A precast box culvert structure with integrated evacuation staircase for shield tunnels and its construction method
By integrating evacuation staircases into the prefabricated box culvert structure of the shield tunnel, the problem of long prefabrication cycle of evacuation staircases in the construction of single-tunnel double-line shield tunnels was solved, and the synchronous construction of prefabricated box culverts and evacuation staircases was realized, improving construction efficiency and safety.
Patent Information
- Application Number
- CN202611576496.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-13
- Publication Date
- 2026-11-17
AI Technical Summary
In existing technologies, the construction period for prefabricated evacuation stairs in single-tunnel double-track shield tunnels is long and difficult to match with the shield tunneling speed. Furthermore, the construction of cast-in-place reinforced concrete is inefficient in confined spaces and relies on time-consuming and labor-intensive manual adjustments.
The shield tunnel precast box culvert structure with integrated evacuation staircases includes precast box culverts, staircase partitions, and precast evacuation staircases. They are sealed with sealant and fixedly connected at the top and bottom. The precast box culverts and evacuation staircases are transported and hoisted using a supporting trolley, and the construction of the precast box culverts and evacuation staircases is completed simultaneously.
It significantly improved the quality, efficiency, and safety of tunnel construction, reduced on-site construction workload, adapted to shield tunneling speed, reduced the risk of cross-operations, and improved construction organization efficiency.
Smart Images

Figure CN123109705A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of shield tunnel engineering technology, specifically to a precast box culvert structure for shield tunnels with integrated evacuation staircases and its construction method, which is particularly suitable for single-bore double-track shield tunnels. Background Technology
[0002] Tunnel construction can employ methods such as mining, shield tunneling (jacking), and cut-and-cover. When constructing urban railway tunnels, which traverse numerous sensitive environmental nodes, shield tunneling is generally used. When using a single-bore, double-track, large-diameter shield tunnel, box culverts are required to divide the tunnel space, forming the track area and the bottom corridor. For disaster prevention, evacuation, and rescue requirements, prefabricated evacuation staircases need to be installed on the box culverts at intervals throughout the tunnel. Currently, box culverts under the railway are generally prefabricated as a whole, and the prefabricated evacuation stairs are made of cast-in-place reinforced concrete. This has the following problems: 1) After the box culvert is assembled, the reinforced concrete stairs need to be constructed on site. The construction period is long and it is difficult to match the speed of shield tunneling, which affects the overall construction efficiency of the tunnel; 2) When constructing the prefabricated evacuation stairs, the cast-in-place stair partition walls need to be constructed first. After the walls have strengthened, the stair holes are cut for the construction of the prefabricated evacuation stairs. This process is long, and the clear distance between the stair partition walls is generally only 0.8m. The construction efficiency is low when casting-in-place reinforced concrete in such a small space; 3) When installing the box culvert, it is necessary to manually adjust it using four leveling bolts at the bottom, which is time-consuming and labor-intensive. Summary of the Invention
[0003] The purpose of this invention is to provide a precast box culvert structure for shield tunnels with integrated evacuation staircases and its construction method, which can at least solve some of the defects in the prior art.
[0004] To achieve the above objectives, the technical solution of the present invention is a precast box culvert structure for a shield tunnel with integrated evacuation staircases, comprising a precast box culvert, the precast box culvert including a top slab, a bottom slab, and two staircase partitions spaced apart, the top and bottom of each staircase partition being connected to the top slab and the bottom slab respectively; a staircase opening is provided on the top slab in the area between the two staircase partitions, a precast evacuation staircase is installed between the two staircase partitions, the top of the precast evacuation staircase is installed in the staircase opening and connected to the top slab, the bottom of the precast evacuation staircase is installed on the bottom slab, and the precast evacuation staircase and the staircase partitions are sealed with sealant.
