction, boom returning to position, and hydraulic pressure safety is confirmed. After both verifications are passed, the estimated unloading volume of the next shovel is used as the benchmark to determine whether to resume unloading, directly avoiding secondary blockages and equipment collision accidents caused by incomplete crushing. The verification process uses the estimated unloading volume of the next shovel as the judgment benchmark rather than simply whether clearing is possible, which can predict the feasibility of unloading in the next work cycle in advance and can also identify deep blockage problems that cannot be solved by a single crushing and trigger manual inspection. Attached Figure Description

[0043] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0044] Figure 1 This is a flowchart of the steps of the present invention.

[0045] Figure 2 This is a schematic diagram of the double-core structure after the present invention is broken.

[0046] Figure 3 This is a schematic diagram of the operation window of the present invention. Detailed Implementation

[0047] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0048] Example 1 illustrates an intelligent interlocking control method for ore unloading in underground mine ore passes under insufficient flow conditions. This example utilizes a 4m diameter circular cross-section main ore pass at a depth of -280m in an underground iron ore mine. The pass is equipped with a 300mm x 300mm screen with a 65% opening rate, and a fixed hydraulic breaker is installed beside it. The operating equipment is an underground loader with a rated bucket volume of 3m³. Due to a temporary malfunction in the vehicle's onboard weighing system, the unloading volume is estimated using a volumetric method. During operation, three large ore pieces (approximately 400mm in diameter) obstruct the screen at the pass opening, resulting in a material discharge rate below the rated value per unit time. This falls under the insufficient flow condition. The specific interlocking control steps are as follows:

[0049] S1, Unloading Intent Recognition: When the loader travels to the detection area 15m in front of the chute, the lidar at the chute and the underground vehicle positioning system work together to collect data and identify the vehicle's continuous deceleration and the bucket's orientation toward the chute. The system determines that the loader has the intent to unload ore and automatically starts the entire interlocking control process.

[0050] S2, Estimated unloading volume determined: Due to the unavailability of the vehicle-mounted weighing system, the system uses the volumetric estimation method to calculate the estimated unloading volume Q. The calculation formula is as follows:

[0051] Q = V × η × ρ;

[0052] The rated volume of the bucket is V=3m³. Based on on-site operating experience, the loading rate is taken as η=0.76. The bulk density of the iron ore is ρ=2.2t / m³. Substituting these values ​​into the calculation, we get Q=3×0.76×2.2≈5.0t.

[0053] S3, Passage Head Status Acquisition: Status data is collected synchronously through the passage head visual recognition device, laser level gauge, and passage flow monitoring module: effective open flow area of ​​the grid screen A=5.0㎡, ore falling through the passage head per unit time D=1.5t / min, ore surface descent rate in the passage L=0.1m / min, ore accumulation height above the grid screen H=0.3m, the proportion of large ore blocks obstructing the grid screen B=30%, and the risk level of material bridging at the passage head is low risk J=1.

[0054] S4, Receiving Capacity Calculation: The current ore receiving capacity R at the ore pass is obtained through a comprehensive calculation model. The calculation formula is as follows:

[0055] R = αA + βD + γL - δH - εB - ζJ;

[0056] The weighting correction coefficients in the formula are determined by combining the characteristics of the ore pass and the specific basis as follows:

[0057] α is the weight coefficient of the screen flow area, with a value of 1.1t / ㎡: the screen hole of the grizzly screen in this instance is 300mm, and the opening rate is 65%, which has a good matching degree with the average ore particle size of 120mm. It is used to convert the dimension of area into the dimension of receiving capacity. The size of the screen hole and the opening rate are at a medium-upper level, and the corresponding value is in the conventional range;

[0058] β is the weight coefficient of blanking smoothness, with a value of 1.0: the diameter of the ore pass is 4m, the lump ore has good fluidity, and the instantaneous blanking rate can well reflect the actual remaining receiving capacity, which is used to convert the dimension of flow rate into the dimension of receiving capacity;

