A Step-by-Step Mining Method for Underground Collapse Mines Based on Moving-Mount Assisted Filling
The mobile mold-assisted filling method solves the problems of large filling material usage, high cost, long cycle and low recovery rate in underground collapse zone mining. It realizes safe and efficient ore recovery and equipment reuse, and reduces engineering costs.
Patent Information
- Application Number
- CN202611535060.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-30
- Publication Date
- 2026-11-17
AI Technical Summary
In underground mining in collapsed areas, existing backfilling and mining technologies suffer from problems such as large amounts of backfill material, high costs, long mining cycles, low recovery rates, and ore dilution, which are particularly difficult to solve effectively under complex geological conditions.
The auxiliary filling method based on the moving mold is adopted. By combining the guide rail assembly and the mold body, the moving mold is used to carry out step-by-step mining in the underground roadway. First, a filling body is formed in the goaf area to reduce the damage to the surrounding rock. The collapsed crushed ore is gradually recovered, and safe and efficient ore recovery is achieved through the mold roadway.
It effectively saves on the amount of filling material and cementing material, shortens the mining cycle, increases the recovery rate, reduces engineering costs, avoids ore dilution, and improves mining safety and equipment utilization.
Smart Images

Figure CN123109664A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of mining and relates to the backfilling and mining of crushed ore in underground collapsed areas of mines. Specifically, it is a step-by-step mining method for underground collapsed mines based on moving mold-assisted backfilling. Background Technology
[0002] As mining depth increases, some mining areas collapse due to geological structures, blasting disturbances, and ground pressure activity. Within these collapse zones, the rock mass is loose and fractured, and the stress field is disordered. Conventional mining methods pose high safety risks, making it difficult to recover large amounts of residual ore resources and creating safety threats to subsequent mining operations. Backfilling mining technology uses backfill as an artificial support structure to manage ground pressure while recovering residual ore resources from collapse zones. It is an important technical means for resource utilization and disaster prevention in complex and fractured mining areas.
[0003] Domestic and international scholars have conducted extensive research on backfilling and mining in collapsed areas. On one hand, numerical simulations are used to analyze the coupling effect between the backfill and the surrounding rock under fractured rock conditions, exploring the influence of approach size, backfill strength, and excavation sequence on ground pressure distribution, and optimizing the mining and backfilling timing. On the other hand, considering the mixed nature of materials in collapsed areas, the backfill material ratio is optimized to improve the slurry's resistance to segregation and bleeding, preventing slurry from seeping into collapsed fissures and causing material waste and backfill quality defects. In engineering practice, this technology has been applied in iron, copper, and other metal mine collapsed ore recovery projects, showing significant effects in reducing collapse risk and improving resource recovery rates.
[0004] Given the engineering characteristics of the collapse area, the current mainstream technology is the access-type isolation and backfilling mining. The core idea of access-type isolation and backfilling mining is to divide the large-scale collapse body into several small independent mining units, construct isolation retaining walls to separate each mining access route; excavate a single access route in a predetermined order, and immediately implement backfilling after ore extraction. Relying on the solidified backfill body to form a continuous artificial support structure, it constrains the deformation of the fractured surrounding rock and prevents the further expansion of the collapse range.
[0005] Approach-type isolation mining, through zoned isolation, segmented excavation, and ongoing backfilling, achieves coordinated management of residual ore resources in collapse zones and ground pressure hazards, making it a crucial technology for handling high-risk fractured mining areas. Compared to open-cut mining, backfill can constrain fractured rock masses and inhibit the continued expansion of the collapse area; compared to conventional backfilling mining, collapse zone mining places greater emphasis on early roof detection, pretreatment of fractured rock masses, and stability design of isolation retaining walls.
[0006] Overall, the backfilling and mining technology provides a feasible solution for the recovery of residual ore in underground collapse areas and the management of ground pressure disasters, taking into account resource recovery, underground disaster prevention and control and mine ecological protection.
[0007] Due to the fractured and loose rock mass and complex geological conditions in the collapse area, the engineering cost of the mining process is relatively high, and it faces problems such as secondary collapse of the surrounding rock, leakage of gangue, and loss of filling slurry.
[0008] This is mainly reflected in the following aspects: (1) The boundaries of the collapse zone and the distribution of the fractured rock mass are difficult to detect accurately, and the geological model has great uncertainty; (2) The stability control of the retaining wall under the fractured surrounding rock is difficult; (3) The introduction of filling material leads to ore depletion; (4) The amount of filling material used is large, resulting in high mining costs in the collapsed area; (5) The mining cycle is long and the mining rate is low.
[0009] Overall, while backfilling mining technology provides a feasible solution for recovering residual ore in underground collapse areas and managing ground pressure disasters, balancing resource recovery, underground disaster prevention and control, and mine ecological protection, further technological development is needed in areas such as suppressing ore dilution, reducing backfilling mining costs, and improving recovery rates to meet the requirements for safe and efficient application under complex mining conditions. Summary of the Invention
[0010] The purpose of this invention is to solve the above-mentioned technical problems and provide a method for step-by-step mining of underground collapsed mines based on moving mold-assisted filling, which can effectively save the amount of filling material and cementing material, significantly reduce mining costs, shorten the mining cycle, and improve the mining rate.
[0011] This invention relates to a step-by-step mining method for underground collapsed mines based on mobile mold-assisted filling, which includes underground roadways, collapsed areas caused by loosening of surrounding rock, and collapsed crushed ore. First, ore extraction equipment is used to mine the collapsed crushed ore near the roadway entrance to form a goaf area. Then, mobile mold-assisted filling is used to mine the collapsed crushed ore outside the goaf area in a step-by-step mining manner.