[0005] As one implementation method, a first embedded sleeve is pre-embedded in the top plate, and an ear plate is reserved at the top of the prefabricated evacuation staircase. The ear plate is connected to the first embedded sleeve by bolts.
[0006] As one implementation method, a backfill layer is provided on the base plate, and a pre-embedded steel plate is embedded in the backfill layer; the bottom of the prefabricated evacuation staircase is welded and fixed to the pre-embedded steel plate.
[0007] The present invention also provides a construction method for a precast box culvert structure for a shield tunnel with integrated evacuation staircase as described in any one of the above claims, comprising the following steps: S1. Complete the prefabrication of precast box culverts and precast evacuation staircases; S2. When the tunnel boring machine advances forward, the precast box culvert is transported to the designated position in the tunnel segment behind the main body of the tunnel boring machine using the rear supporting trolley. S3. Complete the assembly of the prefabricated box culvert; S4. A stairwell opening is made on the top slab of the precast box culvert; S5. Hoist the prefabricated evacuation staircase to the site and lower it from the staircase opening between the two staircase partition walls. Fix the top and bottom of the prefabricated evacuation staircase to the top and bottom plates of the prefabricated box culvert, respectively. Then seal the prefabricated evacuation staircase with the staircase partition wall using sealant.
[0008] As one implementation method, in step S1, when prefabricating the prefabricated box culvert and the prefabricated evacuation staircase, a first pre-embedded sleeve is pre-embedded on the top plate of the prefabricated box culvert, and an ear plate is reserved on the top of the prefabricated evacuation staircase; in step S5, the method for fixing the top of the prefabricated evacuation staircase to the top of the prefabricated box culvert is: to fix the ear plate on the top of the prefabricated evacuation staircase to the first pre-embedded sleeve on the top plate with bolts.
[0009] As one implementation method, the following steps are also included between steps S3 and S4: backfilling is carried out at the bottom of the cavity of the precast box culvert, and a pre-embedded steel plate is embedded on the surface of the backfill.
[0010] As one implementation method, in step S5, the method for fixing the bottom of the prefabricated evacuation staircase to the bottom of the prefabricated box culvert is to weld the bottom of the prefabricated evacuation staircase to the embedded steel plate.
[0011] As one implementation method, in step S1, when prefabricating the precast box culvert, a wire saw hole is reserved on the top plate of the precast box culvert; in step S4, the method of opening a stair hole on the top plate of the precast box culvert is: passing the cutting wire of the wire saw through the wire saw hole and cutting the top plate of the precast box culvert along the outline of the stair hole to form the stair hole.
[0012] As one embodiment, there are multiple wire saw holes, which are spaced apart on the outline of the stair hole.
[0013] As one of the implementation methods, step S3, completing the assembly of the precast box culvert includes: first adjusting the precast box culvert to a preset posture and temporarily fixing it, and then grouting and filling the gap between the shield tunnel segment and the precast box culvert.
