A method for roof cutting and horizontal coal cutting in underground coal mine roadways based on double-arm triangular drilling

By using the double-arm triangular drilling technology, combined with the swing-angle double-arm drilling machine and the mining wire saw, efficient, safe and precise cutting of the roof and coal seam of underground roadways in coal mines has been achieved. This solves the problems of low efficiency and independence of traditional equipment and is suitable for complex geological conditions.

CN123109651APending Publication Date: 2026-11-17SHANDONG UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611279366.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional underground roof cutting operations in coal mines suffer from problems such as high construction vibration, low safety, irregular cuts, independent equipment, and low construction efficiency. Furthermore, drilling and cutting equipment cannot simultaneously complete roof cutting and horizontal coal cutting operations on a single set of equipment.

Method used

The combination of a swing-angle double-arm drilling machine and a mining wire saw is adopted. The double-arm drilling machine with a triangular layout forms a through hole, and the wire saw is used for continuous cutting to achieve low-disturbance cutting and pressure relief of the roof and coal seam.

Benefits of technology

It achieves multiple uses in one machine, improves construction efficiency, reduces equipment space occupation and labor intensity, enhances safety and cutting accuracy, and is suitable for complex geological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109651A_ABST
    Figure CN123109651A_ABST
Patent Text Reader

Abstract

This invention provides a method for roof cutting and horizontal coal cutting in underground coal mine roadways based on double-arm triangular drilling, belonging to the field of underground coal mining equipment and technology. It employs an integrated device combining a swing-angle double-arm drilling machine and a mining wire saw. The double arms form a converging through-hole through a triangular, double-sided swing-angle drilling pattern. A diamond wire saw is then inserted into the through-hole to achieve continuous, low-disturbance cutting of the roof strata or coal seam. Simultaneously, it can be used for small-amplitude cutting of the coal seam to relieve pressure and enhance permeability. This invention can simultaneously achieve roof cutting, coal cutting, and gas pressure relief, reducing equipment investment and underground space occupation. Mechanical cutting replaces blasting, eliminating vibration and shock waves, reducing the risk of surrounding rock damage and gas outbursts. The cut is regular and the cut surface is flat, facilitating subsequent support and pressure relief.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of coal mine underground mining equipment and mining technology, and in particular to a method for cutting the roof and horizontally cutting coal in underground coal mine roadways based on double-arm triangular drilling. Background Technology

[0002] Traditional roof cutting operations use blasting methods, which have drawbacks such as large construction vibrations, easy disturbance and damage to the surrounding rock, low safety, irregular cuts, and difficulty in subsequent support.

[0003] Coal seam cutting operations rely heavily on coal mining machines, which present problems such as low cutting accuracy, high dust generation, high risk of instantaneous gas surge, and difficulty in achieving controllable cutting and slow depressurization.

[0004] Gas depressurization operations use parallel straight holes for gas extraction, which has limited ventilation range, slow depressurization speed, and poor effect.

[0005] The above construction operations often require drilling first. Traditional drilling methods involve drilling forward simultaneously to create two parallel, independent, and unconnected straight holes, without forming a through-hole.

[0006] Moreover, the existing drilling, roof cutting, coal cutting, and pressure relief equipment are independent of each other, making it impossible to complete roof cutting and horizontal coal cutting operations simultaneously on a single set of equipment. This results in poor equipment versatility, large underground space occupation, cumbersome operation procedures, and low overall construction efficiency. Summary of the Invention

[0007] To address the problems existing in the prior art, this invention combines a swing-angle double-arm drilling machine with a mining wire saw. The double arms form a triangular double-sided swing-angle drilling hole to form a through hole. The wire saw is then inserted into the through hole to achieve continuous, low-disturbance cutting of the roof strata or coal seam. It can also be used for small-amplitude cutting of coal seams to relieve pressure and increase permeability.

[0008] To achieve the above objectives, the present invention provides a method for roof cutting and horizontal coal cutting in underground coal mine roadways based on double-arm triangular drilling, comprising: (1) Cutting the roof of the tunnel; The tilting double-arm drilling machine can be moved to the working position below the roadway roof and leveled and fixed, and the drilling arms are arranged vertically to the left and right. Determine the positions of the drill holes at both ends based on the cut-off area; The left drill arm tilts to the upper right at a preset angle, and the right drill arm tilts to the upper left at a preset angle, forming a vertical triangle layout; The left drilling arm drills upward from the left end of the tunnel roof, and the right drilling arm drills upward from the right end of the tunnel roof. The two holes meet and connect at the apex above the tunnel roof, forming a triangular through hole. The wire saw machine feeds the diamond wire saw into the left end hole and leads it out through the right end hole, forming a closed-loop cutting circuit. Start the wire saw machine and pull the diamond wire saw to continuously cut along the triangular through hole, cutting off the roof rock layer of the tunnel.

