A method and system for parallel mining and filling operations in a fully mechanized coal mining face.
By setting up an independent backfill template support behind the fully mechanized mining support, parallel operations of coal mining and backfilling are realized, solving the problem that coal mining and backfilling cannot be carried out in parallel in the existing technology, improving output and safety, and reducing costs.
Patent Information
- Application Number
- CN202611203923.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-10
- Publication Date
- 2026-11-17
AI Technical Summary
In existing backfilling mining operations, coal mining and backfilling cannot be carried out in parallel. Anchor mesh support and manual template sealing are required, resulting in large equipment investment, low output, and safety hazards.
An independent filling template support is set up behind the fully mechanized mining support. It is connected to the fully mechanized mining support through a traction device to achieve self-sealing of the template and expansion and contraction of the movable top beam. This allows the coal mining and filling processes to be carried out at different times, avoiding the need for anchor mesh support and manual sealing.
It enables fully parallel operation of coal mining and backfilling, increases single-face output, reduces equipment investment and labor costs, eliminates the risk of roof collapse and gas poisoning, and improves production efficiency.
Smart Images

Figure CN123109657A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of coal mine backfilling mining technology, specifically to a method and system for parallel operation of coal mining and paste backfilling in fully mechanized coal mining faces. Background Technology
[0002] In the process of underground coal mining, in order to protect surface buildings, farmland and ecological environment, it is necessary to mix solid waste such as gangue and fly ash with cement and water to form a paste, which is then pumped to the goaf for filling. This method is called the post-frame paste filling mining method.
[0003] The existing backfilling mining mainly uses hydraulic backfilling supports, which involves installing templates (isolation plates) at the tail end of the fully mechanized mining support's shield beam. However, the existing technology has the following drawbacks: (i) Roof anchor mesh support is required. The templates of the existing backfilling supports do not have independent support functions. To ensure a safe passage for workers to enter the back of the support for template sealing operations, it is necessary to drill holes in the coal seam roof, install anchor cables, and hang metal mesh (the first generation of backfilling supports supports the front of the support, and the second generation supports the rear of the support). (ii) Template sealing relies on manual operation. There are gaps between adjacent templates of the existing backfilling supports, which do not have self-sealing functions. Workers need to enter the goaf to seal them with non-woven fabric, plastic woven fabric, etc. (iii) Coal mining and backfilling cannot be carried out in parallel. After the paste backfilling is completed, the backfilling support must wait for the paste to solidify (8-10 hours). Coal mining cannot be carried out during this period, resulting in low output per face. (iv) Large equipment investment and low output. It is necessary to purchase new hydraulic backfilling supports.
[0004] In existing filling technologies, the movement of the formwork depends on the movement of the support, resulting in a linkage problem between the support and the formwork, and preventing complete independence between the formwork and the coal mining support. Existing technologies have failed to solve the fundamental problem of the mutual constraints and inability to operate in parallel between coal mining and filling processes. Summary of the Invention
[0005] The purpose of this invention is to provide a method and system for parallel mining and backfilling operations in fully mechanized coal mining faces, aiming to solve the technical problems that coal mining and backfilling cannot be carried out in parallel in existing backfilling mining, and that anchor mesh support and manual template sealing are required, so as to realize the complete parallel operation of coal mining and backfilling.
[0006] According to one objective of the present invention, the present invention provides a method for parallel mining and filling operations in a fully mechanized coal mining face. In the fully mechanized coal mining face, a filling template support, independent of the fully mechanized mining support, is installed behind the fully mechanized mining support. The filling template support is connected to the fully mechanized mining support via a traction device. The method includes the following steps: Step 1: The coal mining machine cuts the coal seam; Step 2: The fully mechanized mining support moves forward with the coal mining machine to cut the coal seam and support the coal seam roof and coal wall. After the fully mechanized mining support moves forward, the movable top beam of the filling template support extends outward synchronously to support the empty roof area formed after the fully mechanized mining support moves. At this time, the previously filled paste is in the initial setting period, and the filling template support remains stationary. Step 3: Repeat steps 1 and 2 until the coal mining machine completes the predetermined number of cutting cuts; Step 4: As the fully mechanized mining support moves forward again, the traction device pulls the filling template support forward. The top beam of the filling template support supports the roof behind the fully mechanized mining support. The movable top beam retracts until the filling template support is in place. As the filling template support moves forward, the template detaches from the preliminarily solidified filling material. Step 5: Seal the template; Step 6: After the template is sealed, paste filling operation is carried out in the goaf area behind the template; Step 7: While the paste filling operation is underway, the coal mining machine continues to cut the coal seam for the next coal mining cycle.
