A bridge erection device and its construction method for constructing precast components at a wharf

By introducing guide beams and positioning mechanisms into the precast component construction equipment at the dock, and utilizing wind power to drive the rotating barrel to automatically fix the moving columns, the problems of construction safety risks and slow progress were solved, achieving stable hoisting and efficient construction.

CN123109067APending Publication Date: 2026-11-17GUANGDONG DATANG INT CHAOZHOU POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611447954.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-17
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional bridge-building equipment for prefabricated components at wharves faces challenges such as high construction safety risks, insufficient installation accuracy, and slow progress in windy and wave-filled environments. Furthermore, it cannot effectively identify the impact of wind on hoisting deviations.

Method used

The bridge erection equipment includes guide beams, movable columns, and positioning mechanisms. It uses wind power to drive the rotating barrel to rotate and the positioning mechanism to automatically fix the movable columns, ensuring that the hoisting structure does not shift under strong wind conditions and resumes movement when the wind weakens.

Benefits of technology

It enabled stable hoisting and movement of the structure in windy and turbulent environments, improving construction safety and installation accuracy, reducing the risk of equipment displacement, and increasing construction progress and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109067A_ABST
    Figure CN123109067A_ABST
Patent Text Reader

Abstract

This invention relates to the technical field of infrastructure construction manufacturing, specifically to a bridge erection device and its construction method for constructing prefabricated components for wharves. The bridge erection device includes a guide beam, a support beam, a positioning mechanism, and a cover mechanism. Operators first support the guide beam and support beam on support columns, then erect the support beam for support and hoisting. Simultaneously, to adapt to strong winds at the coast, the positioning mechanism is used for positioning after the equipment is in use. In strong winds, the support and fixation are strengthened; in light winds, the fixation is weakened, facilitating the movement of the support beam. The device has a simple structure, effectively supports the equipment in strong winds, and effectively assesses the impact of wind on the equipment. It has good practicality and economy, and is beneficial for the promotion and use of the equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the technical field of infrastructure construction manufacturing, specifically to a bridge erection device and its construction method for constructing prefabricated components for wharves. Background Technology

[0002] Precast component construction and bridge erection at wharves is a relatively traditional construction technique, typically used in coastal areas with complex hydrological environments and frequent typhoons. The superstructure is usually constructed using precast installation methods. Traditional crane vessel installation methods are affected by multiple factors such as swells, wind conditions, and vessel traffic and operations in the construction area, resulting in high construction safety risks, insufficient installation accuracy, short effective working time, and slow construction progress. In existing construction processes, bridge erection equipment is typically used for these operations. Due to the large waves in the area where the equipment is used, the bridging equipment may be affected by the waves and move. Manually fixing it with locking structures may lead to misjudgment of the wind strength, affecting the construction progress. At the same time, the impact of wind on the equipment is unknown, and it is impossible to actively identify whether it has been affected and shifted after hoisting, which may cause operational hazards. Summary of the Invention

[0003] In order to solve the above-mentioned problems in the existing technology, the present invention aims to provide a bridge erection equipment and construction method for the construction of prefabricated dock components with a simple structure that can effectively identify wind intensity and realize automatic fixing and moving.

[0004] The technical solution adopted in this invention is as follows: a bridge erection device for the construction of prefabricated components at a wharf, comprising a guide rail beam mounted on a support column, the guide rail beam being supported above the support column by prefabricated support components, a support frame beam being provided above two sets of guide rail beams with the same axial direction for connecting lifting equipment and fixing support, the support frame beam being supported on the guide rail beam by a movable column, the guide rail beam having a guide rail groove on the support surface of the movable column, and a movable drive component placed in the guide rail groove on the movable column to assist in movement; The movable column is provided with a positioning mechanism placed in the guide rail groove on its periphery. The positioning mechanism is used to position the movable column relative to the guide rail beam by wind power. The positioning mechanism includes two sets of support baffles, which are distributed on both sides of the movable column in the direction of movement. The movable column is provided with two sets of clamping baffles on both sides between the support baffles. The clamping baffles are provided with expansion members to expand the ends of the clamping baffles away from the movable column to abut against the sides of the guide rail groove.