[0059] γ is the weight coefficient of the material level descending rate, with a value of 10.0t / m: the effective cross-sectional area of the ore pass is large, the ore drawing system at the lower part is stable, and the internal discharging capacity has a strong constraint on the remaining receiving capacity at the wellhead. Combined with the cross-sectional area, it is used to convert the dimension of speed into the dimension of receiving capacity;

[0060] δ is the negative attenuation coefficient of stacking height, with a value of 2.5t / m: the ore repose angle is 38°, the effective bearing area at the wellhead is large, and the occupied space under the same stacking height is relatively limited, which is used to convert the dimension of height into the occupied receiving volume in combination with the ore repose angle;

[0061] ε is the negative attenuation coefficient of large lump blockage, with a value of 0.07t / %: the large lump particle size of 400mm is slightly larger than the screen hole, which is easy to cause the reduction of flow efficiency accompanied by jamming, and the weakening effect of blockage on the receiving capacity is obvious, which is used to convert the blockage proportion into the attenuation amount of receiving capacity;

[0062] ζ is the negative attenuation coefficient of bridging risk, with a value of 0.5t / level: the ore has low mud content, the circular ore pass is not easy to form bridging, and the reduction of receiving capacity caused by bridging risk is small, which is used to convert the risk level into the safety reduction amount of receiving capacity.

[0063] Substituting all parameters into the formula for calculation gives R=5.5t, and the safety margin S=1.0t is set in this embodiment.

[0064] S5, determine the state of the ore unloading permission window: the system compares the receiving capacity R with the estimated ore unloading amount Q and the safety margin S, and executes hierarchical control: since Q≤R<Q+S, it is determined as the restricted ore unloading working condition, and a restricted ore unloading instruction is output, which does not allow one-time full-volume ore unloading.

[0065] The system further judges the type of insufficient margin: analyze the contribution proportion of insufficient R, in which the εB term accounts for the highest proportion, and the unit time blanking amount D=1.5t / min, which is lower than 60% of the rated blanking amount of 2.5t / min for this ore pass. It is determined as flow-type insufficient margin, and uniform equal-segment control is adopted.

[0066] The specific execution logic of segmented cycle control is as follows: Based on the current available margin of R and the material drop rate D per unit time, the optimal number of unloading segments and the tipping speed are automatically calculated. The unloading is divided into multiple segments according to the margin of R. After each segment is completed, R and the material drop rate are re-measured in real time. If the material drop is smooth and R recovers to the target, the next segment continues. If R drops to the critical value, the unloading is automatically paused and waiting is initiated. At the same time, the opening and speed of the loader's tipping bucket are matched with the principle that the unloading speed is ≤ the real-time material drop rate to achieve a dynamic balance of unloading and dropping simultaneously.

[0067] In this embodiment, the ore is uniformly divided into three equal segments, with each segment unloading 33% of the total ore volume, i.e., approximately 1.65 tons per segment. Simultaneously, the maximum unloading volume per segment is verified to not exceed D × the safe duration for each segment, which is set to 1.1 minutes. Therefore, D × 1.1 = 1.65 tons, matching the set value. During execution, after the first segment's unloading is completed, R is remeasured and rises to 5.7 tons, meeting the continuation conditions, and the second segment is initiated. After the second segment is completed, R is remeasured and rises to 5.8 tons, initiating the third segment. After the third segment's unloading is completed, R at the ore pass stabilizes at 5.6 tons, indicating the completion of the unloading operation and effectively avoiding instantaneous blockage caused by a single unloading operation.

[0068] Table 1 Comparison of Solutions and Existing Technologies for Insufficient Flow Margin Operating Conditions

[0069]

[0070] As shown in Table 1 above, the differences between this embodiment and existing technologies under the condition of insufficient overflow capacity are compared from the core dimensions of control granularity, matching logic, and handling methods. Existing technologies only alleviate overall congestion through macro-level traffic flow scheduling and do not make fine-grained adaptations for the single-shovel unloading scenario at the ore pass. This embodiment, by quantifying the receiving capacity of the ore pass and combining it with the characteristics of overflow capacity, adopts segmented rhythm control, which can achieve a dynamic balance of unloading and falling without disrupting the operation rhythm, and is more suitable for the unique working conditions of large blocks of obstruction and poor material falling in underground mine ore passes.