[0012] The moving mold includes a guide rail assembly and a mold body. The lower end of the mold body is slidably engaged with the guide rail assembly. The mold body is formed by at least one mold unit and a mold tail connected in a detachable manner. The front end of the first mold unit is equipped with a baffle, and an outer airbag is provided on the outside of the baffle. Multiple fins are provided on both sides of the top surface of the mold unit. A semi-annular airbag is provided on the outer side of the mold tail along the circumferential direction.
[0013] The mobile mold-assisted filling step-by-step mining method is as follows: ① Install at least one set of goaf filling pipes by opening a hole at the top of the goaf area above the moving formwork. Each set has two pipes, and both filling pipes are connected to the filling sand bin to transport the filling material. The outlets of the two goaf filling pipes are spaced 4-5 meters apart.
[0014] ② Lay U-shaped guide rail components from inside the roadway into the collapsed crushed ore area to be mined, with the end of the guide rail components reaching the collapsed crushed ore area to be mined; ③ On the U-shaped guide rail assembly in the tunnel, the first section of the mold unit is assembled to form the mold head. The mold head and the U-shaped guide rail assembly are in contact through rolling elements, and the mold body moves along the U-shaped guide rail by the rolling of the rolling elements. ④ Advance the first module unit along the U-shaped guide rail assembly to the area of collapsed crushed ore to be mined, and then connect the next module unit in sequence until the baffle of the first module unit reaches the area of collapsed crushed ore to be mined. Then connect the module tail to the end module unit to complete the on-site assembly of the moving module. The entire module tail is located in the roadway. ⑤ Build a partition wall on the side of the semi-annular airbag at the tail of the mold that is close to the roadway to seal the gap between the tail of the mold and the roadway wall; the partition wall is reserved with fixing holes for the insertion of the filling pipe at the top of the mold into the goaf. ⑥ Install the top filling pipe of the mold, extending through the top plate of the mold to the side of the collapsed crushed ore to be mined on the outer airbag cushion; slowly inject the full tailings slurry to fill the space between the outer airbag cushion and the collapsed crushed ore; when the liquid level of the injected full tailings slurry reaches the top of the moving mold, slowly pull back the top filling pipe of the mold, injecting full tailings slurry while pulling it back. The amount of full tailings slurry injected is 3-5 cubic meters per meter of moving mold length, until the end of the top filling pipe of the mold reaches the junction of the mold tail and the mold body, then stop dragging, continue to inject 2-3 cubic meters of full tailings slurry, stop grouting, pull out the top filling pipe of the mold, and seal the fixing hole; ⑦ After the fixing holes are sealed tightly, inflate the outer airbag to fill the gaps between the baffle and the ore wall, and between the baffle and the ground; inflate the bottom airbag strip to fill the gap between the lower edge of the outer airbag and the front end of the guide rail assembly; inflate the semi-circular airbag at the tail of the mold to seal the gap between the tail of the mold and the surrounding rock at the tunnel entrance, and between the tail of the mold and the partition wall. ⑧ The tailings slurry containing cementitious material is injected into the remaining goaf area through the goaf filling pipe to form a filling layer until the entire goaf area is filled. ⑨ After the filling material in the goaf area has reached the design strength, remove the partition wall on the outside of the mold tail, drag the moving mold into the roadway, remove the moving mold to form the mold roadway, and use the ore extraction equipment to mine the collapsed crushed ore near the mold roadway entrance with the help of the isolation support of the mold roadway. ⑩ Repeat steps ①-⑨ above for step-by-step mining until all collapsed ore fragments are recovered.
[0015] In the moving mold, the guide rail assembly includes two parallel U-shaped rails and multiple spheres located within the rails. The lower ends of both sides of the mold body are in contact with the spheres within the corresponding U-shaped rails. The two parallel U-shaped rails are detachably connected by multiple parallel fixed beams.
[0016] In the movable mold, the cross-section of the mold unit and the mold tail is arched, and they are all assembled from the top plate of the mold and the mold side plates on both sides, or directly from the mold side plates on both sides. The lower sections of the mold side plates on both sides are detachably connected by a bottom beam. A columnar airbag can be installed on the outside of the mold side plate. The bottom beam is detachably connected to the upper sections of the mold side plates on both sides by a support column.
[0017] In the moving mold, the outer edge of the outer airbag pad extends beyond the outer edge of the baffle, and the lower edge of the outer airbag pad extends to the front end of the cover rail assembly. The inflation tube of the outer airbag pad passes through the baffle and extends into the first section of the mold unit.
[0018] In the moving mold, the gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly is also filled with a bottom airbag strip. One end of the bottom airbag strip is fixed to the lower outer side of the baffle, and its inflation tube extends to the tail of the mold. The bottom airbag strip is inflated, and after inflation, it fills the gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly.
[0019] In the moving mold, the fins on both sides of the top surface of the mold unit have a triangular cross-section with the tip pointing upwards; at least two layers of semi-annular airbags are arranged circumferentially on the outer side of the mold tail, and their inflation tubes extend into the mold tail.
[0020] The outer periphery of the mold is entirely covered with geotextile, and the lower end of the geotextile extends to the ground and covers the guide rail assembly.
[0021] The solids content of the tailings slurry is 60-70 wt%, and the mass ratio of cementitious material to tailings slurry in the tailings slurry containing cementitious material is 1:4-5.