[0005] In one embodiment, the support beam is further provided with an auxiliary support column, which can be guided and moved along the support beam, and can be raised and lowered to support an adjacent support column platform.

[0006] In one embodiment, the expansion member includes a rotating barrel that can be driven by wind to rotate. A threaded rotating rod is provided on the axis of the rotating barrel. A support plate is provided between the rotating barrel and two adjacent sets of clamping baffles. The rotating barrel guide beam is slidably connected to the support plate. A rotating column is provided on the side of the clamping baffle near the movable column and is rotatably connected to the support plate. Both sides of the support plate are fixed to the adjacent support baffles. A rotating bearing is also provided in the middle of the threaded rotating rod. The rotating bearing is located in the middle of the positioning plate and can be detached from the positioning plate. The positioning plate is fixed to the support baffles. A movable block is provided between the two adjacent sets of clamping baffles on the threaded rotating rod for moving one side of the two sets of clamping baffles.

[0007] In one embodiment, the supporting plate is further provided with an extension plate on the side near the movable column. The end of the extension plate near the movable column is provided with a fixed diagonal rod. The fixed diagonal rod is obliquely placed on one side of the movable column. The end of the fixed diagonal rod near the movable column is close to the guide beam. A wedge block is provided between the end of the fixed diagonal rod away from the guide beam and the movable column. The wedge block is provided with a dovetail protrusion. The fixed diagonal rod is provided with a dovetail groove. The wedge block abuts against the adjacent movable column and allows the dovetail protrusion to pass into and slide into the dovetail groove.

[0008] In one embodiment, the clamping baffle is provided with a plurality of ball bearings embedded in and tumblingly connected to the support surface of the guide beam.

[0009] In one embodiment, the movable block includes an expanding trapezoidal block, the two inclined surfaces of which respectively abut against the edges of the adjacent clamping baffle. The expanding trapezoidal block is also provided with a connecting round tube, which is sleeved and rotatably connected to the threaded rotating rod.

[0010] In one embodiment, a tension spring is provided between the ends of two adjacent sets of clamping baffles away from the rotating column.

[0011] In one embodiment, a cover mechanism is provided on the side of the positioning mechanism away from the guide beam. The cover mechanism includes a cover barrel placed at the end of the rotating barrel away from the guide beam. A plurality of connecting support frames are provided around the cover barrel. A plurality of cover barrel collars are sleeved and slidably connected to the cover barrel. The cover barrel collar connecting support frames are fixed to adjacent support baffles. A lifting component is provided at the end of the cover barrel away from the rotating barrel. The lifting component is used to lift the cover barrel above the rotating barrel.

[0012] In one embodiment, the lifting component includes a fixed ball positioned at the end of the cover barrel away from the guide beam. A lifting rod is provided between the fixed ball and the cover barrel. Clamping rods are provided on both sides of the lifting rod, and the clamping rods abut against the fixed ball. A clamping arc-shaped ring is provided in the middle of the two sets of clamping rods. The clamping arc-shaped ring is an elastic member, and its two ends are fixed to adjacent clamping rods. The clamping arc-shaped ring is fixed to the support baffle. A guide extension plate is provided on the cover barrel sleeve. A movable lever plate is provided between the rotating barrel and the rotating bearing, which is slidably connected by the threaded rotating rod. A lifting rod is provided on the movable lever plate. The lifting rod is sequentially slidably connected to adjacent guide extension plates. An expansion cone is provided at the end of the lifting rod away from the guide beam, and the expansion cone is positioned between the two sets of clamping rods on the side near the guide beam.