[0071] Example 2 illustrates a method for intelligent interlocking control of ore unloading and fixed hydraulic breaker in underground mine ore chute operation under conditions of ore accumulation and blockage at the ore pass. This example is applied to an underground copper mine's -350m mid-section west wing ore pass operation scenario. The ore pass has a rectangular cross-section, measuring 3m × 4m, and is equipped with a 250mm × 250mm mesh screen with a 60% opening rate at the pass opening, along with one fixed hydraulic breaker. The operating equipment is an underground loader with a rated bucket capacity of 4m³, equipped with a fully functional vehicle-mounted weighing system. Before operation, the ore accumulation at the ore pass was excessive due to concentrated unloading in the preceding phase, accompanied by large blockages and slight signs of material bridging. This condition is characterized by insufficient space and a risk of blockage. The specific interlocking control steps are as follows:

[0072] S1, Unloading Intent Recognition: After the loader enters the detection range of 20m in front of the chute, the millimeter-wave radar at the chute and the vehicle positioning system work together to detect and identify that the vehicle's driving path is pointing towards the chute and the bucket is performing a lifting preparation action. The system confirms the unloading intent and starts the full-process interlocking control logic.

[0073] S2, Expected unloading volume determined: The system first reads the data from the vehicle-mounted weighing system and obtains the expected unloading volume Q=7.04t; at the same time, the backup volume estimation method is used for verification. The rated volume of the bucket V=4m³, the loading rate η=0.8, and the bulk density of the copper ore ρ=2.2t / m³. According to the formula Q=V×η×ρ, Q=4×0.8×2.2=7.04t is calculated, which is consistent with the weighing data. Finally, the expected unloading volume Q=7.04t is confirmed.

[0074] S3, Passage Orifice Status Acquisition: Passage orifice status parameters are collected synchronously through multiple types of sensors: effective open flow area of ​​the grid screen A=6.2㎡, material drop rate per unit time D=1.2t / min, chute material surface descent speed L=0.05m / min, ore accumulation height above the grid screen H=1.1m, proportion of large ore blockage B=18%, and risk level of bridging J=3.

[0075] S4, Receiving Capacity Calculation: The current ore receiving capacity R is calculated using a comprehensive calculation model, with the following formula:

[0076] R = αA + βD + γL - δH - εB - ζJ;

[0077] The values ​​of each weight correction coefficient are determined based on the characteristics of this ore pass, as follows:

[0078] α is set to 1.1t / m²: the grid screen has a mesh size of 250mm and an opening rate of 60%, which is generally well matched with the average particle size of ore of 100mm. The contribution of the grid screen flow area to the receiving capacity is at a moderate level.

[0079] When β is 0.6: the rectangular chute has high frictional resistance, high mud content in the ore, and moderate fluidity, so the instantaneous discharge rate has a weak characterization of the actual receiving margin.

[0080] γ is set to 6.0t / m: the ore discharge rhythm at the bottom of the chute is relatively slow, and the internal discharge capacity has a relatively weak constraint on the wellhead receiving margin. The dimension conversion is carried out in combination with the effective cross-sectional area of ​​the rectangular chute.

[0081] δ value is 3.2t / m: ore repose angle is 42°, blocky ore accounts for a high proportion, occupying more space at the same stacking height, and the effective bearing area at the wellhead is limited, the stacking height has a significant squeezing effect on receiving capacity;

[0082] The value of ε is 0.09t / %: the large lump particle size is mostly concentrated at around 300mm, which is close to the sieve opening size, resulting in a high probability of blockage accompanied by occlusion, significant attenuation of flow passing efficiency, and a great weakening effect of occlusion on the receiving capacity;

[0083] The value of ζ is 1.2t / level: the rectangular pass raise is more prone to bridging than the circular pass raise, and the ore has medium cohesiveness, so the risk of arching imposes stricter restrictions on ore discharge permission, leading to a greater safety reduction amount.

[0084] Substituting the parameters for calculation gives R=-0.9t, and the receiving capacity is a negative value, which indicates that there is no effective remaining receiving margin at the pass raise opening and there is a risk of blockage. In this embodiment, the safety margin S is set to 1.0t.

