Mine ecological protection methods based on modified filling material-moving mold coupling filling
By using modified full tailings filling material and moving mold coupling filling method, the problems of roof strata instability and high filling cost in underground collapse zone mining were solved, realizing full tailings resource utilization and ecological protection, and ensuring the safety and high efficiency of mining.
Patent Information
- Application Number
- CN202611535051.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-30
- Publication Date
- 2026-11-17
AI Technical Summary
The risk of collapse caused by the instability of the roof strata in the collapse zone during underground mining is transmitted to the surface, causing secondary disasters such as subsidence and ground fissures. In addition, the existing full tailings backfill slurry has problems such as severe bleeding, high backfilling cost and low recovery rate. In particular, there are safety and ecological environment challenges in the process of backfilling auxiliary crushed ore recovery in the collapse zone.
The modified full tailings filling material and the mobile mold coupling filling method are adopted. The mobile mold body is assembled and advanced along the guide rail assembly. The charged full tailings slurry and charged filling material are used to form a filling body in the goaf area. Combined with multiple airbags and geotextile to seal the gaps, the step-by-step mining is realized, avoiding blasting to open roadways and ensuring the stability of the filling body and the safety of mining.
It has achieved full utilization of tailings resources, reduced pipeline transportation resistance, increased recovery rate, ensured 100% recovery rate, reduced backfilling costs, avoided disturbance of the backfill body and surrounding rock by blasting, and protected the ecological environment of the mining area.
Smart Images

Figure CN123109770A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of mine ecological protection, and involves the ecological safety of mine areas in terms of the resource utilization of all tailings and the mining of underground collapse areas. Specifically, it is a mine ecological protection method based on modified filling material-moving mold synergistic filling. Background Technology
[0002] Underground mining carries the risk of roof instability and collapse. Severe collapses can lead to secondary disasters such as subsidence and ground fissures on the surface, directly altering the original ecological pattern of the mining area and causing a chain reaction of degradation in soil, water, vegetation, and biological communities. This has become a key concern in mine ecological management. Because the collapse zone also presents safety hazards such as roof falls, rock bursts, and surface subsidence, a large amount of residual ore resources remain. Therefore, the recovery of these residual ore resources has become the primary goal of mine resource development and disaster management.
[0003] The recovery of residual ore in a collapsed area requires balancing resource recovery rate and stope safety, placing high demands on overburden structure detection, surrounding rock stability control, and mining technology selection. The core challenge in recovering from a collapsed area lies in controlling the stability of the fractured surrounding rock. Since the overburden within the collapsed area has already fractured and collapsed, disturbance during mining can induce secondary instability in the overburden, easily leading to disasters such as roof falls and shock waves.
[0004] On the other hand, with the continuous advancement of green mining in my country, the proportion of backfilling mining has been increasing, and full tailings backfilling has become a core technology for green mining and solid waste reduction.
[0005] Because the tailings contain a high proportion of fine particles (tailings mud), have a large specific surface area, and require a large amount of water for the slurry, there are problems such as severe bleeding and low early strength of the backfill under normal mixing conditions. This results in a high proportion of cementitious materials in the backfill, poor mixing uniformity, long mixing time, and a significant increase in backfilling costs. At the same time, the increased proportion of cementitious materials leads to poor rheological properties of the backfill slurry, resulting in high pumping resistance over long distances, which further increases backfilling costs.
[0006] In order to improve the rheological and mechanical properties of full tailings filling slurry, scholars at home and abroad have conducted a lot of research on slurry material modification through methods such as thickening and dewatering, particle pretreatment, replacement of cementitious materials, and chemical additives. Sheng Yuhang et al. used polycarboxylate superplasticizer to modify the filling slurry. The modified material adsorbed on the particle surface to increase the electrostatic repulsion between particles, significantly improving the slurry fluidity at the same concentration, or reducing the mixing water consumption under the same fluidity conditions, thereby improving the compaction and later strength of the filling body [Sheng Yuhang et al. Effect of superplasticizer on rheological properties of cemented filling slurry of tailings[J]. Nonferrous Metals Engineering, 2020, 10(04): 94-99]; Ding Shixian used hydroxypropyl methylcellulose polymer chains to construct a three-dimensional network structure, inhibiting the sedimentation of tailings particles, significantly reducing the slurry bleeding rate, solving the problem of segregation and stratification of low-to-medium concentration slurries, and ensuring the uniformity of pipeline transport materials [Ding Shixian. Study on the synergistic effect of superplasticizer and thickener on rheological properties of tailings slurry[J]. Mineral Resources and Geology, 2025, 39(04): 687-694]; Wang Xinmin et al. used Using slag powder and fly ash as the matrix, and combining quicklime and desulfurized gypsum to construct an alkali-sulfate activation system, the potential cementitious activity of siliceous alumina solid waste is activated to generate CSH gel and ettringite, which can replace part of ordinary silicate cement, reduce backfilling costs, and improve the problem of insufficient early strength of ultrafine whole tailings backfill [Wang Xinmin et al. Application of activator in fly ash whole tailings cemented backfill [J]. Journal of Hunan University of Science and Technology (Natural Science Edition), 2000, 13(03): 72-74, 77]; Zhou Zaibo et al. used silane coupling agents to modify the surface of slag and fly ash cementitious powder hydrophobically, improve the compatibility of powder-tailings-water interface, reduce powder agglomeration, improve hydration reaction efficiency, and improve slurry workability [Zhou Zaibo et al. Bleeding of low-concentration whole tailings backfilling materials and its regulation mechanism [J]. Journal of Materials Research, 2020, 34(07): 481-488].
[0007] While these modification technologies have significantly improved the performance of the backfill slurry, providing technical feasibility for the widespread application of backfill mining of crushed ore and tailings in collapsed areas, the cost of backfill modification is high. This is particularly true for the backfilling process used to assist in the mining of crushed ore in collapsed areas, where large quantities of backfill cementitious materials are required, leading to ore dilution, low recovery rates, and high costs. More importantly, mining crushed ore in collapsed areas requires excavating roadways within the backfill and conducting drilling blasting. The blasting vibrations further impact and loosen the surrounding area, posing a severe challenge to mining safety and the ecological environment of the entire collapsed area. Summary of the Invention
[0008] The purpose of this invention is to solve the above-mentioned technical problems and provide a mine ecological protection method based on modified filling material-moving mold coupling filling, which is simple in process, reduces the risk of bleeding and segregation during pipeline transportation, saves mining time, reduces mining operation risks, and produces dense and stable filling bodies with an ore recovery rate of up to 100%.
[0009] The technical solution includes clearing the collapsed crushed ore near the entrance of the roadway in the collapsed area to form a goaf. A mobile mold, including a mold body and guide rail components, is assembled in the roadway. The mold body is pushed along the guide rail components towards the collapsed crushed ore to be mined. Then, modified tailings filling material is used to fill the goaf around the mold body. After the filling material has been cured to the design strength, the mobile mold is removed to form a mold roadway. The collapsed crushed ore near the entrance of the mold roadway is mined. The above process is repeated until all the collapsed crushed ore in the collapsed area is mined. The modified full tailings filling material includes charged full tailings slurry and charged filling material prepared by mixing charged full tailings slurry with cementitious material; first, charged full tailings slurry is injected into the goaf area until it completely covers the surface of the moving mold to form a full tailings layer, and then charged filling material is injected into the remaining goaf area until it fills the entire goaf area to form a filling body.
