A rigid-flexible combined pressure relief and drainage roadway floor heave control system and method
By combining rigid support with flexible damping energy absorption devices, a rigid-flexible synergistic pressure relief and drainage roadway management system has been developed, solving the problem that traditional support structures cannot adapt to the rheology and water seepage of the surrounding rock, and improving the long-term stability and safety of the roadway.
Patent Information
- Application Number
- CN202611212690.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-11
- Publication Date
- 2026-11-17
AI Technical Summary
Traditional rigid support structures lack energy absorption and buffering capacity, cannot adapt to the slow rheological deformation of the surrounding rock, and are prone to damage; seepage water in the fissures of the surrounding rock in the roadway cannot be effectively drained, resulting in great difficulty in treating floor heave and a high recurrence rate.
The rigid-flexible synergistic pressure relief and drainage roadway management system combines rigid support structures with flexible damping energy absorption devices and integrates drainage channels. It consists of double-layer inverted arches, anchor bolts, double-layer steel pipe columns, dampers, etc., to achieve active support, pressure relief buffering and efficient drainage.
It effectively controls roadway deformation, drains accumulated water, absorbs dynamic load energy, improves the long-term stability and safety of the roadway, reduces the water content of the surrounding rock, and reduces the recurrence of floor heave.
Smart Images

Figure CN123109699A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of mining technology and relates to a rigid-flexible synergistic pressure relief and drainage roadway floor heave treatment system and method. Background Technology
[0002] Under complex geological conditions and intense mining conditions, floor heave occurs frequently, and many roadways experience repeated damage through a cycle of "treatment-deformation-retreatment," severely impacting roadway safety and stability as well as efficient mine production. Traditional methods for treating floor heave mainly include floor anchor reinforcement, concrete inverted arching, and passive support using rigid supports such as U-shaped steel beams. However, these methods have significant shortcomings: traditional rigid support uses high-strength, high-rigidity concrete inverted arches and rigid supports, solely restricting the deformation of the surrounding rock. However, the surrounding rock in deep, high-stress roadways exhibits continuous rheological characteristics, with large floor deformation and long deformation cycles. Rigid support cannot adapt to the slow rheological deformation of the surrounding rock, easily leading to problems such as concrete cracking, steel frame twisting, and anchor bolt / cable breakage, resulting in support structure failure. Traditional rigid structures lack energy absorption and buffering capacity, making them prone to brittle failure under sudden stress changes. For water-rich roadways, most mines currently only focus on surface drainage, making it difficult to completely seal water seepage from surrounding rock fissures. Water continuously seeps into the soft rock strata of the floor, causing the floor strata to absorb water, soften, expand in volume, and reduce strength. At the same time, some roadway drainage systems are poorly designed, and drainage channels are blocked, resulting in long-term water immersion in the floor, continuously exacerbating the rheological deformation of the rock mass. Conventional support reinforcement cannot counteract the continuous damage caused by water action, making floor heave treatment in water-rich soft rock roadways difficult and with a high recurrence rate, which is a core problem that has long plagued floor heave treatment. Summary of the Invention
[0003] To address the issues of traditional rigid structures lacking energy absorption and buffering capacity and the inability to effectively drain seepage water from fissures in roadways, this invention provides a rigid-flexible synergistic pressure relief and drainage roadway floor heave treatment system and method. It integrates active support, pressure relief and buffering, and efficient drainage. Its core technology lies in combining a rigid support structure with a flexible damping energy absorption device and integrating a drainage channel. This system can simultaneously and effectively control deformation, drain accumulated water, and absorb dynamic load energy, thereby improving the long-term stability and safety of the roadway.