[0085] S5, determining the state of the ore discharge permission window: the system executes the hierarchical determination logic. Since R<Q and there are blockage situations such as excessively accumulated ore, arching and bridging at the pass raise opening, the system immediately closes the ore discharge permission window, sends a prompt message of "Ore discharge prohibited, wait for crushing treatment" to the scraper, and automatically generates a crushing treatment demand to trigger the crushing interlocking process at the same time.

[0086] S6, opening the crushing operation window after verification: after generating the crushing demand, the system does not start the crushing hammer directly, but preferentially performs safety condition verification, and strictly follows the mutual exclusion principle between the crushing operation window and the ore discharge permission window, so that the two are never opened at the same time throughout the whole process. The safety verification specifically confirms three items:

[0087] The scraper has reversed out to the safety area 30m outside the motion envelope area of the crushing hammer, and no other vehicles are stranded within the flying stone risk range;

[0088] The infrared detection device for personnel at the raise opening confirms that no personnel break into the operation area;

[0089] The self-inspection of the crushing hammer is completed: the pressure of the hydraulic system is normal, the drill rod has no abnormal wear, and the boom action mechanism has no fault. After all safety conditions are verified, the system officially opens the crushing operation window.

[0090] S7, execution of crushing operation and window closing: during the opening period of the crushing operation window, the fixed crushing hammer follows the preset impact path, first crushes the large lump ore blocked on the surface of the grizzly screen point by point, then impacts and dredges the arching and bridging positions, crushing all large lumps to a size smaller than the sieve opening to ensure the smoothness of the discharging channel. After the whole crushing operation is completed, the system controls the crushing hammer to stop the impact action and automatically closes the crushing operation window.

[0091] S8, Double recheck after crushing: After the crushing window is closed, the system performs two rechecks synchronously: The first recheck: Re-collect all state parameters of the ore pass opening, and calculate the updated receiving capacity R'. The data collected after crushing are: the opening area of the grizzly A'=7.0 ㎡, the material falling amount per unit time D'=2.8t / min, the material surface descending speed L'=0.2m / min, the stacking height H'=0.4m, the bulk material blocking ratio B'=3%, and the bridging risk level J'=Level 1. Substituting into the receiving capacity formula for calculation gives R'=7.83t. The second recheck: Confirm the safe return state of the crushing hammer, which specifically includes: the crushing hammer has stopped the impact action, the hammer head has retreated to the standby position outside the ore unloading area, the boom completely avoids the driving route and ore unloading operation range of the scraper, and the hydraulic system pressure has dropped back to the safe standby pressure range, finally confirming that the crushing hammer has fully returned to the safe position.

[0092] S9, Judgment of ore unloading permission restoration: The system takes the updated receiving capacity R' and the estimated ore unloading amount of the next shovel Q_next as core comparison parameters, where Q_next is calculated in the same way as Q, and the estimated ore unloading amount of the next shovel Q_next=7.0t, the safety margin S=1.0t, Q_next+S=8.0t are predicted in combination with the loading cycle of the scraper.

[0093] After comparison, Q_next≤R'<Q_next+S, which is judged as a restricted ore unloading working condition. The system further analyzes the type of insufficient margin: in the contribution proportion of insufficient R, the δH term accounts for more than 50%, which is judged as space-type insufficient margin, and the decreasing segmented control of "more at first and less at later" is adopted. The decreasing segmentation is divided into 2 sections: the first section unloads 58% of the total ore amount of this time, that is, 7.0×0.58=4.06t, which is quickly unloaded by using the initially relatively sufficient material falling space; after the first section of ore unloading is completed, the system waits for the material surface to descend until the stacking height H falls back to the safety threshold of 0.2m, and then unloads the remaining 42%, that is, 2.94t of ore. During the segmentation process, the R value and the material falling speed are monitored in real time to ensure that the ore unloading rate dynamically matches the material falling rate.