[0013] In one embodiment, a construction method for constructing prefabricated components for a wharf is also included, the specific construction method being as follows: S1. After placing the guide beam above multiple sets of prefabricated support components, construct the support frame beam and move the column support on two sets of guide beams with the same axis, and then use the hoist on the support frame beam. S2. Use lifting equipment to hoist the required materials and prefabricated components to the designated area for installation; S3. After completion, use the positioning mechanism to fix the movable column to ensure that it will not move during strong winds; S4. After the strong winds subside, restore the positioning mechanism to its original position, and then continue to transport the precast components for construction. S5. Move the movable column to move the supporting beam, repeat steps S1-S4 until the installation task is completed and the construction is finished.

[0014] The beneficial effects of this invention are as follows: This invention provides a bridge erection device and its construction method for constructing precast dock components with a simple structure that effectively identifies wind intensity and can achieve automatic fixing and movement. The specific implementation method is as follows: After the operators have assembled the support beam, positioning mechanism, and cover mechanism, they first insert the wedge block into the dovetail groove through the dovetail protrusion, and then the normal hoisting operation can begin. After the hoisting is completed, when it is necessary to move the equipment, the moving drive component drives the moving column and the contacting wedge block to push the positioning mechanism to move. When the wind is weak, the wind cannot blow the rotating barrel to rotate. At the same time, the equipment is usually made of steel and has a heavy structure, so it will not shift. The items will also not shift during hoisting. If the wind increases, the strong wind can cause the rotating barrel to rotate. Due to the blocking effect of the supporting baffle, the rotation of the rotating barrel can be controlled in one direction, rotating in the direction of the wind. Under the action of the rotating barrel's own rotation and its own weight, the rotating barrel drives the threaded rotating rod to rotate simultaneously, and at the same time, it disengages from the connecting round tube. Because the expansion trapezoidal block on the connecting round tube is clamped by the clamping baffle, during the process of disengaging from the connecting round tube, it pushes the clamping baffle to overcome the tension of the tension spring, causing the clamping baffle to rotate along the connection direction of the rotating column, causing the end of the clamping baffle to expand until it abuts against the side wall of the guide rail groove of the guide rail beam, after which it can no longer disengage. At this time, the rotation of the threaded rotating rod drives itself to move upward. During the upward movement of the threaded rotating rod, the rotating bearing pushes the moving plate away from the guide rail beam, further driving the lifting rod to move upward, so that the expansion cone passes between the two sets of lifting rods, causing the two sets of lifting rods to overcome the elasticity of the clamping arc ring and expand, and then... The first step causes the lifting rod to disengage from the clamping effect of the fixed ball, causing the cover barrel to fall and engage with the rotating barrel. The rotating barrel, no longer affected by the wind, will stop rotating. At this point, the clamping baffle on the side of the moving column fully opens, and the positioning mechanism is fully positioned. The moving column can only make a slight displacement. Simultaneously, as the moving column moves, the dovetail protrusions away from the direction of displacement will move towards the guide beam under gravity, further wedging the displacement space of the moving column and thus fixing the guide beam. After the wind volume decreases to an acceptable range, the fixed ball on the cover barrel is pushed between the two sets of lifting rods, and the rotating barrel is rotated in the opposite direction, causing the connecting tube to move upwards. The expanding trapezoidal block disengages from the clamping baffle, and the clamping baffle returns to its position under the elastic force of the tension spring, allowing the moving drive component to move normally. Simultaneously, the ball bearing support below the clamping baffle also reduces friction, facilitating the normal movement of the support beam.

[0015] The device has a simple structure, effectively utilizes airflow to determine the impact on the equipment, and solves the problem of equipment structure movement caused by excessive wind force. It has good practicality and economy, and is beneficial to the promotion and use of the equipment. Attached Figure Description

[0016] The present invention will now be described in further detail with reference to the accompanying drawings and specific implementation methods.