[0010] The moving mold includes a guide rail assembly and a mold body. The lower end of the mold body is slidably engaged with the guide rail assembly. The mold body is formed by at least one mold unit and a mold tail connected in a detachable manner. The front end of the first mold unit is equipped with a baffle, and an outer airbag is provided on the outside of the baffle. A semi-circular airbag is provided on the outside of the mold tail. The mobile module unit is assembled in the roadway and advanced into the goaf area until the front baffle of the first module unit reaches the edge of the collapsed ore pile.
[0011] The data acquisition method using the aforementioned moving module is as follows: ① Install at least one set of goaf filling pipes at the top of the goaf area above the moving formwork. Each set has two pipes. The two filling pipes are connected to two sets of charged filling sand bins with opposite electrical properties, respectively, to transport charged filling materials with opposite electrical properties. The outlets of the two goaf filling pipes are spaced 4-5 meters apart.
[0012] ② Lay U-shaped guide rail components from inside the roadway to the collapsed crushed ore area to be mined, with the end of the guide rail components reaching the collapsed crushed ore area to be mined; ③ On the U-shaped guide rail assembly in the tunnel, the first section of the mold unit is assembled to form the mold head. The mold head and the U-shaped guide rail assembly are in contact through rolling elements, and the mold body moves along the U-shaped guide rail by the rolling of the rolling elements. ④ Advance the first module unit along the U-shaped guide rail assembly to the collapsed crushed ore area to be mined, and then connect the next module unit in sequence until the baffle of the first module unit reaches the collapsed crushed ore to be mined. Then connect the module tail to the end module unit to complete the on-site assembly of the moving module. The entire module tail is located in the roadway. ⑤ Build a partition wall on the side of the semi-annular airbag at the tail of the mold near the roadway to seal the gap between the tail of the mold and the roadway wall; the partition wall is reserved with fixing holes for the insertion of the filling pipe at the top of the mold into the goaf. ⑥ Install the top filling pipe of the mold, extending through the top plate of the mold to the side of the collapsed crushed ore to be mined on the outer airbag cushion; slowly inject the full tailings slurry to fill the space between the outer airbag cushion and the collapsed crushed ore; when the liquid level of the injected full tailings slurry reaches the top of the moving mold, slowly pull back the top filling pipe of the mold, injecting full tailings slurry while pulling it back. The amount of full tailings slurry injected is 3-5 cubic meters per meter of moving mold length, until the end of the top filling pipe of the mold reaches the junction of the mold tail and the mold body, then stop dragging, continue to inject 2-3 cubic meters of full tailings slurry, stop grouting, pull out the top filling pipe of the mold, and seal the fixing hole; ⑦ After the fixing holes are sealed tightly, inflate the outer airbag to fill the gaps between the baffle and the ore wall, and between the baffle and the ground; inflate the bottom airbag strip to fill the gap between the lower edge of the outer airbag and the front end of the guide rail assembly; inflate the semi-circular airbag at the tail of the mold to seal the gap between the tail of the mold and the surrounding rock at the tunnel entrance, and between the tail of the mold and the partition wall. ⑧ The tailings slurry containing cementitious material is injected into the remaining goaf area through the goaf filling pipe to form a filling layer until the entire goaf area is filled. ⑨ After the filling material in the goaf area has reached the design strength, remove the partition wall on the outside of the mold tail, drag the moving mold into the roadway, remove the moving mold to form the mold roadway, and use the ore extraction equipment to mine the collapsed crushed ore near the mold roadway entrance with the help of the isolation support of the mold roadway. ⑩ Repeat steps ①-⑨ above for step-by-step mining until all collapsed ore fragments are recovered.
[0013] In the moving mold, the guide rail assembly includes two parallel U-shaped rails and multiple spheres located within the rails. The lower ends of both sides of the mold body are in contact with the spheres within the corresponding U-shaped rails. The two parallel U-shaped rails are detachably connected by multiple parallel fixed beams. The outer edges of the outer airbags all extend beyond the outer edges of the baffles, and the lower edge of the outer airbags extends to the front end of the cover rail assembly. The inflation tube of the outer airbags passes through the baffles and extends to the tail of the mold.
[0014] In the movable mold, the cross-section of the mold unit and the mold tail is arched, and both are assembled from the top plate and the two side plates, or directly from the two side plates. The lower sections of the two side plates are detachably connected by a bottom beam, and the bottom beam is detachably connected to the upper sections of the two side plates by a support column. Columnar airbags can be installed on the outside of the side plates. Geotextile is laid all around the outer perimeter of the mold body, and the lower end of the geotextile extends to the ground and covers the guide rail assembly.
[0015] In the moving mold, the gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly is also filled with a bottom airbag strip. One end of the bottom airbag strip is fixed to the lower end of the baffle, and its inflation tube extends to the tail of the mold. The bottom airbag strip is inflated, and after inflation, it fills the gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly.
[0016] In the moving mold, multiple fins are provided on both sides of the top surface of the mold unit, and the cross-section of the fins on both sides of the top surface of the mold unit is a triangle with the tip pointing upwards; at least two layers of semi-annular airbags are arranged circumferentially on the outer side of the mold tail, and their inflation tubes extend into the mold tail.
[0017] The method for preparing charged full tailings slurry is as follows: the tailings slurry is passed through the metal induction ring and falls into the charged full tailings slurry pool below for collection. After collection, it is sent to a mixer for stirring and dispersion, and then sent to the corresponding charged filling sand bin for temporary storage as charged filling material. The preparation method of the charged filling material is as follows: the tailings slurry is passed through the metal induction ring and falls into the charged full tailings slurry pool below for collection, and then sent to the mixer to be fully mixed with the cementitious material from the intermediate cementitious material bin. After mixing, it is sent to the corresponding charged filling material sand bin for temporary storage through the filling pipeline.
[0018] The metal induction ring includes a first metal induction ring and a second metal induction ring arranged in pairs, and the charged tailings slurry pool also includes a corresponding first charged tailings slurry pool and a second charged tailings slurry pool; the first metal induction ring and the second metal induction ring are respectively connected to the positive and negative terminals of the starting power supply; the first metal induction ring is connected to the corresponding wire of the second charged tailings slurry pool, and the second metal induction ring is connected to the corresponding wire of the first charged tailings slurry pool, forming a positive feedback loop; When the power supply is turned on, the first and second metal induction rings are energized. The tailings slurry is evenly divided into two streams, which pass through the first and second metal induction rings respectively and fall into the corresponding first and second charged tailings slurry pools below, forming charged tailings slurry. When the relative potential value of the two metal induction rings is higher than the output voltage value of the power supply, the power supply is turned off.
[0019] The mixer also includes a corresponding first mixer and a second mixer, and a charged power supply, which is a high-voltage DC power supply. The first mixer and the second mixer are respectively connected to the positive and negative terminals of the charged power supply; the slurry in the first mixer and the second mixer is charged a second time through the charged power supply.