[0094] If R'≥Q_next+S and the crushing hammer returns safely after recheck, the system directly reopens the ore unloading permission window and resumes normal ore unloading operations; if R' still does not meet the ore unloading demand of the next shovel, the ore unloading window remains closed, and the subsequent disposal process of continuing crushing or manual inspection is triggered.

[0095] Table 2 Comparison Table of Crushing Interlocking Scheme for Stacking Blockage Working Condition and Prior Art

[0096]

[0097] As shown in Table 2 above, this embodiment differs from existing technologies in the case of sluggish blockage, focusing on key aspects such as the crushing trigger mechanism, safety control, and operation recovery. Existing technologies emphasize the macroscopic synergistic efficiency of unloading and crushing, lacking the safety mutual exclusion and effect verification design specific to underground ore chutes. This embodiment forms a complete closed loop of blockage triggering, safety verification, crushing operation, dual verification, and graded recovery. It eliminates the risk of cross-operation through window mutual exclusion and ensures the safety and feasibility of unloading recovery through dual verification, significantly improving both control accuracy and safety level.

[0098] Finally, it should be noted that the above are merely preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for intelligent interlocking control of ore unloading and fixed hydraulic breaker in underground mine ore chute, characterized in that, Specifically, the steps are as follows: S1, Unloading intention identification: When the scraper approaches the ore pass opening, the system identifies its ore unloading intention; S2, Expected unloading amount determination: Data is obtained through on-board weighing, and when there is no weighing system, the expected ore unloading amount is estimated by combining the rated bucket volume, loading rate and ore bulk density; S3, Ore pass opening status collection: Collect data of the opening area of the grizzly at the ore pass opening, the accumulation height of the material surface, the material falling amount per unit time, and the bridging risk status; S4, Receiving capacity calculation: The current ore receiving capacity of the ore pass opening is obtained through a comprehensive calculation model, and it is accurately judged whether the current unloading can be accepted according to the safety margin; S5, Unloading permission window status judgment: Compare the receiving capacity with the expected ore unloading amount, and perform hierarchical control on the unloading permission window; S6, Open the crushing operation window after verification: After the crushing demand is generated, the crushing is not started directly, the safety condition verification is completed first, and the crushing operation window is opened after all safety conditions are met; S7, Crushing operation execution and window closing: During the opening period of the crushing operation window, the fixed crushing hammer deals with the problems of large blocks, blockage and bridging at the ore pass opening; S8, Double recheck after crushing: After the crushing window is closed, two rechecks are performed simultaneously; S9, Restore unloading permission judgment: Judge whether to continue the ore unloading operation according to different recheck results.

2. The intelligent interlocking control method for ore unloading and fixed hydraulic breaker in an underground mine chute as described in claim 1, characterized in that: In steps S1 to S5, the expected ore unloading amount is Q, the ore receiving capacity is R, the safety margin is S, and the hierarchical control of the unloading permission window is specifically that when R≥Q+S, the unloading permission window is opened to allow normal ore unloading; when Q≤R<Q+S, a restricted unloading instruction is output; when R<Q and the ore pass opening can recover by itself, the unloading permission window is closed, and a prompt to wait for unloading is given; when R<Q and there are blockage situations such as jamming, bridging, and severe grizzly shielding, the unloading permission window is closed, and a crushing treatment demand is generated at the same time.

3. The intelligent interlocking control method for ore unloading and fixed hydraulic breaker in underground mine ore chute as described in claim 2, characterized in that: Said Q is specifically the amount of ore that the scraper is expected to unload into the ore pass this time, said Q preferentially uses on-board weighing data, and when the on-board weighing data cannot be measured, it is calculated according to different quantities, and the calculation formula of said Q is as follows: Q=V×η×ρ, Wherein, said V is the rated bucket volume, said η is the loading rate, and said ρ is the ore bulk density.