[0014] Compared with the prior art, the present invention has the following beneficial effects: This invention integrates the staircase partition wall with the precast box culvert and uses a precast evacuation staircase. During the tunnel boring machine (TBM) excavation, the construction of the precast box culvert and the precast evacuation staircase is completed simultaneously, reducing the workload of on-site construction and significantly improving the quality, efficiency and safety of tunnel construction. Furthermore, the precast box culvert and the precast evacuation staircase are constructed within the shield segments that have already been assembled behind the main body of the TBM, reducing cross-operations in the confined space of the tunnel and facilitating construction organization. Attached Figure Description
[0015] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0016] Figure 1 A schematic diagram of a prefabricated box culvert structure for a shield tunnel with integrated evacuation staircase provided in an embodiment of the present invention; Figure 2 A cross-sectional schematic diagram of a prefabricated box culvert structure for a shield tunnel with integrated evacuation staircase provided in an embodiment of the present invention. Figure 3 A longitudinal section schematic diagram of a prefabricated box culvert structure for a shield tunnel with integrated evacuation staircase provided in an embodiment of the present invention; Figure 4 This is a top view of a precast box culvert structure for a shield tunnel with integrated evacuation staircases provided in an embodiment of the present invention; Figure 5 A schematic diagram of the top slab of a precast box culvert provided in an embodiment of the present invention; Figure 6 A schematic diagram of a prefabricated evacuation staircase provided in an embodiment of the present invention; Figure 7 This is a schematic diagram showing the connection between the top of the prefabricated evacuation staircase and the top slab of the prefabricated box culvert provided in an embodiment of the present invention. Figure 8 A schematic diagram showing the connection between the bottom of the prefabricated evacuation staircase and the bottom of the prefabricated box culvert provided in an embodiment of the present invention; Figure 9 A partial schematic diagram of the precast box culvert bottom slab provided in an embodiment of the present invention; In the diagram: 1. Precast box culvert; 11. Top slab; 12. Bottom slab; 13. Side wall; 14. Staircase partition wall; 15. First embedded sleeve; 16. Wire saw hole; 17. Second embedded sleeve; 18. Anchor bar; 2. Precast evacuation staircase; 21. Step; 22. Stair beam; 23. Ear plate; 24. Bolt hole; 3. Backfill layer; 31. Embedded steel plate; 4. Bolt; 41. Washer; 5. Support column; 6. Airbag; 7. Cap; 8. Inflation device; 81. Inflation pipeline; 9. Shield tunnel segment; 10. Grouting layer. Detailed Implementation
[0017] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0018] In the description of this invention, it should be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.
[0019] The terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature; in the description of this invention, unless otherwise stated, "a plurality of" means two or more.
[0020] like Figures 1-3As shown, this embodiment provides a prefabricated box culvert structure for a shield tunnel with integrated evacuation staircases, including a prefabricated box culvert 1. The prefabricated box culvert 1 includes a top slab 11, a bottom slab 12, and two staircase partition walls 14 spaced apart. The top and bottom of each staircase partition wall 14 are connected to the top slab 11 and the bottom slab 12, respectively. A staircase hole is provided on the top slab 11 in the area between the two staircase partition walls 14. A prefabricated evacuation staircase 2 is installed between the two staircase partition walls 14. The top of the prefabricated evacuation staircase 2 is installed in the staircase hole and connected to the top slab 11. The bottom of the prefabricated evacuation staircase 2 is installed on the bottom slab 12. The prefabricated evacuation staircase 2 and the staircase partition walls 14 are sealed with sealant. In this embodiment, the staircase partition wall 14 and the precast box culvert 1 are precast together, and the precast evacuation staircase 2 is used. During the shield tunneling process, the assembly of the shield tunnel segments 9 and the construction of the precast box culvert 1 and the precast evacuation staircase 2 can be completed simultaneously, which reduces the workload of on-site construction and significantly improves the quality, efficiency and safety of tunnel construction. It is especially suitable for shield tunnels that adopt single-hole double-line laying.
[0021] like Figure 2 As shown, the precast box culvert 1 includes a top slab 11 and a bottom slab 12. The bottom slab 12 is an arc-shaped bottom slab, and its two ends are connected to the two ends of the top slab 11, forming a cavity. Further, two side walls 13 are spaced apart along the width direction within the cavity. The top and bottom ends of the side walls 13 are connected to the top slab 11 and the arc-shaped bottom slab, respectively, thus dividing the cavity into three sub-cavities along the width direction. Two staircase partition walls 14 are located in the middle sub-cavity. In this embodiment, the top slab 11, the arc-shaped bottom slab, the two side walls 13, and the two staircase partition walls 14 are integrally formed. By precasting the box culvert 1, the staircase partition walls 14 are integrally cast with the precast box culvert 1, eliminating the need for on-site construction of partition walls, reducing the amount of work inside the tunnel, shortening the construction period, improving the integrity of the staircase partition walls 14 and the precast box culvert 1, and enabling quick and convenient installation of the precast evacuation staircases 2.