[0007] Furthermore, the filling template support is a self-sealing filling template support, comprising: The support body serves as a support frame and moving carrier for the template, and also supports the top plate between the fully mechanized mining support and the template. A template, located on the rear side of the support body, is used to isolate the goaf to be filled. The movable top beam is set on the top of the support body and can extend outward and retract inward to support the empty roof area after the fully mechanized mining support is moved. A traction device, connecting the filling template support and the fully mechanized mining support, is used to pull the filling template support forward when the fully mechanized mining support moves forward; A hydraulic sealing system, installed on the template, is used to mechanically seal the gaps between the template and the coal seam roof, between the template and the coal seam floor, and between adjacent templates.
[0008] Furthermore, the filling template support is the same width and height as the fully mechanized mining support.
[0009] Furthermore, the traction device is a hydraulic jack, one end of which is connected to the base of the filling template support, and the other end is connected to the base of the fully mechanized mining support via a chain.
[0010] Furthermore, the template is an interlocking hydraulic support type anti-leakage template.
[0011] Furthermore, the hydraulic sealing system includes a top plate sealing device, a bottom plate sealing device, and a side seam sealing device.
[0012] Furthermore, in step one, the cutting depth of the coal mining machine in one pass is 0.8 meters.
[0013] Furthermore, the predetermined number of cutting cuts is 3 to 6, and the total cutting depth is 2.4 meters to 4.8 meters.
[0014] Furthermore, in step five, the template is mechanically sealed by the hydraulic sealing system, and the sealing areas include the gaps between the template and the coal seam roof, between the template and the coal seam floor, and between adjacent templates.
[0015] A coal mine fully mechanized mining face parallel mining and filling operation system for the above-mentioned coal mine fully mechanized mining face parallel mining operation method includes: Fully mechanized mining supports are installed at the coal mining face to support the roof and coal face. A self-sealing filling template support is provided behind the fully mechanized mining support; A traction device connects the fully mechanized mining support to the filling template support; The paste filling system is installed under the protective beam of the filling template support and is used to fill the goaf behind the template with paste. The coal mining machine is located in front of the fully mechanized mining support and is used to cut the coal seam.
[0016] The technical solution of this invention, through the sequential extension of the filling template support and its movable top beam independently set behind the fully mechanized mining support, keeps the template support stationary during the initial setting period of the paste while the fully mechanized mining support continues to move forward to cut coal, forming a multi-cutting cycle before uniformly moving the filling template support forward. This allows the coal mining and filling processes to be carried out in parallel with staggered time. It eliminates the need for roof anchoring to eliminate the risk of roof collapse, and also eliminates the need for workers to enter the goaf for manual template sealing to prevent gas poisoning. Furthermore, it ensures that the separation of the template support from the filling body occurs after the paste has initially set, ensuring the stability of the filling body and preventing slurry collapse. Thus, it achieves completely parallel operation of coal mining and filling, significantly improving the coal production time and single-face output of the fully mechanized mining face. Attached Figure Description
[0017] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0018] Figure 1 This is a schematic diagram illustrating the connection relationship between the fully mechanized mining support and the filling template support in an embodiment of the present invention; Figure 2This is a schematic diagram of the structure of the filling template support according to an embodiment of the present invention; Figure 3 This is a schematic diagram of the process flow according to an embodiment of the present invention.
[0019] In the diagram: 1. Support body; 2. Template; 3. Movable top beam; 4. Hydraulic cylinder; 5. Filling pipe; 6. Placing pipe; 7. Coal mining machine; 8. Scraper conveyor; 9. Workers; 10. Fully mechanized mining support; 11. Filling template support; 12. Traction device. Detailed Implementation
[0020] The technical solution of the present invention will be clearly and completely described below with reference to the embodiments. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0021] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," and "counterclockwise," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limiting this invention.
