A method for lifting steel beams of suspension bridges in mountainous areas using a combination of permanent and temporary suspension cables without ground supports.
By assembling steel beams on a foundation platform below the main tower of the suspension bridge and using a combination of cable hoisting and swaying devices to lift the steel beams, the construction problem of steel beams under ground-free conditions was solved, achieving efficient and safe steel beam hoisting.
Patent Information
- Application Number
- CN202611234338.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-14
- Publication Date
- 2026-11-17
AI Technical Summary
When constructing a bridge in a deep canyon, the lack of ground-based lifting facilities makes it difficult to install steel beams, and existing methods are costly and inefficient.
The steel beams are lifted using a combination of temporary and permanent slings without ground supports. The steel beams are assembled on the foundation platform below the main tower and then lifted to the design position using a cable crane and a swinging device. Temporary and permanent slings are then installed, and the cable force is adjusted using a winch to avoid excessive stress on the permanent slings.
The steel beams can be hoisted without construction or ground support, reducing costs, improving construction efficiency, and ensuring the safety of the slings and the protection of the steel beams.
Smart Images

Figure CN123109057A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of suspension bridge construction technology, and in particular to a method for lifting steel beams of suspension bridges in mountainous areas that combine permanent and temporary suspension cables without ground supports. Background Technology
[0002] When constructing a bridge in a deep canyon, the terrain presents significant challenges. Directly lifting the steel truss girder from the ground is not feasible due to transportation limitations, and erecting scaffolding would be both ecologically damaging and costly and inefficient. Therefore, the steel truss girder could only be transported via the approach bridge deck on the Panzhou bank.
[0003] However, due to the limited travel of cable cranes, it is impossible to lift them over the main tower. Therefore, in view of the terrain conditions and actual environmental requirements, it is urgent to develop a steel beam construction method that is suitable for ground-based lifting conditions. Summary of the Invention
[0004] The purpose of this application is to provide a method for lifting steel beams of suspension bridges in mountainous areas without ground-based supports, combining permanent and temporary suspenders, in order to solve the problem that steel beams are difficult to construct due to the lack of ground-based lifting conditions.
[0005] This application provides a method for lifting steel beams of a suspension bridge in mountainous areas without ground-supported temporary and permanent cable-stayed structures, which adopts the following technical solution: A method for lifting a permanent and temporary combined cable-stayed steel beam of a suspension bridge in mountainous areas without ground-based supports includes the following steps: S1. Set up a hoisting area on the foundation platform below the main tower of the suspension bridge, and transport the first foundation steel beam, the second foundation steel beam and the third foundation steel beam to the hoisting area; S2. The cable crane travels to the area above the hoisting area, and then the first foundation steel beam and the second foundation steel beam are swung to the design position by the cable crane in conjunction with the swinging device; S2. Install the first temporary sling and the first permanent sling on the second foundation steel beam, and hinge one end of the first foundation steel beam to the main tower and rigidly connect the other end to the second foundation steel beam. S3. The third foundation steel beam is moved to the design position by means of cable hoisting and swinging device. The second permanent sling and the second temporary sling are installed on the third foundation steel beam to fix the third foundation steel beam to the second foundation steel beam. S4. Hoist the bridge deck and install it on the first, second, and third foundation steel beams. Then, use the bridge deck on the first, second, and third foundation steel beams as a hoisting platform to hoist subsequent steel beams.
[0006] By adopting the above technical solution, the foundation beneath the main tower is first used as a foundation platform to assemble the first, second, and third foundation steel beams. This also facilitates the lifting of the first, second, and third foundation steel beams, making it easier to lift them using a cable crane. However, the area near the main tower is a blind spot for the cable crane, so a swaying device is needed to bring the first foundation steel beam closer to the main tower and connect it to the main tower. After the first, second, and third foundation steel beams are installed sequentially, they will obstruct the foundation platform beneath the main tower. Therefore, the bridge deck is then installed on the first, second, and third foundation steel beams. The platform utilizes the first, second, and third foundation steel beams as a lifting platform to facilitate the lifting of subsequent steel beams. This allows for the lifting of steel beams without the need for ground-based scaffolding, reducing costs and improving construction efficiency. Furthermore, when subsequent steel beams are transported to the lifting platform by a beam transport vehicle, the significant weight can cause slight deformation of the first and second permanent slings. Adjusting the tension of the first and second temporary slings on the lifting platform can achieve tension matching, reducing the stress on the first and second permanent slings and preventing excessive stress. This facilitates the lifting of subsequent steel beams while minimizing the possibility of damage to the first, second, and third foundation steel beams.
