A type of long-span trestle bridge with low clearance spanning the embankment

By setting steel pipe piles on both sides of the embankment to form a portal steel frame support, the flood control compliance, safety and construction problems of existing trestle bridges when crossing the embankment have been solved, and efficient and safe construction results have been achieved.

CN123109044APending Publication Date: 2026-11-17CCCC SECOND HARBOR ENGINEERING CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611128888.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-28
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing trestle structures have deficiencies in flood control compliance, safety, and structural and construction aspects when crossing dikes, and cannot simultaneously meet the requirements of flood control compliance, zero damage to the dike, crossing the dike in one span, and convenient and safe construction.

Method used

The bridge is a large-span trestle bridge with a small clearance height that crosses the embankment. It adopts a single-span, under-bearing truss structure. The truss structure is supported by steel pipe piles on both sides of the embankment to form a portal steel frame. The truss structure crosses the embankment and the bridge deck is installed on the distribution beam. The overall design is reasonable. All support piles are set outside the protection range of the embankment, so as not to damage the embankment structure.

Benefits of technology

Construction was carried out in full compliance with flood control regulations, avoiding damage to the dike structure, enhancing its resistance to flood impacts and typhoons, reducing construction costs and time, and ensuring construction convenience and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109044A_ABST
    Figure CN123109044A_ABST
Patent Text Reader

Abstract

This invention discloses a long-span trestle bridge with a low clearance spanning an embankment, comprising steel frame support structures on both sides outside the embankment, a pair of truss structures, and distribution beams. A set of steel pipe piles is driven on each side of the embankment, with a load-bearing beam at the top of each set of piles to form an integral steel frame support structure. The pair of truss structures span the embankment and are positioned on both sides of the load-bearing beams, with the ends of the truss structures vertically aligned with the corresponding steel pipe piles. The distribution beams are fixedly installed laterally through the bottom of the truss structures, and a bridge deck is located above the distribution beams between the pair of truss structures. This long-span trestle bridge structure eliminates the need for any construction damage to the embankment itself, avoiding damage to the embankment's seepage prevention layer, filter layer, and overall stability, thus ensuring the safe operation of the flood control project. The portal frame support structure and multiple limiting protection systems work together to effectively resist the impact of floods, typhoons, and storm surges.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of temporary trestle technology for bridge construction, and in particular to a large-span trestle with a small clearance height that crosses an embankment. Background Technology

[0002] Bridge construction requires the erection of temporary trestle structures. For flood control dikes, strict adherence to flood control regulations is necessary, and large-span temporary access routes are required. Existing trestle structures are mostly multi-span Bailey bridges and dike-top abutment trestle bridges. Multi-span Bailey bridges use multiple rows of steel pipe piles as intermediate supports driven into the dike slope toe, body, or top, employing a multi-span simply supported Bailey beam structure with a standard span of 12m-15m. Dike-top abutment trestle bridges directly erect both ends of the Bailey beams on concrete abutments on the dike top, forming a single-span simply supported structure, with a span typically not exceeding 24m.