[0022] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the stated features. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified. Furthermore, the terms "installed," "connected," and "linked" should be interpreted broadly; for example, they may refer to a fixed connection, a detachable connection, or an integral connection; they may refer to a mechanical connection or an electrical connection; they may refer to a direct connection or an indirect connection through an intermediate medium; and they may refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0023] Example 1 This embodiment provides a method and system for parallel mining and filling operations in a fully mechanized coal mining face. The equipment arrangement in this parallel mining and filling system is as follows: Figure 1As shown, in a fully mechanized coal mining face, a coal mining machine 7 is installed at the working face, a scraper conveyor 8 is installed in conjunction with the coal mining machine 7, and a fully mechanized mining support 10 is arranged at the working face to support the roof. Behind the fully mechanized mining support 10, a filling template support 11 is independently installed. The filling template support 11 is independent of the fully mechanized mining support 10 and is connected to the base of the fully mechanized mining support 10 via a traction device 12 (in this embodiment, a hydraulic jack with a chain). During use, the filling template support 11 is also equipped with a filling pipe 5 and a material distribution pipe 6, through which paste is filled into the goaf area behind the filling template support 11.
[0024] The filling template support 11 is the same width and height as the fully mechanized mining support 10. The filling template support 11 has the following functions: (1) it serves as a support frame and moving carrier for the template (isolation plate); (2) it provides temporary support for the top plate between the fully mechanized mining support and the template, forming a safe passage for workers 9, which facilitates the movement of personnel.
[0025] The specific structure of the filling template support is as follows: Figure 2 As shown, the self-sealing filling template support 11 includes a support body 1, a template 2, a movable top beam 3, a traction device 12, and a hydraulic sealing system.
[0026] The support body 1 is a frame structure, consisting of a base, columns, and a top beam, serving as a support frame for the formwork and a moving carrier. The width of the support body 1 is the same as the width of the fully mechanized mining support, and the height is the same as the height of the fully mechanized mining support 10, to ensure seamless connection with the fully mechanized mining support 10 in terms of support range and support height.
[0027] Template 2 is located on the rear side of the support body 1 and is used to isolate the goaf to be filled. Template 2 is an interlocking hydraulic prop type anti-leakage template, which is composed of multiple template units arranged along the working face direction, and adjacent template units are connected by an interlocking mechanism.
[0028] The movable top beam 3 is located on top of the support body 1 and can extend outward and retract inward. The extension and retraction of the movable top beam 3 is driven by a hydraulic cylinder 4, and its extension length matches the cutting depth of the coal mining machine in one pass (0.8 meters in this embodiment). The movable top beam is used to support the unsupported roof area formed after the fully mechanized mining support is moved.
[0029] The traction device 12 connects the filling template support 11 and the fully mechanized mining support 10, and is used to pull the filling template support forward when the fully mechanized mining support moves forward. The traction device 12 is a hydraulic jack, one end of which is connected to the base of the filling template support, and the other end is connected to the base of the fully mechanized mining support via a chain. When the fully mechanized mining support moves forward, the hydraulic jack retracts, pulling the filling template support forward synchronously via the chain.
[0030] The hydraulic sealing system is installed on template 2 and includes a top sealing device, a bottom sealing device, and a side seam sealing device. The top sealing device is located between the top of the template and the coal seam roof, the bottom sealing device is located between the bottom of the template and the coal seam floor, and the side seam sealing devices are located at the gaps between adjacent template units. Each sealing device consists of a sealing groove driven by a hydraulic jack and a rubber sealing gasket installed in the sealing groove. The hydraulic system drives the sealing groove to extend outward, so that the rubber sealing gasket is tightly attached to the coal seam roof, coal seam floor, or the surface of an adjacent template, achieving a mechanical seal.
[0031] In another embodiment, the telescopic drive of the movable top beam can also be achieved using a pneumatic cylinder or an electric actuator instead of a hydraulic cylinder. In yet another embodiment, the traction device can also use a wire rope in conjunction with a winch, or a rack and pinion drive mechanism.