[0020] The electrostatic potential of the slurry in the corresponding charged filling sand bin is collected in real time by a potentiometer, and the output voltage of the charged power supply is adjusted according to the collected potential to control the relative potential value of the slurry.
[0021] The charged tailings slurry pool, mixer, and charged filling sand bin are all lined with insulating material to ensure that the charged tailings slurry and charged filling material are insulated from the outside environment; the slurry in the charged filling sand bin is grounded through a regulating switch; the materials between the charged tailings slurry pool, mixer, and charged filling sand bin, as well as between the charged filling sand bin and the goaf, are transported through filling pipes, and all filling pipes are insulated pipes lined with insulating material.
[0022] The solids content of the tailings slurry is 60-70 wt%, and the mass ratio of cementitious material to tailings slurry in the tailings slurry containing cementitious material is 1:4-5.
[0023] Furthermore, based on the relative position of the ore pile in the collapsed area and the roadway entrance, the amount of ore pile, and the surrounding environment of the goaf after some ore has been mined, mobile modules with different cross-sectional dimensions can be flexibly assembled.
[0024] For small collapsed ore piles more than 10 meters from the tunnel entrance, a movable formwork assembled from side panels is used. This reduces the arched cross-sectional size of the movable formwork, improving the flexibility and safety of its assembly, movement, and subsequent dismantling. Because the ore pile is far from the tunnel entrance, the formwork tunnel formed by a single filling is relatively long, and the amount of tailings slurry injected during filling is large. Using a movable formwork with a larger cross-sectional size would create a large formwork tunnel, reducing safety. Furthermore, a longer movable formwork increases the dragging force required to pull it into the tunnel. Reducing the formwork cross-sectional size reduces the required dragging force and improves operational stability.
[0025] Furthermore, due to the uncertainty of the collapse, there are local and scattered fragments of ore in the collapse area. If each of these fragments is filled with a moving mold, although the mining efficiency is higher and the mining cost is lower than that of traditional filling, it will reduce the overall mining efficiency.
[0026] For collapse zones containing both main collapsed ore piles and scattered small ore piles, the ends of the laid U-shaped guide rail assemblies reach the main collapsed ore piles. Based on the distribution of scattered small collapsed ore piles near the U-shaped guide rail assemblies, mold side plates with pipe installation holes are selected for assembling the moving mold.
[0027] The side panel of the formwork has 2-3 rows of pipe installation hole assemblies, arranged in a pattern where the number of M18 pipe installation hole assemblies gradually increases from the top row to the bottom row, with a total of 3-6 groups. Each group contains two holes arranged at the top and bottom. Each group of holes corresponds to a columnar airbag, with an inflation tube and a water inlet tube at one end. The columnar airbag pierces the geotextile through the inflation tube and the water inlet tube, passes through the two holes arranged at the top and bottom, and extends into the inside of the side panel of the formwork for fixed installation. The columnar airbag is 1-2 meters long and 0.3-0.5 meters in diameter.
[0028] Based on the distance between the scattered ore piles and the U-shaped guide rail assembly, columnar airbags of different diameters and lengths are selected and installed on the outside of the mold side plate. The inflated columnar airbags and the tailings slurry trapped between the columnar airbags form a channel connecting the scattered ore piles after filling.
[0029] At the start of filling, water is first injected into the columnar airbags, with the water volume being 5-15% of the volume of the columnar airbags. Then, the airbags are inflated until the air pressure is 80% of the air pressure of the outer airbag cushion. After inflation, the end of the columnar airbags reaches or approaches the scattered collapsed ore piles. After the tailings slurry covers all the columnar airbags, the columnar airbags are inflated a second time until their air pressure is the same as that of the outer airbag cushion.
[0030] While the columnar airbag is being inflated a second time, tailings filling material containing cementitious material is injected into the collapse area until the entire collapse area is filled.
[0031] After the tailings filling material containing cementitious material solidifies to form a filling body and reaches the design strength, the air inlet pipe and water inlet pipe are removed from the moving formwork to drain the water accumulated in the columnar airbags. The moving formwork is then pulled out and dismantled, forming a formwork tunnel. The entire tailings layer in the formwork tunnel is cleaned, the columnar airbags are pulled out, and the entire tailings layer in the area of the columnar airbags is cleaned, forming a channel connecting the formwork tunnel to the scattered fragmented ore piles for the mining of scattered fragmented ore.
[0032] Compared with the prior art, the present invention has the following beneficial effects: 1. Charged modification improves the rheological properties of filling slurry and reduces pipeline transport resistance. Charged tailings slurry is induced to charge by a metal induction ring and then recharged by a mixer. Charged ions are adsorbed on the particle surface. The particles with the same charge repel each other and are not easy to agglomerate. The slurry has good fluidity, which is conducive to long-distance pipeline transport and reduces bleeding and segregation during transportation. 2. Charged filling promotes the dispersion and hydration of the filler, reducing the amount of cementitious material required. The charged filler is stirred and dispersed in the mixer, and the charged tailings particles are mixed evenly with the cementitious material, resulting in a complete hydration reaction. This helps to reduce the amount of cementitious material used, lower filling costs, and improve the homogeneity of the filling body, which is beneficial for improving the early strength of the filling body. 3. The movable formwork is dismantled to directly form the formwork roadway, eliminating the need to excavate roadways within the backfill. The movable formwork is assembled within the roadway and advanced along the guide rail assembly to the area to be mined. After the backfill reaches the designed strength, the movable formwork is pulled out to form the formwork roadway. The formwork roadway directly serves as the subsequent mining passage, eliminating the need to excavate roadways within the backfill, saving time and costs associated with excavation, and avoiding disturbance to the backfill and surrounding rock caused by blasting during roadway excavation. 4. Step-by-step repeated backfilling mining achieves complete recovery of crushed ore. After dismantling the moving formwork, mining continues on the collapsed crushed ore near the formwork entrance, and the process of assembling, advancing, backfilling, and dismantling the moving formwork is repeated, advancing deeper into the collapsed area in a step-by-step manner, which can achieve complete recovery of the crushed ore in the collapsed area, with a recovery rate of up to 100%. 5. The entire tailings layer isolates the moving formwork from the backfill, ensuring smooth formwork removal and safe mining. Before backfilling, charged tailings slurry is injected to completely cover the surface of the moving formwork, forming a complete tailings layer. The charged tailings slurry contains no cementing material and has no binding effect on the moving formwork or crushed ore. After curing, the moving formwork and backfill are easily separated, and the backfill will not be damaged when the moving formwork is pulled out. The entire tailings slurry is filled into the gaps between the crushed ore and has no binding effect on the crushed ore. No drilling blasting is required during mining, avoiding the impact of blasting on the stability of the backfill, saving mining time, and reducing the risk of mining operations. The fins on both sides of the top surface of the formwork unit can trap the charged tailings slurry, allowing the entire tailings layer to adhere stably to the surface of the formwork, increasing the thickness of the entire tailings layer, expanding the cross-sectional size of the formwork roadway, facilitating the easy pulling of the moving formwork into the formwork roadway, and further improving the safety of mining operations.
