Mining operation methods

By using mining robots and automated ore box systems, the problems of numerous deep-sea mining equipment and cumbersome processes have been solved, achieving efficient ore crushing and collection, and improving mining efficiency and equipment utilization.

CN123109667APending Publication Date: 2026-11-17SHANDONG FUTURE ROBOT CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611333167.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-31
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing deep-sea mining technologies and equipment are numerous, have high operating costs, cumbersome processes, and low mining efficiency. Furthermore, equipment docking is difficult under complex underwater conditions, affecting the continuity and efficiency of mining.

Method used

Mining robots are used for seabed ore crushing and collection. The ore is crushed and collected using hook-shaped and bucket-shaped robotic arms. Ore boxes are automatically positioned and quickly replaced using ore box hoisting winches and guide winches, simplifying the mining process and improving equipment utilization.

Benefits of technology

It achieves fewer devices, simplified processes, and guided lifting of ore boxes, thereby improving mining efficiency, reducing equipment costs and time consumption, and enhancing the continuity and efficiency of mining.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109667A_ABST
    Figure CN123109667A_ABST
Patent Text Reader

Abstract

This invention relates to the field of underwater operation equipment technology, specifically to a mining operation method, comprising the following steps: S1: Deploying the mining robot: The operation vessel transports the mining robot to the operating sea area and deploys it to the seabed to begin mining operations; S2: Mining operations: The mining robot performs ore crushing operations using a hook-shaped mechanical arm, and uses a bucket-shaped mechanical arm to scoop the crushed ore into the inlet of a slag loader. The ore is then transported to the ore box via an ore telescopic conveyor mechanism; S3: Repeat step S2 until the ore box is full. Once the ore box is full, the conveyor frame of the ore telescopic conveyor mechanism retracts and moves away from the ore box; S4: Recover the full ore box; S5: Replace with an empty ore box; S6: Repeat steps S2, S3, S4, and S5 until the mining operation is completed. This invention requires fewer devices, simplifies the mining process, provides guided lifting of the ore box, and achieves high mining efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of underwater operation equipment technology, specifically to a mining operation method. Background Technology

[0002] The main deep-sea mining methods include: tugboat type, continuous rope bucket type, shuttle boat type, and mining car plus pipeline hoisting type. Among these, the mining car plus pipeline conveying type mining system consists of a seabed mining car, a mining vessel, and a pipeline hoisting system. A search reveals that Chinese patent CN106761762A discloses an intermittent deep-sea mineral resource mining system and method, including a surface operation mother ship, an underwater operation platform with a storage silo, and a ore collection car connected to the underwater operation platform. Its key feature is that it also includes one or more hoisting compartments. Each hoisting compartment includes a hull for storing materials, a first buoyancy adjustment device on the hull, and an underwater moving device on the hull. The storage silo has a first inlet / outlet interface, and the hull has an openable / closable discharge port and a second inlet / outlet interface for detachably connecting with the first inlet / outlet interface. The shortcomings of the aforementioned patent are: First, the aforementioned patented mining method requires a work vessel, ore collection trucks, an underwater work platform, and a hoisting pod, resulting in numerous pieces of equipment and high operating costs. Second, during mining, the aforementioned patented method involves using ore collection trucks to collect seabed minerals, which are then transported to the underwater work platform. Once the underwater work platform is full, it docks with the hoisting pod to transfer the minerals, which are then transported out. This process is cumbersome, time-consuming, and involves complex underwater conditions, including the ore collection trucks moving back and forth, docking with the underwater work platform, and underwater operations. The docking of the mining platform and the lifting cabin is very inconvenient, requiring multiple adjustments, which is time-consuming, labor-intensive, and results in low mining efficiency. Third, existing mining vehicles, such as the ore collection vehicle in the aforementioned patent, usually require the robotic arm to dig first and then collect the ore. For complex ores, crushing is also necessary, which greatly reduces mining efficiency. Fourth, the aforementioned patent controls the buoyancy of the lifting cabin to make it rise, fall, and dock with the underwater working platform and work vessel. However, underwater working conditions are complex, the lifting cabin may deviate or sway, the lifting and lowering takes a long time, mining continuity is poor, and overall mining efficiency is low. Summary of the Invention

[0003] The purpose of this invention is to overcome the shortcomings of the existing technology and provide a mining operation method that requires less equipment, simplifies the mining process, provides guided lifting of the ore box, and has high mining efficiency.

[0004] To achieve the above objectives, the technical solution adopted by the present invention is as follows: A mining operation method, characterized by comprising the following steps: S1: Deploying the Mining Robot: The work vessel transports the mining robot to the work area, lowers the cable using a winch, and simultaneously lowers the mining robot to the seabed. At the same time, the ore container hoisting winch releases the cable, and the ore container descends with the mining robot. Once the mining robot reaches the seabed, it begins mining operations. S2: Mining operation: The mining robot performs ore crushing operation through the eagle beak hook mechanical arm. The mining robot uses the bucket mechanical arm to scoop the crushed ore into the slag loader inlet. The ore is then transported into the ore box through the ore telescopic conveyor mechanism. S3: Repeat step S2 until the ore box is full. Once the ore box is full, the hook robotic arm, bucket robotic arm, slag loader, and ore telescopic conveyor all stop working. The conveyor frame of the ore telescopic conveyor retracts and moves away from the ore box. S4: Fully loaded ore box recovery: Drive the ore box hoisting winch to retract the cable, and at the same time, the ore box guide winch on the mining robot releases the ore box guide rope connected to the bottom of the ore box. The ore box hoisting winch lifts the fully loaded ore box onto the deck of the work vessel, unties the ore box guide rope at the bottom of the fully loaded ore box and the cable of the ore box hoisting winch at the top of the ore box, and lifts the fully loaded ore box away. S5: Replace with an empty ore box: Take an empty ore box, connect the cable of the ore box hoisting winch in step S4 to the upper end of the empty ore box, connect the ore box guide rope to the bottom of the empty ore box, start the ore box guide winch to retract the ore box guide rope, and the ore box hoisting winch releases the cable to quickly lower the empty ore box to the seabed and connect it to the mining robot through the ore box guide rope. S6: Repeat steps S2, S3, S4, and S5 until the mining operation is completed. Start the hoisting winch to lift the mining robot via cable. Simultaneously, the ore box hoisting winch retracts the cable to ensure that the ore box rises with the mining robot. Lift the mining robot onto the work vessel to end the mining operation. The mining robot collects ore into the ore box. Once the ore box is full, lift it and replace it with an empty ore box to continue mining. The equipment is minimal, the mining process is simple, dual robotic arms operate, and the mining efficiency is high. The ore box lifting and lowering is guided.