4. The intelligent interlocking control method for ore unloading and fixed hydraulic breaker in underground mine ore chute as described in claim 2, characterized in that: Said R is specifically the current receiving capacity of the ore pass opening, said R is used to judge whether the current ore pass opening can receive ore, and the calculation formula of said R is as follows: R=αA+βD+γL-δH-εB-ζJ, Wherein, A is the open area of ​​the screen, specifically the effective open flow area of ​​the screen at the chute opening; D is the amount of ore falling per unit time, specifically the amount of ore falling through the chute opening per unit time; L is the descent rate of the ore surface, specifically the rate at which the ore surface falls within the chute; H is the accumulation height, specifically the ore accumulation height above the screen at the chute opening; B is the degree of large block obstruction, specifically the proportion of large ore blocks obstructing the screen opening and the chute opening; J is the risk of bridging, specifically the risk level of bridging and blockage at the chute opening; and α, β, γ, δ, ε, and ζ are the weighting correction coefficients corresponding to A, D, L, H, B, and J, respectively.

5. The intelligent interlocking control method for ore unloading and fixed hydraulic breaker in underground mine ore chute as described in claim 4, characterized in that: The weighting correction coefficient is used to uniformly convert input parameters with different physical dimensions into the dimension of receiving capacity R. The α characterizes the contribution intensity of the grid screen flow area to the receiving capacity. The larger the α is, the more significant the influence of the grid screen opening area on the ore pass receiving capacity. The α is used to convert the area dimension into the dimension of receiving capacity R. The value of α depends on the grid screen opening ratio, the matching degree between the screen hole size and the average particle size of the ore. The larger the screen hole and the higher the opening ratio, the higher the value of α. The β characterizes the contribution of real-time material discharge smoothness to the current receiving capacity R. The larger the β is, the better the instantaneous material discharge rate can reflect the actual receiving capacity of the ore pass. The β is used to convert the flow rate dimension into the receiving capacity R dimension. The β is affected by the ore pass diameter, the ore wall friction coefficient and the ore flowability. The β value is higher for blocky ores with large ore pass diameter and good flowability. The value of γ represents the contribution of the material level descent rate inside the ore pass to the receiving capacity of the wellhead. The larger the value of γ, the stronger the constraint of the internal material discharge capacity on the wellhead receiving margin. γ is used to combine the velocity dimension with the effective cross-sectional area of ​​the ore pass. γ is directly related to the effective cross-sectional area of ​​the ore pass and the lower ore discharge system. The higher the value of γ, the stronger the lower ore discharge capacity and the larger the cross-sectional area of ​​the ore pass. The δ is a negative attenuation coefficient, which characterizes the degree to which the wellhead stacking height weakens the receiving capacity. The larger the δ is, the faster the remaining receiving space decreases at the same stacking height. The δ is used to convert the height dimension into the occupied receiving volume by combining the ore repose angle and the effective bearing area of ​​the wellhead. The value of δ depends on the ore repose angle and the effective bearing area of ​​the wellhead. The larger the ore repose angle, the more space it occupies at the same height, and the larger its δ value. The smaller the wellhead area, the more obvious the compression of the receiving capacity by the stacking height, and thus the larger the δ is. Said ε is a negative attenuation coefficient. Said ε characterizes the degree to which the blocking of the grizzly by large ore blocks weakens the receiving capacity. A larger value of said ε indicates a more significant impact of large block blocking on the flow passing capacity. Said ε is used to convert the blocking proportion or blocking level into the attenuation amount of the receiving capacity. The value of said ε is strongly correlated with the sieve opening size and the large block particle size distribution. When said sieve opening size is close to the large block particle size, blocking will be accompanied by jamming and a sharp drop in flow passing efficiency, and at this time the value of said ε will increase significantly. When said large block is much larger than the sieve opening, only single-point blocking will be formed, and at this time the value of said ε is relatively reduced; Said ζ is a negative attenuation coefficient. Said ζ characterizes the degree to which the potential risk of ore bridging and arching weakens the receiving capacity. A larger value of said ζ indicates that the blocking risk imposes stricter restrictions on ore unloading permission. Said ζ is used to convert the dimensionless risk level into a safety reduction amount of the receiving capacity. The value of said ζ depends on the ore cohesiveness, particle size gradation and the shape of the ore pass cross-section. Said ores with high mud content and prone to arching have a higher value of ζ. When the cross-section shape of said ore pass is rectangular, bridging occurs more easily than in a circular ore pass, so the value of ζ also needs to be increased.