[0003] Existing trestle structures, when used to cross national key flood control projects such as dikes, not only suffer from structural and construction defects but also pose serious flood control compliance and safety hazards, specifically: 1. Flood control compliance defects: Steel pipe piles must be driven into the dike slope toe or body, directly damaging the dike's seepage-proof core layer, filter layer, and overall stability, violating Article 22 of the Flood Control Law, which prohibits the construction of buildings or structures that obstruct flood passage within the management scope of rivers and lakes, thus failing to obtain approval from the flood control authorities; for example, patent CN104404861A discloses a steel trestle bridge with steel anchor piles and its construction method. The intermediate support piles of multi-span trestle bridges compress the river's flood passage cross-section, increasing water flow resistance, raising upstream water levels, lowering the dike's flood control standard, and threatening the lives and property of people along the river. 2. Flood Control Safety Defects: During the flood season, the central support piles of multi-span trestle bridges are directly impacted by water flow and floating debris, making them prone to tilting, breakage, or even complete collapse. This not only renders the trestle bridge unusable but may also create a landslide dam, further exacerbating flood disasters. The construction of the pier-top trestle bridge abutments can damage the flood control channels and protective facilities on the dike top, affecting the transportation of emergency supplies and the evacuation of personnel during the flood season. Existing trestle bridges lack specialized designs to resist flood impacts and wind and waves, making them highly susceptible to safety accidents during typhoons and storm surges in coastal areas. 3. Structural and Construction Defects: Conventional 321-type Bailey beams have limited single-span load-bearing capacity, with a maximum safe span of only 12m, which cannot meet the crossing requirements of wide dikes. The upper-bearing structure has a high bridge deck elevation, requiring extensive approach road construction, making it difficult for vehicles to ascend and descend slopes, and is extremely sensitive to uneven settlement on the dike top. The need for centralized laying of construction pipelines has not been considered, and the pipeline layout is unplanned, affecting traffic safety and exhibiting low standardization.

[0004] In summary, the existing trestle bridge structure cannot simultaneously meet the requirements of flood control compliance, zero damage to the dike, crossing the dike in one span, and convenient and safe construction. Summary of the Invention

[0005] To address the shortcomings of existing technologies, this invention provides a long-span trestle bridge with a small clearance height that spans over the embankment. It adopts a single-span, under-supported truss structure to meet the requirements for flood control and flood discharge.

[0006] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows: This long-span trestle bridge with a low clearance spanning the embankment includes: The steel frame support structure in the non-embankment area on both sides consists of a set of steel pipe piles on each side of the embankment, with a load-bearing beam on top of each set of steel pipe piles on each side of the embankment to form an overall steel frame support structure. A pair of truss structures are installed on both sides of the load-bearing beam, with the ends of the truss structures and the corresponding steel pipe piles arranged vertically opposite each other. A distribution beam is fixedly installed laterally through the bottom of the truss structure, and a bridge deck is provided above the distribution beam between a pair of trusses.

[0007] Further or preferred: The steel pipe piles are set outside the protection area of ​​the dike and are not constructed on the dike body. The steel pipe piles on each side of the dike are connected by a transverse frame structure to form a portal steel frame support structure.

[0008] Two rows of steel pipe piles are driven on each side of the embankment. The load-bearing beam is a spliced ​​integral load-bearing beam structure, which is set on the top of the two rows of steel pipe piles.

[0009] The bottom of the truss structure is fixed to the load-bearing beam via a base, and the load-bearing beam is provided with longitudinal and transverse limiting structures corresponding to the base.

[0010] The longitudinal and transverse limiting structure is a limiting frame structure with the opening facing downwards. The base is located inside the limiting frame structure. The limiting frame structure includes a pair of side limiting frames and a top frame set on the pair of side limiting frames. The lower end of the side limiting frames is connected to the load-bearing beam, and the lower part of the top frame is provided with a card plate or card slot that is locked on the base.

[0011] The truss structure includes a set of truss sections arranged longitudinally. Adjacent truss sections are connected by a docking structure. Each truss section has a set of docking lugs at its end. A set of docking lugs includes single lugs and double lugs. The double lugs form a docking gap into which the lugs at the end of another truss section are inserted.

[0012] The truss structure includes a base frame and a top frame, as well as vertical frames between the base frame and the top frame. Diagonal frames are provided between the base frame, the top frame, and the vertical frames. Adjacent vertical frames are connected by a set of diagonal frames to form a square frame structure.

[0013] The end of the distribution beam is located on the corresponding truss structure base frame, and the end of the distribution beam extends from the truss structure base frame. The top frame of the truss structure and the end of the distribution beam are connected by a wind brace structure.

[0014] The distribution beam includes a set of distribution beam units arranged side by side at intervals. Each distribution beam unit includes a set of crossbeams. The crossbeams are connected by clamps. A set of connecting frames is provided at the bottom of the bridge deck. The distribution beam units are located between adjacent connecting frames.