[0022] The implementation method of step 9, which utilizes a model roadway for mining, is as follows: ① With the help of the isolation and support of the mold roadway, the tailings layer inside the mold roadway and near the entrance of the mold roadway is stripped and transported out using shovel and ore removal equipment; ② Use shovel and conveyor equipment to shovel and convey crushed ore near the entrance of the mold roadway and send it to the screening unit; ③ The transported ore is screened through a screening unit to separate the tailings and ore.
[0023] Furthermore, the outlets of the two goaf filling pipes T6-5 are spaced 4-5 meters apart. The injected filling material falls on the goaf areas on both sides of the moving formwork, squeezing the previously injected tailings slurry from the edge of the goaf area and pushing it towards the periphery of the moving formwork. After the filling material is formed and reaches the design strength, it is conducive to the removal of the moving formwork. At the same time, it also increases the space of the formwork tunnel, which is convenient for the later installation of the moving formwork.
[0024] Furthermore, based on the relative position of the ore pile in the collapsed area and the roadway entrance, the amount of ore pile, and the surrounding environment of the goaf after some ore has been mined, mobile modules with different cross-sectional dimensions can be flexibly assembled.
[0025] For small collapsed ore piles more than 10 meters from the tunnel entrance, a movable formwork assembled from side panels is used. This reduces the arched cross-sectional size of the movable formwork, improving the flexibility and safety of its assembly, movement, and subsequent dismantling. Because the ore pile is far from the tunnel entrance, the formwork tunnel formed by a single filling is relatively long, and the amount of tailings slurry injected during filling is large. Using a movable formwork with a larger cross-sectional size would create a large formwork tunnel, reducing safety. Furthermore, a longer movable formwork increases the dragging force required to pull it into the tunnel. Reducing the formwork cross-sectional size reduces the required dragging force and improves operational stability.
[0026] Furthermore, due to the uncertainty of the collapse, there are local and scattered fragments of ore in the collapse area. If each of these fragments is filled with a moving mold, although the mining efficiency is higher and the mining cost is lower than that of traditional filling, it will reduce the overall mining efficiency.
[0027] For collapse zones containing both main collapsed ore piles and scattered small ore piles, the ends of the laid U-shaped guide rail assemblies reach the main collapsed ore piles. Based on the distribution of scattered small collapsed ore piles near the U-shaped guide rail assemblies, mold side plates with pipe installation holes are selected for assembling the moving mold.
[0028] The side panel of the formwork has 2-3 rows of pipe installation hole assemblies, arranged in a layout where the number of pipe installation hole assemblies gradually increases from the top row to the bottom row, with a total of 3-6 groups. Each group contains two holes arranged at the top and bottom. Each pipe installation hole assembly is equipped with a corresponding columnar airbag. One end of the columnar airbag is equipped with an inflation tube and a water inlet tube. The columnar airbag pierces the geotextile through the inflation tube and the water inlet tube, passes through the two holes arranged at the top and bottom, extends into the inside of the side panel of the formwork, and is fixed in a horizontal position by the pipe installation hole assembly. The columnar airbag is 1-2 meters long and 0.3-0.5 meters in diameter.
[0029] Based on the distance between the scattered ore piles and the U-shaped guide rail assembly, columnar airbags of different diameters and lengths are selected and installed on the outside of the mold side plate. The inflated columnar airbags and the tailings slurry trapped between the columnar airbags form a channel connecting the scattered ore piles after filling.
[0030] At the start of filling, water is first injected into the columnar airbags, with the water volume being 5-15% of the volume of the columnar airbags. Then, the airbags are inflated until the air pressure is 80% of the air pressure of the outer airbag cushion. After inflation, the end of the columnar airbags reaches or approaches the scattered collapsed ore piles. After the tailings slurry covers all the columnar airbags, the columnar airbags are inflated a second time until their air pressure is the same as that of the outer airbag cushion.
[0031] While the columnar airbag is being inflated a second time, tailings filling material containing cementitious material is injected into the collapse area until the entire collapse area is filled.
[0032] After the tailings filling material containing cementitious material solidifies to form a filling body and reaches the design strength, the air inlet pipe and water inlet pipe are removed from the moving formwork to drain the water accumulated in the columnar airbags. The moving formwork is then pulled out and dismantled, forming a formwork tunnel. The entire tailings layer in the formwork tunnel is cleaned, the columnar airbags are pulled out, and the entire tailings layer in the area of the columnar airbags is cleaned, forming a channel connecting the formwork tunnel to the scattered fragmented ore piles for the mining of scattered fragmented ore.
[0033] Compared with the prior art, the present invention has the following beneficial effects: 1. Saves on filling material and cementing material usage, reducing filling costs: Traditional mining of collapsed crushed ore involves filling the entire collapsed area. During mining, a roadway must be excavated within the filling body to enter the collapsed crushed ore area. This invention uses a moving mold to assist filling. The moving mold occupies the space of the roadway before filling, and the filling material is only injected into the goaf area above the moving mold. After the moving mold is removed, the mold roadway is formed directly, eliminating the need to excavate a separate roadway within the filling body. This saves on the amount of filling material used in the mold roadway area, correspondingly reducing the amount of cementing material used and lowering the cost of filling and mining.
[0034] 2. Eliminates the need for re-excavation of tunnels, reducing solid waste. Traditional methods require excavating tunnels again within the filling body to enter the collapsed ore area, generating a large amount of waste material that becomes underground solid waste. This invention can directly form a tunnel after removing the movable formwork, eliminating the need for re-excavation, thus saving construction costs and time associated with tunnel excavation, while also reducing the amount of waste rock and solid waste generated during excavation.
