Heavy load start / stop device and transfer method for a hill-mounted gravity energy storage system based on RGV trolley

By using an RGV trolley to pull heavy objects on a track, combined with cylindrical protrusions and sleeve structures, the problems of power impact and mechanical loss during the transfer of heavy objects in a mountain slope gravity energy storage system are solved, achieving stable and rapid transfer of heavy objects and efficient energy conversion.

CN123109987APending Publication Date: 2026-11-17XIAN THERMAL POWER RES INST CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611539992.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing gravity energy storage systems for mountain slopes suffer from power surges, high mechanical losses, and slow response during heavy load transfer, making it difficult to achieve stable and rapid transfer of heavy loads and effectively suppress power fluctuations.

Method used

A mountain-type gravity energy storage system based on RGV trolleys is adopted. The RGV trolley pulls the heavy object on the track. Utilizing its precise track guidance and controllable drive characteristics, the heavy object is smoothly accelerated from the initial position to the predetermined speed and stably enters the inclined working area. Combined with cylindrical protrusions and sleeve structures, the heavy object and the RGV trolley can be nested and separated, reducing system complexity and energy loss.

Benefits of technology

It improves the start-up stability and operating efficiency of heavy load transfer, reduces the complexity of the system and energy loss, ensures the safety and efficiency of the heavy load transfer process, and adapts to the rapid adjustment needs of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109987A_ABST
    Figure CN123109987A_ABST
Patent Text Reader

Abstract

This invention discloses a heavy-load start-stop device and transfer method for a hill-mounted gravity energy storage system based on an RGV (Remotely Reinforced Vehicle) trolley, relating to the field of gravity energy storage. This invention aims to solve the problems in existing hill-mounted gravity energy storage technologies regarding the starting and stopping of heavy loads from a stationary state in the storage area to the slope working area, and the transfer and parking of heavy loads after leaving the slope working area back to the storage area. The invention includes: establishing a heavy-load start-stop device for a hill-mounted gravity energy storage system based on an RGV trolley. The RGV trolley pulls the heavy load of the gravity energy storage system at a rated speed, utilizing its precise track guidance and controllable drive characteristics to achieve smooth acceleration of the heavy load from its initial position to a predetermined speed and stable entry into the slope working area. This invention, through the RGV trolley control device and closed-loop control strategy, significantly improves the start-up stability and operating efficiency of heavy load transfer, reduces energy loss, and provides technical support for the large-scale application of hill-mounted gravity energy storage systems.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of gravity energy storage technology, specifically relating to a heavy object start-stop device and transfer method for a mountain-type gravity energy storage system based on an RGV (rail-guided vehicle). Background Technology

[0002] Against the backdrop of the global energy transition towards renewable energy, the large-scale grid connection of intermittent power sources such as wind and solar power poses a severe challenge to the stable operation of the power system. Energy storage technology, especially large-scale, long-duration, and highly secure physical energy storage technology, has become a key infrastructure supporting the new power system.

[0003] Gravity energy storage, as an emerging physical energy storage method, achieves efficient conversion between electrical energy and gravitational potential energy by lifting and lowering heavy objects. It boasts advantages such as environmental friendliness, long lifespan, and adjustable capacity, attracting widespread attention. Among these, hillside gravity energy storage systems, built using natural terrain, effectively utilize geographical elevation differences, demonstrating enormous application potential. A typical hillside gravity energy storage system consists of storage areas at the top and bottom of the slope, an inclined track connecting the two locations, transport vehicles, and a drive / generation system. Its core technology lies in achieving efficient and stable transfer of heavy objects between the horizontal storage area and the inclined working track.

[0004] Currently, there are three main technical solutions for heavy object transfer: the gantry crane solution uses lifting equipment to handle heavy objects, which is technically mature but has low operational efficiency; the continuous conveyor chain solution achieves continuous operation through a closed-loop conveying system, but the system structure is complex and maintenance requirements are high; and the push-rod trolley solution adopts a modular design, which is flexible but requires strict control precision. Existing technical solutions generally suffer from the following problems during operation: First, power surges occur during the starting and braking of heavy objects, affecting the power grid's power quality; second, mechanical losses during transfer reduce the overall system efficiency; and finally, the complex transfer process leads to slow system response, making it difficult to meet the grid's rapid adjustment needs.