[0033] 6. Multiple airbags and geotextile seal the gaps to prevent leakage of filling slurry. After the outer airbag is inflated, it fills the gap between the baffle and the crushed ore. The bottom airbag strip fills the gap between the lower edge of the outer airbag and the front end of the guide rail assembly. At least two layers of semi-ring airbags are arranged circumferentially to seal the gap between the tail of the mold and the surrounding rock at the tunnel entrance, ensuring a tight and reliable seal. The entire outer perimeter of the mold is covered with geotextile, and the lower end of the geotextile extends to the ground and covers the guide rail assembly. This can prevent filling slurry and debris from entering the track area, avoid obstruction of the sphere's rolling, and ensure stable sliding and step-by-step advancement of the moving mold along the guide rail. 7. Full utilization of tailings resources, with backfill support taking into account ecological protection. By modifying the entire tailings by charging, the aggregation and adhesion of fine mud clumps within the tailings are suppressed, and the mud clumps are dispersed to prepare highly homogeneous modified tailings backfill material, forming a dense and stable backfill body. This realizes the resource utilization of tailings solid waste. The backfill body provides continuous support to the collapse area, which is conducive to controlling overburden deformation and surface subsidence, and reducing the impact on the surface ecology of the mining area.
[0034] 8. The positive feedback loop continuously enhances the slurry charging, reducing energy consumption through on-demand charging. The first metal induction ring and the second charged tailings slurry pool are connected by cross-wires to form a positive feedback loop, which continuously enhances the slurry charging effect, ensuring that the entire tailings slurry is fully and uniformly charged. When the relative potential value of the metal induction ring is higher than the output voltage value of the starting power supply, the starting power supply is automatically disconnected, achieving on-demand charging and avoiding overcharging, which helps reduce energy consumption. The electrostatic potential of the slurry in the charged filling sand bin is collected in real time by a potentiometer, and the output voltage of the charging power supply is adjusted according to the collected potential to control the relative potential value of the slurry, thus maintaining a stable and consistent charging state for different batches of slurry.
[0035] 9. The spherical rolling mechanism reduces propulsion resistance and guides the drainage of oozing water. The arched, detachable structure offers good load-bearing capacity and is easy to assemble and disassemble. The formwork is propelled and pulled out along the track by the rolling of the spherical components. The rolling friction resistance is low, and the movement is flexible. Gaps are left between the side plates of the moving formwork and the U-shaped track, between the U-shaped track and the ground, and between the spherical components, forming drainage channels. The oozing water collects on the ground inside the moving formwork and is directly discharged through the connected tunnel. The drainage channel has a large area and a fast drainage speed, reducing or even avoiding the erosion of the surrounding rock by oozing water, which is conducive to maintaining the stability of the filling material and the surrounding rock. The formwork unit and the formwork tail section are both arched, assembled from the top plate and the two side plates. The arched structure is conducive to bearing the load of the filling material layer and loose rock mass, and has good structural stability. The lower sections of the side plates are connected by bottom beams, and the bottom beams are connected to the upper sections of the side plates by support columns. All components can be detached, which facilitates the on-site assembly, disassembly, and transportation of the moving formwork underground.
[0036] 11. For crushed ore piles that are far from the tunnel entrance and have a small amount of collapse, a movable formwork with a small arched cross section can be used. That is, a movable formwork is assembled from the side plates of both sides, which can be flexibly set up and is easy to assemble and dismantle.
[0037] 12. Install columnar airbags on the outside of the mold side plates to shorten the mining cycle and improve the recovery rate. Based on the stockpiling of collapsed crushed ore in the collapse zone and the position of the mold body relative to the goaf area, consider selecting the number of mold side plates with pipe installation holes. Before the mold body advances into the goaf, install columnar airbags on the outside of the mold body to achieve the recovery of localized, scattered collapsed crushed ore.
[0038] In summary, using mobile formwork-assisted filling for the recovery of crushed ore in underground collapse areas eliminates the need for blasting to open roadways for the filling material, thus preventing blasting vibrations from impacting and damaging the junction between the filling material and the surrounding rock, as well as the surrounding rock strata. This improves the safety of mining in other areas, avoids causing larger-scale collapses, and enhances the overall ecological safety of the mining area. Attached Figure Description
[0039] Figure 1 This is a process diagram for preparing charged tailings slurry.
[0040] Figure 2 Process diagram for preparing charged fillers.
[0041] Figure 1 and Figure 2In the middle section, 1. Tailings slurry pump; 2. Starting power supply; 3-1. First metal induction ring; 3-2. Second metal induction ring; 4-1. First intermediate bin for cementing material; 4-2. Second intermediate bin for cementing material; 5-1. First connecting wire; 5-2. Second connecting wire; 6. Charged power supply; 7-1. First charged full tailings slurry tank; 7-2. Second charged full tailings slurry tank; 8-1. First mixer; 8-2. Second mixer; 9-1A. Charged filling sand bin A; 9-1B. Charged filling sand bin B; 9-2A. Charged filling sand bin A; 9-2B. Charged filling sand bin B; 10-1. First charged filling intermediate bin; 10-2. Second charged filling intermediate bin; 11-1. First filling pump; 11-2. Second filling pump; 12. Potentiometer.
[0042] Figure 3 This is a schematic diagram of the backfill material before mining in the collapsed area.
[0043] Figure 4 This is a schematic diagram of the goaf area before the collapse zone was mined back.
[0044] Figure 5 A schematic diagram showing the status of the mobile module entering the mining area after installation.
[0045] Figure 6 A schematic diagram showing the filling status of the goaf area above the moving formwork.
[0046] Figure 7 This is a schematic diagram of the tunnel formed after the moving mold is pulled out.
[0047] Figure 8 yes Figure 6 Enlarged view of section A3 in the image.
[0048] Figure 9 for Figure 8 DD sectional view.
[0049] Figures 3-9 In the middle section: T1-2, ore body outside the collapse zone; T2, roadway; T3-2, edge of the collapse goaf; T4-3, goaf area; T5-1, collapsed crushed ore; T6-3, filling pipe for the collapse zone; T6-5, filling pipe for the goaf; T6-6, filling pipe for the top of the formwork; T7-2, filling body for the collapse zone; T7-3, filling body for the back goaf; T7-4, full tailings layer; T8, moving formwork; T9, partition wall; T10, formwork roadway.
[0050] Figure 10 This is an axial cross-sectional view of the moving mold.
[0051] Figure 11 for Figure 9 A cross-sectional view of the moving mold, which is assembled from two side plates and a top plate.
[0052] Figure 12 Example 2 is a cross-sectional view of the moving mold assembled only by the two side mold plates.
[0053] Figure 13 for Figure 9 Cross-sectional view of the moving mold NN with columnar airbags set on both sides of the side template.
[0054] Figure 14 A schematic diagram of a large collapse zone (section) where a pile of collapsed ore blocks a roadway.
[0055] Figure 15 A schematic diagram of the collapse zone (section) of the collapsed ore pile far from the roadway.