[0032] like Figure 3 As shown, the coal mining and backfilling cycle of the parallel mining and backfilling operation method in the fully mechanized coal mining face includes the following steps: (I) Coal cutting and support shifting stage The first step involves the coal mining machine 7 cutting the coal seam. The cutting depth of the coal mining machine in one pass is one mining step distance, preferably 0.8 meters. In other embodiments, the mining step distance can also be 0.6 meters or other suitable values. The coal mining machine travels back and forth along the working face, completing one cut per stroke.
[0033] The second step involves the fully mechanized mining support 10 moving forward with the coal seam cut by the coal mining machine (this can be controlled manually by hydraulic valves or automatically by an intelligent control system) to support the coal seam roof and walls. After the fully mechanized mining support moves forward, a gap-roof area with a width of one mining step is formed behind it. At this time, the hydraulic valves are operated to cause the movable top beam of the filling template support 11 to extend outward synchronously by one mining step to support this gap-roof area. Meanwhile, the previously filled paste is in its initial setting stage, and the filling template support 11 remains stationary, waiting for the paste to solidify.
[0034] Similarly, with each forward movement of the fully mechanized mining support, the movable top beam of the filling template support extends outward in sequence to support the empty roof area.
[0035] (ii) Template forwarding stage The third step is to repeat the above coal cutting and frame shifting process until the coal mining machine cuts the coal seam for the last time (the total cutting depth is the predetermined value, that is, the coal mining step distance multiplied by the number of cutting blades).
[0036] Fourth, as the fully mechanized mining support 10 moves forward, the hydraulic valve is operated to cause the traction device 12 to pull the filling template support 11 forward. The top beam of the filling template support 11 seamlessly supports the roof behind the fully mechanized mining support. At this time, the movable top beam that has been extended from the top of the filling template support retracts until the filling template support moves into place. As the filling template support moves forward, the template detaches from the initially solidified filling material (at this time, the filling material has completed its initial solidification and has a certain load-bearing capacity).
[0037] The minimum total cutting depth is 2.4 meters, and the maximum is 4.8 meters. Preferably, the total cutting depth is 2.4 meters (corresponding to 3 cuts), 3.2 meters (corresponding to 4 cuts), 4.0 meters (corresponding to 5 cuts), or 4.8 meters (corresponding to 6 cuts).
[0038] Template sealing stage Fifth, under the protective beam of the filling template support 11, operate the hydraulic sealing system to mechanically seal the template. The specific sealing operation is as follows: Start the hydraulic system, causing the hydraulic jacks of the roof sealing device to drive the sealing groove seat upwards, so that the rubber sealing gasket is tightly against the coal seam roof; cause the hydraulic jacks of the floor sealing device to drive the sealing groove seat downwards, so that the rubber sealing gasket is tightly against the coal seam floor; cause the hydraulic jacks of the side seam sealing device to drive the sealing groove seat to extend towards the adjacent template, so that the rubber sealing gasket is tightly against the surface of the adjacent template. Through the above operations, complete sealing of the gaps between the template and the coal seam roof, between the template and the coal seam floor, and between adjacent templates is achieved.
[0039] After sealing is completed, workers can conduct a safety inspection under the protective beam of the filling template support to confirm the sealing effect. At the same time, routine maintenance is carried out on the coal mining face (this procedure is mandatory for coal mining faces that are not filled).
[0040] (iv) Parallel backfilling and coal mining stage Step 6: After the template is sealed, paste filling is carried out in the goaf area behind the template through filling pipe 3 and placing pipe 4. The paste filling material is formed by mixing solid waste (including but not limited to one or more of gangue, slag, tailings, and fly ash) with cement and water in a certain proportion. During filling, the paste is pumped from the ground to the underground through the filling pipeline system and evenly distributed in the goaf area through the placing pipe.
[0041] In the seventh step, while the backfilling operation is underway, the maintenance of the coal mining face is also completed. The coal mining machine continues to cut the coal seam for the next mining cycle, achieving completely parallel operation of coal mining and backfilling.
[0042] Example 2 This embodiment is based on the method and system of Embodiment 1. Building upon Embodiment 1, this embodiment applies the self-sealing filling template support and method of this invention to a fully mechanized mining face in a medium-thick coal seam (3.5 meters thick). The coal mining machine drum has a cutting depth of 0.8 meters, making four consecutive cuts in one pass, for a total cutting depth of 3.2 meters. The paste mix ratio is: gangue:fly ash:cement:water = 45:25:15:15 (by weight), the filling pressure is 4-6 MPa, and the paste slump is 180-220 mm.