[0004] This invention provides a rigid-flexible synergistic pressure relief and drainage roadway floor heave treatment system, including a rigid support structure and a flexible damping energy absorption device. The rigid support structure includes a double-layer inverted arch, anchor bolts, and double-layer steel pipe columns, and the flexible damping energy absorption device includes a damper. The double-layer inverted arch is set in the arc-shaped groove at the bottom of the roadway. Anchor bolts are evenly connected to the double-layer inverted arch, anchoring it to the stable rock strata below the roadway floor. Double-layer steel pipe columns are set in sections above the double-layer inverted arch, and a crushed stone concrete mixed bearing layer is set between two adjacent double-layer steel pipe columns. A crossbeam and a damper are set above the double-layer steel pipe columns and the crushed stone concrete mixed bearing layer. The damper is set at both ends of the crossbeam. One end of the damper is connected to the upper inverted arch through a ball joint support, and the other end is connected to the crossbeam. A concrete layer is set above the damper and the crossbeam.
[0005] Furthermore, the double-layered inverted arch is composed of two layers of steel plates, with a 100mm gap between them to form a water storage space. Drainage pipes are pre-installed within the gap between the two steel plates of the double-layered inverted arch. These drainage pipes should be installed along the centerline of the tunnel floor and are made of rubber. Sufficient length should be provided in the tunnel floor to effectively drain any accumulated water.
[0006] The ball joint support is threadedly connected to the double-layer inverted bottom arch at the ball joint fixing point. To ensure reliable anchoring of the entire structure, anchor bolts need to be installed, and the anchor bolt trays should be placed on the upper inverted arch. The double-layered inverted arch will be anchored as a whole to the stable rock strata below the roadway floor through the anchor bolts.
[0007] The double-layer steel pipe column consists of two layers of steel pipes. The outer steel pipe is fitted over the inner steel pipe. Holes are evenly distributed on the wall of the outer steel pipe, and filter screens are installed at these holes. These filter screens are used to filter particulate matter in the water at the bottom plate, preventing clogging and allowing only water to pass through. The annular gap between the outer and inner steel pipes serves as a seepage channel, allowing water from the tunnel floor to seep in and flow downwards along this channel into the water storage space between the double-layer inverted arch steel plates.
[0008] The damper has a double-layered box structure, including an outer box, an inner box nested inside the outer box, a piston rod, a piston valve, a bottom valve, a protective spring, and a sealing assembly. An annular sandwich is formed between the outer and inner boxes. The upper part of the sandwich is a sealed gas storage chamber filled with nitrogen, and the lower part is a third liquid storage chamber. The inner box is axially divided into upper and lower independent chambers by the piston valve and the bottom valve. Above the piston valve is the first liquid storage chamber filled with a non-Newtonian fluid, and between the piston valve and the bottom valve is the second liquid storage chamber, which is designed as free space. The upper end of the piston rod extends outside the box. A connecting end is provided, and a piston valve is fixedly connected to the lower end of the piston rod. A sealing ring is installed at the top of the housing through which the piston rod passes to achieve a seal. The protective spring is coaxially sleeved on the outside of the piston rod, between the top of the housing and the connecting end. A check valve and a damping valve are respectively installed on both sides of the piston valve. The bottom valve is also equipped with a check valve and a damping valve. The piston valve connects the first liquid storage chamber and the second liquid storage chamber, and the bottom valve connects the second liquid storage chamber and the third liquid storage chamber. The gas storage chamber, each liquid storage chamber, and the valve group cooperate to form a closed medium circulation chamber. Shear damping energy is generated by the flow of non-Newtonian fluid through the damping valve, and the pressure in the chamber is adaptively balanced by the interlayer nitrogen.
[0009] This invention provides a method for treating floor heave in drainage roadways using a combination of rigid and flexible pressure relief and drainage, comprising the following steps: Step 1: Excavate an arc-shaped trench in the tunnel floor, clean out the scum and debris in the trench, and make the bottom vertical outline arc-shaped. Step 2: Install the double-layered inverted bottom arch with a pre-reserved gap into the arc-shaped groove. The double-layered inverted bottom arch has a built-in water pumping pipe. Step 3: The double-layer steel pipe columns are connected to the double-layer inverted bottom arch, and a mixed bearing layer of crushed stone concrete is laid around the steel pipe columns. Step 4: Hinge the double-layered inverted arch foot and crossbeam at both ends of the damper; Step 5: Pour another layer of crushed stone concrete over the damper and crossbeam.