[0035] 3. Shorten the mining cycle in the collapse area and improve mining safety. After the backfill material has cured to the design strength, the moving formwork is removed. After the moving formwork is removed, the formwork roadway is directly formed, eliminating the need to excavate a new roadway within the backfill material, thus saving time. At the same time, it avoids damage to the backfill material caused by excavation and disturbance to the junction between the backfill material and the surrounding rock caused by excavation vibration, which helps to ensure the safety of mining operations.
[0036] 4. Improve recovery rate and suppress ore dilution. Based on the distribution of crushed ore in the collapse zone, this invention gradually extends the moving formwork to the crushed ore area, enabling the complete recovery of crushed ore in the collapse zone. The formwork roadway formed after the moving formwork is dismantled directly reaches the crushed ore in the collapse zone. The recovered ore, after screening and separation of tailings, does not contain backfill material and will not lead to ore dilution.
[0037] 5. The mobile mold is reusable. The mobile mold is composed of mold units and a detachable mold tail. After the filling material reaches the design strength, it can be removed and continuously used for the mining of crushed ore in other collapse areas, thereby improving equipment utilization and reducing the manufacturing cost of the mobile mold.
[0038] 6. Facilitates the collection and discharge of oozing water. Gaps are left between the side plates of the moving formwork and the U-shaped track, between the U-shaped track and the ground, and between the spheres, forming oozing water discharge channels. The oozing water collects on the ground inside the moving formwork and is then discharged directly through connected tunnels. The large area of the oozing water discharge channels and the fast drainage speed reduce or even avoid the erosion of the surrounding rock by oozing water, which helps maintain the stability of the filling body and the surrounding rock.
[0039] 7. Reliable sealing and plugging to prevent slurry leakage. The semi-circular airbags arranged circumferentially on the outer side of the mold tail, after inflation, seal the gaps between the mold tail and the surrounding rock at the tunnel entrance, as well as the partition wall, forming a reliable seal together with the partition wall; the outer edge of the outer airbag pad extends beyond the outer edge of the baffle and the lower edge extends to cover the front end of the guide rail assembly, and together with the bottom airbag strip, fills the gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly. After inflation, it can fill the gaps between the baffle and the ore wall, and between the baffle and the ground, preventing the filling slurry from leaking into the mold tunnel, guide rail assembly, and tunnel area, avoiding the filling material from solidifying into the guide rail assembly and affecting the pulling out of the moving mold, ensuring filling quality and continuous and reliable step-by-step operation; even if the airbag is damaged when pulling out the moving mold, the mold body will not be damaged, and the airbag can be easily replaced or repaired, with low maintenance costs.
[0040] 8. Complete tailings layer isolation and protection ensures smooth removal of the mobile formwork. During filling, complete tailings slurry is first injected into the area above the mobile formwork to form a complete tailings layer. Then, complete tailings slurry containing cementitious materials is injected to form a filling material layer. The complete tailings layer contains no cementitious materials, forming a non-cementing isolation layer on the formwork surface, preventing the filling material layer containing cementitious materials from adhering to the formwork, ensuring easy removal of the mobile formwork. Fins are installed on both sides of the top surface of the formwork unit to intercept the complete tailings slurry. The stable adhesion of the complete tailings layer to the formwork surface increases the thickness of the complete tailings layer and expands the cross-sectional size of the formwork tunnel, facilitating the subsequent easy removal of the mobile formwork into the tunnel and improving the safety of the mining operation. After the mobile formwork is removed, the complete tailings layer is located within the tunnel and can be stripped and transported out during ore extraction operations.
[0041] 9. Rolling guide rails and seepage prevention ensure smooth advancement and withdrawal of the mobile formwork. The formwork contacts the U-shaped track via rolling elements. The rolling of these elements enables the mobile formwork to be advanced and withdrawn along the guide rails. The rolling friction resistance is low, allowing for flexible movement. The entire outer perimeter of the formwork is covered with geotextile, with the lower end extending to the ground and covering the guide rail assembly. This prevents filling slurry and debris from entering the track area, avoiding obstruction of the spherical rolling and ensuring stable sliding and step-by-step advancement of the mobile formwork along the guide rails.
[0042] 10. The arched, detachable structure boasts excellent load-bearing capacity and facilitates easy assembly and disassembly. Both the formwork unit and its tail section are arched, assembled from the top plate and side plates. The arched structure is advantageous for bearing the loads of the upper filling layer and loose rock mass, resulting in good structural stability. The lower sections of the side plates are connected by bottom beams, and the bottom beams are connected to the upper sections of the side plates by support columns. All components are detachable, facilitating on-site assembly, disassembly, and transportation of the mobile formwork underground. The arched cross-sectional dimensions of the mobile formwork can be adjusted according to the amount, shape, and location of the crushed ore accumulation in the collapse zone. For crushed ore piles far from the tunnel entrance and with minimal collapse, a mobile formwork with a small arched cross-section can be selected, i.e., assembled from side plates on both sides, allowing for flexible setup and convenient assembly and disassembly.
[0043] 11. Install columnar airbags on the outside of the mold side plates to shorten the mining cycle and improve the recovery rate. Based on the stockpiling of collapsed crushed ore in the collapse zone and the position of the mold body relative to the goaf area, consider selecting the number of mold side plates with pipe installation holes. Before the mold body advances into the goaf area, install columnar airbags on the outside of the mold body to achieve the recovery of localized, scattered collapsed crushed ore.
[0044] In summary, using mobile formwork-assisted filling for the recovery of crushed ore in underground collapse areas eliminates the need for blasting to open roadways for the filling material, thus preventing blasting vibrations from impacting and damaging the junction between the filling material and the surrounding rock, as well as the surrounding rock strata. This improves the safety of mining in other areas, avoids causing larger-scale collapses, and enhances the overall ecological safety of the mining area. Attached Figure Description
[0045] Figure 1 This is a schematic diagram of the underground mining layout.