[0056] Figures 10-13 In the middle, M1 is the side plate of the mold; M2 is the top plate of the mold; M4 is the parallel fixed beam; M5 is the bottom beam; M6 is the support column; M7 is the sphere; M8 is the wing strip; M9 is the geotextile; M10 is the U-shaped track; M11 is the outer airbag cushion; M12 is the baffle; M13 is the semi-circular airbag; M14 is the inflation pipe; M15 is the bottom airbag strip; M16 is the columnar airbag; M17 is the water inlet pipe; and M18 is the pipe installation hole assembly. Detailed Implementation
[0057] The invention will now be further described with reference to the accompanying drawings.
[0058] Due to the uncertainty of collapses, there are situations where the collapse area is large (the length and width of the collapse area are greater than 10 meters) and the collapsed ore pile blocks the tunnel, such as... Figure 13 As shown; there are cases where collapsed ore piles are far from the tunnel entrance, such as... Figure 14 As shown, there are also localized and sporadic small collapsed ore piles near the main collapsed ore pile.
[0059] Example 1: This embodiment provides a mine ecological protection method based on modified filling material-moving mold coupling filling, including multiple steps such as opening a hole at the top of the collapse zone to install the collapse zone filling pipeline T6-3, preparing charged full tailings slurry and charged filling material, assembling the moving mold and step-by-step filling and mining.
[0060] This embodiment requires the preparation of two raw materials: charged tailings slurry and charged filling material. The charged tailings slurry, which contains no cementitious material, is used to inject into the goaf to form a complete tailings layer. The charged filling material is a mixture of charged tailings slurry and cementitious material, used to inject into the goaf to form a backfill. The preparation process for both raw materials differs only in whether cementitious material is added via an intermediate cementitious material silo; the equipment for the remaining steps can be shared. When shared, charged tailings slurry or charged filling material can be produced at different stages of the filling process; alternatively, two separate systems can be set up to produce charged tailings slurry or charged filling material respectively. This embodiment uses a separate setup as an example for explanation.
[0061] Preparation of charged full tailings slurry: See Figure 1 The tailings slurry produced after flotation and magnetic separation is first concentrated, filtered, and dewatered to form a tailings slurry with a solids content of 60-70 wt%, which is then transported to the charging process by tailings slurry pump 1. For example... Figure 1 As shown, the metal induction rings are arranged in pairs, including a first metal induction ring 3-1 and a second metal induction ring 3-2. The two metal induction rings are arranged horizontally and connected to the positive and negative terminals of the starting power supply 2, respectively. A first charged tailings slurry tank 7-1 and a second charged tailings slurry tank 7-2 are positioned directly below the first metal induction ring 3-1 and the second charged tailings slurry tank 7-2, respectively. The first metal induction ring 3-1 is connected to the second charged tailings slurry tank 7-2 via a first connecting wire 5-1, and the second metal induction ring 3-2 is connected to the first charged tailings slurry tank 7-1 via a second connecting wire 5-2, forming a positive feedback loop that does not pass through the starting power supply 2.
[0062] During initial charging, the starting power supply 2 is first turned on, energizing the first metal induction ring 3-1 and the second metal induction ring 3-2. The tailings slurry is evenly divided into two streams, which flow vertically downwards into the first metal induction ring 3-1 and the second metal induction ring 3-2, respectively. After passing through the metal induction rings, the slurry drips into the corresponding first charged tailings slurry tank 7-1 and second charged tailings slurry tank 7-2 for collection. During the vertical passage of the tailings slurry through the metal induction rings, electrostatic induction occurs between the rings and the slurry. The solid particles in the slurry adsorb hydrated hydrogen ions (H3O). + ) or hydroxide ions (OH-) -The two streams of tailings slurry are charged, forming a charged full tailings slurry. After passing through the first metal induction ring 3-1 and the second metal induction ring 3-2, which are connected to the positive and negative terminals of the starting power supply 2 respectively, the solid particles adsorb hydrated hydrogen ions or hydroxide ions, forming two charged full tailings slurries with opposite charges. The smaller, fine tailings particles repel each other after being charged, making them less prone to aggregation and settling. When the relative potential of the two metal induction rings is higher than the output voltage of the starting power supply 2, the starting power supply 2 is disconnected. The charging effect is self-sustaining through a positive feedback loop, requiring no continuous power supply. The output voltage of the starting power supply 2 can be 10-20kV. Specifically, the metal induction rings are arranged in pairs as a group; one or more groups can be arranged as needed, and the full tailings slurry is evenly distributed according to the number of metal induction rings.
[0063] The corresponding mixers are set up in pairs, including a first mixer 8-1 and a second mixer 8-2, which are respectively connected to the first charged tailings slurry tank 7-1 and the second charged tailings slurry tank 7-2. The first mixer 8-1 and the second mixer 8-2 are respectively connected to the positive and negative terminals of the charged power supply 6, which is a high-voltage DC power supply with an output voltage of 10-20kV. During the mixing process, the linear velocity of the mixing blades is controlled at 2-3m / s, and the mixing time is not less than 5 minutes. The mixing and shearing action breaks up the agglomerates of cementitious materials and the tailings clumps in the charged tailings slurry. At the same time, the high-voltage DC electric field applies secondary charging to the slurry, promoting the full dispersion of tailings particles and cementitious material particles.
[0064] The charged tailings slurries (with opposite electrical properties) in the charged tailings slurry tanks 7-1 and 7-2 are respectively fed into the first mixer 8-1 and the second mixer 8-2 for stirring and dispersion. No binder is added. After secondary charging, they are still charged tailings slurries. After being temporarily stored in the corresponding first charged filling intermediate bin 10-1 and second charged filling intermediate bin 10-2, they are transported by the first filling pump 11-1 and the second filling pump 11-2 to the corresponding two sets of charged filling sand bins for temporary storage. The first set includes charged filling sand bin A (9-1A) and charged filling sand bin B (9-1B) set in parallel, which are used to receive the charged filling material discharged from the first mixer 8-1. The second set includes charged filling sand bin A (9-2A) and charged filling sand bin B (9-2B) set in parallel, which are used to receive the charged filling material discharged from the second mixer 8-2. Sand bins A and B in the same group are used alternately. When one sand bin discharges and discharges material, the other sand bin continues to receive and temporarily store charged filling material, so that the two groups of sand bins can output charged full tailings slurry without interruption, realizing the continuous injection of charged full tailings slurry.
[0065] Potentiometer 12 is installed in any charged filling sand bin to collect the electrostatic potential of the slurry in the bin in real time; the output voltage of the charging power supply 6 is adjusted according to the collected potential to control the relative potential value of the charged filling material entering the charged filling sand bin, maintaining the stability of the charging state of different batches of slurry; or the discharge amount is controlled according to the collected potential. The charged tailings slurry pool, mixer, and charged filling sand bin are all lined with insulating material to ensure that the charged tailings slurry and charged filling material are insulated from the outside environment; materials between each piece of equipment and between the charged filling sand bin and the goaf area are transported through filling pipe T6-5. Filling pipe T6-5 is an insulated pipe to prevent charge discharge and maintain the stability of the slurry's charging state.