[0010] In step one, the maximum excavation depth of the arc-shaped trench is 1100mm. The lowest point of the arc-shaped trench is located at the center line of the tunnel floor and is excavated at intervals of 1200mm along the direction of the tunnel.
[0011] In step two, the internal space height of the double-layer inverted arch is 100mm. The water pumping pipe inside the inverted arch should be installed in advance at the center line of the roadway floor. The drainage pipe is a rubber water pipe, and the roadway floor should have sufficient length for negative pressure drainage. When the anchor bolt is installed, its tray should be left on the upper inverted arch.
[0012] In step three, the inner diameter of the double-layer steel pipe column is 400mm, the outer diameter is 450mm, and the height is based on the actual height between the upper inverted arch and the crossbeam of the tunnel. The bottom of the outer side of the steel pipe column is connected to the inverted arch. The interior is filled with C30 concrete with a cement:sand:gravel:water ratio of 1:1.5:3:0.45 as the main load-bearing structure. The outer layer has perforated mesh with filter screens on the outer wall of the steel pipe column as a seepage channel.
[0013] In step four, the damper piston rod is connected to the ball joint support at the arch foot of the upper inverted bottom arch. A protective spring provides extension and retraction space for the piston rod while preventing rock debris from interfering with its movement. This spring is a high-performance spring with a free height of 150mm-200mm, a maximum extension of 100mm, and an ultimate bearing capacity of 1500kPa-2000kPa. The damper is filled with a non-Newtonian fluid and nitrogen. The damper length is selected based on the tunnel width, ranging from 600mm-800mm, and the width is 400mm. The crossbeam is preferably made of high-strength steel plate, with a width of 400mm and a thickness of 100mm. Its length is calculated as tunnel width - damper length × 2.
[0014] In step five, the thickness of the crushed stone concrete bearing layer is 200mm-300mm.
[0015] The beneficial effects of this invention are: (1) In terms of support effect, the double-layer anti-bottom arch and the anchor bolts that penetrate deep into the stable rock layer constitute a strong rigid support skeleton, providing solid and reliable initial support for the bottom plate, and can effectively resist the initial deformation of the rock layer and hydrostatic pressure. The non-Newtonian fluid damping device set above the concrete layer and the integrated hydraulic damper constitute the flexible buffer core of the system. The characteristics of non-Newtonian fluid (shear thickening fluid) enable it to flexibly cope with external loads: under the normal condition of slow rheological change of the surrounding rock and steady increase of stress in the tunnel, the fluid maintains low viscosity, allowing the support structure to produce controllable pressure relief deformation, thereby releasing the stress of the surrounding rock, avoiding the risk of stress concentration and brittle fracture caused by the inability to deform due to pure rigid support, and greatly improving the adaptability of the support system to long-term deformation of the surrounding rock. When the tunnel floor is subjected to rockburst caused by mining, the viscosity of the non-Newtonian fluid increases dramatically within a short period, even becoming almost solid. Working in conjunction with the hydraulic damper, it rapidly converts the impact kinetic energy into damping heat energy, effectively protecting the main support structure from impact damage and significantly improving the tunnel's safety under dynamic pressure. The piston rod end uses a ball joint connection, allowing the system a certain degree of rotational freedom under load, adapting to uneven settlement and deformation, further enhancing the structure's adaptability and service life.