[0043] In actual operation, coal mining and backfilling were carried out in parallel, with a daily output of 3,000 tons per face and an annual output of approximately 900,000 tons. No anchor mesh support or manual formwork sealing was required, reducing the number of workers by 15 per shift and lowering overall costs by approximately 40%. The formwork sealing effect was excellent, with no grout leakage occurring.
[0044] Example 3 This embodiment is based on the method and system of Embodiment 1. Building upon Embodiment 1, this embodiment applies the self-sealing filling template support and method of this invention to a fully mechanized mining face in another medium-thick coal seam (2.8 meters thick). The coal mining machine drum has a cutting depth of 0.8 meters, making 6 consecutive cuts in one pass, for a total cutting depth of 4.8 meters. The paste mix ratio is: gangue:fly ash:cement:water = 50:20:12:18 (by weight), the filling pressure is 5-8 MPa, and the paste slump is 160-200 mm.
[0045] In actual operation, the annual output reached 1 million tons, the filling and extraction cycle was stable, and the mechanical seal of the template was reliable.
[0046] Example 4 This embodiment is based on the method and system of Embodiment 1. Building upon Embodiment 1, this embodiment applies the self-sealing filling template support and method of this invention to a fully mechanized mining face in a medium-thick coal seam (4.0 meters thick). The coal mining machine drum has a cutting depth of 0.8 meters, making three consecutive cuts in one pass, for a total cutting depth of 2.4 meters. The paste ratio is: gangue:cement:water = 60:20:20 (by weight, without adding fly ash), and the filling pressure is 3-5 MPa.
[0047] In actual operation, the annual output reached 750,000 tons. This embodiment verifies the effectiveness of the invention near the lower limit of the total cutting depth (2.4 meters), proving that the invention can achieve parallel mining and filling operations under different cutting depth conditions.
[0048] Example 5. This embodiment is based on the method and system of Embodiment 1. Building upon Embodiment 1, this embodiment applies the self-sealing filling template support and method of this invention to a fully mechanized mining face in a medium-thick coal seam (3.2 meters thick). The coal mining machine drum has a cutting depth of 0.8 meters, making 5 consecutive cuts in one pass, for a total cutting depth of 4.0 meters. The paste ratio is: coal gangue: fly ash: cement: water = 40:30:10:20 (by weight), and the filling pressure is 4-7 MPa.
[0049] In actual operation, the annual output reached 850,000 tons. This embodiment verifies the effectiveness of the invention near the median total cutting depth (4.0 meters).
[0050] Example 6 This embodiment is based on the method and system of Embodiment 1. Building upon Embodiment 1, this embodiment applies the self-sealing filling template support and method of this invention to a fully mechanized mining face in a thin coal seam (1.8 meters thick). The height of the filling template support is adjusted to 1.8 meters according to the coal seam thickness, matching the height of the fully mechanized mining support. The cutting depth of the coal mining machine drum is 0.6 meters (using a 0.6-meter cutting depth cutting drum), with four continuous cuts per pass, resulting in a total cutting depth of 2.4 meters. The paste ratio is: gangue:fly ash:cement:water = 45:25:15:15 (by weight), and the filling pressure is 3-5 MPa.
[0051] In actual operation, the daily output per face reached 1,800 tons, with an annual output of approximately 550,000 tons. This embodiment verifies the applicability of the invention under different coal mining step distances (0.6 meters) and different coal seam thicknesses (thin coal seams).
[0052] In the above embodiments, the solid waste in the paste filling material can be any one or a combination of gangue, slag, tailings, and fly ash. Ordinary Portland cement is used. The amount of water is adjusted according to the paste's fluidity requirements to control the paste slump within the range of 160-220 mm. The initial setting time of the paste is controlled within 4-8 hours (final setting time controlled within 8-12 hours) to meet the time requirements of the mining-filling cycle.
[0053] In addition to the above-described embodiments, the present invention may also employ the following alternative methods: Flexibility in coal mining step distance: The cutting depth of the coal mining machine's cutting drum is not limited to 0.8 meters; it can also be 0.6 meters or other conventional cutting depths. Correspondingly, the extension length of each movement of the movable top beam of the filling template support remains consistent with the coal mining step distance.