[0005] Therefore, there is an urgent need to develop a new technical solution that can achieve stable and rapid transfer of heavy objects, effectively suppress power fluctuations, and improve system response speed, so as to promote the practical application of mountain slope gravity energy storage technology. Summary of the Invention

[0006] To address the problems existing in the prior art, this invention establishes a heavy object start-stop device for a mountain-type gravity energy storage system based on an RGV trolley. The RGV trolley pulls the heavy object of the gravity energy storage system at a rated speed, and utilizes its precise track guidance and controllable drive characteristics to achieve smooth acceleration of the heavy object from the initial position to the predetermined speed and stable entry into the slope working area.

[0007] To achieve the above objectives, the present invention adopts the following technical solution: The heavy object start-stop device for a mountain-type gravity energy storage system based on RGV trolleys includes: a heavy object, an RGV trolley, and a power generation and energy storage device; the heavy object is transported by the RGV trolley; the power generation and energy storage device includes a lower storage area, a slope working area, a two-vehicle handover area, and an upper storage area arranged sequentially from bottom to top; a single track of the power generation and energy storage device contains four RGV trolleys; the upper storage area contains two RGV trolleys; and the lower storage area contains two RGV trolleys.

[0008] A further improvement of the present invention is that, when transporting heavy objects, the RGV trolleys cooperate with each other, so that each RGV trolley is limited to moving between the upper storage area and the lower storage area.

[0009] A further improvement of the present invention is that the bottom of the weight is provided with a cylindrical protrusion structure.

[0010] A further improvement of the present invention is that the cylindrical protrusion structure is a fixed structure.

[0011] A further improvement of the present invention is that the top of the RGV trolley is provided with a cylindrical sleeve structure, a control switch and a signal receiving device; the cylindrical sleeve structure is nested with the cylindrical protrusion structure and can open and close perpendicular to the track direction; the control switch is used to control the opening and closing of the cylindrical sleeve structure; the signal receiving device is used to receive control signals, control the opening and closing of the cylindrical sleeve structure and realize trolley control and speed adjustment.

[0012] A method for transferring heavy objects using a RGV (RGV vehicle) trolley-based gravity energy storage system's start-stop device, comprising the following stages: Start-up stage: S11: One RGV trolley is responsible for transferring the heavy object from the storage area to the handover area between the two RGV trolleys, and then returning to the storage area to transfer the next heavy object; S12: Another RGV trolley is responsible for accelerating the heavy object from the handover area between the two RGV trolleys to a predetermined speed and smoothly entering the slope working area, and then returning to the handover area between the two RGV trolleys to accelerate the next heavy object; Stop-stop stage: S21: One RGV trolley is responsible for transferring the heavy object from the slope working area to the handover area between the two RGV trolleys, and then returning to the slope working area to transfer the next heavy object; S22: Another RGV trolley is responsible for smoothly transferring the heavy object from the handover area between the two RGV trolleys to the storage area, and then returning to the handover area between the two RGV trolleys to transfer the next heavy object.

[0013] A further improvement of the present invention is that, in step S11: before transferring the heavy object, the RGV trolley control switch is kept in the off state, and the cylindrical sleeve structure is in the open state; when transferring the heavy object, the RGV trolley runs along the track, and when it reaches directly under the heavy object, the cylindrical protrusion structure presses the control switch, the control switch turns to the open state, and controls the cylindrical sleeve structure to be in the closed state, thus achieving nesting with the cylindrical protrusion structure.

[0014] A further improvement of the present invention is that, in step S11: before unloading the heavy object, the RGV trolley control switch remains in the open state, the cylindrical sleeve structure is in the closed state, and it remains nested with the cylindrical protrusion structure; when unloading the heavy object, the signal receiving device receives a control signal, the cylindrical sleeve structure opens, disengages from the nested state with the cylindrical protrusion structure, the RGV trolley moves away from under the heavy object, and the control switch returns to the closed state.