[0015] Adjacent distribution beam units are connected by a set of transverse diagonal braces and vertical scissor braces, with the vertical scissor braces located in the middle and the transverse diagonal braces arranged symmetrically on both sides of the vertical scissor braces.

[0016] Compared with the prior art, the present invention has the following advantages: The design of this large-span trestle bridge, with its low clearance and high elevation, is reasonable. All support piles are located outside the protection zone of the dike, without damaging any structure of the dike or compressing the flood discharge cross-section. It fully complies with the Flood Control Law and related engineering protection regulations, and can smoothly pass the approval of the flood control authorities. The large-span trestle bridge structure requires no construction damage to the dike itself, avoiding damage to the dike's anti-seepage layer, filter layer, and overall stability, ensuring the safe operation of the flood control project. The portal frame support structure and multiple limit protection system work together to effectively resist the impact of floods, typhoons, and storm surges. The pipeline system is laid in a dedicated channel, ensuring safe and convenient construction of pipelines. The trestle bridge, combined with the under-bearing structure design, minimizes the bridge deck elevation, and the bridge deck does not occupy separate space, significantly reducing the amount of approach road engineering and construction costs. No construction is required on the dike itself; steel pipe pile driving and truss assembly can be carried out on flat ground, and the overall hoisting and erection can shorten the construction period by more than 50%. The use of prefabricated components allows for quick disassembly, transportation, and reuse, resulting in relatively low costs. Attached Figure Description

[0017] The following is a brief explanation of the contents of each of the accompanying drawings and the markings in the drawings: Figure 1 This is a schematic cross-sectional view of the trestle structure of the present invention.

[0018] Figure 2 This is a schematic diagram of the truss structure of the present invention.

[0019] Figure 3 This is a schematic diagram of the truss elevation of the present invention.

[0020] Figure 4 This is a schematic diagram of the limiting structure of the present invention.

[0021] Figure 5 This is a schematic diagram of the beam support structure of the present invention.

[0022] Figure 6 This is a partial schematic diagram of the side of the trestle of the present invention.

[0023] Figure 7 This is a schematic diagram of the beam arrangement for this invention.

[0024] Figure 8 This is an enlarged schematic diagram of the distribution beam of the present invention.

[0025] Figure 9 This is a schematic diagram of the joint between adjacent truss sections of the present invention.

[0026] In the picture: 1. Steel pipe piles; 2. Horizontal bracing structure; 3. Load-bearing beams; 4. Longitudinal and transverse restraint structures. 5. Distribution beam, 501. Horizontal diagonal brace, 502. Hoop, 503. Vertical scissor brace, 504. Horizontal beam structure. 6. Support frame, 7. Truss structure, 8. Wind bracing structure, 9. Bridge deck, 10. Connecting lugs. Detailed Implementation

[0027] The specific embodiments of the present invention will be further described in detail below with reference to the accompanying drawings and through the description of the examples.

[0028] Although the invention has been shown and described herein with reference to specific embodiments, it is not intended to be limited to the details shown. Rather, various modifications in detail may be made within the equivalent scope and scope of the claims without departing from the invention. In the drawings, the same item numbers refer to the same elements.

[0029] Throughout this disclosure, various terms are used to describe the physical shape or arrangement of features. Many of these terms are used to describe features conforming to a cylindrical or generally cylindrical geometry with the feature as its radius and a central axis perpendicular to that radius. Unless otherwise specified, the terms are given the following meanings: The terms “longitudinal,” “longitudinal,” “axial,” and “axial” refer to a direction, dimension, or orientation parallel to the central axis. The terms “radial” and “radially” refer to a direction, dimension, or orientation perpendicular to the central axis. The terms “inward” and “inner” refer to a direction, dimension, or orientation extending radially toward the central axis. The terms “outward” and “outer” refer to a direction, dimension, or orientation extending radially away from the central axis.