[0054] Variations in total cutting depth: The total cutting depth is not limited to 2.4 meters to 4.8 meters and can be adjusted appropriately according to the conditions of the coal seam roof and the requirements of the filling process. The greater the total cutting depth, the larger the single filling volume and the higher the filling efficiency, but the higher the requirements for the sealing performance of the template and the initial setting time of the paste.
[0055] Variations in traction devices: Traction devices are not limited to hydraulic jacks with chains; they can also use hydraulic cylinders with wire ropes, rack and pinion mechanisms, screw and nut mechanisms, and other linear drive devices.
[0056] Variations in the drive method of the movable top beam: The extension and retraction drive of the movable top beam is not limited to hydraulic cylinders, but can also use pneumatic cylinders, electric push rods or mechanical linkage mechanisms.
[0057] Variations in template sealing devices: The sealing components in a hydraulic sealing system are not limited to rubber gaskets; polyurethane gaskets, metal sealing rings, or other materials with elasticity and sealing properties can also be used.
[0058] Flexibility of paste materials: Solid waste in paste filling materials can be selected according to the actual conditions of the mining area, and is not limited to gangue and fly ash, but can also include slag, tailings, furnace slag, etc.
[0059] This invention adds an independent filling template support to the fully mechanized mining support in a longwall longwall mining face of a coal mine. It enables continuous coal mining in the front and filling of paste in the back, which solves the shortcomings of the existing paste filling mining method after the support. It realizes continuous coal mining in the front and paste filling in the back, ensuring safety, improving efficiency and increasing coal production. Compared with the traditional method, two process steps are eliminated: (1) the workers do not need to drill holes, install anchor cables and hang nets on the roof slab in front of or behind the support; (2) the workers do not work in the goaf area where gas is prone to emerge, reducing the template sealing and sealing process.
[0060] This invention reduces the labor intensity of workers and ensures their life, health and safety: (1) Workers do not work under the exposed coal seam roof, eliminating the risk of roof collapse and injury; (2) Workers do not work in the goaf, eliminating the risk of gas poisoning.
[0061] This invention reduces material consumption and lowers material costs: (1) saves support materials, such as drilling rigs, drilling tools, anchor cables (special steel wire ropes), metal mesh, etc.; (2) saves sealing materials, such as non-woven fabric (plastic woven fabric), straw mats, etc.
[0062] The present invention reduces ineffective time and increases coal mining production time: (1) drilling and netting time, 12-16 hours; (2) sealing and plugging time after template, 12-16 hours; (3) waiting time for the paste to solidify on the support, 8-10 hours.
[0063] This invention reduces labor and saves on labor costs: because it eliminates two processes, each process requires 15-20 workers for 8 hours.
[0064] This invention enables coal mining in the front and back filling in the rear without affecting each other, and the fully mechanized mining support does not need to wait for the paste to solidify; it can utilize the original fully mechanized hydraulic support, reducing equipment investment; it eliminates the need to cover, block, and seal templates (isolation plates) with non-woven fabric, straw, etc.; the input-output ratio is reasonable: the input is low, and it can mainly increase coal production by 3-4 times the original output (200,000-300,000 tons / year), with an annual output of 600,000-1,200,000 tons; Compared with the prior art, the present invention has the following beneficial effects: This invention eliminates the anchor mesh support process: the filling template support has an independent support function, eliminating the need to drill holes in the top slab, install anchor cables, and hang nets, thus eliminating the risk of roof collapse and ensuring personnel safety.
[0065] This invention eliminates the manual formwork sealing process: the formwork has a hydraulic self-sealing function, eliminating the need for manual entry into the goaf to seal it with non-woven fabric, thus eliminating the risk of gas poisoning.
[0066] This invention enables parallel operation of coal mining and backfilling: the fully mechanized mining support and the backfilling template support are independent of each other, and the backfilling operation and the coal mining operation can be carried out simultaneously without waiting for the paste to solidify.
[0067] This invention can utilize existing fully mechanized hydraulic supports: there is no need to replace the entire set of filling hydraulic supports, greatly reducing equipment investment.
[0068] This invention significantly increases coal production: annual output can reach 600,000 to 1.2 million tons, which is 3 to 4 times the current output.