[0017] Figure 1 This is a three-dimensional structural schematic diagram of the present invention; Figure 2 This is a partial three-dimensional structural schematic diagram of the present invention; Figure 3 This is the second partial three-dimensional structural schematic diagram of the present invention; Figure 4 This is a three-dimensional structural diagram of the positioning mechanism of the present invention; Figure 5This is a three-dimensional structural diagram of the lid mechanism of the present invention.

[0018] Reference numerals: 1. Guide rail beam; 101. Guide rail groove; 11. Support column; 12. Prefabricated support component; 14. Auxiliary support column; 2. Support frame beam; 21. Moving column; 22. Moving drive component; 3. Positioning mechanism; 31. Support baffle; 32. Rotating barrel; 321. Threaded rotating rod; 322. Rotary bearing; 3221 323. Positioning plate; 324. Moving lever; 325. Lifting rod; 326. Expansion cone; 33. Support plate; 331. Clamping baffle; 331. Ball bearing support; 332. Tension spring; 333. Rotating column; 34. Extension plate; 35. Fixed diagonal bar; 351. Wedge block; 352. Dovetail groove; 353. Dovetail protrusion; 36. Expansion trapezoidal block; 361. Connecting round tube; 4. Covering barrel mechanism; 41. Covering barrel collar; 411. Connecting support frame; 42. Covering barrel; 43. Guide extension plate; 44. Clamping fixing rod; 45. Clamping arc ring; 46. Lifting rod; 461. Fixed ball. Detailed Implementation

[0019] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only for explaining the invention and are not intended to limit the invention; that is, the described embodiments are merely some embodiments of the invention, and not all embodiments. The components of the embodiments of the invention described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0020] Therefore, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the invention without inventive effort are within the scope of protection of the invention.

[0021] The following is combined Figures 1-5This invention describes a bridge-building device for constructing prefabricated components at a wharf. The device includes guide beams 1 mounted on supporting columns 11 for guidance and support, typically made of steel. The guide beams 1 are supported above the supporting columns 11 by prefabricated support members 12, which are pre-cast support components used to improve flatness and prevent tilting of the guide beams 1. The supporting columns 11 are support columns on the bridge plane, primarily used for support. The prefabricated components are typically planar splicing modules. The implementation process includes, but is not limited to, hoisting other structures. Support beams 2, typically straight beams or rectangular frames, are mounted above two sets of axially aligned guide beams 1. The beam support is determined according to the usage and hoisting requirements. The attached diagram shows a rectangular frame beam, which can enhance the hoisting strength and support effect, and is used to connect hoisting equipment and fix the support. The support beam 2 is supported by movable columns 21 on the guide rail beam 1. The number of movable columns 21 can be determined according to the hoisting strength, as long as it meets the hoisting requirements, and is generally a multiple of 2. The guide rail beam 1 has a guide rail groove 101 on the support surface of the movable columns 21. The movable column 21 is equipped with a movable drive component 22 placed in the groove of the guide rail 101 to assist in movement. Specifically, the movable drive component 22 is usually a movable platform with a motor and rollers, which can realize automatic or controlled movement. This is existing technology, so it will not be described in detail. The movable column 21 is provided with a positioning mechanism 3 placed in the guide rail groove 101 around its periphery. The positioning mechanism 3 is used to position the movable column 21 relative to the guide rail beam 1 by wind power. The positioning mechanism 3 includes two sets of support baffles 31, which are distributed on both sides of the movable column 21 in the direction of movement. Two sets of clamping baffles 331 are provided on both sides between the movable column 21 and the support baffles 31. The two sets of clamping baffles 331 are provided with expansion members to expand the two sets of clamping baffles 331 so that the ends away from the movable column 21 abut against the sides of the guide rail groove 101.

[0022] Specifically, the support beam 2 is also equipped with an auxiliary support column 14. The auxiliary support column 14 can be guided and moved along the support beam 2. The auxiliary support column 14 can be raised and lowered to support the adjacent support column 11 platform, which facilitates the strengthening of the hoisting support performance of the middle support beam 2. At the same time, it can be replaced with lifting tools, etc., and can be adjusted according to the actual situation.