[0016] (2) In terms of drainage efficiency, a continuous and unobstructed seepage and water storage channel is constructed from the floor rock mass to the tunnel sidewall through the space between the double-layer steel pipe columns and the double-layer inverted arch. This active drainage method fundamentally reduces the water content of the floor rock mass and weakens the softening and expansion effect of water on the rock mass. Compared with traditional passive waterproofing or simple drainage ditches, the drainage path of this system is more direct and effective, and less prone to clogging. Attached Figure Description
[0017] Figure 1 This is an overall schematic diagram of the present invention; Figure 2 This is a schematic diagram of the double-layered inverted arch. Figure 3 This is a schematic diagram of a ball joint support; Figure 4 This is a schematic diagram of a steel pipe column; Figure 5 This is a schematic diagram of the overall damper. Figure 6 This is a schematic diagram of a damper check valve; Figure 7 This is a schematic diagram of a damper damping valve.
[0018] In the diagram: 1-Double-layer inverted arch, 2-Drainage pipe, 3-Double-layer steel pipe column, 4-Compound stone concrete bearing layer, 5-Spherical hinge bracket, 6-Damper, 7-Crossbeam, 8-Anchor point, 9-Spherical hinge fixing point, 10-Filter screen, 11-Piston rod, 12-Piston valve, 13-Bottom valve, 14-Protective spring, 15-Gas storage chamber, 16-First liquid storage chamber, 17-Second liquid storage chamber, 18-Third liquid storage chamber, 19-One-way valve, 20-Damping valve, 21-Sealing ring. Detailed Implementation
[0019] The present invention will be further illustrated by the following embodiments, but is not limited to the following embodiments. Example 1
[0020] like Figures 1-7 As shown, this embodiment provides a rigid-flexible coordinated pressure relief and drainage roadway floor heave treatment system, including a rigid support structure and a flexible damping energy absorption device. The rigid support structure includes a double-layer inverted arch 1, anchor bolts, and a double-layer steel pipe column 3. The flexible damping energy absorption device includes a damper 6. A double-layer inverted arch 1 is set in an arc-shaped groove at the bottom of the roadway. Anchor bolts are evenly connected to the double-layer inverted arch 1, anchoring the double-layer inverted arch 1 to the stable rock strata below the roadway floor. Double-layer steel pipe columns 3 are set in sections above the double-layer inverted arch 1. A crushed stone concrete mixed bearing layer 4 is provided between two adjacent double-layer steel pipe columns 3. A crossbeam 7 and a damper 6 are provided above the double-layer steel pipe columns 3 and the crushed stone concrete mixed bearing layer 4. Two dampers 6 are respectively set at both ends of the crossbeam 7. One end of the damper 6 is connected to the upper inverted arch through a ball joint support 5, and the other end is connected to the crossbeam 7. A concrete layer is provided above the damper 6 and the crossbeam 7.
[0021] Furthermore, the double-layer inverted arch 1 is composed of two layers of steel plates, with a 100mm gap between them to form a water storage space. A drainage pipe 2 is pre-installed within the gap between the two steel plates of the double-layer inverted arch. The drainage pipe 2 should be installed along the centerline of the tunnel floor. The drainage pipe is a rubber hose, and the tunnel floor should have sufficient length to effectively drain any accumulated water.
[0022] The ball joint support 5 is threadedly connected to the double-layer inverted bottom arch 1 at the ball joint fixing point; To ensure reliable anchoring of the entire structure, anchor bolts need to be installed, and the anchor bolt trays should be placed on the upper inverted arch. The double-layered inverted arch will be anchored as a whole to the stable rock strata below the roadway floor through the anchor bolts.
[0023] The double-layer steel pipe column 3 consists of two layers of steel pipes. The outer steel pipe is sleeved on the outside of the inner steel pipe. Holes are evenly distributed on the wall of the outer steel pipe, and a filter screen 10 is installed at each hole. The filter screen 10 is used to filter particulate matter in the water on the floor, preventing clogging and allowing only water to pass through. The annular gap between the outer and inner steel pipes serves as a seepage channel, allowing water from the tunnel floor to seep in and flow downwards along this channel into the water storage space between the double-layer inverted arch steel plates.