[0015] A further improvement of the present invention is that, in step S21: before transferring the heavy object, the RGV trolley control switch is kept in the off state, and the cylindrical sleeve structure is in the open state; when transferring the heavy object, the RGV trolley is stationary at a predetermined position on the track, and the heavy object moves smoothly down the track at a predetermined speed. When the cylindrical protrusion structure presses the control switch, the control switch turns to the open state, controlling the cylindrical sleeve structure to close quickly and achieve nesting with the cylindrical protrusion structure.

[0016] A further improvement of the present invention is that, in step S21: before unloading the heavy object, the RGV trolley control switch remains in the open state, the cylindrical sleeve structure is in the closed state, and it remains nested with the cylindrical protrusion structure; when unloading the heavy object, the signal receiving device receives a control signal, the cylindrical sleeve structure opens, disengages from the nested state with the cylindrical protrusion structure, the RGV trolley moves away from under the heavy object, and the control switch returns to the closed state.

[0017] Compared with the prior art, the present invention has at least the following beneficial technical effects: The present invention proposes a heavy object start-stop device and transfer method for a mountain-type gravity energy storage system based on an RGV trolley. By using an RGV trolley to pull the heavy object of the gravity energy storage system at a rated speed, the heavy object can be smoothly accelerated from the initial position to the predetermined speed and stably enter the slope working area, thereby improving the start-up stability of the heavy object transfer.

[0018] Furthermore, during operation, the RGV trolley control module, speed regulation unit, and position synchronization monitoring device work together to achieve closed-loop control of the RGV trolley, ensuring the safety and efficiency of the traction process.

[0019] Furthermore, the device includes a connecting cylinder for the heavy object and a connecting sleeve for the RGV trolley. When the heavy object is transported from the storage area to the inclined working area, the heavy object and the RGV trolley can be connected by nesting the connecting cylinder and the connecting sleeve. When the heavy object is smoothly accelerated to the predetermined speed and enters the inclined working area stably, the connecting cylinder and the connecting sleeve can automatically separate, thereby realizing the automatic separation of the heavy object and the RGV trolley.

[0020] Furthermore, each track in this device contains four RGV trolleys, two for the upper storage area and two for the lower storage area. Through the cooperation between the RGV trolleys, each RGV trolley is limited to moving between two areas, which reduces the complexity of the system and energy consumption, and improves the operating efficiency of heavy object transfer. Attached Figure Description

[0021] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0022] Figure 1 This is a schematic diagram of a heavy object transfer method for a mountain-type gravity energy storage system based on an RGV trolley, as described in this invention. Figure 2 This is a structural diagram of a heavy object start-stop device for a mountain-type gravity energy storage system based on an RGV vehicle, as described in this invention. Figure 3 This is a detailed schematic diagram of the RGV vehicle described in this invention; Figure 4 This is a detailed drawing of the weight-bearing device described in this invention; Figure 5 This is a schematic diagram of the nested state of the RGV trolley and the heavy object device described in this invention; Figure 6 This is a schematic diagram of the closed-loop strategy for the RGV trolley transporting heavy objects according to the present invention.

[0023] Explanation of reference numerals in the attached figures: 1. RGV trolley; 2. Heavy object; 3. Upper storage area; 4. Lower storage area; 5. Inclined working area; 6. Handover area between two vehicles; 7. Control switch; 8. Signal receiving device; 9. Cylindrical sleeve structure; 10. Cylindrical protrusion structure. Detailed Implementation

[0024] In the following description, only certain exemplary embodiments are briefly described. As those skilled in the art will recognize, the described embodiments can be modified in various ways without departing from the spirit or scope of the invention. Therefore, the drawings and description are considered to be exemplary in nature and not restrictive.

[0025] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," and "circumferential" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0026] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified.

[0027] In this invention, unless otherwise explicitly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a communication connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this invention according to the specific circumstances.