[0007] Optionally, the swaying device includes a first winch, a temporary fixing point, a traction cable, and a first pulley. The first pulley is connected to a first foundation steel beam, a second foundation steel beam, or a third foundation steel beam. The first winch is installed on the bridge bank foundation. The temporary fixing point is installed on the already constructed area of the suspension bridge. One end of the traction cable is connected to the first winch, and the other end passes around the first pulley and is connected to the temporary fixing point.
[0008] The above technical solution utilizes the first winch to wind up the traction cable, which pulls the first pulley toward the main tower, thereby pulling the first foundation steel beam, the second foundation steel beam, or the third foundation steel beam toward the main tower, thus facilitating the installation of the first foundation steel beam, the second foundation steel beam, or the third foundation steel beam.
[0009] Optionally, the top of the main tower is provided with a false frame, and a second winch is provided on the false frame. The second winch is provided with a prestressed cable. The prestressed cable is used to connect with a first temporary sling, a second temporary sling, a first permanent sling, or a second permanent sling to apply prestress to the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling. After the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling has completed the application of prestress, the connection between the prestressed cable and the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling is released.
[0010] By directly installing the second winch at the top of the main tower using the above technical solution, the stroke of the prestressed cables can be reduced, thereby better applying prestress to the first temporary suspender, the second temporary suspender, the first permanent suspender, or the second permanent suspender. This facilitates control over the load-bearing capacity of the first foundation steel beam, the second foundation steel beam, and the third foundation steel beam, and makes it easier to achieve cable force matching, thus improving construction safety.
[0011] Optionally, the main cable of the cable crane is connected to a clamp, and an extension frame is connected below the clamp. The extension frame is equipped with anchors and a steering component. The first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling passes through the anchors and the steering component and is then connected to the prestressed cable.
[0012] The above technical solution uses anchors to anchor the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling, reducing the possibility of damage. The steering component facilitates the steering of the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling for better connection with the prestressed cable.
[0013] Optionally, the steering component includes a U-shaped plate and a second pulley, the second pulley being rotatably connected to the U-shaped plate, and the U-shaped plate being connected to the extension frame.
[0014] Through the above technical solution, the U-shaped plate facilitates the lifting and installation of the second pulley, while the second pulley facilitates the turning of the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling.
[0015] Optionally, the anchor includes an anchor cylinder and a plurality of anchor plates disposed within the anchor cylinder. The anchor cylinder is provided with a conical hole for inserting the anchor plates. The outer wall of the anchor plate is in contact with the inner wall of the conical hole. The small end of the conical hole faces downward. The plurality of anchor plates are provided with anchor holes for a first temporary sling, a second temporary sling, a first permanent sling, or a second permanent sling to pass through.
[0016] By adopting the above technical solution, the anchor plate and the conical hole can be matched to facilitate the anchoring of the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling, thereby reducing the possibility of the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling falling.
[0017] Optionally, an upper fixing plate is connected to the U-shaped plate, a lower fixing plate is connected to the upper fixing plate, the lower fixing plate is connected to the anchor cylinder, a first reinforcing rod is connected between the U-shaped plate and the upper fixing plate, and a second reinforcing rod is connected between the U-shaped plate and the anchor cylinder.
[0018] By adopting the above technical solution, the upper fixing plate, the first reinforcing rod, the lower fixing plate and the second reinforcing rod can connect the anchor cylinder and the U-shaped plate, making the anchor cylinder and the U-shaped plate an integral unit and improving the overall strength. The first reinforcing rod and the second reinforcing rod can form two triangles with the upper fixing plate, the lower fixing plate, the anchor cylinder and the U-shaped plate, further improving the overall strength.