[0024] The damper 6 has a double-layer box structure, including an outer box, an inner box nested inside the outer box, a piston rod 11, a piston valve 12, a bottom valve 13, a protective spring 14, and a sealing ring 21. An annular interlayer is formed between the outer and inner boxes. The upper part of the interlayer is a sealed gas storage chamber 15 filled with nitrogen, and the lower part is a third liquid storage chamber 18. The inner box is axially divided into upper and lower independent chambers by the piston valve 12 and the bottom valve 13. Above the piston valve 13 is a first liquid storage chamber 16 filled with a non-Newtonian fluid. Between the piston valve 12 and the bottom valve 13 is a second liquid storage chamber 17, which is a free space. The upper end of the piston rod 11 extends outside the box and is provided with a connecting end, while the lower end of the piston rod 11 is fixedly connected to… A piston valve 12 and a piston rod 11 are fitted with a sealing ring at the top of the housing to achieve a seal. The protective spring 14 is coaxially sleeved on the outside of the piston rod 11, located between the top of the housing and the connecting end. The spring serves both to extend and retract, and to protect against large external stones from entering the spring. A one-way valve 19 and a damping valve 20 are respectively installed on both sides of the piston valve 12. The bottom valve 13 is also equipped with a one-way valve and a damping valve. The piston valve 12 connects the first liquid storage chamber 16 and the second liquid storage chamber 17, and the bottom valve 13 connects the second liquid storage chamber 17 and the third liquid storage chamber 18. The gas storage chamber 15, each liquid storage chamber, and the valve group cooperate to form a closed medium circulation chamber. The non-Newtonian fluid flows through the damping valve to generate shear damping energy dissipation, and the interlayer nitrogen gas achieves self-adaptive pressure balance within the chamber.
[0025] This embodiment provides a method for treating floor heave in drainage roadways using the aforementioned rigid-flexible pressure relief and drainage roadway floor heave system. The implementation process is as follows: Step 1: At the location of the roadway floor requiring floor heave treatment, excavate an arc-shaped trench according to the design requirements. The bottom vertical contour of the arc-shaped trench is circular, with a maximum excavation depth of 1100mm. The lowest point of the arc-shaped trench is located at the centerline of the roadway floor. The interval between adjacent arc-shaped trenches along the roadway direction is 1200mm. After excavation, thoroughly clean the trench of scum and debris to ensure the trench bottom and walls are clean. Install the pre-fabricated double-layer inverted bottom arch steel plate into the arc-shaped trench. This double-layer inverted bottom arch consists of two layers of steel plates, with a 100mm gap between them to form a water storage space. Simultaneously with the installation of the double-layer inverted bottom arch, drainage pipes must be pre-installed within its internal space (i.e., the gap between the two steel plates). The drainage pipe should be installed along the centerline of the tunnel floor. The pipe should be a rubber hose, and the tunnel floor should have sufficient length for it. Negative pressure drainage should be used to effectively drain any accumulated water. The ball joint support is threaded to the double-layered inverted arch at the ball joint fixing point. To ensure reliable anchoring of the entire structure, anchor bolts must be installed, with the bolt trays placed on the upper inverted arch. The double-layered inverted arch is then anchored as a whole to the stable rock strata below the tunnel floor using these anchor bolts.
[0026] Step Two: After the double-layer inverted bottom arch is fixed, install the double-layer steel pipe columns. The inner diameter of the double-layer steel pipe columns is 400mm, and the outer diameter is 450mm. Their specific height is determined based on the vertical distance between the upper inverted bottom arch and the subsequently installed crossbeams in the actual roadway. During installation, first position the inner steel pipe and connect its outer bottom to the lower double-layer inverted bottom arch. Then, pour C30 concrete inside the inner steel pipe. The preferred concrete mix ratio (by weight) is: cement:sand:gravel:water = 1:1.5:3:0.45, thus forming a stable core load-bearing column to support the overburden load transmitted from the roadway roof and surrounding rock. After the inner steel pipe is poured, fit the outer steel pipe over it. Uniformly distributed through holes are provided on the wall of the outer steel pipe, and a 40-mesh filter screen is installed at each hole. This filter screen filters particulate matter in the water at the bottom plate to prevent clogging and allows only water to pass through. The annular gap between the outer and inner steel pipes serves as a seepage channel, allowing water from the tunnel floor to infiltrate and flow downwards into the water storage space between the double-layered inverted arch steel plates. Ultimately, the accumulated water can be drained through drainage pipes installed on the tunnel walls.