[0028] In this invention, unless otherwise explicitly specified and limited, "above" or "below" the second feature can include direct contact between the first and second features, or contact between the first and second features through another feature between them. Furthermore, "above," "over," and "on top" of the second feature includes the first feature being directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature includes the first feature being directly above or diagonally above the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.

[0029] It should be understood that, when used in this specification and the appended claims, the terms "comprising" and "including" indicate the presence of the described features, integrals, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integrals, steps, operations, elements, components and / or collections thereof.

[0030] It should also be understood that the terminology used in this specification is for the purpose of describing particular embodiments only and is not intended to limit the invention. As used in this specification and the appended claims, the singular forms “a,” “an,” and “the” are intended to include the plural forms unless the context clearly indicates otherwise.

[0031] It should also be further understood that the term "and / or" as used in this specification and the appended claims refers to any combination of one or more of the associated listed items and all possible combinations, and includes such combinations.

[0032] The accompanying drawings illustrate various structural schematic diagrams according to embodiments disclosed in this invention. These drawings are not to scale, and some details have been enlarged for clarity, and some details may have been omitted. The shapes of the various regions and layers shown in the drawings, as well as their relative sizes and positional relationships, are merely exemplary and may deviate from reality due to manufacturing tolerances or technical limitations. Furthermore, those skilled in the art can design regions / layers with different shapes, sizes, and relative positions as needed.

[0033] The embodiments of the present invention will now be described in detail with reference to the accompanying drawings.

[0034] Example 1 like Figure 1 As shown, the heavy object start-stop device for the mountain-type gravity energy storage system based on the RGV trolley provided by the present invention includes: a heavy object 2, an RGV trolley 1, and a power generation and energy storage device. The heavy object 2 is transferred by the RGV trolley 1; The power generation and energy storage device includes a lower storage area 4, a slope working area 5, a two-vehicle handover area 6, and an upper storage area 3 arranged sequentially from bottom to top; The single track of the power generation and energy storage device includes four RGV trolleys 1; The upper storage area 3 includes two RGV trolleys 1; The lower storage area 4 contains two RGV trolleys 1.

[0035] like Figure 4 As shown, the bottom of the weight 2 is provided with a cylindrical protrusion structure 10, which is a fixed structure.

[0036] like Figure 3 , Figure 4 and Figure 5 As shown, the top of the RGV trolley 1 is provided with a cylindrical sleeve structure 9, a control switch 7, and a signal receiving device 8; The cylindrical sleeve structure 9 is nested with the cylindrical protrusion structure 10 and can open and close perpendicular to the track direction; The control switch 7 is used to control the opening and closing of the cylindrical sleeve structure 9; The signal receiving device 8 is used to receive control signals, control the opening and closing of the cylindrical sleeve structure 9, and realize the control and speed adjustment of the trolley 1.

[0037] like Figure 1 and Figure 6 As shown, the present invention provides a method for transferring heavy objects in a mountain-type gravity energy storage system based on an RGV trolley, the method comprising the following stages: Start-up phase: S11: An RGV trolley 1 is responsible for transferring heavy object 2 from the storage area to the two-vehicle handover area 6, and then returning to the storage area to transfer the next heavy object 2; S12: Another RGV trolley 1 is responsible for accelerating the heavy object 2 from the handover area 6 between the two vehicles to the predetermined speed and smoothly entering the ramp work area 5, and then returning to the handover area 6 between the two vehicles to accelerate the next heavy object 2; Stopping phase: S21: An RGV trolley 1 is responsible for transferring the heavy object 2 from the ramp work area 5 to the two-vehicle handover area 6, and then returning to the ramp work area 5 to transfer the next heavy object 2. S22: Another RGV trolley 1 is responsible for smoothly transferring the heavy object 2 from the two-vehicle handover area 6 to the storage area, and then returning to the two-vehicle handover area 6 to transfer the next heavy object 2.