[0019] Optionally, a pressure plate is provided above the upper fixed plate, and a first pressure rod and a second pressure rod are connected to the bottom of the pressure plate. The first pressure rod passes through the upper fixed plate and is used to press the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling. The second pressure rod passes through the upper fixed plate and is connected to the anchor plate. A compression spring is sleeved on the first and second pressure rods. The compression spring is located between the upper fixed plate and the pressure plate. An adjusting rod is connected to the bottom of the pressure plate. An installation plate located below the anchor cylinder is provided on the extension frame. The adjusting rod passes through the installation plate and is threadedly connected to an adjusting nut.
[0020] By adopting the above technical solution, when it is necessary to lock the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling, the first pressure bar can easily press the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling, reducing the possibility of movement of the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling. The second pressure bar can also ensure the reliable anchoring of the anchor plate. When it is necessary to remove the first temporary sling and the second temporary sling, the first pressure bar and the second pressure bar can be moved upward by loosening the adjusting nut, thus engaging the locking of the first temporary sling or the second temporary sling. In addition, both the pressure plate and the second pressure bar have a certain deformation capacity, so the anchor plate can move downward a little further than the second pressure bar under the tension of the sling.
[0021] Optionally, the U-shaped plate is connected to a hook, and the extension frame is provided with a hanging rod for the hook to catch.
[0022] Optionally, a side plate is connected to the side wall of the anchor cylinder, and the side plate is connected to the mounting plate by bolts.
[0023] By adopting the above technical solution, the hook and hanging rod cooperate, and the side plate is connected to the mounting plate, so that the anchor cylinder and U-shaped plate are reliably fixed on the extension frame.
[0024] In summary, this application includes at least one of the following beneficial technical effects: 1. First, utilize the foundation beneath the main tower as a foundation platform to assemble the first, second, and third foundation steel beams. This also facilitates the lifting of the first, second, and third foundation steel beams, enabling them to be lifted using a cable crane. However, the area near the main tower is a blind spot for the cable crane; therefore, a swaying device is needed to bring the first foundation steel beam closer to the main tower and connect it to the tower. After installing the first, second, and third foundation steel beams sequentially, they will obstruct the foundation platform beneath the main tower. Therefore, at this point, bridge deck panels are installed on the first, second, and third foundation steel beams. The foundation steel beams, second foundation steel beams, and third foundation steel beams serve as lifting platforms to facilitate the lifting of subsequent steel beams. This allows for the lifting of steel beams without the need for ground-based scaffolding, reducing costs and improving construction efficiency. Furthermore, when subsequent steel beams are transported to the lifting platform via a beam transport vehicle, their weight can cause slight deformation of the first and second permanent slings. Therefore, by adjusting the tension of the first and second temporary slings on the lifting platform, cable tension matching can be achieved, reducing the stress on the first and second permanent slings and preventing them from exceeding their stress limits. This facilitates the lifting of subsequent steel beams while minimizing the possibility of damage to the first, second, and third foundation steel beams. 2. Use the first winch to wind up the traction cable and pull the first pulley toward the main tower, that is, pull the first foundation steel beam, the second foundation steel beam or the third foundation steel beam toward the main tower, thereby facilitating the installation of the first foundation steel beam, the second foundation steel beam or the third foundation steel beam; 3. Installing the second winch directly at the top of the main tower can reduce the stroke of the prestressed cables, thereby better applying prestress to the first temporary suspenders, the second temporary suspenders, the first permanent suspenders, or the second permanent suspenders. This makes it easier to control the load-bearing capacity of the first foundation steel beam, the second foundation steel beam, and the third foundation steel beam, and is more conducive to achieving cable force matching and improving construction safety. 4. Anchors are used to secure the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling to reduce the possibility of damage. The steering component facilitates the steering of the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling for better connection with the prestressed cable. 5. The anchor plate and the tapered hole make it easy to anchor the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling, reducing the possibility of the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling falling down; 6. The upper fixing plate, the first reinforcing rod, the lower fixing plate, and the second reinforcing rod can connect the anchor cylinder and the U-shaped plate, making the anchor cylinder and the U-shaped plate an integral unit and improving the overall strength. The first reinforcing rod and the second reinforcing rod can form two triangles with the upper fixing plate, the lower fixing plate, the anchor cylinder, and the U-shaped plate, further improving the overall strength. 7. When it is necessary to lock the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling, the first pressure bar facilitates the clamping of the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling, reducing the possibility of movement of the first temporary sling, the second temporary sling, the first permanent sling, or the second permanent sling. The second pressure bar also ensures the reliable anchoring of the anchor plate. When it is necessary to remove the first temporary sling and the second temporary sling, the first pressure bar and the second pressure bar can be moved upward by loosening the adjusting nut, thus engaging the locking of the first temporary sling or the second temporary sling. In addition, both the pressure plate and the second pressure bar have a certain deformation capacity, so the anchor plate can move downward a little further than the second pressure bar under the tension of the sling. 8. The hooks and hanging rods work together, and the side plates are connected to the mounting plates to reliably fix the anchor cylinder and U-shaped plate to the extension frame. Attached Figure Description
[0025] Figure 1 This is a schematic diagram illustrating the installation of the first foundation steel beam in this invention.