[0009] (2) Horizontal coal cutting; The tilting double-arm drilling machine is moved to the working position in front of the coal wall and leveled and fixed, and the drill arms are arranged horizontally from left to right. Determine the locations of the drill holes at both ends based on the coal cutting area; The left drill arm tilts to the right front at a preset angle, and the right drill arm tilts to the left front at a preset angle, forming a horizontal triangular layout; The left drill arm drills a hole forward from the left end of the coal wall, and the right drill arm drills a hole forward from the right end of the coal wall. The two holes meet and connect at the front apex of the coal wall, forming a triangular through hole. The wire saw machine feeds the diamond wire saw into the left end hole and leads it out through the right end hole, forming a closed-loop cutting circuit. Start the wire saw machine and pull the diamond wire saw to continuously cut along the triangular through hole to cut off the coal seam.

[0010] Optionally, when gas depressurization is required, the wire saw is started, and the diamond wire saw is pulled to cut the coal seam in a small range to form a groove and release the gas.

[0011] By adopting the above technical solution, the present invention has at least the following beneficial effects: 1. Multi-purpose machine: It can simultaneously cut the roof, cut coal, and depressurize gas, reducing equipment investment and underground space occupation.

[0012] 2. Significantly improved efficiency: Dual-arm synchronous angle drilling, one-time forming of through holes, drilling efficiency increased by more than 50%, and cutting is continuous and efficient.

[0013] 3. Significantly improved safety: Mechanical cutting replaces blasting, eliminating vibration and shock waves, reducing the risk of surrounding rock damage and gas outbursts.

[0014] 4. Precise and controllable cutting: The cut is regular and the cut surface is flat, which facilitates subsequent support and pressure relief.

[0015] 5. Low disturbance and high adaptability: It causes little damage to coal and rock masses and is suitable for complex conditions such as high gas levels and fractured roofs.

[0016] 6. Easy to operate: The drilling angle is adjustable and the degree of automation is high, reducing labor intensity and manual intervention. Attached Figure Description

[0017] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0018] Figure 1 This is a schematic diagram of the drilling process using a swing-angle double-arm drilling machine according to Embodiment 1 of the present invention.

[0019] Figure 2 This is a schematic diagram of the wire saw cutting the top in Embodiment 1 of the present invention.

[0020] Figure 3 This is a schematic diagram of the drilling process using a swing-angle double-arm drilling machine in Embodiment 2 of the present invention.

[0021] Figure 4 This is a schematic diagram of horizontal coal cutting using a wire saw in Embodiment 2 of the present invention. Detailed Implementation

[0022] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0023] This invention employs an integrated device combining a swing-angle double-arm drilling machine and a mining wire saw, used for roof cutting and depressurization in underground coal mines, horizontal coal cutting, and coal seam gas depressurization and permeability enhancement.

[0024] (1) Angle-swinging double-arm drilling machine.

[0025] Main components: hydraulic station, control panel, frame.

[0026] Left and right drill arms: Both have pitch and horizontal tilt functions, and the two arms can tilt towards each other in a triangular double-sided layout.

[0027] Drive mechanism: hydraulic motor, rotary head, feed cylinder, angle adjustment cylinder, to realize independent or linked angle control of the drill arm.

[0028] Positioning mechanism: support legs, leveling device.

[0029] (2) Mining wire saw.

[0030] Power unit: Explosion-proof hydraulic and electric drive main unit.

[0031] Actuating mechanisms: diamond beaded rope, guide wheel, tensioning mechanism, traction mechanism.

[0032] Threading mechanism: It can feed the rope in from one end of the through hole and lead it out from the other end to achieve closed-loop threading.

[0033] Example 1: Based on the above-mentioned integrated device of a swing-angle double-arm drilling machine and a mining wire saw, this embodiment of the invention discloses a method for cutting the roof of underground coal mine roadways based on double-arm triangular drilling, including drilling and roof cutting.

[0034] like Figure 1 As shown, the drilling process is as follows: The tilting double-arm drilling machine can be moved to the working position below the roadway roof and leveled and fixed, with the drilling arms arranged vertically to the left and right.

[0035] The location of the drilling holes at the left and right ends is determined based on the cutting range, and the spacing between the drilling holes is generally 2~10m.

[0036] The left drill arm tilts to the upper right at a preset angle, and the right drill arm tilts to the upper left at a preset angle, forming a vertical triangle layout. The tilt angle of the drill arms is generally 20~70°.