[0038] In step S11: Before transferring the heavy object 2, the RGV trolley 1 control switch 7 is kept in the off state, and the cylindrical sleeve structure 9 is in the open state; When transporting the heavy object 2, the RGV trolley 1 runs along the track. When it reaches directly below the heavy object 2, the cylindrical protrusion structure 10 presses the control switch 7, and the control switch 7 turns to the open state, controlling the cylindrical sleeve structure 9 to be in the closed state, thus achieving nesting with the cylindrical protrusion structure 10.

[0039] Before unloading the heavy object 2, the RGV trolley 1 keeps the control switch 7 in the open state, the cylindrical sleeve structure 9 is in the closed state, and it is nested with the cylindrical protrusion structure 10.

[0040] When unloading the heavy object 2, the signal receiving device 8 receives the control signal, the cylindrical sleeve structure 9 opens and disengages from the nested state of the cylindrical protrusion structure 10, the RGV trolley 1 moves away from under the heavy object 2, and the control switch 7 returns to the off state.

[0041] In step S21: Before transferring the heavy object 2, the RGV trolley 1 control switch 7 is kept in the off state, and the cylindrical sleeve structure 9 is in the open state; When transporting heavy object 2, the RGV trolley 1 is stationary at a predetermined position on the track. The heavy object 2 descends smoothly along the track at a predetermined speed. When it reaches the cylindrical protrusion structure 10 and presses the control switch 7, the control switch 7 turns to the open state, controlling the cylindrical sleeve structure 9 to close quickly and nest with the cylindrical protrusion structure 10.

[0042] Before unloading the heavy object 2, the RGV trolley 1 keeps the control switch 7 in the open state, the cylindrical sleeve structure 9 is in the closed state, and it is nested with the cylindrical protrusion structure 10.

[0043] When unloading the heavy object 2, the signal receiving device 8 receives the control signal, the cylindrical sleeve structure 9 opens and disengages from the nested state of the cylindrical protrusion structure 10, the RGV trolley 1 moves away from under the heavy object 2, and the control switch 7 returns to the off state.

[0044] Example 2 like Figure 1 As shown, the present invention provides a method for transferring heavy objects in a mountain-type gravity energy storage system based on an RGV trolley, the method comprising the following stages: Start-up phase: S11: One RGV trolley is responsible for transferring the heavy object from the storage area to the handover area between the two vehicles, and then returning to the storage area to transfer the next heavy object; S12: Another RGV trolley is responsible for accelerating the heavy object from the handover area between the two vehicles to the predetermined speed and smoothly entering the ramp working area, and then returning to the handover area between the two vehicles to accelerate the next heavy object. Stopping phase: S21: One RGV trolley is responsible for transferring the heavy object from the ramp work area to the two-vehicle handover area, and then returning to the ramp work area to transfer the next heavy object; S22: Another RGV trolley is responsible for smoothly transferring the heavy object from the two-vehicle handover area to the storage area, and then returning to the two-vehicle handover area to transfer the next heavy object.

[0045] The mountain-type gravity energy storage system based on RGV trolley has a heavy object start-stop device including: a heavy object 2, an RGV trolley 1, and a power generation and energy storage device; The power generation and energy storage device includes an upper storage area 3, a lower storage area 4, a ramp working area 5, and a two-vehicle handover area 6. Each track of the power generation and energy storage device contains four RGV trolleys 1, two in the upper storage area and two in the lower storage area. When transporting heavy objects 2, the RGV trolleys 1 cooperate with each other, so that each RGV trolley 1 is limited to moving between the upper storage area 3 and the lower storage area 4, which reduces the complexity of the system and energy loss, and improves the operating efficiency of transporting heavy objects 2.

[0046] The heavy object 2 is transferred by the RGV trolley 1; The bottom of the weight 2 is provided with a cylindrical protrusion structure 10; the cylindrical protrusion structure 10 is a fixed structure.