[0026] Figure 2 This is a schematic diagram illustrating the basic platform and the first temporary sling in this invention.
[0027] Figure 3 This is a schematic diagram illustrating the installation of the second foundation steel beam in this invention.
[0028] Figure 4 This is a schematic diagram illustrating the installation of the third foundation steel beam in this invention.
[0029] Figure 5 yes Figure 1 A magnified view of part A in the middle.
[0030] Figure 6 yes Figure 1 A magnified view of part B in the middle.
[0031] Figure 7 This is a structural schematic diagram illustrating the extension frame and clamp in this invention.
[0032] Figure 8This is a partial structural diagram illustrating the installation of anchors and steering components in this invention.
[0033] Figure 9 This is a schematic diagram illustrating the subsequent hoisting of the steel beam on the lifting platform in this invention.
[0034] In the diagram, 1. Main tower; 11. Foundation platform; 12. Frame; 13. Second winch; 2. First foundation steel beam; 21. Third temporary sling; 3. Second foundation steel beam; 31. First permanent sling; 32. First temporary sling; 4. Third foundation steel beam; 41. Second permanent sling; 42. Second temporary sling; 5. Cable crane; 6. Main cable; 51. Swinging device; 61. First winch; 62. Temporary fixing point; 63. First pulley; 64. Traction cable; 7. Clamping clamp; 71. Extension frame; 711. Mounting plate; 712. Hanging rod; 72. U-shaped plate; 721. Second pulley; 73. Anchor cylinder; 731. Anchor plate; 74. Upper fixing plate; 741. Lower fixing plate; 742. First reinforcing rod; 743. Second reinforcing rod; 75. Pressure plate; 751. First pressure rod; 752. Second pressure rod; 753. Compression spring; 754. Adjusting rod; 755. Adjusting nut; 76. Hook; 77. Side plate; 8. Lifting platform. Detailed Implementation
[0035] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, illustrating only the basic structure of the invention, and therefore only show the components relevant to the invention.
[0036] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential," etc., indicating orientation or positional relationships based on the orientation or positional relationships shown in the accompanying drawings, are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the invention. Furthermore, features defined with "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, unless otherwise stated, "a plurality of" means two or more. In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installed," "connected," and "linked" should be interpreted broadly, for example, as a fixed connection, a detachable connection, or an integral connection; as a mechanical connection or an electrical connection; as a direct connection or an indirect connection through an intermediate medium; or as a connection within two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.
[0037] Example 1 This application discloses a method for lifting steel beams of suspension bridges in mountainous areas that combine permanent and temporary suspension cables without ground supports.
[0038] A method for lifting steel beams of a suspension bridge in mountainous areas using a combination of permanent and temporary suspension cables without ground supports, referring to... Figures 1 to 9 This includes the following steps: S1. A hoisting area is set up on the foundation platform 11 below the main tower 1 of the suspension bridge. The components of the first foundation steel beam 2, the second foundation steel beam 3 and the third foundation steel beam 4 are transported to the hoisting area and assembled there.