[0023] Beneficially, the expansion component includes a rotating barrel 32, which can be driven by wind to rotate, similar to a wind-powered shaft, achieving rotation by wind blowing. This can be achieved by mounting several baffles on a rotating shaft, or by having a threaded rotating rod 321 on the axis of the rotating barrel 32. A support plate 33 is provided between the rotating barrel 32 and two adjacent sets of clamping baffles 331. The guide beam 1 of the rotating barrel 32 is slidably connected to the support plate 33. The clamping baffles 331 have a rotatable connection to the support plate 33 on the side near the movable column 21. The rotating column 333 of the plate 33 supports the two sides of the plate 33 and is fixed to the adjacent support baffles 31. The threaded rotating rod 321 is also provided with a rotating bearing 322 in the middle. The rotating bearing 322 is located in the middle of the positioning plate 3221. The rotating bearing 322 can be separated from the positioning plate 3221 and mainly plays a positioning role. The positioning plate 3221 is fixed to the support baffle 31. The threaded rotating rod 321 is provided with a movable block between the two adjacent clamping baffles 331 to move one side of the two clamping baffles 331.

[0024] Beneficially, the support plate 33 is also provided with an extension plate 34 on the side near the movable column 21. The end of the extension plate 34 near the movable column 21 is provided with a fixed diagonal rod 35. The fixed diagonal rod 35 is obliquely placed on one side of the movable column 21. The end of the fixed diagonal rod 35 near the movable column 21 is close to the guide rail beam 1. A wedge block 351 is provided between the end of the fixed diagonal rod 35 away from the guide rail beam 1 and the movable column 21. A dovetail protrusion 353 is provided on the wedge block 351. A dovetail groove 352 is provided on the fixed diagonal rod 35. The wedge block 351 abuts against the adjacent movable column 21 and allows the dovetail protrusion 353 to pass into and slide into the dovetail groove 352.

[0025] Specifically, a plurality of ball bearing supports 3311 are provided between the clamping baffle 331 and the support surface of the guide beam 1, which are embedded in and tumbledly connected to the clamping baffle 331.

[0026] Beneficially, the movable block includes an expanding trapezoidal block 36, the two inclined surfaces of which respectively abut against the edges of the adjacent clamping baffles 331. The expanding trapezoidal block 36 is also provided with a connecting round tube 361, which is sleeved and rotatably connected to the threaded rotating rod 321.

[0027] Specifically, a tension spring 332 is provided between the ends of the two sets of clamping baffles 331 that are far from the rotating column 333.

[0028] Beneficially, a cover mechanism 4 is provided on the side of the positioning mechanism 3 away from the guide beam 1. The cover mechanism 4 includes a cover barrel 42 placed at the end of the rotating barrel 32 away from the guide beam 1. Several connecting support frames 411 are provided around the cover barrel 42. Several cover barrel collars 41 are sleeved and slidably connected to the cover barrel 42. The cover barrel collars 41 are fixed to the connecting support frames 411 and the adjacent support baffles 31. A lifting component is provided at the end of the cover barrel 42 away from the rotating barrel 32. The lifting component is used to lift the cover barrel 42 above the rotating barrel 32.

[0029] Beneficially, the lifting component includes a fixed ball 461, which is positioned at the end of the cover barrel 42 away from the guide rail beam 1. A lifting rod 46 is provided between the fixed ball 461 and the cover barrel 42. Clamping fixing rods 44 are provided on both sides of the lifting rod 46, and the clamping fixing rods 44 abut against the fixed ball 461. A clamping arc-shaped ring 45 is provided in the middle of the two sets of clamping fixing rods 44. The clamping arc-shaped ring 45 is an elastic component and has elasticity. The two ends of the clamping arc-shaped ring 45 are fixed to the adjacent clamping fixing rods 44. The support baffle 31 and the cover ring 41 are provided with guide extension plates 43. Between the rotating barrel 32 and the rotating bearing 322, there is a movable dial plate 323 that is slidably connected by a threaded rotating rod 321. The movable dial plate 323 is provided with a lifting rod 324. The lifting rod 324 is slidably connected to the adjacent guide extension plates 43 in sequence. The end of the lifting rod 324 away from the guide rail beam 1 is provided with an expansion cone 3241. The expansion cone 3241 is placed between the two sets of clamping and fixing rods 44 on the side close to the guide rail beam 1.