[0066] Preparation of charged fillers: See Figure 2 ,and Figure 1 The difference is that a first intermediate silo for adhesives 4-1 and a second intermediate silo for adhesives 4-2 have been added. The charged tailings slurry in charged tailings slurry tanks 7-1 and 7-2 is fed into the corresponding first mixer 8-1 and second mixer 8-2. Simultaneously, the cementitious material in the first cementitious material intermediate bin 4-1 and the second cementitious material intermediate bin 4-2 is added to the corresponding first mixer 8-1 and second mixer 8-2 according to the designed ratio, and thoroughly mixed with the charged tailings slurry. After mixing, it is used as charged filling material. It is first temporarily stored in the first charged filling material intermediate bin 10-1 and the second charged filling material intermediate bin 10-2, and then transported by the first filling pump 11-1 and the second filling pump 11-2 to the corresponding two sets of charged filling material sand bins for temporary storage, to be injected into the goaf area to form filling bodies. The two sets of charged filling material sand bins are set up as above. In this embodiment, the mass ratio of cementitious material to charged tailings slurry in the filling material is 1:4-5. The specific ratio is determined according to the strength requirements of the filling body. Conventional cementitious materials in the art can be selected for the cementitious material, which will not be described in detail.
[0067] In this embodiment, the slurry potential inside the charged filler sand chamber can be discharged via a grounded regulating switch, and the discharge amount is controllable. For example, when injecting charged tailings slurry into the goaf, discharge can be omitted to reduce the bleeding problem of charged tailings slurry; however, when injecting charged filler, discharge can be performed, with the charged filler injected at a low or zero potential, or starting at a low or zero potential and gradually increasing the potential of the injected charged filler as the liquid level rises, which can be selected according to the specific needs.
[0068] Further measures were taken regarding the collapsed area, in conjunction with... Figure 10 , Figure 11The mobile mold T8 includes a guide rail assembly and a mold body, with the lower end of the mold body slidingly engaged with the guide rail assembly. The guide rail assembly includes two parallel U-shaped rails M10 and multiple spheres M7 located within the rails. The lower ends of both sides of the mold body contact the corresponding spheres M7 within the U-shaped rails M10. The two U-shaped rails M10 are detachably connected by multiple parallel fixed beams M4. A gap is left between the spheres M7 and the U-shaped rails M10, allowing the exudate from the filling material to flow into the ground inside the mobile mold T8 through the gap and be discharged through a connected tunnel. The mold body is composed of at least one mold unit and a mold tail that are detachably connected in sequence. The cross-section of the mold unit and the mold tail are both arched. It is assembled from the top mold plate M2 and the two side mold plates M1 on both sides. The lower sections of the two side mold plates M1 are detachably connected by the bottom beam M5. The bottom beam M5 is detachably connected to the upper sections of the two side mold plates M1 by the support column M6. The outer periphery of the mold body is covered with geotextile M9. The lower end of the geotextile M9 extends to the ground and covers and shields the guide rail assembly, which can prevent the filling slurry and debris from entering the track area and prevent the sphere M7 from being obstructed from rolling.
[0069] The front end of the first module unit is equipped with a baffle M12, and an outer airbag pad M11 is provided on the outer side of the baffle M12. The outer edge of the outer airbag pad M11 extends beyond the outer edge of the baffle M12, and the lower edge of the outer airbag pad M11 extends to cover the front end of the guide rail assembly. The inflation tube M14 of the outer airbag pad M11 passes through the baffle M12 and extends to the tail of the module. The gap between the lower edge of the outer airbag pad M11 and the front end of the guide rail assembly is filled with a bottom airbag strip M15. One end of the bottom airbag strip M15 is fixed to the lower end of the baffle M12, and its inflation tube M14 extends to the tail of the module. Multiple fins M8 are provided on both sides of the top surface of the module unit. The cross-section of the fins M8 is a triangle with the tip pointing upwards, which can intercept the injected tailings slurry and make the whole tailings layer stably adhere to the surface of the module. At least two layers of semi-annular airbags M13 are arranged circumferentially on the outer side of the tail of the module, and their inflation tubes M14 extend into the tail of the module.
[0070] Combination Figure 3 , Figure 4 and Figure 14 In response to the situation where the collapse area is large and the collapsed ore fragments block the roadway, this embodiment first uses ore extraction equipment to mine and clear the collapsed ore fragments T5-1 near the T2 entrance of the roadway before mining, forming the goaf T4-3; for the collapsed ore fragments T5-1 that are far from the T2 entrance of the roadway, a moving mold-assisted filling step-by-step mining method is used, and the following steps are followed: Step ①: Combining Figure 5 and Figure 6 At least one set of goaf filling pipes T6-5 shall be opened at the top of the goaf area T4-3 above the moving formwork T8. Two pipes shall be set in each set. The two filling pipes shall be connected to two sets of charged filling sand bins with opposite electrical properties, and respectively transport charged filling materials with opposite electrical properties. The outlets of the two goaf filling pipes T6-5 shall be spaced 4-5 meters apart.
[0071] Step 2: Lay guide rail components from inside roadway T2 into goaf area T4-3, with the end of the guide rail components reaching the collapsed crushed ore to be mined; Step 3: Complete the assembly of the first mold unit on the guide rail assembly in tunnel T2 to form the mold head. The mold head and the guide rail assembly are in contact through the ball M7. The movement of the mold body along the guide rail assembly is achieved by the rolling of the ball M7. Step 4: Combining Figure 5 , Figures 8-11 The first module unit is pushed along the guide rail assembly towards the goaf area T4-3, and then the next module unit is connected in sequence until the baffle M12 of the first module unit reaches the collapsed crushed ore T5-1 to be mined. Then the tail of the module is connected to the end module unit to complete the on-site assembly of the moving module T8. At this time, the tail of the module is located in the roadway T2. Step 5: Build a partition wall T9 on the side of the semi-annular airbag M13 at the tail of the mold, near the roadway, to seal the gap between the tail of the mold and the roadway wall; leave a fixed hole for the top filling pipe T6-6 of the mold to be inserted into the goaf in the partition wall T9. Step 6: Install the top filling pipe T6-6, extending it from the top of the top plate M2 to the side of the collapsed crushed ore to be mined on the outer airbag cushion M11; slowly inject the full tailings slurry to fill the space between the outer airbag cushion M11 and the collapsed crushed ore; when the level of the injected full tailings slurry reaches the top of the moving mold, slowly pull back the top filling pipe T6-6, injecting full tailings slurry while pulling. The injection rate of full tailings slurry is 3-5 cubic meters per meter of moving mold length, until the end of the top filling pipe T6-6 reaches the junction of the mold tail and the mold body, then stop pulling, continue injecting 2-3 cubic meters of full tailings slurry, stop grouting, pull out the top filling pipe T6-6, and seal the fixing hole; Step 7: After the fixing holes are sealed tightly, inflate the outer airbag M11 to fill the gap between the baffle M12 and the collapsed crushed ore T5-1; inflate the bottom airbag strip M15 to fill the gap between the lower edge of the outer airbag M11 and the front end of the guide rail assembly; inflate the semi-annular airbag M13 to seal the gap between the tail of the mold and the surrounding rock at the tunnel entrance. Step 8: Inject charged filling material into the remaining goaf area T4-3 through the goaf filling pipeline T6-5 until the entire goaf area T4-3 is filled, forming the goaf backfill body T7-3. Figures 6-11 As shown; Figure 8 for Figure 6 Enlarged view of section A3 in the image; Figure 9 for Figure 8 DD sectional view.