[0046] In the diagram, A1 represents the goaf area, A2 represents the collapse area, and the lines of different colors and shapes in the diagram represent the following: Figure 2 A schematic diagram showing the status of the mobile module entering the mining area after installation.
[0047] Figure 3 A schematic diagram showing the filling status of the goaf area above the moving formwork.
[0048] Figure 4 This is a schematic diagram of the tunnel formed after the moving mold is pulled out.
[0049] Figure 5 for Figure 3 Enlarged view of section A3 in the image.
[0050] Figures 2-5In the diagram, T1-2 is the ore body outside the collapse zone; T2 is the roadway; T3-2 is the edge of the collapse void; T4-3 is the goaf area; T5-1 is the collapsed crushed ore; T6-5 is the goaf filling pipe; T6-6 is the top filling pipe; T7-2 is the collapse zone filling body; T7-3 is the goaf filling body; T7-4 is the entire tailings layer; T8 is the moving mold; T9 is the partition wall; and T10 is the mold roadway.
[0051] Figure 6 for Figure 5 DD sectional view.
[0052] Figure 7 An axial cross-sectional view of the moving mold (also) Figure 8 (MM cross-section without geotextile).
[0053] Figure 8 for Figure 7 NN cross-sectional view of the movable mold assembled from the side templates and the top template.
[0054] Figure 9 for Figure 7 A cross-sectional view of the moving mold assembled only from the two side templates, excluding the mold top plate (excluding the mold top plate).
[0055] Figure 10 for Figure 7 Cross-sectional view of the moving mold NN with columnar airbags set on both sides of the side template.
[0056] Figure 11 A schematic diagram of a large collapse zone (section) where a pile of collapsed ore blocks a roadway.
[0057] Figure 12 A schematic diagram of the collapse zone (section) of the collapsed ore pile far from the roadway.
[0058] Figures 6 to 10 In the middle, M1 is the side plate of the mold; M2 is the top plate of the mold; M4 is the parallel fixed beam; M5 is the bottom beam; M6 is the support column; M7 is the sphere; M8 is the wing strip; M9 is the geotextile; M10 is the U-shaped track; M11 is the outer airbag cushion; M12 is the baffle; M13 is the semi-circular airbag; M14 is the inflation pipe; M15 is the bottom airbag strip; M16 is the columnar airbag; M17 is the water inlet pipe; and M18 is the pipe installation hole assembly. Detailed Implementation
[0059] The specific embodiments of the present invention will be further described below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are only for explaining the present invention and are not intended to limit the scope of protection of the present invention.
[0060] Due to the uncertainty of collapses, there are situations where the collapse area is large (the length and width of the collapse area are greater than 10 meters) and the collapsed ore pile blocks the tunnel, such as... Figure 11 As shown; there are cases where collapsed ore piles are far from the tunnel entrance, such as... Figure 12 As shown, there are also localized and sporadic small collapsed ore piles near the main collapsed ore pile.
[0061] Example 1: A movable mold is adopted, which is assembled from two side mold plates and a top mold plate (see...). Figure 6 and Figure 7 ).
[0062] Combination Figure 1 In order to recover the collapsed ore fragments in the collapse zone A2, this embodiment provides a step-by-step mining method for underground collapsed mines based on moving mold assisted filling.
[0063] like Figure 11 As shown, for cases where the collapse area is large, the collapsed ore fragments are concentrated, and the roadway entrance is blocked, the ore extraction equipment is first used to mine the collapsed ore fragments T5-1 near the T2 entrance of the roadway. For the collapsed ore fragments T5-1 that are far from the T2 entrance of the roadway, a moving mold-assisted filling step-by-step mining method is used.
[0064] Combination Figures 6 to 9 The movable mold T8 includes a guide rail assembly and a mold body, with the lower end of the mold body slidingly engaged with the guide rail assembly. The guide rail assembly includes two parallel U-shaped rails M10 and multiple spheres M7 located within the rails. The lower ends of both sides of the mold body contact the corresponding spheres M7 within the U-shaped rails M10. The two U-shaped rails M10 are detachably connected by multiple parallel fixed beams M4. The mold body is composed of at least one mold unit and a mold tail, which are sequentially and detachably connected. Both the mold unit and the mold tail have arched cross-sections and are assembled from a top mold plate M2 and two side mold plates M1. The lower sections of the side mold plates M1 are detachably connected by a bottom beam M5, and the bottom beam M5 is detachably connected to the upper sections of the side mold plates M1 by support columns M6. Gaps are left between the spheres M7, allowing the exudate from the filling material to flow into the ground inside the movable mold T8 through these gaps and be discharged through connected channels.
[0065] The front end of the first mold unit is equipped with a baffle M12, and an outer airbag cushion M11 is provided on the outer side of the baffle M12. The outer edge of the outer airbag cushion M11 extends beyond the outer edge of the baffle M12, and the lower edge of the outer airbag cushion M11 extends to cover the front end of the guide rail assembly. The inflation tube M14 of the outer airbag cushion M11 passes through the baffle M12 and extends into the first mold unit. The gap between the lower edge of the outer airbag cushion M11 and the front end of the guide rail assembly is filled with a bottom airbag strip M15. One end of the bottom airbag strip M15 is fixed to the lower outer side of the baffle M12, and its inflation tube M14 extends to the mold tail. Multiple fins M8 are provided on both sides of the top surface of the mold unit. The cross-section of the fins M8 is a triangle with the tip pointing upwards. A semi-annular airbag M13 is provided circumferentially on the outer side of the mold tail. At least two layers of semi-annular airbags M13 are arranged circumferentially, and their inflation tubes M14 extend into the mold tail. The outer perimeter of the mold is entirely covered with M9 geotextile, and the lower end of the M9 geotextile extends to the ground and covers the guide rail assembly.