[0047] The RGV trolley 1 is equipped with a control switch 7 and a controllable movable cylindrical sleeve structure 9 on its top. The cylindrical sleeve structure 9 and the cylindrical protrusion structure 10 of the load can be nested together and can move along the vertical track direction, thereby realizing the nesting and separation of the trolley 1 and the load 2. The cylindrical sleeve structure 9 is controlled by the control switch 7. When the control switch 7 is open, the cylindrical sleeve structure 9 is closed, achieving nesting with the cylindrical protrusion structure 10. The RGV trolley 1 is equipped with a signal receiving device 8 on its top. The signal receiving device 8 receives control signals and controls the cylindrical sleeve structure 9 to open, disengaging from the nested state with the cylindrical protrusion structure 10. This enables the RGV trolley 1 to operate using a closed-loop control strategy, ensuring the safety and efficiency of the traction process.

[0048] Before the RGV trolley 1 transfers the heavy object 2, the cylindrical sleeve structure 9 is kept open. When transferring the heavy object 2, the trolley 1 runs along the track, and the control switch 7 is pressed by the cylindrical protrusion structure 10, which controls the cylindrical sleeve structure 9 to close, thus achieving nesting with the cylindrical protrusion structure 10.

[0049] Before unloading the heavy object 2, the RGV trolley 1 keeps the cylindrical sleeve structure 9 closed; when unloading the heavy object 2, the signal receiving device 8 receives the control signal and controls the cylindrical sleeve structure 9 to open, disengage from the cylindrical protrusion structure 10, and the RGV trolley 1 moves away from under the heavy object 2, and the control switch 7 returns to the closed state.

[0050] When the RGV trolley 1 is pulling the heavy object 2, it maintains the rated speed, which can make the heavy object 2 accelerate smoothly from the initial position to the predetermined speed and enter the inclined working area 5 stably, thus improving the starting stability of the transfer of the heavy object 2.

[0051] Example 3 This embodiment uses a mountain-type gravity energy storage system with a rated power generation of 1MW and a total energy storage capacity of 3MWh as an example. The energy storage and release slope working area 5 is constructed based on a natural mountain, with a slope set at 30° and a vertical height difference of 120m between the high and low potential energy levels. Geometric calculations show that the total length of the inclined side of the track in the slope working area 5 is approximately 240m. The system is equipped with 100 high-density energy storage weights 2, each weighing 65t. Under rated operating conditions, five weights 2 are simultaneously positioned on the traction chain within the slope working area 5, generating electricity by gravity. The remaining weights 2 are statically stored in the upper storage area 3 (high potential energy level) and the lower storage area 4 (low potential energy level), awaiting dispatch and connection.

[0052] In this embodiment, the ramp power generation section and the horizontal RGV transfer section are clearly spatially divided. The ramp section adopts a traditional chain traction mode; while between the storage areas at the upper and lower ends and the two ends of the chain, four RGV transport trolleys 1 with independent load-bearing capacity are deployed, denoted as trolley a, trolley b, trolley c, and trolley d, forming an independent horizontal relay transfer system. The transfer trolley system does not enter the ramp, but only runs on the horizontal track, specifically responsible for the horizontal relay of heavy objects between the storage area and the connection points at both ends of the chain.

[0053] Under the above parameters, the total weight of the chain and the load 2 is: At this moment, the constant driving force of gravity along the inclined plane is... After deducting the rolling friction between the chain and the guide rail, as well as air resistance at low speeds, the net force required for the chain system to maintain a constant downward speed is approximately 1.57MN. To achieve a rated power output of 1MW, the rated physical operating speed of the entire system during actual continuous operation is: .

[0054] Based on this speed, the approximate time it takes for each piece of weight 2 to travel from the top mounting point to the bottom unhooking point along the 240-meter slope using the chain to pull the weight 2 is:

[0055] Five weights 2 are evenly distributed within the inclined working area 5, with a physical distance of 48m between them. Therefore, a new weight 2 must be added to the top mounting point of the chain every 75 seconds to maintain the continuous operation of the chain.

[0056] In the horizontal areas available at both ends of the actual mountain terrain, the effective transport distance from the loading point in the storage area to the chain junction is set to approximately 50m. The rated full-load operating speed of the four RGV trolleys 1 is set to 1.5m / s, and the unloaded return speed is set to 2.0m / s.