[0027] Step 3: After the double-layer steel pipe column is installed in place, a mixed bearing layer of crushed stone concrete is laid and poured around it. This bearing layer completely wraps around and fixes the bottom of the steel pipe column, ensuring that the column has sufficient stability in the tunnel floor and can effectively resist the stress generated by the floor heave.
[0028] Step 4: After the first layer of crushed stone concrete mixed bearing layer has cured, install the damper and crossbeam. The two ends of the damper are hinged to the arch foot of the upper inverted arch and the crossbeam, respectively. Specifically, the piston rod end of the damper is connected to the arch foot of the upper inverted arch via a ball joint bracket to accommodate complex deformations of the tunnel floor in multiple directions; the other end of the damper is connected to the crossbeam. The crossbeam is preferably made of high-strength steel plate, with a width of 400mm and a thickness of 100mm. Its length is calculated based on "tunnel width - damper length × 2". The length of the damper is selected based on the actual tunnel width, ranging from 600mm to 800mm, and its width is 400mm.
[0029] The damper is filled with a non-Newtonian fluid and nitrogen. To improve its adaptability under complex stress environments, the damper has multiple chambers: the first liquid storage chamber 16 is filled with a non-Newtonian fluid (preferably a shear-thickening fluid); the second liquid storage chamber 17 is located between the piston valve 12 and the bottom valve 13, and the second liquid storage chamber 17 is designed as a free space; the piston valve 12 connects the first liquid storage chamber 16 and the second liquid storage chamber 17, and the bottom valve 13 connects the second liquid storage chamber 17 and the third liquid storage chamber 18; the gas storage chamber is filled with nitrogen. The chambers are connected by check valves and damping valves. The non-Newtonian fluid has the following characteristics: when subjected to slow deformation or low-rate loads, its viscosity is low, exhibiting flexible pressure relief; while when subjected to rapid impact or high stress loading, its viscosity increases sharply and instantaneously, exhibiting a high-resistance state similar to a solid, thus achieving an adaptive support effect of "slow relief and fast resistance".
[0030] To prevent rock debris from interfering with the normal extension and retraction of the piston rod, the damper is also equipped with a protective spring to provide space for the piston rod to extend and retract. The high-performance spring inside the protective spring has a free height of 150mm–200mm, a maximum extension and retraction of 100mm, and an ultimate bearing capacity of 1500kPa–2000kPa.
[0031] Step 5: Pour another layer of concrete above the damper and crossbeam, and after laying, gradually compact and level it to complete the construction of the entire bottom drum treatment system.
[0032] The compression process of the damping device is as follows: When the arch of the roadway is subjected to horizontal compressive stress from the floor, the damper is compressed, and its piston rod moves downward relative to the damper cylinder. The downward movement of the piston rod drives the piston valve to move downward together. At the same time, the non-Newtonian fluid in the second liquid storage chamber below the piston valve is pressurized. Part of the non-Newtonian fluid flows into the first liquid storage chamber above the piston valve through a one-way flow valve (which provides a channel with no damping or minimal damping). Another part of the non-Newtonian fluid flows into the third liquid storage chamber through the damping valve of the bottom valve. The nitrogen in the gas storage chamber is blocked and compressed by the sealing ring, the temperature rises, and the heat energy is transferred and released to the outside, consuming some energy. When the non-Newtonian fluid flows through the damping valve, it generates damping force, thereby dissipating the impact energy.