[0030] Also beneficial is a construction method for prefabricated components of a wharf, the specific construction method of which is as follows: S1. After placing the guide beam 1 above multiple sets of prefabricated support components 12, construct the support frame beam 2 and the movable column 21, which are supported on the two sets of guide beams 1 with the same axis. Then, use the hoist on the support frame beam 2. S2. Use lifting equipment to hoist the required materials and prefabricated components to the designated area for installation; S3. After completion, use the positioning mechanism 3 to fix the movable column 21 to ensure that the movable column 21 will not move in strong winds; S4. After the strong winds subside, restore the positioning mechanism 3 to its original position, and then continue to transport the precast components for construction. S5. Move the movable column 21 to move the support beam 2, repeat steps S1-S4 until the installation task is completed and the construction is finished.

[0031] Working principle of this invention: After the operator has assembled the support beam 2, positioning mechanism 3 and cover mechanism 4, the wedge block 351 is first inserted into the dovetail groove 352 through the dovetail protrusion 353, and the normal hoisting operation can begin. After the hoisting is completed, when it needs to be moved, the moving drive component 22 drives the moving column 21 and the contacting wedge block 351 to push the positioning mechanism 3 to move. When the wind is weak, the wind cannot blow the rotating barrel 32 to rotate. At the same time, the equipment is usually made of steel and has a heavy structure, so it will not shift. The items will also not shift during hoisting. If the wind increases, the strong wind can cause the rotating barrel 32 to rotate. Due to the blocking effect of the supporting baffle 31, the rotation of the rotating barrel 32 can be controlled in one direction, rotating in the direction of the wind. Under the action of the rotating barrel 32's own rotation and its own weight, the rotating barrel 32 drives the threaded rotating rod 321 to rotate, and simultaneously disengages from the connected circular tube 361. Because the expanding trapezoidal block 36 on the connecting circular tube 361 is clamped by the clamping baffle 331, during the disengagement process of the connecting circular tube 361, the clamping baffle 331 is pushed to overcome the tension of the tension spring 332, causing the clamping baffle to... Rotating along the connecting direction of the rotating column 333, the end of the clamping baffle 331 expands until it abuts against the side wall of the guide rail groove 101 of the guide rail beam 1, at which point it can no longer disengage. At this time, the rotation of the threaded rotating rod 321 drives itself to move upward. During the upward movement of the threaded rotating rod 321, the rotating bearing 322 moves the moving plate 323 away from the guide rail beam 1, further driving the lifting rod 324 to move upward, so that the expansion cone 3241 passes between the two sets of lifting rods 46, allowing the two sets of lifting rods 46 to overcome the elasticity of the clamping arc ring 45. The expansion further causes the lifting rod 46 to detach from the clamping effect on the fixed ball 461, resulting in the covering barrel 42 falling and engaging the rotating barrel 32. The rotating barrel 32, no longer affected by wind, will not rotate. At this point, the clamping baffle 331 on the side of the moving column 21 fully opens, and the positioning mechanism 3 is fully positioned. The moving column 21 can only make a slight displacement. Simultaneously, as the moving column 21 moves, the dovetail protrusion 353, away from the direction of displacement, will move towards the guide beam 1 under the influence of gravity, further wedging the displacement space of the moving column 21. The guide beam 1 is fixed. After the air volume is reduced to an acceptable range, the fixed ball 461 on the cover barrel 42 is inserted between the two sets of lifting rods 46. The rotating barrel 32 is rotated in the opposite direction to make the connecting round tube 361 move upward. The expanding trapezoidal block 36 is released from the pressure on the clamping baffle 331. The clamping baffle 331 is also restored to its position by the elastic force of the tension spring 332. The moving drive component 22 can then be driven normally. At the same time, the ball bearing support 3311 below the clamping baffle 331 also has the function of reducing friction, which facilitates the normal movement of the support beam 2.