[0022] like Figure 7 As shown, the prefabricated evacuation staircase 2 includes steps 21 and stair beams 22. The stair beams 22 are sealed to the staircase partition walls 14 with sealant, which can improve evacuation safety. Polysulfide sealant can be used. The spacing between the two staircase partition walls 14 matches the width of the prefabricated evacuation staircase 2, which can limit the prefabricated evacuation staircase 2 during installation, facilitating rapid positioning and installation.
[0023] In some embodiments, a first embedded sleeve 15 is pre-embedded on the top slab 11, and an ear plate 23 is pre-reserved on the top of the prefabricated evacuation staircase 2. The ear plate 23 is connected to the first embedded sleeve 15 by bolts 4. Furthermore, ear plates 23 are provided on both sides of the top of the prefabricated evacuation staircase 2, and each ear plate 23 is provided with multiple bolt holes 24; a first embedded sleeve 15 is pre-embedded on the top slab 11 of the prefabricated box culvert 1 at the position corresponding to each bolt hole 24, and the bolt 4 passes through the corresponding bolt hole 24 and the corresponding first embedded sleeve 15.
[0024] Preferably, the bolt hole 24 is an elongated bolt hole 24, which can accommodate machining and installation deviations. For example... Figure 5 and Figure 7 As shown, each ear plate 23 is provided with two bolt holes 24, and two first pre-embedded sleeves 15 are pre-embedded on the top plate 11 of the precast box culvert 1 at the position corresponding to each ear plate 23.
[0025] Furthermore, an anchor bar 18 is welded to the outer wall of the first embedded sleeve 15, and the anchor bar 18 extends into the concrete of the top plate 11 of the precast box culvert 1; a washer 41 is provided between the nut of the bolt 4 and the ear plate 23.
[0026] In some embodiments, a backfill layer 3 is provided on the base plate 12, and a pre-embedded steel plate 31 is embedded in the backfill layer 3; the bottom of the prefabricated evacuation staircase 2 is welded and fixed to the pre-embedded steel plate 31. By constructing the backfill layer 3 at the bottom of the cavity of the prefabricated box culvert 1, support can be provided for the prefabricated evacuation staircase 2, avoiding stress concentration, and the pre-embedded steel plate 31 on the backfill layer 3 facilitates the welding and fixing of the steel prefabricated evacuation staircase 2.
[0027] This embodiment also provides a construction method for a precast box culvert structure for a shield tunnel with integrated evacuation staircases as described in any of the above claims, comprising the following steps: S1. Complete the prefabrication of precast box culvert 1 and precast evacuation staircase 2; S2. When the tunnel boring machine advances forward, the precast box culvert 1 is transported to the designated position in the shield tunnel segment 9 behind the main body of the tunnel boring machine using the rear supporting trolley. S3. Complete the assembly of prefabricated box culvert 1; S4. A stairwell hole is made on the top plate 11 of the precast box culvert 1; S5. Hoist the prefabricated evacuation staircase 2 to the site and lower it from the staircase opening between the two staircase partition walls 14. Fix the top and bottom of the prefabricated evacuation staircase 2 to the top plate 11 and bottom plate 12 of the prefabricated box culvert 1 respectively. Then seal the prefabricated evacuation staircase 2 with the staircase partition wall 14 with sealant.
[0028] In this embodiment, the assembly of shield tunnel segments 9 and the construction of precast box culverts 1 and precast evacuation stairs 2 were completed simultaneously during the shield tunneling process. This reduced the workload of on-site construction and significantly improved the quality, efficiency and safety of tunnel construction. It is especially suitable for shield tunnels that adopt single-tunnel double-track laying, and where the precast box culverts 1 and precast evacuation stairs 2 are constructed in the shield tunnel segments 9 that have been assembled behind the shield machine body. This reduces cross-operations in the confined space of the tunnel and is conducive to construction organization.