[0033] The damping device's recovery process is as follows: When the instantaneous high-level stress applied to the arch suddenly disappears or decreases, the piston rod moves upward relative to the damper cylinder under internal force or rebound, causing the piston valve to move upward. At this time, the non-Newtonian fluid in the first reservoir chamber is pressurized and flows into the second reservoir chamber through the damping valve on the piston valve, generating damping force. Simultaneously, due to the upward movement of the piston rod, it partially exits the first reservoir chamber, resulting in a volume cavity in the first reservoir chamber and creating a vacuum effect. To compensate for this volume, the non-Newtonian fluid in the third reservoir chamber is drawn into the second reservoir chamber through a one-way valve (this channel provides no damping or minimal damping).
[0034] After the dampers and crossbeams are fully installed, a second layer of crushed stone concrete is poured on top of them. This layer serves as the second crushed stone concrete load-bearing layer, and its thickness is preferably 200mm–300mm. After pouring, the concrete is gradually compacted and leveled, thus completing the construction of the entire rigid-flexible combined drainage tunnel floor heave control system.
Claims
1. A rigid-flexible combined pressure relief and drainage roadway floor heave control system, characterized in that, It includes a rigid support structure and a flexible damping energy absorption device. The rigid support structure includes a double-layer inverted arch, anchor bolts, and double-layer steel pipe columns. The flexible damping energy absorption device includes a damper. The double-layer inverted arch is set in the arc-shaped groove at the bottom of the roadway. Anchor bolts are evenly connected to the double-layer inverted arch, anchoring it to the stable rock strata below the roadway floor. Double-layer steel pipe columns are set in sections above the double-layer inverted arch, and a crushed stone concrete mixed bearing layer is set between two adjacent double-layer steel pipe columns. A crossbeam and a damper are set above the double-layer steel pipe columns and the crushed stone concrete mixed bearing layer. The damper is set at both ends of the crossbeam. One end of the damper is connected to the upper inverted arch through a ball joint support, and the other end is connected to the crossbeam. A concrete layer is set above the damper and the crossbeam.
2. The rigid-flexible synergistic pressure relief and drainage roadway floor heave control system according to claim 1, characterized in that, The double-layer inverted bottom arch is composed of two layers of steel plates, with a 100mm gap between them to form a water storage space. Drainage pipes are pre-installed in the gap between the two layers of steel plates of the double-layer inverted bottom arch. The drainage pipes are installed along the centerline of the roadway floor and are made of rubber.
3. The rigid-flexible synergistic pressure relief and drainage roadway floor heave control system according to claim 1, characterized in that, The double-layer steel pipe column consists of two layers of steel pipes. The outer steel pipe is sleeved on the inner steel pipe. Holes are evenly arranged on the wall of the outer steel pipe, and a filter screen is installed at the hole. The filter screen is used to filter particulate matter in the water at the bottom plate and only allows water to pass through. The annular gap between the outer steel pipe and the inner steel pipe is a seepage channel.
4. The rigid-flexible synergistic pressure relief and drainage roadway floor heave control system according to claim 1, characterized in that, The damper has a double-layered box structure, including an outer box, an inner box nested inside the outer box, a piston rod, a piston valve, a bottom valve, a protective spring, and a sealing assembly. An annular sandwich is formed between the outer and inner boxes. The upper part of the sandwich is a sealed gas storage chamber filled with nitrogen, and the lower part is a third liquid storage chamber. The inner box is axially divided into upper and lower independent chambers by the piston valve and the bottom valve. Above the piston valve is the first liquid storage chamber filled with a non-Newtonian fluid, and between the piston valve and the bottom valve is the second liquid storage chamber, which is designed as free space. The upper end of the piston rod extends outside the box. A connecting end is provided, and a piston valve is fixedly connected to the lower end of the piston rod. A sealing ring is installed at the top of the housing through which the piston rod passes to achieve a seal. The protective spring is coaxially sleeved on the outside of the piston rod, between the top of the housing and the connecting end. A check valve and a damping valve are respectively installed on both sides of the piston valve. The bottom valve is also equipped with a check valve and a damping valve. The piston valve connects the first liquid storage chamber and the second liquid storage chamber, and the bottom valve connects the second liquid storage chamber and the third liquid storage chamber. The gas storage chamber, each liquid storage chamber, and the valve group cooperate to form a closed medium circulation chamber. Shear damping energy is generated by the flow of non-Newtonian fluid through the damping valve, and the pressure in the chamber is adaptively balanced by the interlayer nitrogen.