[0005] In step S1 of the present invention, the cable of the hoisting winch guides the robot guide roller for the lifting and lowering of the mining robot and is connected to the hoisting of the mining robot. The cable of the ore box hoisting winch passes through the ore box drive railcar used to adjust the horizontal position of the ore box and is connected to the hoisting of the ore box, so as to guide the lifting and lowering of the mining robot through the robot guide roller and adjust the horizontal position of the ore box through the ore box drive railcar.

[0006] In step S4 of this invention, after the fully loaded ore box rises above the deck, the ore box drive railcar is started to move the fully loaded ore box horizontally above the ore box conversion seat on the deck. At the same time, the ore box guide rope moves with the ore box, approaching the ore box conversion seat. The ore box guide rope is fixed to the guide cone at the lower end of the ore box. The guide cone engages with the guide sleeve fixed at the bottom of the ore box and is fixed by a connecting pin. The ore box hoisting winch is driven to lower the ore box. The ore box moves downward toward the ore box conversion seat. The outer wall of the ore box engages with the inner wall of the ore box conversion slot of the ore box conversion seat for guidance. The ore box enters the ore box conversion slot. The guide cone at the lower end of the ore box enters the cone limit hole of the ore box conversion slot. The ore box guide rope passes through the guide on the side of the ore box conversion seat. The slotted hole enters the cone-shaped limiting hole, the ore box descends to the correct position, the connecting pin and the two pin shafts in the ore box conversion slot are aligned with the manipulator, and the lower part of the guide cone is aligned with the two locking clamping claws in the ore box conversion slot. The locking clamping claw drive cylinder is activated, driving the two locking clamping claws to extend and clamp the guide cone, thus limiting and fixing the ore box and the ore box conversion seat. The pin shaft push manipulator is activated, and the pin shaft push manipulator on the tail side of the connecting pin extends, pushing the connecting pin towards the pin shaft push manipulator on the head side of the connecting pin until the connecting pin separates from the guide sleeve and the guide cone. The cable of the ore box hoisting winch at the top of the ore box is released, and the fully loaded ore box is lifted away to pass through the ore box conversion seat, achieving automatic positioning of the ore box and automatic insertion and removal of the connecting pin.

[0007] In step S4 of this invention: the outer wall of the ore box engages with the outer guide flare at the top of the ore box conversion seat, guiding the ore box into the ore box conversion seat. As the ore box continues to move downward, the outer wall of the ore box engages with the inner guide flare at the lower end of the outer guide flare, further guiding the position of the ore box. A retaining rod is fixed on the guide sleeve above the connecting pin. As the ore box continues to fall, the retaining rod falls and touches the axial limiting arc plate on the ore box conversion seat. Guided by the axial limiting arc plate, the retaining rod is embedded in the axial limiting groove of the axial limiting arc plate, and the ore box falls into place, so that the ore box is guided into the ore box conversion seat through the outer guide flare and the inner guide flare. The retaining rod is guided into the axial limiting groove through the engagement of the retaining rod and the axial limiting guard plate, so that the ore box descends into place, and the connecting pin is horizontal and exactly between the two pin shafts pushing the manipulator.

[0008] In step S5 of this invention: an empty ore box is placed on the ore box conversion seat. The empty ore box is guided by the conical guide horn at the lower end of the guide sleeve at its bottom and is inserted into the guide cone on the ore box conversion seat. The locking rod of the empty ore box is positioned in conjunction with the axial limiting arc plate. The guide sleeve of the empty ore box is inserted into the guide cone on the ore box conversion seat. The pin shaft on one side of the connecting pin head is activated to push the manipulator, inserting the connecting pin into the guide sleeve and the guide cone, fixing the empty ore box and the guide cone. The upper end of the empty ore box is connected to the cable of the ore box hoisting winch. The locking clamping claw drive cylinder is activated, the locking clamping claw retracts and separates from the guide cone. The ore box hoisting winch is activated to lift the ore box above the ore box conversion seat. The ore box drive railcar is activated to move the ore box horizontally above the deck moon pool. The ore box hoisting winch is activated to lower the ore box, so that the guide sleeve and the guide cone are quickly inserted through the conical guide horn, realizing the rapid connection between the empty ore box and the guide cone.

[0009] In step S4 of the present invention, the guide rope of the ore box is guided into the guide slot by the guide roller installed on the deck of the work vessel, and then guided by the guide roller on both sides of the inner wall of the guide roller to fall onto the guide roller, and then guided into the guide slot by the guide roller.

[0010] In step S1 of this invention: In the initial state, the robot tray is located above the moon pool of the work vessel, the mining robot is placed on the robot tray, the upper end of the mining robot is connected to the cable of the hoisting winch, and the ore box of the mining robot is connected to the cable of the ore box hoisting winch. After the work vessel transports the mining robot to the work area, the work vessel control system controls the hoisting winch and the ore box hoisting winch to simultaneously retract the cable, lift the mining robot, and separate the mining robot from the robot tray. The work vessel control system controls the slide drive cylinder to drive the slide to move towards the hoisting winch. After the slide leaves the moon pool, the mining robot is above the moon pool.

[0011] In step S6 of the present invention, the mining robot exits the moon pool and is positioned above the moon pool. The operation vessel control system controls the slide drive cylinder to drive the slide to move towards the moon pool, so that the robot tray is below the mining robot. The operation vessel control system controls the hoisting winch and the ore box hoisting winch to release the cable at the same time, so that the mining robot lands on the robot tray.

[0012] Due to the above-mentioned structure, the present invention has the advantages of requiring less equipment, simplifying the mining process, providing guidance for the lifting of the ore box, and increasing mining efficiency. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of the structure of the present invention.

[0014] Figure 2 This is a schematic diagram of the mining robot of the present invention being lowered to the seabed.

[0015] Figure 3 This is a schematic diagram of the mining robot of the present invention at one angle during mining.

[0016] Figure 4 This is a schematic diagram from another angle of the mining robot of the present invention during mining.

[0017] Figure 5 This is a schematic diagram of the retraction of the ore telescopic conveying mechanism of the present invention.

[0018] Figure 6 This is a schematic diagram of the mining robot of the present invention lifting the ore box.

[0019] Figure 7 This is a schematic diagram of the guide box conversion seat for the mining robot of the present invention.

[0020] Figure 8 This is a schematic diagram showing an angle at which the mining robot of this invention is about to dock with the ore box conversion seat.