[0072] Step 9: Combining Figure 6 , Figure 7After the filling material in the goaf T4-3 has reached the design strength, the mobile formwork T8 is dragged into the roadway T2, and the mobile formwork T8 is dismantled to form the formwork roadway T10. The collapsed crushed ore T5-1 near the entrance of the formwork roadway T10 is mined using ore extraction equipment. The tailings layer T7-4 in the formwork roadway T10 does not contain cementing material and has no cementing effect, so it can be stripped and transported out along with the ore extraction operation. Step 10: Due to the large size of the collapsed area (length and width dimensions greater than 10 meters), the remaining collapsed ore fragments are mined by repeating steps 1-9 above using the formwork tunnel, until all the ore fragments T5-1 in the collapsed area are mined.
[0073] For small collapse areas with a length and width of less than 10 meters, after one filling, the entire crushed ore T5-1 of the collapse area is mined by means of the support of the model roadway T10 and the collapse area filling body T7-2.
[0074] Example 2: like Figure 15 As shown, for cases where the collapse area is large and the collapsed ore pile is far from the roadway entrance, guide rail assemblies are laid from inside roadway T2 to the goaf area T4-3. The end of the guide rail assembly reaches the collapsed ore to be mined. The rest of the implementation method is the same as in Example 1.
[0075] Example 3: Combination Figure 12 A small arched cross section moving mold can be selected, that is, a moving mold assembled only by the two side mold plates M1 and without the top mold plate M2. Its assembly, pushing, filling, demolding and mining process is the same as that of Example 1, and will not be repeated here.
[0076] Example 4: Combination Figure 13 Assisted filling is achieved using columnar airbags. Due to the uncertainty of collapse, there are localized and scattered small collapsed ore piles near the larger main collapsed ore piles. Moreover, the larger main collapsed ore piles are far from the roadway entrance. If each scattered ore pile is filled with T8 moving molds, the overall mining efficiency will be significantly reduced.
[0077] For collapse zones containing both main collapsed ore piles and scattered small ore piles, the end of the U-shaped guide rail M10 assembly is laid to reach the main collapsed ore pile. Based on the distribution of scattered small collapsed ore piles near the U-shaped guide rail M10 assembly, the side plate M1 with pipe mounting hole assembly M18 is selected for assembling the moving mold T8.
[0078] The side panel M1 of the formwork has 2-3 rows of pipe installation hole assemblies M18, arranged in a layout where the number of pipe installation hole assemblies M18 gradually increases from the top row to the bottom row, with a total of 3-6 groups. Each group contains two holes arranged at the top and bottom. Each group of holes corresponds to a columnar airbag M16. One end of the columnar airbag M16 is equipped with an inflation tube and a water inlet tube. The columnar airbag M16 pierces the geotextile M9 through the inflation tube M14 and the water inlet tube M17, passes through the two holes arranged at the top and bottom, and extends into the inside of the side panel M1 of the formwork to be fixed in a horizontal position through the pipe installation hole assembly. The columnar airbag M16 is 1-2 meters long and 0.3-0.5 meters in diameter.
[0079] Based on the distance between the scattered ore pile and the U-shaped guide rail M10 assembly, columnar airbags M16 of different diameters and lengths are selected and installed outside the mold side plate M1. The inflated columnar airbags M16 and the tailings slurry trapped between the columnar airbags M16 form a channel connecting the scattered ore pile after filling.
[0080] At the start of filling, water is first injected into the columnar airbag M16 through the water inlet pipe M17. When the water volume reaches 5-15% of the volume of the columnar airbag M16, the inflation pipe M14 is switched to inflate it once. When the air pressure is 80% of the air pressure of the outer airbag pad M11, the inflation is stopped. After inflation, the end of the columnar airbag M16 reaches or approaches the scattered collapsed ore pile.
[0081] Fill the surface of the moving mold T8 and the surface of the columnar airbag M16 with the full tailings slurry. After the full tailings slurry covers the surface of the mold and all columnar airbags M16, inflate the columnar airbags M16 a second time until their air pressure is the same as that of the outer airbag pad M11.
[0082] While the columnar airbags are being inflated a second time, tailings slurry containing cementitious material is injected into the remaining empty areas of the collapsed zone until all empty areas are filled.
[0083] After the injected tailings slurry containing cementitious material solidifies to form a filling body and reaches the design strength, the air inlet pipe M14 and water inlet pipe M17 are removed from the moving formwork T8 to drain the water accumulated in the airbags. The moving formwork T8 is then pulled out and dismantled, forming a formwork tunnel. The entire tailings layer within the formwork tunnel is cleaned, and the columnar airbag M16 is pulled out. The entire tailings layer in the area of columnar airbag M16 is then cleaned, forming a channel connecting the formwork tunnel to the scattered fragmented ore piles for fragmented ore mining.
[0084] The remaining implementation methods are the same as in Example 1.
Claims
1. A mine ecological protection method based on modified filling material-moving mold coupling filling, comprising prior removal of collapsed crushed ore near the entrance of the roadway connected to the collapse zone to form a mined-out area, characterized in that, The mobile mold, consisting of the mold body and guide rail assembly, is assembled inside the roadway. The mold body is then pushed along the guide rail assembly towards the goaf area, reaching the edge of the collapsed ore pile to be mined. Modified tailings filling material is then used to fill the goaf area around the mold body. After the filling material has been cured to the design strength, the mobile mold is dismantled to form the mold roadway. The collapsed ore near the entrance of the mold roadway is then mined. The above process is repeated until all the collapsed ore in the collapsed area is mined.
2. The mine ecological protection method based on modified filling material-moving mold coupling filling as described in claim 1, characterized in that, The modified full tailings filling material includes charged full tailings slurry and charged filling material prepared by mixing charged full tailings slurry with cementitious material; first, charged full tailings slurry is injected into the goaf area until it completely covers the surface of the moving mold to form a full tailings layer, and then charged filling material is injected into the remaining goaf area until the entire goaf area is filled to form a filling body.
3. The mine ecological protection method based on modified filling material-moving mold coupling filling as described in claim 1, characterized in that, The moving mold includes a guide rail assembly and a mold body. The lower end of the mold body is slidably engaged with the guide rail assembly. The mold body is formed by at least one mold unit and a mold tail connected in a detachable manner. The front end of the first mold unit is equipped with a baffle, and an outer airbag is provided on the outside of the baffle. A semi-circular airbag is provided on the outside of the mold tail. The mobile module unit is assembled in the roadway and advanced into the goaf area until the front baffle of the first module unit reaches the edge of the collapsed ore pile.