[0029] Further, in step S1, when prefabricating the precast box culvert 1 and the precast evacuation staircase 2, a first embedded sleeve 15 is pre-embedded on the top plate 11 of the precast box culvert 1, and an ear plate 23 is reserved on the top of the precast evacuation staircase 2; in step S5, the method for fixing the top of the precast evacuation staircase 2 to the top of the precast box culvert 1 is as follows: the ear plate 23 on the top of the precast evacuation staircase 2 is fixedly connected to the first embedded sleeve 15 on the top plate 11 by bolts 4. Figures 5-7 As shown, in this embodiment, the ear plate 23 at the top of the prefabricated evacuation staircase 2 is fixedly connected to the first embedded sleeve 15 on the top plate 11 of the prefabricated box culvert 1 by bolts 4, thereby realizing a reliable connection between the prefabricated evacuation staircase 2 and the prefabricated box culvert 1. The assembly process is simple, the amount of on-site work is reduced, and the construction efficiency of the prefabricated evacuation staircase 2 is improved.
[0030] In some embodiments, the following step is further included between steps S3 and S4: constructing a backfill layer 3 at the bottom of the cavity of the precast box culvert 1, and pre-embedding a steel plate 31 on the surface of the backfill layer 3. By constructing a backfill layer 3 at the bottom of the cavity of the precast box culvert 1 after the precast box culvert 1 is assembled, support can be provided for the precast evacuation staircase 2, avoiding stress concentration. At the same time, the pre-embedded steel plate 31 on the surface of the backfill layer 3 can serve as an anchoring base for the bottom of the precast evacuation staircase 2.
[0031] Furthermore, in step S5, the method for fixing the bottom of the prefabricated evacuation staircase 2 to the bottom of the prefabricated box culvert 1 is as follows: the bottom of the prefabricated evacuation staircase 2 is welded to the embedded steel plate 31. Preferably, the prefabricated evacuation staircase 2 is a steel staircase. Figure 8 As shown, the bottom of the prefabricated evacuation staircase 2 is welded to the pre-embedded steel plate 31 on the backfill layer 3 inside the prefabricated box culvert 1, thereby achieving a reliable connection between the prefabricated evacuation staircase 2 and the prefabricated box culvert 1. The assembly process is simple.
[0032] In some embodiments, in step S1, when prefabricating the precast box culvert 1, a wire saw hole 16 is pre-reserved on the top slab 11 of the precast box culvert 1; in step S4, the method for opening a stair hole on the top slab 11 of the precast box culvert 1 is as follows: the cutting wire of the wire saw passes through the wire saw hole 16 and cuts the top slab 11 of the precast box culvert 1 along the outline of the stair hole to form the stair hole. By pre-reserving the wire saw hole 16 directly on the top slab 11 of the precast box culvert 1 during the precast stage, drilling on-site in the tunnel is avoided. Furthermore, the static cutting of the box culvert top slab 11 using a wire saw avoids strong impact vibration, resulting in a smooth and flat cutting surface with high dimensional accuracy. This effectively ensures the forming quality of the stair hole and the integrity of the surrounding structure. Additionally, the stair partition wall 14 can provide stable vertical support for the opening position on the top slab 11, reducing the risk of cracking and deformation of the top slab 11 caused by the opening operation.
[0033] Preferably, there are multiple wire saw holes 16, which are spaced apart along the outline of the stairwell opening. For example... Figure 4 As shown, by setting multiple wire saw holes 16 at intervals along the outline of the stair hole, the wire saw cutting wire can cut in segments along the outline between adjacent wire saw holes 16, reducing the resistance of a single cut and improving the hole opening accuracy.