[0069] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for parallel mining and filling operations in a fully mechanized coal mining face, characterized in that, In a fully mechanized coal mining face, a filling template support, independent of the fully mechanized mining support, is installed behind the fully mechanized mining support. The filling template support is connected to the fully mechanized mining support via a traction device. The method includes the following steps: Step 1: The coal mining machine cuts the coal seam; Step 2: The fully mechanized mining support moves forward with the coal mining machine to cut the coal seam and support the coal seam roof and coal wall. After the fully mechanized mining support moves forward, the movable top beam of the filling template support extends outward synchronously to support the empty roof area formed after the fully mechanized mining support moves. At this time, the previously filled paste is in the initial setting period, and the filling template support remains stationary. Step 3: Repeat steps 1 and 2 until the coal mining machine completes the predetermined number of cutting cuts; Step 4: As the fully mechanized mining support moves forward again, the traction device pulls the filling template support forward. The top beam of the filling template support supports the roof behind the fully mechanized mining support. The movable top beam retracts until the filling template support is in place. As the filling template support moves forward, the template detaches from the preliminarily solidified filling material. Step 5: Seal the template; Step 6: After the template is sealed, paste filling operation is carried out in the goaf area behind the template; Step 7: While the paste filling operation is underway, the coal mining machine continues to cut the coal seam for the next coal mining cycle.
2. The method for parallel mining and filling operations in a fully mechanized coal mining face according to claim 1, characterized in that: The filling template support is a self-sealing filling template support, comprising: The support body serves as a support frame and moving carrier for the template, and also supports the top plate between the fully mechanized mining support and the template. A template, located on the rear side of the support body, is used to isolate the goaf to be filled. The movable top beam is set on the top of the support body and can extend outward and retract inward to support the empty roof area after the fully mechanized mining support is moved. A traction device, connecting the filling template support and the fully mechanized mining support, is used to pull the filling template support forward when the fully mechanized mining support moves forward; A hydraulic sealing system, installed on the template, is used to mechanically seal the gaps between the template and the coal seam roof, between the template and the coal seam floor, and between adjacent templates.
3. The method for parallel mining and filling operations in a fully mechanized coal mining face according to claim 2, characterized in that: The filling template support is the same width and height as the fully mechanized mining support.
4. The method for parallel mining and filling operations in a fully mechanized coal mining face according to claim 2, characterized in that: The traction device is a hydraulic jack, one end of which is connected to the base of the filling template support, and the other end is connected to the base of the fully mechanized mining support via a chain.
5. The method for parallel mining and filling operations in a fully mechanized coal mining face according to claim 2, characterized in that: The template is an interlocking hydraulic support type anti-leakage template.
6. The method for parallel mining and filling operations in a fully mechanized coal mining face according to claim 2, characterized in that: The hydraulic sealing system includes a top plate sealing device, a bottom plate sealing device, and a side seam sealing device.
7. The method for parallel mining and filling operations in a fully mechanized coal mining face according to any one of claims 1-6, characterized in that: In step one, the coal mining machine cuts to a depth of 0.8 meters in a single pass.
8. The method for parallel mining and filling operations in a fully mechanized coal mining face according to any one of claims 1-6, characterized in that: The predetermined number of cutting cuts is 3 to 6, and the total cutting depth is 2.4 meters to 4.8 meters.
9. The method for parallel mining and filling operations in a fully mechanized coal mining face according to any one of claims 2-6, characterized in that: In step five, the template is mechanically sealed by the hydraulic sealing system. The sealing areas include the gaps between the template and the coal seam roof, between the template and the coal seam floor, and between adjacent templates.
10. A coal mine fully mechanized mining face parallel mining and filling operation system based on the coal mine fully mechanized mining face parallel mining operation method according to any one of claims 1-6, characterized in that, include: Fully mechanized mining supports are installed at the coal mining face to support the roof and coal face. A self-sealing filling template support is provided behind the fully mechanized mining support; The traction device connects the fully mechanized mining support to the filling template support; The paste filling system is installed under the protective beam of the filling template support and is used to fill the goaf behind the template with paste. The coal mining machine is positioned in front of the fully mechanized mining support and is used to cut the coal seam.