[0057] Located at the far end of the upper storage area 3, trolley A first automatically loads a 65t load 2, then travels at a speed of 1.5m / s to the upper chain handover area 50m away. This 50m transport distance takes approximately 33s. Upon reaching the handover area 6, trolley B approaches trolley A and physically transfers the load 2 during its journey. This handover process requires no stopping and takes approximately 10s. Subsequently, trolley B smoothly pushes the load 2 to the chain mounting point, completing the docking between the load and the chain traction component. After delivery, trolley A immediately leaves the handover area 6 and returns to the upper storage area 3 at high speed in an empty state, with the return process taking approximately 25s. Therefore, trolley A completes a full physical closed loop of outbound loading, horizontal transport, handover, and empty return in only approximately 68s. Meanwhile, the cycle time of trolley b is slightly shorter than that of trolley a, giving the entire horizontal transfer system more leeway and enabling it to better match the supply rhythm at the chain end.

[0058] The same applies to the bottom of the chain. After the heavy object 2 reaches the bottom unhooking position along the ramp, the waiting trolley c at the bottom picks up the heavy object 2 at the same speed, completes the 50m transport, and hands the heavy object 2 over to trolley d, which then sends it into the lower storage area 4 for storage. After unloading, trolley c also returns quickly to the receiving point in an empty state, ready to receive the next heavy object 2 sliding down.

[0059] Furthermore, the 68 seconds required for the transfer system to complete one full cycle is less than the 75 seconds required for the chain to consume one weight 2. This means that the transfer system can deliver the next weight 2 to the chain mounting point approximately 7 seconds ahead of schedule each time, ensuring that the chain is always in a state of sufficient material preparation during long-term operation and reducing the engineering risk of chain interruption and shutdown due to material supply delays.

[0060] Therefore, it can be seen that the present invention achieves effective decoupling between the horizontal junction area and the long-distance slope potential energy conversion area in terms of physical structure, which reduces mechanical fatigue loss while ensuring the continuous and stable operation of the power generation chain, and has good comprehensive engineering applicability and promotion prospects.

[0061] The foregoing has shown and described the basic principles, main features, and advantages of the present invention. It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above, and that the invention can be implemented in other specific forms without departing from its spirit or essential characteristics. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description. Thus, all variations falling within the meaning and scope of equivalents of the claims are intended to be included within the scope of the invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

[0062] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can be appropriately combined to form other embodiments that can be understood by those skilled in the art. The above content is only for illustrating the technical concept of the present invention and should not be construed as limiting the scope of protection of the present invention. Any modifications made based on the technical concept proposed in this invention shall fall within the scope of protection of the claims of this invention.

Claims

1. A heavy-load start-stop device for a mountain-type gravity energy storage system based on an RGV trolley, characterized in that, include: Heavy object (2), RGV trolley (1) and power generation and energy storage device; The heavy object (2) is transported by the RGV trolley (1); The power generation and energy storage device includes a lower storage area (4), a slope working area (5), a two-vehicle handover area (6), and an upper storage area (3) arranged sequentially from bottom to top. The single track of the power generation and energy storage device includes four RGV trolleys (1). The upper storage area (3) contains two RGV trolleys (1); The lower storage area (4) contains two RGV trolleys (1).

2. The heavy-load start-stop device for a mountain-type gravity energy storage system based on an RGV vehicle according to claim 1, characterized in that, When transporting heavy objects (2), the RGV trolleys (1) cooperate with each other so that each RGV trolley (1) is limited to moving between the upper storage area (3) and the lower storage area (4).

3. The heavy-load start-stop device for a mountain-type gravity energy storage system based on an RGV vehicle according to claim 1, characterized in that, The bottom of the weight (2) is provided with a cylindrical protrusion structure (10).

4. The heavy-load start-stop device for the mountain-type gravity energy storage system based on an RGV vehicle according to claim 3, characterized in that, The cylindrical protrusion structure (10) is a fixed structure.