[0034] In some embodiments, step S3, assembling the precast box culvert, includes: first adjusting the precast box culvert 1 to a preset posture and temporarily fixing it, and then grouting the gap between the shield tunnel segment 9 and the precast box culvert 1. By grouting the gap between the precast box culvert 1 and the shield tunnel segment 9 to form a grouting layer 10, the precast box culvert 1 and the shield tunnel segment 9 become an integral whole, effectively preventing the box culvert's posture from shifting during subsequent construction or operation.
[0035] Furthermore, in step S1, during the prefabrication of the prefabricated box culvert 1, a plurality of second pre-embedded sleeves 17 are pre-embedded on the bottom plate 12 of the prefabricated box culvert 1; in step S3, adjusting the prefabricated box culvert 1 to a preset posture includes: A support column 5 and an airbag 6 are sequentially placed in each of the second pre-embedded sleeves 17, so that the bottom end of the support column 5 abuts against the inner wall of the shield segment 9. Then, the cap 7 is detachably connected to the top of the second pre-embedded sleeve 17, so that the airbag 6 is sealed between the cap 7 and the support column 5, and the airbag 6 is connected to the inflation device 8. The airbags 6 are inflated by the inflation device 8 to adjust the posture of the precast box culvert 1; when the precast box culvert 1 reaches the preset posture, the inflation of the airbags 6 is stopped.
[0036] like Figure 9As shown, in this embodiment, the inflation device 8 independently inflates each airbag 6. After the airbag 6 expands, it presses downward against the support column 5, and relies on the shield tunnel segment 9 to provide reverse support force to lift the precast box culvert 1 upward. Through multi-point coordination, the attitude adjustment of the precast box culvert 1 is completed, which greatly improves the fine-tuning speed of the integral box culvert, makes the installation speed of the precast box culvert 1 match the shield tunneling speed, and improves the overall construction efficiency of large-diameter shield tunnels. Preferably, the bottom surface of the sub-cavities on both sides of the precast box culvert 1 is a plane, and the second pre-embedded sleeve 17 is pre-embedded on the plane of the sub-cavities on both sides.
[0037] Furthermore, during the adjustment of the attitude of the precast box culvert 1, the elevation of multiple monitoring points on the top plate 11 of the precast box culvert 1 is measured in real time. Combined with the design elevation of each monitoring point, the error assessment value ε of the top plate 11 is calculated. Based on the error assessment value ε of the top plate 11, it is determined whether the precast box culvert 1 has reached the preset attitude. When a certain area needs to be raised, the inflation device 8 is controlled to inflate the airbag 6 corresponding to that area. After the airbag 6 expands, it pushes the support column 5 downward, so that the precast box culvert 1 is lifted on that side. When a certain area needs to be lowered, the corresponding airbag 6 is controlled to deflate, and the precast box culvert 1 sinks under its own weight. Through the independent adjustment of each airbag 6, the attitude of the precast box culvert 1 is dynamically adjusted, and the error assessment value ε is continuously optimized. When the error assessment value ε reaches the minimum value, the precast box culvert 1 is considered to have reached the preset attitude. Theoretically, this minimum value is 0.
[0038] The measured elevations of each monitoring point are h1, h2, ..., h n The design elevations of each monitoring point are h. 1设计 h 2设计 , ..., h n设计 , n≥4; the formula for calculating the error assessment value ε of the top plate 11 is: .