[0021] Figure 9 This is the present invention. Figure 8 Enlarged view of section I.

[0022] Figure 10 This is a schematic diagram from another angle showing the mining robot of the present invention about to dock with the ore box conversion seat.

[0023] Figure 11 This is the present invention. Figure 9 Enlarged view of section II.

[0024] Figure 12 This is a schematic diagram of the docking of the mining robot and the ore box conversion seat of the present invention.

[0025] Figure 13 This is a top view of the guide cone clamped on the ore box conversion seat of the present invention.

[0026] Figure 14 This is the present invention. Figure 13 Sectional view of section I-I.

[0027] Figure 15 This is the present invention. Figure 14 Cross-sectional view of KK.

[0028] Figure 16 This is the present invention. Figure 15 Enlarged view of section IV.

[0029] Figure 17 This is a schematic diagram of the movement of the bucket robotic arm in this invention.

[0030] Reference numerals: 1. Working vessel; 2. Mining robot; 3. Robot guide roller; 4. Hoisting winch; 5. Ore box hoisting winch; 6. Ore box; 7. Slag loader; 8. Ore telescopic conveyor mechanism; 9. Hook robotic arm; 10. Bucket robotic arm; 11. Ore box guide winch; 12. Ore box guide rope; 13. Ore box drive railcar; 14. Ore box conversion seat; 15. Guide roller; 16. Outer guide flare; 17. Inner guide flare; 18. Guide cone; 19. Cone limiting hole; 20. Guide slot; 21. Guide sleeve; 22. Connecting pin; 23. Shaft locking rod; 24. Axial limiting arc plate; 25. Axial limiting groove; 26. Pin-driven robotic arm. 6. Locking clamping claw 27. Locking clamping claw drive cylinder 28. Conical guide horn mouth 29. Mining machine frame 30. Working arm 31. Swing seat 32. Fixed seat 33. Working drive cylinder 34. Collecting plate 35. Collecting impeller 36. Collecting adjusting cylinder 37. Guide plate 38. Mineral box lifting mechanism 39. Mineral box hoisting hole 40. Mineral box guiding moving mechanism 41. Translation guide frame 42. Mineral box stabilizing lifting mechanism 43. Mineral box clamping limit mechanism 44. Mineral box conversion groove 45. Pin shaft drive cylinder 46. Push guide plate 47. Clamping guide plate 48. Guide groove 49. Slide table 50. Robot tray 51. Detailed Implementation

[0031] The specific embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.

[0032] A mining operation method, comprising a work vessel 1 and a mining robot 2, characterized in that the mining operation method includes the following steps: S1: Deploying Mining Robot 2: The work vessel 1 transports mining robot 2 to the work area. Mining robot 2 is positioned above the moon pool on the deck of work vessel 1. The work vessel's control system controls the lowering winch 4 to release the cable. Mining robot 2 passes through the moon pool and is lowered to the seabed. Simultaneously, the ore box lifting winch 5 releases the cable to ensure that the ore box 6 falls with mining robot 2. After mining robot 2 reaches the seabed, mining operations begin. S2: Mining operation: Start the muck loader 7 and the ore telescopic conveyor 8. The mining robot 2 performs ore crushing operation through the eagle beak hook mechanical arm 9. The mining robot 2 uses the bucket mechanical arm 10 to scoop the crushed ore into the inlet of the muck loader 7. The ore is transported into the ore box 6 through the ore telescopic conveyor 8. S3: Repeat step S2, monitor the mining robot 2 mining frame 30 with the fixed camera until the ore box 6 is full. After the ore box 6 is full, the eagle beak hook robotic arm 9, the bucket robotic arm 10, the slag loader 7, and the ore telescopic conveyor mechanism 8 all stop working. The conveyor frame of the ore telescopic conveyor mechanism 8 retracts and moves away from the ore box 6. S4: Recovering a Fully Loaded Ore Container 6: The drive winch 5 lifts the fully loaded ore container 6 above the deck of the work vessel 1. Simultaneously, the ore container guide winch 11 releases the ore container guide rope 12 at the bottom of the ore container 6, guiding its ascent. After the fully loaded ore container 6 rises above the deck, the ore container drive railcar 13 is activated, moving the fully loaded ore container 6 horizontally above the ore container conversion seat 14 on the deck. At the same time, the ore container guide rope 12 moves with the ore container 6, approaching and passing through the guide roller 15 towards the ore container conversion seat 14. The drive winch 5 lowers the ore box 6, which moves downwards toward the ore box conversion seat 14. The outer wall of the ore box 6 engages with the outer guide horn 16 on the upper part of the ore box conversion seat 14, guiding the ore box 6 into the ore box conversion seat 14. As the ore box 6 continues to move downwards, its outer wall engages with the inner guide horn 17 at the lower end of the outer guide horn 16, further guiding the position of the ore box 6. This causes the guide cone 18 at the lower end of the ore box 6 to enter the cone limiting hole 19 of the ore box conversion seat 14. The ore box guide rope 12, connected to the guide cone 18, passes through the guide groove 20 on the side of the ore box conversion seat 14 and enters the cone limiting hole 19. The upper end of the guide cone 18 is inserted into the guide sleeve 21 at the lower end of the ore box 6. The guide sleeve 21 and the guide cone 18 are fixed by a connecting pin 22. A retaining rod 23 is fixed on the guide sleeve 21 above the connecting pin 22. As the ore box 6 continues to fall, the retaining rod 23 falls and touches the axial limiting arc plate 24 on the ore box conversion seat 14. Guided by the axial limiting arc plate 24, the retaining rod 23 is embedded in the axial limiting groove 25 of the axial limiting arc plate 24. At the same time... The connecting pin 22 is opposite to the two pin-driven manipulators 26 inside the ore box conversion seat 14. The lower part of the guide cone 18 is opposite to the two locking clamping claws 27. The locking clamping claw drive cylinder 28 is activated, which drives the two locking clamping claws 27 to extend and clamp the guide cone 18, thus limiting and fixing the ore box 6 and the ore box conversion seat 14. The pin-driven manipulator 26 is activated, and the pin-driven manipulator 26 on the tail side of the connecting pin 22 extends, pushing the connecting pin 22 towards the pin-driven manipulator 26 on the head side of the connecting pin 22 until the connecting pin 22 separates from the guide sleeve 21 and the guide cone 18. The cable of the ore box hoisting winch 5 at the upper end of the ore box 6 is released, and the fully loaded ore box 6 is lifted away by a crane. S5: Replace with an empty mining box 6: Take an empty mining box 6 and place it on the mining box conversion seat 14. The empty ore box 6 is guided by the tapered guide flare 29 at the lower end of the guide sleeve 21 and engages with the guide cone 18 on the ore box conversion seat 14. The locking rod 23 of the empty ore box 6 engages with the axial limiting arc plate 24 for positioning. The guide sleeve 21 of the empty ore box 6 is engaged with the guide cone 18 on the ore box conversion seat 14. The pin shaft on one side of the head of the connecting pin 22 is activated to push the manipulator 26, inserting the connecting pin 22 into the guide sleeve 21 and the guide cone 18, fixing the empty ore box 6 to the guide cone 18, and connecting the upper end of the empty ore box 6 to the cable of the ore box hoisting winch 5. Start the locking gripper drive cylinder 28, the locking gripper 27 retracts and separates from the guide cone 18, start the ore box lifting winch 5, lift the ore box 6 above the ore box conversion seat 14, start the ore box drive railcar 13, move the ore box 6 horizontally above the deck moon pool, start the ore box lifting winch 5, lower the ore box 6, at the same time drive the ore box guide winch 11 to retract the ore box guide rope 12, guide the empty ore box 6 back quickly to the mining robot 2 and connect it to the mining frame 30 of the mining robot 2; S6: Repeat steps S2, S3, S4, and S5 until the mining operation is completed. Start the hoisting winch 4 to lift the mining robot 2 via cable. Simultaneously, the ore box hoisting winch 5 retracts the cable to ensure that the ore box 6 rises together with the mining robot 2. Lift the mining robot 2 onto the work vessel 1 to end the mining operation.