[0039] S2. The cable crane 5 moves to the area above the hoisting zone and lifts the first foundation steel beam 2. When the first foundation steel beam 2 is hoisted to the set height, the swaying device 51 moves the first foundation steel beam 2 closer to the main tower 1 until the first foundation steel beam 2 can be connected to the main tower 1. The second foundation steel beam 3 is hoisted to the design position in the same way.
[0040] Reference Figure 1 , 5The swaying device 51 includes a first winch 61, a temporary fixing point 62, a traction cable 64, and a first pulley 63. The first pulley 63 is connected to the first foundation steel beam 2, the second foundation steel beam 3, or the third foundation steel beam 4. The first winch 61 is installed on the bridge abutment foundation, and the temporary fixing point 62 is installed on the already constructed area of the suspension bridge. One end of the traction cable 64 is fixedly connected to the drum of the first winch 61, and the other end passes over the first pulley 63 and is fixedly connected to the temporary fixing point 62. By using the first winch 61 to wind up the traction cable 64, the first pulley 63 is pulled towards the main tower 1, that is, the first foundation steel beam 2, the second foundation steel beam 3, or the third foundation steel beam 4 is pulled towards the main tower 1, thereby facilitating the installation of the first foundation steel beam 2, the second foundation steel beam 3, or the third foundation steel beam 4.
[0041] S2. Install the first temporary sling 32 and the first permanent sling 31 on the second foundation steel beam 3, hinge one end of the first foundation steel beam 2 to the main tower 1, and rigidly connect the other end to the second foundation steel beam 3, so as to realize the fixed connection between the first foundation steel beam 2 and the second foundation steel beam 3.
[0042] It should be noted that, referring to Figure 2 and Figure 3 Before the second foundation steel beam 3 is installed, one end of the first foundation steel beam 2 is hinged to the main tower 1, and the other end is suspended below the main cable 6 of the cable crane 5 by the third temporary sling 21. After the second foundation steel beam 3 is installed, the third temporary sling 21 on the first foundation steel beam 2 is removed.
[0043] S3. The third foundation steel beam 4 is moved to the design position by means of cable hoist 5 and swing device 51. The second permanent sling 41 and the second temporary sling 42 are installed on the third foundation steel beam 4 to fix the third foundation steel beam 4 to the second foundation steel beam 3.
[0044] To facilitate the application of stress to the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41, a falsework 12 is fixedly connected to the top of the main tower 1. A second winch 13 is fixedly installed on the falsework 12, and a prestressing cable is fixedly connected to the drum of the second winch 13. The prestressing cable is used to connect with the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41 to apply prestress. After the prestressing of the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41 is completed, the connection between the prestressing cable and the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41 is released.
[0045] Installing the second winch 13 directly on the top of the main tower 1 can reduce the stroke of the prestressed cable, thereby better applying prestress to the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41. This facilitates control over the load-bearing capacity of the first foundation steel beam 2, the second foundation steel beam 3, and the third foundation steel beam 4, and makes it easier to achieve cable force matching, thus improving construction safety.
[0046] Reference Figure 7 and Figure 8 To facilitate the connection between the first temporary sling 32, the second temporary sling 42, the first permanent sling 31 or the second permanent sling 41 and the main cable 6 of the cable crane 5, a clamp 7 is fixedly connected to the main cable 6 of the cable crane 5. An extension frame 71 is fixedly connected below the clamp 7. An anchor and a turning component are provided on the extension frame 71. The first temporary sling 32, the second temporary sling 42, the first permanent sling 31 or the second permanent sling 41 are connected to the prestressed cable after passing through the anchor and the turning component.
[0047] Anchors are used to secure the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41, reducing the possibility of damage. The steering component facilitates the steering of the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41 for better connection with the prestressed cable.
[0048] Specifically, the steering component includes a U-shaped plate 72 and a second pulley 721, which is rotatably connected to the U-shaped plate 72. The U-shaped plate 72 is connected to the extension frame 71. The U-shaped plate 72 facilitates the lifting of the installation foundation for the second pulley 721, while the second pulley 721 facilitates the steering of the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41.