[0039] In this embodiment, during the prefabrication of the precast box culvert 1, multiple automatic monitoring points for real-time monitoring of the elevation of the top slab 11 are pre-embedded on the top slab 11, and the multiple automatic monitoring points and the inflation device 8 are all electrically connected to the control system. Each automatic monitoring point can collect the elevation of the corresponding monitoring point of the top slab 11 in real time through wired or wireless means, and feed the elevation data back to the control system in real time. The control system controls the inflation device 8 to independently inflate and deflate each airbag 6 according to the elevation of each monitoring point. Among them, the automatic monitoring points can be monitoring equipment with automatic data acquisition and transmission functions, such as hydrostatic level. Preferably, the multiple automatic monitoring points are symmetrically arranged about the longitudinal central axis of the top slab 11, and the design elevation of two monitoring points symmetrically arranged about the longitudinal central axis of the top slab 11 is the same. In some embodiments, monitoring points are provided at the four corners of the top plate 11, namely Q1, Q2, Q3, and Q4. Q1 and Q3 are symmetrically arranged about the longitudinal central axis of the top plate 11, and Q2 and Q4 are symmetrically arranged about the longitudinal central axis of the top plate 11. The design elevation h of Q1 is... 1设计 With respect to the design elevation h of Q3 3设计 Similarly, the design elevation h of Q2 2设计 With Q4's design elevation h 4设计 same.
[0040] Preferably, the plurality of second pre-embedded sleeves 17 are symmetrically arranged about the longitudinal central axis of the base plate 12. In one embodiment, four second pre-embedded sleeves 17 are provided on the base plate 12, and four automatic monitoring points are provided on the four corners of the top plate 11.
[0041] In this embodiment, the top of the airbag 6 has an air nozzle, and the cap 7 has a mounting hole. The air nozzle extends upward through the mounting hole and connects to the inflation device 8. The minimum withstandable air pressure of the airbag 6 is P=K*G / 4 / S, where K is the safety factor, G is the weight of the precast box culvert 1, S is the inner circular area of the second embedded sleeve 17, and P is the minimum required air pressure. The inflation device 8 can be an air compressor. The inflation device 8 is equipped with multiple inflation lines 81 corresponding to the airbags 6, and each inflation line 81 is connected to the corresponding airbag 6. Each inflation line 81 is equipped with a control valve. Each control valve connects the airbag 6 to the inflation device 8 when it needs to be inflated and connects the airbag 6 to the atmosphere when it needs to be deflated. The control valve is electrically connected to the control system, allowing for individual control of the inflation and deflation of each airbag 6, achieving precise leveling of the precast box culvert 1.
[0042] Furthermore, in step S3, after grouting and filling the gap between the shield tunnel segment 9 and the precast box culvert 1, once the grout reaches a preset strength, the cap 7 is removed and the airbag 6 is taken out. Then, the support column 5 is removed from the second embedded sleeve 17. The cap 7, airbag 6, and support column 5 can all be reused, effectively reducing construction costs and improving tooling utilization. Before removing the airbag 6, it is deflated to facilitate removal.
[0043] The method for removing the support column 5 from the second embedded sleeve 17 is as follows: Screw the end of the tie rod with the first external thread into the blind hole of the support column 5 with the first internal thread, so that the tie rod and the support column 5 are connected by threads. Then pull the tie rod outwards, thereby pulling the support column 5 out of the second embedded sleeve 17. Further, after removing the support column 5 from the second embedded sleeve 17, seal the second embedded sleeve 17.
[0044] Furthermore, the bottom surface of the support column 5 is inclined, and the direction of inclination is consistent with the tangent direction of the shield segment 9 at the contact position of the support column 5. This can increase the contact area between the bottom surface of the support column 5 and the inner wall of the shield segment 9, avoid local stress concentration problems, and improve the stability of the precast box culvert 1 during the leveling process.
[0045] Furthermore, the cap 7 includes an integrally formed cap body and an inner tube. One end of the inner tube is connected to the cap body, and the other end extends into the second embedded sleeve 17 and has a second external thread on its outer wall. The inner wall of the top of the second embedded sleeve 17 has a second internal thread, and the second external thread and the second internal thread are connected by threads. In this embodiment, the embedded sleeve, anchor bar 18, cap 7, and support column 5 are all made of steel, and the anchoring force of the second external thread of the cap 7 is greater than K*G / 4, and the anchoring capacity of the anchor bar 18 is greater than K*G / 4, where K is the safety factor and G is the weight of the precast box culvert 1.