[0032] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal communication between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0033] The above description is merely an example and illustration of the structure of the present invention. Those skilled in the art can make various modifications or additions to the specific embodiments described or use similar methods to replace them, as long as they do not deviate from the structure of the invention or the scope defined by the claims of the present invention, they should all fall within the protection scope of the present invention.

Claims

1. A bridge erection device for constructing precast components at a wharf, characterized in that: Includes a guide rail beam (1) mounted on a support column (11), the guide rail beam (1) being supported above the support column (11) by a prefabricated support member (12), and a support frame beam (2) above two sets of guide rail beams (1) with the same axial direction, for connecting the lifting device and fixing the support. The support frame beam (2) is supported on the guide rail beam (1) by a movable column (21). The guide rail beam (1) is provided with a guide rail groove (101) on the support surface of the movable column (21), and the movable column (21) is provided with a movable drive member (22) placed in the groove of the guide rail groove (101) to assist in movement. The movable column (21) is provided with a positioning mechanism (3) placed in the guide rail groove (101) around its periphery. The positioning mechanism (3) is used to position the movable column (21) relative to the guide rail beam (1) by wind power. The positioning mechanism (3) includes two sets of support baffles (31). The two sets of support baffles (31) are distributed on both sides of the movable column (21) in the direction of movement. The movable column (21) is provided with two sets of clamping baffles (331) on both sides between the support baffles (31). The two sets of clamping baffles (331) are provided with expansion members to expand the two sets of clamping baffles (331) away from the movable column (21) to abut against both sides of the guide rail groove (101).

2. The bridge erection equipment for the construction of precast components at wharfs according to claim 1, characterized in that: The support beam (2) is also provided with an auxiliary support column (14), which can be guided and moved on the support beam (2), and can be raised and lowered to support the adjacent support column (11) platform.

3. The bridge erection equipment for the construction of precast components at wharfs according to claim 1, characterized in that: The expansion component includes a rotating barrel (32) that can be driven by wind to rotate. A threaded rotating rod (321) is provided on the axis of the rotating barrel (32). A support plate (33) is provided between the rotating barrel (32) and two adjacent sets of clamping baffles (331). The guide beam (1) of the rotating barrel (32) is slidably connected to the support plate (33). A rotating column (333) is rotatably connected to the support plate (33) on the side of the clamping baffle (331) near the movable column (21). The support plate (33) is fixed to the support baffle (31) on both sides. The threaded rotating rod (321) is also provided with a rotating bearing (322) in the middle. The rotating bearing (322) is located in the middle of the positioning plate (3221). The rotating bearing (322) can be detached from the positioning plate (3221). The positioning plate (3221) is fixed to the support baffle (31). The threaded rotating rod (321) is provided with a movable block between two sets of clamping baffles (331) that are close to each other, so as to move one side of the two sets of clamping baffles (331).

4. The bridge erection equipment for the construction of precast components at wharfs according to claim 3, characterized in that: The supporting plate (33) is provided with an extension plate (34) on the side near the movable column (21). The extension plate (34) is provided with a fixed diagonal rod (35) on the end side near the movable column (21). The fixed diagonal rod (35) is placed obliquely on one side of the movable column (21). The end of the fixed diagonal rod (35) near the movable column (21) is close to the guide rail beam (1). A wedge block (351) is provided between the end of the fixed diagonal rod (35) away from the guide rail beam (1) and the movable column (21). A dovetail protrusion (353) is provided on the wedge block (351). A dovetail groove (352) is provided on the fixed diagonal rod (35). The wedge block (351) abuts against the adjacent movable column (21) and allows the dovetail protrusion (353) to pass through and slide into the dovetail groove (352).