[0033] The cable of the hoisting winch 4 described in this invention passes through the robot guide roller 3 and is connected to the mining frame 30 of the mining robot 2, for guiding the lifting and lowering of the mining robot 2. The cable of the ore box lifting winch 5 passes through the ore box drive railcar 13 and is connected to the handle at the upper end of the ore box 6. A guide sleeve 21 is fixed at the bottom of the ore box 6. A guide cone 18 is inserted into the guide sleeve 21 and fixed by a connecting pin 22. The lower end of the guide cone 18 is fixedly connected to the ore box guide rope 12 of the ore box guide winch 11. The ore box guide winch 11 is fixed on the mining frame 30 and guides the lifting and lowering of the ore box 6.

[0034] In step S1 of this invention: In the initial state, the robot tray 51 is located above the moon pool of the work vessel 1, the mining robot 2 is placed on the robot tray 51, the upper end of the mining robot 2 is connected to the cable of the hoisting winch 4, and the ore box 6 of the mining robot 2 is connected to the cable of the ore box hoisting winch 5, as shown in the attached diagram. Figure 1 After the work vessel 1 transports the mining robot 2 to the work area, the work vessel control system controls the hoisting winch 4 and the ore box hoisting winch 5 to simultaneously retract the cable, lifting the mining robot 2. The mining robot 2 separates from the robot tray 51. The work vessel control system controls the slide drive cylinder to drive the slide 50 to move towards the hoisting winch 4. After the slide 50 leaves the moon pool, the mining robot 2 is above the moon pool.

[0035] In step S6 of the present invention, the mining robot 2 exits the moon pool and is placed above the moon pool. The operation vessel control system controls the slide drive cylinder to drive the slide 50 to move towards the moon pool, so that the robot tray 51 is below the mining robot 2. The operation vessel control system controls the hoisting winch 4 and the ore box hoisting winch 5 to release the cable at the same time, so that the mining robot 2 lands on the robot tray 51.

[0036] A mining robot 2, characterized in that: the mining robot 2 includes a mining frame 30 and a mining control system. The front end of the mining frame 30 is equipped with a hook-shaped mechanical arm 9 for crushing ore on one side and a bucket-shaped mechanical arm 10 for collecting ore on the other side. A slag remover 7 is located at the front end of the mining frame 30. The slag remover 7 is fixedly connected to the mining frame 30. The inlet of the slag remover 7 is configured to cooperate with the bucket-shaped mechanical arm 10. The outlet of the slag remover 7 is connected to the inlet of the ore box 6 on the mining frame 30 via an ore telescopic conveying mechanism 8. The ore telescopic conveying mechanism 8, the slag remover 7, the bucket-shaped mechanical arm 10, and the hook-shaped mechanical arm 9 are all controlled by the mining control system to operate in cooperation with the mechanical arms. The hook-shaped mechanical arm 9 is used for crushing and stripping ore from underwater. The bucket-shaped mechanical arm 10 is used to collect and scoop the crushed ore to the inlet of the slag remover 7. The slag remover 7 delivers the ore to the ore telescopic conveying mechanism 8, which then transports the ore into the ore box 6.

[0037] The eagle-beak hook robotic arm 9 and the bucket robotic arm 10 of the present invention each include a working arm 31. The lower end of the working arm 31 is provided with a swing seat 32. A fixed seat 33 is provided on one side of the swing seat 32. The fixed seat 33 is fixedly connected to the mining frame 30. The swing seat 32 is hinged to the fixed seat 33. A swing cylinder is provided on the left or right side of the swing seat 32. One end of the swing cylinder is hinged to the mining frame 30 and the other end is hinged to the swing seat 32. The lower end of the working arm 31 is hinged to the swing seat 32. A working drive cylinder 34 is provided on the swing seat 32. The lower end of the working drive cylinder 34 is hinged to the swing seat 32 and the upper end is hinged to the working arm 31. The swing cylinder and the working drive cylinder 34 are respectively connected to the mining control system so that the swing seat 32 can swing left and right through the swing cylinder, thereby driving the working arm 31 to swing. The working arm 31 can be raised and lowered through the working drive cylinder 34 to realize the chiseling, digging or scraping action.

[0038] The working end of the working arm 31 of the present invention is equipped with a beak hook or a bucket, so that the beak hook mechanical arm 9 is formed by installing the beak hook, and the bucket mechanical arm 10 is formed by installing the bucket.

[0039] The slag remover 7 of the present invention includes a collecting plate 35, a collecting impeller 36, and a collecting cylinder. The mining frame 30 has a material collection plate 35 at its front end. The material collection plate 35 is inclined downwards from back to front, with its front end close to the ground and its rear end engaging with the inlet of the ore telescopic conveying mechanism 8. The rear end of the material collection plate 35 is hinged to the mining frame 30. The collecting plate 35 is driven by the collecting regulating cylinder 37. One end of the collecting regulating cylinder 37 is hinged to the collecting plate 35, and the other end is hinged to the mining frame 30. The collecting plate 35 is provided with collecting impellers 36 at intervals on the left and right. The collecting impellers 36 are driven by the collecting cylinder. The collecting cylinder is fixedly connected to the mining frame 30 and connected to the mining control system. By driving the collecting impellers 36 to rotate, the ore that the bucket has scraped onto the collecting plate 35 is transported to the ore telescopic conveying mechanism 8.