6. The intelligent interlocking control method for ore unloading and fixed hydraulic breaker in underground mine ore chute as described in claim 1, characterized in that: In steps S6 to S9, the crushing operation window and the ore unloading permission window are strictly mutually exclusive and cannot be opened at the same time. Said safety condition verification specifically refers to confirming that the scraper has exited the motion envelope area of the crushing hammer and the flying rock risk area, no personnel or other equipment break into the site, and the crushing hammer is in a normal state. One part of said double recheck is to re-detect the state of the ore pass opening and calculate the updated receiving capacity R', and the second part of said double recheck is to confirm that the crushing hammer returns to a safe position. Said safe return of the crushing hammer includes stopping impact, withdrawing the hammer head from the ore unloading area, moving the boom away from the scraper route, and keeping the hydraulic pressure within a safe range.

7. The intelligent interlocking control method for ore unloading and fixed hydraulic breaker in an underground mine chute as described in claim 6, characterized in that: The core comparison parameter for rechecking the receiving capacity of the ore pass opening and judging whether to restore the ore unloading permission is the estimated ore unloading amount Q_next of the next scraper. The calculation formula of said Q_next is the same as that of Q. After said recheck, if R' ≥ the estimated ore unloading amount Q_next of the next scraper + safety margin S, and said crushing hammer has returned to the safe position, the ore unloading permission window is reopened to resume the ore unloading operation; if said R' does not meet the ore unloading demand of the next scraper, the ore unloading window is kept closed, and subsequent treatments such as continuing crushing and manual inspection are triggered.

8. The intelligent interlocking control method for ore unloading and fixed hydraulic breaker in underground mine ore chute as described in claim 4, characterized in that: Said ore unloading restriction instruction is specifically set as segmented beat control. Said segmented beat control specifically means that when Q ≤ R < Q + S, the optimal number of ore unloading segments and tipping rate are automatically calculated according to the current available margin of said R and the material falling amount per unit time D. The current ore unloading is split into multiple segments according to the margin of said R. After each segment of said ore unloading is completed, R and the material falling speed are re-measured in real time. If the material falls smoothly and R rises to the standard, the next segment is continued; if said R drops to the critical value, the ore unloading is automatically paused and waited. Meanwhile, the opening degree and speed of the scraper tipping are matched based on the principle that said ore unloading rate ≤ the real-time material falling rate. Said segmented beat control is used to realize the dynamic balance of simultaneous unloading and falling, so as to avoid instantaneous blocking caused by one-time ore unloading.

9. The intelligent interlocking control method for ore unloading and fixed hydraulic breaker in underground mine ore chute as described in claim 8, characterized in that: The splitting of said multiple segments is based on the dominant attenuation factor of R to distinguish different scenarios of insufficient margin, and automatically match the corresponding segmentation method and single-segment ore unloading amount distribution: When H causes insufficient spatial margin, a decreasing segmentation with more at the beginning and less at the end is adopted. The judgment condition for insufficient spatial margin is that the δH item accounts for more than 50% of the contribution of insufficient R. The decreasing segmentation is split into 2 segments by default. The first segment of the decreasing segment unloads 55%-60% of the total ore quantity Q. It is unloaded quickly by taking advantage of the initial sufficient material dropping space. After the first segment is completed, wait for the material level to drop. After H drops back to the safe threshold, unload the remaining 40%-45% of the ore quantity. When B and D cause insufficient flow-type margin, uniform equal-volume segmentation is adopted. The judgment condition for insufficient flow-type margin is that the εB item has the highest contribution ratio of insufficient R or D is less than 60% of the rated value. The uniform equal-volume segmentation is split into 3 segments by default. The unloading amount of Q in each segment is 30%-35%. The unloading amount of each segment strictly matches the current material discharge capacity. The maximum unloading amount of a single segment is set not to exceed D × the safe time of a single segment. The uniform equal-volume segmentation is used to ensure that the unloaded ore can fall in time and avoid the accumulation of pressure on the surface of the grid screen.

Citation Information

Patent Citations

  • Crushing opening collaborative unloading method and device, storage medium and electronic equipment

    CN122362945A