5. The bridge erection equipment for the construction of precast components at wharfs according to claim 3, characterized in that: A plurality of ball bearing supports (3311) are provided between the clamping baffle (331) and the support surface of the guide beam (1) and are embedded in and rolled to the clamping baffle (331).

6. The bridge erection equipment for the construction of precast components at wharfs according to claim 4, characterized in that: The movable block includes an expanding trapezoidal block (36), the two inclined surfaces of which respectively abut against the edges of the adjacent clamping baffle (331). The expanding trapezoidal block (36) is also provided with a connecting round tube (361), which is sleeved and rotatably connected to the threaded rotating rod (321).

7. The bridge erection equipment for the construction of precast components at wharfs according to claim 6, characterized in that: A tension spring (332) is provided between the ends of the two adjacent clamping baffles (331) that are away from the rotating column (333).

8. The bridge erection equipment for the construction of precast components at wharfs according to claim 3, characterized in that: The positioning mechanism (3) is provided with a cover mechanism (4) on the side away from the guide beam (1). The cover mechanism (4) includes a cover barrel (42) placed at the end of the rotating barrel (32) away from the guide beam (1). The cover barrel (42) is provided with several connecting support frames (411) around its periphery. Several cover barrel collars (41) are sleeved and slidably connected to the cover barrel (42). The cover barrel collars (41) are fixed to the connecting support frames (411) and adjacent support baffles (31). The end of the cover barrel (42) away from the rotating barrel (32) is provided with a lifting component. The lifting component is used to lift the cover barrel (42) above the rotating barrel (32).

9. The bridge erection equipment for the construction of precast components at wharfs according to claim 8, characterized in that: The lifting component includes a fixed ball (461), which is placed at one end of the covering barrel (42) away from the guide beam (1). A lifting rod (46) is provided between the fixed ball (461) and the covering barrel (42). Clamping fixing rods (44) are provided on both sides of the lifting rod (46), and the clamping fixing rods (44) abut against the fixed ball (461). A clamping arc ring (45) is provided in the middle of the two sets of clamping fixing rods (44). The clamping arc ring (45) is an elastic member, and the two ends of the clamping arc ring (45) are fixed to the adjacent clamping fixing rods (44). The support baffle (31) is provided, the cover ring (41) is provided with a guide extension plate (43), the rotating barrel (32) and the rotating bearing (322) are provided with a movable dial plate (323) which is slidably connected by the threaded rotating rod (321), the movable dial plate (323) is provided with a lifting rod (324), the lifting rod (324) is slidably connected to the adjacent guide extension plate (43) in sequence, and the end of the lifting rod (324) away from the guide rail beam (1) is provided with an expansion cone (3241), the expansion cone (3241) is placed between the two sets of clamping and fixing rods (44) on the side close to the guide rail beam (1).

10. A construction method for constructing precast components for wharfs, using the bridge erection equipment for constructing precast components for wharfs as described in any one of claims 1-9, characterized in that: The specific construction method is as follows: S1. After placing the guide beam (1) above multiple sets of prefabricated support components (12), build the support frame beam (2) and the movable column (21) on the two sets of guide beams (1) with the same axis, and place the hoist on the support frame beam (2); S2. Use lifting equipment to hoist the required materials and prefabricated components to the designated area for installation; S3. After completion, use the positioning mechanism (3) to fix the movable column (21) to ensure that the movable column (21) will not move in strong winds; S4. After the strong winds have subsided, restore the original position of the positioning mechanism (3) so that the precast components can be transported for construction. S5. Move the moving column (21) to move the supporting beam (2), repeat steps S1-S4 until the installation task is completed and the construction is finished.