[0040] The ore telescopic conveying mechanism 8 of the present invention has guide plates 38 on both sides of the inlet. The two guide plates 38 are arranged in a trumpet shape and are inclined. The front end of the guide plate 38 is matched with the collecting impeller 36 on the same side. The width between the front ends of the two guide plates 38 is smaller than the width between the rear ends of the two guide plates 38. The guide plates 38 are fixedly connected to the mining frame 30 so as to guide the ore from the collecting plate 35 into the ore telescopic conveying mechanism 8 through the guide plates 38.

[0041] The feed inlet of the ore telescopic conveying mechanism 8 of the present invention is abutted against the rear end of the collecting plate 35. The conveyor frame of the ore telescopic conveying mechanism 8 is telescopic and movable. After the conveyor frame extends, it cooperates and docks with the ore box 6. After the conveyor frame retracts, it separates from the ore box 6 so that the ore can be transported into the ore box 6 through the ore telescopic conveying mechanism 8. After the ore box 6 is full, the conveyor frame of the ore telescopic conveying mechanism 8 retracts to facilitate the lifting of the ore box 6.

[0042] A mining operation equipment includes a work vessel 1 and a work vessel control system, characterized in that it also includes the aforementioned mining robot 2. The mining control system is connected to the control system of the work vessel 1. A hoisting winch 4 is provided on the deck of the work vessel 1. The mining robot 2 is driven by the hoisting winch. The hoisting winch is connected to the control system of the work vessel 1 so as to control the raising and lowering of the mining robot 2 through the robot winch, lowering the mining robot 2 to the seabed for mining operations, and retrieving the mining robot 2 after the operation is completed.

[0043] The present invention provides a ore box lifting mechanism 39 between the ore box 6 and the working vessel 1. The ore box lifting mechanism 39 includes an ore box lifting winch 5. The lower end of the ore box 6 is plugged into and connected to the mining machine frame 30. The deck of the working vessel 1 is equipped with a ore box lifting winch 5, and the upper end of the ore box 6 is provided with an ore box hoisting hole 40. The cable of the ore box lifting winch 5 passes through the ore box hoisting hole 40 and is connected to the ore box 6 so that when the ore box 6 is full, the ore box 6 is lifted to the deck by the ore box lifting winch 5 and replaced with an empty ore box 6.

[0044] The work vessel 1 of the present invention is equipped with a ore box guiding and moving mechanism 41, which includes a translational guide frame 42 and an ore box driving railcar 13. The working vessel 1 is equipped with a translation guide frame 42. The lower end of the translation guide frame 42 is fixedly connected to the deck. A ore box drive railcar 13 is installed on the translation guide frame 42. The cable of the ore box hoisting winch 5 passes through the ore box drive railcar 13 and the ore box hoisting hole 40 and is connected to the ore box 6 so as to guide the lifting and lowering of the ore box 6 through the ore box drive railcar 13. At the same time, the ore box drive railcar 13 can also drive the ore box 6 to move along the translation guide frame 42.

[0045] The ore box 6 of the present invention is provided with an ore box stabilizing and lifting mechanism 43, which includes an ore box guide winch 11 and a guide cone 18. The mining frame 30 is equipped with a ore box guide winch 11 and an ore box groove, and the ore box groove is provided with a conical insertion slot. The bottom of the ore box 6 is provided with a guide sleeve 21 and a guide cone 18. The upper end of the guide sleeve 21 is fixedly connected to the ore box 6, and the guide sleeve 21 is provided with a connecting pin hole. The upper part of the guide cone 18 is provided with an insertion pin hole. The upper part of the guide cone 18 is inserted into the guide sleeve 21 and fixed by the connecting pin 22. The guide rope 12 of the ore box guide winch 11 is fixed to one side of the lower end of the guide cone 18 or the side of the guide cone 18. The ore box 6 is embedded in the ore box groove and connected by the guide cone 18 and the cone insertion slot. The ore box guide winch 11 is fixed on the mining machine frame 30 so as to guide the ore box 6 to rise or fall when the ore box 6 rises or falls. At the same time, after the ore box 6 is replaced, the empty ore box 6 can be quickly guided to the mining machine frame 30.

[0046] The work vessel 1 of the present invention is equipped with a ore box clamping and limiting mechanism 44, which includes a pin-driven manipulator 26, a pin-driven cylinder 46, a locking clamping claw 27, and a locking clamping claw drive cylinder 28. The working vessel 1 is equipped with a ore box conversion seat 14, which is fixed to a clamping plate. The ore box conversion seat 14 has an ore box conversion groove 45, and a conical limiting hole 19 is provided in the middle of the ore box conversion groove 45. A guide groove 20 is provided on one side of the conical limiting hole 19. One end of the guide groove 20 communicates with the conical limiting hole 19, and the other end extends to the edge of the ore box conversion seat 14. The cone-shaped limiting hole 19 is located on both sides of the guide groove hole 20, and a pin-driven manipulator 26 is provided on each side. The pin-driven manipulator 26 is driven by a pin-driven cylinder 46, and a push guide plate 47 is provided at the lower end of the pin-driven manipulator 26. The pin shaft drives the manipulator 26 to slide in connection with the guide plate 47. A locking clamping claw 27 is provided below the pushing guide plate 47. The locking clamping claw 27 is driven by a locking clamping claw drive cylinder 28. A clamping guide plate 48 is provided at the lower end of the locking clamping claw 27. The locking clamping claw 27 is slidably connected to the clamping guide plate 48. The clamping guide plate 48, the locking clamping claw drive cylinder 28, the pushing guide plate 47, and the pin drive cylinder 46 are respectively fixedly connected to the ore box base. When the ore box 6 enters the ore box conversion slot 45, the guide cone 18 enters the cone limit hole 19. The guide cone 18 is clamped by the locking gripper 27, which fixes the ore box 6 and the ore box conversion seat 14. The drive pin pushes the robot arm 26 to push the pin out of the connecting pin hole and the insertion pin hole, so as to facilitate the subsequent separation of the ore box 6 and the guide cone 18.