5. The heavy-load start-stop device for a mountain-type gravity energy storage system based on an RGV vehicle according to claim 3, characterized in that, The RGV trolley (1) is equipped with a cylindrical sleeve structure (9), a control switch (7) and a signal receiving device (8) on its top. The cylindrical sleeve structure (9) is nested with the cylindrical protrusion structure (10) and can open and close perpendicular to the track direction; The control switch (7) is used to control the opening and closing of the cylindrical sleeve structure (9); The signal receiving device (8) is used to receive control signals, control the opening and closing of the cylindrical sleeve structure (9), and realize the control and speed adjustment of the trolley (1).

6. The method for transferring the heavy object start-stop device of the mountain-type gravity energy storage system based on an RGV trolley as described in claim 5, characterized in that, The method includes the following stages: Start-up phase: S11: An RGV trolley (1) is responsible for transferring heavy objects (2) from the storage area to the two-vehicle handover area (6), and then returning to the storage area to transfer the next heavy object (2). S12: Another RGV trolley (1) is responsible for accelerating the heavy object (2) from the two-vehicle handover area (6) to the predetermined speed and smoothly entering the ramp work area (5), and then returning to the two-vehicle handover area (6) to accelerate the next heavy object (2). Stopping phase: S21: An RGV trolley (1) is responsible for transferring the heavy object (2) from the ramp work area (5) to the two-vehicle handover area (6), and then returning to the ramp work area (5) to transfer the next heavy object (2); S22: Another RGV trolley (1) is responsible for smoothly transferring the heavy object (2) from the two-vehicle handover area (6) to the storage area, and then returning to the two-vehicle handover area (6) to transfer the next heavy object (2).

7. The method for transferring heavy objects in the mountain-type gravity energy storage system based on an RGV trolley according to claim 6, characterized in that, In step S11: Before transferring the heavy object (2), the RGV trolley (1) control switch (7) is kept in the closed state, and the cylindrical sleeve structure (9) is in the open state; When transporting heavy objects (2), the RGV trolley (1) runs along the track. When it reaches directly below the heavy objects (2), the cylindrical protrusion structure (10) presses the control switch (7), and the control switch (7) turns to the open state, controlling the cylindrical sleeve structure (9) to the closed state, and nesting with the cylindrical protrusion structure (10).

8. The method for transferring the heavy object start-stop device of the mountain-type gravity energy storage system based on an RGV trolley according to claim 7, characterized in that, In step S11: Before unloading the heavy object (2), the RGV trolley (1) control switch (7) is kept in the open state, the cylindrical sleeve structure (9) is in the closed state, and it is nested with the cylindrical protrusion structure (10); When unloading the heavy object (2), the signal receiving device (8) receives the control signal, the cylindrical sleeve structure (9) opens and disengages from the nested state of the cylindrical protrusion structure (10), the RGV trolley (1) moves away from under the heavy object (2), and the control switch (7) returns to the off state.

9. The method for transferring heavy objects in the mountain-type gravity energy storage system based on an RGV trolley according to claim 6, characterized in that, In step S21: Before transferring the heavy object (2), the RGV trolley (1) control switch (7) is kept in the closed state, and the cylindrical sleeve structure (9) is in the open state; When transporting heavy objects (2), the RGV trolley (1) is stationary at a predetermined position on the track. The heavy objects (2) descend smoothly along the track at a predetermined speed. When the cylindrical protrusion structure (10) presses the control switch (7), the control switch (7) turns to the open state, controlling the cylindrical sleeve structure (9) to close quickly and nest with the cylindrical protrusion structure (10).

10. The method for transferring heavy objects in the mountain-type gravity energy storage system based on an RGV trolley according to claim 9, characterized in that, In step S21: Before unloading the heavy object (2), the RGV trolley (1) control switch (7) is kept in the open state, the cylindrical sleeve structure (9) is in the closed state, and it is nested with the cylindrical protrusion structure (10); When unloading the heavy object (2), the signal receiving device (8) receives the control signal, the cylindrical sleeve structure (9) opens and disengages from the nested state of the cylindrical protrusion structure (10), the RGV trolley (1) moves away from under the heavy object (2), and the control switch (7) returns to the off state.