[0030] In this specification, relative terms such as “horizontal,” “vertical,” “upward,” “downward,” “top,” and “bottom,” and their derivatives (e.g., “horizontal,” “downward,” “upward,” etc.) should be interpreted as referring to the direction described or the direction shown in the accompanying drawings. These relative terms are for ease of description and are not generally intended to require a specific direction.

[0031] like Figures 1 to 9 As shown, this application provides a long-span trestle bridge with a small clearance height that crosses the embankment, including steel frame support structures in the non-embankment areas on both sides, a pair of truss structures, distribution beams 5 and bridge deck 9; it simultaneously meets the requirements of flood control compliance, zero damage to the embankment, crossing the embankment in one span, and convenient and safe construction.

[0032] The steel frame support structure in the non-embankment area on both sides includes a set of steel pipe piles 1 driven on each side of the embankment. The top of the set of steel pipe piles on each side of the embankment is equipped with a load-bearing beam to form an overall steel frame support structure. The steel pipe piles are set outside the protection range of the embankment and are not constructed on the embankment itself. The steel pipe piles on each side of the embankment are connected by a transverse frame structure to form a portal steel frame support structure. The preferred transverse frame structure adopts a horizontal bracing structure 2, which is stable and reliable.

[0033] Two rows of steel pipe piles are driven on each side of the embankment. The load-bearing beams are spliced ​​together as an integral load-bearing beam structure. The integral load-bearing beam structure is set on the top of the two rows of steel pipe piles to ensure that the load of the upper truss is evenly transferred to the steel pipe piles, and the structure is stable and reliable.

[0034] A pair of truss structures span the embankment and are located on both sides of the load-bearing beam 3. The ends of the truss structures are set up vertically opposite to the corresponding steel pipe piles. The distribution beam 5 is fixedly installed horizontally through the bottom of the truss structure. A bridge deck 9 is provided above the distribution beam between the pair of truss structures.

[0035] The steel frame support structure extends the steel pipe piles outside the protection area of ​​the dike, without conducting any construction work on the dike itself. This avoids disturbing the dike soil, damaging the dike's seepage prevention and slope protection structure, effectively preventing safety hazards such as dike cracking, leakage, and settlement, and fully preserving the original flood control and seepage prevention performance of the dike. The steel pipe piles are symmetrically arranged on both sides and paired with the top load-bearing beam to form a single-sided integral steel frame. The relative steel pipe piles are then connected by a transverse frame to form a portal steel frame force system. The vertical load-bearing and transverse tie work together, resulting in high overall rigidity, excellent anti-overturning and anti-lateral displacement performance, uniform load transfer, and strong support stability.

[0036] The entire support system is located on the outside of the embankment, without occupying the working space on the top or slope of the embankment. Daily embankment patrols, flood control and emergency rescue, and embankment maintenance and passage are not affected. All components are made of steel frame profiles, and modular assembly construction is highly efficient. After the project is completed, it can be completely dismantled, recycled and reused, with relatively low cost.

[0037] In some embodiments, such as Figure 1 and Figure 4As shown, the bottom of the truss structure is fixed to the load-bearing beam 3 by a base, and the load-bearing beam 3 is provided with longitudinal and transverse limiting structures 4 corresponding to the base; preferably, the longitudinal and transverse limiting structures 4 are limiting frame structures with the opening facing downwards, the base is located inside the limiting frame structure, the limiting frame structure includes a pair of side limiting frames and a top frame provided on the pair of side limiting frames, the lower end of the side limiting frames is connected to the load-bearing beam, and the lower part of the top frame is provided with a card plate or card slot that is locked on the base.

[0038] By constraining the base with both longitudinal and transverse limiting frames, the horizontal movement of the truss base along the load-bearing beam can be simultaneously restricted, preventing the truss from shifting due to load, vibration, and temperature differences, thus eliminating the risk of horizontal slippage and instability at its source. The downward-facing limiting frame encloses the entire base, and together with the clamping plate / slot at the top frame, it secures the upper part of the base, forming an upper and lower clamping constraint. This not only resists the vertical uplift force of the truss but also resists the end overturning moment caused by lateral bending moment, significantly improving the truss's anti-overturning and anti-lifting capabilities at the ends.