[0047] The upper end of the ore box conversion trough 45 of the present invention is an outer guide horn opening 16 that cooperates with the outer wall of the ore box 6, and the lower part of the inner wall of the ore box conversion trough 45 is an inner guide horn opening 17 that cooperates with the outer wall of the ore box 6. The ore box 6 is guided into the ore box conversion trough 45 through the outer guide horn opening 16, and the position of the ore box 6 in the conversion box is further guided through the inner guide horn opening 17, and the guide cone 18 is guided into the cone limiting hole 19.

[0048] The upper end of the cone-shaped limiting hole 19 of the present invention is provided with an axial limiting arc plate 24. The axial limiting arc plate 24 is arc-shaped and opens on the side facing the guide slot hole 20. The lower end of the axial limiting arc plate 24 is fixedly connected to the ore box conversion slot 45. The upper end face of the axial limiting arc plate 24 is inclined. The axial limiting arc plate 24 is provided with an axial limiting groove 25 above the pin shaft pushing manipulator 26. The bottoms of the two axial limiting grooves 25 are on the same horizontal plane. The guide sleeve 21 has symmetrical retaining rods 23 on both sides of its outer wall. The retaining rods 23 are horizontally positioned above the connecting pin 22 and are configured to cooperate with the axial limiting groove 25. The guide cone 18 is guided into the cone limiting hole 19 by the axial limiting arc plate 24. The connecting pin 22 is horizontal and is determined to be on the same horizontal plane as the connecting pin 22 and the pin shaft pushing the robot arm 26 by the engagement of the retaining rod 23 and the axial limiting groove 25.

[0049] The present invention provides a guide roller 15 on one side of the guide slot hole 20. The guide roller 15 is fixedly connected to the deck via a bracket. The guide roller 15 has a guide groove 49 in the middle for guiding the cable. The inner walls of the guide groove 49 are flared outward in a trumpet shape on both sides so as to guide the guide rope through the guide groove 49 and into the guide slot hole 20.

[0050] The present invention provides a lifting and guiding mechanism between the hoisting winch 4 and the mining robot 2. The lifting and guiding mechanism includes a robot guide roller 3. The robot guide roller 3 is installed on the translational guide frame 42. The mining frame 30 of the mining robot 2 is provided with a robot hoisting hole. The cable of the hoisting winch 4 passes through the robot guide roller 3 and the robot hoisting hole and is fixedly connected to the mining robot 2 so as to guide the lifting and lowering of the mining robot through the robot guide roller.

[0051] The work vessel 1 of the present invention is provided with a sliding platform 50 above the moon pool. The sliding platform 50 is slidably connected to the deck of the work vessel 1. The sliding platform 50 is driven by a sliding platform drive cylinder. A robot tray 51 is fixedly provided at the upper end of the sliding platform 50. The robot tray 51 is fixedly connected to the sliding platform 50 so that when in use, the mining robot is placed on the sliding platform and the sliding platform is moved to the upper part of the moon pool by the sliding platform drive cylinder. After the mining robot is lifted, the sliding platform drive cylinder drives the sliding platform to move out of the moon platform, so that the mining robot can fall from the moon pool to the seabed.

[0052] As attached Figure 1-17 In this invention, the workboat 1 and the deck moon pool adopt existing technology. Both the workboat control system and the mining control system can be PLC control systems. The mining control system is connected to the workboat control system. The mining robot 2's mining frame 30 is equipped with existing components such as a control cabin, hydraulic system, and tracked walking system. A camera can be installed on the mining frame 30 on one side of the ore box 6 to facilitate operators' real-time monitoring of whether the ore box 6 is full. The ore telescopic conveying mechanism 8 in this invention adopts an existing mining belt telescopic conveyor, or the conveyor disclosed in Chinese Patent Publication No. CN102514905A, entitled "Conveyor". The inner frame and outer frame together constitute the conveyor frame. The inner frame can extend and retract relative to the outer frame, and the conveyor frame can also be raised and lowered to adjust the docking angle. In this invention, the lower end of the outer frame docks with the collecting plate 35, the inner frame extends and docks with the ore box 6, and the inner frame retracts and separates from the ore box 6. For specific structure details, please refer to CN102514905A; further details are omitted here. In this invention, when the ore box 6 is fully loaded and lifted onto the work vessel 1, there are two methods for changing the ore box. One method involves manually inserting and removing the connecting pin: In step S4, after the fully loaded ore box 6 is lifted to the deck of the work vessel 1 by the ore box lifting winch 5, the operator manually removes the connecting pin 22 at the lower end of the ore box 6, pulls the guide cone 18 out of the guide sleeve 21 and fixes it to one side, moves the fully loaded ore box 6 to the ore box conversion seat 14 via the ore box drive railcar 13, and then manually unties the cable of the ore box lifting winch 5 on the fully loaded ore box 6. The fully loaded ore box 6 is then lifted away by other lifting equipment on the work vessel 2. In step S5: Take an empty ore box and place it on the ore box conversion seat 14. Then, manually fix the cable of the ore box lifting winch 5 to the ore box hoisting hole 40 of the empty ore box. Drive the empty ore box to rise away from the ore box conversion seat 14 by the ore box lifting winch 5. Then, manually insert the previously removed guide cone 18 into the guide sleeve 21 of the ore box in the hole and insert the connecting pin 22. Then, drive the ore box drive railcar 13 to move the ore box in the hole to the deck moon pool. As the ore box lifting winch 5 moves downward, the ore box guide winch 11 retracts the ore box guide rope 12, so that the empty ore box quickly descends to the mining robot 2 on the seabed. Another method is the automatic plug-in connector 22: In step S4, after the fully loaded ore box 6 is lifted to the deck of the work vessel 1 by the ore box hoisting winch 5, the fully loaded ore box 6 is moved horizontally above the ore box conversion seat 14 on the deck by the ore box drive railcar 13. At the same time, the ore box guide rope 12 moves with the ore box 6, and the ore box guide rope 12 approaches and passes through the guide roller 15 to approach the ore box conversion seat 14. The ore box guide rope 12 can be installed on the eccentric side of the lower end of the guide cone 18 or on the side of the guide cone 18. During the process of the fully loaded ore box 6 being moved horizontally above the ore box conversion seat 14, the ore box guide rope 12 will cause the ore box 6 to rotate slightly under its own weight to adjust the subsequent docking angle between the ore box 6 and the ore box conversion seat 14. The ore box hoisting winch 5 lowers the ore box 6, which moves downwards towards the ore box conversion seat 14. The outer wall of the ore box 6 engages with the outer guide horn 16 on the upper part of the ore box conversion seat 14, guiding the ore box 6 into the ore box conversion seat 14. As the ore box 6 continues to move downwards, its outer wall engages with the inner guide horn 17 at the lower end of the outer guide horn 16, further guiding the position of the ore box 6. This causes the guide cone 18 at the lower end of the ore box 6 to enter the cone limiting hole 19 of the ore box conversion seat 14. The ore box guide rope 12, connected to the guide cone 18, passes through the guide slot 20 on the side of the ore box conversion seat 14 and enters the cone limiting hole 19. The operator can observe from one side, which can assist in the docking of the ore box 6 and the ore box conversion seat 14, understand the descent angle of the ore box 6, and understand the orientation of the head of the connecting pin 22. As the ore box 6 continues to fall, the retaining rod 23 touches the axial limiting arc plate 24 on the ore box conversion seat 14. Guided by the axial limiting arc plate 24, the retaining rod 23 is embedded in the axial limiting groove 25 of the axial limiting arc plate 24. At the same time... The connecting pin 22 is opposite to the two pin-driven manipulators 26 inside the ore box conversion seat 14. The lower part of the guide cone 18 is opposite to the two locking clamping claws 27. The locking clamping claw drive cylinder 28 is activated, which drives the two locking clamping claws 27 to extend and clamp the guide cone 18, thus limiting and fixing the ore box 6 and the ore box conversion seat 14. The pin-driven manipulator 26 is activated, and the pin-driven manipulator 26 on the tail side of the connecting pin 22 extends, pushing the connecting pin 22 towards the pin-driven manipulator 26 on the head side of the connecting pin 22 until the connecting pin 22 separates from the guide sleeve 21 and the guide cone 18. The cable of the ore box hoisting winch 5 at the upper end of the ore box 6 is released, and the fully loaded ore box 6 is lifted away by a crane. In step S5, take an empty mining box 6 and place it on the mining box conversion seat 14. The empty ore box 6 is guided by the tapered guide flare 29 at the lower end of the guide sleeve 21 and engages with the guide cone 18 on the ore box conversion seat 14. The locking rod 23 of the empty ore box 6 engages with the axial limiting arc plate 24 for positioning. The guide sleeve 21 of the empty ore box 6 is engaged with the guide cone 18 on the ore box conversion seat 14. The pin shaft on one side of the head of the connecting pin 22 is activated to push the manipulator 26, inserting the connecting pin 22 into the guide sleeve 21 and the guide cone 18, fixing the empty ore box 6 to the guide cone 18, and connecting the upper end of the empty ore box 6 to the cable of the ore box hoisting winch 5. Activate the locking gripper drive cylinder 28, the locking gripper 27 retracts and separates from the guide cone 18, activate the ore box lifting winch 5 to lift the ore box 6 above the ore box conversion seat 14, activate the ore box drive railcar 13 to move the ore box 6 horizontally above the deck moon pool, activate the ore box lifting winch 5 to lower the ore box 6, and simultaneously drive the ore box guide winch 11 to retract the ore box guide rope 12, guiding the empty ore box 6 back quickly to the mining robot 2 and connecting it to the mining frame 30 of the mining robot 2; in the above method, the operator assists on one side in docking the ore box 6 with the ore box conversion seat 14 and in replacing the ore box 6. If necessary, the operator can assist in rotating the ore box 6 to ensure reliable docking between the ore box 6 and the ore box conversion seat 14.