[0066] The mobile mold-assisted filling step-by-step mining is carried out according to the following steps: Step ①: Combining Figure 2 , Figure 3 At least one set of goaf filling pipes T6-5 shall be opened at the top of the goaf area T4-3 above the moving formwork T8. Two pipes shall be set in each set. The two filling pipes shall be connected to the filling sand bin to transport the filling material. The outlets of the two goaf filling pipes T6-5 shall be spaced 4-5 meters apart.
[0067] Step 2: Lay guide rail components from inside roadway T2 into the goaf area, with the end of the guide rail components reaching the collapsed crushed ore to be mined; Step 3: On the guide rail assembly in tunnel T2, complete the assembly of the first section of the mold unit to form the mold head. The mold head and the guide rail assembly are in contact through the ball M7. The mold body moves along the guide rail by the rolling of the ball M7. Step 4: Combining Figure 2 The first module unit is advanced along the guide rail assembly to the area of collapsed crushed ore to be mined, and then the next module unit is connected in sequence until the baffle M12 of the first module unit reaches the collapsed crushed ore to be mined. Then the tail of the module is connected to the end module unit to complete the on-site assembly of the moving module T8. The tail of the module is located in the roadway T2. Step 5: Build a partition wall T9 on the side of the semi-annular airbag M13 at the tail of the mold, near the roadway, to seal the gap between the tail of the mold and the roadway wall; leave a fixed hole for the top filling pipe T6-6 of the mold to be inserted into the goaf in the partition wall T9. Step 6: Install the top filling pipe T6-6, extending it through the top plate M2 to the side of the collapsed crushed ore to be mined on the outer airbag cushion M11; slowly inject the full tailings slurry to fill the space between the outer airbag cushion M11 and the collapsed crushed ore; when the injected full tailings slurry reaches the top of the moving mold T8, slowly pull back the top filling pipe T6-6, injecting full tailings slurry while pulling. The injection rate of full tailings slurry is 3-5 cubic meters per meter of moving mold T8, until the end of the top filling pipe T6-6 reaches the junction of the mold tail and the mold body, then stop pulling, continue injecting 2-3 cubic meters of full tailings slurry, stop grouting, pull out the top filling pipe T6-6, and seal the fixing hole; Step 7: After the fixing holes are sealed tightly, inflate the outer airbag M11 to fill the gaps between the baffle M12 and the ore wall, and between the baffle M12 and the ground; inflate the bottom airbag strip M15 to fill the gap between the lower edge of the outer airbag M11 and the front end of the guide rail assembly; inflate the semi-annular airbag M13 to seal the gap between the tail of the mold and the surrounding rock and partition wall T9 at the tunnel entrance. Step 8: A full tailings slurry containing cementitious material is injected into the remaining goaf area through the goaf filling pipe T6-5 to form a filling layer until the entire goaf area is filled, forming the collapse area filling body T7-2 and the goaf area filling body T7-3. In this embodiment, the solid content of the full tailings slurry is 60-70 wt%, and the mass ratio of cementitious material to full tailings slurry in the full tailings slurry containing cementitious material is 1:4-5. Step 9: Combining Figure 4 After the filling material in the goaf area has reached the design strength, the partition wall T9 on the outside of the tailings is removed, and the movable tailings T8 is dragged into the roadway T2. The movable tailings T8 is then removed to form the tailings roadway T10. With the help of the isolation support of the tailings roadway T10, the entire tailings layer T7-4 in the tailings roadway T10 and near the entrance of the tailings roadway T10 is stripped and transported out using shovel and ore removal equipment. Then, the collapsed crushed ore T5-1 near the entrance of the tailings roadway T10 is shoveled and transported to the screening unit. The transported ore is screened by the screening unit to separate the tailings and ore. Step 10: Due to the large size of the collapsed area (length and width dimensions greater than 10 meters), the remaining collapsed ore fragments need to be mined by repeating steps 1-9 above in a step-by-step manner using the formwork tunnel T10 until all collapsed ore fragments T5-1 have been mined.
[0068] For small collapse areas with a length and width of less than 10 meters, after one filling, the entire crushed ore T5-1 of the collapse area is mined by means of the support of the model roadway T10 and the collapse area filling body T7-2.
[0069] Because the filling material injected through the goaf filling pipe T6-5 contains solidified tailings slurry with less water content and higher density than the whole tailings slurry, and the outlets of the two goaf filling pipes T6-5 are spaced 4-5 meters apart, the injected filling material falls on both sides of the moving mold T8. The filling material pushes the previously injected whole tailings slurry to the periphery of the moving mold T8, increasing the space of the mold roadway T10 and facilitating the later installation of the moving mold T8.
[0070] Example 2: A movable mold is assembled using only the side plates on both sides (see...). Figure 6 and Figure 8 ).
[0071] Combination Figure 1 and Figure 11 This embodiment provides a step-by-step mining method for underground collapsed ore based on moving mold-assisted filling. In this embodiment, the collapsed crushed ore T5-1 near the entrance of roadway T2 is first mined using ore extraction equipment. For the collapsed crushed ore T5-1 that is farther away from the entrance of roadway T2, the moving mold T8 is used for assisted filling and step-by-step mining.