4. The mine ecological protection method based on modified filling material-moving mold coupling filling as described in claim 3, characterized in that, The data acquisition method using the aforementioned moving module is as follows: ① Install at least one set of goaf filling pipes at the top of the goaf area above the moving formwork. Each set has two pipes. The two filling pipes are connected to two sets of charged filling sand bins with opposite electrical properties, respectively, to transport charged filling materials with opposite electrical properties. The outlets of the two goaf filling pipes are spaced 4-5 meters apart. ② Lay U-shaped guide rail components from inside the roadway to the collapsed crushed ore area to be mined, with the end of the guide rail components reaching the collapsed crushed ore area to be mined; ③ On the U-shaped guide rail assembly in the tunnel, the first section of the mold unit is assembled to form the mold head. The mold head and the U-shaped guide rail assembly are in contact through rolling elements, and the mold body moves along the U-shaped guide rail by the rolling of the rolling elements. ④ Advance the first module unit along the U-shaped guide rail assembly to the collapsed crushed ore area to be mined, and then connect the next module unit in sequence until the baffle of the first module unit reaches the collapsed crushed ore to be mined. Then connect the module tail to the end module unit to complete the on-site assembly of the moving module. The entire module tail is located in the roadway. ⑤ Build a partition wall on the side of the semi-annular airbag at the tail of the mold that is close to the roadway to seal the gap between the tail of the mold and the roadway wall; the partition wall is reserved with fixing holes for the insertion of the filling pipe at the top of the mold into the goaf. ⑥ Install the top filling pipe of the mold, extending through the top plate of the mold to the side of the collapsed crushed ore to be mined on the outer airbag cushion; slowly inject the full tailings slurry to fill the space between the outer airbag cushion and the collapsed crushed ore; when the liquid level of the injected full tailings slurry reaches the top of the moving mold, slowly pull back the top filling pipe of the mold, injecting full tailings slurry while pulling it back. The amount of full tailings slurry injected is 3-5 cubic meters per meter of moving mold length, until the end of the top filling pipe of the mold reaches the junction of the mold tail and the mold body, then stop dragging, continue to inject 2-3 cubic meters of full tailings slurry, stop grouting, pull out the top filling pipe of the mold, and seal the fixing hole; ⑦ After the fixing holes are sealed tightly, inflate the outer airbag to fill the gaps between the baffle and the ore wall, and between the baffle and the ground; inflate the bottom airbag strip to fill the gap between the lower edge of the outer airbag and the front end of the guide rail assembly; inflate the semi-circular airbag at the tail of the mold to seal the gap between the tail of the mold and the surrounding rock at the tunnel entrance, and between the tail of the mold and the partition wall. ⑧ The tailings slurry containing cementitious material is injected into the remaining goaf area through the goaf filling pipe to form a filling layer until the entire goaf area is filled. ⑨ After the filling material in the goaf area has reached the design strength, remove the partition wall on the outside of the mold tail, drag the moving mold into the roadway, remove the moving mold to form the mold roadway, and use the ore extraction equipment to mine the collapsed crushed ore near the mold roadway entrance with the help of the isolation support of the mold roadway. ⑩ Repeat steps ①-⑨ above for step-by-step mining until all collapsed ore fragments are recovered.
5. The mine ecological protection method based on modified filling material-moving mold coupling filling as described in claim 3, characterized in that, In the moving mold, the guide rail assembly includes two parallel U-shaped rails and multiple spheres located within the rails. The lower ends of both sides of the mold body are in contact with the spheres within the corresponding U-shaped rails. The two parallel U-shaped rails are detachably connected by multiple parallel fixed beams. The outer edges of the outer airbags all extend beyond the outer edges of the baffles, and the lower edge of the outer airbags extends to the front end of the cover rail assembly. The inflation tube of the outer airbags passes through the baffles and extends to the tail of the mold. The top surface of the module unit has multiple fins on both sides, and the cross-section of the fins on both sides of the top surface of the module unit is a triangle with the tip pointing upwards; at least two layers of semi-annular airbags are arranged circumferentially on the outer side of the module tail, and their inflation tubes extend into the module tail.
6. The mine ecological protection method based on modified filling material-moving mold coupling filling as described in claim 3, characterized in that, In the movable mold, the cross-section of the mold unit and the mold tail are both arched, and are assembled from the top plate and the two side plates on both sides, or directly assembled from the two side plates on both sides. The lower sections of the two side plates on both sides are detachably connected by a bottom beam, and the bottom beam is detachably connected to the upper sections of the two side plates on both sides by a support column. Columnar airbags can be installed on the outside of the side plates. Geotextile is laid all around the outer periphery of the mold body, and the lower end of the geotextile extends to the ground and covers the guide rail assembly.
7. The mine ecological protection method based on modified filling material-moving mold coupling filling as described in claim 3, characterized in that, In the moving mold, the gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly is also filled with a bottom airbag strip. One end of the bottom airbag strip is fixed to the lower end of the baffle, and its inflation tube extends to the tail of the mold. The bottom airbag strip is inflated, and after inflation, it fills the gap between the lower edge of the outer airbag pad and the front end of the guide rail assembly.
8. The mine ecological protection method based on modified filling material-moving mold coupling filling as described in claim 2, characterized in that, The method for preparing charged tailings slurry is as follows: the charged tailings slurry is collected by passing through a metal induction ring into the charged tailings slurry pool below and then sent to the corresponding charged filling sand silo for temporary storage as charged filling material, or sent to a mixer for stirring and dispersion, and then sent to the corresponding charged filling sand silo for temporary storage. The method for preparing the charged filler is as follows: the tailings slurry is passed through the metal induction ring and falls into the charged full tailings slurry pool below for collection, and then sent to a mixer to be fully mixed with the cementitious material from the intermediate cementitious material bin. After mixing, it is sent to the corresponding charged filler sand bin for temporary storage via the filling pipeline.
9. The mine ecological protection method based on modified filling material-moving mold coupling filling as described in claim 8, characterized in that, The metal induction ring includes a first metal induction ring and a second metal induction ring arranged in pairs, and the charged tailings slurry pool also includes a corresponding first charged tailings slurry pool and a second charged tailings slurry pool; the first metal induction ring and the second metal induction ring are respectively connected to the positive and negative terminals of the starting power supply; the first metal induction ring is connected to the corresponding wire of the second charged tailings slurry pool, and the second metal induction ring is connected to the corresponding wire of the first charged tailings slurry pool, forming a positive feedback loop; When the power supply is turned on, the first and second metal induction rings are energized. The tailings slurry is evenly divided into two streams, which pass through the first and second metal induction rings respectively and fall into the corresponding first and second charged tailings slurry pools below, forming charged tailings slurry. When the relative potential value of the two metal induction rings is higher than the output voltage value of the power supply, the power supply is turned off.
10. The mine ecological protection method based on modified filling material-moving mold coupling filling as described in claim 9, characterized in that, The mixer also includes a corresponding first mixer and a second mixer, and a charged power supply, which is a high-voltage DC power supply. The first mixer and the second mixer are respectively connected to the positive and negative terminals of the charged power supply; the slurry in the first mixer and the second mixer is charged a second time through the charged power supply.