[0053] Compared to existing technologies, this invention offers several advantages: First, it utilizes only a workboat and a mining robot, with the ore box integrated onto the robot, eliminating the need for an underwater work platform and lifting cabin, thus reducing equipment and significantly lowering operating costs. Second, the dual robotic arms work collaboratively, with the left arm using a hook for crushing and the right arm using a bucket for shoveling, their actions independent of each other. Ore crushing, collection, and conveying are completed in one integrated process, greatly improving ore crushing and collection efficiency and adapting to complex underwater mining conditions. Third, the ore box is designed to be separate from the mining frame, eliminating the need to lift the entire robot; only the ore box is hoisted, shortening work intervals and improving mining continuity. Fourth, the ore box is lifted from the top by a cable from a ore box hoisting winch, and guided from the bottom by a guide rope from a ore box guiding winch, along with guide pulleys on the deck, achieving precise positioning and lifting of the ore box, increasing transport speed, and preventing rope entanglement and ore box collisions. Fifth, a pin on the ore box conversion seat drives the robotic arm to engage with a connecting pin, enabling rapid assembly and disassembly of the ore box, preventing the guide cone from falling off, and improving the safety and convenience of ore box replacement.

[0054] Due to the above-mentioned structure, the present invention has the advantages of requiring less equipment, simplifying the mining process, providing guidance for the lifting of the ore box, and increasing mining efficiency.

Claims

1. A mining operation method, characterized in that: Includes the following steps: S1: Deploying the mining robot (2): The work vessel (1) transports the mining robot (2) to the work area, and the hoisting winch (4) releases the cable to lower the mining robot (2) to the seabed. The ore box hoisting winch (5) releases the cable simultaneously, and the ore box (6) of the mining robot (2) falls together with the mining robot (2). After the mining robot (2) reaches the seabed, it begins mining operations: S2: Mining operation: The mining robot (2) performs ore crushing operation through the hook arm (9). The mining robot (2) uses the bucket arm (10) to scoop the crushed ore into the inlet of the slag loader (7). The ore is transported to the inside of the ore box (6) through the ore telescopic conveyor (8). S3: Repeat step S2 until the ore box (6) is full. After the ore box (6) is full, the hook arm (9), the bucket arm (10), the slag remover (7), and the ore telescopic conveyor (8) all stop working. The conveyor frame of the ore telescopic conveyor (8) retracts and moves away from the ore box (6). S4: Recovering a full-loaded ore box (6): Drive the ore box hoisting winch (5) to retract the cable, and at the same time, the ore box guide winch (11) on the mining robot (2) releases the ore box guide rope (12) connected to the bottom of the ore box (6). The ore box hoisting winch (5) lifts the full-loaded ore box (6) onto the deck of the work vessel (1), unties the ore box guide rope (12) at the bottom of the full-loaded ore box (6) and the cable of the ore box hoisting winch (5) at the top of the ore box (6), and lifts the full-loaded ore box (6) away. S5: Replace an empty ore box (6): Take an empty ore box (6), connect the cable of the ore box hoisting winch (5) in step S4 to the upper end of the empty ore box (6), connect the ore box guide rope (12) to the bottom of the empty ore box (6), start the ore box guide winch (11) to retract the ore box guide rope (12), and the ore box hoisting winch (5) releases the cable to quickly lower the empty ore box to the seabed and connect it to the mining robot (2) through the ore box guide rope (12); S6: Repeat steps S2, S3, S4, and S5 until the mining operation is completed. Start the hoisting winch (4) to lift the mining robot (2) via cable. The ore box hoisting winch (5) simultaneously retracts the cable to ensure that the ore box (6) rises together with the mining robot (2). Lift the mining robot (2) onto the work vessel (1) to end the mining operation.