5. The rigid-flexible synergistic pressure relief and drainage roadway floor heave control system according to claim 1, characterized in that, The anchor plate is set on the upper inverted arch, and the double-layered inverted arch is anchored as a whole to the stable rock layer below the roadway floor through the anchor bolt; the ball joint support is threadedly connected to the double-layered inverted arch at the ball joint fixing point.
6. A method for treating floor heave in a rigid-flexible synergistic pressure relief and drainage roadway, comprising the rigid-flexible synergistic pressure relief and drainage roadway floor heave treatment system as described in any one of claims 1 to 5, characterized in that... Includes the following steps: Step 1: Excavate an arc-shaped trench in the tunnel floor, clean out the scum and debris in the trench, and make the bottom vertical outline arc-shaped. Step 2: Install the double-layered inverted bottom arch with a pre-reserved gap into the arc-shaped groove. The double-layered inverted bottom arch has a built-in water pumping pipe. Step 3: The double-layer steel pipe columns are connected to the double-layer inverted bottom arch, and a mixed bearing layer of crushed stone concrete is laid around the steel pipe columns. Step 4: Hinge the double-layered inverted arch foot and crossbeam at both ends of the damper; Step 5: Pour another layer of crushed stone concrete over the damper and crossbeam.
7. The method for treating floor heave in roadways using a combination of rigid and flexible pressure relief and drainage as described in claim 6, characterized in that, In step one, the maximum excavation depth of the arc-shaped trench is 1100mm. The lowest point of the arc-shaped trench is located at the center line of the tunnel floor and is excavated at intervals of 1200mm along the direction of the tunnel. In step two, the internal space height of the double-layer inverted arch is 100mm, and the water pumping pipe inside the inverted arch is pre-installed at the center line of the roadway floor; the anchor plate is left in the upper inverted arch.
8. The method for treating floor heave in roadways using a combination of rigid and flexible pressure relief and drainage as described in claim 6, characterized in that, In step three, the inner diameter of the double-layer steel pipe column is 400mm and the outer diameter is 450mm. The height is based on the actual height between the upper inverted bottom arch and the crossbeam of the tunnel. The bottom of the outer side of the steel pipe column is connected to the inverted bottom arch. The inside is filled with C30 concrete with a cement:sand:gravel:water ratio of 1:1.5:3:0.
45. The outer steel pipe has holes with filter screens on the outer wall of the steel pipe column as a seepage channel.
9. The method for treating floor heave in a rigid-flexible synergistic pressure relief and drainage roadway according to claim 6, characterized in that, In step four, the damper piston rod is connected to the ball joint support at the arch foot of the upper inverted bottom arch; the protective spring provides the piston rod with extension and contraction space, and at the same time prevents the rock debris on the bottom plate from interfering with the extension and contraction of the piston rod. The free height of the protective spring is 150mm-200mm, the maximum extension and contraction is 100mm, and the ultimate bearing capacity is 1500kPa-2000kPa; the damper is filled with non-Newtonian fluid and nitrogen gas. The length of the damper is selected according to the width of the roadway, with a length of 600mm-800mm and a width of 400mm; the crossbeam is made of high-strength steel plate, with a width of 400mm and a thickness of 100mm.