[0049] The anchor includes an anchor cylinder 73 and multiple anchor plates 731 disposed within the anchor cylinder 73. The anchor cylinder 73 has conical holes for inserting the anchor plates 731. The outer wall of the anchor plate 731 fits against the inner wall of the conical hole, with the small end of the conical hole facing downward. The multiple anchor plates 731 have anchor holes through which a first temporary sling 32, a second temporary sling 42, a first permanent sling 31, or a second permanent sling 41 passes. The engagement of the anchor plates 731 with the conical holes facilitates the anchoring of the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41, reducing the possibility of the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41 sagging.
[0050] Specifically, an upper fixing plate 74 is fixedly connected to the U-shaped plate 72, and a lower fixing plate 741 is fixedly connected to the upper fixing plate 74. The lower fixing plate 741 is fixedly connected to the anchor cylinder 73. A first reinforcing rod 742 is fixedly connected between the U-shaped plate 72 and the upper fixing plate 74, and a second reinforcing rod 743 is fixedly connected between the U-shaped plate 72 and the anchor cylinder 73. The upper fixing plate 74, the first reinforcing rod 742, the lower fixing plate 741, and the second reinforcing rod 743 enable the connection between the anchor cylinder 73 and the U-shaped plate 72, making the anchor cylinder 73 and the U-shaped plate 72 an integral unit, thus improving the overall strength. The first reinforcing rod 742 and the second reinforcing rod 743 can form two triangles with the upper fixing plate 74, the lower fixing plate 741, the anchor cylinder 73, and the U-shaped plate 72, further enhancing the overall strength.
[0051] More specifically, a pressure plate 75 is provided above the upper fixed plate 74. A first pressure rod 751 and a second pressure rod 752 are fixedly connected to the bottom of the pressure plate 75. The first pressure rod 751 passes through the upper fixed plate 74 and is used to press the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41. The second pressure rod 752 passes through the upper fixed plate 74 and is fixedly connected to the anchor plate 731. A compression spring 753 is sleeved on the first pressure rod 751 and the second pressure rod 752, and the compression spring 753 is located between the upper fixed plate 74 and the pressure plate 75. An adjusting rod 754 is fixedly connected to the bottom of the pressure plate 75. An installation plate 711 located below the anchor cylinder 73 is provided on the extension frame 71. The adjusting rod 754 passes through the installation plate 711 and is threadedly connected to an adjusting nut 755 so as to lock or loosen the pressure plate 75.
[0052] When it is necessary to lock the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41, the first pressure bar 751 facilitates the clamping of the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41, reducing the possibility of movement of the first temporary sling 32, the second temporary sling 42, the first permanent sling 31, or the second permanent sling 41. The second pressure bar 752 can also ensure the reliable anchoring of the anchor piece 731. When it is necessary to remove the first temporary sling 32 and the second temporary sling 42, by loosening the adjusting nut 755, the first pressure bar 751 and the second pressure bar 752 can move upward and engage the locking of the first temporary sling 32 or the second temporary sling 42. In addition, both the pressure plate 75 and the second pressure bar 752 have a certain deformation capacity, so the anchor piece 731 can move downward a little further than the second pressure bar 752 under the action of the sling tension.
[0053] In addition, a hook 76 is connected to the U-shaped plate 72, and a hanging rod 712 is provided on the extension frame 71 for the hook 76 to hook onto. A side plate 77 is connected to the side wall of the anchor cylinder 73, and the side plate 77 is connected to the mounting plate 711 by bolts. The hook 76 cooperates with the hanging rod 712, and the side plate 77 is connected to the mounting plate 711, so that the anchor cylinder 73 and the U-shaped plate 72 are reliably fixed on the extension frame 71.
[0054] It should be noted that a safety passage for operators is set up near the main cable of the cable crane 5.
[0055] S4. Hoist the bridge deck and install it onto the first foundation steel beam 2, the second foundation steel beam 3, and the third foundation steel beam 4. Then, use the bridge deck on the first foundation steel beam 2, the second foundation steel beam 3, and the third foundation steel beam 4 as the hoisting platform 8 (refer to...). Figure 9 This is to facilitate the lifting of subsequent steel beams.