[0072] Combination Figures 6 to 9 The movable mold T8 includes a guide rail assembly and a mold body, with the lower end of the mold body slidingly engaged with the guide rail assembly. The guide rail assembly includes two parallel U-shaped rails M10 and multiple spheres M7 located within the rails. The lower ends of both sides of the mold body contact the corresponding spheres M7 within the U-shaped rails M10. The two U-shaped rails M10 are detachably connected by multiple parallel fixed beams M4. The mold body is composed of at least one mold unit and a mold tail, which are sequentially and detachably connected. Both the mold unit and the mold tail have arched cross-sections and are assembled from two mold side plates M1. The lower sections of the two mold side plates M1 are detachably connected by a bottom beam M5, and the bottom beam M5 is detachably connected to the upper sections of the two mold side plates M1 by support columns M6. Gaps are left between the spheres M7, allowing the exudate from the filling material to flow into the ground inside the movable mold T8 through these gaps and be discharged through connected tunnels.
[0073] The remaining implementation methods are the same as in Example 1.
[0074] Example 3: Due to the uncertainty of the collapse, there are localized and scattered small collapsed ore piles near the larger main collapsed ore pile, and the main collapsed ore pile is far from the roadway entrance, such as... Figure 12 As shown, if each scattered fragment of ore is filled with auxiliary T8 moving molds, the overall mining efficiency will be significantly reduced.
[0075] Combination Figure 10The filling is assisted by columnar airbags. In the collapse area where there are main collapsed ore piles and scattered small ore piles, the end of the U-shaped guide rail M10 assembly is laid to reach the main collapsed ore pile. According to the distribution of scattered small collapsed ore piles near the U-shaped guide rail M10 assembly, the mold side plate M1 with pipe mounting hole assembly M18 is selected for assembling the moving mold T8.
[0076] The side panel M1 of the formwork has 2-3 rows of pipe installation hole assemblies M18, arranged in a layout where the number of pipe installation hole assemblies M18 gradually increases from the top row to the bottom row, with a total of 3-6 groups. Each group contains two holes arranged at the top and bottom. Each group of holes corresponds to a columnar airbag M16. One end of the columnar airbag M16 is equipped with an inflation tube and a water inlet tube. The columnar airbag M16 pierces the geotextile M9 through the inflation tube M14 and the water inlet tube M17, passes through the two holes arranged at the top and bottom, extends into the inside of the side panel M1 of the formwork, and is fixed in a horizontal position by the pipe installation hole assemblies M18. The columnar airbag M16 is 1-2 meters long and 0.3-0.5 meters in diameter.
[0077] Based on the distance between the scattered ore pile and the U-shaped guide rail M10 assembly, columnar airbags M16 of different diameters and lengths are selected and installed outside the mold side plate M1. The inflated columnar airbags M16 and the tailings slurry trapped between the columnar airbags M16 form a channel connecting the scattered ore pile after filling.
[0078] At the start of filling, water is first injected into the columnar airbag M16 through the water inlet pipe M17. When the water volume reaches 5-15% of the volume of the columnar airbag M16, the inflation pipe M14 is switched to inflate it once. When the air pressure is 80% of the air pressure of the outer airbag pad M11, the inflation is stopped. After inflation, the end of the columnar airbag M16 reaches or approaches the scattered collapsed ore pile.
[0079] Fill the surface of the moving mold T8 and the surface of the columnar airbag M16 with the full tailings slurry. After the full tailings slurry covers the surface of the mold and all columnar airbags M16, inflate the columnar airbags M16 a second time until their air pressure is the same as that of the outer airbag pad M11.
[0080] While the columnar airbag M16 is being inflated a second time, tailings slurry containing cementitious material is injected into the remaining empty areas of the collapsed zone until all empty areas are filled.
[0081] After the injected tailings slurry containing cementitious material solidifies to form a filling body and reaches the design strength, the air inlet pipe M14 and water inlet pipe M17 are removed from the moving formwork T8 to drain the water accumulated in the airbags. The moving formwork T8 is then pulled out and dismantled, forming formwork tunnel T10. The entire tailings layer within formwork tunnel T10 is cleaned, the columnar airbag M16 is pulled out, and the entire tailings layer in the area of columnar airbag M16 is cleaned, forming a channel in formwork tunnel T10 connecting to the scattered fragmented ore piles for the mining of scattered fragmented ore.
[0082] The remaining implementation methods are the same as in Example 1.
Claims
1. A method for step-by-step mining of underground collapsed mines based on moving-mode assisted filling, comprising underground roadways, collapsed zones caused by loosening of surrounding rock, and collapsed ore fragments, characterized in that, First, mining equipment is used to extract the collapsed ore near the tunnel entrance to form a goaf area. Then, a moving mold-assisted filling step-by-step mining method is used to extract the collapsed ore outside the goaf area.
2. The method for step-by-step mining of underground collapsed mines based on mobile module-assisted filling as described in claim 1, characterized in that, The moving mold includes a guide rail assembly and a mold body. The lower end of the mold body is slidably engaged with the guide rail assembly. The mold body is formed by at least one mold unit and a mold tail connected in a detachable manner. The front end of the first mold unit is equipped with a baffle, and an outer airbag is provided on the outside of the baffle. Multiple fins are provided on both sides of the top surface of the mold unit. A semi-annular airbag is provided on the outer side of the mold tail along the circumferential direction.