[0037] The left drilling arm drills upwards from the left end of the tunnel roof, and the right drilling arm drills upwards from the right end of the tunnel roof. The two holes meet and connect at the apex above the tunnel roof, forming a triangular through hole. The diameter of the through hole is generally 60~200mm.

[0038] like Figure 2 As shown, the top-cutting process is as follows: The wire saw machine feeds the diamond wire saw into the left end hole and leads it out through the right end hole, forming a closed-loop cutting circuit.

[0039] Start the wire saw machine and pull the diamond wire saw to continuously cut along the triangular through hole, cutting off the roof rock layer of the tunnel.

[0040] Example 2: Based on the above-mentioned integrated device of the tilting double-arm drilling machine and the mining wire saw, this embodiment of the invention discloses a method for horizontal coal cutting in underground coal mines based on double-arm triangular drilling, including drilling and horizontal coal cutting.

[0041] like Figure 3 As shown, the drilling process is as follows: The tilting double-arm drilling machine is moved to the working position in front of the coal face and leveled and fixed, and the drill arms are arranged horizontally to the left and right.

[0042] The positions of the boreholes at the left and right ends are determined according to the coal cutting range, and the spacing between the boreholes is generally 1~10m.

[0043] The left drill arm tilts to the right front at a preset angle, and the right drill arm tilts to the left front at a preset angle, forming a horizontal triangular layout. The tilt angle of the drill arms is generally 20~70°.

[0044] The left drill arm drills forward from the left end of the coal face, and the right drill arm drills forward from the right end of the coal face. The two holes meet and connect at the front apex of the coal face, forming a triangular through hole. The diameter of the through hole is generally 60~200mm.

[0045] like Figure 4 As shown, the horizontal coal cutting process is as follows: The wire saw machine feeds the diamond wire saw into the left end hole and leads it out through the right end hole, forming a closed-loop cutting circuit.

[0046] Start the wire saw machine and pull the diamond wire saw to continuously cut along the triangular through hole to cut off the coal seam.

[0047] Example 3 differs from Example 2 in that, when gas depressurization is required, the wire saw is started, and the diamond wire saw is pulled to cut the coal seam in a small range to form a groove, release gas, increase permeability and reduce the risk of outburst.

[0048] The present invention has been described above with reference to the preferred embodiments shown in the accompanying drawings. However, it will be readily understood by those skilled in the art that the scope of protection of the present invention is obviously not limited to these specific embodiments. Without departing from the principles of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will all fall within the scope of protection of the present invention.

Claims

1. A method for cutting coal in a coal mine roadway based on double-arm triangular punching, characterized in that, include: (1) Cutting the roof of the tunnel; The tilting double-arm drilling machine can be moved to the working position below the roadway roof and leveled and fixed, and the drilling arms are arranged vertically to the left and right. Determine the positions of the drill holes at both ends based on the cut-off area; The left drill arm tilts to the upper right at a preset angle, and the right drill arm tilts to the upper left at a preset angle, forming a vertical triangle layout; The left drilling arm drills upward from the left end of the tunnel roof, and the right drilling arm drills upward from the right end of the tunnel roof. The two holes meet and connect at the apex above the tunnel roof, forming a triangular through hole. The wire saw machine feeds the diamond wire saw into the left end hole and leads it out through the right end hole, forming a closed-loop cutting circuit. Start the wire saw machine and pull the diamond wire saw to continuously cut along the triangular through hole, cutting off the roof rock layer of the tunnel; (2) Horizontal coal cutting; The tilting double-arm drilling machine is moved to the working position in front of the coal wall and leveled and fixed, and the drill arms are arranged horizontally from left to right. Determine the locations of the drill holes at both ends based on the coal cutting area; The left drill arm tilts to the right front at a preset angle, and the right drill arm tilts to the left front at a preset angle, forming a horizontal triangular layout; The left drill arm drills a hole forward from the left end of the coal wall, and the right drill arm drills a hole forward from the right end of the coal wall. The two holes meet and connect at the front apex of the coal wall, forming a triangular through hole. The wire saw machine feeds the diamond wire saw into the left end hole and leads it out through the right end hole, forming a closed-loop cutting circuit. Start the wire saw machine and pull the diamond wire saw to continuously cut along the triangular through hole to cut off the coal seam.

2. The method for coal mine roadway roof cutting and horizontal coal cutting based on double-arm triangular punching according to claim 1, characterized in that, When gas depressurization is needed, start the wire saw machine and pull the diamond wire saw to cut the coal seam in a small range to form a groove and release the gas.