2. The mining operation method according to claim 1, characterized in that: In step S1, the cable of the hoisting winch (4) passes through the robot guide roller (3) that guides the mining robot (2) to lift and connect with the mining robot (2). The cable of the ore box hoisting winch (5) passes through the ore box drive railcar (13) used to adjust the horizontal position of the ore box (6) and connects with the ore box (6).

3. A mining operation method according to claim 2, characterized in that: In step S4, after the fully loaded ore box (6) rises above the deck, the ore box drive railcar (13) is started to move the fully loaded ore box (6) horizontally above the ore box conversion seat (14) on the deck. At the same time, the ore box guide rope (12) moves with the ore box (6) and approaches the ore box conversion seat (14). The ore box guide rope (12) is fixed on the guide cone (18) at the lower end of the ore box (6). The guide cone (18) is matched with the guide sleeve (21) fixed at the bottom of the ore box (6). The ore box is connected and fixed by the connecting pin (22). The ore box hoisting winch (5) is driven to lower the ore box (6). The ore box (6) moves downward toward the ore box conversion seat (14). The outer wall of the ore box (6) cooperates with the inner wall of the ore box conversion groove (45) of the ore box conversion seat (14) for guidance. The ore box (6) enters the ore box conversion groove (45). The guide cone (18) at the lower end of the ore box (6) enters the cone limit hole (19) of the ore box conversion groove (45). The ore box guide rope (12) passes through... The guide slot (20) on the side of the ore box conversion seat (14) leads into the cone head limiting hole (19). The ore box (6) descends to its position. The connecting pin (22) and the two pin shafts in the ore box conversion slot (45) push the manipulator (26) to face each other. The lower part of the guide cone head (18) faces the two locking grippers (27) in the ore box conversion slot (45). The locking gripper drive cylinder (28) is activated, driving the two locking grippers (27) to extend and clamp the guide cone head (18), thus transferring the ore. The box (6) and the ore box conversion seat (14) are fixed in a limited position; the pin shaft pusher (26) is started, and the pin shaft pusher (26) on the tail side of the connecting pin (22) extends out, pushing the connecting pin (22) towards the pin shaft pusher (26) on the head side of the connecting pin (22) until the connecting pin (22) separates from the guide sleeve (21) and the guide cone (18), and the cable of the ore box hoisting winch (5) at the top of the ore box (6) is untied, and the fully loaded ore box (6) is hoisted away.

4. A mining operation method according to claim 3, characterized in that: In step S4: the outer wall of the ore box (6) cooperates with the outer guide horn (16) at the top of the ore box conversion seat (14) to guide the ore box (6) into the ore box conversion seat (14). As the ore box (6) continues to move downward, the outer wall of the ore box (6) cooperates with the inner guide horn (17) at the bottom of the outer guide horn (16) to further guide the position of the ore box (6). A retaining rod (23) is fixed on the guide sleeve (21) above the connecting pin (22). As the ore box (6) continues to fall, the retaining rod (23) falls and touches the axial limiting arc plate (24) on the ore box conversion seat (14). Guided by the axial limiting arc plate (24), the retaining rod (23) is embedded in the axial limiting groove (25) of the axial limiting arc plate (24), and the ore box (6) falls into place.

5. A mining operation method according to claim 4, characterized in that: In step S5: the empty ore box (6) is placed on the ore box conversion seat (14). The empty ore box (6) is guided by the conical guide horn (29) at the lower end of the guide sleeve (21) at its bottom and is engaged with the guide cone (18) on the ore box conversion seat (14). The locking rod (23) of the empty ore box (6) is engaged with the axial limiting arc plate (24) for positioning. The guide sleeve (21) of the empty ore box (6) is engaged with the guide cone (18) on the ore box conversion seat (14). The pin shaft on one side of the head of the connecting pin (22) is activated to push the manipulator (26) to move the connecting pin (22). 22) Insert the guide sleeve (21) and guide cone (18) into the guide sleeve (21) and fix the empty ore box (6) to the guide cone (18). Connect the upper end of the empty ore box (6) to the cable of the ore box hoisting winch (5). Start the locking clamping claw drive cylinder (28). The locking clamping claw (27) retracts and separates from the guide cone (18). Start the ore box hoisting winch (5) to lift the ore box (6) above the ore box conversion seat (14). Start the ore box drive railcar (13) to move the ore box (6) horizontally above the deck moon pool. Start the ore box hoisting winch (5) to lower the ore box (6).

6. A mining operation method according to claim 3, 4, or 5, characterized in that: In step S4, the guide rope (12) of the ore box is guided into the guide slot (20) by the guide roller (15) installed on the deck of the work vessel (1).

7. A mining operation method according to any one of claims 1-5, characterized in that: In step S1: In the initial state, the robot tray (51) is located above the moon pool of the work vessel (1), the mining robot (2) is placed on the robot tray (51), the upper end of the mining robot (2) is connected to the cable of the hoisting winch (4), the ore box (6) of the mining robot (2) is connected to the cable of the ore box hoisting winch (5), after the work vessel (1) transports the mining robot (2) to the work area, the work vessel control system controls the hoisting winch (4) and the ore box hoisting winch (5) to simultaneously retract the cable, lift the mining robot (2), the mining robot (2) separates from the robot tray (51), the work vessel control system controls the slide drive cylinder to drive the slide (50) to move towards the hoisting winch (4), after the slide (50) leaves the moon pool, the mining robot (2) is above the moon pool.

8. A mining operation method according to any one of claims 1-5, characterized in that: In step S6, the mining robot (2) exits the moon pool and is placed above the moon pool. The operation vessel control system controls the slide drive cylinder to drive the slide (50) to move towards the moon pool, so that the robot tray (51) is below the mining robot (2). The operation vessel control system controls the hoisting winch (4) and the ore box hoisting winch (5) to release the cable at the same time, so that the mining robot (2) falls on the robot tray (51).

Citation Information

Patent Citations

  • Conveyor

    CN102514905A

  • Intermittent deep-sea mineral resource mining system and mining method thereof

    CN106761762A