[0046] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A precast box culvert structure for a shield tunnel with integrated evacuation staircase, comprising a precast box culvert, characterized in that: The precast box culvert includes a top slab, a bottom slab, and two stair partitions spaced apart. The top and bottom of each stair partition are connected to the top slab and the bottom slab, respectively. A stair opening is provided on the top slab in the area between the two stair partitions. A precast evacuation staircase is installed between the two stair partitions. The top of the precast evacuation staircase is installed in the stair opening and connected to the top slab. The bottom of the precast evacuation staircase is installed on the bottom slab. The precast evacuation staircase and the stair partition are sealed with sealant.
2. The precast box culvert structure for shield tunnels with integrated evacuation staircases as described in claim 1, characterized in that: A first embedded sleeve is pre-embedded in the top slab, and an ear plate is reserved at the top of the prefabricated evacuation staircase. The ear plate is connected to the first embedded sleeve by bolts.
3. The precast box culvert structure for shield tunnels with integrated evacuation staircases as described in claim 1, characterized in that: A backfill layer is provided on the base plate, and a pre-embedded steel plate is embedded in the backfill layer; the bottom of the prefabricated evacuation staircase is welded and fixed to the pre-embedded steel plate.
4. A construction method for a precast box culvert structure with an integrated evacuation staircase in a shield tunnel according to any one of claims 1-3, characterized in that, Includes the following steps: S1. Complete the prefabrication of precast box culverts and precast evacuation staircases; S2. When the tunnel boring machine advances forward, the precast box culvert is transported to the designated position in the tunnel segment behind the main body of the tunnel boring machine using the rear supporting trolley. S3. Complete the assembly of the prefabricated box culvert; S4. A stairwell opening is made on the top slab of the precast box culvert; S5. Hoist the prefabricated evacuation staircase to the site and lower it from the staircase opening between the two staircase partition walls. Fix the top and bottom of the prefabricated evacuation staircase to the top and bottom plates of the prefabricated box culvert, respectively. Then seal the prefabricated evacuation staircase with the staircase partition wall using sealant.
5. The construction method as described in claim 4, characterized in that: In step S1, when prefabricating the prefabricated box culvert and the prefabricated evacuation staircase, a first pre-embedded sleeve is pre-embedded on the top plate of the prefabricated box culvert, and an ear plate is reserved on the top of the prefabricated evacuation staircase. In step S5, the method for fixing the top of the prefabricated evacuation staircase to the top of the prefabricated box culvert is as follows: the ear plate at the top of the prefabricated evacuation staircase is fixedly connected to the first embedded sleeve on the top plate by bolts.
6. The construction method as described in claim 4, characterized in that: Between steps S3 and S4, the following steps are also included: backfilling is carried out at the bottom of the cavity of the precast box culvert, and a pre-embedded steel plate is embedded on the surface of the backfill.
7. The construction method as described in claim 6, characterized in that, In step S5, the method for fixing the bottom of the prefabricated evacuation staircase to the bottom of the prefabricated box culvert is as follows: the bottom of the prefabricated evacuation staircase is welded to the embedded steel plate.
8. The construction method as described in claim 4, characterized in that: In step S1, when prefabricating the precast box culvert, a wire saw hole is reserved on the top plate of the precast box culvert; in step S4, the method for opening a stair hole on the top plate of the precast box culvert is to pass the wire saw cutting rope through the wire saw hole and cut the top plate of the precast box culvert along the outline of the stair hole to form the stair hole.
9. The construction method as described in claim 8, characterized in that: The wire saw holes are multiple and are spaced apart on the outline of the stair holes.
10. The construction method as described in claim 4, characterized in that, In step S3, the assembly of the precast box culvert includes: first adjusting the precast box culvert to a preset posture and temporarily fixing it, and then grouting the gap between the shield tunnel segment and the precast box culvert.