[0039] like Figure 3 and Figure 6 As shown, the truss structure 7 includes a set of truss sections arranged longitudinally. Adjacent truss sections are connected by a docking structure. Each truss section has a set of docking lugs 10 at its end. A set of docking lugs includes single lugs and double lugs. The double lugs form a docking gap for the insertion of the end lug of another truss section.

[0040] The system employs a single-ear and double-ear mating connection method, with a pre-existing gap between the double ears. The ear ends of adjacent truss sections are embedded within this gap. After mating, the double ears wrap around the single ear on the opposite side, limiting lateral displacement and transverse shift of the truss section and preventing lateral instability at the joint, thus significantly improving lateral torsional and transverse resistance. Each set of truss section ends is equipped with a complete set of mating ear groups, enabling multi-point synchronous force transmission. The load is no longer concentrated at a single connection point; axial force, bending moment, and shear force can be evenly transmitted along multiple sets of ear groups, reducing the risk of pressure and shear overload at a single connection point. The joint stiffness is uniform, reducing the likelihood of localized stress concentration deformation, resulting in a stable and reliable structure.

[0041] In some embodiments, a truss structure on the side of the trestle structure includes two sets of trusses connected by a support frame 6 to form an integral truss structure. The truss structure includes a base frame and a top frame, as well as vertical frames disposed between the base frame and the top frame. Diagonal frames are provided between the base frame, the top frame, and the vertical frames. Adjacent vertical frames are connected by a set of diagonal frames to form a square frame structure. The end of the distribution beam is located on the corresponding truss structure base frame, and the end of the distribution beam extends from the truss structure base frame. The top frame of the truss structure and the end of the distribution beam are connected by a wind bracing structure 8.

[0042] The truss itself forms a stable and geometrically invariant system with diagonal members. At the same time, wind bracing is added to connect the top frame and the end of the outward distribution beam, constraining the lateral displacement of the distribution beam end. Vertical loads are directly transmitted to the truss base frame via the distribution beam, and then layered through the vertical frame and cross diagonal frame to the overall support. Horizontal wind force is synchronously transmitted to the truss top frame by the wind bracing, and the load is distributed to each member, with no local stress concentration. The distribution beam rests on the base frame, and the load is evenly transmitted to the truss, resulting in high overall load-bearing capacity and resistance to deformation under heavy load conditions.

[0043] In some embodiments, such as Figure 3 and Figure 7 as well as Figure 8 As shown, the distribution beam 5 includes a set of distribution beam units arranged side by side at intervals. Each distribution beam unit includes a set of crossbeam structures 504. The crossbeams are connected by clamps 502. A set of connecting frames is provided at the bottom of the bridge deck. The distribution beam units are located between adjacent connecting frames. The structure is stable and reliable, and the bridge deck is easy to install.

[0044] Adjacent distribution beam units are connected by a set of transverse diagonal braces 501 and vertical scissor braces 503. The transverse diagonal braces are horizontal structures, and the vertical scissor braces are vertical structures. The vertical scissor braces are located in the middle, and the transverse diagonal braces are symmetrically arranged on both sides of the vertical scissor braces.

[0045] Adjacent distribution beam units, together with central vertical scissor bracing and symmetrical horizontal diagonal bracing on both sides, form a three-dimensional support system: the vertical scissor bracing controls vertical deformation and resists vertical load bending; the symmetrical horizontal diagonal bracing constrains horizontal displacement, resists lateral overturning and horizontal thrust, provides bidirectional restraint, and significantly improves the overall torsional and lateral displacement resistance of the distribution beams; the distribution beam units are arranged between adjacent connecting frames below the bridge deck, and the bridge deck load is evenly transferred to each distribution beam unit through the connecting frames; the symmetrical diagonal bracing between units distributes the force of each unit, avoiding local stress concentration in a single distribution beam, and ensuring uniform force distribution.