[0056] Working principle: First, the foundation below the main tower 1 is used as the foundation platform 11 to assemble the first foundation steel beam 2, the second foundation steel beam 3, and the third foundation steel beam 4. This also facilitates the lifting of the first foundation steel beam 2, the second foundation steel beam 3, and the third foundation steel beam 4, which can then be lifted by the cable crane 5. However, the area near the main tower 1 is a blind spot for the cable crane 5, so a swaying device 51 is needed to bring the first foundation steel beam 2 closer to the main tower 1 and connect it to the main tower 1. After the first foundation steel beam 2, the second foundation steel beam 3, and the third foundation steel beam 4 are installed in sequence, they will obstruct the foundation platform 11 below the main tower 1. Therefore, a bridge is then installed on the first foundation steel beam 2, the second foundation steel beam 3, and the third foundation steel beam 4. The panel uses the first foundation steel beam 2, the second foundation steel beam 3, and the third foundation steel beam 4 as a lifting platform 8 to facilitate the lifting of subsequent steel beams. This allows for the lifting of steel beams without the need for ground supports, reducing costs and improving construction efficiency. Furthermore, when subsequent steel beams are transported to the lifting platform 8 by a beam transport vehicle, the weight may cause slight deformation of the first permanent sling 31 and the second permanent sling 41. Therefore, the tension of the first temporary sling 32 and the second temporary sling 42 on the lifting platform 8 can be adjusted to achieve cable force matching, thereby reducing the stress on the first permanent sling 31 and the second permanent sling 41 and preventing excessive stress on them. This facilitates the lifting of subsequent steel beams while reducing the possibility of damage to the first foundation steel beam 2, the second foundation steel beam 3, and the third foundation steel beam 4.
[0057] The embodiments described in this specific implementation are preferred embodiments of this application and are not intended to limit the scope of protection of this application. Identical components are represented by the same reference numerals. Therefore, all equivalent changes made to the structure, shape, and principle of this application should be covered within the scope of protection of this application.
Claims
1. A method for lifting a permanent and temporary combined suspension cable steel beam of a suspension bridge in mountainous areas without ground-based supports, characterized in that, Includes the following steps: S1. Set up a hoisting area on the foundation platform (11) below the main tower (1) of the suspension bridge, and transport the first foundation steel beam (2), the second foundation steel beam (3) and the third foundation steel beam (4) to the hoisting area; S2. The cable crane (5) moves to the top of the hoisting area, and then the first foundation steel beam (2) and the second foundation steel beam (3) are moved to the design position by the cable crane (5) in conjunction with the swinging device (51); S2. Install the first temporary sling (32) and the first permanent sling (31) on the second foundation steel beam (3), and hinge one end of the first foundation steel beam (2) to the main tower (1) and rigidly connect the other end to the second foundation steel beam (3); S3. The third foundation steel beam (4) is moved to the design position by the cooperation of the cable hoist (5) and the swinging device (51). The second permanent sling (41) and the second temporary sling (42) are installed on the third foundation steel beam (4) to fix the third foundation steel beam (4) to the second foundation steel beam (3). S4. Hoist the bridge deck and install the bridge deck on the first foundation steel beam (2), the second foundation steel beam (3) and the third foundation steel beam (4). Then use the bridge deck on the first foundation steel beam (2), the second foundation steel beam (3) and the third foundation steel beam (4) as a hoisting platform (8) to hoist the subsequent steel beams.
2. The method for lifting a permanent and temporary combined suspension cable steel beam for a mountain suspension bridge without ground support as described in claim 1, characterized in that: The swaying device (51) includes a first winch (61), a temporary fixing point (62), a traction cable (64), and a first pulley (63). The first pulley (63) is connected to the first foundation steel beam (2), the second foundation steel beam (3), or the third foundation steel beam (4). The first winch (61) is installed on the bridge bank foundation. The temporary fixing point (62) is installed on the construction area of the suspension bridge. One end of the traction cable (64) is connected to the first winch (61), and the other end passes around the first pulley (63) and is connected to the temporary fixing point (62).