3. The method for step-by-step mining of underground collapsed mines based on mobile module-assisted filling as described in claim 2, characterized in that, The mobile mold-assisted filling step-by-step mining method is as follows: ① Install at least one set of goaf filling pipes by opening a hole at the top of the goaf area above the moving formwork. Each set has two pipes, and both filling pipes are connected to the filling sand bin to transport the filling material. The outlets of the two goaf filling pipes are spaced 4-5 meters apart. ② Lay U-shaped guide rail components from inside the roadway to the collapsed crushed ore area to be mined, with the end of the guide rail components reaching the collapsed crushed ore area to be mined; ③ On the U-shaped guide rail assembly in the tunnel, the first section of the mold unit is assembled to form the mold head. The mold head and the U-shaped guide rail assembly are in contact through rolling elements, and the mold body moves along the U-shaped guide rail by the rolling of the rolling elements. ④ Advance the first module unit along the U-shaped guide rail assembly to the area of collapsed crushed ore to be mined, and then connect the next module unit in sequence until the baffle of the first module unit reaches the area of collapsed crushed ore to be mined. Then connect the module tail to the end module unit to complete the on-site assembly of the moving module. The entire module tail is located in the roadway. ⑤ Build a partition wall on the side of the semi-annular airbag at the tail of the mold that is close to the roadway to seal the gap between the tail of the mold and the roadway wall; the partition wall is reserved with fixing holes for the insertion of the filling pipe at the top of the mold into the goaf. ⑥ Install the top filling pipe of the mold, extending through the top plate of the mold to the side of the collapsed crushed ore to be mined on the outer airbag cushion; slowly inject the full tailings slurry to fill the space between the outer airbag cushion and the collapsed crushed ore; when the level of the injected full tailings slurry reaches the height of the moving mold top, slowly pull back the top filling pipe of the mold top, injecting full tailings slurry while pulling it back. The injection volume of full tailings slurry is 3-5 cubic meters per meter of moving mold length, until the end of the top filling pipe of the mold top reaches the junction of the mold tail and the mold body, then stop dragging, continue to inject 2-3 cubic meters of full tailings slurry, stop grouting, pull out the top filling pipe of the mold top, and seal the fixing hole; ⑦ After the fixing holes are sealed tightly, inflate the outer airbag to fill the gaps between the baffle and the ore wall, and between the baffle and the ground; inflate the bottom airbag strip to fill the gap between the lower edge of the outer airbag and the front end of the guide rail assembly; inflate the semi-circular airbag at the tail of the mold to seal the gap between the tail of the mold and the surrounding rock at the tunnel entrance, and between the tail of the mold and the partition wall. ⑧ The tailings slurry containing cementitious material is injected into the remaining goaf area through the goaf filling pipe to form a filling layer until the entire goaf area is filled. ⑨ After the filling material in the goaf area has reached the design strength, remove the partition wall on the outside of the mold tail, drag the moving mold into the roadway, remove the moving mold to form the mold roadway, and use the ore extraction equipment to mine the collapsed crushed ore near the mold roadway entrance with the help of the isolation support of the mold roadway. ⑩ Repeat steps ①-⑨ above for step-by-step mining until all collapsed ore fragments are recovered.
4. The method for step-by-step mining of underground collapsed mines based on mobile module-assisted filling as described in claim 1, characterized in that, In the moving mold, the guide rail assembly includes two parallel U-shaped rails and multiple spheres located within the rails. The lower ends of both sides of the mold body are in contact with the spheres within the corresponding U-shaped rails. The two parallel U-shaped rails are detachably connected by multiple parallel fixed beams.
5. The method for step-by-step mining of underground collapsed mines based on mobile module-assisted filling as described in claim 1, characterized in that, In the movable mold, the cross-section of the mold unit and the mold tail is arched, and they are all assembled from the top plate of the mold and the mold side plates on both sides, or directly from the mold side plates on both sides. The lower sections of the mold side plates on both sides are detachably connected by a bottom beam, and the bottom beam is detachably connected to the upper sections of the mold side plates on both sides by a support column. A columnar airbag can be installed on the outside of the mold side plate.
6. The method for step-by-step mining of underground collapsed mines based on mobile module-assisted filling as described in claim 1, characterized in that, In the moving mold, the outer edge of the outer airbag pad extends beyond the outer edge of the baffle, and the lower edge of the outer airbag pad extends to the front end of the cover rail assembly. The inflation tube of the outer airbag pad passes through the baffle and extends into the first section of the mold unit.
7. The method for step-by-step mining of underground collapsed mines based on mobile module-assisted filling as described in claim 6, characterized in that, In the moving mold, the gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly is also filled with a bottom airbag strip. One end of the bottom airbag strip is fixed to the lower outer side of the baffle, and its inflation tube extends to the tail of the mold. The bottom airbag strip is inflated, and after inflation, it fills the gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly.
8. The method for step-by-step mining of underground collapsed mines based on mobile module-assisted filling as described in claim 1, characterized in that, In the moving mold, the fins on both sides of the top surface of the mold unit have a triangular cross-section with the tip pointing upwards; at least two layers of semi-annular airbags are arranged circumferentially on the outer side of the mold tail, and their inflation tubes extend into the mold tail.
9. The method for step-by-step mining of underground collapsed mines based on mobile module-assisted filling as described in claim 1, characterized in that, The outer periphery of the mold is entirely covered with geotextile, and the lower end of the geotextile extends to the ground and covers the guide rail assembly.
10. The method for step-by-step mining of underground collapsed mines based on mobile module-assisted filling as described in claim 3, characterized in that, The implementation method of step 9 is as follows: ① With the help of the isolation and support of the mold roadway, the tailings layer inside the mold roadway and near the entrance of the mold roadway is stripped and transported out using shovel and ore removal equipment; ② Use shovel and conveyor equipment to shovel and convey crushed ore near the entrance of the mold roadway and send it to the screening unit; ③ The transported ore is screened through a screening unit to separate the tailings and ore.