[0046] The proposed design for a large-span trestle bridge spanning the embankment with a low clearance is reasonable. All support piles are located outside the embankment's protection zone, without damaging any structure of the embankment or compressing the flood discharge cross-section. It fully complies with the Flood Control Law and relevant engineering protection regulations, ensuring smooth approval from the flood control authorities. The large-span trestle bridge structure requires no construction damage to the embankment itself, avoiding damage to the embankment's anti-seepage layer, filter layer, and overall stability, thus guaranteeing the safe operation of the flood control project. The portal frame support structure and multiple limiting protection systems work in tandem. It can effectively resist the impact of floods, typhoons and storm surges; the pipeline system is laid in a dedicated channel to ensure the safety and convenience of construction pipelines; the trestle bridge combined with the under-deck structure design minimizes the bridge deck elevation, and the bridge deck does not occupy separate space, greatly reducing the amount of approach road engineering and construction costs; no construction is required on the main embankment, and the steel pipe pile driving and truss assembly can be carried out on flat ground, and the overall hoisting and erection can shorten the construction period by more than 50%; the use of prefabricated components allows for quick disassembly, transportation and reuse, and the cost is relatively low.

[0047] like Figures 1 to 9 As shown, the preferred embodiment of this application is as follows: This invention adopts an integrated structure that prioritizes flood control, combines portal frame support in non-embankment areas on both sides, a single-span under-supported truss, and centralized pipeline laying on both sides. Strictly following the requirements of the flood control authorities, steel pipe piles are driven into the flood safety zone on both sides of the embankment, at least 5 meters from the embankment toe, and a portal frame structure is used to enhance support stability. The trestle bridge uses a 25-meter-long under-supported truss spanning the embankment. Dedicated pipeline laying channels are also provided on both sides of the trestle bridge. All designs meet the requirements for flood control and flood discharge.

[0048] The long-span trestle bridge structure of this application includes the following main components: 1. Portal frame support structure on both sides Two rows of φ820×10mm spiral steel pipe piles were driven on each side of the dike, with the pile positions at a horizontal distance of no less than 6m from the toe of the dike, completely avoiding the protection area of ​​the dike and without damaging any structure of the dike.

[0049] The steel pipe piles are connected by horizontal and diagonal bracing with φ325×6mm steel pipes to form a stable portal frame structure, which enhances the ability to resist flood impact and typhoon.

[0050] Double-layered HN600×200 load-bearing beams are installed on the top of the piles to ensure that the load of the upper truss is evenly transferred to the steel pipe piles.

[0051] 2. Main body of the under-supported truss The trestle bridge is assembled from six large trusses using high-strength bolts to form a 25-meter-long monolithic beam. Both ends rest directly on the load-bearing beams of the steel pipe piles on either side, with no intermediate support, spanning the entire dike. The bottom of the trestle bridge is higher than the top of the dike's wave wall to meet flood control requirements.

[0052] The bridge adopts a bottom-bearing structure, with the bridge deck located below the truss, which significantly reduces the bridge deck elevation and minimizes the impact of the approach roads on the flood control channel on the top of the embankment.

[0053] 3. Bottom load-bearing and passage system HN600×200 and 2I45a distribution beams are installed at equal intervals along the transverse direction of the trestle. The distribution beams are fixed to the lower chord and vertical members of the main truss by special U-shaped clamps, which are firmly connected and have strong impact resistance.

[0054] Composite steel bridge decks are laid on top of the distribution beams, and the bridge decks are bolted to the distribution beams to ensure reliable connection and achieve precise flatness.

[0055] The large trusses on both sides of the trestle can serve as protective structures to ensure the safety of vehicles and personnel.

[0056] 4. Centralized pipeline laying system The distribution beam structure inside and outside the truss on the upstream and downstream sides of the trestle can be used as a dedicated pipeline support, so that construction pipelines such as cables and water pipes can be laid in a centralized and zoned manner in this area, which is physically isolated from the vehicle passage area.