3. The method for lifting a permanent and temporary combined suspension cable steel beam for a mountain suspension bridge without ground support as described in claim 2, characterized in that: The main tower (1) is provided with a false frame (12) at the top. The false frame (12) is provided with a second winch (13). The second winch (13) is provided with a prestressed cable. The prestressed cable is used to connect with the first temporary sling (32), the second temporary sling (42), the first permanent sling (31) or the second permanent sling (41) to apply prestress to the first temporary sling (32), the second temporary sling (42), the first permanent sling (31) or the second permanent sling (41). After the first temporary sling (32), the second temporary sling (42), the first permanent sling (31) or the second permanent sling (41) has completed the application of prestress, the connection between the prestressed cable and the first temporary sling (32), the second temporary sling (42), the first permanent sling (31) or the second permanent sling (41) is released.
4. The method for lifting a permanent and temporary combined suspension cable steel beam for a mountain suspension bridge without ground support as described in claim 3, characterized in that: A clamp (7) is connected to the main cable (6) of the cable crane (5). An extension frame (71) is connected below the clamp (7). An anchor and a steering component are provided on the extension frame (71). The first temporary sling (32), the second temporary sling (42), the first permanent sling (31) or the second permanent sling (41) are connected to the prestressed cable after passing through the anchor and the steering component.
5. The method for lifting a permanent and temporary combined suspension cable steel beam for a mountain suspension bridge without ground support as described in claim 4, characterized in that: The steering component includes a U-shaped plate (72) and a second pulley (721), the second pulley (721) being rotatably connected to the U-shaped plate (72), and the U-shaped plate (72) being connected to the extension frame (71).
6. The method for lifting a permanent and temporary combined suspension cable steel beam for a mountain suspension bridge without ground support as described in claim 5, characterized in that: The anchor includes an anchor cylinder (73) and a plurality of anchor plates (731) disposed within the anchor cylinder (73). The anchor cylinder (73) is provided with a conical hole for inserting the anchor plates (731). The outer wall of the anchor plate (731) is in contact with the inner wall of the conical hole. The small end of the conical hole faces downward. The plurality of anchor plates (731) are provided with anchor holes for a first temporary sling (32), a second temporary sling (42), a first permanent sling (31), or a second permanent sling (41) to pass through.
7. The method for lifting a permanent and temporary combined suspension cable steel beam for a mountain suspension bridge without ground support as described in claim 6, characterized in that: An upper fixing plate (74) is connected to the U-shaped plate (72), a lower fixing plate (741) is connected to the upper fixing plate (74), the lower fixing plate (741) is connected to the anchor cylinder (73), a first reinforcing rod (742) is connected between the U-shaped plate (72) and the upper fixing plate (74), and a second reinforcing rod (743) is connected between the U-shaped plate (72) and the anchor cylinder (73).
8. The method for lifting a permanent and temporary combined suspension cable steel beam for a mountain suspension bridge without ground support as described in claim 7, characterized in that: A pressure plate (75) is provided above the upper fixing plate (74). The bottom of the pressure plate (75) is connected to a first pressure rod (751) and a second pressure rod (752). The first pressure rod (751) passes through the upper fixing plate (74) and is used to press the first temporary sling (32), the second temporary sling (42), the first permanent sling (31), or the second permanent sling (41). The second pressure rod (752) passes through the upper fixing plate (74) and is connected to the anchor plate (731). Next, compression springs (753) are sleeved on the first pressure rod (751) and the second pressure rod (752). The compression springs (753) are located between the upper fixing plate (74) and the pressure plate (75). An adjusting rod (754) is connected to the bottom of the pressure plate (75). An installation plate (711) is provided on the extension frame (71) below the anchor cylinder (73). The adjusting rod (754) passes through the installation plate (711) and is threadedly connected to an adjusting nut (755).
9. A method for lifting a permanent and temporary combined suspension cable steel beam for a mountain suspension bridge without ground support, as described in claim 8, characterized in that: The U-shaped plate (72) is connected to a hook (76), and the extension frame (71) is provided with a hanging rod (712) for the hook (76) to hook onto.
10. A method for lifting a permanent and temporary combined suspension cable steel beam for a mountain suspension bridge without ground support, as described in claim 9, characterized in that: A side plate (77) is connected to the side wall of the anchor cylinder (73), and the side plate (77) is connected to the mounting plate (711) by bolts.