[0057] 5. Multiple flood control and safety protection systems U-shaped limiting grooves are installed at the bottom and sides of the distribution beam to limit the displacement of the truss under flood impact and vehicle dynamic loads. Wind-resistant supports are installed on both sides of the trestle to stabilize and strengthen the overall structure, enhancing its stability under typhoon and storm surge weather.

[0058] The specific construction process is as follows: ① Construction preparation Accurately measure the total width of the dike, the top elevation of the dike, the elevation of the wave wall, and the design flood level to determine the location for driving steel pipe piles.

[0059] Level the construction site on both sides and build temporary access roads to ensure that pile drivers and cranes can enter the site smoothly.

[0060] All incoming materials are subject to quality inspection to ensure that the materials and specifications of components such as steel pipe piles, steel sections, and trusses meet the design requirements.

[0061] ② Construction of the portal frame support system on both sides Two rows of φ820×10mm spiral steel pipe piles were driven on each side of the embankment. The pile length was determined according to the geological conditions, and the pile top elevation and longitudinal and transverse distance were precisely controlled.

[0062] A φ325×6mm horizontal steel pipe is welded between two steel pipe piles on each side, and φ325×6mm steel pipe scissor bracing is arranged between the horizontal steel pipes to form a stable portal frame structure.

[0063] Double-layered HN600×200 load-bearing beams are welded to the top of the steel pipe piles. The top surface of the load-bearing beams is flat, with an error not exceeding ±5mm.

[0064] ③Assembly of the under-supported truss On a flat site on one side of the dike, three standard large trusses were assembled into a 27m long integral beam using high-strength pins. Two sets of trusses were assembled in total, with a spacing of 0.375m between the trusses. Adjacent trusses were connected to each other by a transverse support frame to form a single set, thereby enhancing the lateral integrity and flood resistance of the beam.

[0065] Using one crane in conjunction with other operations, the assembled 27m long truss was hoisted into place as a whole, ensuring that both ends of the beam accurately rested on the top of the load-bearing beam, and was fixed with U-shaped limiters.

[0066] Install lateral limiting baffles and longitudinal thrust devices at the ends of the truss to limit the displacement of the beam under flood impact and vehicle dynamic load within the allowable range.

[0067] ④ Installation of bridge deck load-bearing and traffic systems On the lower chord of the main truss, HN600×200 distribution beams are installed at the designed vertical spacing, and bolts are used to tighten the HN600×200 distribution beams on both sides to clamp the Bailey vertical members. 2I45a steel sections are installed in the middle of the Bailey where there are no vertical members. The distribution beams are connected and stabilized vertically and horizontally using diagonal bracing structures. At the Bailey vertical members, wind-resistant supports are installed at both ends of the distribution beams to enhance the overall structural stability under typhoon and storm surge conditions.

[0068] Steel composite bridge deck panels are laid on the distribution beams to complete the bridge deck paving.

[0069] ⑤ Installation of centralized pipeline laying system Pipelines are laid out in sections according to construction needs within the gaps between the distribution beams and Bailey beams on the upstream and downstream sides of the trestle bridge.

[0070] Using portal frames on both sides of the dike as the sole support, the large truss adopts a single-span structure to directly span the entire dike, achieving zero contact and zero damage to the dike; the under-bearing load-bearing system ensures that the lower chord of the truss is under tension and the upper chord is under compression, giving full play to the tensile strength of the steel and greatly improving the single-span crossing capacity; the centralized and zoned laying system for pipelines on both sides enables safe and standardized management of construction pipelines; and the multiple limiting and protection system ensures the structural safety of the trestle bridge under various loads.

[0071] The above description is merely an illustration of preferred embodiments of the present invention, and the above technical features can be arbitrarily combined to form multiple embodiments of the present invention.

[0072] The present invention has been described above by way of example with reference to the accompanying drawings. Obviously, the specific implementation of the present invention is not limited to the above-described manner. Any non-substantial improvements made using the concept and technical solution of the present invention, or the direct application of the concept and technical solution of the present invention to other occasions without modification, are all within the protection scope of the present invention.

Claims

1. A long-span trestle bridge with a small clearance height spanning an embankment, characterized in that: include: The steel frame support structure in the non-embankment area on both sides consists of a set of steel pipe piles on each side of the embankment, with a load-bearing beam on top of each set of steel pipe piles on each side of the embankment to form an overall steel frame support structure. A pair of truss structures are installed on both sides of the load-bearing beam, with the ends of the truss structures and the corresponding steel pipe piles arranged vertically opposite each other. A distribution beam is fixedly installed laterally through the bottom of the truss structure, and a bridge deck is provided above the distribution beam between a pair of trusses.

2. The long-span trestle bridge with low clearance crossing the embankment as described in claim 1, characterized in that: The steel pipe piles are set outside the protection area of ​​the dike and are not constructed on the dike body. The steel pipe piles on each side of the dike are connected by a transverse frame structure to form a portal steel frame support structure.

3. The long-span trestle bridge with low clearance crossing the embankment as described in claim 2, characterized in that: Two rows of steel pipe piles are driven on each side of the embankment. The load-bearing beam is a spliced ​​integral load-bearing beam structure, which is set on the top of the two rows of steel pipe piles.

4. The long-span trestle bridge with low clearance crossing the embankment as described in claim 1, characterized in that: The bottom of the truss structure is fixed to the load-bearing beam via a base, and the load-bearing beam is provided with longitudinal and transverse limiting structures corresponding to the base.

5. The long-span trestle bridge with low clearance crossing the embankment as described in claim 4, characterized in that: The longitudinal and transverse limiting structure is a limiting frame structure with the opening facing downwards. The base is located inside the limiting frame structure. The limiting frame structure includes a pair of side limiting frames and a top frame set on the pair of side limiting frames. The lower end of the side limiting frames is connected to the load-bearing beam, and the lower part of the top frame is provided with a card plate or card slot that is locked on the base.

6. The long-span trestle bridge with low clearance crossing the embankment as described in claim 1, characterized in that: The truss structure includes a set of truss sections arranged longitudinally. Adjacent truss sections are connected by a docking structure. Each truss section has a set of docking lugs at its end. A set of docking lugs includes single lugs and double lugs. The double lugs form a docking gap into which the lugs at the end of another truss section are inserted.

7. The long-span trestle bridge with low clearance crossing the embankment as described in claim 1, characterized in that: The truss structure includes a base frame and a top frame, as well as vertical frames between the base frame and the top frame. Diagonal frames are provided between the base frame, the top frame, and the vertical frames. Adjacent vertical frames are connected by a set of diagonal frames to form a square frame structure.

8. The long-span trestle bridge with low clearance crossing the embankment as described in claim 8, characterized in that: The end of the distribution beam is located on the corresponding truss structure base frame, and the end of the distribution beam extends from the truss structure base frame. The top frame of the truss structure and the end of the distribution beam are connected by a wind brace structure.

9. The long-span trestle bridge with low clearance crossing the embankment as described in claim 8, characterized in that: The distribution beam includes a set of distribution beam units arranged side by side at intervals. Each distribution beam unit includes a set of crossbeams. The crossbeams are connected by clamps. A set of connecting frames is provided at the bottom of the bridge deck. The distribution beam units are located between adjacent connecting frames.

10. The long-span trestle bridge with low clearance crossing the embankment as described in claim 9, characterized in that: Adjacent distribution beam units are connected by a set of transverse diagonal braces and vertical scissor braces, with the vertical scissor braces located in the middle and the transverse diagonal braces arranged symmetrically on both sides of the vertical scissor braces.

Citation Information

Patent Citations

  • Steel trestle provided with steel anchor pile and construction method of steel trestle

    CN104404861A